STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace
|
|
|
- Ashlynn Ferguson
- 10 years ago
- Views:
Transcription
1 STORMWATER MANAGEMENT AND SERVICING REPORT IN SUPPORT OF SITE PLAN APPLICATION Cumberland Terrace City of Toronto Toronto & North York District Prepared For: Oxford Properties Group 130 Adelaide Street West, Suite 1100 Toronto, ON M5H 3P5 Counterpoint Engineering Inc Jane Street, Suite 100, Vaughan, Ontario L4K 5Y2 Tel: (905) File Number: Date: August 20 th, 2014
2 Oxford Properties Group Cumberland Terrace EXECUTIVE SUMMARY Counterpoint Engineering Inc. has been retained by Oxford Properties Group to prepare this Stormwater Management and Servicing Report in support of the Site Plan Application submitted for this project to the City of Toronto (the City ). The Application is in support of the proposed redevelopment of the lands located at 2 Bloor Street West/Cumberland Terrace mall in the Bloor-Yorkville area of downtown Toronto. The existing tower at 2 Bloor West will remain unchanged and Phase 2 is currently under conceptual design, therefore the subject lands for this submission will refer to the 0.42 ha Phase 1 portion the property (the site ). The site is bound by Cumberland Street to the north, Yonge Street to the east, Mayfair Mews (a service lane) and Bloor Street to the south, and Bay Street to the west. As well the site is located directly above the Bloor-Danforth subway tunnel. Refer to Figure 1 Site Location Plan. This report presents a site servicing strategy and stormwater management analysis that meets the City of Toronto s servicing and stormwater management guidelines and remains in conformance with the approved Functional Servicing Report (FSR): Functional Servicing Report In Support of Zoning By-Law Amendment Application, 2 Bloor Street West and Cumberland Terrace prepared by Counterpoint Engineering Inc. dated May 5 th, 2009 The servicing strategy for the site is summarized as follows: Stormwater Servicing: Under existing conditions, the subject site is comprised entirely of impervious surfaces (concrete/asphalt, pavement and conventional roofing), and therefore any proposed site configuration will not result in an increase in site stormwater runoff. Proposed controlled runoff from the Phase 1 portion of the site will be conveyed by utilizing existing site connections. The west podium will outlet through the existing 225mmø storm connection at the west end of the site connecting to the combined sewer on Project No.: August 2014 Page 2
3 Oxford Properties Group Cumberland Terrace Cumberland Street. The residential tower and east podium will outlet through the existing 375mmø storm connection at the east end of the site connecting to the combined sewer on Cumberland Street. Quantity On-site water quantity requirements for the site redevelopment will be met through use of concrete storage tanks located within the buildings in combination with a corresponding orifice control located within a control MH at the property line. Quality Rain falling upon roof surfaces is generally considered clean, given suitable roof materials will be used. The requirement for implementing a quality control unit for TSS removal will not be a requirement for this project. Water Balance Site constraints preclude infiltration techniques due to the underlying TTC tunnel, existing concourse and any proposed basements. Water Balance will be met through the implementation of the green roof/rooftop park areas and rainwater harvesting cisterns. The cisterns will be designed to capture any remaining runoff from the 5mm event which will be used for irrigation and within grey water systems in the buildings. Sanitary Servicing: The west podium is to be serviced by an existing 150mmø sanitary connection located at the west end of the site connecting to the existing combined sewer along Cumberland Street. The residential tower and east podium will serviced by an existing 225mmø sanitary connection located at the east end of the site connecting to the existing combined sewer along Cumberland Street. The proposed site peak sewage flow generation will be L/s which is in general conformance with the approved FSR. Project No.: August 2014 Page 3
4 Oxford Properties Group Cumberland Terrace Water Servicing: The west podium is to be serviced by a new 200mmø watermain which will connect to the existing 150mmø watermain on Cumberland Street at the west end of the site. This building will require a 200mmø domestic and a 200mmø fire connection. The residential tower and east podium is to be serviced by the existing 200mmø fire watermain connection and the existing 150mmø domestic watermain connection. These two existing connections are located at the east end of the site and connect to the existing 150mmø watermain on Cumberland Street. The domestic water usage for the proposed site is 5.93 l/s. As per the FSR, water pressure tests were carried out to assess the adequacy of the existing watermains in the vicinity of the site. The test results prepared by A1-Hydrant Services on September 5, 2008 have been included in Appendix D. Any pumps required to increase pressure within the building will be determined by the mechanical consultant. A total Fire Flow demand (based on FUS calculations completed by HRT/Schirmer within the FSR); will be 9, L/min. Building fire protection will be designed by the mechanical engineer in accordance with all applicable codes and standards. Project No.: August 2014 Page 4
