EDSA BUSWAY PROJECT. Maximizing public and personal transport options in a New Normal Scenario
|
|
|
- Oscar Poole
- 4 years ago
- Views:
Transcription
1 EDSA BUSWAY PROJECT Maximizing public and personal transport options in a New Normal Scenario
2 BACKGROUND EDSA Busway Project is a joint undertaking of the DOTr, MMDA, and DPWH. The goal of the project is to deliver reliable, safe, accessible, environmentally-friendly, dependable, efficient, and comfortable road-based public transport system in the country s main thoroughfare. The Project features the use of a dedicated median lane for buses with stations built at the median island, allowing for a more efficient travel by avoiding conflict with connecting streets, driveways, commercial centers, and curbside drop off points.
3 MAY 2020 TIMELINE Installation of temporary barriers to enclose the median lane Construction of the initial station attached to rail facilities (7 stations) Consolidation of operators that will run the EDSA Busway JULY 2020 Painting of the median lane (in partnership with Boysen) OCTOBER 2020 Discussion with SwedFund on the grant that they are offering MARCH 2021 Requested the approval of the Office of the President (thru DOF, DFA, and NEDA) to accept the grant for a technical assistance being offered by SwedFund DECEMBER 2021 Inauguration of the three (3) Concourses from the SM Prime Holdings Inc APRIL 2020 Planning stage (review of the E-Bus concept and MMBRT-L2 concept) JUNE 2020 Start of operation and Procurement of barriers that will replace the temporary barriers AUGUST 2020 Additional stations along the route started operating (5 additional stations) NOVEMBER 2020 Signing of the Memorandum of Agreement between the DOTr and the private companies that will donate the busway bridge with concourse OCTOBER 2021 Civil works completion of bus stops in Buendia, Roxas Blvd. Taft, and Tramo (To be implemented by MMDA)
4 Fig 2. EDSA Busway Concourse Perspective
5 Fig 3. EDSA Busway Concourse Perspective
6 Fig 4. EDSA Busway Concourse Amenities
7 Fig 5. Start of Construction of EDSA Busway Stations
8 Fig 6. View of the EDSA Busway Guadalupe Stations
9 Fig 7. Painting of the Median Lane Markers
10 Fig 8. Installation of Concrete Barriers at Median Separator
11 KEY COMPARISON Number of bus units CURBSIDE BUS (PRE-BUSWAY) Average of 3340 units passing through EDSA daily EDSA BUSWAY Total of 550 units will run the route Franchise Fragmented franchise being run by several operators Operators that consolidated to form a consortia that will run the route will be issued with franchise for the EDSA Busway route Lane Utilization No dedicated bus lane in EDSA Buses to run the median lane for the entire stretch from PITX to Monumento, free from obstruction from the mix traffic.
12 Average Daily Ridership KEY COMPARISON CURB-SIDE BUS (PRE-BUSWAY) 260,000 pax/day (Based on ITDP Survey: 2015) EDSA BUSWAY 300,000 pax/day to 500,000 pax/day if the current system improved.(sweco 2018) Travel Time 2 hours to 3 hours from end-to-end (Sweco 2018 report) Travel Speed Stop-and-go and standstill traffic affects the buses. Average travel speed in EDSA is around 12 kph (Based on Sweco 2018 report, average P2P speed) Stations (Bus Stops) Pick-up and drop-off points are at the curbside 45 mins to 1 hour because the traffic congestion at the outer lanes has minimum to no effect on the median busway lane (Data from LTFRB Monitoring and info from consortia) Buses are traveling the busway at around 20kph to 34kph at an average with a maximum speed limit of 50kph (Data from Sakay.ph, Speed taken from GPS data) To build a total of 28 stations at the median island. This excludes the PITX
13 KEY COMPARISON Pre-Busway Condition where buses are mixed with other vehicles where both buses and private vehicles are stuck in traffic. Resulting to poor PUB level-of-service along EDSA Current bus system in EDSA, where traffic at the private car lanes has a minimal effect on the dedicated median lane. This resulted to less travel time and better level-of-service.
14 ATTACHEMENTS Median Busway Plans and Key Results from the 2018 Sweco Study
15 Reference for the Ridership Data
16 Reference for the Busway Benefits
17 Reference for the Busway Benefits
18 Design Reference for the Median Lane
19 Design Reference for the Median Lane
ATTACHMENT A SHUTTLE SERVICE ROUTES
Page 1 of 32 Attachment A ATTACHMENT A SHUTTLE SERVICE ROUTES The shuttle service is detailed as follows: Employee Parking Lots Shuttle The Employee Shuttle transports Authority employees between the Employee
Median Bus Lane Design in Vancouver, BC: The #98 B-Line
Li 1 Median Bus Lane Design in Vancouver, BC: The #98 B-Line Simon Li, P.Eng. PTOE Acting Program Manager, Road and Bridge Projects TransLink (Greater Vancouver Transportation Authority) 1600 4720 Kingsway
Transitways and the RouteAhead for Calgary Transit
Transitways and the RouteAhead for Calgary Transit Chris Jordan, P.Eng., M.Sc., Manager, Strategic Planning, Calgary Transit, Transportation, City of Calgary Jen Malzer, P.Eng., M.Sc., Senior Transit Planner,
Rapid Transit Backgrounder
Rapid Transit Backgrounder Moving Forward On Rapid Transit The concept of a Rapid Transit System for Winnipeg has been debated for over 30 years. City Council and the Province of Manitoba have demonstrated
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Penalty points and fixed charge offences
Appendix : points and fixed charge offences s that carry penalty points Payment Conviction 8 next 8 Speeding E0 Failure by Driver to comply with front seat belt requirements (for self and for passengers
A Review of Transit Technology Specifications
. Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.
Measuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA
www.arpapress.com/volumes/vol12issue3/ijrras_12_3_14.pdf ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA Robert M. Brooks Associate Professor, Department of Civil and Environmental Engineering,
Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study
Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: [email protected] Phone: 021 1067139 Date: 30 September 2013 About
Metro Rail Gating Study
Executive Management & Audit Committee Item # 27 Operations Committee Item # 43 FINAL DRAFT Metro Rail Gating Study Los Angeles, California November 15, 2007 Filename/RPS Number 1 Briefing Contents Executive
Guidelines for Attractive Public Transport with a Focus on BRT
Guidelines for Attractive Public Transport with a Focus on BRT Advanced BRT systems have provided many developing country cities public transport with rail-like capacities and speed. BRT Guidelines adapted
OM-13: Transportation Management and Operations
: Transportation and Operations 1-15 points Goal: Maximize the utility of the existing roadway network through use of technology and management of operations strategies. Sustainability Linkage Transportation
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
Granger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland 2007 2017, 2006
and 7 Key result area 1 Shaping the future Developing new products and services, planning and behavioural change 1. Change behaviour to encourage sustainable transport choices To develop an awareness of
Journal of Environmental Protection and Ecology 13, No 2, 611 619 (2012)
Journal of Environmental Protection and Ecology 13, No 2, 611 619 (2012) Environmental protection and sustainable development Bus Rapid Transit as a Contribution to Sustainable Transportation. The Case
SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016
SKY BET CHAMPSIONSHIP PLAY-OFF SATURDAY 28 TH MAY 2016 Travel Plan Wembley Stadium will be hosting the Sky Bet Championship Play-Off Final on Saturday 28 th May 2016. Kick off will be at 17:00, with this
11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 [email protected] Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
Elevated Roads for Sri Lanka
Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University
ROAD SIGNS IN JAPAN PARKING SIGNS. No Parking or Stopping Anytime SIZE & WEIGHT LIMIT SIGNS SPEED LIMIT SIGNS
ROAD SIGNS IN JAPAN Stop Slow & all Do Not Enter & Motorcycles Road Large Sized Trucks & Special Duty Road All Except Two Wheeled Light Except Bicycles Large Passenger No Right Turn No Passing No U-Turn
FOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
MANAGEMENT PLAN. Fiscal Year 2015-2016
MANAGEMENT PLAN Fiscal Year 2015-2016 May 6, 2015 Table of Contents I. Executive Summary... 2 Omnitrans Vision... 5 Omnitrans Mission Statement... 5 II. Strategic Initiatives... 5 Implementation... 6 Strategic
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION CAPITAL TRANSPORTATION PROGRAM TRANSIT FACILITIES 3-306
SUPPORT SYSTEM TRANSIT FACILITIES 3-306 NEWARK TRANSIT HUB PROJECT SCOPE/DESCRIPTION: Funding was authorized to begin a study to select a site for the Newark Transit Hub. Future improvements may include
Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by
Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)
2012 Saskatoon Transit Services Annual Report
2012 Annual Report Saskatoon Transit provides a high quality of service for all citizens in our community, and is undertaking initiatives focused on building its ridership. Like most North American cities,
time and thought that the buses had a higher on-time arrival rate than the actual on-time arrival rate. 2
