1 Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015

2 Project Purpose Upgrade critical components of the District's water system Develop a more robust water treatment facility that is capable of treating more challenging water and meeting future regulations Upgrade critical facilities to reduce electrical consumption, water use and operator time Photos of the Existing Genesee WTP

3 Upgrades to Base and Larkspur Pump Stations Replace equipment and electrical gear that is near the end of its useful life System upgrades will significantly reduce energy use for these facilities (estimated at 29% / 37%) Reduce operating costs (estimated at 37%) Provides better system function with fewer pumps for delivering a range of flows into the distribution system The Larkspur Pump Station is over 30 years old

4 Replacement of Pressure Reducing Stations (PRS) Removes stations that are located in roadways and don t have proper traffic loading Replaces facilities that are deteriorating and have reduced reliability Provides systems with proper ventilation and access to increase operator safety Provides new systems with the capacity needed to deliver higher flows for fire protection Old Pressure Reducing Stations will be replaced with new, reliable units

5 Replacement of Customer Water Meters Water industry standards recommend that meters be replaced every 15 years New units will reduce underrecording water use New units will include remote monitoring capabilities, thereby significantly reducing operator time used for meter reading New customer water meters will include remote monitoring capabilities

6 Construction of a New Advanced Water Treatment Facility (WTF) The existing water treatment plant is over 30 years old and approaching the end of its useful life The existing plant treatment processes were designed to meet less stringent filtration performance requirements The new Advanced WTF will be capable of treating more challenging raw water and meet future regulations The new Advanced WTF will provide enhanced treatment for removal of organic compounds The Genesee Raw Water Reservoir

7 Recommended Water Treatment Process Six potential processes were identified that can meet overall treatment goals An evaluation was performed that analyzed both benefits and costs for each system (costs include capital and O&M) Microfiltration with floc/sed pretreatment and granular activated carbon post treatment was selected Provides the highest Benefit Score Provides the highest Cost to Benefit Score Cost competitive compared to other options Positions the District well for future raw water quality challenges and potentially changing regulations Relatively simple and reliable to operate

8 Plant Site Selection Considerations Space Site and Building Access (trucks, chemicals, eqpt, FD) System Hydraulics Residuals Management and Disposal Utilities Land Acquisition Requirements Environmental Considerations Aesthetics and Public Perception Constructability / Cost

9 Site Design Concepts Locate the facilities on District property Keep the roof level as low as possible Keep as many large trees as possible Provide functional site access Integrate the plant into site contours View of the Administration Building / Advanced Water Treatment Facility Site from Daisy Lane

10 Architectural Renderings of the New Genesee Advanced WTF

11 Site Rendering

12 Project Budgets LOCATION INITIAL PROJECT BUDGET Advanced Water Treatment Facility $8,320,000 Pressure Reducing Stations (PRS) Stonecrop PRS $135,000 Holly PRS $145,000 Montane East PRS $145,000 North Bowl PRS $145,000 Pump Stations Base Pump Station $410,000 Larkspur Pump Station $410,000 Customer Water Meter Replacement $400,000 Financing/Issuance Costs $190,000 TOTAL $10,300,000

13 Impacts to Customer Water Bills Operation of the new Advanced WTF could increase operating costs from $275,000 per year up to $320,000 to $340,000 per year Increased operating pressures for the microfiltration system Chemicals for cleaning of the membrane system Replacement of Granular Activated Carbon However, upgrades to pump stations will result in an approximate $50,000/year cost decrease Efficiencies with reduced operator time and lower water use have not been taken into account In addition, Genesee repaid some bonds for the reservoir project early and refinanced the debt, thereby decreasing the mill levy for 2015

14 Project Locations

15 Federal Agencies Contacted U.S. Fish and Wildlife State Engineers Office, Colorado Division of Water Resources Colorado Historical Society U.S. Army Corps of Engineers Natural Resource Conservation Service Division of Wildlife Air Pollution Office, Colorado Dept of Public Health and Environment National Park Service

16 Potential Environmental Impacts Short term impacts during construction: Increased noise and ambient air particles during construction Increased site traffic Impacts to storm water quality until the site is fully restored Long-term impacts: Increased storm water runoff volume due to development Loss of a limited amount of habitat, with impacts to native vegetation

17 Mitigation Measures Comply with all Building and Regulatory Permits including dust, erosion control, and protection of storm water quality The project has gone through significant Public Participation process to date to receive comments on location and aesthetics Distributed vegetation will be reestablished by the District The site has been designed with an open land concept to allow wildlife free movement through the area Regulatory Permits require proper protection of construction sites to limit dust, erosion, impacts to storm water quality and the off-site tracking of dirt

18 Question and Answer

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

Kansas City s Overflow Control Program

Kansas City s Overflow Control Program Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater

More information

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN

Sanitary Sewers LINK TO THE COMPREHENSIVE PLAN Sanitary Sewers PROGRAM DESCRIPTION Fairfax County provides sewer service to its residents through a system of nearly 3,412 miles of sewer lines, 59 sewage pumping stations, 5 storm water pumping stations,

More information

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties. There were 10 comments received in response to an April 14, 2014

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers America s drinking water systems face an annual shortfall of at least $11 billion to replace aging facilities that are near the end of their useful lives and to comply

More information

US Army Corps of Engineers Authorities and Programs

US Army Corps of Engineers Authorities and Programs US Army Corps of Engineers Authorities and Programs Section 206; Flood Plain Management Services Program Section 22; Planning assistance to States General Investigations (large-scale flood risk reduction)

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting

Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth

More information

STATE OF MICHIGAN. Bond Qualification Process Overview. School Bond Qualification and Loan Program Bureau of Bond Finance

STATE OF MICHIGAN. Bond Qualification Process Overview. School Bond Qualification and Loan Program Bureau of Bond Finance Michigan Department of Treasury 3160, (Rev. 4-06) STATE OF MICHIGAN Bond Qualification Process Overview School Bond Qualification and Loan Program Bureau of Bond Finance Michigan Department of Treasury

More information

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing N A T U R A L R E S O U R C E C O N S E R V A T I O N As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing conservation

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit. 2008 Annual Report to the Land Use Parks & Environment Committee

Waukesha County. Municipal Separate Storm Sewer System (MS4) Permit. 2008 Annual Report to the Land Use Parks & Environment Committee Waukesha County Municipal Separate Storm Sewer System (MS4) Permit 2008 Annual Report to the Land Use Parks & Environment Committee What is an MS4 permit? 1972 Clean Water Act (Water pollution control):

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Smoke Management Plan

Smoke Management Plan Smoke Management Plan December 2007 TABLE OF CONTENTS 1.0 Introduction 3 2.0 Background 6 3.0 Smoke Management Plan 7 3.1 Authorization to Burn 10 3.2 Minimizing Air Pollutant Emissions 11 3.3 Smoke Management

More information

Supplier Environmental Health and Safety Certification

Supplier Environmental Health and Safety Certification Supplier Environmental Health and Safety Certification It is the intention of Cisco Systems, Inc. (Cisco) to take reasonable and practicable steps to ensure workplace safety and protect the environment

More information

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES

More information

Public Survey for Phase I

Public Survey for Phase I Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South

More information

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we

More information

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No. UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION United Water Conservation District Project No. 2153-022 ORDER APPROVING SPOIL MANAGEMENT, EROSION, AND SEDIMENT CONTROL PLAN

More information

Urban Ecosystem Services Seattle s Urban Forest

Urban Ecosystem Services Seattle s Urban Forest Urban Ecosystem Services Seattle s Urban Forest Dr. Kathleen Wolf Dr. Dale Blahna University of Washington, College of the Environment USDA Forest Service, Pacific NW Research Station Laos/Cambodia Study

More information

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate

2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate 2007 Operating Budget 2007-2016 Capital Budget 2007 Proposed Water and Wastewater Service Rate Toronto City Council February 1 5, 2007 Multi-Year Toronto Water Business Plan was approved by Council February

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002 Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon

More information

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015

REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 REPORT TO WILDERNESS MOUNTAIN WATER SERVICE COMMISSION MEETING OF TUESDAY, MARCH 31, 2015 SUBJECT COST ESTIMATE FOR A PROPOSED ELECTRICAL CABLE CONNECTION FOR PORTABLE GENSET ISSUE To conceptualize and

More information

9.1. Adequacy of Available Data and Monitoring Efforts

9.1. Adequacy of Available Data and Monitoring Efforts 9. DATA MANAGEMENT Data management is a crucial aspect of successful implementation of the ARB IRWMP and its component projects. This section discusses the adequacy of available data and monitoring efforts,

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Recommended Practices Associated with Hydraulic Fracturing Operations

Recommended Practices Associated with Hydraulic Fracturing Operations Recommended Practices Associated with Hydraulic Fracturing Operations API standards program includes best-practices for hydraulic fracturing which include: Proper well construction and integrity Zonal

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

CRS Report for Congress

CRS Report for Congress Order Code RS22285 Updated March 22, 2006 CRS Report for Congress Received through the CRS Web Hurricane-Damaged Drinking Water and Wastewater Facilities: Impacts, Needs, and Response Summary Claudia Copeland

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

SPECIFICATIONS FOR APPROVED OFFSITE RECORDS STORAGE FACILITIES

SPECIFICATIONS FOR APPROVED OFFSITE RECORDS STORAGE FACILITIES 1. Bonding and Insurance 2. Facilities (including equipment and materiel e.g., shelving, pallets, containers and other internal fixtures and contents) The storage facility company must be bonded and insured.

