Doe Residence - 5.64 kw DC Roof Mounted Photovoltaic System



Similar documents
How To Plan Out An Array Of Solar Panels

County of Riverside Building and Safety Department

City of Riverside Building & Safety Division Phone: (951)

Solar Panel Installations

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

Submittal Requirements for Solar Photovoltaic Installations 10 kw or Less in One and Two Family (Duplex) Dwellings

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Solar Power System Installation Manual

CITY OF LOS ANGELES CALIFORNIA

Expedited Permit Process for PV Systems AC Module

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

AC Module Installation Guide Content

Solar Photovoltaic (PV) Systems

Request for Proposals for Photovoltaic System Installation

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

SOLAR PV SYSTEMS PERMITTING PROCESS

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

Understanding the Cal Fire Solar Photovoltaic Installation Guideline

Focus of the Guidebook

AC Module Installation Guide Content

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

Installation Guide Content for P250xV-240 microinverters

Installation Guide of Sunrise Solartech PV Modules. Term Contents. Purpose of this guide. General. Safety precaution for installing a solar

Top Commercial / Residential Electrical Requirements *

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

ADDENDUM #1(BID PACKAGE # 3)

Solarize Connecticut Attachment B.2 - Residential Pricing Proposal

Please check with your local inspection authority for any additional requirements before installation.

Contractors Guide Central Inverter System Installation

Developed by CA Matt Paiss, and Bill Brooks, PE

Photovoltaic System Overcurrent Protection

PV and the Electrical Code Page 1 PV and the Electrical Code

Solar Photovoltaic SPECIFICATION, CHECKLIST AND GUIDE. Renewable Energy Ready Home

Understanding the Cal Fire

Electrical Service Guidelines

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

GUIDELINES FOR PLAN CHECK AND PERMIT REQUIREMENTS FOR SOLAR ENERGY SYSTEMS

Solar Integrated Solar Roof Panel System Installation Manual

GUIDELINES FOR PLAN CHECK AND PERMIT REQUIREMENTS FOR SOLAR ENERGY SYSTEMS

SOLAR ELECTRIC MODULE ES-124 & ES-62T Owners Manual and Installation Guide

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010

SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE (In partnership with interested local fire officials, building officials, and industry representatives)

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

PS4-24 OWNERS MANUAL 24 VAC 90 WATT WALL MOUNTED CCTV POWER SUPPLY

GENERAL INSTALLATION MANUAL FOR EGING PV MODULES

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Electrical safety of grid-connected solar installations in Western Australia December 2011

IRRIGATION PUMPING Table of Contents - Section 900

D. Permits: A building permit is required for the structural support of all solar energy device installations.

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

Washer, Electrical Equipment Bond WEEB

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Electrical Code Regulation

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

Model Number Electrical Compatibility Module Connector Type. M LL-S22 60 cell PV module MC-4 Type 2 Locking

ADM1TE 5/30A DIN rail single phase two wire energy meter

Electrical Grounding. Appendix C

CITY OF SONOMA TOOLKIT DOCUMENT #1a

Expedited Permit Process for PV Systems

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

TECHNICAL SPECIFICATIONS

Section III Schedule of Requirements TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS

Ontario Electrical Safety Code 25 th Edition/ 2012

Installation Guide Solar Connect-11

MOBILE HOME SERVICE REQUIREMENTS GAS

Conext Grid Tie Solar Inverter Conext TX 2800 NA Conext TX 3300 NA Conext TX 3800 NA Conext TX 5000 NA

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret

SOLAR PV INFORMATION. January, 2015

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

sdci 420 Seattle Permits Tip Solar Energy Systems GREEN PERMIT REQUIREMENTS Building Permit Types of Solar Energy Systems

Safety and Installation Instructions for AC Modules

FW-X240 AUTO TRANSFORMER Installation Manual

B. Related Sections: 1. Section Raceway and Boxes for Electrical Systems.

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

Sample - No Commercial Use

ATS Overhead Table Shelf System INSTRUCTION MANUAL

1 GENERAL 4 2 DEFINITIONS 4 3 STANDARDS FOR INSTALLATION 4 4 LICENSING Extra Low Voltage (ELV) Low Voltage (LV) 5

SECTION LOW VOLTAGE LIGHTING CONTROLS

ELECTRICAL INSPECTION BULLETIN (Effective )

RAY-MAX Integrated Solar Power Strip

Transcription:

EQUIPMENT SUMMARY 20 LG 300W solar panels 1 SMA SE6000AUS Inverter Everest Solar Systems Cross Rail Racking System QuickMount PV Quick Hook Curved Tile Mount QMCTH SHEET INDEX T01 COVER PV01 SITE MAP & PV LAYOUT PV02 ELECTRICAL 1LINE DIAGRAM PV03 system labeling detail PV04 MOUNTING DETAIL GOVERNING CODES Customer: John Doe Doe Residence 5.64 kw DC Roof Mounted Photovoltaic System All work to comply with the following codes: UNDERWRITERS LABORATORIES (UL) STANDARDS OSHA 29 CFR 1910.269 2013 California electrical code 2013 California MECHANICAL Code 2013 California Building Code 2013 California Residential Code 2013 California PLUMBING Code 2013 California FIRE Code 2010 California ENERGY Code with 2008 CA Energy Efficiency Standards. : Lic. #99999999 Vicinity Map Lic. #99999 Single Family Residence T01

1. New NonCenterfed Main Service Panel with 225A Bus Bar 2. PV Production Meter 3. SMA SE6000AUS Inverter 4. Location of 20 LG 300W Solar Modules 36 Fire Setback Solar Modules Cover Less than %50 of Total Roof Area Roof Access (1)(2)(3) Lic. #99999 GENERAL NOTES: This project has been designed in compliance with the CBC Section 11&09 to withstand a minimum 85mph wind load. This system will not be interconnected until approval from the local jurisdiction and the utility is obtained. 24733 Main Street (4) 6 5 4 B 1 2 3 3 4 A 2 1 Driveway (4) This system is an utility interactive system with no storage batteries. The solar photovoltaic installation shall not obstruct any plumbing, mechanical or building roof vents. Roof access and ladder shall be located in area not requiring placement of ground ladder over openings such as doors or windows. Roof access shall be located in strong points of building construction in locations where access point does not conflict with overhead obstructions such as tree limbs, wires or signs. Proper access and working clearance will be provided as per Section 110.21& CEC. All equipment shall be identified on a warning placard clearly showing the location of all pertinent equipment and disconnects. Alternate power source placard shall meet the specifications of The San Diego Area Newsletter. Provide load calculations at first inspection. All breaker spaces shall be used at distribution panel Azimuth: 135 Tilt: 26 LEGEND 1 Suneye (1) Main Service Panel (2) PV Production Meter (3) Inverter (4) Solar Array(s) Attachment Rail Fire Setback PV01

(E) Existing (N) New Utility Service 1. Key Manufacturers Inverter PowerOne 740 Calle Plano Camarillo, CA, 93012 Solar Modules REC Solar US LLC 835 Aerovista Place, Suite 230 San Luis Obispo, CA 93401 Racking SnapNrack PV Mounting 775 Fiero Lane Suite 200, San Luis Obispo CA 93401 2. All Components are UL Listed and CEC Certified, where warranted. ELECTRICAL NOTES: Main Service Panel (E) 125A Rated M 100A Main OCPD PV Backfed Circuit Breaker 2 Pole 30 Amp 30A Inverter OCPD G (3) #10 AWG THWN2 (1) #8 AWG THWN2 Ground In 3/4 E.M.T. Inverter Ratings: PowerOne Aurora PVI5000OUTDUS Inverter Input: 36A DC Output: 240 VAC Imax = 23A Inec = 28.75A (@ 125%) Outdoor NEMA 4X Enclosure UL1741/IEEE 1547 REC235PE BLK 235W Solar Module Specs Pmax 235W Vmp 29.5V Imp 8.06A Voc 36.6V Isc 8.66A AC Disconnect (N) GE TFN60RCP 60Amp 240Volt NonFuse Metalic Inverter (N) PowerOne Aurora PVI5000OUTDUS Inverter with integrated DC disconnect AC System Configuration: DC (4 )#10 AWG THWN2 (1)#10 AWG THWN2 Ground In 3/4 E.M.T. Number of Strings 2 Modules per String 6 and 12 Number of Inverters 1 Module Model Hanwha HSL60P6PB4250TW Power Optimizer Model SolarEdge P300 Inverter Model SolarEdge SE3800AUS Service Bus Ampere Rating 200 A Main Breaker Ampere Rating PV Backfed Breaker Ampere Rating DC Watts STC Max AC Output Current Operating AC Voltage 200 A 20 A 4.5 kw 16 A 240 V JBox (N) Carlon E989NNJCAR CSA, UL listed NEMA 6P (4) #10 AWG USE2 Conductors (1) #10 AWG Bare Ground PV SYSTEM DC DISCONNECT Label Located on Inverter / DC Disconnect PV Array (N) 2 Strings of 12 Modules REC Solar REC235PE Modules Total Output: 5,640W 1 String of 12 Modules 1 String of 12 Modules Operating Current: 16.0A Operating Voltage: 350.0V Maximum System VOLTAGE: 500.0V SHORT CIRCUIT CURRENT: 22.0A 1. All modules will be grounded in accordance with code and the manufacturer s installation instructions. Each module shall be grounded using supplied connection point identified on the module and the manufactures instructions with direct burial laying lugs (gbl4dbt or equal). 2. If the existing grounding electrode system can not be verified or is only metallic water piping, contractor shall install a supplemental grounding electrode. 3. Exposed noncurrent carrying metal parts of module frames, equipment, and conductor enclosures shall be grounded in accordance with 250.13 or 250.136 (a) regardless of voltage. 4. Marking will be provided in accordance with CalFire Solar Photovoltaic Installation Guideline 5. Utility will be notified prior to use and activation of any solar installation. System will be Commissioned by owner per utility interconnection Agreement. 6. All wires to be provided with strain relief at all entry to junction boxes as required by the box listing. 7. DC combiner box is UL listed with Touch Safe fuse holders. Lic. #99999 PV02

03341 system labeling detail: All Plaques and signage required by the 2013 edition of California Electrical Code, NEC and the San Diego Area Electrical Newsletter will be installed as required. Placards consist of white lettering on red background with text written in capitol lettering a minimum of 3/8 in height on plastic Engraved placards. Alternate Power Source Placard shall be metallic or plastic with engraved or machine printed letters in a contrasting color to the plaque, include the location of meter, disconnects, inverter, the array and a footprint of the entire building and site. This plaque will be attached by pop rivets, screws or other approved fasteners. If exposed to sunlight, it shall be UV resistant. Photovoltaic DC conductors entering the building shall be installed in a metallic raceway and shall be identified every 5 feet and within 1 foot of turns or bends and within 1 foot above and below penetrations of roof/ceiling assemblies, walls, or barriers labeled Caution Solar Circuit or equivalent. Examples of all required warning labels per NEC and CEC 690 below: DC DISCONNECT WARNING AC DISCONNECT WARNING SERVICE PANEL Lic. #99999 DC DISCONNECT XXX VDC XXX ADC XXX VDC XXX ADC DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION per NEC 690.53 operating voltage, operating current, max system voltage, short circuit current and maximum output current of the charge controller if one is installed. PLACE ON: Main Solar Disconnect PV System Disconnect label NEC 690.14(C)(2) Required Disconnect Markings DC LABELS PLACE ON: 1. DC Junction Boxes 2. DC Combiner Boxes THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED PER NEC 690.14(C)(2), 690.35(F), 690.53 04680 03327 03104 Electric Shock Hazard label. NEC 690.35(F) Ungrounded PV Systems PLACE ON: 1. DC Junction Boxes 2. DC Combiner Boxes per NEC 690.54 operating voltage, operating current PLACE ON: Inverter Breaker Panel if sum of breakers exceeds panels rating XXX DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION PER NEC 690.14(C)(2), 690.17(4), 690.54 Inverter output connection label NEC 705.12(7) Point of Connection PLACE ON: All DC Source Markings and System Output Conductors Raceways Caution Solar Circuit label NEC 690.4(F), 690.31(E)(4) place on conduit every 10 feet IFC 605.11.1.1 & IFC 605.11.1.2 *MUST BE REFLECTIVE IF INDOORS OR IN ATTIC 04681 03212 03329 must show drawing of the property and equipment layout. per NEC 690.56 OTHER PLACE ON: Next to Inverter Interconnection Breaker, Load Center, & Service Panel 03344 Dual Power Supply label NEC 690.64, 705.12(4) Point of Connection Do not touch terminals label NEC 690.17(4) Switch or Circuit Breakers PLACE ON: Near GFI Reset 03211 03100 THIS ELECTRIC SYSTEM IS ALSO SERVED BY A PHOTOVOLTAIC SYSTEM CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED 04335 04357 Ground Fault Indicated label NEC 690.5(C) Ground Fault Protection PV Power Source label. NEC 690.31(E)(3) DC PV Source Conductors SIGNAGE REQUIREMENTS: RED BACKGROUND. WHITE LETTERING. ( WARNING 3/8 LETTERS). ALL CAPITAL LETTERS. ARIAL OR SIMILAR FONT. WEATHER RESISTANT MATERIAL, UL 969. PV03

Mounting detail: 1. IronRidge XRS Rail Racking System with IronRidge Flash Foot Mount. Sized for 110 mph wind loads. 2. Racking loading calculations were performed for ASCE 710 wind speeds @ 110 mph for B and C exposure categories and ASCE 710 Seismic Design Category E. 3. Roof attachment hardware to be mounted to existing rafters; 72 rail spans or less. 4. Lag bolts are 5/16 X 4 stainless steel with 2.5 minimum penetration into the rafters. 5. Roof sheathed with ½ plywood and upper surface is faced with felt paper. Finished roof surface is composite shingle. 6. Lag screws shall be at least 6 inches from any truss joints. 7. Lfoot base is sealed with Tremco Vulkem 116 Polyurethane Sealant or equivalent. Flush Mount Detail Attachement Span Max 72 24 O.C. Existing Roof Structure 2 x4 Rafters MAX 25% MAX 50% MAX 25% Lic. #99999 Attachement Span Max 72 24 O.C. Existing Roof Structure 2 x4 Rafters PV04