1 A CASE STUDY ON: THE EFFECTS OF HIGHER OPERATING TEMPERATURES ON DATA CENTER EFFICIENCY Victor Garcia Director of Facilities Brocade October 24, 2012 Jeff Stein, PE Principal Taylor Engineering 2010 Brocade Communications Systems, Inc. Proprietary Information 1

2 Agenda Background Hypothesis Experiment Findings Next Steps 2

3 Brocade San Jose Labs 75,000 square feet of labs 1,900 racks 3 kw/rack 6 MW Total Building Load Hot aisle containment In-row cooling Water side economizer PUE of

4 Hypothesis Lowering the cold aisle temperature setpoint reduces IT power but the HVAC penalty is bigger than the IT savings IT fan power goes down But HVAC fan and chiller plant power goes up more 4

5 IRC Control Sequence 95% 75% Fan Speed Max SAT = 80F 50% Supply Air Temp Setpoint Min SAT = 66F 0% 50% 75% 100% IRC Group Reset Point 5

6 Temperature Sensors Before On rack In front of equipment After Hanging in cold row Uniform temperatures 6

7 Cold Aisle Setpoint Experiment Raise and lower cold aisle temperature setpoint in several cold aisles Monitor IRC fan power, IT gear power 7

8 Area of Experiments 3 rd Floor 12 rows 9 cold aisles 2 nd floor 6 rows 4 cold aisles 8

9 Row 2T 9

10 Row 2T (server/storage gear) 1.5% increase in IT KW per 5 degf 10

11 Row 2T 11

12 Row 2T 12

13 Row 2R,2S (mixed gear) 1.2% increase in KW per 5 deg F 13

14 Row 3C (IP gear) No relationship between kw and Max Temp 14

15 Row 3C, 3D (IP/Servers) 2% step change at 85F 15

16 Row 3E, 3F (mixed, storage) 4% step change at 84F 16

17 Summary of IT Power Changes Row Gear Increasing Cold Aisle Temp results in: 2R Mixed not valid due to IT changes 2R, 2S mixed 1.2% increase in IT per 5F increase in cold aisle setpt 2S, 2T mixed 1.5%/5F positive relationship 2T server/storage 1.5%/5F positive relationship 3A IP/Servers not valid due to IT changes 3A, 3B IP/Servers not valid due to IT changes 3B mixed positive but also some IT changes 3C IP no relationship 3C, 3D IP/Servers 2% step change at 85F 3D Servers no relationship 3E SAN/Server no relationship 3E, 3F mixed (E) and storage (F) 4% step change at 85F 3F, 3G servers 1.2%/5F positive relationship 17

18 8% avg decrease in fan speed for 5F increase in cold aisle setpoint 18

19 8% increase in fan speed is a 30-50% increase in fan power 19

20 Plant Power: 20% increase in plant power per 5F increase in wetbulb 5F increase in chilled water return temp. would have similar effect 20

21 Water economizer serves more load as supply and return water temperatures increase Water Entering Economizer Water Leaving Economizer Water Leaving Chiller 21

22 Water economizer serves more load as supply and return water temperatures increase Load served by Economizer Load served by Chillers 22

23 Economizer Operation Last 30 Days 23

24 Results: Lowering Setpoint Increases Total Power 24

25 Sensitivity Analysis Q: How big a decrease in IT power makes the IT savings greater than the HVAC penalty? A: IT power would have to decrease at least 8% per 5F decrease in cold aisle setpoint We saw only a 1.2% decrease per 5F A recent study by APC/Dell found a 3% decrease per 5F ( ) 25

26 Conclusions If the HVAC system has an economizer and has good part load performance (e.g. VFD fans) then the hotter the cold aisles the lower the total power consumption Commissioning is key Continuous monitoring Containment integrity Cold aisle sensor placement Incorrectly oriented gear Rogue zones 26

27 Next Steps More testing and data analysis Total building level experiment Monitor loads at equipment level Hotter cold aisles is more efficient but does it effect IT gear reliability? IT gear fan control algorithms More commissioning 27

28 Thank You 28

NetApp Data Center Design

NetApp Data Center Design NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center Solutions Data Center Design Evolution Capacity Build Cost

