Subject: No-Rise Certification for River Restoration Activities on a section of the West Fork White River near the Fayetteville Executive Airport

Size: px
Start display at page:

Download "Subject: No-Rise Certification for River Restoration Activities on a section of the West Fork White River near the Fayetteville Executive Airport"

Transcription

1 tts WATERSHED CONSERVATION RESOURCf C NTER August 30,2013 Sarah Wrede Floodplain Administrator City of Fayetteville, AR 113 West Mountain Street Favetteville. AR Subject: No-Rise Certification for River Restoration Activities on a section of the West Fork White River near the Fayetteville Executive Airport Dear Mrs. Wrede: The purpose of this letter is to convey modeling results from the stream restoration project designed by the Watershed Conservation Resource Center (WCRC) for the West Fork White River (WFWR) near the Fayetteville Executive Airport. The project, when implemented, will reduce bank erosion, improve in-stream habitat, restore riparian habitat, prevent damage to City, County and Private land, and improve aesthetics of an approximately 4,600 foot reach of the WFWR. The WCRC performed modeling using the HEC-RAS model to demonstrate that the proposed actions of this important river restoration project does not cause an increase in water surface elevation during the 1O0-year flood event. The WCRC developed existing and proposed conditions models for the two scenarios and compared the water surface elevation at those cross sections. The existing conditions model was developed using cross-section locations from previous modeling efforts located outside of the project confines with the addition of cross sections at locations which would demonstrate effects of the proposed activities within the project area. Elevations for the existing model were established using 2009 LiDAR data supplemented with additional survey data within the project area. Manning's oon" values were determined based on previous field studies by the WCRC and are consistent with industry standards. The 100-year flood event discharge was obtained from the May 16, 2008 Flood Insurance Study for Washington County published by the Federal Emergency Management Agency (FEMA). The proposed conditions model was developed by creating proposed cross section geometry for locations which were modeled in the existing conditions model and also occurring in the proposed project limits. Manning's oon" values for the proposed condition were set to the same values as found in the existing conditions model. Based on the modeling results, the water surface will show a slight rise at XS C, D, G, H, and I, with the largest rise being only 0.04 feet, which is within a reasonable margin of precision for the HEC-RAS model. XS E and F both result in a decrease in water surface elevation for a 100-year flood event. The water surface elevations for the ten cross sections modeled as part of the 100-yr floodplain evaluation are shown in the table below. As shown in the table, the proposed project does not exceed a rise of 0.04 feet in any cross section lensth. 380 W. Rock St., Fayetteville, AR 7270L I phone: 50L fax: wcrc@watershedconservation.org I watershedconservation,org

2 Water Surface Elevation (ft) Existins Proposed Difference XSA t XSB L L XSC L L XS D" L L234.L XS E" L t o.26 XS F XS G' 124L72 t24t XSH L 0.01 XSI L L XSJ L L *Cross-sections located within the project area Based on these results, the WCRC is submitting this letter to the city of Fayetteville as the "norise" certification for the proposed project. A map of the modeled area, comparative cross section plots, and a copy of the proposed construction plan is attached to this letter. Please contact me at your earliest convenience if should have any questions. Sincerelv. Matthew A. Van Eps, P.E. Associate Director, WCRC 380 W. Rock St., Fayetteville, AR 7270L I phone: 50I fax: wcrc@watershedconservation.org I watershedconservation.org