5 Oxford Properties Group Cumberland Terrace Table of Contents Executive Summary... 2 Table of Contents... 5 List of Figures, Tables, and Appendices Introduction Background Proposed Development Stormwater Management Existing Conditions Proposed Conditions Water Quantity Water Quality Water Balance Sanitary Servicing Sanitary Site Servicing Watermain Servicing Proposed Water Servicing Strategy Erosion and Sediment Control Conclusions Project No.: August 2014 Page 5
6 Oxford Properties Group Cumberland Terrace List of Figures, Tables, and Appendices Figures Figure 1 Figure 2 Figure 3 Figure 4 Site Location Plan Existing Conditions Site Plan & Phasing SWM Drainage Area Tables Table 1 Table 2 Table 3 Table 4 Allowable Release Rate Development Flow and Storage Summary Year Storm Event Proposed Wastewater Flow Calculations (Residential) Proposed Wastewater Flow Calculations (Retail) Appendices Appendix A Appendix B Appendix C Appendix D Storm Design Calculations Sanitary Design Calculations Water Usage Calculations HRT/Schirmer Fire Underwriters Survey Project No.: August 2014 Page 6
7 Oxford Properties Group Cumberland Terrace 1.0 Introduction The Stormwater Management and Servicing Report has been prepared in support of a Site Plan Application submission and outlines the proposed stormwater, sanitary and watermain servicing that will be implemented in order to meet the City of Toronto s servicing and stormwater management guidelines and will remain consistent with the approved Functional Servicing Report for the site. Functional Servicing Report In Support of Zoning By-Law Amendment Application, 2 Bloor Street West and Cumberland Terrace prepared by Counterpoint Engineering Inc. dated May 5 th, 2009 (FSR) 1.1 Background The overall site is located at 2 Bloor Street West in the Bloor-Yorkville area of downtown Toronto. The existing site is a mix of office and retail space composed of two significant divisions: a low-rise concrete slab building containing a retail mall and some office space (known as Cumberland Terrace) and a high-rise office tower at the north-west corner of Yonge Street and Bloor Street (known as 2 Bloor West). An existing below-grade concourse connects the site with the Toronto Parking Authority s Yorkville-Cumberland Garage to the north, the Toronto Transit Commission ( TTC ) Yonge-Bloor subway station to the east, the Bay subway station to the west, and a variety of stores along Bloor Street West to the south. The entire site is located directly above the Bloor-Danforth subway tunnel and west of the Yonge Street subway tunnel. Adjacent land uses include a mix of office, residential, retail, and hotel buildings. Refer to Figure 1 Site Location Plan for the location of the site and Figure 2 for existing conditions. 1.2 Proposed Development The proposed redevelopment area will contain mixed-use buildings consisting of residential and retail spaces. Specifically, a 7 storey building identified as the west podium, a 5 storey east podium and a 57-storey residential tower will be constructed. The 57-storey residential tower will be situated on top a podium consisting of extensive commercial space, aboveground parking, amenity space, gardens, and a dog park. The proposed redevelopment area Project No.: August 2014 Page 7
8 Oxford Properties Group Cumberland Terrace will be 0.42 ha, having gross floor areas of 33,804m 2 and 5,428m 2 for the residential and retail uses, respectively. The 33-storey residential tower as part of Phase 2 of the overall development will not be covered within this report. Refer to Figure 3 for the proposed site plan and phasing. 2.0 Stormwater Management 2.1 Existing Conditions Under existing conditions, the subject site is comprised entirely of impervious surfaces (concrete/asphalt, pavement and conventional roofing); therefore any proposed site configuration will not result in an increase in site stormwater runoff. The redevelopment site area is 0.42 ha and currently discharges via multiple service connections into the existing 450mmø combined sewer on Cumberland Street. The existing 450mmø combined sewer drains westerly, dropping-in at multiple locations to an existing 1200mm x 1350mm concrete combined sewer located 8m below the 450mmø sewer. There are no external areas draining into the site. See Figure 2 for existing site conditions and SW-S for existing servicing details. 2.2 Proposed Conditions The existing storm connections will be utilized as per the approved FSR. The redevelopment area is 0.42 ha, Area WEST will be 0.18 ha consisting of the west podium and will outlet to the existing 225mmø storm connection at the west end of the site, Area EAST will be 0.20 ha consisting of the residential tower and east podium and will outlet to the existing 375mmø storm connection at the east end of the site, and the remaining 0.04 ha (Area UNC) will be uncontrolled portions of the drive aisles Refer to Figure 4 Proposed Storm Drainage for the proposed site conditions and Drawings SW-S and SW-G for storm servicing connection locations and site grading. 2.3 Water Quantity As per the approved FSR, the allowable release rate to the municipal storm sewer system from site during the 2 to 100-year design storm event must not exceed the 2-year peak runoff Project No.: August 2014 Page 8
