Policy and Procedures for the Evaluation of Downstream Impoundments
|
|
|
- Edith Turner
- 10 years ago
- Views:
Transcription
1 I. Definitions A. Potential Influence Area is defined as the closer of 1. The point at which the total drainage area is at least 100 times greater than the maximum proposed disturbed area, or 2. An offsite water impoundment downstream of the proposed land-disturbing activity where the cumulative total water surface area of the downstream water impoundment(s) exceeds ten percent of the proposed disturbed area. B. Land Disturbing Activity: The definition of land-disturbing activity for this policy will be identical to the definition in Chapter 104 of the Code of the County of Fairfax, Virginia with the exception that disturbed land areas for commercial and non-commercial uses less than one acre shall be considered exempt from the provisions of this policy. II. Developer/Engineer Responsibilities A. The submitting engineer will identify all downstream water impoundments within the potential influence area of proposed land-disturbing activity through: 1. Latest aerial photographs, and/or 2. Approved plans, and/or 3. Existing County tax maps, and/or 4. A field investigation of the site outfall(s) to the extent possible to ensure all downstream water impoundments have been identified within the potential influence area. B. The submitting engineer will provide a certification on the plan that indicates if a water impoundment is or is not located within the potential influence area of the proposed landdisturbing activity. C. A pre-development bathymetric survey shall be: 1. Provided for all water impoundments located in the potential influence area defined above, or 2. Provided as required by the department. 3. Performed within 180 days prior to plan approval or as otherwise approved in writing by the Environmental and Facilities Review Division (EFRD).
2 Page 2 D. The developer will be released from the requirement to perform a pre-development and/or post development bathymetric survey if: 1. The owner of the water impoundment does not respond within 30 calendar days to the developer s written request to perform a pre-development bathymetric survey. A copy of a suggested written notice requesting permission to perform a pre-development bathymetric survey of the water impoundment(s) is available at under Letters to Industry or at the Plan and Document Control (PDC) Counter. If a written notice is issued, a copy of the notification and certified mail receipt provided to the Plan and Document Control Section (PDC), will satisfy this criteria, or 2. The owner of the water impoundment does not allow the developer reasonable access to perform the bathymetric survey after reasonable efforts to secure that access by developer have been made, or 3. The requirement is waived or modified in writing by EFRD on behalf of the Director, Department of Public Works and Environmental Services. E. A post-development bathymetric survey will be required: 1. If a Notice of Violation (NOV) has been issued regarding offsite damage associated with erosion and sedimentation from the proposed development and the NOV requires the submission of a post-development bathymetric survey, or 2. If requested by EFRD or the Environmental and Facilities Inspections Division. F. Two copies of each submission of the bathymetric survey must be submitted to PDC, for review and approval by EFRD on behalf of the Director. The Department of Public Works and Environmental Services Responsibilities A. If the Engineer certifies a water impoundment as being within the potential influence area of the proposed land-disturbing activity, PDC will add a pre-approval condition in the County's land development automated records to satisfy the requirements listed below. B. The Site Reviewer is responsible for ensuring the applicable requirements, including the bathymetric survey requirements have been satisfied before changing the pre-approval condition to MET. C. The pre-development bathymetric survey shall be approved by EFRD on behalf of the Director prior to plan approval. D. A copy of the approved bathymetric survey should be placed in the project file.
3 Page 3 E. If a post-development bathymetric survey is required, the site inspector shall ensure that a postapproval condition is added to the County's land development records, and request the Bonds, Agreements, and Administration Section to add a condition on the appropriate bond release screen. F. The site inspector should not process any requests of a reduction or release of a conservation deposit or forward the Letter 18 for approval, until the associated NOV has been released. G. If a development agreement was not executed with the County, the site inspector shall place a note in the project file, if a post-bathymetric survey is required. The site inspector should not process any requests for reductions or release of a conservation deposit until the associated NOV has been released. IV. Bathymetric survey submission requirements A. The bathymetric survey should be performed in accordance with the U.S. Army Corps of Engineers Manual No , Hydrographic Surveying, Chapter 8, Section 8-4. Sounding Pole, page 8-4 through 8-6. B. The survey grid of the water impoundment shall be established as follows: 1. For water impoundments with surface areas less than one and one half acres, the grid spacing shall not exceed 25 feet, provided a minimum of five survey points are attained. 2. For water impoundments with a surface area greater than or equal to one and one half acres but less than five acres, the grid shall not exceed 25 feet for a one half acre area nearest to each concentrated tributary and 50 feet for the remainder of the water body. 3. For water impoundments greater than or equal to five acres, the grid and method and extent of analysis shall be submitted to PDC for approval by EFRD. C. All Bathymetric Surveys shall contain: 1. The approximate coordinates of the grid that are utilized to establish the elevations of the floor of the water impoundment. The coordinates of the grid used in the predevelopment survey shall be used in the post-development bathymetric survey. The coordinates shall be tied to the Virginia Coordinate System of 1983 (VCS 1983). 2. A plan that depicts the location and identifies each survey coordinate on the grid. 3. A summary of all the coordinate points on the grid and computed elevation of each coordinate. 4. The metadata about the vertical data of survey.
4 Page 4 5. If a post-development bathymetric survey is required, the results of a three dimensional analysis shall be provided that computes the quantity of sediment that has accumulated in the water impoundment since the pre-development survey was conducted. The analysis shall utilize and be based on the data from the pre-and post-development bathymetric surveys. 6. The following signed and sealed certification by a surveyor licensed in the Commonwealth of Virginia: Certification: I certify that this bathymetric survey has been performed in accordance with the U. S. Army Corps of Engineers Manual No , Hydrographic Surveying Chapter 8, Section 8-4 and/or Fairfax County policies regarding bathymetric surveys. SEAL
5 Notification Letter XYZ Development Corporation 123 Main Street Fairfax, VA Mr.\ (Mr. & Mrs.)\ ( Ms.) J. Doe Any Drive Fairfax, VA Reference: Project name and County Plan Number Dear Mr.\ (Mr. & Mrs.)\ (Ms.) Doe: It is our understanding that you are the owner(s) of the property identified on Fairfax County Tax Map XX-X ((X)) XXXXX and that a water impoundment such as a pond or lake exists on your property. As the developer of the project referenced above, which is located upstream from your property, we would like to obtain your permission to conduct a pre-construction survey of the elevation of the bottom of your pond. This type of survey procedure is commonly referred to as a bathymetric survey. Sediment accumulates in all ponds as a result of several factors including natural stream bank erosion; however, we are required to minimize any sediment resulting from our construction activity. The purpose of requesting the survey is to establish the elevations and topography of the bottom of the pond so that all parties have accurate documentation and a common understanding of its condition before construction commences. The results of the pre-construction bathymetric survey may assist to determine the extent of sediment deposited in the water as a result of our development activities. This information may help us avoid disputes at the conclusion of our project about the extent of sedimentation we might have caused. The survey will be conducted in accordance with the procedures established by the U.S. Army Corps of Engineers Manual No , Hydrographic Surveying, Chapter 8, Section 8-4 and endorsed by Fairfax County. Usually, this involves a team using a small boat to make depth measurements at certain points in the pond, from which a topographical profile of the pond bottom can be drawn. A copy of all survey data will be forwarded to you at your request. Please note that you are not required or obligated to grant us permission to conduct the pre-construction bathymetric survey. Further, the County s approval of our project s proposed construction plan is not contingent upon receiving authorization to conduct a bathymetric study. You will not be responsible for the costs of this survey. Of course, any study which you commission on your behalf will be your own obligation. We are requesting your permission to conduct a pre-construction bathymetric survey in order to avoid any future misunderstanding or disagreements and to minimize the costs and length of time to resolve any disputes regarding the extent of sedimentation caused by upstream development activities. Prior to conducting any survey work, we will work with you to develop and establish the details regarding reasonable access, timing of the work, responsibilities and liabilities.
