1 629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District Functional Servicing and Stormwater Management Report June

2

3 Executive Summary This Functional Servicing and Stormwater Management Report (FSSR) has been prepared in support of the Re-Zoning Application being submitted for the subject lands generally bounded by Eastern Avenue to the north and Lake Shore Boulevard to the south, between Pape Avenue and Larchmount Avenue. The site is surrounded by residential development to the north; a two-storey film studio complex to the east; a number of commercial and industrial buildings to the south (other side of Lake Shore Boulevard); and a Subaru dealership and Diamond Towing company to the west. The proposed development integrates new office, hotel and retail/service uses with the existing Toronto Film Studios buildings which will be retained. This report demonstrates that the proposed development can be serviced through the utilization of both existing and new infrastructure, without any adverse impact to the municipal services of the surrounding areas or the existing studio buildings. Water supply and fire flow requirements for the proposed development will be provided from service connections feeding off the existing 300mm diameter watermain located on Eastern Avenue. Fire flow looping through an additional connection to the existing 300mm diameter watermain on Lake Shore Boulevard is provisional upon confirmation of a water flow test that the watermain on Eastern Avenue does not provide adequate fire flows. Flow and pressure tests are scheduled to be conducted on both watermains in the summer of 2013 to confirm if there is adequate capacity in the existing water distribution system to accommodate the proposed development for fire and non-fire demands. Post-development stormwater runoff collected from the new development portion of the subject site will be controlled on-site, stored via a combination of subsurface storage systems, and released to the municipal storm sewer system at controlled release rates. Storm runoff directed overland to the right-of-ways of the proposed private driveways and service lanes will be captured by the roadway catchbasins and directed to either the 1050mm diameter storm sewer west of the site or to the mm diameter storm sewer located on Lake Shore Boulevard, via the proposed internal storm sewer system. The proposed development will also be subject to the City s Wet Weather Flow guidelines for water balance and water quality control. Stormwater flows from major rainfall events exceeding the 100-year event will be conveyed overland to the adjacent municipal road allowances, and will ultimately outlet to the West Don River. Under the proposed development scenario, the sanitary peak flows for the site were determined to be approximately 15.4 litres per second. The existing sanitary flows peak rate of 13.1 litres per second. This flow increase is considered negligible as it will only be over a short 3.0m section of relatively steep sewer before discharging to the City of Toronto s 1680mm diameter Low Level Interceptor trunk sewer. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

4 The subject development is proposed to also include an internal driveway and service lane network. These proposed right-of-ways will have pavement widths of 7.0m and 10.0m respectively. Respectfully Submitted, The Sernas Group (A GHD Company) Shawn Huynh Rick Tranquada, P.Eng., M.B.A. Project Coordinator Regional Manager, Community Development JL/SH/er GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

5 Table of Contents 1. Purpose Background Investigation of Existing Utilities on Site Certificate of Property Use Servicing Requirements Watermains Stormwater Management Sanitary Sewers Proposed Road Network Figure Index Figure 2-1 Key Plan...3 Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Fire Protection Computations Pre-development Drainage Plan Stormwater Management Calculations Sanitary Flow Calculations Reduced Proposed Site Plan Topographic / Boundary Survey Plan Certificate of Property Use GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

6

7 1. Purpose This Functional Servicing and Stormwater Management Report has been prepared in support of the Re-Zoning Application being submitted for the subject lands. The purpose of this report is to address conceptually the provision of site grading, storm and sanitary sewers, stormwater management (SWM), water distribution, and road servicing for the proposed commercial development. Additionally, the report will provide details on stormwater management in response to Toronto s Wet Weather Flow Management Master Plan Guidelines. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