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

understanding Sustainable Landscaping & Tree Preservation Standards

understanding Sustainable Landscaping & Tree Preservation Standards understanding Sustainable Landscaping & Tree Preservation Standards Purpose To promote landscaping around development that is compatible with the existing environment, and which reduces greenhouse gas

More information

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed

More information

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By

INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By INNOVATION AND COST EFFECTIVE APPROACH TO POTABLE WATER PIPE REPLACEMENT STRATEGICALLY FOCUSED ON DISTRIBUTION SYSTEM WATER QUALITY IMPROVEMENT By ABSTRACT Migdalia Hernandez, City of Sanford P.O. Box

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007 Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

RESTORATION & REVITALIZATION

RESTORATION & REVITALIZATION RESTORATION & REVITALIZATION Legal preservation has not proved to be sufficient to preserve natural communities. Restoration activities are diverse and includes revitalization of natural communities which

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov Environmental Self Audit For Small Businesses Disclaimer The materials in this document are intended

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014

Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Brushy Creek Municipal Utility District (the District) Brushy Bend Waterline Replacement Project Community Meeting February 6, 2014 Recap of Question & Answer Session Sorted by topic not necessarily in

More information

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University.

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Page 1 of 5 INTRODUCTION Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Queen Lane Addition is described as follows: Medical

More information

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS

Triple Bottom Line Analysis for Green Infrastructure A Case Study 2012 ARCADIS Triple Bottom Line Analysis for Green Infrastructure A Case Study Imagine 1 25 June the 2013 result Learning Objectives Explain Green Infrastructure (GI) as a strategy for stormwater management Describe

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email [email protected]

More information

City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects

City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects October 13, 2014 Tulsa, OK City of West Palm Beach makes Water Treatment Plant Improvements by Implementing Priority Projects Ron Cass Gert-Jan Schers Location West Palm Beach 2 Consent Order - 2008 Source

More information

Acton Quarry Extension. Halton Region June 11, 2014

Acton Quarry Extension. Halton Region June 11, 2014 Acton Quarry Extension Halton Region June 11, 2014 1 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land

More information

Water Quality and Water Usage Surveys

Water Quality and Water Usage Surveys Appendix 1 Water Quality and Water Usage Surveys This appendix contains copies of the Water Quality Survey and the Lake Usage Survey that we used to complete the watershedbased community assessments. We

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

Halton Region Planning & Public Works Committee Meeting July 8, 2015

Halton Region Planning & Public Works Committee Meeting July 8, 2015 Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8, 2015 1 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding New York State Water Resources Institute Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding Emily Vail Hudson River Estuary Program NYS Department of Environmental Conservation

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Green Spaces to Improve Waterways and Communities

Green Spaces to Improve Waterways and Communities Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015

More information

GOALS, OBJECTIVES AND POLICIES

GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates

More information

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water

Director of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water DEPARTMENT ORGANIZATIONAL CHART WATER RESOURCES Director of Utilities Secretary Resources Manager Business Services Manager Utilities Engineer Resources Supervisor Distribution Supervisor Utilities Project

More information

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment

1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment 1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

CWSRF Project Descriptions and Examples for Green Project Reserve

CWSRF Project Descriptions and Examples for Green Project Reserve CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN Tof Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN 1 TABLE OF CONTENTS PAGE 3 OVERVIEW 8 FACILITIES 12 FLEET 16 PLAYGROUND EQUIPMENT 19 ROADWAYS 23 BRIDGES 26 WATER RELATED ASSETS 2 One of the goals

More information

SECTION EIGHT BONDING REQUIREMENTS

SECTION EIGHT BONDING REQUIREMENTS SECTION EIGHT BONDING REQUIREMENTS 8-00 BONDING REQUIREMENTS 8-01 No building permit for any construction in the subdivision shall be issued nor any lot within the subdivision conveyed until a bond has

More information