1 Acton Quarry Extension Halton Region June 11,

2 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land Pre-consultation began in June, The application was submitted in March, For 8 years Dufferin has been working to address comments from the agencies and members of the public. 10 Public Meetings / Open Houses have been held. Additionally, Dufferin has met individually with many of the neighbours. 3 JART Reports have been issued since submission of the application. Local Economy Rehabilitation Dufferin Aggregates Open Door Policy 2

3 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% in an effort to address comments from the agencies and members of the public. MNR advised in March 2014 that agreement reached on extraction limits and MNR had no technical issues regarding the Endangered Species Act allowing extraction in Phases 5 & 6 3

4 Protects Surrounding Residences Dufferin has acquired significant lands to increase the separation distance between the proposed extension and surrounding residences: Phase 4 no residences within 500 m Phase 5 East no residences within 500 m Phase 5/6 West 5 residences within 500 m JART has confirmed: All standards for blasting, noise and air quality can be met for the closest residents The extension will not impact municipal water wells The extension will not impact private water wells, including those along 4 th Line, recognizing that these wells are constructed in a different geologic formation than the quarry The proposed haul routes are acceptable 4

5 Background Proposed Extraction Area Residential and Agricultural Wells Will Be Protected A detailed Hydrogeological Report has been completed Compliance with Ministry Guidelines Hydrogeologists from the: Ministry of the Environment; Halton Region Official Region of Halton; Plan Credit Valley Conservation; Conservation Halton; Greenlands System Ministry of Natural Resources; and, Conveyance of Land Local Economy An Independent Peer Reviewer hired by the Agencies Rehabilitation Dufferin Aggregates Open Door Policy all concur that the wells will be protected and are satisfied with Dufferin s well complaint response procedure. 5

6 Well Complaint Response Procedure Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land Local Economy Rehabilitation Dufferin Aggregates Open Door Policy In Consultation with the Agencies, Dufferin has developed a Well Complaint Response Procedure. The following are highlights from the protocol: - In the event of a complaint, Dufferin shall notify government agencies immediately. - If water supply is disrupted, Dufferin will supply water within 24 hours at Dufferin s expense. - Investigations to be completed at Dufferin s expense. - If the investigation cannot definitively rule out the quarry, Dufferin, at its expense, is required to restore or replace the water supply. 6

7 Blasting Limits Satisfied A detailed blast impact assessment has been completed The Agencies hired a peer reviewer who concurred that the blasting can be completed within the limits prescribed by the Ministry of the Environment. Dufferin notifies those land owners who have requested notification prior to a blast All blasts will be monitored Dufferin has implemented a program called Blasting Beyond Compliance at Acton Quarry 1. Refinement of blasting techniques smaller holes, reduced charges, etc., 2. Significant reductions in blast vibration further below MOE standards 7

8 Background Proposed Extraction Area Quarry Vibrations Below Limits Ground Vibration Far Below Limits and Impact Thresholds Peak Particle Velocity Ground Vibration Effect (mm/s) mm/s, Ontario limit for construction blasting (different from Quarry blasting) Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land Local Economy Rehabilitation Dufferin Aggregates Open Door Policy mm/s, potential impact on structures 22.4 mm/s, pounding nails 12.7 mm/s, door slamming 12.5 mm/s, Ontario limit for surface mines/quarries 5 mm/s, maximum levels recorded around Acton Quarry 0.8 mm/s, minimum levels recorded around Acton Quarry mm/s, ground vibrations become perceptible Air Vibration Below Limits Acton Quarry Air vibration levels approx 113 db (Provincial Limit is 128dB). 8

9 Operational Noise Limits Satisfied Background A detailed noise impact study has been completed. Proposed Extraction Area Compliance with Ministry Guidelines A peer reviewer was hired by the Agencies to review the study. The Peer Reviewer concurred that the Ministry limits can be met. Halton Region Official Plan At the commencement of each phase Dufferin is Greenlands System required to complete a Noise Monitoring Report to ensure that MOE limits are being adhered to. Conveyance of Land Local Economy Rehabilitation Dufferin Aggregates Open Door Policy The Monitoring Report will be provided to the MOE, the Region of Halton, the Town of Halton Hills, MNR and the NEC. 9

