TITLE: [Name of municipality] Storm Water Abatement Feasibility Study
|
|
|
- David Preston
- 5 years ago
- Views:
From this document you will learn the answers to the following questions:
Who will be in charge of the steering committee?
What will the project steering committee review the plan?
What is the process used to hire a consultant?
Transcription
1 TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed in [name of water quality study such as a TMDL] to be impaired by [list of pollutants that impair the waterbody (e.g., bacteria, nutrients, etc.)] for [list resource values (e.g., drinking water, shellfishing, swimming, habitat, etc.]. [Quantify importance of water resources with a brief (i.e., 1-5 sentence) description of historic uses, socioeconomic importance and/or ecological value.] [Name of water quality study such as a TMDL] has identified storm water as a significant contributor to impairments being experienced in [name of waterbody]. The following locations have been identified as particularly significant for stormwater pollution: [List of identified locations] This project will assess the feasibility of constructing stormwater best management practices (BMPs) at each location using conceptual (i.e., 10%) designs. This will serve as a first step in implementing stormwater controls and restoring water quality and resource values to [name of waterbody]. Follow-up progress may include full (i.e., 100%) designs, permitting, exploration of watershed management alternatives and construction. CATEGORIES OF NONPOINT SOURCE POLLUTION ADDRESSED This project will conceptually address [list of storm water pollutants that impair the water resource] from storm water sources at [number of locations identified, above] locations. PURPOSE: [Name of water quality study such as a TMDL] has identified storm water as a significant contributor to impairments being experienced in [name of waterbody]. This project will assess the feasibility of constructing stormwater best management practices (BMPs) using conceptual (i.e., 10%) designs. This will serve as a first step in implementing stormwater controls and restoring water quality and resource values to [name of waterbody]. GENERAL PROJECT PLAN: Upon approval of this grant request [name of sponsor (e.g., municipality)] intends to use a competitive bid process to hire a consultant to develop
2 EXAMPLE conceptual (i.e., 10%) engineering design plans for [list of identified locations, above] which discharge to [name of waterbody]. The designs will be compiled in a document that will include site-by-site write-ups with the following: Conceptual layout of BMP options at each location. Size of catchment. Description of existing storm water system and controls. Estimated quantities of pollutant loadings. Available land and land ownership issues. Environmental siting constraints (such as soil type, presence of wetlands or other sensitive resources). Anticipated water quality benefit. Estimated cost of each option. Other important infrastructure siting constraints. Discussion of feasibility. Discussion of recommended approach. Potential funding options. [Other information as deemed appropriate by the sponsor.] A 1-2 page tabular summary of all feasible BMP options at each location and a discussion of prioritized recommendations for the watershed as a whole will provided following the write-ups of the individual sites. The document will also include an appendix with all pertinent engineering calculations. The document will be reviewed in draft by a project steering committee that will include the following members: [List of members typically includes representatives from the departments of planning, public works and engineering, town council, conservation commission as well as local neighborhood and watershed associations] RIDEM will be provided with an opportunity to review the plan in draft. Once consensus is reached on the draft document, a public meeting will be held review design options with all interested parties. 2
