Chapter 2 Spatial Portrait

Size: px
Start display at page:

Download "Chapter 2 Spatial Portrait"

Transcription

1 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the meeting, our suggested further detailed comments are set out below. Chapter 2 Spatial Portrait Lytham and St Annes Key Characteristics 1) We suggest paragraph 2.19 includes some minor additional wording which further explains the fact that a number of watercourses in the area discharge to the combined sewerage system. This is unusual and helps explain the circumstances of the area and the need to ensure that the discharge of surface water from development sites is fully considered in advance of determination of applications for planning permission to ensure the most sustainable approach to surface water management is investigated and secured. Implications for the local plan 2) Paragraph 2.24 refers to the need to phase development throughout the plan period to allow for the provision of infrastructure. It specifically refers to such as increased capacity of the combined sewer system. Whilst it may be necessary to co-ordinate the delivery of development with increased capacity of our infrastructure, we understand there are other factors which have driven any phasing of development within the development plan. In this context we think it would be most appropriate to delete the reference to the combined sewer system at this point of the plan. Blackpool Periphery Key Characteristics 3) We suggest paragraph 2.46 is amended to state: There are surface water issues in the vicinity of junction 4 of the M55, which mean that development in this area will need to carefully consider the approach to surface water management. The most sustainable form of managing the surface water from the site will be expected to be investigated and confirmed as part of any planning application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run off rate.

2 The preference will be for no surface water to discharge to the public sewer, directly or indirectly, if more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Chapter 4 Strategic Objectives Introduction 4) Should Authority Monitoring Report state Annual Monitoring Report at paragraph 4.2? Chapter 6: The Spatial Development Framework Policy SD1 The Spatial Development Framework Justification 5) Paragraph 6.32 states: Whilst the Blackpool Periphery has some wastewater issues (meaning development will need to be phased towards the end of the plan period) there is good access to the primary services in the Blackpool sub-regional centre. Although Warton currently performs the role of a Local Service Centre, utilising the potential for development on previously developed land at BAE Systems, the establishment of the Enterprise Zone, the prospect of improved road access to a new junction 2 of the M55 and the proximity to wastewater treatment facilities, means that this is a sustainable location for new development. As stated above, we understand there are other factors which have contributed to the phasing of development within the development plan. In this context we think it would be most appropriate to delete the specific reference to the wastewater issues being a specific factor which is referenced in policy as determining the need to phase development in this location towards the end of the plan period. As for all development in the borough, it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate on greenfield sites and surface water betterment on brownfield sites. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of development with the delivery of infrastructure. What you said 6) Paragraph 6.40 considers what was said in response to option 5. It states Option 5 (focus on Blackpool Periphery, along with Lytham St Annes) had the potential to take pressure off rural areas. However, the point was made that the area has drainage problems and infrastructure and services would need to be addressed in a timely and co-ordinated manner for this option to be deliverable. We note the specific reference to drainage problems. As is clear from the above comments, please be aware that various parts of the borough have a drainage challenge. The need to co-ordinate the delivery of development with drainage infrastructure would need to be considered having regarding to the detail of the circumstances of each development proposal. For example, the redevelopment of a brownfield site could result in an improved drainage situation through surface water betterment.

3 Chapter 7: Strategic Locations for Development Policy SL1 Lytham and St Annes Strategic Location for Development Infrastructure requirements 7) Paragraph 7.8 states: Infrastructure capacity for wastewater and water supply is limited for the following sites: Land at Queensway; Land West of North Houses Lane; and Land North of Moss Hall Lane. Infrastructure capacity for water supply is limited for the Former EDS site, Heyhouses Lane. There is, therefore, a requirement for investment to meet demand and/or to reduce consumption elsewhere in order to deliver these sites. Given that planning permission already exists for the development of the EDS site and Land at Queensway, we do not think it is necessary to refer to the issues in respect of these sites. We suggest the following amendment. For Land West of North Houses Lane; and Land North of Moss Hall Lane, it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. West of North Houses Lane, St Annes (site H2) 8) We suggest paragraph 7.22 is amended as follows: The site cannot be developed until after the implementation of the M55 to St Annes link road, which is scheduled for completion in It will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. North of Moss Hall Lane, St Annes (site H3) 9) We suggest paragraph 7.25 should be amended as follows: The site cannot be developed until after the implementation of the M55 to St Annes link road, which is scheduled for completion in It will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure.