More information

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory

More information

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National

More information

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the

More information

GREEN DATA CENTER DESIGN

GREEN DATA CENTER DESIGN Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A

More information

Data Center Infrastructure Management (DCIM) Utility Energy Efficiency Opportunities Discussion & Demos July 2, 2013

Data Center Infrastructure Management (DCIM) Utility Energy Efficiency Opportunities Discussion & Demos July 2, 2013 Data Center Infrastructure Management (DCIM) Utility Energy Efficiency Opportunities Discussion & Demos July 2, 2013 Ted Brown Sr. Energy Management Analyst Data Center / IT Energy Efficiency [email protected]

More information

Specialty Environment Design Mission Critical Facilities

Specialty Environment Design Mission Critical Facilities Brian M. Medina PE Associate Brett M. Griffin PE, LEED AP Vice President Environmental Systems Design, Inc. Mission Critical Facilities Specialty Environment Design Mission Critical Facilities March 25,

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Dealing with Thermal Issues in Data Center Universal Aisle Containment Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges

More information

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Legacy Data Centres Upgrading the cooling capabilities What are the options? Legacy Data Centres Upgrading the cooling capabilities What are the options? Presentation Structure What is a Legacy Data Centre? What is CRAC cooling? ASHRAE Standards Overview Available Cooling Systems

More information

How To Benchmark Power Production

How To Benchmark Power Production Energy Benchmarking Service for Data Centre Industry in Hong Kong and Initial Findings Simon Lam Acting Deputy Director, Business Marketing & Development Department, CLP Power Agenda 1. Introduction: Why

More information

University of St Andrews. Energy Efficient Data Centre Cooling

University of St Andrews. Energy Efficient Data Centre Cooling Energy Efficient Data Centre Cooling St. Andrews and Elsewhere Richard Lumb Consultant Engineer Future-Tech Energy Efficient Data Centre Cooling There is no one single best cooling solution for all Data

More information

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001

Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue

More information

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building

More information

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants

HIGH PERFORMANCE CHILLED WATER SYSTEMS. EarthWise HVAC. EarthWise HVAC High Performance CHW Plants HIGH PERFORMANCE CHILLED WATER SYSTEMS EarthWise HVAC Simon Ho e: [email protected] 2012 EarthWise HVAC High Performance CHW Plants Low Flow Low Temperature Systems Variable Flow Systems Variable CHW Variable

More information

FEAR Model - Review Cell Module Block

FEAR Model - Review Cell Module Block F.E.A.R. Returns: 5 Steps Toward Data Center Efficiency Today Objectives Benefits for ITS professionals Brief review of the FEAR data center Define data center efficiency Link efficiency to the FEAR data

More information

Data Center Components Overview

Data Center Components Overview Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room

More information

Data Center Technology: Physical Infrastructure

Data Center Technology: Physical Infrastructure Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider

More information

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably

Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Data Center 2020: Delivering high density in the Data Center; efficiently and reliably March 2011 Powered by Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Review:

More information

National Grid Your Partner in Energy Solutions

National Grid Your Partner in Energy Solutions National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National

More information

Data Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1

Data Centers WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 WHAT S ONTHEHORIZON FOR NR HVAC IN TITLE 24 2013? SLIDE 1 Data Center CASE Scope Existing Title 24 2008 Scope Current scope ( 100 T24-2008) exempts process space from many of the requirements, however

More information

Best Practices in HVAC Design/Retrofit

Best Practices in HVAC Design/Retrofit Best Practices in HVAC Design/Retrofit Little Server Room BIG $AVINGS Justin Lewis, P.E., LEED AP, DCEP Sr Energy Project Manager C:530.400.6042 O:530.754.4870 [email protected] 1 What s the problem here?