8 2. Background The subject site is located south of Eastern Avenue and north of Lake Shore Boulevard, on the lands municipally known as 629, 633, and 675 Eastern Avenue, in the City of Toronto-Toronto East York District. The subject lands are bounded by Eastern Avenue to the north, existing commercial properties to the east and west, and Lake Shore Boulevard to the south. The westerly portion of the site is presently occupied and used by Toronto Film Studios. Several buildings occupy this portion of the site, and surfaces are generally paved. The easterly portion of the site is presently vacant but was formally occupied by the A.R. Clarke Tannery, which manufactured patent leather until According to old photographs, a large portion of the site was once covered with several buildings and pavement. Currently, only one building remains and the rest of the site is covered with a mixture of gravel and grass/overgrowth. A key plan indicating the site location has been provided as Figure 1.0 below. Storm runoff from the western portion of the site is captured by internal catchbasins, and directed to an existing 1050mm diameter storm sewer system along the western boundary of the site during minor storm events. The eastern portion of the site generally relied upon ground infiltration and several site catchbasins connecting to a combined sanitary/storm sewer to accommodate minor storm events. Eastern Avenue adjacent to the site is a typical urban street with curbs on both sides. The south boulevard is approximately 3.5m wide and contains a sidewalk located adjacent the curb. The north curb of the west-bound lane of Lake Shore Boulevard is located approximately 25m from the property boundary. This boulevard currently contains a 4m wide asphalt path, as well as a 1.5m wide concrete sidewalk. The proposed redevelopment will retain most of the existing buildings on the western portion and will incorporate six new buildings throughout the rest of the site. Where possible, existing building and boundary grades are maintained to avoid radical grade differences between the redeveloped site and the surrounding area. A copy of the proposed site plan is attached in Appendix E. 2 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

9 Figure 2.1 Key Plan *Source: Google Maps 2.1 Investigation of Existing Utilities on Site The following action was undertaken to ascertain the presence and location of possible utilities: City records were retrieved which showed storm sewer, sanitary, and watermain locations. The topographic survey identified manhole locations for the storm and sanitary sewer, and generally confirmed the existence and extent of these sewers. A detailed survey of the existing internal services in the Toronto Film Studios portion of the site which is to be retained, will be completed in order to establish a comprehensive servicing system. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

10 2.2 Certificate of Property Use The site is subject to a Certificate of Property Use (CPU) issued by the Ministry of the Environment to address Risk Management Measures (RMM) associated with a Risk Assessment conducted for the entire property. A copy of the Certificate of Property Use is included in Appendix F for reference. The RMM outlines a number of required measures to be implemented to ensure the property is suitable for the intended land use. As such, development of this site will undertake the necessary processes at the appropriate time in order to meet the requirements of the RMM. 4 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

11 3. Servicing Requirements 3.1 Watermains There is an existing 300mm diameter watermain located on Eastern Avenue and an existing 300mm watermain on the south boulevard of Lake Shore Boulevard. The location and size of the existing watermains in the surroundings of the subject lands have been determined from information obtained from the City of Toronto and topographic surveys. As mentioned in Section 2.1 above, the existing internal services will be surveyed and a servicing strategy between the existing and proposed portions of the site will be determined. At present, we are outlining requirements for hydrant fire-flow tests surrounding the site and will provide further details once results become available. Domestic Demand The City s Design Criteria for Sewers and Watermain, November 2009 (herein referred to as the City s Design Manual), does not define a specific method for determining domestic industrial water demand. As the development contains more than one building higher than a single storey, we have applied the City s multi-unit demand rate of 191 litres/capita/day as found in the City s Design Manual. Using an equivalent population density of 80 persons per hectare of floor-space, and a total on-site floor-space of 113,519m2 (11.4 ha), an equivalent population of 910 persons is calculated. Average Day = 191 litres/capita/day x 910 persons = litres/min Maximum Day = 1.10 x Average Day = litres/min Peak Hour = 0.90 x Average Day = litres/min Fire Demand Based on the provided site plan, it is assumed that all new buildings will have protected openings (as defined by the Fire Underwriters Survey) and sprinkler systems. It is also assumed that all new buildings will be constructed of fire resistive material. Existing buildings are assumed to be constructed using conventional non-combustible materials and methods and are therefore not considered fire-resistive. Further, existing buildings are assumed to not have a fire suppression/sprinkler system installed. Given the above, the estimated fire flow required is given by the following formula (as based on the Fire Underwriters Survey): F = 220 * C * A^0.5 For a building with non-combustible construction, C = 0.8. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