4 Policy SL2 The Blackpool Periphery Strategic Location for Development Infrastructure Requirements 10) We suggest paragraph 7.31 is amended as follows: Given the strategic nature of the development proposed at Whyndyke Farm, Land East of Cropper Road and Blackpool International Airport, it may be necessary to invest in water supply infrastructure. 11) We suggest paragraph 7.32 is amended as follows. In relation to Wyndyke Farm, no surface water should discharge to the public sewerage system. This is in accordance with the recent application submission which has confirmed that surface water will discharge to a watercourse which does not subsequently connect with the combined sewerage system. The discharge to watercourse should be attenuated to greenfield run off rate and incorporate sustainable urban drainage principles. Given the size of this site and the fact that it is likely to be constructed by a number of developers over many years, it will be necessary to ensure a co-ordinated and holistic approach to the delivery of all infrastructure during the whole lifetime of the construction process. It will also be necessary to ensure that there is an appropriate maintenance and management regime for the surface water management measures as part of any development proposal. We also suggest the following additional paragraph in relation to land east of Cropper Road. With regards land east of Cropper Road, it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Whyndyke Farm (site M2) 12) We suggest paragraph 7.42 is amended as follows. Development of this site will need to be co-ordinated with the road improvements to junction 4 of the M55 Motorway. Land East of Cropper Road (site M1) 13) We suggest paragraph 7.44 is amended as follows. It will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure.

5 Policy SL3 Warton Strategic Location for Development Infrastructure Requirements 14) We suggest paragraph 7.52 is amended as follows: For all these sites it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Land north of Warton (site H9) 15) We suggest paragraph 7.62 is amended as follows: For this site it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Land west of Warton (site H8) 16) Paragraph 7.64 states: Due to the scale of development proposed at Warton, it is not anticipated that all the sites could be developed concurrently. One issue is that of traffic congestion. A new link road (the Preston Western Distributor) providing access to a new junction 2 of the M55 will contribute towards alleviating such congestion and this is due to be completed in Also, wastewater infrastructure in the Warton area will need to be upgraded to deliver this site. This indicates that this site should be phased for commencement after the other two sites in the Warton Strategic Location for Development have started and after the new link road has been completed. It is therefore anticipated that development could start on this site in 2021 and be completed by In accordance with our earlier comments, we suggest this paragraph could be amended along the following lines although in this case we are mindful of the references to other infrastructure in the existing paragraph which may need to be taken account of in any amended paragraph. For this site it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation SuDS. This would be to greenfield run-off rate for greenfield areas of the site. For any brownfield areas, there will be an expectation to secure surface water betterment against the existing rate of surface water discharge. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure.

6 Policy S4 Kirkham and Wesham Strategic Location for Development Infrastructure Requirements 17) We suggest paragraphs 7.71 and 7.72 are amended as follows: For these sites, it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. In addition, it may be necessary to invest in water supply infrastructure. Land north of Dowbridge, Kirkham (site H7) 18) We suggest paragraph 7.81 is amended as follows: In terms of wastewater infrastructure, this site is likely to have less impact on infrastructure improvements than other sites in Kirkham and Wesham. However this can only be confirmed once greater detail is known. For this site it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Land North of Blackpool Road, Kirkham (site M3) 19) We suggest paragraph 7.86 is amended as follows: For this site it will be necessary to secure the most sustainable approach to surface water management and this should be investigated and confirmed as part of any application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be to greenfield run-off rate. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, where more sustainable alternatives are available. Subject to the detail of the drainage proposals and the nature of the mixed uses, it may be necessary to co-ordinate the delivery of the development with the delivery of infrastructure. Chapter 8: General Development Policies Policy GD1 Settlement Boundaries Justification 20) We suggest the 7 th bullet point of paragraph 8.3 should be amended as follows.