More information

Control of Computer Room Air Handlers Using Wireless Sensors. Energy Efficient Data Center Demonstration Project

Control of Computer Room Air Handlers Using Wireless Sensors. Energy Efficient Data Center Demonstration Project Control of Computer Room Air Handlers Using Wireless Sensors Energy Efficient Data Center Demonstration Project About the Energy Efficient Data Center Demonstration Project The project s goal is to identify

More information

THE WORLD S MOST EFFICIENT DATA CENTER

THE WORLD S MOST EFFICIENT DATA CENTER THE WORLD S MOST EFFICIENT DATA CENTER HP POD 240a Ed Turkel Manager, WW HPC Marketing Hyperscale Business Unit 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject

More information

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates

More information

Greening Data Centers

Greening Data Centers Greening Data Centers Dallas Thornton SDSC Division Director, Cyberinfrastructure Services March 2, 2011 Data Centers Are Enormous Users of Power US Data Centers (TeraWatt Hours per Year) 125 US Televisions

More information

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-

More information

Data Center Energy Profiler Questions Checklist

Data Center Energy Profiler Questions Checklist Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space

More information

Data Centre Testing and Commissioning

Data Centre Testing and Commissioning Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to

More information

Re Engineering to a "Green" Data Center, with Measurable ROI

Re Engineering to a Green Data Center, with Measurable ROI Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices

More information

Self-benchmarking Guide for Data Center Infrastructure: Metrics, Benchmarks, Actions 6-28-10. Sponsored by:

Self-benchmarking Guide for Data Center Infrastructure: Metrics, Benchmarks, Actions 6-28-10. Sponsored by: Self-benchmarking Guide for Data Center Infrastructure: Metrics, Benchmarks, Actions 6-28-10 Sponsored by: Disclaimer This document was prepared as an account of work sponsored by the United States Government.

More information

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling

More information

Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie

Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie Energy Efficiency in New and Existing Data Centers-Where the Opportunities May Lie Mukesh Khattar, Energy Director, Oracle National Energy Efficiency Technology Summit, Sep. 26, 2012, Portland, OR Agenda

More information

Managing Data Centre Heat Issues

Managing Data Centre Heat Issues Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design

More information

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview Automated Commissioning for Energy (ACE) Platform for Large Retail Property $62,900 dollars of energy savings identified during the first 6 weeks Overview The ability to pull large amounts of complex data

More information

Energy Impact of Increased Server Inlet Temperature

Energy Impact of Increased Server Inlet Temperature Energy Impact of Increased Server Inlet Temperature By: David Moss, Dell, Inc. John H. Bean, Jr., APC White Paper #138 Executive Summary The quest for efficiency improvement raises questions regarding

More information

How To Improve Energy Efficiency Through Raising Inlet Temperatures

How To Improve Energy Efficiency Through Raising Inlet Temperatures Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD

More information

APC APPLICATION NOTE #92

APC APPLICATION NOTE #92 #92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center

More information

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units

More information

Hot-Aisle vs. Cold-Aisle Containment for Data Centers

Hot-Aisle vs. Cold-Aisle Containment for Data Centers Hot-Aisle vs. Cold-Aisle Containment for Data Centers White Paper 135 Revision 1 by John Niemann, Kevin Brown, and Victor Avelar > Executive summary Both hot-air and cold-air containment can improve the

More information

How to Build a Data Centre Cooling Budget. Ian Cathcart

How to Build a Data Centre Cooling Budget. Ian Cathcart How to Build a Data Centre Cooling Budget Ian Cathcart Chatsworth Products Topics We ll Cover Availability objectives Space and Load planning Equipment and design options Using CFD to evaluate options

More information

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America 7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer

More information

AIRAH Presentation April 30 th 2014

AIRAH Presentation April 30 th 2014 Data Centre Cooling Strategies The Changing Landscape.. AIRAH Presentation April 30 th 2014 More Connections. More Devices. High Expectations 2 State of the Data Center, Emerson Network Power Redefining

More information

Data Center RD&D at EPRI

Data Center RD&D at EPRI Data Center RD&D at EPRI Mukesh Khattar Technical Executive Critical facilities Round Table Meeting Palo Alto, CA 16 October 2015 EPRI Focus for Data Centers RD&D Address problems facing the member electric

More information

Data Centre/Server Room Containment: How to Get More Cooling Capacity without Adding Additional AC

Data Centre/Server Room Containment: How to Get More Cooling Capacity without Adding Additional AC Data Centre/Server Room Containment: How to Get More Cooling Capacity without Adding Additional AC About us Data centre consulting World-class products Expert national team Mike Hassaballa, Applications