9 Oxford Properties Group Cumberland Terrace rate from the site under predevelopment conditions (maximum runoff coefficient value of C=0.50). The existing percent impervious (building and parking) is above 50%. As such, Toronto WWFMG criteria dictates that the 2-year existing development peak flow be calculated with a maximum runoff coefficient of C=0.50. As a result, the allowable discharge from the subject site is calculated as follows: Q A = C x A x i x N (l/s) Table 1: Allowable Release Rate A - Site Area (ha) 0.42 Tc (min) 10 C - Runoff Coefficient 0.5 i Intensity (mm/hr) N Constant 0.36 Q - Release Rate (l/s) 51 Refer to Appendix A for the allowable release rate calculation. In order to attenuate the site to the allowable release rate of 51 l/s, two orifice controls will be installed, one at each outlet, within the proposed storm MHs located at the property line. Two concrete storage tanks will be required in order to retain the 100-year storm event; one will be located within the west podium building at the outlet and the other located underground at the outlet. Table 2 summarizes the 100-year post development flow and storage requirements. Table 2 Development Flow and Storage Summary Year Storm Event t c (min) Storage Available (m 3 ) Storage Require d (m 3 ) Re lease Rate (m 3 /s) Description Area ID Area (ha) Runoff Coefficient WEST West Podium EAST East Poduim/Tow er UNC Phase 2 Uncontrolled Total m 3 storage tank will be constructed within the west podium building and a corresponding orifice control having a peak release rate of 12 l/s will be installed. Project No.: August 2014 Page 9
10 Oxford Properties Group Cumberland Terrace 61m 3 storage tank will be constructed underground at the east podium/residential tower existing outlet and a corresponding orifice control having a peak release rate of 14 l/s will be installed. As shown in Table 2 the proposed site release rate during the 100-year storm event will be 51 l/s which equal to the allowable release rate of 51 l/s. Refer to Appendix A for proposed modified rational calculations. In events greater than the 100-year storm and in emergency situations, the pressure fitted roof leaders will surcharge causing the rooftop runoff to pond. Once the rooftop storage available is exceeded the storm runoff will spill through the emergency relief scuppers located in the parapet walls. 2.4 Water Quality Rain falling upon roof surfaces is generally considered clean; given suitable roof materials will be used. The requirement for implementing a quality control unit for TSS removal will not be a requirement for the rooftop areas. Two drive aisles running north-south, providing vehicular access from Mayfair Mews and Cumberland Street will be graded to flow uncontrolled as such catch basins or quality control will not be provided above the TTC tunnel. Project No.: August 2014 Page 10
11 2.5 Water Balance Oxford Properties Group Cumberland Terrace Cisterns and will be provided to promote water balance as per the City of Toronto s WWFM guidelines. To achieve the water balance objectives, the drainage areas were categorized by surface types: asphalt/pavement/roof and green roof. The initial abstraction of the various site areas were determined by calculating a site composite (base line). The required retention volume for the development area was then found by using the required 5mm rainfall depth and subtracting the base line initial abstraction. Based on site characteristics, 6.4m 3 volume for the west podium and 7.0m 3 volume for the east podium/residential tower will be required to be retained to meet water balance objectives. A 6.4m 3 cistern and a 7.0m 3 cistern will be provided to achieve the water balance requirements for the site. Refer to Appendix A for water balance volume calculations. The harvested rainwater volume will be available for green roof irrigation and will be used within the grey water systems in the buildings. Water exceeding the cistern storage tank capacity will be diverted to the underground storage tanks then into municipal sewers. 3.0 SANITARY SERVICING 3.1 Sanitary Site Servicing As per the approved FSR, the proposed development will utilize existing service connections. The wets podium building is to be serviced by an existing 150mmø sanitary connection located at the west end of the site connecting to the existing combined sewer along Cumberland Street. The east podium and residential tower is to be serviced by an existing 225mmø sanitary connection located at the east end of the site connecting to the existing combined sewer along Cumberland Street. Sanitary flows are conveyed westward by an existing 450mmø combined sewer which drops-in at multiple locations to an existing 1200mm x 1350mm concrete horseshoe combined sewer which also conveys flows westward. Project No.: August 2014 Page 11
