Using Autodesk Fabrication Software from TSI



Similar documents
DATASHEET: TSI PROFESSIONAL SERVICES

Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

A Need for Expansion: Mechanical and Electrical Courses

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

BIM Department. BIM Modeling Using Faro Focus3D Laser Scanner

Transition to 3D Fabrication Workflows

Establishing Commissioning Costs

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education

ENTRY FORM. DVASE 2013 Excellence in Structural Engineering Awards Program

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Victaulic Total Piping Solutions

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

The World s Leading Duct board Solution Package

Duplexvent DV72 EC So light, so slim it fits inside a 600mm cupboard

Free Examples of plant layout drawing

Head: The new space race

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

BIM Extension into Later Stages of Project Life Cycle

The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD.

Laser Scanning for an Integrated BIM

lindab ventilation Solutions for ventilation

Certified Instructors & Curriculum

Mechanical Insulation. Hospitals and Schools

Turnaround and Maintenance Services

Seek. Autodesk. Autodesk Seek THE ONLINE MARKETING SOURCE FOR BUILDING PRODUCT MANUFACTURERS INDUSTRY SHIFT

Radiant Panels and Chilled Sails.

Asbestos Procedures. Asbestos Products

International Training Institute for the Sheet Metal and Air Conditioning Industry

FIRE DETECTION BUILDING AUTOMATION CAPITAL PROJECTS HVAC SERVICES SECURITY SYSTEMS PROJECT MANAGEMENT.

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.

your comfort. our world. DNSS EcoSave A/C remote monitoring and malfunction prediction

Challenges and Failures in Green Building Design Using Under-Floor Air Distribution. Ken Urbanek, PE, HBDP, LEED AP Director of Engineering

Realizing the Future of Sustainable Design through BIM and Analysis

Risk Bulletin. Mold Prevention and Control for Mechanical and HVAC Contractors. XL Group Insurance

Duct Leakage Testing. Ken Helfers, TSI Inc. 2011, TSI Incorporated

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

Data Centres A complete solution to noise control and acoustic packages

Dimensioning and Estimating Brick Masonry

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

AGI Abbie Gregg, Inc.

Scalable. Affordable. Flexible. Fast.

Questions and Answers

IBM Data Center Services. Building or upgrading your data center, while helping to minimize cost, risk and delay

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

1932 Lexington Houston, Texas (713) Recommendations for installation of cooling systems

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Sample Company SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

ASTACEA4 Inspect complex/central air conditioning systems

Construction layout and scanning solutions for the MEP contractor

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

We Speak the Language of Controls

Performance by design. Autodesk Revit MEP

Project Document Manager. For Subcontractors

Building Information Modeling for MEP Engineering. Revit MEP 2008

Daikin VRV, controls, and lighting retrofit gives St. Louis area high school new life

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009

Daikin VRV, controls, and lighting retrofit gives St. Louis area high school new life

SPED Piping Certification Guide (Revised: 12/05)

Green Globes for New Construction Pre-Assessment Checklist for Project Managers

We ve got you covered.

d e n v e r a r t m u s e u m

Integrated Solar Radiant Systems

A Prototype Alternative Ventilation System for Retrofit, Rehab and Renovation of Rural Alaska Houses

When every minute counts, choose the solution that makes a difference.

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

Design without compromise. Autodesk Revit. Architecture

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Design without compromise. Autodesk Revit. Architecture 2010

Reducing Client s Hazardous / Landfill Waste; Improving Air Quality

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) March

Setting a New Standard for 2D Design

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

YR&G. Corporate Sustainability. New York Denver Chicago

HEATING, VENTILATION & AIR CONDITIONING

Range Equipment HVAC Design & Supply Modular Ranges

The Evolution of HVAC Software and the Revolution of BIM!

Setting a New Standard for 2D Design

How To Design A Bim Project

How To Calculate Cost Of An Eco-Friendly Building

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

CAD Standards Guideline For Facility Documentation and Construction Projects

HOW TO ESTIMATE THE COST OF T-BAR

Transcription:

Using Autodesk Fabrication Software from TSI Photo courtesy of Lend Lease COMPANY BACKGROUND Walsh Mechanical Contractors is a full service, commercial mechanical contractor serving Eastern New England, most visibly in and around the Boston area. Based in Abington, Massachusetts, Walsh Mechanical Contractors has nearly a century of experience serving a variety of project types and sizes. Their industry knowledge and range of client services have established them as one of the area s most respected specialty contractors. Walsh Mechanical s ability to innovate while creating successful solutions stems from their superb planning and state-of-the-art equipment and systems throughout their operations. Using the Autodesk Fabrication software from Technical Sales International, Inc. (TSI), Walsh Mechanical s Estimating and CAD departments are able to work closely with Fabrication and Project Management from a single, centralized database which ensures projects are completed properly and promptly from the initial bid proposal to the turnover of the building to the owner. The result of that software interoperability is quality system design, fabrication, and installation. As an innovative leader in its industry, Walsh Mechanical Contractors is recognized for its design-assist capabilities, cutting-edge BIM software, machine shop technology, transportation operations and efficiently coordinated field work. Its specialty is the ability to manufacture and install all types of quality ductwork, including the most environmentally responsible system of air distribution, spiral ductwork. Because spiral duct, including flat oval, exhibits a very high level of airtightness, Walsh Mechanical can guarantee a line of spiral duct that meets or exceeds the highest air leakage standard recognized by SMACNA.