TriMet Transit Tracker Implementation Summary Transit Tracker is a real-time bus arrival prediction system that provides information to riders at bus stops and light rail stations with a count down in
CAPACITY AND LEVEL-OF-SERVICE CONCEPTS
CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3
Tools and Operational Data Available. 15.12.2015 1 st RESOLUTE Workshop, Florence
Tools and Operational Data Available Athens Transport Tools and Operational Data Operations Control Center (OCC): mimic panels, operations modi (full, downgraded, manual) Metro Security Systems: sensors
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
The Mobility Opportunity Improving urban transport to drive economic growth
, CEO Infrastructure & Cities Sector, Siemens The Mobility Opportunity Improving urban transport to drive economic growth Answers for infrastructure and cities. We are in the "urban millennium" Population
Safety Evidence for Bicycling
Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists
Harlem River Bridges Access Plan
Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:
Transport planning in the Stockholm Region
Stockholm County Council Office of Regional Planning and Urban Transportation Hans Hede Transport planning in the Stockholm Region METREX/Moscow International workshop June 2006 A region with great potential
Mount Royal College Transit Service Plan
Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back
Street Audit Tool: Web 2.0 Tools
Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of
CHAPTER 14: GUARDRAIL and BARRIERS
CHAPTER 14: GUARDRAIL and BARRIERS If you have any questions regarding guardrail, end treatments and/or pay items included in your plan, please contact the Project Design Services Unit or the Design Standards
Appendix E Transportation System and Demand Management Programs, and Emerging Technologies
Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking
VERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
Welcome to the LRT Overview Open House
Welcome to the LRT Overview Open House Please sign-in so that we may provide you with updates on future events. TORONTO LRT OVERVIEW Importance of Transit to Cities Increase City s competitiveness (World
City of Vantaa New Plans and Projects
City of Vantaa New Plans and Projects Smart Mobility for Better Cities Conference 12 May, 2011 Gilbert Koskela Project Engineer Marja-Vantaa project City of Vantaa has been a forerunner in Finland in studying
A Users Guide to Tolling
A Users Guide to Tolling Content: 1. WHAT IS TOLLING AND WHY IS IT IMPORTANT? 2. WHAT ARE THE BENEFITS OF TOLLING? 3. WHAT IS OPEN ROAD TOLLING (ORT)? 4. HOW DOES ORT AND PAYMENT WORK? 5. WHAT ARE THE
ONLINE DATABASE ON GOOD PRACTICES. http://activecitizenship.net/bp/2013/form/new.php
ONLINE DATABASE ON GOOD PRACTICES http://activecitizenship.net/bp/2013/form/new.php - GOOD PRACTICES- What is a Good Practice? Good practices are actions whose very nature is the impact on the quality
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
VRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit
Bus Priority Measures in Calgary: Past, Present and Future Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit Nora Kajdy, P.Eng., Transit Priority Engineer, Calgary Transit
We would be pleased to discuss these issues with you at your convenience.
Public Transport Users Association Inc. Ross House, 247 Flinders Lane Melbourne 3000 Reg. No. A-6256L Email: [email protected] Dear Councillor Queen Victoria Market Redevelopment Project The Public Transport
NZ Transport Agency Safer journeys for schools: guidelines for school communities 2
NZ Transport Agency Safer journeys for schools: guidelines for school communities 2 Understanding school road safety 1. The purpose of these guidelines The safety of students travelling to and from school
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
DRAFT Freight Performance Measures
DRAFT Freight Performance Measures The purpose of the Industrial Areas Freight Access Project is to conduct a focused and pragmatic technical evaluation to identify and assess current and future freight
The Use of Above Ground Vehicle Detectors
Traffic Advisory Leaflet 16/99 December 1999 The Use of Above Ground Vehicle Detectors Introduction Responsive traffic signal systems are a key component in managing the safe and efficient progress of
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
TRAFFIC CALMING GUIDE FOR LOCAL RESIDENTIAL STREETS
TRAFFIC CALMING GUIDE FOR LOCAL RESIDENTIAL STREETS Traffic Engineering Division Virginia Department of Transportation Richmond, Virginia October 2002 (Revised July, 2008) Copyright 2002, Virginia Department
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in
Vehicular Access Standards
Development Control Advice Note 15 (2nd Edition) Vehicular Access Standards August 1999 Development Control Advice Note 15 Vehicular Access Standards This is a joint Planning and Roads Service Development
PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: CUSTOMER SERVICE PLAN (RATED) Selection Committee
Selection Committee PROPOSER. MBCR DATE: 8/28/2013 OVERALL RATING: Good NARRATIVE SUMMARY: The Proposal builds on the customer service initiatives currently available on the commuter rail system today.
Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa
Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch
GOALS, OBJECTIVES, AND EVALUATION MEASURES
GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities
1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):
Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports
Residential Development Travel Plan
Residential Development Travel Plan A Template for Developers Name of Development (Address) Name of Developer (Contact Details) Date of Travel Plan For office use: Planning reference.. /.. /.. Residential
Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk
December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort
Manitowoc County Mobility Management Transportation Resource Directory
Manitowoc County Mobility Management Transportation Resource Directory Bridging Resources to Better Meet Transportation Needs Presented in part by: About This Directory The Manitowoc County Transportation
Latest anf Future Development Plans in Helsinki
Latest anf Future Development Plans in Helsinki Ville Lehmuskoski, Planning Director Best seminar, 16th November 2006 Content of the presentation Traffic Signal Priorities and Passenger Information (HELMI)
2016 Performance Measures
2016 Performance Measures Community Indicators/Benchmarks Airport Enplanements Stabilizing at a Lower Level of Air Service Source: Colorado Springs Airport Between 2008 and 2012, four Airline mergers consolidated
Impact of Hurricane Ike
Island Transit History, Design and Impact of Hurricane Ike By Gary A. Gordon, P.E. Assistant Federal Security Director-Surface Surface, South Central Region and Michael Worthy Director of Transportation,
Los Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas
Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions
ORDINANCE CODES FOR PARKING TICKETS
ORDINANCE CODES FOR PARKING TICKETS Ordinance Ordinance Fine Fine if towed Code 001 Expired Meter (Municipal Lot) - Did park a motor vehicle in a municipal lot without paying or depositing in the meter,
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
VIII. TRANSPORTATION
VIII. TRANSPORTATION Railroad Railroads came to Vermont and Mount Holly in the late 1840s and early 1850s. The Rutland and Burlington Railroad was originally built through Mount Holly to Bellows Falls.
All Systems Go! How Austin, Texas said yes to Urban Commuter Rail
All Systems Go! How Austin, Texas said yes to Urban Commuter Rail Capital Metro Today 500 square-mile service area Highest per capita ridership in Texas 130,000+ one-way trips every day 35 million total
OPEN SOURCE SOFTWARES IN BUILDING WEBGIS OF BUS INFORMATION SYSTEM.
OPEN SOURCE SOFTWARES IN BUILDING WEBGIS OF BUS INFORMATION SYSTEM. Duc Nguyen Huu 1 and Chon Le Trung 2 1 University of Resources and Environment, Ho Chi Minh City. Email: [email protected] 2 University
Walking school bus. coordinator, s guide
Walking school bus coordinator, s guide Contents 1 Why set up a Walking School Bus? How does it work? What parents/caregivers tell us Why students think a Walking School Bus is fun 2 Getting started Ideas
Adaptive Optimal Scheduling of Public Utility Buses in Metro Manila Using Fuzzy Logic Controller
Adaptive Optimal Scheduling of Public Utility Buses in Metro Manila Using Fuzzy Logic Controller Cyrill O. Escolano a*, Elmer P. Dadios a, and Alexis D. Fillone a a Gokongwei College of Engineering De
Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos
Seagull Intersection Layout. Island Point Road - A Case Study Authors: John Harper, Wal Smart, Michael de Roos Presented by Mr John Harper, Road Safety and Traffic Services Manager Phone: 4221 2456 Mobile:
Always in the Fast Lane. Voith DIWA in BRT Systems
Always in the Fast Lane. Voith DIWA in BRT Systems 1 Sustainable Solution for Urban Mobility. Bus Rapid Transit (BRT) Road congestion, environmental pollution, budget restrictions for public transport,
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
Principles of Traffic Management on sites / road network
IOSH Ireland, Construction Specialist Section Springfield Hotel, Leixlip, County Kildare. 25 March 2015 Principles of Traffic Management on sites / road network Padraig Watters, Chartered Engineer This
Nashville Freight Model. Max Baker, Nashville MPO Rob Bostrom, WSA July 17, 2008 Tennessee MUG
Nashville Freight Model Max Baker, Nashville MPO Rob Bostrom, WSA July 17, 2008 Tennessee MUG Overview of Presentation Nashville Area Study Background Truck Model Nashville Area Nashville Area MPO 7 County
Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?
Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Introduction This paper forms one of a series of thematic