3

4 XS A Full view XS A Zoom view

5 XS B Full view XS B Zoom View

6 XS C Full view XS C Zoom view

7 XS D Full view XS D Zoom view

8 XS E Full view XS E Zoom view

9 XS F Full view XS F Zoom view

10 XS G Full view XS G Zoom view

11 XS H Full view XS H Zoom view

12 XS I Full view XS I Zoom view

13 XS J Full view XS J Zoom view

14 DEPARTMENT OF THE ARMY LTTTLE ROCK DISTRICT, CORPS OF ENGINEERS ROGERS REGUI,ATORY FIELD OFFICE 2260 N. SECOND STREET ROGERS, ARKANSAS Regulatory REPLY TO ATTENTION OF Division May 6,2013 Mr. Matthew Van Eps Watershed Conservation Resource Center 380 W. Rock Street Favetteville. Arkansas 127 0I )e- ].1;. \. ::t : ni' "r -' NATIONWIDE PERMIT NO. 201I-0047 O-I Please refer to your letter dated, April 30, 2013, on behalf of the City of Fa1'etter ille. concerning Deparlment of the Army (DA) permit requirements pursuant to Section 404 of the Clean Water Act. You requested the reauthorizationto stabilize, enhance, create and improve aquatic habitat along 4000 linear foot of stream bank along West Fork White River. The proposed site is located in Section 9 T. 15 N., R. 30 W. Fayetteville, Washington County, Arkansas. The proposed activity is authorized by Department of the Army Nationwide Permit (NWP) No. 27 (copy enclosed), provided that the conditions therein, are met. You should become familiar with the conditions and maintain a copy of the permit at the worksite for ready reference. If changes are proposed in the design or location of the facilities, you should submit revised plans to this office for approval before construction of the change begins. Please refer to NWP Condition No. 12, which stipulates that appropriate erosion and siltation Cr.rr.iri-S b: used during construction and all exposed soil be permanently stabilized. Erosion J,':.:r-- - :-.==s-:es must be implemented during and after construction of the proposed project to :':l':.. :: ::-. ::::::it;ondition. -*-:i >... :.r \ l:: \\\-P determination u'ill be valid for two years unless the NWP is modified, suspended, - I :3', urk3d u ithin the tn'o-1'ear period. If NWP No. 27 is modified, suspended, or revoked :-:::ng this period. 1'our project may not be authorized unless you have begun or are under contract to begin the project. If work has started or the work is under contract, you would then have tn-elve months to complete the work. This permit does not authorize placement of fill material for bank extension riverward or for alignment with the adjoining property and does not grant any property rights or exclusive privileges. The authorization of this work by a NWP does not relieve you of complying with other

15 applicable local, state, and Federal laws. You are reminded that any future proposal for the discharge of dredged or fill material in waters of the United States requires prior approval from the Corps of Engineers under Section 404 of the Clean Water Act. If you have any questions about this permit or any of its provisions, please contact me at (479) , ext 1389 and refer to Permit No Enclosrs Sincerely, Cop)'Fumisbal Ch. Regularcq Fif &- r,!r druss Arkansas De1rrtanu,..r Earircrrrmeilal QualiN. rr cv dngs 8 "[r*[ll*,t:i,u,{. t hbra \\-ocrls'arc PRr5err \(r'e.r

16 PERMITTEE COMPLIANCE CERTIFICATION PERMITNO.: NWP/S NO.: 27 PERMITTEE NAME: Citv of Favetteville DATE OF REISSUAIT{CE: May PRGIECT [taltiager: Drtn \Uoods'rrd Upon completion of the activity authorized by this permit and any mitigation required by the permitn sign this certification and return it to the following address: US Army Corps of Engineers Attn: Debra Woodward Rogers Regulatory Field Office 2260 N. 2nd Street Rogers, Arkansas Please note that!'our permitted activity is subject to a compliance inspection by a US Army Corps of Engineers representative. If you fail to comply with this permit, you are subject to pc:nit suspension. modification, or revocation. I Ltttt c:rt{ tr tlc rorh, utlorizcd bf the ebot.e referenced pcrmir hrs bru.qlil - --'rjr.grll ft tsr.- ud corditins of the sei<l pcrrnit, erd rcqnircd -- rr crrplcted in eccordence with the permit conditions. I'ATE IVORK COMPLETED: SIGNATURE OF PERMITTEE DATE

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov.

RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking Portal at www.regulations.gov. April 18, 2011 U.S. Army Corps of Engineers Attn: CECW CO R 441 G Street, N.W. Washington, DC 20314 1000 RE: Docket # COE 2010 0035; ZRIN 0710 ZA05 Submitted via email to NWP2012@usace.army.mil and Rulemaking

More information

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased

More information

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed

What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed What We Do: Wetlands, Wildlife Habitat & Flood Hazards in the Root River Watershed presented by Ceil Strauss, State Floodplain Manager DNR Ecological & Water Resources 1 EWR Roles In Floodplains Regulatory:

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Inland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director

Inland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Inland Wetlands and Watercourses Permit Water Quality Certification Permittee: Connecticut Department

More information

Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway

Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway US Department of Homeland Security Region X 130 228 th Street, SW Bothell, WA 98021 Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway Section 60.3 (d) (3) of the

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER No. 08-02 Date: 26 June 2008 SUBJECT: Jurisdictional Determinations 1. Purpose. Approved jurisdictional determinations (JDs) and preliminary JDs are tools used by the U.S. Army

More information

Determination of NEPA Adequacy (DNA)

Determination of NEPA Adequacy (DNA) DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Federal Emergency Management Agency Region IV 3003 Chamblee-Tucker Road Atlanta, GA 30341

Federal Emergency Management Agency Region IV 3003 Chamblee-Tucker Road Atlanta, GA 30341 Federal Emergency Management Agency Region IV 3003 Chamblee-Tucker Road Atlanta, GA 30341 GUIDANCE FOR "NO-RISE / NO-IMPACT" CERTIFICATION FOR PROPOSED DEVELOPMENTS IN REGULATORY FLOODWAYS The National