6 J. Doe Page 2 The County may eventually require that a post-construction bathymetric survey be performed if it observes a failure of our erosion and sediment controls and evidence of new sedimentation in your pond. If that occurs, we would request your permission again to access your property. Please fill out and return the enclosed form letter in the self addressed and stamped envelope within 30 days of the postmarked date on the envelope. The purpose of the attached form is to indicate your intention to work with our firm in establishing the parameters to conduct a bathymetric survey of the pond on your property. Please understand that agreeing to discuss this matter with our firm in no way obligates you or provides any additional rights for us to perform any work on your property. If you have any questions regarding this letter, please call (Contact person from your firm) at (Phone number of contact person). If you have any questions regarding Fairfax County s requirements pertaining to this matter please call the Environmental and Facilities Review Division at (703) Sincerely, XYZ Development Corporation Enclosure: As stated
7 Date: XYZ Development Company 123 Main Street Fairfax, VA Dear Mr./Mrs./Ms. (Developer s Name): I have received your notice informing me of your desire to conduct a survey of the bottom of the water impoundment that exits on my property. This indicates my willingness to work reasonably with your firm in establishing the parameters of the survey work that you would like to perform on my property, but does not authorize you or your firm to perform any work on my property at this time. Sincerely, Name of property owner Phone number:
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
Annual Standards and Specifications. Erosion and Sediment Control
Annual Standards and Specifications for Erosion and Sediment Control January 2012 Version: September 15, 2009 INTRODUCTION Virginia Commonwealth University (VCU), Annual Standards and Specifications for
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR
SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR 1. ANY MAP OR PLAN THAT SHOWS: Property Lines. NJSA 45:8-28(e), NJAC 13:40-1.3, 13:40-5.1 Locations of Existing Buildings
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 , MO-0098001, Construction Permit No. CP0001707, Callaway County
Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 , MO-0098001, Construction,
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS The Board of Supervisors of Tazewell County, Virginia is soliciting proposals, pursuant to Section 56-575.4 of the Code of Virginia, from private entities to design and build an onsite
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
NRG) #~-/dl~ Mr. Richard Kinch United States Environmental Protection Agency (5306P) 1200 Pennsylvania Avenue, NW Washington, DC 20460
~~ NRG) Mr. Richard Kinch United States Environmental Protection Agency (5306P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 SUBJECT: Request for Information Under Section 104(e) of the Comprehensive
Administrative Procedures Regarding the Application of Flood Damage Prevention
Administrative Procedures Regarding the Application of Flood Damage Prevention A floodplain development permit, conforming to the provisions of the Flood Damage Prevention Ordinance ( the Ordinance, shall
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
Control filling, grading, dredging, and other development which may increase erosion or flood damage; and
ARTICLE 16. FLOOD DAMAGE PREVENTION Section 16-1: Findings of Fact The flood hazard areas of the Town of Lillington are subject to periodic inundation which results in loss of life and property, health
CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL
CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
DEPARTMENT OF PLANNING AND DEVELOPMENT
DEPARTMENT OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION FOR NON-RESIDENTIAL DEVELOPMENT Property Owner Telephone Street/P.O. Box City State ZIP Agent (if any) Relationship to Property
GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS
GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS DATE RFQ RELEASED July 13, 2013 1 PURPOSE OF THIS REQUEST FOR
APPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
Receiving Water Body:
62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 04-Nov-2015 APPLICATION #: IND-059-16968-1 Applicant: Eddie Dixon Holmes District School Board 701 E Pennsylvania Ave Bonifay, FL
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
7.2 CONDITIONAL APPROVAL
SECTION 7.0 GUARANTEE OF PERFORMANCE 7.1 GENERAL REQUIREMENTS In lieu of requiring the completion of all improvements previous to the final approval of a subdivision plan, the Commission may accept a bond
REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION
REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 ABSTRACT: Regional sediment management (RSM) requires the capability
Carlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL 33408 Phone: (561) 656-0302 Fax: (561) 775-0812
TOWN OF JUNO BEACH 340 Ocean Drive Phone: (561) 656-0302 Fax: (561) 775-0812 Application for Building Permit & Certificate of Occupancy OFFICE USE ONLY: Date: Permit #: Tracking #: Job Address: Property
Requirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: [email protected] To: Architects, Designers
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
ADVERTISEMENT FOR BIDDERS
ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the
Harris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
104 INTERPRETATION OF TEXT
100 PURPOSE The Purpose of these rules, guidelines and standards as adopted by the Delaware County Board of Commissioners, hereinafter referred to as the County Commissioners, is to provide engineering
TENT AND STAGE CUSTOMER ASSISTANCE GUIDE
TENT AND STAGE CUSTOMER ASSISTANCE GUIDE Charles County Government Department of Planning & Growth Management P.O. Box 2150 La Plata, MD 20646 (301) 645 0692 / (301) 870 3935 Fax: (301) 645 0575 Web Site:
Request for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming
Request for Proposals for Topographic Mapping Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming Proposals due: 2:00PM MDT July 1, 2015 Proposals may be delivered to: Teton
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
APPLICATION FOR 2016 TAX RELIEF FOR THE ELDERLY OR PERSONS WITH DISABILITIES
APPLICATION FOR 2016 TAX RELIEF FOR THE ELDERLY OR PERSONS WITH DISABILITIES Dear City of Fairfax Resident: Enclosed is a copy of the 2016 Tax Relief application form for the Elderly, or Persons with Disabilities
*** PUBLIC NOTICE ***
*** PUBLIC NOTICE *** UNIVERSITY OF ALASKA BILL RAY CENTER OFFICE BUILDING AND PARKING LOT DISPOSAL PLAN JUNEAU, ALASKA The University of Alaska ( University ) is offering for sale an approximately 22,000
APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT
APPLICATION FOR A FILL, ECAVATION AND SITE GRADING PERMIT 1. The first step to obtain a Fill, Excavation and Site Grading permit is to obtain a Broward County Environmental Review Approval. Through the
DATE STAMP RECEIVED BY OFFICE OF PLANNING
Applicants must appear in person to file an application. Applications by mail or courier will not be accepted. APPLICATION FOR A SPECIAL ADMINISTRATIVE PERMIT (SAP) File No.: FOR CELL TOWERS (new or increase
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
Appendix F Subdivision Street Construction Applications and Forms
Appendix F Subdivision Street Construction Applications and Forms Subdivison Street Construction Process: Applicant submits the following: o Copy of the recorded record plan o Approved construction drawings
Termination of National Bank Status
Termination of National Bank Status Other Changes and Activities Comptroller s Corporate Manual Washington, DC April 1998 Termination of National Bank Status Table of Contents Introduction Background
Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff)
FLOOD PLAIN DEVELOPMENT PERMIT APPLICATION of Olathe, Department of Public Works 1385 S. Robinson Drive P.O. Box 768 Olathe, Kansas 66051-0768 (913) 971-9045 FAX (913) 971-9099 Olathe, Kansas, Community
12-O-1761 A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE
A SUBSTITUTE ORDINANCE BY CITY UTILITIES COMMITTEE 12-O-1761 AN ORDINANCE TO AMEND VARIOUS SECTIONS OF CHAPTER 74, ARTICLE X OF THE CITY OF ATLANTA CODE OF ORDINANCES FOR THE PURPOSE OF PROMOTING GREEN
CHAPTER 118. Chesapeake Bay Preservation Ordinance.
CHAPTER 118. Chesapeake Bay Preservation Ordinance. CHAPTER 118. Chesapeake Bay Preservation Ordinance. ARTICLE 1. General Provisions and Definitions. ARTICLE 2. Allowed Uses, Development and Redevelopment.
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced
City of Mandeville. Guidelines for Construction and Development
City of Mandeville Guidelines for Construction and Development 1 Application for Permitting Requirements The following items must accompany any application for a permit for the construction of single family
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
April 15, 2014. Greg Baugh, Incorporator/Organizer GSB Builders, LLC 2917 King St. Jonesboro, AR 72401
April 15, 2014 Greg Baugh, Incorporator/Organizer GSB Builders, LLC 2917 King St. Jonesboro, AR 72401 RE: SFR 312 Buck Brush & SFR 4852 Wildwood Inspections AFIN: 16-00000 Permit No.: ARR150000 Dear Mr.
HYDROGRAPHIC DEPARTMENT MARITIME AND PORT AUTHORITY OF SINGAPORE (MPA) (Version: July 2015)
HYDROGRAPHIC DEPARTMENT MARITIME AND PORT AUTHORITY OF SINGAPORE (MPA) (Version: July 2015) GENERAL SPECIFICATIONS FOR THE CONDUCT OF HYDROGRAPHIC SURVEYS 1 Engagement of Commercial Hydrographic Surveyor
VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)
Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms) This New Home Building Permit Application Package is online at: www.shorehamvillage.org Please
PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS
H a n o v e r C o u n t y PERFORMANCE AGREEMENT AND SURETY PROCESS FOR SUBDIVISIONS AND SITE PLANS County of Hanover Department of Planning 7516 County Complex Road P.O. Box 470 Hanover, VA 23069 Phone:
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA 15219 412-255-2241 412-255-2561(fax)
CITY OF PITTSBURGH Department of City Planning 200 Ross Street, Pittsburgh, PA 15219 412-255-2241 412-255-2561(fax) APPLICATION Construction and Development In the Flood Plain Overlay District This is
OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES
OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES Requirements, Rules and Design Criteria for Storm Water Management January 1, 2006 Revised May 13, 2013
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.
Department of Community Development, P. O. Box 427, Herndon, Virginia 20172-0427
March 2013 HOME-BASED BUSINESS, INCLUDING HOME DAY CARE: PART 1 Note: In certain cases, a Special Exception may be required for home-based businesses (see Zoning Ordinance 78-402.7(k)) Submittal of this
Teller County, Colorado Floodplain Development Permit Application
Teller County, Colorado Floodplain Development Permit Application This is an application packet for a Floodplain Development Permit (FDP). Certain sections are to be completed by the Applicant, and certain
Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
The answers to some of the following questions are separated into two major categories:
Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the
Request for Qualifications
Request for Qualifications Consultant Selection for Assistance with U.S. EPA Brownfields Cleanup Grant for the Jefferson County Economic & Industrial Development Authority BROWNFIELDS PROJECT Former Trinity
TSIS CBS Interface Training Script Part IV: Contracts with Payment Bonds
TSIS CBS Interface Training Script Part IV: Contracts with Payment Bonds Slide 1: TSIS CBS Interface Part IV Contracts with Payment Bonds Welcome to the BLM s Training Course, titled TSIS CBS Interface
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS
CHAPTER 3 page 69 LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS LOCAL FLOODPLAIN REGULATIONS AND NFIP STANDARDS, page 69 THE PARTICIPATION OF A COMMUNITY IN THE NFIP IS MADE POSSIBLE BY ITS ADOPTION
LAKEHAVEN UTILITY DISTRICT. Developer Extension Agreement Application
Applicant shall indicate that the required information has been provided or is not applicable to the project by placing the appropriate mark in the first column of this checklist. Missing or incomplete
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS The Town of Ayer s Department of Planning & Development seeks proposals from qualified consultants to provide the following services in the Town of Ayer: INFRASTRUCTURE PROJECT CONSULTANT
FOR ASSISTANCE PLEASE CALL 703-222-8234 TTY 703-222-7594
2014 Desiree M. Baltimore, Manager, Tax Relief Section Department of Tax Administration 703-222-8234 [email protected] TTY: 703-222-7594 APPLICATION FOR TAX RELIEF COUNTY OF FAIRFAX DEPARTMENT
ENCLOSURES TO BE SUBMITTED WITH INVITATION TO OFFER
ENCLOSURES TO BE SUBMITTED WITH INVITATION TO OFFER NOTICE: PLEASE CHECK BOXES AND INCLUDE THE RELEVANT INSTRUMENT WITH THE INVITATION TO OFFER (ITO). ITOs submitted without the relevant instrument and
City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.
[email protected] Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES
5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people
Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey
Data Sharing System (DSS) Data Entry Instruction for Archaeological Survey Introduction The following data entry guidelines are to be followed for new Data Sharing System (DSS) entries. When updating previously
Computing Stormwater Runoff Rates and Volumes
New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff
