Navigating the Credit River by Canoe, Kayak, Raft and Tubes
|
|
|
- Brice Stephens
- 9 years ago
- Views:
Transcription
1 Navigating the Credit River by Canoe, Kayak, Raft and Tubes NOTE: Credit Valley Conservation does not endorse navigation of the river, trespassing nor suggests that it is a safe recreational activity. General Considerations Given its overall high gradient currents can be dangerous especially during high flows at locations (old dams or log jams) where constricted flow chutes are present. At low flows many boulders and shallow riffles are present (even a small single person kayak gets scraped, bumped and beached). Lifejackets are a must, and hypothermia a serious concern in late spring. Water quality can be unsafe for body contact (eyes, ears, nose, mouth and cuts) especially following rainfalls (Never drink the water). Log jams and beaver dams can be numerous in some reaches requiring portages. Some reaches may have fencing or barbed wire stretched across the river. Much of the upper reaches are privately owned (at least the bed and banks) such that trespassing is a concern (the Ministry of Natural Resources should be consulted). Privately owned dams (existing and old) along the Credit require portages that result in trespassing. Dogs and even cattle along private property could present a problem. Liability and injury concerns re: navigation through various golf courses. Watch out for poison ivy and stinging nettle plants along the banks. The entire Credit cannot be navigated in one day and there are no camping opportunities along the way, but one is usually within an hour or so from a public road crossing. Public phones and General Stores are found near the river in Orangeville, Alton, Inglewood, Terra Cotta, Glen Williams, Norval, Huttonville, Meadowvale, Streetsville and Port Credit. Topographic maps for navigation purposes are not readily available for the Credit River from CVC but are available from normal government map outlets. Two National Topographic Series (NTS) maps and about 15 Ontario Base Maps (OBM) cover the river from source to mouth. Even the best ones do not show rapids, old dams or constrictions and log jams. Orangeville to Hwy 10 Orangeville Reservoir (Island Lake Conservation Area) is ideal for non gasoline - motorized watercraft, although it is often exposed to high winds. An entry fee is required and boat and canoe rentals for use in the Conservation Area only are available. South of the reservoir there is a massive wetland complex owned by the Town with several beaver dams, dead end channels and ponds. There is also a channel
2 originating from the sewage treatment plant. An informal foot bridge is at an old crossing where the channel reforms into a more easily navigable single channel. Just before Hwy 10 there is private property abutting the banks with another foot bridge. Trespassing could be an issue here. Hwy 10 Crossings, Melville Dam to Porterfield Road Private property, posted no trespassing on some properties. Beaver dams, bridges and log jams present. Melville dam (private) creates impoundment through Orangeville Golf Course Former cattle pasture with fencing across river may be present. Upper Credit Conservation Area Former cattle pasture with plantings and footbridge leading into section with many log jams. Parking lot is far from river that is not ideal for launching access. The Grange MNR Property Public access from Porterfield Road to Beechgrove Sideroad Most of this reach requires several portages due to the excess amount of log jams and woody debris. Beechgrove Sideroad Posted no trespassing downstream of road crossing with a private residence and trout club. Charles Sauriol Conservation Area Public access via trails/road allowance only. Log jams and beaver dam present. Hwy 24 to Forks of the Credit Publically accessible Provincial Park at bridge crossings. Navigable from Hwy 24 (one portage past old dam) until first pedestrian bridge in Forks of the Credit Provincial Park in Cataract. Cataract Dams and Falls must be avoided and even if portaged is not navigable (except by tubers) due to high gradient and a lengthy boulder strewn gorge.
3 There is no parking in Cataract and is limited along the roadside further downstream at the Forks, Dominion Street bridge. Forks of the Credit Road to Grange Sideroad Mostly posted private property and two landowners have a cable stretched across the river. A few log jams are present. Downstream of the Grange Sideroad there are no postings and leads to the Ken Whillans Resource Management Area. Ken Whillans Resource Management Area to Inglewood This Conservation Area only has Parking at Hwy 10 and involves a bit of a hike to the River via the Caledon Rail Trail. Navigation on through to Inglewood is permitted in cooperation with a private landowner downstream of the Conservation Area. A few log jams exist and often pile up thick in some years. Inglewood, Cheltenham and Terra Cotta (1/2 day) There is a small parking lot with easy river access on McLaughlin Road in Inglewood. This is a popular starting point for many attempting a long journey down the Credit without too many portages required. Log jams are much less frequent from here on downstream. Shallow riffle water can still be common. Immediately downstream is the Caledon Golf and Country Club which requires a portage over a rock dam. This could be a trespassing issue if not a liability concern from flying golf balls. Be quick, courteous and keep low through any golf course! Private residences and trailer parks become very common through Ferndale, Cheltenham and Terra Cotta along the banks but know one seems to mind canoeists just passing through. There is one old dam creating a chute of water upstream of Boston Mills Road. Portaging this could be a trespassing issue, but better safe than sorry if you dump. Another portage is also made by the chute at the old Haines Dam in Cheltenham Other road crossings include Mill Street (near Cheltenham General Store), Mississauga Road, Heritage Road and Winston Churchill Blvd. in Terra Cotta. There is a small public playground in Terra Cotta with a phone booth and parking lot just across the road. A few tourist shops can also be seen. Terra Cotta, Georgetown and Norval (1/2 day) Continue downstream of Winston Churchill respecting private lands along the banks.
4 There is a cattle pasture with electric fencing along the banks downstream of the 9 th Line bridge. At Glen Williams, Preston s Convenience Store will be visible from the river at a small park providing good public access. The only portage usually necessary is at the old Paper Mill Dam site in Georgetown where the water flows through a restricted chute. This is a popular public access area for locals using River Road. You will note how incised the valley becomes by the span of the rail tressel and shale cliffs walls along the river bank. Keep to the more gradual opposite banks if in doubt of safety. Some trails exist along this valley as well as Conservation owned lands. Parking access is questionable. This reach has a consistent high gradient. Overall it is not posted along the river although these private lands must be respected to avoid trespassing becoming an issue. Corporate holdings include Sheridan Nurseries and Upper Canada College. You must take out in Willow Park (Ecology Center) at the Silver Creek confluence on the west bank of the Credit before the Norval Dam. The impoundment has created a few islands and side channels as the waters slow down. Some buildings in Norval will also be apparent. NOTE: The courts have agreed with the private landowner that portaging the Norval Dam is an offence under the trespassing act. One can portage over the foot bridge and up the west bank of Silver Creek through the park to the Village on Guelph St. (Hwy 7) and down to the river along Winston Churchill. There is a corner store and public phone. Norval to Meadowvale (1/2 day) Generally farm lands with urban expansion and old villages. Before Huttonville at Mississauga Road there is an old dam that may require a portage over private posted land. Below the bridge is the Lionshead Golf Course spanned by bridges and greens that may raise a liability issue. The historic village of Churchville now hugs the banks in Brampton where public access to Eldorado Park is popular. Downstream you enter the Meadowvale Park and Conservation Area accessible from Old Derry Road further downstream. Meadowvale to Port Credit (3/4 day) Some of the last farmland now becomes subdivision where valley lands are in public domain and linked by the City of Mississauga s David Culham Trail. Easy access is found at Credit Meadows, Streetsville and Erindale Parks. Be prepared to portage an old dam / bridge constriction and around the privately owned Streetsville Milling Dam. The Croatian Parklands are also private property. Conflicts with anglers during the peak of the fall salmon run may occur from above Burnamthorpe to Dundas Street.
5 One last golf course, the QEW and rail tressel will be passed by before the Lake Ontario lighthouse is in site. In Port Credit you will see cattail marshes emerge in turbid waters active in boat traffic and rowers from the Don (?) Rowing Club. The lack of current makes it as easy to travel upstream from the public parks around the mouth. Avoid any motorized boats or travelling out to the harbour and lake. Comments The following was based on a personal experience over a period of days during the summer of No portrayal of the real experience is presented above including the natural flows and eddies of the river as a natural bloodstream connecting landscape physiology, climate, plant and animal life in the watershed. Most commonly appreciated were simple sightings of sand bars, shale cliffs, dense cedars, damselflies, blue herons, ducks, kingfishers, mink, muskrat, beaver, fish and even how man was historically dependent on river life and the people I met canoeing, tubing, sunning, swimming, fishing, frog catching or passively contemplating life down by the river. A slide show is available depicting this journey. It is recommended one read The Credit: Canoeing in Suburbia in Canoeing Ontario s Rivers Great Canoe Trips in Canada s Northern Wilderness by Ron Reid and Janet Grand, William Fox, Sierra Club Books, San Francisco.
6
7
8
Hydrology & Hydraulics
Hydrology & Hydraulics ADAPTING TO NEW WEATHER REALITIES Presentation to Technical Committee of Lake Ontario Integrated Sub watershed Study March 24, 2014 Neelam Gupta Manager, Hydrology & Hydraulics Credit
Bowmanville Marsh Habitat Restoration and Public Access Project
Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration
Howsham fish passage Consultation document
Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing
Background Information: The Mamquam River Floodplain Restoration Project
Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Acton Quarry Extension. Halton Region June 11, 2014
Acton Quarry Extension Halton Region June 11, 2014 1 Background Background Proposed Extraction Area Compliance with Ministry Guidelines Halton Region Official Plan Greenlands System Conveyance of Land
Town of Richmond Hill Beaver Management Policy Summary
Town of Richmond Hill Beaver Management Policy Summary Above Left: Tree damage from beaver. Above Right: Beaver dam in stream - notice the water level above and below the dam! Below: Beaver swimming. Town
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane
Lower Dungeness River Estuarine & Floodplain Restoration
PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology;
Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties
Pennsylvania Fish & Boat Commission Biologist Report Youghiogheny River From Confluence, Pa to Indian Creek Fayette and Somerset Counties August 2012 Electrofishing Survey Originating in the mountains
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
Monitoring at Credit Valley Conservation. Presented by Jackie Thomas and Luke Harvey
Monitoring at Credit Valley Conservation Presented by Jackie Thomas and Luke Harvey Where are we? WHAT IS MONITORING? Long-term sampling of the same point or reach to track changes over time/space Short
Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
Halton Region Planning & Public Works Committee Meeting July 8, 2015
Acton Quarry Extension Halton Region Planning & Public Works Committee Meeting July 8, 2015 1 Proposed Extraction Area 50% Reduction The extraction area was reduced by 50% to address comments from the
Dorset Green SANGs Report
Dorset Green SANGs Report April 2012 FARRELLS Contents 1.0 Introduction 1.1 Accessible Green Spaces 2.0 SANGs Objectives 2.1 Proposals 2.2 Ecology Park 2.3 Village Green 2.4 Country Heritage Park 2.5 Dorset
Burnt River Black River and Gull River Flood Contingency Plan
Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT
NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT August 2006 Prepared by: NB Department of Environment Environment 1. INTRODUCTION This General Review Statement
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
West London Dyke Flood Control Structure Master Plan Appendix A
West London Dyke Flood Control Structure Master Plan Appendix A Introduction The West London Dyke runs along the west bank of the North Branch of the Thames River from Oxford Street to the forks of the
Summary of the Second College Grant Master Plan
1 Summary of the Second College Grant Master Plan Dartmouth College owns and manages 27,000 acres of woodland in the Northern Forest region of New Hampshire, near Erroll, New Hampshire and the Maine state
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014
Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated
Thank you to all of our 2015 sponsors: Media Partner
Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context
Penticton Creek May 4, 2015 Council Meeting
Penticton Creek May 4, 2015 Council Meeting Penticton Creek Council Meeting May 4, 2015 Penticton Creek in the Early Years Penticton Creek Council Meeting May 4, 2015 Penticton Creek Today Penticton Creek
Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008
Plumas Watershed Forum Review of Ongoing Projects Updated 10/1/008 Hosselkus II Restoration Project Approved Funding: $80,000 (A funds) Expended By 10/1/08: $79,603 This pond-and-plug creek restoration
HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan
HARBOR INFRASTRUCTURE INVENTORIES Port Austin Harbor, Michigan Harbor Location: Port Austin Harbor is located at the tip of the thumb of Michigan, about 80 miles northeast of Saginaw, MI Authority: Rivers
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Town of Richmond Hill Community Stewardship Program
Town of Richmond Hill Community Stewardship Program Environmental Services Division November 19, 2011 Environmental Advisory Committee Symposium Richmond Hill s s Organization Office of the C.A.O. Community
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
FLOOD PLAIN DESIGNATION AND PROTECTION
CITY OF RICHMOND FLOOD PLAIN DESIGNATION AND PROTECTION BYLAW NO. 8204 EFFECTIVE DATE - SEPTEMBER 8, 2008 CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amendment
Pond Vocabulary Words and Meanings
Pond Vocabulary Words and Meanings Adapt: to adjust to a use or situation Aquatic: from or in the water Bacteria: tiny organisms, too small to be seen with the naked eye Carnivore: an animal that eats
Muddy River Restoration Project Project Description
Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in
Novel Ecosystems: The Changing Landscape of Ecological Restoration
Novel Ecosystems: The Changing Landscape of Ecological Restoration Valentin Schaefer, Ph.D., R.P.Bio. Restoration of Natural Systems Program University of Victoria Definition Ecosystems that differ in
Arkansas River Corridor Vision & Master Plan
A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership
Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)
Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach
Question 2: What are our challenges?