12 A is taken as the area of the largest floor plus 25% of each of the two immediately adjoining floors. Based on the current site plan, the worst case fire flow is generated by Existing Building 11, with an Area = 4,221 m2. Therefore F = 11,440 litres/min. As this building is a number of years old and was used as a film studio stage, it can be surmised that construction consists of limited fire resistive material, therefore fire flow can be reduced by 15%. Thus F = 9,720 litres/min. Finally, the fire flow will be increased by 75% due to exposure to structures within 45 metres of Building 20. Thus, F = 16,370 litres/min. Fire Flow Demand calculations for each building can be found in Appendix A at the back of this report. Total Demand The total demand is the greater of Maximum Day Domestic Demand plus the Fire Demand or the Peak Hour Demand. Thus, the total demand for the site is approximately 16,370 litres per minute. To confirm that the existing system is adequate to meet the fire flow requirements for the proposed development, flow and pressure tests will be scheduled in the Spring of Connections to the proposed development will be provided from the existing 300mm diameter Eastern Avenue watermain and the existing 300mm diameter watermain on Lake Shore Blvd. The site will be serviced with two separate internal systems to meet fire and domestic requirements. The proposed 200mm looped watermain system providing fire demand will be connected at the intersections of Pape Avenue and Eastern Avenue, and the future southwest driveway from Lake Shore Boulevard including double-check valve chambers at each location. The latter connection is provisional upon confirmation (via a water flow test) of adequate flows from Eastern Avenue. Should it be determined that Eastern Avenue can provide the necessary flows for fire demand, the connection to Lake Shore Boulevard would not be required. The proposed 150mm watermain providing domestic demand will be connected at Winifred Avenue and Eastern Avenue. Fire hydrants will be placed to provide fire protection throughout the site. 6 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

13 Per the City s requirements, a water meter inside an underground chamber will be located at the connection for the domestic watermain. The exact size and location of the aforementioned connections and internal watermain are shown on our Functional Servicing Plan (Drawing FSP-1). 3.2 Stormwater Management Existing Conditions An existing 1050mm diameter storm sewer on the adjacent property west of the proposed development runs from Eastern Avenue to Lake Shore Boulevard and services the western portion of the existing site. It is our understanding from City staff that this 1050mm diameter storm sewer typically runs at capacity under minor storm events, and is approximately one-third full during dry-weather conditions. Given that the subject lands are approximately m above the level of the lake, it can be inferred that this pipe naturally receives backflow from Lake Ontario. In addition to the 1050mm storm sewer, there is a minor local system on Eastern Avenue that primarily provides drainage for the road, and two systems along Lake Shore Boulevard (one along the west-bound lanes and one along the east-bound lanes), which flow toward the west. The pipes in the westbound lane range in size from 525mm dia. to 900mm dia., which indicates they have been sized to accommodate lands beyond the road right-of-way. This sewer system continues west to Carlaw Avenue, where it connects to a 2550x1800 box pipe trunk storm sewer that outlets directly to Lake Ontario, just south of Commissioner Street. Finally there is a 2750mm diameter trunk storm sewer along an easement within the east boundary of the site. According to City staff, this is a trunk very deep sewer that operates as a combined sewer overflow and storage system during high flows, and is eventually pumped back into the lake as flows subside. This trunk sewer runs directly to the Lake Ontario shoreline just south of Commissioner Street. The sizes and locations of all of existing storm sewers in the vicinity of the subject lands have been determined from information provided by the City of Toronto, including plan/profile records drawings, and topographic survey. As previously discussed, the site was originally occupied by industrial buildings and pavement. As such, the pre-development conditions for the subject site consist mainly of rooftop areas and paved areas (with very little to no landscaping) with some overgrowth. Under pre-development conditions, the majority of storm runoff from the site was captured by internal catchbasins, and directed to the aforementioned 1050mm diameter storm sewer and a combined sanitary/storm sewer on Lake Shore Boulevard during minor storm events. Storm flows from major storms events were conveyed overland to both the Lake Shore Boulevard and Eastern Avenue road allowances, where flows were eventually conveyed to Lake Ontario. The subject lands are within a TRCA designated floodplain. The TRCA defines flooding areas based on the 1:350 year storm event. The TRCA floodplain program has determined that the site lands are subject to the Don River Special Policy Area (SPA), with a flooding elevation of 77.70m. New buildings constructed within the subject lands GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