10 Air Quality Requirements Satisfied Background Proposed Extraction Area A detailed Air Quality Study has been completed The study has been peer reviewed by an independent reviewer hired by the Agencies. The Peer Reviewer concurs that the MOE limits can be met. Dufferin prepared a Best Management Practices Plan in 2009 to control dust on site for the existing quarry and the proposed extension. The BMP includes: Implementation of plan/schedule Inspection and Maintenance Practices Monitoring and Record keeping The MOE and Peer Reviewer have reviewed and endorse the Best Management Practices Plan. Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land Local Economy Rehabilitation Dufferin Aggregates Open Door Policy 10

11 Background Proposed Extraction Area Compliance with Ministry Guidelines Other Measures To Ensure That Residents Are Protected Open door policy to address neighbour s concerns Requirement for posting of sign at the Quarry Extension entrance with a Hotline Number for concerned citizens to call. Halton Region Official Plan Community Liaison Committee that has met 25 times since Greenlands System Conveyance of Land Annual Monitoring Meeting with Agencies and Members of the community to review the monitoring results. Local Economy Rehabilitation Dufferin Aggregates Open Door Policy 11

12 Halton Region Official Plan 49.3 ha to be designated for Mineral Resource Extraction. The Region s Official Plan directs extraction to these locations ha is being designated to a more restrictive Environmental Designation. 12

13 Acton Quarry Enhances Region Greenland System Application proposes to remove 8.7 ha of existing greenlands (Non significant wetlands and a portion of the significant woodland) Regional policy permits removal of the features subject to providing an overall net gain taking into account rehabilitation of the Extension and other offsite ecological enhancements. Overall, the Off-Site Ecological Enhancement Plan and the Rehabilitation Plan will enhance ha of future Greenlands Area. 13

14 Off-Site Ecological Enhancement Plan Enhances Region Greenlands System ha +9.0 ha tree planting /reforestation within 5 years +7.2 ha tree planting /reforestation within 15 years +18 ha thicket management ongoing for 15 years ha woodland management ongoing for 15 years +10 ha grassland creation within 5 years 1 amphibian pool/wetland within 5 years (already built Pool G) +0.1 ha wetland enhancement area within 5 years 2 turtle nesting areas within 5 years 14

15 Conveyance of Land to Public Ownership If the currently extraction area is Dufferin has agreed ±436 ha of land ownership. proposed approved, to convey to public The Town of Halton Hills has an interest in acquiring land for recreation, conservation and water management purposes. 15

16 Conveyance of Land for Public Use The lands north of 22nd sideroad would be available for active recreation (e.g. Sports fields, buildings, structures, etc). The lands north and south of 22nd sideroad would be available for passive / open space recreation (e.g. Trails, swimming, boating, lookouts, picnic areas etc.) 16

17 Water Management System will Benefit CH & CVC Watersheds Current approvals for the existing quarry require water to be pumped to the Conservation Halton and Credit Valley Conservation watersheds during periods of high flow (spring season / storm events) which provides only limited ecological and social benefits. The application proposes a water management system that protects the existing ecological water resources and allows water to be stored and released to the watersheds during periods of low flow, thereby providing higher ecological and social benefits. This water management system will provide significant public benefits: o Protect or enhance fish habitat in Black Creek; o Opportunities for enhancement of Acton Wastewater Treatment Plant; o Protect or enhance downstream water supply to 16 Mile Creek. Dufferin is prepared to enter into legal agreements and post financial securities for mitigation performance and for long-term water management system operations by a public agency. Conservation Halton is planning to take over long-term water management operations. 17

18 Supports the Local Economy The Region s Official Plan has an objective to provide for new quarries in this location, by amendment. The proposed extension lands contain 38 million tonnes of the highest quality aggregate in Southern Ontario. Superior Glove Splash Pad 60 people directly employed and 150 people indirectly employed by the quarry. $12 million spent annually on services, taxes and levies. Over the life of the extension (19 years), this would equal approx. $228 million. Acton Branch of the Halton Hills Public Library The Acton Quarry is a key contributor to many local charities and groups and has made donations totaling over $220,000 in the last 2 years. Dufferin has contributed to initiatives in Halton Region totaling an additional $450,000 in the last 2 years. New Oakville Hospital 18