12 Oxford Properties Group Cumberland Terrace Using the City of Toronto Design criteria for Residential and Retail Population Equivalency, the population equivalent for the site is 997 persons. Peak sanitary flow from the site has been calculated to be l/s which is in general conformance with the approved FSR. Refer to Appendix B for sanitary design calculations and Drawing SW-S for the location of the proposed sanitary connection. Table 3 and 4 below summarize the proposed wastewater flow calculations. Table 3 Proposed Wastewater Flow Calculations (Residential) Drainage Area Type of Unit Persons per Unit Average Wastewater Flow (litres / capita / day) Number of Units Number of People Typical Flow (L/day) Peaking Factor Peak Flow (L/s) Total Flow (L/s) Bachelor ,720 Residential Towers 1 Bedroom ,570 2 Bedroom ,440 3 Bedroom Rooftop Villas Villas (2 Bedroom) TOTAL , Extraneous Flows 0.11 (0.26L/s/ha) Total Table 4 Proposed Wastewater Flow Calculations (Retail) Drainage Area Type of Unit Gross Floor Area (ha) Average Wastewater Flow (litres/person/day) Number of People per 100m 2 GFA Number of People Typical Flow (L/s) Peaking Factor Peak Flow (L/s) Total Flow (L/s) Retail Buildings Retail Total WATERMAIN SERVICING 4.1 Proposed Water Servicing Strategy The west podium is to be serviced by a new 200mmø watermain which will connect to the existing 150mmø watermain on Cumberland Street at the west end of the site. This building will require a 200mmø domestic and a 200mmø fire connection. The east podium and Project No.: August 2014 Page 12
13 Oxford Properties Group Cumberland Terrace residential tower is to be serviced by the existing 200mmø fire watermain and the existing 150mmø domestic watermain connections, located at the east end of the site, to the existing 150mmø watermain on Cumberland Street. The expected domestic water usage rate for the residential portion of the development was calculated based on per capita demand specified in the City of Toronto design guidelines. The number of occupants was determined based on a residential unit count multiplied by a rate of 191 litres per capita per day (L / capita / day) as per City of Toronto standards. See Appendix C for calculation details. Based on equivalent population densities specified by the City of Toronto, the total number of persons residing in the 575 units that make up the residential tower is 939. Using a per capita demand of 191 litres per capita per day, the total demand is 2.08 L/s. The City of Toronto guidelines state a peaking factor of 2.50 for peak hour apartment building usage which results in an expected total residential domestic demand of 5.19 L/s. The expected domestic water usage rate for the commercial portions of the proposed development was calculated in the same fashion as the existing commercial demand; that is, based on MOE guidelines for shopping centres. Based on a commercial gross floor area of 5,332m 2 and an average daily usage of 5000 L / 1000m 2 / day, the average daily commercial domestic water use was calculated to be 0.31 L/s. As before, this value was adjusted to reflect operating times and further adjusted for a peaking factor of 1.2. The final commercial domestic water use is 0.74 L/s. Summing up the residential and commercial domestic water demands yields a total domestic water demand of 5.93 L/s. Fire flow demand was estimated using the Fire Underwriters Survey (FUS). These calculations were carried out by HRT/Schirmer and were completed on December 2, 2009 (Appendix D). The development will consist of non-combustible construction and all will be Project No.: August 2014 Page 13
14 Oxford Properties Group Cumberland Terrace fully sprinklered as per the Ontario Building Code. It has been determined that the required fire flow, including adjustments, will be 9, l/min. The minimum residual pressure in the watermain based on hydrant flow tests were: Cumberland Street: 30 psi (207 kpa) Bloor Street: 40 psi (276 kpa) Yonge Street: 40 psi (276 kpa) Bay Street: 38 psi (262 kpa) Refer to Appendix D for the hydrant report, completed in September, The City of Toronto s minimum residual pressure during a maximum domestic demand + fire scenario is 20 psi (140 kpa). Through extrapolation of the plotted available water supply, it was determined that in order to achieve minimum pressure during the domestic + fire scenario, a pump will be required and will be designed by the mechanical engineer. Within West Podium, the new incoming water service room will house the water service, meter and fire protection valves. 5.0 EROSION AND SEDIMENT CONTROL The following erosion and sediment control measures will be implemented during construction to minimize sediment transport downstream of the site. The following is in conformance with the City of Toronto design notes and details and the Erosion & Sediment Control Guidelines for Urban Construction. Temporary silt and construction fencing and will be installed along site boundary prior to grading activities Temporary catch basin sediment controls and construction access mud mats will be installed as necessary; and Future grassed areas will be seeded as soon as possible. Project No.: August 2014 Page 14
15 Oxford Properties Group Cumberland Terrace All erosion and sediment control measures will be installed prior to commencement of site construction works and will remain in place through the duration of construction. During construction, the erosion and sediment control measures will be monitored by the site and maintained. 6.0 CONCLUSIONS This Stormwater Management and Servicing Report presents a site servicing strategy for the proposed site that addresses the requirements of the City of Toronto. The servicing strategy for the proposed redevelopment is summarized below: Stormwater Servicing: Based on the approved 2009 FSR, controlled runoff from the site will be conveyed to the existing 450mmø combined sewer on Cumberland Street. Existing 225mmø and 375mmø connections will be used. The City of Toronto s Wet Weather Flow Management Policy indentifies performance objectives for runoff from the development sites including quantity, quality and water balance. Quantity On-site water quantity requirements for the site redevelopment will be met through use of concrete storage tanks located within the buildings and underground in combination with a corresponding orifice control located within a MH at the property line. Quality Rain falling upon roof surfaces is generally considered clean, given suitable roof materials will be used. The requirement for implementing a quality control unit for TSS removal will not be a requirement for this project. Water Balance Site constraints preclude infiltration techniques due to the underlying TTC tunnel and any proposed basements. Water Balance will be met through the implementation of green roof/rooftop park areas and rainwater harvesting cisterns. Project No.: August 2014 Page 15
16
17
18
19
20
21 Appendix A Storm Design Calculations
22 counterpoint engineering Rational Method - 2 Year Predevelopment Project No: Project Name: Cumberland Terrace Event: 2 years a ABC's: b 0 c 0.78 Time of Concentration: t 10 min Runoff Coefficient: C 0.5 Site Area A 0.42 ha Intensity i mm/hr i=a/(t+b) c Flow Q 0.05 m 3 /s Q=CiA/ l/s
23 Project Name: Project Number: Cumberland Terrace 8601 Rainfall Data Location: City of Toronto a 59.7 Event 100-year b 0 c 0.8 Area ID Area (ha) Runoff Coefficient t c (min) Storage Available (m 3 ) Storage Required (m 3 ) Release Rate (m 3 /s) Description WEST West Podium EAST East Poduim/Tower UNC Uncontrolled Total Allow cms AREA ID PH1 BUILD Composite RC Value Area [ha] RC RC * Area Green Roof Area Conventional Roof Total Divided by Total Area = 0.80 AREA ID PH2 BUILD Composite RC Value Area [ha] RC RC * Area Green Roof Area Conventional Roof Total Divided by Total Area = 0.81
24 counterpoint engineering Modified Rational Area: WEST Project Name: Cumberland Terrace Project Number: 8601 Rainfall Data Location: City of Toronto a Event 100-year b c Site Data Area 0.18 ha Runoff Coefficient 0.80 AC 0.14 Tc 10 Time Increment 10 Release Rate 12 l/s Storage Required 55 m 3 Storm Runoff Released Storage Time Rainfall Intensity Runoff Volume Volume Volume (min) (mm/hr) (m 3 /s) (m 3 ) (m 3 ) (m 3 ) ********
25 counterpoint engineering Modified Rational Area: EAST Project Name: Cumberland Terrace Project Number: 8601 Rainfall Data Location: City of Toronto a Event 100-year b c Site Data Area 0.20 ha Runoff Coefficient 0.81 AC 0.16 Tc 10 Time Increment 10 Release Rate 14 l/s Storage Required 61 m 3 Storm Runoff Released Storage Time Rainfall Intensity Runoff Volume Volume Volume (min) (mm/hr) (m 3 /s) (m 3 ) (m 3 ) (m 3 ) ********
26 counterpoint engineering Modified Rational Area: UNC Project Name: Cumberland Terrace Project Number: 8601 Rainfall Data Location: City of Toronto a Event 100-year b c Site Data Area 0.04 ha Runoff Coefficient 0.90 AC 0.04 Tc 10 Time Increment 10 Release Rate 25 l/s Storage Required 0 m 3 Storm Runoff Released Storage Time Rainfall Intensity Runoff Volume Volume Volume (min) (mm/hr) (m 3 /s) (m 3 ) (m 3 ) (m 3 ) ********
27 counterpoint engineering Orifice Control Job Cumberland Terrace Detention Storage Job No Phase 1 Orifice Orifice Control Flow m 3 /s Underground Storage Tank: 55 m 3 Phase 2 Orifice Orifice Control Flow m 3 /s Underground Storage Tank: 61 m 3
28 Counterpoint Engineering Cumberland Terrace, West Podium City of Toronto's Green Standard Tier Section QW 2.2 Initial Abstraction Asphalt, I 1 mm Initial Abstraction Pervious and Green Roof, P 5 mm Toronto's small design rainfall event has 5mm excess rainfall Type of Area Impervious Asphalt/Paved Area/Roof Pervious Grass/Landscaped/Green Roof Total Area Area Units % Redevelopment Area 0.16 ha 80% 0.04 ha 20% 0.20 ha Initial Abstraction (credit)= 1.8 mm Required Development Retention = (Excess Rainfall- Initial Abstraction) * (Total Development Area) Required Development Retention = (5mm- 1.8mm) * (0.20ha) Required Development Retention (debit)= 6.4 m 3 Cistern to Provide = 6.4 m 3
29 Counterpoint Engineering Cumberland Terrace, East Podium/Tower City of Toronto's Green Standard Tier Section QW 2.2 Initial Abstraction Asphalt, I 1 mm Initial Abstraction Pervious and Green Roof, P 5 mm Toronto's small design rainfall event has 5mm excess rainfall Type of Area Impervious Asphalt/Paved Area/Roof Pervious Grass/Landscaped/Green Roof Total Area Area Units % Redevelopment Area 0.18 ha 81% 0.04 ha 19% 0.22 ha Initial Abstraction (credit)= 1.7 mm Required Development Retention = (Excess Rainfall- Initial Abstraction) * (Total Development Area) Required Development Retention = (5mm- 1.7mm) * (0.22ha) Required Development Retention (debit)= 7.0 m 3 Cistern to Provide = 7.0 m 3
30 Appendix B Sanitary Design Calculations
31 Project No: Client: Oxford Properties Group Location: Toronto, Ontario Prepared by: C.R. Checked by: A.D. Date: 7/14/2014* *=From summary listed on drawing A.3, 10 Jun 14 "Progress Set" Drawings Residential Towers Drainage Area Type of Unit Persons per Unit Average Wastewater Flow (litres / capita / day) Number of Units Number of People Typical Flow (L/day) Peaking Factor Peak Flow (L/s) Total Flow (L/s) Cumberland and Yonge Bachelor ,720 1 Bedroom ,570 2 Bedroom ,440 3 Bedroom Rooftop Villas Villas (2 Bedroom) TOTAL , Extraneous Flows (0.26L/s/ha) 0.11 Total Assumptions: Extraneous Flows of 0.26L/s/ha per City of Toronto "Design Criteria for Sewers and Watermains" Retail Space Drainage Area Type of Unit Gross Floor Area (ha) Average Wastewater Flow (litres/person/day) Number of People per 100m 2 GFA Number of People Typical Flow (L/s) Peaking Factor Peak Flow (L/s) Total Flow (L/s) Retail Buildings Retail Total Assumptions: Average flow of 250 litres/person/day and population density assumption of 1.1persons/100m 2 is assumed per City of Toronto "Design Criteria for Sewers and Watermains" Extraneous flows are consided for the entire site in the residential portion of the calculation.
32 Appendix C Water Usage Calculations
33 Counterpoint Engineering Inc. PROPOSED WATER USAGE Project: Cumberland Terrace Project No: Client: Oxford Properties Group Location: Toronto, Ontario Prepared by: C.R. Checked by: A.D. Date: 7/14/2014 Residential Demand (Cumberland Residential Tower) Towers Type of Unit Persons per Unit Number of Units Number of People Per Capita Demand (L / capita / day) * Demand (L / s) Peaking Factor (Peak Hour)* Peak Hour Flow (L / s) Cumberland Bachelor And Yonge 1 Bedroom Bedroom Bedroom Villas Villas (2 Bedroom) Notes RESIDENTIAL TOTAL * Value as per City of Toronto Design Criteria for Sewers and Watermains (pg. 98) ** Value as per City of Toronto Design Criteria for Sewers and Watermains (pg. 100) Retail Demand (Cumberland Residential Tower) Use Gross Floor Area (m 2 ) Average Daily Water Usage (L / 1000m 2 / day) * Average Daily Usage (L / s) Adjustment for Operation Period ** Adjusted Average Daily Usage (L / s) Peak Hour Peaking Factor *** Total Average Daily Usage (L / s) Retail RETAIL TOTAL 0.02 Notes * Value as per "Shopping Centre" value from MOE Guidelines, 1984 ** Assuming 12 hours of operation per day, value is 24/12 = 2. Instructions as per MOE Guidelines, 1984, pg. 6 (Watermains) *** Value as per City of Toronto Guidelines in "Design Criteria for Sewers and Watermains" page 98 Retail Demand (West Podium) Use Gross Floor Area (m 2 ) Average Daily Water Usage (L / 1000m 2 / day) * Average Daily Usage (L / s) Adjustment for Operation Period ** Adjusted Average Daily Usage (L / s) Peak Hour Peaking Factor *** Total Average Daily Usage (L / s) Retail 3, RETAIL TOTAL 0.54 Notes * Value as per "Shopping Centre" value from MOE Guidelines, 1984 ** Assuming 12 hours of operation per day, value is 24/12 = 2. Instructions as per MOE Guidelines, 1984, pg. 6 (Watermains) *** Value as per City of Toronto Guidelines in "Design Criteria for Sewers and Watermains" page 98 Retail Demand (East Podium) Use Gross Floor Area (m 2 ) Average Daily Water Usage (L / 1000m 2 / day) * Average Daily Usage (L / s) Adjustment for Operation Period ** Adjusted Average Daily Usage (L / s) Peak Hour Peaking Factor *** Total Average Daily Usage (L / s) Retail 1, RETAIL TOTAL 0.18 Notes * Value as per "Shopping Centre" value from MOE Guidelines, 1984 ** Assuming 12 hours of operation per day, value is 24/12 = 2. Instructions as per MOE Guidelines, 1984, pg. 6 (Watermains) *** Value as per City of Toronto Guidelines in "Design Criteria for Sewers and Watermains" page 98
34 Appendix D HRT/Shirmer Fire Underwriters Survey
35
36
37
38
39
40
41
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT
TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN
PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT
High Park Bayview Inc. c/o GWL Realty Advisors Inc. GRENADIER SQUARE DEVELOPMENT CITY OF TORONTO PRELIMINARY STORMWATER MANAGEMENT AND SERVICING REPORT LEA PROJECT #: 9114 NOV.2012 (REV. NOV. 2013) www.lea.ca
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.
Stormwater Management Functional Servicing Report
Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015
629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District. Functional Servicing and Stormwater Management Report June 2013 13029
629, 633 and 675 Eastern Avenue City of Toronto Toronto & East York District Functional Servicing and Stormwater Management Report June 2013 13029 Executive Summary This Functional Servicing and Stormwater
Functional Servicing and Storm Water Management Report. Project Location: 258 Sunview Street Waterloo, Ontario
258 SUNVIEW STREET Functional Servicing and Storm Water Management Report Project Location: 258 Sunview Street Waterloo, Ontario Prepared for: 258 Sunview Inc. 815 Bridge Street West Waterloo, ON N2V 2M7
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate
2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February
50 Bloor Street West Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 50 Bloor Street West Zoning Amendment Application - Preliminary Report Date: August 10, 2012 To: From: Wards: Reference Number: Toronto and East York Community Council Director,
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE
ON-SITE STORMWATER DETENTION TANK SYSTEMS TECHNICAL GUIDE This page is intentionally left blank Contents 1 Introduction 1 11 Background 1 12 Requirements for Managing Peak Runoff at Source 1 13 On-site
SERVICING REPORT SITE PLAN AND PLAN OF CONDOMINIUM BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO
BLOCK 53 FERRIS DRIVE PLAN 58M-379 & PART OF LOT 4, REGISTERED PLAN 622 WELLESLEY, ONTARIO MARCH 2014 BLOCK 53 Ferris Drive Plan 58M-379 & Part of Lot 4, Registered Plan 622 WELLESLEY, ONTARIO DOCUMENT
Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18
Schedule H to Bylaw 7452, Subdivision Bylaw Page 18 3.4 Sanitary Sewers 3.4.1 Materials 3.4.1.1 The class and type of pipe and fittings, together with required class of bedding and trench widths, shall
Recommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
Home Drainage & Causes of Basement Flooding. Water
Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House
Stormwater Credit Open House Q&A
Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or
Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission
Functional Servicing and Preliminary Stormwater Management Report Paris Grand Submission GolfNorth Properties 400 Golf Course Road Conestoga, ON N0B1N0 R.J. Burnside & Associates Limited 6990 Creditview
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT
APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager [email protected] Stormwater
Preliminary Servicing & Stormwater Management Report
Prepared By: Hart Subdivision, City of Guelph Preliminary Servicing & Stormwater Management Report GMBP File: 112-155 May 22, 2015 GUELPH OW EN SOUND LISTOW EL KITCHENER EXETER HAMILTON GTA 650 W OODLAW
STAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.
Stormwater Management Design Brief Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario Prepared For: 1319 Kanata Tires & Rims June 30, 2015 Report No: FS-15-013-REP.02 Stormwater
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water
1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
DRAINAGE SERVICE CHARGES
DRAINAGE SERVICE CHARGES Louisville and Jefferson County Metropolitan Sewer District 700 West Liberty Street Louisville, Kentucky 40203-1913 EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2013 A
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Training Module 4
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Solution Sprinklers should be directed at lawn areas Spraying water on pavement increases runoff Look for more water-efficient
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto
HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.
Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
Fiberglass Tanks for Green Building Applications. a subsidiary of ZCL Composites Inc.
Fiberglass Tanks for Green Building Applications a subsidiary of ZCL Composites Inc. Xerxes Fiberglass Tanks for Green Building When people think of green building, they often think of the more obvious
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Downspout to storm sewer. Leaky laterals
Flooded street Surface water through MH top Blocked street catch basin Cracked MH or sewer Property line Downspout to storm sewer BREATHERS Leaky laterals Weeping Tile to sanitary or storm sewer BASEMENT
Chapter 5.0. Stormwater Credits for Innovative Site Planning
Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that
Breslau Settlement Plan. Preliminary Servicing and Stormwater Management Report. December 2015. Prepared by:
Breslau Settlement Plan Preliminary Servicing and Stormwater Management Report December 2015 Prepared by: SCS Consulting Group Ltd 30 Centurian Drive, Suite 100 Markham, ON, L3R 8B8 Phone 905 475 1900
Fiberglass Storage Tanks for Green Building Applications
Fiberglass Storage Tanks for Green Building Applications www.zcl.com www.xerxes.com Fiberglass Tanks for Green Building Applications Water Storage Tanks and Green Building When people think of green building,
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Planning, Health and Environment Division
18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority
DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council
DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy
23 Glen Watford Drive - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 23 Glen Watford Drive - Zoning Amendment Application - Preliminary Report Date: August 21, 2013 To: From: Wards: Reference Number: Scarborough Community Council Director, Community
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water
United States Office of Water EPA 916-F-01-032 Environmental Protection (4606) July 2001 Agency Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows
The Clean Water Project What Is The Stormwater Impact?
The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More
Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems
STAFF REPORT ACTION REQUIRED Impact of July 8, 2013 storm on the City's Sewer and Stormwater Systems Date: September 6, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
Financial Analysis for the Ambleside Centre Zoning Districts
Financial Analysis for the Ambleside Centre Zoning Districts July 2013 Prepared for: The District of West Vancouver By: Coriolis Consulting Corp. Table of Contents 1.0 Introduction... 1 1.1 Purpose...
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
Permeable Interlocking Concrete Pavements. The Stormwater Problem
Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact
CITY COUNCIL PACKET MEMORANDUM
CITY COUNCIL PACKET MEMORANDUM DOCUMENT: Final Plan and Final Plat SUBJECT: City Center Lenexa The Domain at City Center CONTACT PERSON: Beccy Yocham, Director of Community Development DATE: December 3,
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Class Environmental Assessment Schedule B Project File Report
R.J. Burnside & Associates Limited 16775 Yonge Street Suite 200 Newmarket ON L3Y 8J4 Canada telephone (905) 953-8967 fax (905) 953-8945 web www.rjburnside.com Class Environmental Assessment Schedule B
WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT CONSOLIDATED REPORT AND ACTION PLAN
Background WEST-END FLOODING INVESTIGATION 24 JULY 2009 RAINSTORM EVENT MARCH 2011 TABLE OF CONTENT Summary Report 1. Background 2. Flood Investigation Process 3. Public Input 4. Level of Service Objective
Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.
Town of Essex Basement Flooding Study Town of Essex NE Lagoon Service Area Pumping Station No. 4 Essex Plant Service Area Wastewater Pumped To NE Lagoons (Treatment Plant No. 2) Essex Treatment Plant (Treatment
Development enquiry request
Development enquiry request Water supply and/or drainage capacity assessment for a proposed development NOTE: Please ensure all relevant sections of the application are completed and refer to the attached
Basement Flood Risk Reduction City of Winnipeg. Charles Boulet
Basement Flood Risk Reduction City of Winnipeg Charles Boulet Outline Background Winnipeg Floodway Rain Events Winnipeg Sewer System Basement Flooding Flood Reduction Measures ICLR - BFRR Strategy 2 Where
Costs for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
STAFF REPORT. December 20, 2004. North District Community Council. Director of Community Planning - North
STAFF REPORT December 20, 2004 To: From: Subject: North District Community Council Director of Community Planning - North Preliminary Report Respecting Revised Application OPA & Rezoning Application 01
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS
(408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination
Site Development Information Worksheet for single family residential development
Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT
Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview
Costs for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 23, 2015
Item 2, Report No. 27, of the Committee of the Whole (Public Hearing), which was adopted, as amended, by the Council of the City of Vaughan on June 23, 2015, as follows: By receiving the following Communications:
Implementing Green Infrastructure in Atlanta
City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
Sustainable Drainage Systems (SUDS) A guide for developers
Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your
HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS
HYDRAULIC ANALYSIS OF OIL SPILL CONTROL SYSTEMS AT ELECTRICAL TRANSFORMER STATIONS JAMES LI (1) & CELIA FAN (2) (1) Department of Civil Engineering, Ryerson University, Toronto, Canada, [email protected]
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
City of Beverly Hills Construction Stormwater Requirement Checklist
City of Beverly Hills Construction Stormwater Requirement Checklist Construction activities are required to retain sediments, non-stormwater runoff and all constructionrelated materials, wastes, spills,
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED
WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared
Sustainable Urbanism with Green Roofs Natural Stormwater Management Wolfgang Ansel, Alfred Diem
Wolfgang Ansel, Alfred Diem (Dipl. Wirt.-Biol. Wolfgang Ansel, International Green Roof Association (IGRA), PO Box 2025, 72610 Nürtingen, Germany, [email protected]) (Dipl. Ing.(FH) Alfred Diem, diem.baker
Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161
Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.
Individual Residential Property Credit
NORTHEAST OHIO REGIONAL SEWER DISTRICT Stormwater Management Program Individual Residential Property Credit Revised 12/11/12 why stormwater management? flooding POLLUTION EROSION The inability to effectively
68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 68 & 70 Charles Street East & 628, 634, 636 & 638 Church Street- Zoning Amendment Application - Preliminary Report Date: November 21, 2014 To: From: Wards: Reference Number: