Halton Region Planning & Public Works Committee Meeting July 8, 2015

Size: px
Start display at page:

Download "Halton Region Planning & Public Works Committee Meeting July 8, 2015"

Transcription

1 Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8,

2 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the agencies and members of the public. 2

3 Impacts to Surrounding Residences Are Minimized Dufferin has acquired significant land to increase the separation distance between the proposed extension and surrounding residences. Phase 4 no residences within 500 m Phase 5 East no residences within 500 m Phase 5/6 West 5 residences within 500m Agencies have confirmed: All standards for blasting, noise and air quality can be met The extension will not impact municipal water wells The extension will not impact private water wells, including those along 4 th Line The proposed haul routes are acceptable 3

4 Other Measures To Ensure That Residents Are Protected t Open door policy to address neighbour s concerns. Requirement for posting a sign at the Quarry Extension entrance with a Hotline Number for concerned citizens to call. Community Liaison Committee that has met 27 times since Annual Monitoring Meeting with Agencies and Members of the community to review the monitoring results. POWER has been invited to participate in these meetings. 4

5 Rehabilitation & Ecological Enhancement Plan Contribute to the Region s Natural Heritage System Acton Quarry Extension Rehabilitation Plan includes 40ha of ecological enhancements (tree plantings, lakes and shoreline wetlands), 2 turtle nesting sites and 1.8 km of cliffs. Off-site Ecological Enhancement Plan (EEP) includes : 16.3ha of tree planting 18.5ha thicket management 15.5ha woodland management 10.2 ha grassland creation 1 wetland (Pool G) 0.1ha wetland enhancement 2 turtle nesting sites 5

6 Conveyance of Land to Public Ownership 438ha of land are being conveyed to the Town of Halton Hills. Of these lands, 318ha are being added to the Niagara Parks and Open Space System. 6

7 Conveyance of Land for Public Use The lands north of 22 nd Sideroad would be available for active recreational uses subject to future approvals and conservation uses. The lands south of 22 nd Sideroad would be available for passive / open space recreation and conservation uses. 7

8 The Lands to be Conveyed to Public Ownership Include a Water Management System That Will Benefit CH & CVC Watersheds Current approvals for the existing quarry require water to be pumped to the Conservation Halton and Credit Valley Conservation watersheds during periods of high flow (spring season / storm events) which provides only limited ecological and social benefits. The application proposes a water management system that protects the existing ecological water resources and allows water to be stored and released to the watersheds during periods of low flow, thereby providing higher ecological and social benefits. This water management system will provide significant public benefits: Protect t or enhance fish habitat t in Black Creek; Opportunities for enhancement of Acton Wastewater Treatment Plant, including additional capacity; Protect or enhance downstream water supply to 16 Mile Creek. Dufferin is building the water management system and fully funding the long term operation of the system at no cost to the public. The system will be operated by Conservation Halton and water will be managed for environmental lbenefits. 8

9 Supports the Local Economy The proposed extension lands contain 38 million tonnes of the highest quality aggregate in Southern Ontario. Superior Glove Splash Pad At Acton Branch of the Halton Hills Public Library 60 people directly employed and 150 people indirectly employed by the quarry. New Oakville Hospital $12 million spent annually on services, taxes and levies. Over the life of the extension (19 years), this would equal approx. $228 million. 9

10 Conclusion The Acton Quarry Extension application conforms to the Region of Halton Official Plan. The application is supported by all of the review agencies: MNRF NEC Town of Halton Hills Credit Valley Conservation Authority Conservation Halton Region of Halton Staff are recommending approval of the Extension. This application is in the public interest and includes numerous aspects that will benefit the community, environment and water resources. Dufferin supports Staff s recommendations to adopt OPA 44 and execute the legall agreements. 10

Acton Quarry Extension. Halton Region June 11, 2014

Acton Quarry Extension. Halton Region June 11, 2014 Acton Quarry Extension Halton Region June 11, 2014 1 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land

More information

REPORT. Mayor Bonnette & Members of Council. Dufferin Aggregates Acton Quarry Expansion