19 Acton Quarry Rehabilitation is Restoring Habitat In 2012, Dufferin began implementing a biodiversity monitoring program with Bird Studies Canada and Couchiching Conservancy. Rehabilitation of Phase 1 Recent biodiversity monitoring was completed in the existing quarry s rehabilitated areas. For example, in Phase 1 and 2, the following were recently observed: o 93 different species of birds including Bank Swallow, Barn Swallow, Osprey, and Wood Thrush. o Amphibians including American Toad, Gray Treefrog, Green Frog, Northern Leopard Frog. Dufferin is proud of its National Partnership with Earth Rangers Bring Back the Wild TM project in Rehabilitation of Phase 2 Barn Swallow Rehabilitation of Phase 2 Wood Thrush 19

20 Dufferin s Open Door Policy Future Meetings: If anyone has any questions or concerns with the existing operation or proposal, Dufferin would be pleased to arrange a meeting to discuss these concerns with you. Quarry Tours: If you are interested in touring the current operation, please contact Dufferin. Additional Information: For additional application information, please visit: Dufferin Contact: Enzo Bertucci (905) Enzo.Bertucci@Holcim.com 20

Halton Region Planning & Public Works Committee Meeting July 8, 2015

Halton Region Planning & Public Works Committee Meeting July 8, 2015 Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8, 2015 1 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the

More information

REPORT. Mayor Bonnette & Members of Council. Dufferin Aggregates Acton Quarry Expansion

REPORT. Mayor Bonnette & Members of Council. Dufferin Aggregates Acton Quarry Expansion REPORT REPORT TO: Mayor Bonnette & Members of Council REPORT FROM: Mark H. Kluge, Senior Planner - Development Review DATE: REPORT NO.: RE: PDS-2014-0028 Dufferin Aggregates Acton Quarry Expansion RECOMMENDATION:

More information

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey

Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey Monitoring at Credit Valley Conservation Presented by Jackie Thomas and Luke Harvey Where are we? WHAT IS MONITORING? Long-term sampling of the same point or reach to track changes over time/space Short

More information

Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012

Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012 Submission to the Standing Committee on General Government regarding the review the Aggregate Resources Act, May 16, 2012 Dear Members of the Standing Committee, On behalf of our members and member groups

More information

Biodiversity Action at Holcim Canada

Biodiversity Action at Holcim Canada Strength. Performance. Passion. Biodiversity Action at Holcim Canada Global Partnership for Business and Biodiversity, Montreal, Oct 2, 2013 Short title, Department, Date yymmdd, Classification 2012Holcim

More information

Town of Richmond Hill Community Stewardship Program

Town of Richmond Hill Community Stewardship Program Town of Richmond Hill Community Stewardship Program Environmental Services Division November 19, 2011 Environmental Advisory Committee Symposium Richmond Hill s s Organization Office of the C.A.O. Community

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

PLANNING REPORT HIDDEN QUARRY

PLANNING REPORT HIDDEN QUARRY PLANNING REPORT PROPOSED ZONING BY-LAW AMENDMENT HIDDEN QUARRY PART OF LOT 6 CONCESION 1 TOWNSHIP OF GUELPH-ERAMOSA (FORMER TOWNSHIP OF ERAMOSA) COUNTY OF WELLINGTON SEPTEMBER, 2012 PREPARED FOR: JAMES

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan. Public Submission No.: 2014-I17e To: Board of Directors For: INFORMATION Date: 2014-11-19 1. TITLE Greenbelt Master Plan Implementation 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors

More information

Overview of DFA OPQ CAP Meeting

Overview of DFA OPQ CAP Meeting Strength. Performance. Passion. Overview of DFA OPQ CAP Meeting Feb 24 th 2014 2012 Holcim 2012 (Canada) Holcim Inc. (Canada) Inc. Dufferin Aggregates (DFA), a division of Holcim (Canada) Inc., is a leading