More information

Improving Data Center Energy Efficiency Through Environmental Optimization

Improving Data Center Energy Efficiency Through Environmental Optimization Improving Data Center Energy Efficiency Through Environmental Optimization How Fine-Tuning Humidity, Airflows, and Temperature Dramatically Cuts Cooling Costs William Seeber Stephen Seeber Mid Atlantic

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

Enabling an agile Data Centre in a (Fr)agile market

Enabling an agile Data Centre in a (Fr)agile market Enabling an agile Data Centre in a (Fr)agile market Phil Dodsworth Director, Data Centre Solutions 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without

More information

How Row-based Data Center Cooling Works

How Row-based Data Center Cooling Works How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that

More information

How To Improve Energy Efficiency In A Data Center

How To Improve Energy Efficiency In A Data Center Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice

More information

CRITICAL COOLING FOR DATA CENTERS

CRITICAL COOLING FOR DATA CENTERS IDEA 100 th Annual Conference & Trade Show CRITICAL COOLING FOR DATA CENTERS Presented by Ron Johanning, PE, LEED AP Mission Critical Market Leader Agenda EPA Report Data Center Energy Trends IT Best Practice

More information

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency

More information

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room

More information

Alan Matzka, P.E., Senior Mechanical Engineer Bradford Consulting Engineers

Alan Matzka, P.E., Senior Mechanical Engineer Bradford Consulting Engineers Information Technology and Data Centers HVAC Showcase November 26, 2013 Alan Matzka, P.E., Senior Mechanical Engineer Bradford Consulting Engineers Welcome. Today s webinar is being recorded and will be

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

Benefits of. Air Flow Management. Data Center

Benefits of. Air Flow Management. Data Center Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel

More information

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010

White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010 White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence

More information

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential

Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com

More information

Submersion Cooling Evaluation

Submersion Cooling Evaluation Submersion Cooling Evaluation ET Project Number: Project Manager: Jeff Beresini Pacific Gas and Electric Company Prepared By: Luke Werner, P.E. Energy Resources Integration (ERI) 251 Donahue St. Sausalito,

More information

The Efficient Enterprise. Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric

The Efficient Enterprise. Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric Ee The Efficient Enterprise Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic! 30,000

More information

Trends in Data Center Design ASHRAE Leads the Way to Large Energy Savings

Trends in Data Center Design ASHRAE Leads the Way to Large Energy Savings Trends in Data Center Design ASHRAE Leads the Way to Large Energy Savings ASHRAE Conference, Denver Otto Van Geet, PE June 24, 2014 NREL/PR-6A40-58902 NREL is a national laboratory of the U.S. Department

More information

High-density modular data center making cloud easier. Frank Zheng Huawei

High-density modular data center making cloud easier. Frank Zheng Huawei High-density modular data center making cloud easier Frank Zheng Huawei 2012-10-10 Content 1 2 3 4 Cloud s impact to data center Concerns of DC construction 4S DC making cloud easier Success stories Cloud?

More information

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS Air / Water / DX Cooled Cabinet Solutions Mini Data Centre All in One Solution: Where there is a requirement for standalone computing and communications, or highly

More information

Measure Server delta- T using AUDIT- BUDDY

Measure Server delta- T using AUDIT- BUDDY Measure Server delta- T using AUDIT- BUDDY The ideal tool to facilitate data driven airflow management Executive Summary : In many of today s data centers, a significant amount of cold air is wasted because

More information

Elements of Energy Efficiency in Data Centre Cooling Architecture

Elements of Energy Efficiency in Data Centre Cooling Architecture Elements of Energy Efficiency in Data Centre Cooling Architecture Energy Efficient Data Center Cooling 1 STULZ Group of Companies Turnover 2006 Plastics Technology 400 Mio A/C Technology 200 Mio Total

More information

EXAMPLE OF A DATA CENTRE BUILD

EXAMPLE OF A DATA CENTRE BUILD EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist

More information

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Energy Efficiency Best Practice Guide Data Centre and IT Facilities 2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits

More information

EMC DURHAM CLOUD DATA CENTER

EMC DURHAM CLOUD DATA CENTER EMC DURHAM CLOUD DATA CENTER Energy efficient design and construction EMC IT was hard at work reducing operational costs, increasing IT agility, and preparing for a dynamic future in the cloud when it