REPORT. Mayor Bonnette & Members of Council. Dufferin Aggregates Acton Quarry Expansion REPORT REPORT TO: Mayor Bonnette & Members of Council REPORT FROM: Mark H. Kluge, Senior Planner - Development Review DATE: REPORT NO.: RE: PDS-2014-0028 Dufferin Aggregates Acton Quarry Expansion RECOMMENDATION:

More information

Overview of DFA OPQ CAP Meeting

Overview of DFA OPQ CAP Meeting Strength. Performance. Passion. Overview of DFA OPQ CAP Meeting Feb 24 th 2014 2012 Holcim 2012 (Canada) Holcim Inc. (Canada) Inc. Dufferin Aggregates (DFA), a division of Holcim (Canada) Inc., is a leading

More information

Biodiversity Action at Holcim Canada

Biodiversity Action at Holcim Canada Strength. Performance. Passion. Biodiversity Action at Holcim Canada Global Partnership for Business and Biodiversity, Montreal, Oct 2, 2013 Short title, Department, Date yymmdd, Classification 2012Holcim

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

Town of Richmond Hill Community Stewardship Program

Town of Richmond Hill Community Stewardship Program Town of Richmond Hill Community Stewardship Program Environmental Services Division November 19, 2011 Environmental Advisory Committee Symposium Richmond Hill s s Organization Office of the C.A.O. Community

More information

4. Priority Areas of Conservation

4. Priority Areas of Conservation 4. Priority Areas of Conservation A. SIGNIFICANT RESOURCE AREAS This Open Space and Farmland Plan identifies the key issues facing open space and agricultural resources in the Town, highlights the location

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER

The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER INTRODUCTION On December 2 nd, 2014, the High Speed Rail (HSR) Project released new maps showing recently proposed alternate rail routes that go

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012

Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012 Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012 Dear Members of the Standing Committee, On behalf of our members and member groups

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater INFLOW AND INFILTRATION CUSTOMER OUTREACH

More information

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT

THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT THE CORPORATION OF THE CITY OF COURTENAY STAFF REPORT To: Council File No.: 1705-20 / 1830-05 From: Chief Administrative Officer Date: January 21, 2015 Subject: PURPOSE: The purpose of this report is to

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

The 25 Year Saskatchewan Water Security Plan. February 2013

The 25 Year Saskatchewan Water Security Plan. February 2013 The 25 Year Saskatchewan Water Security Plan February 2013 OUTLINE Challenges The Plan The Agency Implications for Agriculture Water Security Plan Development Consultation in 2011 with 174 individuals

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014 Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated

More information

Black Mountain Reservoir Land Rezoning

Black Mountain Reservoir Land Rezoning Black Mountain Reservoir Rezoning Information Meeting Black Mountain Reservoir Rezoning 1.0 Black Mountain Reservoir What the reservoir provides The Black Mountain Reservoir will be a low-elevation raw

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Rural Settlement Patterns

Rural Settlement Patterns Rural Settlement Patterns A summary with pictures. Courtesy of Crescent School There are three types of rural settlement patterns that occurred where large numbers of people settled: the long lots of

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed

More information

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey Monitoring at Credit Valley Conservation Presented by Jackie Thomas and Luke Harvey Where are we? WHAT IS MONITORING? Long-term sampling of the same point or reach to track changes over time/space Short

More information

PLANNING REPORT HIDDEN QUARRY

PLANNING REPORT HIDDEN QUARRY PLANNING REPORT PROPOSED ZONING BY-LAW AMENDMENT HIDDEN QUARRY PART OF LOT 6 CONCESION 1 TOWNSHIP OF GUELPH-ERAMOSA (FORMER TOWNSHIP OF ERAMOSA) COUNTY OF WELLINGTON SEPTEMBER, 2012 PREPARED FOR: JAMES

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

What Is Rehabilitation?

What Is Rehabilitation? Location of Aggregate Operations Ready Mix Plant Locations Aggregate Locations Cement Terminal Locations What Is Rehabilitation? Rehabilitation is the treatment of land from which aggregate has been excavated

More information

4.4 ECOCITY Tampere - Vuores

4.4 ECOCITY Tampere - Vuores 4.4 ECOCITY Tampere - Vuores Figure 4.4.1 Location of the Vuores area 4.4.1 General information The Vuores case area is a typical greenfield development in a woodland area to the south of the city of Tampere.

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Dorset Green SANGs Report

Dorset Green SANGs Report Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset

More information

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions What is the DNR s authority for leasing oil and gas? How are state-owned oil and gas rights leased? Who decides which state-owned oil and gas rights will be offered for lease at the auction? How often

More information

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan. Public Submission No.: 2014-I17e To: Board of Directors For: INFORMATION Date: 2014-11-19 1. TITLE Greenbelt Master Plan Implementation 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors

More information

Corralling the evidence about the value of Green Infrastructure. Martin Moss. Senior Advisor Green Infrastructure Operations England.

Corralling the evidence about the value of Green Infrastructure. Martin Moss. Senior Advisor Green Infrastructure Operations England. Corralling the evidence about the value of Green Infrastructure Martin Moss. Senior Advisor Green Infrastructure Operations England. Flow of discussion. Part 1 - What do we mean by GI? Part 2 - What are

More information

RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA

RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA RESTORATION OF URBAN WATERWAYS AS A GREEN INFRA October 10, 2014 Hyoseop Woo President Korean Society of Ecology and Infrastructure Engineering (KSEIE) Green Infra (EU Commission) a strategically planned

More information

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN

Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Chapter 7 COMMUNITY FACILITIES and SERVICES PLAN Introduction Community facilities play an important role in ensuring a quality standard of living for Township residents, as well as impacting the location

More information

Living with Foxes and Skunks Goose Hunting: CWS

Living with Foxes and Skunks Goose Hunting: CWS Ministry of Natural Resources and Forestry Living with Foxes and Skunks Goose Hunting: CWS November 19 th, 2015 Town of Tecumseh Kathryn Markham, A/Management Biologist Steven Rowswell, A/Wildlife Technician

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

Notice of Study Commencement and Invitation to Participate

Notice of Study Commencement and Invitation to Participate REGION OF WATERLOO Wastewater Treatment Master Plan Class Environmental Assessment Notice of Study Commencement and Invitation to Participate Background The Regional Municipality of Waterloo is responsible

More information

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto Evergreen s Urban Watershed Forum 20 March 2015 Presented by Kurtis Elton Policy & Program Advisor, Toronto

More information

Lake Erie Commission OVERVIEW

Lake Erie Commission OVERVIEW LEC - Overview No GRF funding. Lake Erie Commission Funding is increased 5.0% in FY02 and 3.2% in FY03. OVERVIEW The Lake Erie Commission (LEC) is responsible for coordinating state policies and programs

More information

Payments for Ecosystem Services: towards improved biodiversity conservation and water security in South Africa, a semi-arid, developing country

Payments for Ecosystem Services: towards improved biodiversity conservation and water security in South Africa, a semi-arid, developing country Payments for Ecosystem Services: towards improved biodiversity conservation and water security in South Africa, a semi-arid, developing country Jane Turpie & James Blignaut Introduction Ecosystems largely

More information

Big Black Mesa Wildlife Water Development Plan

Big Black Mesa Wildlife Water Development Plan Big Black Mesa Wildlife Water Development Plan The goal of the plan is establishing reliable sources of permanent water for wildlife on the Prescott National Forest lands on Big Black Mesa. This 100 square-mile

More information

Checklist for Reviewing Technical Programs and Procedures

Checklist for Reviewing Technical Programs and Procedures Checklist for Reviewing Technical Programs and Procedures Attachment 9 to KQAP A. Soil Survey 1) Does the official soil survey meet the needs of the internal and external customers? 2) Is there a method

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

SECTION 3.2 CLIMATE AND PRECIPITATION

SECTION 3.2 CLIMATE AND PRECIPITATION SECTION 3.2 CLIMATE AND PRECIPITATION Ulster County Climate Data A preliminary analysis of the Preserve s weather data shows that the average temperature has risen about two degrees over the past 114 years.

More information

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Thunder Bay Area of Concern Status of Beneficial Use Impairments September 2010 The Thunder Bay Area of Concern extends approximately 28 km along the shoreline of Lake Superior from north of Bare Point

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

Meeting Water Needs through Investing in Nature

Meeting Water Needs through Investing in Nature Meeting Water Needs through Investing in Nature Water & the Future Key Challenges Aging and vulnerable infrastructure Degraded water quality Drought Growing demands for water Increased frequency of extreme

More information

The EMRC has written to member Councils seeking advice on this proposal.