More information

3 JOINT SOURCE SEPARATED ORGANICS TREATMENT FACILITY STATUS REPORT - PROJECT 71335

3 JOINT SOURCE SEPARATED ORGANICS TREATMENT FACILITY STATUS REPORT - PROJECT 71335 3 JOINT SOURCE SEPARATED ORGANICS TREATMENT FACILITY STATUS REPORT - PROJECT 71335 The Environmental Services Committee recommends the adoption of the recommendation contained in the following report dated

More information

Terms of Reference for Vibration Monitoring of Quarry Blasting. Public Consultation

Terms of Reference for Vibration Monitoring of Quarry Blasting. Public Consultation Terms of Reference for Vibration Monitoring of Quarry Blasting Public Consultation 1 Terms of Reference for Vibration Monitoring of Quarry Blasting 1. Introduction Malta has a number of quarry operators

More information

The 25 Year Saskatchewan Water Security Plan. February 2013

The 25 Year Saskatchewan Water Security Plan. February 2013 The 25 Year Saskatchewan Water Security Plan February 2013 OUTLINE Challenges The Plan The Agency Implications for Agriculture Water Security Plan Development Consultation in 2011 with 174 individuals

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Green Infrastructure Case Study Template

Green Infrastructure Case Study Template Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case

More information

Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity?

Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity? Gravel Pit Rehabilitation Near Shallow Municipal Wells Threat or Opportunity? Tanya Kampherm Martin, Scott Lister & Wendy Kemp Regional Municipality of York, Newmarket, Ontario, Canada ABSTRACT When the

More information

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE

WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water

More information

Biodiversity Concepts

Biodiversity Concepts Biodiversity Concepts WHAT IS BIODIVERSITY? Biodiversity is the variety of life on Earth. For any kind of animal or plant each individual is not exactly the same as any other; nor are species or ecosystems.

More information

Dorset Green SANGs Report

Dorset Green SANGs Report Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset

More information

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014

Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014 Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated

More information

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we

More information

Environmental Review Process

Environmental Review Process The Saskatchewan Natural Gas Advantage Workshop Environmental Review Process Bernie Ryma Environment & Sustainability TransGas February 24, 2010 Presentation Outline The presentation today will provide

More information

4. Priority Areas of Conservation

4. Priority Areas of Conservation 4. Priority Areas of Conservation A. SIGNIFICANT RESOURCE AREAS This Open Space and Farmland Plan identifies the key issues facing open space and agricultural resources in the Town, highlights the location

More information

Broadmoor Public Golf Course TREE MANAGEMENT GUIDE

Broadmoor Public Golf Course TREE MANAGEMENT GUIDE Broadmoor Public Golf Course TREE MANAGEMENT GUIDE Conservation of the trees at the Broadmoor Public Golf Course is a priority for environmental, economic and human health reasons. Trees make a difference

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta

Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta Fish and Wildlife Division Sustainable Resource Development Recommended Land Use Guidelines for Protection of Selected Wildlife Species and Habitat within Grassland and Parkland Natural Regions of Alberta

More information

The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER

The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER The HIGH SPEED RAIL THREAT to LOS ANGELES DRINKING WATER INTRODUCTION On December 2 nd, 2014, the High Speed Rail (HSR) Project released new maps showing recently proposed alternate rail routes that go

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

Prepared By: Eric Chamberlain

Prepared By: Eric Chamberlain Prepared By: Eric Chamberlain Drainage 101 So, What s a Municipal Drain??? It is a Drainage System either open ditch or enclosed pipe system or any other water control structure Petitioned for by landowners

More information

Dillon Consulting Limited. Invenergy Solar Canada ULC. Woodville Solar Farm Renewable Energy Approval (REA) Draft Project Description Report