7 In addition the following matters will be taken into consideration: Whether the proposals present the most sustainable form of managing surface water from the site. This will be expected to be investigated and confirmed as part of any planning application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, if more sustainable alternatives are available. Policy GD4 Large Developed Sites in the Countryside Context 21) We suggest paragraph 8.14 should be amended as follows. There are a number of large developed sites in the countryside or Green Belt areas within Fylde, such as Weeton Camp and Kirkham Prison. Whether they are redundant or in continuing use, the complete or partial redevelopment of these sites may provide opportunities for environmental improvements and local employment in the rural areas. The Council encourages such proposals, subject to the provisions of Policy GD4 and other relevant policies in the Local Plan. Applicants should be aware that redevelopment proposals in these locations can place different pressure on infrastructure. It will be necessary to consider the impact of any redevelopment proposal on infrastructure as part of an application submission. It may be necessary to co-ordinate the delivery of development with the delivery of infrastructure. Chapter 9: The Fylde Economy Policy EC2 Managing Development of Employment Land 22) We suggest the addition of a further criterion to Policy EC2. The Council will take account of the following factors when assessing all development proposals for employment uses: h) the impact on foul and surface water drainage infrastructure especially the need to secure the most sustainable approach to surface water drainage. Chapter 10 Provision of Homes in Fylde Policy H1 Density, Mix and Design of New Residential Development 23) In this policy, we would encourage the council to promote improvements in water efficiency through the design of all development. This reduces pressure on the supply of water and reduces the impact on wastewater infrastructure. United Utilities encourages new housing development to achieve the water efficiency target set out in Level 3 of the Code for Sustainable Homes. The cumulative impact of reducing pressure on wastewater infrastructure leads to more sustainable development and assists in improving bathing waters. Under the heading of Design, we encourage the following amendment to Policy H1. Design of new residential development will be assessed against paragraphs of the NPPF, Policy ENV 6: Good Design in New Development and Building for Life 12.

8 Justification As a minimum, all new housing developments should meet the Homes and Communities Agency Design and Quality Standards which are currently in force. All new homes will be expected to achieve the water efficiency target set out within Level 3 of the Code for Sustainable Homes. 24) In line with the above point, it is appropriate to expand on the justification text with the insertion of the following additional paragraph. The inclusion of water efficiency measures in new homes reduces pressure on the supply of water and pressure on wastewater infrastructure. This is more sustainable and, in the Fylde Coast, helps to most appropriately manage the impact of new development on bathing waters. Chapter 12: Infrastructure, Service Provision and Transport Policy INF 1 Service Accessibility and Infrastructure 25) We suggest Policy INF 1 is amended as follows. New development will be required to provide essential site service and communications infrastructure and demonstrate that it will support infrastructure requirements as set out in the Infrastructure Delivery Plan. In order for Fylde to protect and create sustainable communities, proposals for development should: e) In considering development proposals, it may be necessary to co-ordinate the timescales for delivery of development with the timescales for the delivery of infrastructure. For large development sites, which may be constructed over a number of years and by various developers, it will be necessary to ensure a co-ordinated and holistic approach to the delivery of infrastructure, especially drainage infrastructure through the requirement for site wide strategies which establish principles to be adhered to during the construction process. Policy INF 2 Developer Contributions 26) We suggest the council could consider amending Policy INF 2 as follows: The types of infrastructure that developments may be required to provide contributions towards include, but are not limited to: b) Flood prevention and sustainable drainage measures (both on site and borough wide, including the retrofitting of SuDS) (see policy CL1); Chapter 13 Sustaining the Environment & Addressing Climate Change Policy CL1 Flood Alleviation and Water Efficiency 27) We suggest Policy CL1 is amended to state. Planning decisions should follow the sequential, risk-based approach to the location of development, as required under paragraph 100 of the NPPF.

9 All new development is required to minimise flood risk impacts on the environment and mitigate against the likely effects of Climate Change on present and future generations. This will be achieved by: a) Ensuring that new development incorporates the most sustainable form of managing surface water. This will be expected to be investigated and confirmed as part of any planning application submission. It will be necessary to attenuate any discharge of surface water through the incorporation of SuDS. This would be greenfield run off rate on greenfield sites. On brownfield sites surface water betterment will be expected. The preference will be for no surface water to discharge to the public sewer, directly or indirectly, if more sustainable alternatives are available. The priority options for the management of surface water are set out in detail in the infrastructure delivery plan. b) Supporting the retrofitting of SuDS in locations that generate surface water run-off. c) Improving water efficiency standards by minimising the use of potable mains water in new development and incorporating measures to recycle and conserve water resources. d) Ensuring that new development is directed away from areas at high risk of flooding and incorporating appropriate mitigation against flooding in areas of lower risk. e) Ensuring that watercourses, which are important habitats for water voles and other species, are protected from encroachment and adverse impacts and that water quality is maintained and improved. Justification f) Seeking to maximise the potential of Green Infrastructure within developments to contribute to flood relief. g) Ensuring that new development does not adversely affect the quality of groundwater. Developer contributions will be required for the provision and maintenance of SuDS, where this is not provided as part of the development. Contributions will be made through Section 106 agreements or the Community Infrastructure Levy, as set out in Policy INF2. Developer contributions will be required for the repair or replacement of the coastal flood defences and the maintenance of the dunes system. Contributions will be made through the Community Infrastructure Levy. Managing Surface Water 28) After paragraph 13.17, we suggest the council could consider including the following paragraph: It is a clear priority of the council that development should not discharge to public sewerage system, directly or indirectly, where alternatives are available. In some circumstances, however, discharge to public sewer, directly or indirectly, may be the only option. In those circumstances, a contribution may be requested to retrofit / divert surface water elsewhere in the borough to negate the impact of

10 discharging surface water to the public sewer. The applicant will also be expected to mitigate the impact of surface water discharge to the public sewer through landscaping schemes and other measures, which will include maximising the use of permeable surfaces and grey water and rainwater harvesting measures. Given the circumstances on the Fylde Coast, you may wish to consider whether it is appropriate to encourage the promoters of any large sites, which are allocated in the emerging development plan, to present high level drainage strategies as part of the development plan preparation process. United Utilities encourages this as good practice so that the most appropriate form of managing surface water can be established as soon as possible. 29) We suggest the fifth sentence of paragraph 3.19 is amended to state: This reinforces the imperative that surface water run-off from new development is managed through SuDS, rather than unattenuated discharges to the Borough s watercourses or public sewer. Water Efficiency 30) In accordance with our comments in respect of Policy H1, we support paragraph However, we also acknowledge the potential financial viability issues at the current time associated with the achievement of Level 6 of the Code for Sustainable Homes. Chapter 14: Preserving and Enhancing the Natural and Built Environment Policy ENV 1 Landscape and Biodiversity 31) We suggest criterion f) of Policy ENV 1 is amended to state: Suitable landscape planting should be incorporated within or, where appropriate, close to new development. Measures should be put in place for the management of such landscaping. Specific consideration should be given to how landscaping schemes will minimise the rate of surface water run off. Policy ENV6 Good Design in New Development 32) Criterion f of Policy ENV 6 states: Ensuring that the amenities of occupiers of the new development will not be adversely affected by neighbouring uses and vice versa. We suggest criterion f) of Policy ENV 6 is amended to state: Ensuring that the amenities of occupiers of the new development will not be adversely affected by neighbouring uses and vice versa. This will be most appropriately managed by locating sensitive uses away from other incompatible uses. We suggest the third paragraph of Policy ENV 6 is amended to state: The effects of climate change should be mitigated by the incorporation of energy and water efficiency in new and existing buildings, grey water and rainwater harvesting, measures to reduce surface water run-off and storage for waste and recyclables.

11 Appendix 2 Development of the Spatial Option and Strategic Sites Assessment Consultation with Infrastructure Providers 33) We suggest paragraph 1 on Page 196 is amended to state: The availability of infrastructure is another key aspect of deliverability. There are infrastructure issues in parts of the Borough, such as the capacity of the wastewater system and capacity of the local road network. The NPPF states that such barriers to investment should be overcome wherever possible, and that the Local Plan should be positively prepared so that the plan meets objectively assessed development and infrastructure requirements. Whilst noting the statutory obligations of some infrastructure providers, the site selection process should still be informed by meaningful discussion to take account of the availability of infrastructure and how the impact of development on infrastructure can be most appropriately managed. 34) We suggest paragraph 3 on Page 196 is amended to state: Wastewater treatment capacity is one issue for Fylde because it has an effect on bathing water quality. The Blackpool Periphery presents the most acute issues, as it is equidistant from the treatment works at Fleetwood and Freckleton and therefore, subject to the detail of the drainage proposals, is most likely to have a greater impact on wastewater infrastructure. 35) On page 198 in relation to H2 Land West of North Houses Lane, St Annes (housing), it states: Due to wastewater capacity issues, the site is phased towards the end of the Plan period. Development could start on this site in 2021 and be completed by We suggest this is amended to state: Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale. 36) On page 199 in relation to H3 Land North of Moss House Lane, St Annes (housing), it states: Infrastructure issues are the same as for H2, above. Likewise, an Appropriate Assessment will be required. In order to maintain a five year supply of housing land throughout the Plan period, and to enable upgrades to the wastewater network to take place, development on this site could start in 2026 and be completed in We suggest this is amended to state: Infrastructure issues are the same as for H2, above. Likewise, an Appropriate Assessment will be required. Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale.