Additionally, Walsh Mechanical was the first to receive the Underwriters Laboratories (UL) third-party certification for the listing and labeling of sheet metal air duct under the UL s Sheet Metal Air Ducts category. This certification assures the fabrication of superior duct systems; it provides a higher degree of confidence to the engineering/architectural community, via an independent third-party, that duct is constructed to the industry standard; it provides a continuing education process for participating firms; ensures that an efficient, low leakage air distribution system is constructed; and provides a means for identifying sheet metal duct that is compliant with code. THE CHALLENGE In 2010, Walsh Mechanical was hired as the mechanical contractor for the Shire Human Genetic Therapies (HGT) building expansion in Lexington, MA. The Lexington Technology Park Building 200 (B200) project was designed with office and laboratory elements to meet the needs of a research and development building. manufacturing, warehousing, central utilities and administrative offices. The building is organized into two wings: a north wing that includes the office functions (approx. 60,000 GSF) and a south wing that includes the laboratory functions (approx. 111,200 GSF) with a lower level accommodating building support space. The project goal was to achieve a Leadership in Energy and Environmental Design ( LEED ) Silver Rating and the building was designed to extend and complement the existing site buildings both functionally, including energy savings, and aesthetically by enhancing the occupants work place environment with indoor air quality (IAQ) and noise reduction. THE PROCESS To reduce waste in the design and construction process and eliminate unnecessary effort, the entire project team from architect to fabrication utilized virtual construction coordination using a sophisticated set of BIM tools and an integrated project delivery (IPD) methodology. A fully coordinated virtual model was developed in October 2010 releasing fabricationgrade drawings and accurate quantity take-offs for pre-fabrication and bulk procurement. The model represented a shared effort between the owner, architects, engineers, trade partners and construction teams. Walsh Mechanical contributed to the Integrated Design Assist concept with six full time CAD personnel contributing over 4,000 CAD man-hours. Shire HGT s Lexington Technology Park Bldg 200 The building is a three-story, 190,000 gross square foot (GSF) facility housing clinical and commercial (Photo courtesy of Lend Lease) Walsh Mechanical provided the full mechanical services with their in-house piping and sheet metal capabilities. Their model-based prototyping process, enabled by Autodesk Fabrication software from Technical Sales International, streamlines and improves the quality of their internal shop drawings and fabrication production.

TSI s Managed Content libraries allow Walsh Mechanical to draw to fabrication-level detail from the start of the design phase and then, using the same Autodesk Fabrication software, send the ductwork layouts of a model directly to the shop machines for flawless of which contributes to the LEED rating, spiral ductwork was chosen for its inherent qualities: airtightness, energy savings, comfort, sound attenuation, lower space requirements, quicker installation, delivery and storage, and certifiable guaranteed performance. As a SPIDA member, Walsh Mechanical led the design assist team in implementing spiral duct design into the project in order to take advantage of the benefits. Once the building envelope was optimized, the infrastructure was integrated to fulfill the space s programmatic requirements. These included active chilled beams, heat shift chillers, high efficiency chillers and cooling towers, fabrication of the spiral duct components. Additionally, their online field coordination capabilities being able to respond to and implement job-site changes quickly and accurately was a huge success made possible by TSI s integration of 3-D modeling software with on-site Trimble units. Using [Autodesk Fabrication] software products with managed content from TSI allowed us to almost totally eliminate waste on all systems using the spiral duct, said Tom Downey, BIM Manager at Walsh Mechanical. This is because having an accurate model allows us to fabricate all spiral duct to the exact lengths required, rather than standard lengths to be measured and cut in the field. LEED RATING CONTRIBUTORS Because the entire mechanical system was evaluated on energy savings, air quality and noise emissions, all Mechanical components can be prefabricated and shipped to the job on flat bed tractor trailers and installed with cranes, thereby reducing field time and exposure to hazardous work conditions around open shafts.