Dillon Consulting Limited. Invenergy Solar Canada ULC. Woodville Solar Farm Renewable Energy Approval (REA) Draft Project Description Report Renewable Energy Approval (REA) 10-3523 Prepared by Dillon Consulting Limited Submitted by Invenergy Solar Canada ULC Table of Contents Page 1.0 INTRODUCTION... 1 2.0 CONTACT INFORMATION... 1 3.0 AUTHORIZATIONS

More information

U.S. SOYBEAN SUSTAINABILITY ASSURANCE PROTOCOL

U.S. SOYBEAN SUSTAINABILITY ASSURANCE PROTOCOL US SOYBEAN SUSTAINABILITY ASSURANCE PROTOCOL A Sustainability System That Delivers MARCH 2013 Since 1980, US farmers increased soy production by 96% while using 8% less energy US SOYBEAN SUSTAINABILITY

More information

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions

Michigan Department of Natural Resources Oil and Gas Leases Frequently Asked Questions What is the DNR s authority for leasing oil and gas? How are state-owned oil and gas rights leased? Who decides which state-owned oil and gas rights will be offered for lease at the auction? How often

More information

One Major Six Concentrations. Department of Environmental Conservation University of Massachusetts Amherst

One Major Six Concentrations. Department of Environmental Conservation University of Massachusetts Amherst One Major Six Concentrations Natural Resources Conservation Undergraduate Major Department of Environmental Conservation University of Massachusetts Amherst Conserving Earth s biological diversity and

More information

Water Security Agency. Plan for 2015-16. saskatchewan.ca

Water Security Agency. Plan for 2015-16. saskatchewan.ca Water Security Agency Plan for 2015-16 saskatchewan.ca Statement from the Minister I am pleased to present the Water Security Agency s Plan for 2015-16. The Honourable Scott Moe Minister Responsible for

More information

Personal Training in Moonee Valley. Terms and Conditions

Personal Training in Moonee Valley. Terms and Conditions Personal Training in Moonee Valley Terms and Conditions 1. Introduction 1.1 Moonee Valley City Council strongly supports parkland usage for safe supervised, health and fitness activities, increasing the

More information

The Nature Conservancy Offering Protected Lands for Sale in the Adirondacks Sustainable Forestry to Continue

The Nature Conservancy Offering Protected Lands for Sale in the Adirondacks Sustainable Forestry to Continue News release For immediate release August 21, 2008 Contact: Connie Prickett, (518) 576-2082 x162, cprickett@tnc.org The Nature Conservancy Offering Protected Lands for Sale in the Adirondacks Sustainable

More information

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc.

Environmental Assessment Approval. Approval Date: Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Environmental Assessment Approval Approval Date: ocr 2 8 zols Liverpool Wind Farm Liverpool Wind Energy Storage Project Inc. Queens County, Nova Scotia The Liverpool Wind Farm (the Undertaking ), proposed

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Conducting a Land Use Inventory

Conducting a Land Use Inventory Chapter 3 Conducting a Land Use Inventory Included in this chapter: Determining Current Land Use Conditions Preparing a Base Map Deciding on Land Use Categories Collecting Current Land Use Data Preparing

More information

CITY OF FERNDALE EAGLE Checklist

CITY OF FERNDALE EAGLE Checklist CITY OF FERNDALE EAGLE Checklist Purpose of the Checklist: The City of Ferndale has adopted EAGLE, an indicator-based program intended to provide the citizens of Ferndale, the applicant, and the City with

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

REFERRAL TO RECOMMENDED DIRECTION REQUIRED RECEIPT RECOMMENDED. Dear Kathryn Lockyer,

REFERRAL TO RECOMMENDED DIRECTION REQUIRED RECEIPT RECOMMENDED. Dear Kathryn Lockyer, From: Carrnela Radice [rnailto:carmela.radice@mississauga.ca] Sent: June 28, 2013 10:14 AM To: Lockyer, Kathryn Subject: Council Resolution 0110-2013 - June 19, 2013 Dear Kathryn Lockyer, The Council of

More information

Required Components for the SHSM Environment

Required Components for the SHSM Environment Introduction Required Components for the SHSM 1. bundle of nine Grade 11 and Grade 12 credits that comprises: four environment major credits three other required credits from the Ontario curriculum, in

