CITY OF COOS BAY CITY COUNCIL Agenda Staff Report



Similar documents
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

FY08 SEWER POINT REPAIRS BID TABULATION

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

ADVERTISEMENT FOR BIDDERS

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Special Specification 7021 Water Main and Sewer Line Replacements

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Honorable Mayor and Members of the City Council

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

City of Hilshire Village Pine Creek Ln Reconstruction

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

Honorable Mayor and Members of the City Council

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

Addendum Number 1 Request for Bids # BUD BENDER PARK REHABILITATION PROJECT City Project No. CB 1302

CITY OF EL PASO BID TABULATION FORM

Technical Memorandum Cost Criteria for 2010 System Capacity Plan

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

UNIT PRICE LIST January 2009

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

Beacon Hill Sewer District Standard Specifications

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

2014 Inlet Rehab Project II Various Locations

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

City of Mill Valley Sewer Capital Improvement Plan

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

Bidding and Contract Requirements:

Riverside County Transportation Department Summary of Bids

Asphaltic Wedge Paving

Sanitary Sewer Overflow (SSO) Incident Report Form

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Chapter 9 Sanitary Sewers

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

Figure 3 Pipe Cracking

5O. Consideration of adopting a Sanitary Sewer Maintenance Policy for the City of Monticello (MT)

DEPARTMENT OF ENVIRONMENTAL QUALITY

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

DESCRIPTION OF WORK:

CLEANING, INSPECTION, AND TESTING OF SEWERS

CCTV INSPECTION OF SEWER LINES. A. Section Sanitary Gravity Sewer Lines. B. Section Sanitary Gravity Sewer Line Testing

City of Largo Environmental Services Department Environmental Control Program th Avenue North Clearwater, FL Phone: (727)

Sewer Rehabilitation Design Requirements

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

TOWN OF HILLSBOROUGH BUILDING & PLANNING DEPARTMENT DESIGN, CONSTRUCTION AND LANDSCAPE PROFESSIONAL NEWSLETTER Fall Greetings 2013

February 4, Estimate

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.:

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

BACKGROUND DISCUSSION

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

SECTION ABANDONMENT OF SEWER MAINS

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

CONSTRUCTION CONTRACTS: Bureau of Environmental Services strengthened its contract management procedures

INSTALLATION OF INSITUFORM LINER

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

WATER & SEWER LINE REPLACEMENT PROJECT Downtown Tempe Neighborhoods

FRONT STREET & MUD ISLAND Interceptor Rehab

A. Structures Quantity Item Price $3,500 EA

AGENDA REPORT. Honorable Mayor and Members of City Council Daniel Gho, Public Works Superintendent MEETING DATE: November 5, 2014

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

VACANT BASEMENTS FOR STORMWATER MANAGEMENT FEASIBILITY STUDY

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

Porous Pavement Alternatives Cost Analysis

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

LS 2540 SEWER LATERALS AND INSPECTION TEES

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

AGENDA ASTORIA CITY COUNCIL WORK SESSION / REGULAR SESSION

SEPARATION OF WATER MAINS, SEWERS, STORM DRAINS, AND UNDER DRAINS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION 5 DRAFTING STANDARDS

SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL

Wastewater Collection and Treatment Systems For Small Cities

Transcription:

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public Works Director ~ Rodger Craddock, City Manager~ ISSUE: Consideration to Award the Contract for the Empire and Kingwood Bundle Sewer Line Replacement Project BACKGROUND: In 2009 a number of sewer lines were identified as needing to be replaced and were titled the "Bundle Projects". Design was performed on all and construction was completed on all but four. Replacement of the remaining four lines was delayed due to the complexity of the areas where the sewer lines are located and the resources needed to obtain necessary easements and permit approvals. This contract will cover three of the four locations, 2 in Empire and 1 on Kingwood Avenue. The fourth location will be addressed at a later date. The scope of work for these locations include the replacement of approximately 812 feet of sanitary sewer mainline, rehabilitation of 2 manholes, new connections for all laterals currently serviced, and the replacement of landscaping and fencing in the construction areas. All necessary easements have now been obtained for these three locations. The City contracted with Kerbo Engineering to perform minor updates to the plans and specifications, obtain easements, and to perform bidding and construction management services for this project. The request for bid was advertised June 22nd and June 29 1 h, 2015 and the bids were opened on July 22nd, 2015 at 2:00 pm. A total of two bids were received with the engineer's estimated cost being $160,000: BIDDER AMOUNT Billeter Marine LLC $147,399.53 Johnson Rock Products Inc. $236,000.00 ADVANTAGES: Replacing these deficient sections will minimize the amount of Ill (Inflow and Infiltration) into and improve the overall efficiency of the sewer system. Also, by replacing these sections we will reduce the likelihood of an emergency in the City mainline at these locations where emergency repairs would most likely be extremely expensive. DISADVANTAGES: Staff sees no disadvantages.

BUDGET IMPLICATIONS: The source of funds for this contract is from the Oregon Infrastructure Finance Authority Loan #1 (29-810-530-3015). The bid amount is for$147,399.53, Staff has recommended a 15% contingency of $22,109.47 for a total amount of$169,509. ACTION REQUESTED: If it pleases the City Council, award the bid to Billeter Marine LLC for the Empire and Kingwood Sewer Line Replacement Project for an amount not to exceed $169,509 without prior approval from Council. ATTACHMENTS: Location Maps Bids

Salmon Alley (4 I. :. N. LOCATION MAP \\"+E... ~~, ~-- s ( - - )' Date: Ht412llt5 t indj = 100 reet

Michigan 11 Alley" Date: 1114120 15 LOCATION MAP N W+ E s 1 inch = too feet

Kingwood 1 inch = 1 00 feet

CITY OF COOS BAY EMPIRE & KINGWOOD SEWER IMPROVEMENTS Bid Tab- Sheet 1/2 SCHEDULE 1 EMPIRE PROJECT Billeter Marine Johnson Rock Item No. Description Est Quant. Unit Total Price Total Price 1 Construction Facilities and Temporary Controls. All LS 19,969.97 11,860.00 2 Demolition & Site Preparation All LS 2,742.32 12,115.00 3 8" Gravity Sewer Line Replacement 690 LF 51,736.20 80,833.50 4 Service Lateral Connections 20 EA 4,854.20 11,060.00 5 Concrete Surface Cut and Replace 8 LF 880.08 3,936.00 6 Asphalt Concrete Pavement Removal & Replacement 200 SF 1,964.00 2,350.00 7 Gravel Surface Remove and Replace 290 LF 10,437.10 1,725.50 8 Manhole Connections 5 EA 5,800.85 2,925.00 9 Main Line Pipe Connection 1 EA 217.75 182.00 10 Manhole 20BD-6 Repairs 1 EA 987.97 4,465.00 11 Manhole 20AC-5 Repairs 1 EA 1,070.39 4,370.00 12 Landscaping 1LS 3,587.17 3,820.00 13 Fencing 1025 LF 22,047.75 29,725.00 14 Foundation Rock 4 CY 366.92 748.00 SCHEDULE 1-Total $ 126,662.67 $ 170,115.00 SCHEDULE 2 KINGWOOD PROJECT Billeter Marine Johnson Rock Item No. Description Est Quant. Unit Total Price Total Price 1 Construction Facilities and Temporary Controls. All LS 3995.6 6,840.00 2 Demolition & Site Preparation All LS 3377.08 30,870.00 3 8" Gravity Sewer Line Replacement 122 LF 8132.52 12,505.00 3A Class B Backfill to Surface for Item 3 22 LF 947.1 1,100.00 4 Service Lateral Connections 2 EA 615.92 1,890.00 5 Slurry Fill Over Shallow Sewer Line 30 LF 519.9 1,305.00 6 Manhole Connections 2 EA 506.86 370.00 7 Manhole 20BA-17 Repairs 1 EA 1011.14 4,370.00 8 Manhole 20BA-18 Repairs 1 EA 885.2 4,370.00 9 Landscaping 1LS 366.94 2,550.00 10 Foundation Rock 2 CY 365.04 714.00 Schedule 2- Total $ 20,723.30 $ 66,884.00 TOTAL BASIC BID- Schedules 1 and 2 $ 147,385.97 $ 236,999.00

SCHEDULE 3 PRIVATE LATERAL REPLACEMENT Billeter Marine Johnson Rock Item No. Description Est Quant. Unit Total Price Total Price 1 Basic Private Lateral Replacement All LS 28,923.95 840 2 Demolition & Site Preparation All LS 75.21 55.8 CITY OF COOS BAY EMPIRE & KINGWOOD SEWER IMPROVEMENTS Bid Tab- Sheet 2/2