14 will be flood protected according to the Don River SPA by having all entrances and windows at least 0.30m above the flood elevation. Given the pre-development land use, 100-year pre-development storm flows for the site were determined to be approximately L/s (NW area), L/s (South area) and L/s (SW area) respectively (based on a runoff coefficient of 0.90). The predevelopment drainage plan is included in Appendix B. Stormwater Management Criteria The total site area is 7.48 hectares of which only 5.30 hectares is intended to be developed. The balance of the site consisting of 2.18 hectares (Existing Buildings 2,10 to 15, plus parking) will remain in its current state. As such, our SWM strategy is based on 5.30 hectares of redeveloped land. Based on City of Toronto s Wet Weather Flow Management Guidelines (WWFMG), the applicable SWM criteria are as follows: a) Contributing Area The area of 5.30 hectares associated with the redeveloped portion of the site, recognizing that 2.18 hectares of the site is existing and will be retained as part of the overall development, this area is excluded from the Wet Weather Flow Management calculations and results found in this FSSR. b) Water Quantity The 100-year post-development storm flows from the subject lands are to be controlled to the allowable release rate that is based on the lesser of the 2-year predevelopment flow, the 2-year rainfall event based on a composite runoff coefficient of 0.50, or the capacity of the receiving sewer. c) Water Balance On-site runoff retention from a 5mm, 24 hour storm event. d) Water Quality 80% removal of total suspended solids (TSS) on an average annual loading basis. e) Erosion & Sediment Control During Construction Temporary erosion and sediment control is to be implemented on-site during construction. f) Discharge Criteria to Municipal Infrastructure 8 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

15 Discharge the minor flow to the 2-year design storm event using the Rational Method / IDF Curves, or at the capacity of the sewer whichever is less. Proposed Conditions Water Quantity Based on our grading design and stormwater management concept for the proposed development, overland flow for the site is divided into three (3) major drainage areas. The Northwest portion of the site outlets to Eastern Avenue via the proposed driveway at the intersection of Winifred Avenue and Eastern Avenue; the Southwest portion of the site outlets to Lake Shore Boulevard via the proposed driveway west of Building 07; and the rest site drains towards the South, and outlets to Lake Shore Boulevard via the proposed driveway east Building 07. Separating the site into three catchment areas was required given the need to match into the existing flat lands of the surrounding area, the requirement to match existing building elevations that will be retained on-site, and the need to tie into existing sewers. Given the proposed site plan for the subject development, post-development runoff rates were calculated for the 100-year rainfall event as follows (modelling results for each area are presented in Appendix C ): a) Northwest Drainage Area 19,800 m 2 Our calculations were based on the following: Proposed rooftop areas comprised of controlled rooftop drainage and Green Roof tops where allowed for by the City s Green Roof By-Law 492. For this major drainage area, two new buildings will be constructed, allowing for a total of 978 m 2 of Green Roof space, 3,911 m 2 of controlled roof flow, and uncontrolled existing roof flow of 1200 m 2. An impervious / paved area of approximately 13,711 m 2. Given the above, the 100-year post development flow for the site was determined to be approximately L/s. A storage volume of approximately 506 m 3 will be required to attenuate the post-development flow for this drainage area. This storage volume will be provided through the implementation of a subsurface impermeable (to prevent infiltration from the shallow groundwater table) storage system, the details of which will be established at the time of detailed design during the Site Plan Approval process. b) South Drainage Area 25,918 m 2 Our calculations were based on the following: Proposed rooftop areas comprised of controlled rooftop drainage and Green Roof tops where allowed for by the City s Green Roof By-Law 492. For this major drainage area, GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

16 three new buildings will be constructed, allowing for a total of 1,163 m 2 of Green Roof space and 10,955 m 2 of controlled roof flow. An impervious / paved area of approximately 13,800 m 2. Given the above, the 100-year post development flow for the site was determined to be approximately L/s. A storage volume of approximately 373 m 3 will be required to attenuate the post-development flow for this drainage area. This storage volume will be provided through the implementation of a subsurface impermeable (to prevent infiltration from the shallow groundwater table) storage system, the details of which will be discussed further at the time of detailed design during the Site Plan Approval stage. c) Southwest Drainage Area 7,300 m 2 Our calculations were based on the following: Proposed rooftop areas comprised of controlled rooftop drainage and Green Roof tops where allowed for by the City s Green Roof By-Law 492. For this major drainage area, one new building will be constructed, allowing for a total of 1,000 m 2 of Green Roof space and 4,000 m 2 of controlled roof flow. An impervious / paved area of approximately 2,300 m 2. Given the above, the 100-year post development flow for the site was determined to be approximately L/s. A storage volume of approximately 41 m 3 will be required to attenuate the post-development flow for this drainage area. This storage volume will be provided through the implementation of a subsurface impermeable (to prevent infiltration from the shallow groundwater table) storage system, the details of which will be discussed further at the time of detailed design during the Site Plan Approval stage. Water Balance The objective of the water balance target is to preserve pre-development hydrology through the combination of various SWM practices. According to the City s Wet Weather Flood Management Guidelines (WWFMG) guidelines the subject lands must be able to retain all the runoff from a small design rainfall event on site. The City defines a 5mm, 24-hour storm event as a small design rainfall event and is used for this calculation. This runoff must be retained through infiltration, evapotranspiration or rainwater reuse. Given a site area of 53,000 m 2 for the development, a 5mm, 24-hour storm is equivalent to approximately 265 m 3 of total site storage (53,000 m 2 x 0.005m). Under the City of Toronto stormwater management criteria and in accordance with the City s WWFMG, methods to enhance infiltration are to be implemented where possible. A few issues arise that affect the ability to implement on-site infiltration of runoff. The first issue is a shallow groundwater table. The existing groundwater table is approximately 0.5 m below 10 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

17 the existing surface therefore ground infiltration is very limited. The second issue is the presence of contaminated soils and groundwater on site. On this basis, we believe the City s Water Balance requirements for Wet Weather Flow by any infiltration techniques will be difficult to meet but will be reviewed in detail during detailed design stage. Rainwater harvesting whereby runoff is collected and stored for later use in irrigation is another option that was considered, however the proposed development has limited landscaping area, therefore rainwater harvesting methods would not be an economical solution. Other techniques such as grey-water collection/reuse and Green Roof retention for evapotranspiration are also viable options which can be examined further at the time of detailed design during the Site Plan Approval application stage of the project. Water Quality There are a number of Stormwater Management Practices (SWMPs) available to meet the various aspects of water quality control. However, site characteristics and the nature of the development will determine the applicability and possible usage of many of the different SWMPs. The stormwater management approach endorsed by the Ministry of the Environment (MOE) is to preserve the natural hydrologic cycle. As discussed in the March 2003 MOE manual, the establishment of water quality criteria in the absence of a subwatershed study will have a certain degree of subjectivity. The level of protection is selected such that the existing aquatic habitat is maintained or enhanced. The levels of protection identified in the manual are given as Basic, Normal, and Enhanced, where a watercourse requiring Basic protection has less stringent control requirements than one requiring Normal protection. However, the strategy acknowledges that individual development plans cannot explicitly address cumulative effects. Stormwater management measures are to be assessed in the following order: 1) stormwater lot level controls, 2) stormwater conveyance controls, and 3) end-of-pipe stormwater management facilities. Lot level controls would include such measures as: rainwater leaders discharging to infiltration areas; rainwater leaders discharging to a subsurface soakaway pits; reducing grassed site grading to a minimum of 0.5%; separate foundation drains and routing of storm runoff along grassed swales. Conveyance controls would include perforated storm sewers, pervious catchbasins, and grassed swales. The selection of conveyance control is very much dependent on municipal requirements. It must be an acceptable form of servicing for a municipality and the municipality must be willing to implement and maintain these controls. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

18 End-of-pipe facilities receive water from the conveyance system and discharges the water to the receiving system. The March 2003 MOE Stormwater Management Planning and Design (SWMPD) Manual includes nine categories of end-of-pipe facilities as follows; wet ponds, wetlands, dry ponds, infiltration basins, infiltration trenches, filter strips, buffer strips, sand filters, and oil/grit separators. Physical factors such as topography, soil stratification, depth to bedrock, depth to water table and drainage areas are factors to be assessed in determining SWMP type. The manual indicates that the selection and design of an end-of-pipe system in the absence of a subwatershed plan is driven by receiving water concerns. The selection of the appropriate water quality measure is based on four factors, namely: - physical suitability; - conformity with development plan; - cost; - technical effectiveness As defined by the March 2003 SWMPD Manual and as required by the City of Toronto s Wet Weather Flow Management Master Plan (WWFMMP) Guidelines, an Enhanced level of water quality control must be achieved for the subject site. As previously noted, under the post-development conditions, the majority of the site will consist of rooftop areas and paved areas, with minimal landscaped areas. As such, it is likely that specific on-site water quality control measures will be required for this development to achieve the City of Toronto s requirement for 80% TSS removal. Oil/Grit Separators will be sized based on the calculated contributing flows and installed at all three discharge points to meet the TSS targets. Erosion and Sediment Control Erosion and sediment control will be provided on-site during construction, including silt fence around the site perimeter, silt sacks on the external catchbasins adjacent to the site and a mud mat at the access point of the site to control mud tracking by construction traffic. Regular maintenance of the erosion / sediment control measures above will be implemented throughout the duration of construction. Discharge Criteria to Municipal Infrastructure The allowable release rates for the subject lands were calculated to be L/s (NW area); L/s (South area); and L/s (SW area); which are based on the 2-year predevelopment rainfall event at a composite runoff coefficient of 0.50 for the subject lands. Our calculations are presented in Appendix C. As per the Flood Flow Management (FFM) criteria mandated by Toronto and Region Conservation Authority (TRCA), the 100-year post-development flows should be attenuated to the 2-year pre-development flow of approximately L/s (NW area), L/s (South 12 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

19 area) and L/s (SW area) respectively. Our calculations are presented in Appendix C. Based on the above, the Discharge Criteria to Municipal Infrastructure criteria represents a more conservative approach for the Northwest and Southwest discharges to the existing 1050mm storm sewer adjacent to the west side of the site; the 100-year post-development to 2-year pre-development flow governs in the case of the South discharge point to the existing 900mm storm sewer on Lake Shore Boulevard. As such, these criteria will govern the SWM design. Summary of Proposed Storm Servicing Post-development storm flows from the site have been split into three (3) separate areas (Refer to Drawing EDP-1). Minor Flows are directed to either the existing 1050mm storm sewer immediately west of the subject lands or to the existing storm sewer on Lake Shore Boulevard. These flows converge at an existing 2550x1800 box culvert storm trunk sewer that discharges to Lake Ontario at Ashbridges Bay. The size and location of the proposed internal storm sewer and associated servicing connections are shown on our Functional Servicing Plan (Drawing FSP-1). Note that the new storm sewers, connections and appurtenances will be watertight to prevent surcharging from the shallow groundwater table and to mitigate potential contamination of storm flows. Calculations for the three catchment areas can be found in Appendix C. In summary: The 100-year post-development flow for the Northwest Drainage Area was determined to be approximately L/s. A corresponding storage volume of approximately 506 m 3 will be required to control the 100-year post-development flow to the allowable level. The 100-year post-development flow for the Southern Drainage Area was determined to be approximately L/s. A corresponding storage volume of approximately 373 m 3 will be required to control the 100-year post-development flow to the allowable level. The 100-year post-development flow for the Southwest Drainage Area was determined to be approximately L/s. A corresponding storage volume of approximately 41 m 3 will be required to control the 100-year post-development flow to the allowable level. It should be noted the aforementioned storage volumes will be accommodated via an impermeable subsurface storage system, which will prevent infiltration from the shallow groundwater table. The details of this subsurface storage system will be discussed further at the time of detailed design during the Site Plan Approval stage. This report provides preliminary sizing and configuration details only. As previously discussed in the Water Balance discussion, given that post-development conditions will include mostly rooftop areas, paved areas and existing site conditions, on-site infiltration is not feasible. Therefore it is likely that the provision of on-site water quality control measures will also be required for the proposed development to achieve 80% TSS removal as outlined in the WWFMMP. Oil/grit separators installed at each discharge location, downstream of each storage tank, will achieve the required TSS requirements. GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

20 Site grading is to be such that storm flows greater than the 2-year rainfall event will be directed overland away from proposed buildings to the adjacent road allowances, and will ultimately drain to the West Don River. Existing drainage patterns on the adjacent properties will not be altered and stormwater runoff from the subject development will not be permitted to drain onto adjacent properties. Details of the proposed stormwater management measures will be outlined in a separate Stage-2 Stormwater Management Implementation Report to be prepared at the time of detailed design during the Site Plan Approval stage of the project. 3.3 Sanitary Sewers Existing Conditions According to drawings obtained from the City, a 300mm dia. local sanitary sewer exists on Eastern Avenue, approximately 2.5 m to 3.0 m below the road surface. This local sewer connects to a 1680 mm diameter sanitary trunk sewer (Toronto s Low Level Interceptor Sewer, or LLI) interceptor pipe at Caroline Avenue. The LLI is located underneath the westbound lane of Eastern Avenue. In addition to providing service for the buildings fronting Eastern Avenue, the local sewer also conveys the sewage from the local systems on Pape Avenue, Winnifred Avenue and Caroline Avenue to the Lower level interceptor. In addition to the above, a 300mm dia. sanitary sewer also exists under the northerly portion of the west-bound lane of Lake Shore Boulevard east of Larchmount Avenue. It slopes down toward the east and is at a depth of 2.5 to 3.0m below the road. The size and location of the existing sanitary sewers in the vicinity of the subject lands have been determined from information obtained from the City of Toronto, including plan/profile records drawings and topographic surveys. As mentioned in Section 2.1 above, the existing internal services will be surveyed and a servicing strategy between the existing and proposed portions of the site will be determined. Flows generated by the existing site are based on the following City of Toronto Design Criteria for Sewers and Watermain, dated November 2009: An industrial generation rate of 250 litres/person/day An equivalent population density of 136 persons/hectare. Peak generation factor of 3.80 based on the Harmon Peaking Factor equation An infiltration rate of 0.26 litres/second/hectare Given a site area of 7.48 hectares, a Peak Hour Sanitary flow of 13.1 L/s is calculated. Our calculations are provided in Appendix D. 14 GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report 13029

21 Proposed Sanitary Servicing Contributing sanitary flows from the proposed development were calculated based on land and floor usage criteria defined by City of Toronto s Equivalent Population Density and Infiltration Rates. In summary: A commercial generation rate of 250 litres/person/day An equivalent population of 1.1 persons / 100m 2 of floor space for commercial. Total retail floor area of 113,519 m 2. Peak generation factor of 3.70 based on the Harmon Peaking Factor equation An infiltration rate of 0.26 litres/second/hectare. Given the above, a total Peak Hour Flow of 15.4 L/s is calculated. Calculations can be found in Appendix D. The proposed servicing design includes a new sewer connection the existing local sanitary system on Eastern Avenue at Caroline Avenue. Despite the flow increase relative to existing conditions, the existing receiving pipe on Eastern Avenue is 3.0m in length with a slope of approximately 17%. This translates to a negligible flow increase before discharging into the City of Toronto s 1680mm dia. Low Level Interceptor (LLI) trunk sanitary main within Eastern Avenue. The proposed internal sanitary sewer and proposed sanitary servicing connections are shown on our Functional Servicing Plan (Drawing FSP-1). Note that the new sanitary sewers, connections and appurtenances will be watertight to prevent surcharging from the shallow groundwater table. Construction of an impermeable sewer will ensure that the existing shallow groundwater table is not contaminated by raw sanitary sewage. In accordance with City of Toronto standards, backflow preventers will be provided for the proposed sanitary service connections. 3.4 Proposed Road Network The proposed development site includes a mix of private driveways and private service lanes. Driveways will have pavement widths ranging from 8.5m to 10.0m and service lanes will have 7.0m wide pavement. Concrete curb and gutter will be used to separate the paved areas from pedestrian and landscape areas. Site access is provided at four locations along Eastern Avenue, generally aligning with Pape Avenue, Winnifred Avenue, Caroline Avenue and Larchmount Avenue, and three locations along Lake Shore Boulevard GHD 629, 633 and 675 Eastern Avenue, City of Toronto Toronto & East York District Functional Servicing Report

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto

89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto 89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit

More information

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace

STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace City of Toronto Toronto & North York District Prepared For: Oxford Properties Group 130 Adelaide Street

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN

SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Preliminary Servicing & Stormwater Management Report

Preliminary Servicing & Stormwater Management Report Prepared By: Hart Subdivision, City of Guelph Preliminary Servicing & Stormwater Management Report GMBP File: 112-155 May 22, 2015 GUELPH OW EN SOUND LISTOW EL KITCHENER EXETER HAMILTON GTA 650 W OODLAW

More information

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO

SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT

PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT High Park Bayview Inc. c/o GWL Realty Advisors Inc. GRENADIER SQUARE DEVELOPMENT CITY OF TORONTO PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT LEA PROJECT #: 9114 NOV.2012 (REV. NOV. 2013) www.lea.ca

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual

Anglian Water Services Limited. Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited i towards sustainable water stewardship Sustainable drainage systems (SUDS) adoption manual Anglian Water Services Limited 1 Tomorrow s forecast is more frequent, more violent

More information

Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario

Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario 258 SUNVIEW STREET Functional Servicing and Storm Water Management Report Project Location: 258 Sunview Street Waterloo, Ontario Prepared for: 258 Sunview Inc. 815 Bridge Street West Waterloo, ON N2V 2M7

More information

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission

Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission GolfNorth Properties 400 Golf Course Road Conestoga, ON N0B1N0 R.J. Burnside & Associates Limited 6990 Creditview

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario. Stormwater Management Design Brief Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario Prepared For: 1319 Kanata Tires & Rims June 30, 2015 Report No: FS-15-013-REP.02 Stormwater