More information

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Frequently Asked Questions About Septic System Maintenance Inspections

Frequently Asked Questions About Septic System Maintenance Inspections Frequently Asked Questions About Septic System Maintenance Inspections 1. What is a Septic System Maintenance Inspection Program? A septic system maintenance inspection program is a formal assessment of

More information

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study

Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study OCCIAR and Northern Conservation Authorities March 26-27, 2012 Mike Garraway, MNR Centre of Excellence for Water Quantity

More information

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL PROJECT INFORMATION

ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL PROJECT INFORMATION ARIZONA GAME AND FISH DEPARTMENT HABITAT PARTNERSHIP PROGRAM HABITAT ENHANCEMENT AND WILDLIFE MANAGEMENT PROPOSAL Project Title: Houston Mesa, Tank Maintenance: PROJECT INFORMATION Project Type: Tank cleanout,

More information

Public Survey for Phase I

Public Survey for Phase I Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South

More information

1 ASIAN LONGHORNED BEETLE OUTBREAK

1 ASIAN LONGHORNED BEETLE OUTBREAK 1 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 10 OF THE REGIONAL COMMISSIONER OF TRANSPORTATION AND WORKS For Consideration by The Council of The Regional Municipality of York on October 16, 2003 1 ASIAN

More information

Auditor General of Canada to the House of Commons

Auditor General of Canada to the House of Commons 2010 Report of the Auditor General of Canada to the House of Commons FALL Chapter 1 Canada s Economic Action Plan Office of the Auditor General of Canada The Fall 2010 Report of the Auditor General of

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

Recreational Water Protocol, 2016

Recreational Water Protocol, 2016 Ministry of Health and Long-Term Care Recreational Water Protocol, 2016 Population and Public Health Division, Ministry of Health and Long-Term Care May 2016 Preamble The Ontario Public Health Standards

More information

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010

Thunder Bay. Area of Concern Status of Beneficial Use Impairments September 2010 Thunder Bay Area of Concern Status of Beneficial Use Impairments September 2010 The Thunder Bay Area of Concern extends approximately 28 km along the shoreline of Lake Superior from north of Bare Point

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Rural dwellings including bed and breakfast accommodation

Rural dwellings including bed and breakfast accommodation MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including

More information

Texas Section Society for Rangeland Management

Texas Section Society for Rangeland Management 2015 Outstanding Rangeland Award Recipient Dr. Kevin Thuesen City of Austin Water Quality Protection Lands and 2015 TSSRM President Dr. Cody Scott Texas Section Society for Rangeland Management Outstanding

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno

Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno Eco-tourism and Biodiversity Conservation and Protection Management of Olango Island Wildlife Sanctuary By: Reginaldo G. Bueno Introduction Olango Island Wildlife Sanctuary (OIWS) was proclaimed as protected

More information

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012

Waldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012 Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28

More information

Town of Huntsville Municipal Asset Management Plan

Town of Huntsville Municipal Asset Management Plan Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...

More information

UNIT FIVE TURTLE CONSERVATION

UNIT FIVE TURTLE CONSERVATION UNIT FIVE TURTLE CONSERVATION 101 102 UNIT FIVE: TURTLE CONSERVATION Science Expectations met in this unit: Activity Number: Activity Name Strand 16: Lights, Camera, Grade 7 Interactions Action! Within

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Natural Resource-Based Planning*

Natural Resource-Based Planning* Natural Resource-Based Planning* Planning, when done well, is among the most powerful tools available to communities. A solid plan, based on good natural resource information, guides rational land-use

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

Genesee Advanced Water Treatment Facility

Genesee Advanced Water Treatment Facility Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015 Project Purpose Upgrade critical components of the District's water system Develop a more robust water

More information

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

CHAD R. GOURLEY SPECIALTY EMPLOYMENT CHAD R. GOURLEY P.O. Box 919 Verdi, Nevada 89439 phone 775.345.9960 cell 775.250.8140 chad_gourley at att.net SPECIALTY Restoration of riverine, spring, and wetland ecosystems, specializing in a process

