BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT
|
|
|
- Miles Conley
- 10 years ago
- Views:
Transcription
1 BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT Department of Environmental Conservation Region 7 Counties: Broome, Cayuga, Chenango, Cortland, Madison, Onondaga, Oswego, Tioga, Tompkins Operated and Maintained by: New York State PROJECT LOCATION The project lies almost entirely within the corporate limits of the city of Binghamton, county seat of Broome County, New York, and is located at the confluence of the Chenango and Susquehanna Rivers, 329 miles above the mouth of the Susquehanna River. Page 1 of 10
2 PROJECT DESCRIPTION The improvement consisted of constructing walls, levees, and appurtenant drainage structures where required along both banks of the Susquehanna and Chenango Rivers. Sections of floodwalls and levees previously constructed were raised and reinforced. The lower portions of Park, Pierce, Chamberlain, and Phelps Creeks were improved to provide protection from backwater flooding during high stages of the rivers. A detailed description of the several features is presented in subsequent sections of this report. AUTHORIZATION By enactment of the Flood Control Act approved June 22 nd, 1936 (Public Law No. 738, 74 th Congress), Congress authorized, Construction of detention reservoirs and related flood control works for protection of Binghamton, Hornell, Corning, and other towns in New York and Pennsylvania in accordance with plans approved by the Chief of Engineers The floodprotection project at Binghamton, New York, constructed under this authority, as amended by the Flood Control Act approved June 28 th, 1938 (Public Law No. 761, 75 th Congress, third session), is a part of the comprehensive plan for flood control in the Upper Susquehanna River watershed in southern New York and eastern Pennsylvania. The general scope of this project is described in House Document No. 702, 77 th Congress, second session. PROTECTION PROVIDED The authorized plan of flood protection for Binghamton is based on the combination of local improvements with a system of retention reservoirs on tributaries upstream from the confluence of the Susquehanna and Chenango Rivers. Whitney Point Reservoir now controls 16% of the entire Chenango River watershed, or 6.6% of the combined Chenango and Susquehanna River watersheds at Binghamton. Two other reservoirs, Genegantslet and South Plymouth, on tributaries of the Chenango River, are authorized. These two reservoirs, in conjunction with Whitney Point Reservoir, will control 25% of the Chenango River watershed or 10% of the combined Chenango and Susquehanna River watersheds at Binghamton. In addition, four reservoirs on tributaries of the Susquehanna River above Binghamton area authorized and one of which, the East Sidney Reservoir, has been completed and has been in operation since These reservoirs will control 22% of the Susquehanna River watershed at Binghamton and will in conjunction with the three reservoirs mentioned above, control 23% of the combined Chenango and Susquehanna River watersheds at Binghamton. Page 2 of 10
3 The system of floodwalls and levees comprising the local improvement has increased the non-damaging capacity of the Chenango River from 42,000 c.f.s. to 75,000 c.f.s. and that of the Susquehanna River, above the confluence, from 50,000 c.f.s. to 80,000 c.f.s. The design capacity of the Susquehanna River downstream from the Chenango is 126,000 c.f.s. Completion of the authorized plan will protect various low lying industrial, commercial, residential, and recreational areas in and about the city from frequent flooding and eliminate an estimated 99 percent of the average annual flood losses. CONSTRUCTION Section No. 1. This unit comprising of protective facilities on the left bank of the Susquehanna River from high ground near Vestal Avenue below the Johnson-MacArthur athletic field, upstream to high ground at Livingston Street including Park Creek conduit, was constructed during the period from June 1940 to October 1941 by C.D. Murray and Company and Pepper Brothers of Syracuse, New York. Section No. 2. This unit includes protective measures at the following locations: The left bank of the Susquehanna River upstream from Rockbottom Bridge and along Pierce Creek. The right bank of the Susquehanna River from Washington Street bridge upstream to a point above Rockbottom Bridge. The left bank of the Chenango River upstream from Cutler Dam and along Phelps Creek. The right bank of the Chenango River upstream from McDonald Avenue. This unit was constructed during the period July 1940 to October 1941 by the Tuckahoe construction Company of Tuckahoe, New York. Section No. 3. This unit, consisting of new walls and raising and strengthening existing floodwalls, together with appurtenant structures, on the right bank of the Susquehanna River upstream from Tompkins Street Bridge, was constructed during the period from January to November 1941 by L. B. Strandberg and Son of Chicago, Illinois. Page 3 of 10
4 Section No. 4. This unit which includes the floodwalls and appurtenant structures along the left bank of the Chenango River from its confluence with the Susquehanna River upstream to Cutler Dam was constructed during the period from January to December 1943 by L. B. Strandberg and Son of Chicago, Illinois. Section No. 5. This unit comprising of levees and appurtenant structures on the right bank of Chamberlin St, was constructed during ther summer of 1942 by C.D. Murray and Co., of Syracuse New York. Subsequent contracts for the project entailed the additional work performed between 1949 and 1952: Clearing and snagging which included the removal of an abandoned dam, excavation of the Chenango River to prevent shoaling, and overbank clearing in Port Dickinson. Channel clearing and the partial removal of the Cutler Dam, excavation of a pilot channel, island removal, riprap protection in the Chenango River. Construction of flood barriers across Court St. and the Erie-Lackawanna Railroad, on the right bank of Chamberlin Creek. Wall rehabilitation and construction from the Cutler Ice Plant to Front and Prospect Streets, and riprap protection along the right bank. The placement of a debris dam, concrete flume and construction of over 400 feet of levee. Page 4 of 10
5 BINGHAMTON GENERAL PLAN (A) Page 5 of 10
6 BINGHAMTON GENERAL PLAN (B) Page 6 of 10
7 BINGHAMTON BIRD S EYE VIEW (A) Page 7 of 10
8 BINGHAMTON BIRD S EYE VIEW (B) Page 8 of 10
9 BINGHAMTON GENERAL PLAN AND AERIAL MAP OVERLAY (A) Page 9 of 10
10 BINGHAMTON C&S GENERAL PLAN AND AERIAL MAP OVERLAY Page 10 of 10
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Multi-Jurisdictional Hazard Mitigation Plan
Flooding General Flooding is the leading cause of death among all types of natural disasters throughout the United States, with its ability to roll boulders the size of cars, tear out trees, and destroy
AOT (Assisted Outpatient Treatment) Court Orders
Row Created Date Time Data Level Indicator County or Region 01/13/2016 10:54:18 AM Statewide Statewide 01/13/2016 10:54:18 AM Region Central 01/13/2016 10:54:18 AM Region Hudson River 01/13/2016 10:54:18
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Chapter 4. Flood Control
Chapter 4. Flood Control As noted by their name, flood control measures control floodwaters and keep them from reaching damageable property. They are also called structural measures because they involve
2012 Salary Survey Results
2012 Salary Survey Results The New York State Association of School Business Officials March 2013 The salary information that follows is taken from the 2012 Salary Survey of the NYSASBO membership conducted
A JAILHOUSE LAWYER S MANUAL
A JAILHOUSE LAWYER S MANUAL Appendix III: Addresses of New York District Attorneys Columbia Human Rights Law Review Ninth Edition 2011 LEGAL DISCLAIMER A Jailhouse Lawyer s Manual is written and updated
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
Development of Technical Data For Long Term Flood Solutions For the Red River Basin
IDENTIFYING WHAT WE DIDN T KNOW Development of Technical Data For Long Term Flood Solutions For the Red River Basin LTFS Study Area U.S. Portion of Red River Basin (MN, ND & SD) Main Stem Red River Tributaries
Eldred Central School District
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Eldred Central School District Virtual Desktops: Cost Savings and Energy Conservation Report of Examination
Investors Title Insurance Company - New York Approved Settlement Providers
( ALL COUNTIES ) First Resource Title & Abstract, LLC 229175 Entire Firm 102 Motor Parkway, Suite 220 Hinman, Howard & Kattell 131803 Entire Firm 700 Security Mutual Building Exchange St. Land Record Services,
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway
Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A
The Mississippi River & Tributaries Project
The Mississippi River & Tributaries Project The Mississippi River & Tributaries (MR&T) project was authorized by the 1928 Flood Control Act. Following the devastating 1927 flood, the nation was galvanized
Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, [email protected]; Jay Pak,
Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment
Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,
Lawyers caring. Lawyers sharing.
Lawyers caring. Lawyers sharing. Around the corner. Around the state. The New York Bar Foundation is the charitable arm of the New York State Bar Association. Through the caring and sharing of lawyers,
Health Plans by Counties and Boroughs
Albany County Health Plans by Counties and Boroughs Empire Blue Cross HealthNow dba BlueCross BlueShield of Northeastern NY Allegany County HealthNow dba BlueCross BlueShield of Western NY Bronx Affinity
EMERGENCY ACTION PLAN
EMERGENCY ACTION PLAN INDIAN SPRINGS LAKE ESTATES PROPERTY OWNERS ASSOCIATION WILD INDIAN LAKE DAM Inventory No.: TX04915 Water Right Adjudication: 04416 Prepared April 12, 2010 by ISLEPOA PARTIALLY REVISED
Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)
Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
TABLE OF CONTENTS. This document was prepared by. URS Group, Inc. 200 Orchard Ridge Drive, Suite 101 Gaithersburg, MD 20878. In Association with:
Delaware and Susquehanna River Basin Flood Data Assessment Pennsylvania May 2008 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington, DC 20472 TABLE OF CONTENTS
Greater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
DRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.
St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m. City Council Study Session Room City of Longmont Civic Center, 350 Kimbark Street, Longmont Minutes 1. Introductions a. Jeff Crane
Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT
UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the
Monticello Central School District
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Monticello Central School District Information Technology Cost Savings Report of Examination Period Covered:
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
Conventional Plus/FHA Plus Programs Participating Lenders
Conventional Plus/FHA Plus Programs Participating Lenders Region/County Lender Name Location/Telephone # Region 1: Buffalo Cattaraugus, Chautauqua, Erie, and Niagara Region 2: Rochester Genesee, Livingston,
Rates and the Choices pamphlets are also available online at www.cs.ny.gov/ employee-benefits.
New York State Correctional Officers & Police Benevolent Association, Inc. 102 Hackett Boulevard - Albany, NY 12209 (518) 427-1551 www.nyscopba.org [email protected] TO: FROM: NYSCOPBA Chief Sector
Innovative Approaches in Flood Damage Reduction
Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm
Rouge River Watershed, MI Region 5. Community Case Study ROU-1. Number of CSO Outfalls. Combined Sewer Service Area. Wastewater Treatment Capacity
Community Case Study Rouge River Watershed, MI Region 5 Number of CSO Outfalls 168 Combined Sewer Service Area 93 square miles Wastewater Treatment Capacity 1,700 mgd (primary) 930 mgd (secondary) Receiving
Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects
City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Aetna Small Business Health Plan Options
Aetna Small Business Health Options NYC Community SM Manhattan, Bronx, Queens, Staten Island and Brooklyn RATES EECTIVE 01/01/01 through 0/1/01 Options NYC Community SM 1-1 NYC Community SM Referred Specialist
How to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
Naples Central School District
O f f i c e o f t h e N e w Y o r k S t a t e C o m p t r o l l e r Division of Local Government & School Accountability Naples Central School District Online Banking Report of Examination Period Covered:
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
Alfred-Almond Central School District
O f f i c e o f t h e N e w Y o r k S t a t e C o m p t r o l l e r Division of Local Government & School Accountability Alfred-Almond Central School District Financial Software Access and Monitoring Report
DALLAS FLOODWAY TIMELINE
DALLAS FLOODWAY TIMELINE Commerce Street Bridge during the May 25, 1908, Trinity River flood that inundated Dallas. Trinity River Corridor Project Chronology A century ago floodwaters swamped a growing
CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY
US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSES NOTES: 1) All elevations listed in this report are referenced
New York State Office of Mental Health Organization, Structure and Facilities
Appendix D New York State Office of Mental Health Organization, Structure and This Appendix contains contact information on the OMH Field Offices, State Operated and Forensic Services. Central Office The
Tompkins-Seneca-Tioga Board of Cooperative Educational Services
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Tompkins-Seneca-Tioga Board of Cooperative Educational Services Energy Performance Contract Report of Examination
River Management 2013 Colorado Flood
River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,
Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration
Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria
Prepared by. Drew Davidge
Flood Damage Estimation in the Upper Thames River Watershed CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions Project Report VII. August 2005 Prepared
Hicksville Union Free School District
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Hicksville Union Free School District Purchasing Report of Examination Period Covered: July 1, 2014 October
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
A JAILHOUSE LAWYER S MANUAL
A JAILHOUSE LAWYER S MANUAL Appendix II: New York State: Filing Instructions & Addresses of New York State Courts Columbia Human Rights Law Review Ninth Edition 2011 LEGAL DISCLAIMER A Jailhouse Lawyer
West Islip Union Free School District
O f f i c e o f t h e N e w Y o r k S t a t e C o m p t r o l l e r Division of Local Government & School Accountability West Islip Union Free School District Payroll Report of Examination Period Covered:
Capital Region BOCES
O f f i c e o f t h e N e w Y o r k S t a t e C o m p t r o l l e r Division of Local Government & School Accountability Capital Region BOCES Claims Auditing Report of Examination Period Covered: July
COMBINING RESOURCES FOR DOWNTOWN REVITALIZATION
COMBINING RESOURCES FOR DOWNTOWN REVITALIZATION Who We Are... Thoma Development Consultants Bernie Thoma, Senior Consultant Rich Cunningham,CMSM, Program Manager 34 Tompkins St. Cortland, NY 13045 (607)
Queensbury Union Free School District
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Queensbury Union Free School District Server Virtualization Technology Report of Examination Period Covered:
New York State Department of Health Division of Managed Care and Program Evaluation Managed Care Plan Directory
Friday, August 07, 2015 Page 1 of 28 Aetna Health Inc. HMO (Health Maintenance Organization) 2/3/1986 For-profit 1160286 100 Park Avenue, 12th Floor New York, NY 10017 (212) 457-0700 Mr. Steven Logan,
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.
MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
C. Owego RESTORE III Historic Central Business Restoration (W846) August 16, 2010. General Project Plan. Village of Owego ( Owego or the Village )
General Project Plan Grantee: Beneficiaries: ESD Investment: Project Locations: NYS Empire Zone: Village of Owego ( Owego or the Village ) Field Afar Properties, LLC (2 Court Street) Gerald Arbes (20 Church
Flood Damage Prevention in Delaware County, NY
Flood Damage Prevention in Delaware County, NY Susquehanna Basin 2 Villages, 8 Hamlets Schoharie Basin 1 Hamlet Cannonsville Basin 4 Villages, 6 Hamlets Pepacton Basin 2 Villages, 6 Hamlets Upper Delaware
1. INTRODUCTION 5. THE PERMIT PROCESS
1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed
Watershed Rehabilitation Program in Texas
Watershed Rehabilitation Program in Texas 1 Dams Constructed by Year (nationwide) 700 600 500 PL-566 Pilot/RC&D PL-534 400 300 200 100 0 48 51 54 57 60 63 66 69 72 75 78 81 84 87 90 93 96 99 Year 2 Number
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
ResearchBrief. Cleaning It Up: The Foreclosure Problem and the Response of Local Governments NEW YORK STATE OFFICE OF THE STATE COMPTROLLER.
ResearchBrief NEW YORK STATE OFFICE OF THE STATE COMPTROLLER D I V I S I O N O F LO C A L G OV E R N M E N T A N D S C H O O L AC C O U N TA B I L I T Y Cleaning It Up: The Foreclosure Problem and the
Broadalbin-Perth Central School District
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Broadalbin-Perth Central School District Health Insurance Buyouts and Separation Payments Report of Examination
Village of Dannemora
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Village of Dannemora Internal Controls Over Cash Receipts Report of Examination Period Covered: June 1, 2011
Jackson Gulch Outlet Canal Rehabilitation Project
Jackson Gulch Outlet Canal Rehabilitation Project Preliminary Budgetary Estimate for Rehabilitation February 2004 Prepared for the Mancos Water Conservancy District Jackson Gulch Reservoir 42888 County
Health insurance coverage in upstate New York
T H E F A C T S A B O U T Health insurance coverage in upstate New York Upstate New York: Lower uninsured, higher employer-based coverage rates compared to state, nation (2011-2013) Franklin Clinton Upstate
DAMS ON THE GRAND RIVER*
DAMS ON THE GRAND RIVER* Almost ever since men first realized that electric power could be produced from the streams and rivers of our country, the imagination of Oklahoma builders has been attracted to
Oklahoma Governor s Water Conference
Oklahoma Governor s Water Conference COL Michael Teague District Commander Tulsa District US Army Corps of Engineers 27 October 2010 US Army Corps of Engineers Tulsa District Over 600 people Arkansas River
Annual Conference Sponsorship and Exhibitor Opportunities
80 Years and Still Growing ROI CODING EHR INNOVATI O N ANALYTICS WE ARE NYHIMA DATA GOVERNANCE AdHIMA HIMANNY CNYHIMA RRHIMA HIMAWNY SENYHIMA TZHIMA HIMANYC LIHIMA Annual Conference Sponsorship and Exhibitor
Health Sciences Charter School
O FFICE OF THE NEW YORK STATE COMPTROLLER DIVISION OF LOCAL GOVERNMENT & SCHOOL ACCOUNTABILITY Health Sciences Charter School Procurement Report of Examination Period Covered: July 1, 2011 May 3, 2013
Public Law 84-99 and Non-Structural Alternatives to Levee Repairs
Public Law 84-99 and Non-Structural Alternatives to Levee Repairs Presented by: Mr. Jerry A. Skalak, CFM U.S. Army Corps of Engineers Rock Island District and Mr. Tom Oswald Iowa Homeland Security and
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the