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of

More information

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:

More information

2. BENEFIT:COST ECONOMIC ANALYSIS

2. BENEFIT:COST ECONOMIC ANALYSIS 2. BENEFIT:COST ECONOMIC ANALYSIS 2.1 Riverine and Coastal A-Zone Flood Model Overview The Riverine and Coastal A-Zone Flood model (RCAZF) (Version 1.0, January 1995), a spreadsheetbased model developed

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. There were 10 comments received in response to an April 14, 2014

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

DEPARTMENT OF THE ARMY Los Angeles District Corps of Engineers P.O. Box 532711 Los Angeles, CA 90017-3401. July 2, 2013

DEPARTMENT OF THE ARMY Los Angeles District Corps of Engineers P.O. Box 532711 Los Angeles, CA 90017-3401. July 2, 2013 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY Los Angeles District Corps of Engineers P.O. Box 532711 Los Angeles, CA 90017-3401 July 2, 2013 Regulatory Division Russell Williams, Principal Planner Riverside

More information

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance

Emergency Streambank Restoration/Stabilization. Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Emergency Streambank Restoration/Stabilization Kentucky Division of Water Water Quality Certification May 2010 Educational Assistance Due to the severity of the recent rains and flooding occurrences, the

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation

Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Watersheds, Streams, & Highways: Resiliency in Disaster Recovery Through Partnerships and Innovation Chris Sturm Colorado Water Conservation Board Stream Restoration Coordinator 303 866 3441 chris.sturm@state.co.us

More information

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact

County Watersheds. Total Project Cost - $11.1 M. Project Description. Funding Sources. Project Milestones. Service Impact County Watersheds Total Project Cost - $11.1 M Project Description These funds are for watershed capital projects throughout the County. Projects can include stream restoration, best management practices

More information

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS

RESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS STATE OF NEW YORK COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by, ("Declarant"), A New York corporation with offices at,, New York.

More information

How To Get A Parkland Permit

How To Get A Parkland Permit Permit # Page 1 SEPULVED BASIN RECREATION ZONE PERMIT Permit applicant: ( Permittee ) Permit for use of the Sepulveda Basin Recreation Zone managed by the Mountains Recreation and Conservation Authority

More information

DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN

DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN DELAWARE COUNTY STREAM CORRIDOR MANAGEMENT PROGRAM TWO-YEAR ACTION PLAN FOR THE WEST BRANCH DELAWARE RIVER CANNONSVILLE RESERVOIR BASIN May 2011 - April 2013 1. Introduction 2. Recommendations Table of

More information

DECISION DOCUMENT NATIONWIDE PERMIT 27

DECISION DOCUMENT NATIONWIDE PERMIT 27 DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:

More information

September 25, 2015. Dear Concerned Citizen:

September 25, 2015. Dear Concerned Citizen: IN REPLY REFER TO 5400/1792 (ORC030) ORC00-TS-2016.0001 Cloud 19 CT Timber Sale DOI-BLM-OR-C030-2010-0001-EA Fairview NWFP Project Environmental Assessment September 25, 2015 Dear Concerned Citizen: United

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012

King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers. Public Meeting December 5, 2012 King County Flood Hazard Management Plan Update Cedar/ Sammamish Rivers Public Meeting December 5, 2012 Goals of the Presentation Cedar and Sammamish R. Plan Update Context - Brief summary info about the

More information

REGULATORY GUIDANCE LETTER

REGULATORY GUIDANCE LETTER REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

US Army Corps of Engineers Authorities and Programs

US Army Corps of Engineers Authorities and Programs US Army Corps of Engineers Authorities and Programs Section 206; Flood Plain Management Services Program Section 22; Planning assistance to States General Investigations (large-scale flood risk reduction)

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction Permit No. CP0001707, Callaway County Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO-0098001, Construction,

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

a. For all activities that would result in the discharge of fill material into any vernal pool;

a. For all activities that would result in the discharge of fill material into any vernal pool; Final Sacramento District Nationwide Permit Regional Conditions for Nevada and the Lake Tahoe Basin in California (Effective March 19, 2012 until March 18, 2017) 1.* When pre-construction notification

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. 33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.

More information

MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION

MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MEMORANDUM OF AGREEMENT AMONG THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND THE UNITED STATES ARMY CORPS OF ENGINEERS, WILMINGTON

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

1. INTRODUCTION 5. THE PERMIT PROCESS

1. INTRODUCTION 5. THE PERMIT PROCESS 1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

This letter revises the above-referenced NFIP map to remove the property from the SFHA. The property is now in

This letter revises the above-referenced NFIP map to remove the property from the SFHA. The property is now in .. U 0 * Washington, D.C. 20472 U v: The Honorable Jan Laverty Jones Mayor, City of Las Vegas 400 East Stewart Avenue Qfa Las Vegas, Nevada 89101 30 r\ 1 & Q Dear Mayor Jones: N REPLY REFER TO CASE NO.

More information

Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE

Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE Updates: LUR Rulemaking & FEMA Flood Mapping Vince Mazzei, PE New Jersey Department of Environmental Protection Division of Land Use Regulation February 11, 2015 Today s topics: Brief overview of NJ s

More information

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

Teller County, Colorado Floodplain Development Permit Application

Teller County, Colorado Floodplain Development Permit Application Teller County, Colorado Floodplain Development Permit Application This is an application packet for a Floodplain Development Permit (FDP). Certain sections are to be completed by the Applicant, and certain

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

PIPELINE AND UTILLITY PERMIT APPLICATION PACKET

PIPELINE AND UTILLITY PERMIT APPLICATION PACKET Orange County Drainage District 8081 Old Hwy 90 Orange, Texas 77630 Main Office (409) 745-3225 Fax (409) 745-3004 PIPELINE AND UTILLITY PERMIT APPLICATION PACKET Contact the Orange County Drainage District

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

July 20, 2015. Subject: 7 th Avenue Creek Project Update & Elevation Certificates

July 20, 2015. Subject: 7 th Avenue Creek Project Update & Elevation Certificates July 20, 2015 Subject: 7 th Avenue Creek Project Update & Elevation Certificates Below are a few updates regarding the 7 th Avenue Creek Project. As you may recall there are two concurrent and independent

More information

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014 Background Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014 Senate Bill 14-179, proposed to the 2014 Colorado General Assembly, establishes funding for stream

More information

Remaining Wetland Acreage 1,500,000 915,960 584,040-39%

Remaining Wetland Acreage 1,500,000 915,960 584,040-39% NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.

More information

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS: Date Received: Received By: Project/Permit Number: Fee: (To be Completed by MOA) FLOOD HAZARD PERMIT APPLICATION (Please fill out application completely; Indicate NA if necessary. Property information

More information

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are

More information

A. Flood Management in Nevada

A. Flood Management in Nevada Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen

More information

Policy and Procedures for the Evaluation of Downstream Impoundments

Policy and Procedures for the Evaluation of Downstream Impoundments I. Definitions A. Potential Influence Area is defined as the closer of 1. The point at which the total drainage area is at least 100 times greater than the maximum proposed disturbed area, or 2. An offsite

More information

Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program

Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Techniques Applied and Lessons Learned Seth Ahrens, P.E., CFM Selena Forman,

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.

More information

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002 Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon

More information

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS .-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

Lincoln County Floodplain Development Permit Application

Lincoln County Floodplain Development Permit Application Lincoln County Floodplain Development Permit Application Application # FP Use Permit Variance Appeal Date SECTION I: GENERAL PROVISIONS (APPLICANT to read and sign) 1. No work of any kind may start until

More information

Protecting Floodplain. While Reducing Flood Losses

Protecting Floodplain. While Reducing Flood Losses Protecting Floodplain Natural and Beneficial i Functions While Reducing Flood Losses Jon Kusler Association of State Wetland Managers 518 872 1804; jon.kusler@aswm.org Report available at: http://aswm.org/pdf_lib/nbf.pdf

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

Laws and Regulatory Requirements to Consider Before You Build a Pond

Laws and Regulatory Requirements to Consider Before You Build a Pond Bulletin #2376 Laws and Regulatory Requirements to Consider Before You Build a Pond John M. Jemison, Jr., Extension water quality and soil specialist Donna Lamb, Extension educator Before constructing

More information

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework

More information

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

City of Valdosta Land Development Regulations

City of Valdosta Land Development Regulations Chapter 306 Soil Erosion, Sedimentation, and Pollution Control Section 306-1 Exemptions This chapter shall not apply to any of the following activities: (A) Surface mining, as the same is defined in O.C.G.A.

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

Using GIS Data With HEC-RAS

Using GIS Data With HEC-RAS C H A P T E R 14 Using GIS Data With HEC-RAS HEC-RAS has the ability to import three-dimensional (3D) river schematic and cross section data created in a GIS or CADD system. While the HEC- RAS software

More information

Appendix D Flood Damage Assessment

Appendix D Flood Damage Assessment Appendix D Flood Damage Assessment There is no single definition of the phrase flood-damage assessment that is applicable to all agencies. Such a definition would be difficult to develop and may be unnecessary.