TH RESULTS OF THE APRIL 14, 2006 PUBLIC FORUM NOTES FROM CONVERSATION TABLE FLIP CHARTS - CHALLENGES Themes Housing/Assisted Living /General Development A small village which offers those amenities not
EPR Exempt Flood Risk Activities: descriptions and conditions
EPR Exempt Flood Risk Activities: descriptions and conditions Version 1 April 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing climate
How To Check For Scour At A Bridge
Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway
Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation
Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:
Water Quality and Water Usage Surveys
Appendix 1 Water Quality and Water Usage Surveys This appendix contains copies of the Water Quality Survey and the Lake Usage Survey that we used to complete the watershedbased community assessments. We
A PENNSYLVANIA SCENIC RIVER
Lehigh River Water Trail Southern Section Map & Guide Water trails are recreational waterways on a lake, river, or ocean between specific points, containing access points and day-use and/or camping sites
Highland Charter Township Recreation Plan. Oakland County Parks
Highland Charter Township Recreation Plan Oakland County Parks Highland Oaks With 264 acres of parkland, Highland Oaks is located within the headwaters of the Shiawassee River and preserves sensitive habitat
Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.
WATER QUALITY MANAGEMENT FOR ECOLOGICAL RESTORATION IN ANYANG STREAM Yu, M.J., Cho, Y.M. 2, Lee, S.K. 3 Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea. 2 Department
www.trafficsigns.co.za
Freeway Advance Exit Advance Turn Final Turn Service Exit Sequence Rest and Service Sequence Advance Roadside Emergency Service Part-Time Attraction National Park (RSA) National Park (Nam) Generic National
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
Stouffville Corridor Rail Service Expansion
Stouffville Corridor Rail Service Expansion Stouffville Corridor Rail Service Expansion Class Environmental Assessment Study WELCOME PUBLIC INFORMATION CENTRE #2 Tuesday January 28, 2014 Agincourt Recreation
REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
Watershed Education for Teachers. Cinde Thomas-Jimenez Guadalupe-Blanco River Authority
Watershed Education for Teachers Cinde Thomas-Jimenez Guadalupe-Blanco River Authority In This Presentation Why Watersheds Matter What Is a Watershed Water Quality Parameters Point Source and NonPoint
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
Why Watersheds? An introduction to the whys and hows of water resource protection. Center for Watershed Protection
Why Watersheds? An introduction to the whys and hows of water resource protection In This Presentation Why Watersheds Matter What Is a Watershed Impacts of Impervious Cover What Your Community Can Do What
Excerpt of FSM 2710 issued 09-17-2008. 2713.1 Liability and Insurance. 1. Inherent Risks.
Excerpt of FSM 2710 issued 09-17-2008 2713.1 Liability and Insurance 1. Inherent Risks. a. Engaging in most activities on National Forest System lands involves inherent risks. Swimming, boating, skiing,
Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration
Green Infrastructure Case Study Template
Green Infrastructure Case Study Template The aim of the exercise is to provide information on how the elements of the Green Infrastructure Strategy are implemented at national level and to provide case
Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization
Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official
The River Ribble is one of the longest rivers in the North West of England
River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety
BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT
BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT Department of Environmental Conservation Region 7 Counties: Broome, Cayuga, Chenango, Cortland, Madison, Onondaga, Oswego, Tioga, Tompkins Operated and Maintained
Code of conduct Safe on-water conduct on the Brisbane River
Code of conduct Safe on-water conduct on the Brisbane River Introduction The safe operation of passive craft on Queensland s waterways is a priority for state and local government authorities, commercial
Activities CAMP KAUFMANN
Activities CAMP KAUFMANN In the following pages you will see activities available to enhance your camping experience FROG POND Girls learn about the delicate eco-system of the frog pond. They also discover
BI-POLE III - KEEWATINOOW CONVERTER STATION PROJECT Construction Access Management Plan
2013 BI-POLE III - KEEWATINOOW CONVERTER STATION PROJECT Construction Access Management Plan Manitoba Hydro Manitoba Hydro 9/9/2013 BI-POLE III KEEWATINOOW CONVERTER STATION PROJECT Construction Access
The Towns at Legacy Park
The Towns at Legacy Park New Town Homes Development Near Walt Disney World, Orlando Davenport, Florida, United States The Towns at Legacy Park Davenport, Florida, United States 2- and 3-bedroom luxury
Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for
4-H Marine Biology and Oceanography Proficiency Program A Member s Guide
4-H Marine Biology and Oceanography Proficiency Program A Member s Guide OVERVIEW The 4 H Marine Biology and Oceanography Proficiency program helps you learn what you need to know about your 4 H project.
Stop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management
Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Habitat Restoration Cost Considerations MARK COCKE, Civil Engineer Natural Resources Conservation
Description Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
Introduction to the Envision Sustainability Rating System
THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.
Introduction Welcome to the Indian Creek Conservation Reserve Program (CRP) visualization tool. This tool was developed by the University of Iowa - Institute for Hydroscience and Research (IIHR) as part
Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
Oregon Administrative Rules Oregon Department of Fish and Wildlife
DIVISION 023 COLUMBIA RIVER ZONE AND SNAKE RIVER ZONE 635-023-0080 Purpose and Scope (1) The purpose of Division 023 is to provide for management of sport fisheries in the Columbia River Zone and in the
1 Introduction. 1.1 Key objective. 1.2 Why the South Esk
1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping
Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans
Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking
Climate, Vegetation, and Landforms
Climate, Vegetation, and Landforms Definitions Climate is the average weather of a place over many years Geographers discuss five broad types of climates Moderate, dry, tropical, continental, polar Vegetation:
Kancamagus Highway Guide
Kancamagus Highway Guide The Kancamagus Highway. Undoubtedly the most scenic route in Mountain Country, the Kancamagus (k?an-c?a-mä-g?us) Highway (Rt. 112) stretches from the Pemigewasset River at Lincoln
Floodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
Designing a Basic White Water Canoe/Kayak Course using InfoWorks ICM
Designing a Basic White Water Canoe/Kayak Course using InfoWorks ICM Adam Cambridge Hydrologist, Sinclair Knight Merz Robert Morden Senior Hydrologist, Sinclair Knight Merz Summary A functional design
Parks, Forestry & Recreation
Re: PE4.6 Parks, Forestry & Recreation Service Level Review Parks and Environment Committee Presentation June 22, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service
Introduction to Architecture. Lesson 13: Hoover Dam
Introduction to Architecture Lesson 13: Hoover Dam Back in 2010, my family and I flew to California and then drove to the Grand Canyon via the Hoover Dam. Named after President Herbert Hoover, the Hoover
5-1. Section 5 ASC Treks
5-1 Section 5 ASC Treks All treks that leave from Sabattis Scout Reservation must be pre-approved and all Pack and Paddle forms must be turned into the Hiawatha Seaway Council Service Center by April 1
Welcome to the future of Terwillegar Park a Unique Natural Park
Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM
SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental
THE NEW BOY SCOUT HANDBOOK AND THE SCOUT HANDBOOK HISTORY
In this Issue: The New Boy Scout Handbook and the Scout Handbook History Staying Dry on Water Adventures Gone Fishing Vol. 1, No. 7 THE NEW BOY SCOUT HANDBOOK AND THE SCOUT HANDBOOK HISTORY The New 12th
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016
Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately
Benton MacKaye Trail - Section 2. Three Forks (FS 58) to GA. Highway 60. 11.4 miles
General Benton MacKaye Trail - Section 2 Three Forks (FS 58) to GA. Highway 60 11.4 miles This is the longest and most remote section of the Benton MacKaye Trail (BMT) east of GA 5. It follows the Appalachian
