Floor structures Building constructure 2 REINFORCED CONCRETE FLOOR STRUCTURES
|
|
|
- Kerry Summers
- 9 years ago
- Views:
Transcription
1 REINFORCED CONCRETE FLOOR STRUCTURES
2 Structure of RC floors joist structures Floor structures Building constructure 2 slab structures
3 Classification of RC floor structures Floor structures Building constructure 2 monolithic RC floor structures - flat slab construction - joist construction precast RC floor structures - prefab RC joist structure - prefab RC panel floor structure - prefab RC mushroom floor structure composite RC floor structure - joist construction formed with hollow brick or concrete units - composite RC slabs
4 MONOLITHIC RC FLOOR STRUCTURES Floor structures Building constructure 2 Formwork Permanent formwork ( lost formwork )
5
6 Monolithic RC flat slab floor structures one-way spanning slabs - simply supported slab: max. recommended span: 3 m - slabs with fixed or continuous supports: max. recommended span: 4,5 6 m t = 1/25. L (simple support) t = 1/30. L (fixed support) t min = 50 mm (l < 1 m) t min = 60 mm (l < 1,5 m) t min = 70 mm (l >1,5 m)
7 two-way spanning slab (ratio l 1 / l 2 = 1/1,5 ) - simply supported slabs: max. recommended span: 4,5 x 4,5 up to 5,5 m t = 1/75. (l x + l y ) - slab with fixed supports: - max. recommended span: 6 x 6 m ( up to 9 x 9 m ) t = 1/105. (l x + l y )
8 locally supported slab floor structures column and slab systems - flat slabs with flat ceilings - flat slabs with mushroom ceiling t = min. 160 mm, l = max. 7 m t > 1/35 l, t > 100 mm q = max. 5 kn/m 2 q > 10 kn/m 2 Floor structures Building constructure 2
9
10
11 Monolithic RC joist and rib floor structures one way joist and rib floor structures (visible joists x flat soffit) - monolithic RC joist floor structure Floor structures Building constructure 2 l = 6 7 m a = 1,2 3,0 m h = (1/17 1/10) l simply supported h = (1/20 1/15) l fixt, contiuous h = (1/12 1/10) l girders b = (1/2 1/3) h - monolithic RC rib floor structure
12
13 - monolithic RC floor structures with lost formwork from boxes Floor structures Building constructure 2
14 - monolithic RC rib floor structures with lost formwork from ceramic fillers Floor structures Building constructure 2
15 Self-acting (lost) formwork ooden chips + cement mortar
16 two way joist and rib floor structures (waffle and grid structures) - waffle and grid floor structures with visible joists Floor structures Building constructure 2 - waffle and grid floor structures with lost forms
17
18
19
20 Glass-concrete floor structure glass concrete floor structure Floor structures Building constructure 2 l = max 1,5 m 150 x 150mm x 250mm expansion gap glass concrete vault and cupola structure
21
22 PRECAST RC FLOOR STRUCTURES Floor structures Building constructure 2 Precast RC beam floors precast RC beam floors - the floor consists of a number of beams placed side by side precast RC rib and filler floors
23 Precast RC floors from panels Floor structures Building constructure 2 interaction of floor panels installation gaps
24 solid panels Floor structures Building constructure 2
25 hollow panels Floor structures Building constructure 2
26
27 precast ceramic-concrete floor panels precast ceramic-concrete planks
28 prestressed hollow panels Floor structures Building constructure 2
29 prestressed rib panels Floor structures Building constructure 2
30 Precast girders of prefab column systems Floor structures Building constructure 2
31
32
33
34 COMPOSITE RC FLOOR STRUCTURES
35 COMPOSITE RC FLOOR STRUCTURES Floor structures Building constructure 2 interconnection interaction of precast and monolithic parts Composite RC floors from ribs and fillers Composite RC slab floors
36 Composite RC floors from ribs and fillers Floor structures Building constructure 2
37 Composite RC floors with interconnected ribs and fillers (type filigran ) h = mm t = mm
38 h Composite RC floors with ceramic fillers t
39 Composite RC floors from concrete hollow fillers Floor structures Building constructure 2
40 Structural modifications for heavier loading Floor structures Building constructure 2
41 Composite RC floors from prestressed RC ribs type HATTRICK and HURDIS fillers Floor structures Building constructure 2
42 mm Floor structures Building constructure 2 Composite RC slabs
43
44 l =7,2 8,4 m t = mm u = min 75 mm
45
46
47
48
49 Composite RC slabs with plastic fillers Floor structures Building constructure 2
50 Installation fillers from recycled plastic waste Floor structures Building constructure výztužné žebro instalační komínek instalační komínek polodrážka zeslabená stěna
51
52
53 prefab RC mushroom floor structure Floor structures Building constructure 2
DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia
DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
Building Construction. Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two
Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two Factors governing type selection Economics not necessarily the one that requires the least structural
The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.
9.2 One-way Slabs This section covers the following topics. Introduction Analysis and Design 9.2.1 Introduction Slabs are an important structural component where prestressing is applied. With increase
Technical Assignment 2 TABLE OF CONTENTS
2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
Design Of Reinforced Concrete Structures ii Two-Way Slabs
1. Inroduction When the ratio (L/S) is less than 2.0, slab is called two-way slab, as shown in the fig. below. Bending will take place in the two directions in a dish-like form. Accordingly, main reinforcement
Buildable Design Appraisal System
Guideline BCA Technology Development Division Guide to the Buildable Design Appraisal System!" The Guide to the Buildable Design Appraisal System is electronically published by the Technology Development
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Introduction. Eurocodes. Specification. Cost
Introduction Eurocodes Specification Cost Structural Eurocodes BS EN 1990 (EC0): BS EN 1991 (EC1): Basis of structural design Actions on Structures BS EN 1992 (EC2): BS EN 1993 (EC3): BS EN 1994 (EC4):
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA
STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California
Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
Aluminium systems profile selection
Aluminium systems profile selection The purpose of this document is to summarise the way that aluminium profile selection should be made, based on the strength requirements for each application. Curtain
Construction of precast reinforced concrete structures. Prefabricated reinforced concrete construction:
Construction of precast reinforced concrete structures István VidovszkyPhD definition 2 Prefabricated reinforced concrete construction: Construction of RC components of buildings, the majority of which
A Case Study Comparing Two Approaches for Applying Area Loads: Tributary Area Loads vs Shell Pressure Loads
1 A Case Study Comparing Two Approaches for Applying Area Loads: Tributary Area Loads vs Shell Pressure Loads By Dr. Siriwut Sasibut (Application Engineer) S-FRAME Software Inc. #1158 13351 Commerce Parkway
1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
STANDARD OPEN PATIO COVER
STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist
ASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
FIRE-RESISTANCE RATINGS WITH STEEL JOISTS
FIRE-RESISTANCE RATINGS WITH STEEL JOISTS The Underwriters Laboratories (U.L.) Fire Resistance Directory lists hundreds of assemblies their fire resistance ratings. The Specifying Professional can choose
CONCRETE WORK. A g reement between The Cement League and the Metallic Lathers Union, as of February 20, 1918.
CONCRETE WORK 59 A g reement between The Cement League and the Metallic Lathers Union, as of February 20, 1918. Article 11. Work covered. The Employer agrees that the following work is covered and shall
4.1 POST-TENSIONED IN BUILDINGS PUBLISHED BY VSL INTERNATIONAL LTD.
POST-TENSIONED IN BUILDINGS General Objectives in Building Design Applications of Post-Tensioning in Building Structures The VSL Hardware for Use in Buildings Details and Layouts Improving the Constructability
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
PRO. English COMPLETE PRECAST PLANT
PRO English COMPLETE PRECAST PLANT THE WORLD STANDARD FOR PRECAST PRODUCTION THE PRO PLANT Elematic s PRO production lines and machines are especially designed for precasters who need to produce different
16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
Performance On Innovative Mechanical Connections In Precast Building Structures Under Seismic Conditions. 1º Year Meeting
Performance On Innovative Mechanical Connections In Precast Building Structures Under Seismic Conditions 1º Year Meeting LOEMCO LABORATORY 1º year meeting Summary: Work package number 1 Design exercise
FLUXearch User Information
FLUXearch User Information The web search engine FLUXearch helps you to find commercial available certified reference materials (CRM) for optical emission spectroscopy (OES) and x ray fluorescence analysis
INNOVATIVE CONSTRUCTION METHOD
TRANSLATING INNOVATIVE CONSTRUCTION METHOD INTO COST SAVING by Ar Haji Abdul Halim Suhor HASA Arkitek Sdn Bhd Hollistic Approach Sustainable Architecture www.hasaarkitek.com What is innovative construction?
Fire Alarm And System Description. Automatic Sprinkler System Description. Fire Suppression Equipment. Fire and Evacuation Drills
Building Name: Maddox Hall Year Built: 1985 Occupancy: Residence Hall Capacity: 152 Construction Type: Reinforced concrete slab, CMU walls, flat roof concrete slab. Building Name: Wright Hall Year Built:
Passive Fire Protection
Firestopping Passive Fire Protection FS20 Firestop Compound 6 hour fire rated penetration seals for electrical and mechanical services FS20 Firestop Compound FS20 Firestop Compound is a Fire-Rated Penetration
Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with
Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and
FORMWORK INTRODUCTION
FORMWORK INTRODUCTION Formwork is a mould or open box, like container into which fresh concrete is poured and compacted. When the concrete is set, the formwork is removed and a solid mass is produced in
ISO Types 1-6: Construction Code Descriptions
ISO 1 Frame (combustible walls and/or roof) Class 1B Buildings where the exterior walls are wood or other combustible materials, including construction where the combustible materials are combined with
Bridge Type Selection
Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when
If stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: +27 21 425 0065 REVISION P01 E-mail:
Installation Instructions
Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email [email protected] Phone:
GRC Porticos. Lightweight entrance porticos ABBEY ARTSTONE
GRC Porticos Lightweight entrance porticos ABBEY ARTSTONE GRC Porticos Lightweight entrance porticos Abbey Artstone's range of lightweight products designed for the construction industry is the only range
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span
formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and
CONCAST PRECAST GROUP CIVIL ENGINEERING SOLUTIONS
CONCAST PRECAST GROUP CIVIL ENGINEERING SOLUTIONS Copyright Concast Precast Ltd 2009 Note: Please note technical information provided is for guidance only, project specific requirements should be discussed
Wisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
HOUSING REPORT Load-bearing stone masonry building
World Housing Encyclopedia an Encyclopedia of Housing Construction in Seismically Active Areas of the World an initiative of Earthquake Engineering Research Institute (EERI) and International Association
CODE OF PRACTICE ON. Buildable Design September 2005
CODE OF PRACTICE ON Buildable Design September 2005 The Code of Practice on Buildable Design is published by the Building and Construction Authority. Building and Construction Authority, September 2005
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
Quantity Takeoff. Dr. Ahmed Elyamany
Quantity Takeoff Dr. Ahmed Elyamany 1 Outline Importance of Quantity Takeoff Preparation of Quantity Takeoff Measurement Units Measuring excavation, P.C footings, Beams, Columns, slabs, and stairs. Solved
Concrete Design to Eurocode 2
Concrete Design to Eurocode 2 Jenny Burridge MA CEng MICE MIStructE Head of Structural Engineering Introduction to the Eurocodes Eurocode Eurocode 1 Eurocode 2 Materials Cover Flexure Shear Deflection
GENERAL SHIELDING REQUIREMENTS FOR DIAGNOSTIC X-RAY FACILITIES. Major Medical (Radio/Fluoro/CT/Cardiac/Chiropractic)
GENERAL SHIELDING REQUIREMENTS FOR DIAGNOSTIC X-RAY FACILITIES 1. PROTECTIVE SCREENS (a) Major Medical (Radio/Fluoro/CT/Cardiac/Chiropractic) Typically, 15 kg m -2 (1.3 mm) sheet lead or its shielding
King Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
Technical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed
TYPICAL PATIO COVERS 111
City of Laguna Niguel Building Division 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362-4360 FAX 362-4369 www.cityoflagunaniguel.org TYPICAL PATIO COVERS 111 PLEASE NOTE: This information Bulletin
Chapter 8. Flexural Analysis of T-Beams
Chapter 8. Flexural Analysis of T-s 8.1. Reading Assignments Text Chapter 3.7; ACI 318, Section 8.10. 8.2. Occurrence and Configuration of T-s Common construction type.- used in conjunction with either
Controlling the Transmission of Impact Sound through Floors
Construction Technology Update No. 35 Controlling the Transmission of Impact Sound through Floors by A.C.C. Warnock This Update presents guidelines for controlling the transmission of impact sound through
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Long Carbon Europe Sections and Merchant Bars. Slim Floor. An innovative concept for floors
Long Carbon Europe Sections and Merchant Bars Slim Floor An innovative concept for floors Fire resistant Integrated Flexible Architectes Claude Vasconi et Jean Petit - Chambre de Commerce Luxembourg Contents
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
TRIO 330 The framed panel formwork for heights of up to 3.30 m
TRIO 330 The framed panel formwork for heights of up to 3.30 m product range 4.30 3.30 2 ties up to 3.30 m TRIO 330 The framed panel formwork for floor heights up to 3.30 m TRIO 330 is an independent formwork
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
Session 5D: Benefits of Live Load Testing and Finite Element Modeling in Rating Bridges
Session 5D: Benefits of Live Load Testing and Finite Element Modeling in Rating Bridges Douglas R. Heath P.E., Structural Engineer Corey Richard P.E., Project Manager AECOM Overview Bridge Testing/Rating
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls
Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto
Structural Analysis. EUROCODE 2 Background and Applications
Dissemination of information for training Brussels, 20-21 October 2011 1 Prof. Dr.-Ing. Manfred Curbach TU Dresden, Institute for Concrete Structures M.Sc. Martin Just TU Dresden, Institute for Concrete
Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection
PB301 July 2009 Lightweight Building Solutions Bushfire Protection www.boral.com.au/bushfireprotection Attached or adjacent within 6m roofed structures such as garages, carports, verandas and the like,
Form: an adventure in concrete and brick. Pai Lin Li Travel Award Application Mr John Orr
Form: an adventure in concrete and brick Form: an adventure in concrete and brick Abstract The principles of form active design can facilitate architecturally interesting, structurally optimised, materially
1..GENERAL DATA 2. CLIMATIC DATA. Location
1..GENERAL DATA Location Szentendre, Downtown, Hungary Property Community centre of Szentendre, Public, Municipality of Szentendre Year of Building: End of 19th Century Present use (1) Community centre
Fire and Concrete Structures
Fire and Concrete Structures Authors: David N. Bilow, P.E., S.E., Director, Engineered Structures, Portland Cement Association 5420 Old Orchard Road, Skokie, IL 60077,Phone 847-972-9064, email: [email protected]
Rockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
How To Design A Post Tensioned Deck For A Building
SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University
Analysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
Chapter 5 Bridge Deck Slabs. Bridge Engineering 1
Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid
HUS-A 6 / HUS-H 6 / HUS-I 6 / HUS-P 6 Screw anchor in precast prestressed hollow core slabs
HUS-A 6 / HUS-H 6 / HUS-I 6 / HUS-P 6 Screw anchor in precast Anchor version HUS-A 6 Screw with hex head HUS-H 6 Screw with hex head HUS-I 6 Screw with hex head Benefits - Quick and easy setting - Low
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
REINFORCED CONCRETE STRUCTURE DESIGN ASSISTANT TOOL FOR BEGINNERS. Kang-Kyu Choi
REINFORCED CONCRETE STRUCTURE DESIGN ASSISTANT TOOL FOR BEGINNERS by Kang-Kyu Choi A Thesis Presented to the FACULTY OF THE SCHOOL OF ARCHITECTURE UNIVERSITY OF SOUTHERN CALIFORNIA In Partial Fulfillment
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
PRESTRESSED CONCRETE FLOORING BEAMS
PRESTRESSED CONCRETE FLOORING BEAMS TRIED & TRUSTED Introduction Established in 2001 TT Concrete Products Limited has become a prominent manufacturer of prestressed concrete flooring beams throughout the
Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors
Best Practice in Steel Construction - Industrial Residential Buildings Contents The Steel Construction Institute (SCI) develops and promotes the effective use of steel in construction. It is an independent,
Expected Performance Rating System
Expected Performance Rating System In researching seismic rating systems to determine how to best classify the facilities within the Portland Public School system, we searched out what was used by other
Floor systems - key elements for sustainable multi-storey buildings
Floor systems - key elements for sustainable multi-storey buildings Döring, B., AAINA GmbH, Institute for sustainable construction Aachen, Germany (Presenting), [email protected]; Kuhnhenne, M., RWTH Aachen,
Dual Laser InfraRed (IR) Thermometer
User Manual Dual Laser InfraRed (IR) Thermometer MODEL 42512 Introduction Congratulations on your purchase of the Model 42512 IR Thermometer. This Infrared thermometer measures and displays non-contact
Structural Retrofitting Process and Techniques
Structural Retrofitting Process and Techniques Md. Mostafizur Rahman Sr. Business Consultant Fosroc Chemicals (I) Pvt Ltd Brief over view of FOSROC Construction Products Supplier with Manufacturing facilities
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width
Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
Quantity Take-off. Quantity Take-off
Quantity Take-off Required Information for Cost Estimate Detailed drawings Specifications Available site data Available resource data (labor, material & equipment) Government regulations Applicable owner
Simplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
MULTI-RESIDENTIAL BUILDING SOLUTIONS
MULTI-RESIDENTIAL BUILDING SOLUTIONS OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since
Management Consultancy Training. Asbestos Materials. Residential Guide
Asbestos Materials Residential Guide This guide highlights some of the more common asbestos containing materials (ACMs) in low occupancy residential buildings, their uses and likely locations. The guide