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines

Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines Site Grading, Erosion Control, Servicing & Stormwater Management Guidelines SECTION 41 DEVELOPMENT AGREEMENTS (Site Plans) Development & Technical Services Engineering Development Division Revised April

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT Proposed Residential and Commercial Development AT 177 Cross Avenue Town of Oakville Prepared for Salmona Tregunno Inc. Jun 18, 2012 REVISIONS 1 st

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Toronto s Wet Weather Flow Master Plan

Toronto s Wet Weather Flow Master Plan Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Stormwater Credit Open House Q&A

Stormwater Credit Open House Q&A Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

Technical and Engineering Guidelines for Stormwater Management Submissions

Technical and Engineering Guidelines for Stormwater Management Submissions Technical and Engineering Guidelines for Stormwater Management Submissions Prepared By: Ganaraska Region Conservation Authority This page is intentionally left blank CONTENTS PAGE 1 Introduction 1 1.1

More information

STAFF REPORT TO COMMITTEE OF THE WHOLE

STAFF REPORT TO COMMITTEE OF THE WHOLE STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Downspout to storm sewer. Leaky laterals

Downspout to storm sewer. Leaky laterals Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT

More information

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE

ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

City of West Linn Public Works Design Standards 2010. Table of Contents

City of West Linn Public Works Design Standards 2010. Table of Contents City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy

City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy City of London South Street and Wellington Street Storm / Sanitary / Water Servicing Strategy Prepared by: AECOM 410 250 York Street, Citi Plaza 519 673 0510 tel London, ON, Canada N6A 6K2 519 673 5975

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Stormwater Design Guidelines Frequently Asked Questions:

Stormwater Design Guidelines Frequently Asked Questions: 525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

DECISION/DIRECTION NOTE

DECISION/DIRECTION NOTE DECISION/DIRECTION NOTE Title: Proposed rezoning new residential zone PDE file MPA1500006 150 Stavanger Drive Date Prepared: April 12, 2016 Report To: Chair and Members, Planning and Development Committee

More information

CONTENT COPY OF ORIGINAL

CONTENT COPY OF ORIGINAL Ministry of the Environment Ministère de l Environnement Access Self Storage Inc. 100 Canadian Road Toronto, Ontario M1R 4Z5 AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 8701-9A4QC7 Issue Date: August

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

CHAPTER 7 STORM WATER DESIGN

CHAPTER 7 STORM WATER DESIGN CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS CHAPTER 7 STORM WATER DESIGN TABLE OF CONTENTS Section Page 7.01 GENERAL...4 (A) INTENT... 4 (B) STORM WATER AND GREENWAYS MASTER PLANS... 4 (C) REFERENCE

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE

12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE 12-O-1761 AN ORDINANCE TO AMEND VARIOUS SECTIONS OF CHAPTER 74, ARTICLE X OF THE CITY OF ATLANTA CODE OF ORDINANCES FOR THE PURPOSE OF PROMOTING GREEN

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

4.3 Cisterns and Rain Barrels

4.3 Cisterns and Rain Barrels 4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding.

To prevent increased stormwater runoff entering Council s drainage system and causing overloading of the system that in turn might cause flooding. Background & Issues To provide guidelines and requirements for Developers, the Community and the Shire s Planning and Sustainability officers for connection to the Shire s Stormwater Drainage Disposal

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004

SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 SUSTAINABLE DRAINAGE IN LEEDS Supplementary Guidance No. 22 JULY 2004 BACKGROUND This guidance provides information for developers on the use of sustainable drainage techniques in new developments. It

More information

SUBDIVISION REQUIREMENTS SECTION 2 - DESIGN REQUIREMENTS INDEX

SUBDIVISION REQUIREMENTS SECTION 2 - DESIGN REQUIREMENTS INDEX SUBDIVISION REQUIREMENTS SECTION 2 - DESIGN REQUIREMENTS INDEX Page 2.00 INTRODUCTION... 1 2.01 STORM DRAINAGE... 2 2.01.01 Storm Sewer Design... 2 2.01.01.01 Run-off Calculations... 2 2.01.01.02 Storm

More information

Engineering Department

Engineering Department Engineering Department Site Plan Review Application 1025 31st St SE PO Box 5006 Minot, ND 58702 engineers@minotnd.org (701) 857-4100 Contact Information Developer/Property Owner Address City State Zip

More information

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems

Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems STAFF REPORT ACTION REQUIRED Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems Date: September 6, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information