3 EXAMPLE ONLY TASKS, SCHEDULES AND ESTIMATED COSTS: Tasks Participants Deliverables Grant Budget Match Budget Month 1 1. Establish [name of List of 0 $1,500 1 project steering committee municipality] committee members 2. Develop [name of RFP for 0 $3, consultant services bid, issue bid and contract for services municipality] and steering committee consultant services, contract for services 3. Develop a Consultant, Draft plan, $18,000 [about $6, conceptual (i.e., 10%) design plan using the steering committee for input and provide it to DEM for review and comment [name of municipality], steering committee minutes of steering committee meetings and attendance list $3,000/site] 4. Hold a public meeting [e.g., town council meeting] to review and Consultant, [name of municipality], steering committee Public meeting $2,000 $ Month numbers are based on the grant period. (The first month begins on the date of the grant agreement approval; month two begins on same number day of the following calendar month; etc.) Deliverables are to be completed at the end of the final month when listed as a range. 3
4 approve the conceptual design plan 6. Provide conceptual design plan and materials from public meeting in Task 4 to DEM for final approval 5. Project administration Consultant, [name of municipality], steering committee Consultant, [name of municipality] Final conceptual design plan, town council resolution or other formal town approval, public advertisement and meeting EXAMPLE ONLY minutes Project reports 0 $ TOTALS $20,000 $13,333 4
5 DELIVERABLES: EXAMPLE ONLY RFP for consultant services. Contract for consultant services. List of steering committee members. List of steering committee attendants and meeting minutes for each meeting. Draft conceptual design plan for DEM review and comment. Final conceptual design plan for DEM approval. Public meeting advertisement and meeting minutes. Administrative reports. INTERAGENCY COORDINATION: [Name of municipality] will use a steering committee and public review meeting of the conceptual design plan to engage public involvement. All meetings will be held in compliance with local and state laws regarding public meetings. ENVIRONMENTAL RESULTS/MEASURES OF SUCCESS: This project will be evaluated primarily on the successful development of the conceptual design plan. The project will also be evaluated by attendance of public meetings and participation in the steering committee meetings. PROJECT MANAGER: [Name and title of primary municipal official in charge of project administration] Address: Phone: Fax: ESTIMATED TOTAL COST, STATE AND MATCH AMOUNTS: Grant: $20,000 Match: $13,333 TOTAL: $33,333 5
6 EXAMPLE ONLY BUDGET DETAIL Project Name: [Name of waterbody] Stormwater Abatement Study Estimated Personnel Expenses Name Title Salary % of Time Salary Costs Fringe Total (@30%) [Name] Town Planner $55,363 7% $3,875 $1,163 $5,038 To be determined $15/hour 29 hours/each N/A N/A $3,045 7 Steering Committee Members Totals $8,083 Budget Estimate Total Costs Grant Requested Non-federal Match Estimated Personnel Expenses (from above) $8,083 0 $8,083 Contractual $24,000 $20,000 $4,000 Indirect Cost Supplies Equipment Travel Construction Other--Bid advertisement $1,250 0 $1,250 Total $33,333 $20,000 $8,083 6
7 EXAMPLE ONLY Contractual Budget Planning Consultant 1. Conceptual design plan $22, Meeting facilitation and related expenses $2,000 TOTAL $24,000 7
North Branch Chicago River Watershed-Based Plan
North Branch Chicago River Watershed-Based Plan EXECUTIVE SUMMARY In Lake County, the Lake County Stormwater Management Commission (SMC) is responsible for managing Lake County s water resources. The North
Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH
Final Report of the Town Owned Lands Improvement Project for the Town of Brentwood, NH Project Background In November of 2013 the Green Infrastructure for Sustainable Coastal Communities (GISCC) project
Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents
Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents Chapter 10. Selecting Metrics or Indicators of WQS Attainment... 10-2 Chapter 11. Monitoring
Accounting for Uncertainty in Offset and Trading Programs
Accounting for Uncertainty in Offset and Trading Programs EPA Technical Memorandum February 12, 2014 Prepared by EPA Region III 1 of 12 CONTENTS Abbreviations and acronyms... 3 Scope... 4 Executive summary...