More information

Impact of Virtualization on Data Center Physical Infrastructure White Paper #27. Tom Brey, IBM Operations Work Group

Impact of Virtualization on Data Center Physical Infrastructure White Paper #27. Tom Brey, IBM Operations Work Group Impact of Virtualization on Data Center Physical Infrastructure White Paper #27 Tom Brey, IBM perations Work Group 1 Virtualization Two Steps WP #19 USING VIRTUALIZATIN T IMPRVE DATA CENTER EFFICIENCY

More information

Data center upgrade proposal. (phase one)

Data center upgrade proposal. (phase one) Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The

More information

How To Find A Sweet Spot Operating Temperature For A Data Center

How To Find A Sweet Spot Operating Temperature For A Data Center Data Center Operating Temperature: The Sweet Spot A Dell Technical White Paper Dell Data Center Infrastructure David L. Moss THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL

More information

The Benefits of Supply Air Temperature Control in the Data Centre

The Benefits of Supply Air Temperature Control in the Data Centre Executive Summary: Controlling the temperature in a data centre is critical to achieving maximum uptime and efficiency, but is it being controlled in the correct place? Whilst data centre layouts have

More information

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.

Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Business Management Magazine Winter 2008 Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Contrary to some beliefs, air is quite

More information

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore

Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational

More information

A Blueprint for a Smarter Data Center Data Center Services helps you respond to change

A Blueprint for a Smarter Data Center Data Center Services helps you respond to change Bret W. Lehman, PE GTS Site and Facilities Services March 25, 2011 A Blueprint for a Smarter Data Center Data Center Services helps you respond to change 2011 IBM Corporation Change is accelerating IT

More information

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned Outline CC objectives Site and building description ypical data floor overview CC measures Results Lessons learned 2 CC Objectives Identify and solve existing operating problems Improve building thermal

More information

Impact of Control System Technologies on Industrial Energy Savings

Impact of Control System Technologies on Industrial Energy Savings Impact of Control System Technologies on Industrial Energy Savings Priyam Parikh Industrial Assessment Center Texas A&M University Bryan P. Rasmussen Industrial Assessment Center Texas A&M University http://farolconsulting.com/?page_id=110

More information

Capgemini UK Infrastructure Outsourcing

Capgemini UK Infrastructure Outsourcing Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,

More information

Optimization of energy consumption in HPC centers: Energy Efficiency Project of Castile and Leon Supercomputing Center - FCSCL

Optimization of energy consumption in HPC centers: Energy Efficiency Project of Castile and Leon Supercomputing Center - FCSCL European Association for the Development of Renewable Energies, Environment and Power Quality (EA4EPQ) International Conference on Renewable Energies and Power Quality (ICREPQ 12) Santiago de Compostela

More information

Airflow Simulation Solves Data Centre Cooling Problem

Airflow Simulation Solves Data Centre Cooling Problem Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length

More information

Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems

Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are

More information

Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation

Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation Recommendation For Incorporating Data Center Specific Sustainability Best Practices into EO13514 Implementation Version 1.0 - November, 2011 Incorporating Data Center-Specific Sustainability Measures into

More information

BRUNS-PAK Presents MARK S. EVANKO, Principal

BRUNS-PAK Presents MARK S. EVANKO, Principal BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations

More information

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems

How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems How Does Your Data Center Measure Up? Energy Efficiency Metrics and Benchmarks for Data Center Infrastructure Systems Paul Mathew, Ph.D., Staff Scientist Steve Greenberg, P.E., Energy Management Engineer

More information

Paul Oliver Sales Director. Paul Oliver, Airedale Tom Absalom, JCA

Paul Oliver Sales Director. Paul Oliver, Airedale Tom Absalom, JCA Paul Oliver Sales Director Paul Oliver, Airedale Tom Absalom, JCA Airedale an overview 25,000m 2 UK premier test centre 450 staff Global distribution A Modine company Modine centre of excellence Airedale

More information

Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems

Data Center Cooling. 1-800-693-0351 www.dpstele.com. A guide from: Your partners in UPS Monitoring Systems Data Center Cooling A guide from: Your partners in UPS Monitoring Systems The air in your server room, especially nearest the processors in your equipment, will rise to dangerous temperatures quickly if

More information