The EMRC has written to member Councils seeking advice on this proposal. 4.1 WASTEWATER TREATMENT FACILITY - RED HILL (Gidgegannup) (Operations) KEY ISSUES The EMRC has been approached to sell or lease an area of land at its Red Hill waste treatment facility for the establishment

More information

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute Healthy Forests Resilient Water Supply Vibrant Economy Ecological Restoration Institute How Water Gets to Your Home MOST OF THE VALLEY S WATER SUPPLY comes from winter precipitation and runoff from Arizona

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Texas Section Society for Rangeland Management

Texas Section Society for Rangeland Management 2015 Outstanding Rangeland Award Recipient Dr. Kevin Thuesen City of Austin Water Quality Protection Lands and 2015 TSSRM President Dr. Cody Scott Texas Section Society for Rangeland Management Outstanding

More information

ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL PROJECT INFORMATION

ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL PROJECT INFORMATION ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL Project Title: Houston Mesa, Tank Maintenance: PROJECT INFORMATION Project Type: Tank cleanout,

More information

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012 Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Genesee Advanced Water Treatment Facility

Genesee Advanced Water Treatment Facility Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015 Project Purpose Upgrade critical components of the District's water system Develop a more robust water

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Town of Richmond Hill Beaver Management Policy Summary

Town of Richmond Hill Beaver Management Policy Summary Town of Richmond Hill Beaver Management Policy Summary Above Left: Tree damage from beaver. Above Right: Beaver dam in stream - notice the water level above and below the dam! Below: Beaver swimming. Town

More information

Development Approval & Planning Policy Department

Development Approval & Planning Policy Department DP-2014-021 To: From: Mayor and Members of Council Development Approval & Planning Policy Department Meeting: 2014-04-01 Subject: Zoning By-law Amendment Application The Correct Group of Companies Inc.

More information

A Green Sector Overview

A Green Sector Overview A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North

More information

Natural Resource-Based Planning*

Natural Resource-Based Planning* Natural Resource-Based Planning* Planning, when done well, is among the most powerful tools available to communities. A solid plan, based on good natural resource information, guides rational land-use

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.

More information

Ecological Mitigation Strategies

Ecological Mitigation Strategies Greg McGowan Director of Ecological Services Types, Risks, and Relative Costs of Ecological Mitigation LFR Inc. www.lfr.com Greg.McGowan@LFR.com 2004 2004 2006 The Road to Success Understand & Quantify

More information

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study OCCIAR and Northern Conservation Authorities March 26-27, 2012 Mike Garraway, MNR Centre of Excellence for Water Quantity

More information

New York Sea Grant Strategic Plan

New York Sea Grant Strategic Plan New York Sea Grant Strategic Plan Introduction and Process This is the new strategic plan for New York Sea Grant (NYSG) for the years 2010-2013 as requested by the National Sea Grant Office. This plan

More information

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy

Untreated (left) and treated (right) Sierra Nevada forests in Amador County, CA. Photos: Sierra Nevada Conservancy Case Study Mokelumne Watershed, CA and Santa Fe, NM Avoided Costs: The Economics of Watershed Restoration Forested headwaters are the source of much of the West s drinking water. Protecting and restoring

More information

edms 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions

edms 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions 8. AUSTRALIA 8.1 Water Resources Management Policies and Actions In Australia, an Intergovernmental Agreement for a National Water Initiative (NWI) was signed by the Australian Government, all state and

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately

More information

2015 -- H 6042 S T A T E O F R H O D E I S L A N D

2015 -- H 6042 S T A T E O F R H O D E I S L A N D LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

SPECIAL DISTRICTS AND LAFCO OVERVIEW

SPECIAL DISTRICTS AND LAFCO OVERVIEW 2005-2006 SANTA CLARA COUNTY CIVIL GRAND JURY REPORT Introduction SPECIAL DISTRICTS AND LAFCO OVERVIEW The 2005-2006 Santa Clara County Civil Grand Jury (Grand Jury) reviewed ten special districts, covering