Software from TSI contributes to on-time delivery of pre-fabricated ductwork. daylight harvesting, as well as low pressure air handling and distribution design. For instance, chilled beams were used for delivering conditioned air to the lab and office buildings. Walsh Mechanical installed 869 chilled beams with over 13,000 linear feet of spiral duct all fabricated in their Abington, MA facility and consistently passed SMACNA Leakage Class 3 requirements. Walsh Mechanical fabricated the spiral duct in their facility, pre-built it into manageable sections, and then containerized these sections in rolling containers for clean shipment to the site. Sheet metal duct and piping risers were also fabricated in shop, and shipped to the job on flat bed tractor trailers and installed with cranes, thereby reducing field time and exposure to hazardous work conditions around open shafts. on site. Because of Walsh Mechanical s demonstrated efficiency and accuracy on the job site, the other project contractors were asked to use the Trimble units as well. We had used the TSI JOB-Site Solutions software and Trimble hardware for our hanger layout on building B400 with such great success that the construction manager suggested that other subs invest in the product to help ensure exact placement of each trade s work due to the tight conditions, said Bill Kimball, Project Manager at Walsh Mechanical. With Walsh Mechanical s experience and commitment to innovation, the mechanical work in over 190,000 square feet of usable space with 80,000 square feet of lab space was completed in just 12 months. Walsh s design assist role and 3-D virtual modeling with Autodesk Fabrication software from TSI contributed to enhanced planning that allowed for these on time deliveries of prefabricated spiral duct, pipe and equipment. Notably, fabricated materials were only allowed on sight three days prior to installation, alleviating job site congestion and enhancing job safety. At the height of construction, Walsh Mechanical had 61 men on site and 14 men in their fabrication facilities dedicated to the project and contributed over 60,000 man hours without a single injury. EFFICIENCY AND ACCURACY Further enabling compliance with job-site restrictions, Walsh Mechanical used TSI s Job-Site Solutions software and two Trimble Total Station units to install thousands of duct and piping hangers prior to any duct or pipe landing Using Job-Site Solutions, one person can accurately lay out hundreds of points in a single day.

TSI s Managed Content allows you to draw to fabrication-level detail from the start of the design phase. Although spiral duct comes in standardized sizes (as do the necessary components such as hangers), Walsh Mechanical was able to cut to specificity with its Autodesk Fabrication software from TSI. Having access to the Lindab fitting library through the TSI Managed Content system allowed us to cut and spool sections of pre-fab spiral duct and fittings with complete confidence that the information contained in the model was 100% accurate, said Tom Downey, BIM Manager, Walsh Mechanical Contractors. Using TSI s Managed Content, Walsh Mechanical is assured that all parts are BIM-rich with comprehensive attribute sets for accurate and efficient fabrication and installation.

SUSTAINABLE CONTENT Each individual line item in TSI s Managed Content database has an extensive set of attributes already attached to it meaning that intelligent data about the designs could be forwarded to anyone in the project. Material with weight Material cost Labor units Labor cost Manufacturers PDF specification sheets Dimensional data for prefabrication Kimball concluded, The combination of our software capabilities provided by TSI including the use of the Trimble Total Station with Job-Site Solutions plus in-house production of our own spiral pipe made for a winning combination. Our investment in this cutting edge technology has allowed us to become one of the most competitive mechanical contractors in our area. Using TSI Managed Content in Building-Data.net provides Walsh Mechanical with sustainable content to support estimates, procurement, submittal documents, CAD/ CAM fabrication, modular pre-fabrication, field layout documentation, staging and as-built documentation. Furthermore, hyperlinked PDF spec sheets are supported for all of their FAB, CAD and Estimating products, and can be used within AutoCAD and Navisworks. A WINNING COMBINATION With Walsh Mechanical s foresight into the benefits of using spiral duct, the project achieved energy savings from meeting the highest, Class 3 leakage standards, produced improved Indoor Air Quality with more even airflow and comfortable climate control with increased fresh air intake (made possible by the airtight ducts), and the entire HVAC system generates less noise because of the equalized pressure in spiral ductwork. TSI s Managed Content is the world leader in industry standard fitting libraries. Walsh Mechanical Contractors experience, innovation and sophisticated facilities, the features and benefits of spiral ductwork, Autodesk Fabrication software and Job- Site Solutions provided by Technical Sales International, all successfully contributed to the project s anticipated Silver LEED Rating.

UNPARALLELED MANAGED CONTENT DATABASE ABOUT BUILDING-DATA.NET Building-Data.net provides support services for companies implementing BIM software. Our staff is dedicated to the accumulation and organization of information relative to manufactured components. We provide BIM content to mechanical, electrical, and plumbing contractors. The content is designed to support the tasks of installation, manufacturing, estimating and fabrication for customers of Technical Sales International. We look forward to making your BIM experience less complicated. TSI Managed Content at www.building-data.net is a comprehensive database of real-world pipe fittings and valves and HVAC standard fittings and accessories that no other software can match. With nearly ½ million line items on the dedicated website, component items are always accurate, updated and extensible, so users can be sure they have the right manufacturerspecific information available when designing a building services model. ABOUT TECHNICAL SALES INTERNATIONAL Estimate, draw, fabricate and install TSI provides the tools you need to quickly design fully-constructable 3D models with real-world intelligent components. The single, integrated system yields speed and accuracy in the construction process, reduces labor costs, increases efficiency and productivity, and improves quality in the shop and on the job site. Serving clients in the U.S., Europe and Australia, TSI has been named a Top 5000 fastest growing private company for four consecutive years by Inc. magazine. Visit www.tsi-software.com for more information. With the fabrication-level detail of TSI s Managed Content libraries, users can manufacture HVAC components and output pipe components as spool sheets. Each manufacturer component is meticulously modeled in 3-D for dimensions and likeness, and all of the required information labor costing, parts costing, submittal, and specification documents is built into the job, ready for extraction.