More information

FY 2015-2019 Capital Improvement Program Arroyo Projects - Lower Arroyo. 13 - Summary

FY 2015-2019 Capital Improvement Program Arroyo Projects - Lower Arroyo. 13 - Summary LOWER ARROYO FY 215-219 Capital Improvement Program Description FY 214 FY 215 FY 216 FY 217 FY 218 FY 219 1 Bird Sanctuary Improvements (7749) 35, 225, 125, 2 Lower Arroyo - Implement Master Plan - Signage

More information

Proposal to the Trinity Adaptive Management Working Group (TAMWG)

Proposal to the Trinity Adaptive Management Working Group (TAMWG) Proposal to the Trinity Adaptive Management Working Group (TAMWG) Request that the TAMWG recommend that the Trinity River Restoration Program fund BLM to purchase the Weigel parcel at Gold Bar (river mile

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Decision Support Tools for the Columbia Basin from the BC Breeding Bird Atlas Final Report 2013-14. Project # W-F14-18

Decision Support Tools for the Columbia Basin from the BC Breeding Bird Atlas Final Report 2013-14. Project # W-F14-18 Decision Support Tools for the Columbia Basin from the BC Breeding Bird Atlas Final Report 2013-14 Project # W-F14-18 Prepared by Bird Studies Canada with financial support of the Fish and Wildlife Compensation

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Wastewater Regulation and Designing Changes in South East Asia

Wastewater Regulation and Designing Changes in South East Asia Chapter 15 Water Security Agency Regulating Wastewater Systems 1.0 MAIN POINTS Effectively regulating public wastewater systems 1 is essential to protecting our environment and in turn, the health and

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Land and Resource Management Plan Chattahoochee-Oconee National Forests

Land and Resource Management Plan Chattahoochee-Oconee National Forests United States Department of Agriculture Forest Service Southern Region Land and Resource Management Plan Chattahoochee-Oconee National Forests Management Bulletin R8-MB 113 A January 2004 The revision

More information

Myre-Big Island State Park

Myre-Big Island State Park Myre-Big Island State Park Management Plan Amendment Resource Management Timber Harvesting Minnesota Department of Natural Resources Division of Parks and Trails May 2013 For more information on this management

More information

Visiting a wetland without the chirping

Visiting a wetland without the chirping Monitoring your Wetland a primer to site-level monitoring activities for volunteer coordinators Frogs & Toads (Anurans).......... Visiting a wetland without the chirping of frogs on a warm summer night

More information

communication tower means a tower or structure built to support equipment used to transmit communication signals;

communication tower means a tower or structure built to support equipment used to transmit communication signals; Ontario Ministry of Natural Resources Subject Communication Tower Sites on Crown Land Compiled by - Branch Lands & Waters Replaces Directive Title Communication Tower Sites Section Land Management Number

More information

WELCOME PURPOSE OF THE OPEN HOUSE. To introduce Vulcan Materials Company and Morien Resources Corp. To receive your feedback on the Project

WELCOME PURPOSE OF THE OPEN HOUSE. To introduce Vulcan Materials Company and Morien Resources Corp. To receive your feedback on the Project WELCOME PURPOSE OF THE OPEN HOUSE To introduce Vulcan Materials Company and Morien Resources Corp. To introduce the Black Point Quarry Project To receive your feedback on the Project To outline future

More information

Development Approval & Planning Policy Department

Development Approval & Planning Policy Department DP-2014-021 To: From: Mayor and Members of Council Development Approval & Planning Policy Department Meeting: 2014-04-01 Subject: Zoning By-law Amendment Application The Correct Group of Companies Inc.

More information

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT

ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT Joy D. Blackmon, P.E. Director, County Engineer Public Works Department ESCAMBIA COUNTY FLOOD RECOVERY: 1- YEAR ANNIVERSARY REPORT EXECUTIVE SUMMARY One year after the devastating April 2014 floods hit

More information

Marchand Provincial Park. Draft Management Plan

Marchand Provincial Park. Draft Management Plan Marchand Provincial Park Draft Management Plan Marchand Provincial Park Draft Management Plan Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational...

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information