Overview of the Division of Water Restoration Assistance
Overview of the Division of Water Restoration Assistance Presented by Trina Vielhauer Director, Division of Water Restoration Assistance Water Restoration Assistance Trina Vielhauer Director State Revolving
Natural Resource-Based Planning*
Natural Resource-Based Planning* Planning, when done well, is among the most powerful tools available to communities. A solid plan, based on good natural resource information, guides rational land-use
MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL
MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL FOREWORD This document contains the basis for NOAA and EPA s decision to fully approve Massachusetts Coastal Nonpoint
Watershed-Wide Modeling for TMDL/MS4 Permit Compliance. Greg Wilson, Barr Engineering
Watershed-Wide Modeling for TMDL/MS4 Permit Compliance Greg Wilson, Barr Engineering Acknowledge City of Golden Valley Eric Eckman Heather Hegi Laura Jester and BCWMC Technical Advisory Committee members
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package Grant Guidelines.. 2 Grant Application & Statement of Work. 7 Fiscal Year 2013-2014 St. Lucie River Issues Team
Presented below are water quality standards that are in effect for Clean Water Act purposes.
Presented below are water quality standards that are in effect for Clean Water Act purposes. EPA is posting these standards as a convenience to users and has made a reasonable effort to assure their accuracy.
EPA Grants Supported Restoring the Chesapeake Bay
OFFICE OF INSPECTOR GENERAL Audit Report Catalyst for Improving the Environment EPA Grants Supported Restoring the Chesapeake Bay Report No. 2006-P-00032 September 6, 2006 Report Contributors: Randy Holthaus
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Towards Integrated Water/Watershed Management: Data Strategies. Clay Clifton EcoLayers, Inc.
Towards Integrated Water/Watershed Management: Data Strategies Clay Clifton EcoLayers, Inc. Water environment an Integrated System; one scale is the watershed Historically, management of water resources
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
BALTIMORE COUNTY. Phase II Watershed Implementation Plan
BALTIMORE COUNTY Phase II Watershed Implementation Plan July 2, 2012 Vincent J. Gardina, Director Department of Environmental Protection and Sustainability CHAPTER 1 OVERVIEW OF THE BALTIMORE COUNTY PHASE
Greater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist
Exhibit A-7.III Water Quality Management Plan (WQMP) Checklist Water Quality Management Plan Checklist The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
Bowmanville Marsh Habitat Restoration and Public Access Project
Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration
Warren County MS4 Stormwater Management Program Plan
Warren County MS4 Stormwater Management Program Plan This Plan is a requirement under NYSDEC General Permit For Municipal Stormwater Discharges, Permit # GP-0-10-002 Prepared By: Jim Lieberum, CPESC Warren
CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT
CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES Stormwater LID Infrastructure Plan PROPOSAL SUBMITTAL DEADLINE DATE: March 22, 2016 TIME: 4:00 pm LOCATION:
Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007
Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards
Section 4 General Strategies and Tools
Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General
ERP: Willamette-Ecosystem Services Project
ERP: Willamette-Ecosystem Services Project Presented by Iris Goodman to NAS Sustainability R&D Forum October 17-18, 2007 Conserving ecosystem services through proactive decision-making making Linking Human
Ginger Paige and Nancy Mesner University of Wyoming Utah State University
Effective Water Quality BMP Monitoring Tools Ginger Paige and Nancy Mesner University of Wyoming Utah State University Overview BMP Monitoring Guidance Document for Stream Systems Lessons learned CEAP
Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility
Draft Photo Documentation Update for Proposition 13 Grant Agreement No. San Diego Region McClellan-Palomar Airport Water Quality Treatment Facility Prepared For: County of San Diego DPW 555 South Overland
Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington
Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the
Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Memorandum TO: FROM: Michael Bergstrom and Robin Cole City of Bellevue Nancy Bird, AICP EDAW, Inc. DATE: July 23, 2008 RE: Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria
Summary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
Green Spaces to Improve Waterways and Communities
Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