More information

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

Village of Spring Valley Comprehensive Plan 2009-2029

Village of Spring Valley Comprehensive Plan 2009-2029 Chapter 8: Intergovernmental Cooperation Introduction Intergovernmental communication, coordination, and cooperation can make a significant difference in the implementation and administration of a comprehensive

More information

Hydrology & Hydraulics

Hydrology & Hydraulics Hydrology & Hydraulics ADAPTING TO NEW WEATHER REALITIES Presentation to Technical Committee of Lake Ontario Integrated Sub watershed Study March 24, 2014 Neelam Gupta Manager, Hydrology & Hydraulics Credit

More information

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

AGENDA. The following projects/items will be discussed, in approximately this order, at approximately the times listed.

AGENDA. The following projects/items will be discussed, in approximately this order, at approximately the times listed. NHDOT Natural Resource Agency Coordination Meeting Wednesday, December 16, 2015 John O. Morton Building, 7 Hazen Drive, Concord, NH 9:00 am, Bureau of Environment Conference Room (Room 161) AGENDA The

More information

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

ENVIRONMENTAL REVIEW SCREENING QUESTIONS ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

TOWNSHIP OF ORO-MEDONTE 2015 CAPITAL BUDGET- PROJECT FINANCING

TOWNSHIP OF ORO-MEDONTE 2015 CAPITAL BUDGET- PROJECT FINANCING RESERVE TRANSFERS - CAPITAL REPLACEMENT Vehicle Replacement: Emergency Services 223,000 223,000 Building 10,000 10,000 Municipal Law Enforcement 9,000 9,000 Transportation 322,700 322,700 Recreation 21,000

More information

STAFF REPORT WATERDOWN/ALDERSHOT TRANSPORTATION MASTER PLAN ENVIRONMENTAL ASSESSMENT (EA) PHASE 2

STAFF REPORT WATERDOWN/ALDERSHOT TRANSPORTATION MASTER PLAN ENVIRONMENTAL ASSESSMENT (EA) PHASE 2 March 15, 2007 STAFF REPORT RE: WATERDOWN/ALDERSHOT TRANSPORTATION MASTER PLAN ENVIRONMENTAL ASSESSMENT (EA) PHASE 2 RECEIVED: August 8 th, 2005 PROPONENT: City of Hamilton, City of Burlington, and Region

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

Get to Know Your Watershed. McMillan Creek

Get to Know Your Watershed. McMillan Creek Get to Know Your Watershed McMillan Creek Where is McMillan Creek? McMillan Creek is found in the northeastern portion of the City of Prince George, know as the Hart and Shady Valley. It is located entirely

More information

State of Green Infrastructure in the Gauteng City-Region

State of Green Infrastructure in the Gauteng City-Region State of Green Infrastructure in the Gauteng City-Region Valuing Natural Capital Dialogue City of Johannesburg 26 th February 2014 Kerry Bobbins Researcher GCRO kerry.bobbins@gcro.ac.za Overview Structure

More information

Four Short Walks From the Mill

Four Short Walks From the Mill Four Short Walks From the Mill With directions, duration and length of walk www.ratonera.com (0034) 958 339 560 There are steep sections on most of these walks so please wear boots or stout shoes. A stick

More information

Lower Connecticut River. The Mission of the Connecticut River Gateway Commission

Lower Connecticut River. The Mission of the Connecticut River Gateway Commission Protecting the of the Character Lower Connecticut River The Mission of the Connecticut River Gateway Commission June, 2011 NOTES Protecting the Character of the Lower Connecticut River: The Connecticut

More information

Conducting a Land Use Inventory

Conducting a Land Use Inventory Chapter 3 Conducting a Land Use Inventory Included in this chapter: Determining Current Land Use Conditions Preparing a Base Map Deciding on Land Use Categories Collecting Current Land Use Data Preparing

More information

Operations, Maintenance and Monitoring Branch Status Update

Operations, Maintenance and Monitoring Branch Status Update Operations, Maintenance and Monitoring Branch Status Update Presentation to Committee of the Whole Brett Bloxam Director, Operations, Maintenance and Monitoring March 20, 2014 #5405920 Agenda Overview

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information