12 37) On page 202 in relation to M1 Land east of Cropper Road (mixed-use), it states; Due to surface water issues, the site is phased towards the end of the Plan period. The housing element of this site could start in 2025 and be completed by We suggest this is amended to state: Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale. 38) On page 202 in relation to M2 Whyndyke Farm (mixed-use), it states: Although there is a current planning application on this site, there are surface water issues. Therefore it is anticipated that the housing element of this site could start in 2020 and be developed throughout the plan period and beyond. We suggest this is amended to state: Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale. 39) On page 205 in relation to H7 Land North of Dowbridge, Kirkham (housing), it states: In terms of wastewater infrastructure this site is sequentially preferable to the other sites in Kirkham and Wesham. Development could start in 2016 and be completed by We suggest this is amended to state: The impact on wastewater infrastructure is likely to be more appropriately managed by development of sites on the eastern side of Kirkham and Wesham. The impact on wastewater infrastructure can only be confirmed once greater detail is known. Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale, however, this may not be necessary given the original timescale for commencing development was assumed to be ) On page 205 in relation to H13 Land North of Mowbreck Lane, Wesham (housing), it states: In terms of wastewater infrastructure, development on this side of Kirkham and Wesham is sequentially preferable to sites on the west side, as it is closer to Clifton Marsh Wastewater Treatment Works. It would be useful to better understand the sequentially preferable reference in respect of this site in comparison with the sites on the west side. It may be more appropriate to state the following:

13 The impact on wastewater infrastructure is likely to be more appropriately managed by development of sites on the eastern side of Kirkham and Wesham. The impact on wastewater infrastructure can only be confirmed once greater detail is known. Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. 41) On page 206 in relation to H14 Land south of Weeton Road, Wesham (housing), it states: Wastewater infrastructure is more costly to implement for sites on the west side of Kirkham and Wesham, as it will need to connect to Clifton Marsh Wastewater Treatment Works at the east of the Borough. On page 206 in relation to H15 Land north of Weeton Road, Wesham (housing), it states: Wastewater infrastructure is more costly to implement for sites on the west side of Kirkham and Wesham, as it will need to connect to Clifton Marsh Wastewater Treatment Works at the east of the Borough. We suggest both sections are amended to state: The impact on wastewater infrastructure is likely to be more appropriately managed by development of sites on the eastern side of Kirkham and Wesham. 42) On page 208 in relation to M3 Land north of Blackpool Road, Kirkham (mixed use), it states: There are significant wastewater issues that need to be addressed for development to take place on this site. Therefore, although there is strong developer interest, it is anticipated that development could only start in 2020 and be completed by We suggest this is amended to state: Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy. In the context of the above amendment you may consider it appropriate to amend the delivery timescale. 43) On page 210 in relation to H8 Land west of Warton (housing) it states: There are wastewater infrastructure issues for this site. On page 210 in relation to H9 Land north of Warton (housing) it states: There are wastewater infrastructure issues for this site. On page 211 in relation to H10 Land east of Warton (housing) it states: There are wastewater infrastructure issues for this site. We suggest the above are all amended to state: Due to wastewater capacity issues, it will be necessary to carefully consider the impact on wastewater infrastructure in accordance with the content of policy.

14 44) On page 211 in relation to H11 Land NE of Warton (housing) it states: There are wastewater infrastructure issues for this site. We suggest this is amended to state: Due to wastewater capacity issues, if this site was allocated, it would be necessary to carefully consider the impact on wastewater infrastructure. 45) With respect the infrastructure delivery plan, we have suggested various amendments to the sections on water and wastewater. Our suggested amended version is enclosed for your review. Please do let me know if you wish to discuss in any further detail. Yours sincerely Andrew Leyssens Planning Manager United Utilities Encs.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014.

Thames Water is pleased to comment on the proposed changes to the London Plan 2014. Boris Johnson Mayor of London (London Plan) Greater London Authority City Hall More London The Queen s Walk London SE1 2AA Thames Water Property Services Your ref Our ref Name Phone Email London Plan Review

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Public Examination into the Haringey Core Strategy June 2011

Public Examination into the Haringey Core Strategy June 2011 Public Examination into the Haringey Core Strategy June 2011 Indicative Matters and Issues for Examination Hearing 3 Matter 3 - Issues 3.10-3.13 Does the Core Strategy provide a suitable and evidenced

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.

CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT. 2014/1898 BIRMINGHAM ROAD MERIDEN Application No: Ward/Area: Location: 2014/1898/S MERIDEN BIRMINGHAM ROAD MERIDEN Date Registered: 21/11/2014 Applicant: Proposal: MR VAUGHN WILLIAMS CHANGE OF USE FROM

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Flood Risk & Surface Water Management. Page 1 of 20

Flood Risk & Surface Water Management. Page 1 of 20 Page 1 of 20 Flood Risk & Surface Water Management Flood Risk & Surface Water Management and the Planning Process Introduction The purpose of this document is to increase awareness of the potential of

More information

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION 1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)

More information

Sustainability appraisal of the Norwich development management policies local plan:

Sustainability appraisal of the Norwich development management policies local plan: Norwich Local Plan Sustainability appraisal of the Norwich development management policies local plan: Environmental adoption statement (December 2014) DM policies plan Environmental adoption statement

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Flood Risk Management in Southwark

Flood Risk Management in Southwark Flood Risk Management in Southwark 1 Presented to Borough & Bankside Community Council 25 th April 2012 By Flood and Drainage Team Agenda Item 11 IN BRIEF Background Legislation What have we done? What

More information

Assessment of Site Deliverability in the Market Towns

Assessment of Site Deliverability in the Market Towns East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of

More information

Stowmarket Area Action Plan (AAP) Examination

Stowmarket Area Action Plan (AAP) Examination Stowmarket Area Action Plan (AAP) Examination Main Matters, Issues and Questions Matter 3 - Employment (Appendix) This contains additional information in support of the Hearing Statement and relates to

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan

Site Alternative Deliverability Report. SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable. Local Development Plan Local Development Plan Site Alternative Deliverability Report Brecon Beacons National Park Authority SALT 033 Former Mid Wales Hospital, Talgarth Resubmission: Undeliverable SALT 033 Former Mid Wales Hospital

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY

FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH

January 2016. Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH January 2016 Kath Lawless Assistant Director of Planning Newcastle City Council, Civic Centre, Barras Bridge, Newcastle upon Tyne, NE1 8QH Pre-planning application advice service The city council is committed

More information

East Riding of Yorkshire Council

East Riding of Yorkshire Council East Riding of Yorkshire Council Lead Local Flood Authority Interim Standing Advice Revision A - April 2015 1. Introduction From April 2015 the Lead Local Flood Authority (LLFA) became a statutory consultee

More information

There are access points readily available into the site.

There are access points readily available into the site. Site Name Reference Number Settlement Land at Broughton Atterbury U4 Size (Ha) 4. Broughton Planning history/context This section provides a brief overview of any significant planning history on the site

More information

www.gov.uk/defra Delivering Sustainable Drainage Systems

www.gov.uk/defra Delivering Sustainable Drainage Systems www.gov.uk/defra Delivering Sustainable Drainage Systems September 2014 Crown copyright 2014 You may re-use this information (not including logos) free of charge in any format or medium, under the terms

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3

ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL STATEMENT: VOLUME 2 APPENDICES 11.1 TO 11.3 AD06.02 NORTH LONDON WASTE AUTHORITY NORTH LONDON HEAT AND POWER PROJECT ENVIRONMENTAL

More information

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Appendix 1 Denbighshire County Council PLANNING STRATEGY DEVELOPER GUIDANCE NOTE November 2015 SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Context

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

Bolton s Flood Risk Management Strategy

Bolton s Flood Risk Management Strategy Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk

More information

Water and Flooding Position Statement

Water and Flooding Position Statement Derby City Local Plan, Part 1: Core Strategy Water and Flooding Position Statement August 2015 1. Introduction 1.1 This position statement provides an update to the Derby HMA Joint Water Issues Paper which

More information

Strategic Flood Risk Assessment Update 2015

Strategic Flood Risk Assessment Update 2015 Strategic Flood Risk Assessment Update 2015 On behalf of Contents Glossary... iv Executive Summary... 1 1 Introduction... 4 1.1 Overview... 4 1.2 Future Development in Lewisham Borough... 5 2 SFRA Approach...

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

The South West Regional Spatial Strategy: Schedule of the Secretary of State's Proposed Changes and Reasons - For Public Consultation July 2008

The South West Regional Spatial Strategy: Schedule of the Secretary of State's Proposed Changes and Reasons - For Public Consultation July 2008 - The South West Regional Spatial Strategy: Schedule of the Secretary of State's Proposed Changes and Reasons - For Public Consultation July 2008 The South West Regional Spatial Strategy: Schedule of the

More information

Development Brief for the Gedling Colliery and Chase Farm site

Development Brief for the Gedling Colliery and Chase Farm site Development Brief for the Gedling Colliery and Chase Farm site Contents 1. Introduction 2. The Site 3. Planning Policy Context 4. Development Requirements Figures 1. Site Location 2. Gedling Access Road

More information

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON

LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,

More information

Site Specific Policies

Site Specific Policies Local Development Framework Site Specific Policies Development Plan Document 03450 450 500 www.scambs.gov.uk Local Development Framework Site Specific Policies Development Plan Document Published by South

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

Council, Municipal Building, Kingsway, Widnes, Cheshire, WA8 7QF. Greenspace. DEVELOPMENT PLAN ALLOCATION:

Council, Municipal Building, Kingsway, Widnes, Cheshire, WA8 7QF. Greenspace. DEVELOPMENT PLAN ALLOCATION: APPLICATION NO: LOCATION: PROPOSAL: WARD: PARISH: CASE OFFICER: AGENT(S) / APPLICANT(S): DEVELOPMENT PLAN ALLOCATION: 13/00397/HBCOUT Land at Widnes Recreation Ground, Liverpool Road, Widnes, Cheshire.

More information

What do we already know about Bradford-on-Avon community area?

What do we already know about Bradford-on-Avon community area? What do we already know about Bradford-on-Avon community area? Bradford-on-Avon is one of the smaller market towns in Wiltshire. It has good public transport connectivity and functions as a popular tourist

More information

Ballycullen - Oldcourt Local Area Plan

Ballycullen - Oldcourt Local Area Plan Ballycullen - Oldcourt Local Area Plan Environmental Assessment Report of A: s proposed by the Elected Members and B: Recommendations within the Manager s Report on the Proposed Ballycullen Oldcourt Local

More information

eco-towns A supplement to Planning Policy Statement 1

eco-towns A supplement to Planning Policy Statement 1 Planning shapes the places where people live and work and the country we live in. It plays a key role in supporting the Government s wider social, environmental and economic objectives and for sustainable

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Strategic Flood Risk Assessment

Strategic Flood Risk Assessment local development framework Strategic Flood Risk Assessment LOCAL DEVELOPMENT FRAMEWORK ROYAL BOROUGH OF KINGSTON UPON THAMES Level 1 and 2 April 2011 Contents Executive Summary 5 Part 1 - Aiding Planning

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Draft Winchester District Local Plan Part 2. Recommended Responses to Issues Raised WALTHAM CHASE

Draft Winchester District Local Plan Part 2. Recommended Responses to Issues Raised WALTHAM CHASE Draft Winchester District Local Plan Part 2 Recommended Responses to Issues Raised WALTHAM CHASE 1. A summary of all the representations on the draft Local Plan directly relating to Waltham Chase was presented

More information

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment Sewer Flooding Alleviation in the Counters Creek Catchment London Borough of Hammersmith and Fulham Monday, 14 November 2011 at 7.00pm The Small Hall, Hammersmith Town Hall, King Street, W6 9JU Agenda

More information

Kirklees Draft Local Plan Development Plan Document

Kirklees Draft Local Plan Development Plan Document Development Plan Representation - Kirklees Draft Local Plan Development Plan Document On behalf of Taylor Wimpey (Penistone Road, Shelley Site H169) January 2016 1. Introduction Spawforths have been instructed

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note

Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS. Culvert Advice Note Places Directorate Environment Infrastructure PO Box 100 Wigan Council WN1 3DS Culvert Advice Note Culverts Advice Note Revisions Rev Date Details Prepared by Reviewed by Approved by 1 19/07/2013 AC MAJ

More information

Water Security Action Plan 2011-2016

Water Security Action Plan 2011-2016 Water Security Action Plan 2011-2016 Approved on: 30 May 2011 Owner: Program Manager, Sustainable City 8203 7723 Trim Reference: ACC2011/59983 Net Review Date: 2013 1 1. Introduction Why Has Council Developed

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Development Brief Erskine Lodge Site, Great Whelnetham

Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Erskine Lodge Site, Great Whelnetham Development Brief Contents 1.0 Introduction 2.0 Site Context 3.0 Development Constraints 4.0 Whelnetham Context Analysis 5.0 Development Opportunities

More information

Mechanical Biological Treatment Facility

Mechanical Biological Treatment Facility Mechanical Biological Treatment Facility Former Britannia Zinc Site, Avonmouth Environmental Statement Non Technical Summary Non Technical Summary July 09 New Earth Solutions Group Ltd Mechanical Biological

More information

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by

Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

Homes and Environment Scrutiny Committee. (Environment & Transport)

Homes and Environment Scrutiny Committee. (Environment & Transport) REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)

More information

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP

Granville Road Estate, London Borough of Barnet. Flood Risk Assessment and Drainage Strategy August 2014. New Granville LLP Granville Road Estate, London Borough of Barnet Flood Risk Assessment and Drainage Strategy August 2014 New Granville LLP Document History JOB NUMBER: 237 DOCUMENT REF: Granville Road FRA REVISIONS: Final

More information

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services

Issue: 2 Adopted by Council: 20/02/07. Directorate of Environment and Regeneration Planning Services Issue: 2 Adopted by Council: 20/02/07 Directorate of Environment and Regeneration Planning Services LOCAL PLANNIING GUIIDANCE NOTE NO..19:: SUSTAIINABLE DRAIINAGE SYSTEMS Background The provision of adequate

More information

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF

IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition

More information

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015

State of Qatar. Ministry of Environment. Intended Nationally Determined Contributions (INDCs) Report. November 19 th, 2015 State of Qatar Ministry of Environment Intended Nationally Determined Contributions (INDCs) Report November 19 th, 2015 State of Qatar is pleased to submit its Intended Nationally Determined Contributions

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Surface Water Management: Interim Guidance for Developers

Surface Water Management: Interim Guidance for Developers Surface Water Management: Interim Guidance for Developers www.shropshire.gov.uk Contents Executive Summary 1. Introduction...1 2. National Policy Context...2 Making Space for Water...2 Future Water...2

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph

Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph Draft Site Development Brief: Land at HM Stanley Hospital, St Asaph Strategic Planning and Housing September 2015 Content Page No. 1. Introduction 2 2. Document Status and Stages in Preparation 2 3. Site

More information

Variation No. 2 of the Louth County Development Plan 2009-2015. Louth County Core Strategy

Variation No. 2 of the Louth County Development Plan 2009-2015. Louth County Core Strategy Variation No. 2 of the Louth County Development Plan 2009-2015 Louth County Core Strategy Adopted 10 th January 2012 Contents Page Part 1 Introduction 1 1.0 Introduction 3 1.1 Reason for Variation 3 1.2

More information

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site.

The application site is on the edge of flood zones 1 and 2 with flood zone boundary cutting across part of the southern boundary of the site. Flood Risk Assessment Erection of Masjid/ Place of Worship, extended car parking following demolition of 11a Grafton Street & boundary treatment Land adjacent 11/ 11a Grafton Street, Preston, PR1 8JB 0723/

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

London Borough of Croydon Local Flood Risk Management Strategy

London Borough of Croydon Local Flood Risk Management Strategy London Borough of Croydon Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

Basement Development SPD: Discussion paper and questionnaire. December 2014

Basement Development SPD: Discussion paper and questionnaire. December 2014 Basement Development SPD: Discussion paper and questionnaire December 2014 1 Introduction 1.1. The purpose of this discussion paper is to set out the scope of a Supplementary Planning Document (SPD) and

More information

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:

More information

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings

Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings Duchy Homes Site: Cantley Lane Doncaster Proposal to achieve Code for Sustainable Homes Level 3 for a development of 7 detached dwellings 22 nd February 2013 Leanne Brooksbank Accredited Energy & Code

More information

Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure

Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure Wiltshire Local Development Framework Working towards a Core Strategy for Wiltshire Topic paper 11: Green infrastructure Wiltshire Core Strategy Consultation January 2012 Wiltshire Council Information

More information

HISTORIC & NATURAL ENVIRONMENT

HISTORIC & NATURAL ENVIRONMENT North Wiltshire Local Development Framework Core Strategy Planning Services Business Area Consultation Forum 1. Introduction A consultation forum was run for the Planning Services Business Area meeting.

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Renfrewshire Strategic Flood Risk Assessment

Renfrewshire Strategic Flood Risk Assessment Background Report Renfrewshire Strategic Flood Risk Assessment 16 Renfrewshire Local Development Plan Main Issues Report December 2011 Renfrewshire Local Development Plan Background Report X Renfrewshire

More information

INTEGRATED WATER FOR CASEY CLYDE

INTEGRATED WATER FOR CASEY CLYDE INTEGRATED WATER FOR CASEY CLYDE James Westcott 1, Andrew Chapman 1, Jamie Ewert 2, Brigid Adams 3 1. South East Water, Melbourne, Vic, Australia 2. Melbourne Water, Melbourne, Vic, Australia 3. Department

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Shaping the Future of North East Lincolnshire

Shaping the Future of North East Lincolnshire North East Lincolnshire New Local Plan Issues Paper: Housing Analysing the evidence and identifying the issues October 2014 Shaping the Future of North East Lincolnshire Executive summary 1 This paper

More information

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA 10.1 Summary Information 10.1.1 Location SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA The limits of Management Unit 5, a 2.9km stretch of shoreline fronting the town of Hornsea on the Holderness coast, are

More information

Planning and Environmental Policy Group

Planning and Environmental Policy Group Planning and Environmental Policy Group Planning Policy Statement 18 Renewable Energy August 2009 Planning Policy Statement 18: Renewable Energy Planning Policy Statements (PPSs) set out the policies

More information