Webcast 2: Watershed Treatment Model
Webcast 2: Watershed Treatment Model Welcome to the Webcast To Ask a Question The lower lefthand corner of the screen contains a chat box. Click on the Public tab and type your question in the box and
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
Economic Analysis of Proposed Revised Definition of Waters of the United States
Economic Analysis of Proposed Revised Definition of Waters of the United States March 2014 U.S. Environmental Protection Agency primary author U.S. Army Corps of Engineers contributing author US EPA assembled
Data Management Model. Potential Component of the Thames River Water Management Plan
WISKI Water Quality / Quantity Data Management Model Potential Component of the Thames River Water Management Plan Background Goal of the Thames River Water Management Plan: Improve water quality of the
~Pennsylvania Campaign for Clean Water~ Stormwater Workgroup
c/o Liz Deardorff, co-chair 1845 Market Street, Suite 206 Camp Hill, PA 17011 [email protected] April 30, 2015 Sally Claggett Chesapeake Bay Program U.S. Environmental Protection Agency 410
Center for Urban Ecology Strategic Plan
January 2004 1 Center for Urban Ecology Strategic Plan Science and Service through Partnerships Mission The Center for Urban Ecology is an interdisciplinary team that provides scientific guidance, technical
Acton Quarry Extension. Halton Region June 11, 2014
Acton Quarry Extension Halton Region June 11, 2014 1 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston
SUFFOLK COUNTY WATER QUALITY PROTECTION AND RESTORATION PROGRAM AND LAND STEWARDSHIP INITIATIVES APPLICATION FORM
May 2012 SUFFOLK COUNTY WATER QUALITY PROTECTION AND RESTORATION PROGRAM AND LAND STEWARDSHIP INITIATIVES APPLICATION FORM PROJECT TITLE: Meetinghouse Creek Water Quality Restoration Strategy Steven Bellone,
San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers
United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
Executive Summary Minnesota Nutrient Reduction Strategy
Executive Summary The (NRS) will guide the state in reducing excess nutrients in waters so that in-state and downstream water quality goals are ultimately met. Nutrient impacts are widespread. Excessive
THE CITY OF EDGEWOOD STORMWATER MANAGEMENT PROGRAM
THE CITY OF EDGEWOOD STORMWATER MANAGEMENT PROGRAM March 2015 Prepared By City of Edgewood, Department of Community Development City of Edgewood, WA 98372 For use in NPDES Phase II implementation Prepared
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
Pamela Birak, Jordan Lake State Park, Chatham County, NC
Pamela Birak, Jordan Lake State Park, Chatham County, NC 3 Lakes, Reservoirs, and Ponds Forty-six states, Puerto Rico, and the District of Columbia (collectively referred to as states in the rest of this
Costs for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
ESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW
ESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW Advancing an integrated approach to flood risk management and habitat restoration planning in the Puget Sound
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS LOWER GREAT MIAMI RIVER NUTRIENT MANAGEMENT PROJECT INTRODUCTION On behalf of a partnership of Water Resource Recovery Facilities (WRRFs) WRRFs and other stakeholders with permitted
State of Georgia Department of Natural Resources Environmental Protection Division Watershed Protection Branch
State of Georgia Department of Natural Resources Environmental Protection Division Watershed Protection Branch National Pollutant Discharge Elimination System (NPDES) Industrial Antidegradation Analysis
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
FY 2016 Clean Water Fund Multipurpose Drainage Management (MDM) Grants Frequently Asked Questions (FAQs)
FY 2016 Clean Water Fund Multipurpose Drainage Management (MDM) Grants Frequently Asked Questions (FAQs) Table of Contents **Submit additional questions to: [email protected]... 1 General Requirements,
Halton Region Planning & Public Works Committee Meeting July 8, 2015
Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8, 2015 1 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the
Handbook for Developing Watershed Plans to Restore and Protect Our Waters
This document is one chapter from the EPA Handbook for Developing Watershed Plans to Restore and Protect Our Waters, published in March 2008. The reference number is EPA 841-B-08-002. You can find the
Sustainability Brief: Water Quality and Watershed Integrity
Sustainability Brief: and Watershed Integrity New Jersey depends on water resources for the health of our people, the strength of our economy, and the vitality of our ecosystems. The quality of our water
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike