1 Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports Complex NTS Berkley Road

2 TRANSPORTATION DIVISION / ENGINEERING PROJECT MODIFICATION / CHANGE ORDER SUMMARY PROJECT NAME: Alignment Study for the Polk Commerce Centre CRA Spine Road Project Amount Time (days) Reason Original Contract: $158, Modification No. 1 $ Modification No. 1 will extend the contract time an additional 180 days to allow the Consultant to present the Alignment Study results and recommendations at a future CRA Board meeting. Extra contract time is needed to convene Board on a date agreeable to at-large members. Current Contract Total $158, S:\EN_Common\Admin\Agenda Tracking\Proposed E-Agendas\2014\ \CSA Mod 1 Jacobs\CO-MOD1 SUMMARY.xls 12/17/2013

3

4

5 1.0 PURPOSE SCOPE OF SERVICES CONSULTING ENGINEERING SERVICES FOR This project will develop and evaluate a given roadway alignment, analyze a preferred typical section for suitability within the County provided ROW corridor, and prepare conceptual roadway plans for a new roadway running the length of the Polk County Commerce Centre from Braddock Road to north of Pace Road, a distance of approximately 3.03 miles. 2.0 PROJECT DESCRIPTION 2.1 General The general objective of the alignment study is to identify and refine a North- South roadway alignment to connect the land uses and provide internal circulation within the Polk Commerce Centre. Polk County has engaged landowners from the surrounding area to identify a preliminary corridor; this corridor will be used as a starting point for the study effort. This study will determine the environmental, physical, and cultural considerations of the proposed corridor, develop engineering refinements, and provide a conceptual design and construction cost estimate for a new alignment that will facilitate and support future development patterns within the Polk County Commerce Centre. The proposed corridor is located in or near the City of Auburndale. The CONSULTANT will coordinate with the City of Auburndale as appropriate and as specifically directed herein. Project Name: Polk County Commerce Centre Alignment Study Limits: from Braddock Road to north of Pace Rd Major Intersections: Braddock Rd and Pace Rd Existing Signalized Intersections: none Public Meetings: none 2.2 Project Schedule Within ten (10) business days after the Notice To-Proceed and before beginning work, the Consultant shall provide a detailed project activity and event schedule for deliverables and COUNTY and CONSULTANT activities required to meet the County s Work Program schedule. Project schedule shall be updated and revised, as directed by the COUNTY, to accommodate any necessary changes. For the scheduling purposes, three (3) weeks will be allowed for County review of plans, reports and technical memoranda. Polk County Commerce Centre Alignment Study 1 12/12/2012

6 2.3 Submittals The CONSULTANT shall furnish plans and documents as required by the COUNTY to review and coordinate the project as listed below and distribute phase submittal documents as directed by the COUNTY. These are anticipated printing requirements and the COUNTY Project Manager will determine specific number of copies required before each submittal. Draft documents will be submitted for review. If there are significant comments on the draft documents, revised draft documents may be requested for review before submitting the final documents. DESCRIPTION Draft Copies Recommended Alignment (Roll plot) 5 5 Corridor Alignment Report & Alignment Sheets 5 5 Final documents delivered on CD/DVD 2 2 Pond Siting Technical Memorandum 1 1 Preliminary Contamination Memo Provisions for Work Final Copies The Primary Design Standards used will be the current (at NTP) editions of the 2011 Florida Department of Transportation (FDOT) Manual of Minimum Uniform Design Standards for Roads and Streets (Florida Green Book), the Polk County Land Development Code and the American Association of State Highway Officials (AASHTO) Geometric Design for Streets and Highways. Design criteria in the 2012 FDOT Plans Preparation Manual, Volume 1 Design Criteria and Process shall be used when the Primary Design Standards, stated above, do not address a required design element. 2.5 Services to be performed by the County Furnish all available existing right of way mapping, including subdivision plans and maintained right of way plans. Provide any necessary survey Provide aerial data for study area Provide any necessary property appraisals and ROW impact estimates Provide timely review of work products Traffic Analysis if needed Sign permit applications 3.0 GENERAL TASKS Project Common Tasks, as listed below, are work efforts that are applicable to many project activities. These tasks are to be included in the project scope in each applicable activity when the described work is to be performed by the CONSULTANT. 2

7 Cost Estimates: The CONSULTANT shall be responsible for producing an estimate of probable construction costs, and reviewing and updating the estimate when scope changes occur at project milestones. Technical Meetings: Includes meetings with COUNTY and/or agency staff, between disciplines and sub-consultants, such as design meetings, access management meetings, local governments, railroad companies, progress review meetings, and miscellaneous meetings. Quality Assurance/Quality Control: The CONSULTANT shall submit a Quality Control Plan for approval within 20 calendar days of the written Notice to Proceed. The responsible Certified Planner, Professional Engineer, Landscape Architect, or Professional Surveyor & Mapper that performed the Quality Control review will document that the review was conducted. Supervision: Includes all efforts required to supervise all technical design activities. Coordination: Includes all efforts to coordinate with all disciplines of the project to produce the final work products called for in this agreement. Project General Tasks, described in Sections below, represent work efforts that are applicable to the project as a whole and not to any one or more specific project activity. The work described in these tasks shall be performed by the CONSULTANT when included in the project scope. 3.1 Prime Consultant Project Manager Meetings and Coordination Prime CONSULTANT Project Manager shall attend all technical meetings, attend monthly progress meetings, coordinate attendance of other appropriate disciplines, prepare meeting minutes and distribute minutes to attendees. 3.2 Field Reviews Includes all trips required to obtain necessary data for all elements of the project. 4.0 ALIGNMENT STUDY The COUNTY has designated the corridor from Braddock Road to north of Pace Road. Unless otherwise specified, all language, conditions and assumptions herein shall apply to this corridor study. 4.1 Aerial Photography The COUNTY shall provide controlled aerial photography to be used as a basis for plotting data for both engineering and environmental analysis of the conceptual alternative alignments. Aerial photography shall completely cover the boundaries of the study corridor and potential storm water pond and mitigation areas. Aerial photography shall be of an appropriate resolution to be accurately viewed and plotted at a scale of 1 inch = 200 feet (1 foot pixel min.). Photography will be used to prepare the corridor base maps, alignment maps and display boards. 3

8 4.2 Survey Coordination Coordinate with COUNTY surveyor to assure appropriate vector and raster information is provided for the mapping. 4.3 Utility Technical Memorandum Identify the ownership of all known utility facilities in the project corridor. Obtain available information from utility owners regarding the location of existing and proposed above ground and underground utility facilities within the project corridor. Prepare a Utility Coordination Technical Memorandum identifying utility and railroad owners and their facilities in the project corridor. Discuss how these facilities influence the alternative alignments and recommend accommodation measures. 4.4 Corridor Base Maps Prepare Corridor Base Maps on the aerial photo base. Delineate or label all pertinent topographic, cultural and geopolitical features influencing the proposed project onto the aerial photography for subsequent use in the development and evaluation of the Conceptual Alignment(s). The Corridor Base Maps shall include: North arrow, graphic scale and aerial flight date. Transportation Features: Existing roadways (road names and numbers), configuration of travel lanes, intersections (signalized and unsignalized), sidewalks, bicycle routes, trails, cross drains, stormwater facilities, etc. Include any adjoining proposed roadways. Cultural, geopolitical and land use information: archaeological sites, historic sites, etc. Land Lines: Existing and proposed rights of way, platted property lines, utility easements, and drainage easements. Environmental Features: Wetlands and threatened or endangered species habitat, flood zones and flood prone areas. Documented or suspected areas of potential contamination or hazardous material use. 4.5 Develop Alignment The objective of the conceptual design is to develop, analyze, and refine a corridor based on available data. The concept will be developed in sufficient detail to permit determination of the viability of the alternative to function inside the COUNTY provided ROW corridor. The alignment shall be prepared on the aerial base maps and provided in roll plot format. The desirable scale is 1 inch = 200 feet, but the scale may be adjusted if this produces unusually large or small drawings (as approved by the COUNTY). Include the sketches of the typical section(s) and critical profile segments and cross sections on the roll plot. 4

9 Conceptual design of the alignment shall include analysis and documentation of: Roadway Design Alternative(s): Roadway classification and design criteria to be used for the project. (Design Speed shall be 35 MPH.) Horizontal alignment and geometry. Vertical alignment shall be evaluated in critical areas (i.e., intersections, grade separations, bridges, culverts, areas with high ground water, floodplains, etc.). Turn lanes at all intersections shall assume/show minimum standard lengths, unless otherwise directed by the COUNTY. Assess impacts to utility facilities created by the proposed alternative alignments identifying any potential significant utility relocation (i.e., transmission lines for electricity, fuel or gas, etc.). Analyze one corridor for two typical sections: a two-lane interim and a four-lane ultimate. Structures: Conceptual bridge layout and location (plan view and typical section). Evaluate bridge structure needs to the extent necessary to identify viable design alternative(s) based on available data. Describe the alternative structural design concepts considered and the basis for elimination of any found not feasible or cost effective. Drainage Analysis and Stormwater Management: Preliminary drainage analysis to define the approximate location and size of bridges, major cross drains and outfalls, and identify any existing drainage deficiencies that may influence the project. Approximate the requirements for storm water management facilities, and wetland and floodplain mitigation, while looking for opportunity to pair proposed facilities with future development demands. Geotechnical Coordination: Coordinate and discuss the Geotechnical conditions. Right-of-Way: Identify Preliminary proposed right-of-way and easements, including approximate take areas for each parcel affected by the preferred alignment. Generate roll plots at a scale of 1 = 200 to facilitate the parcel and ROW cost estimate to be performed by the COUNTY. 4.6 Cost Estimates Prepare estimate of probable costs for engineering, construction, and construction management and inspection for the alignment. 5

10 4.7 Comparative Analysis of Design Alternate After developing the viable design alternatives and associated costs, prepare a matrix comparing the significant impacts and costs of the design alternatives and identify the most feasible and cost-effective of the design alternatives and present the recommendation to the COUNTY. The COUNTY shall determine which design alternative(s) shall be included as part of the recommended alternative. If an alternative is determined to be not feasible, this will be noted in the Corridor Report. The parameters to be considered in the analysis shall include: Wetland and floodplain impacts. Impacts to wildlife and threatened or endangered plant or animal species. Impacts to utility facilities. Impacts to archaeological and historical sites. Unsuitable geotechnical conditions. Potential for involvement with contamination and hazardous materials. Estimated Costs for: o o o o Preliminary engineering, design and permitting costs. Construction costs. Environmental mitigation. Construction engineering, management, inspection and final certification. o Remediation of potential contamination and hazardous 5.0 DRAFT CORRIDOR REPORT Prepare a Draft Corridor Report and submit the required number of copies of the draft report to the County for review concurrently with any supporting reports/memoranda. Revise and update the draft report in response to comments from the COUNTY. Document the results of the data collection efforts, engineering and environmental analysis including development of the alignment and typical sections. Include the typical section approved by the COUNTY. Describe the recommended alignment Drainage maps shall be shall be presented on the aerial base maps in roll plot format. The desirable scale is 1 inch = 200 feet, but the scale may be adjusted if this produces unusually large or small drawings (as approved by the COUNTY). 6

11 Plan view, typical sections and any other drawings (unless otherwise specified herein) shall be presented on the aerial base maps in 11 inch x 17 inch format. 5.1 Typical Sections Prepare two typical sections, one rural design and one urban design, for the mainline illustrating the basic roadway sections and right-of-way lines. 5.2 Roadway Plan The plan view of the Preliminary Roadway Plans shall be prepared on the Corridor Base Mapping. In addition to the information required for the Corridor Base Maps, the plans shall include: existing topography, wetland lines, existing utilities, centerline of construction, curve data, horizontal geometry, approximate bridge and culvert layout, recommended stormwater pond sites (approximate size), existing & proposed right-of-way lines, north arrow and scale, and begin and end stations for the project. 5.3 Roadway Profile Prepare a preliminary roadway profile for the mainline roadway and major connecting roadways based on the profile survey. Required profile information shall include: existing ground line, preliminary profile grade line, vertical curve k values, and scale. 5.4 Cross Sections Prepare preliminary roadway cross sections at 500-foot intervals along the mainline roadway. Required cross section information shall include: existing ground line, survey baseline, baseline ground elevation, proposed roadway template, proposed profile grade elevation, existing and proposed right-of-way lines, station numbers, and scale. 5.5 Drainage Maps Prepare preliminary drainage maps that illustrate drainage divides and ground elevations, drainage areas and flow direction arrows, high water information, preliminary horizontal alignment, section, township, range lines, street names, existing structures & pipes with relevant information, and north arrow and scale. 5.6 Pond Siting Technical Memorandum Prepare a Pond Siting Technical memorandum identifying potential sites that satisfy the hydraulic requirements for storm water ponds for each major drainage basin. It is desirable to evaluate two (2) feasible alternative sites for each pond. Prepare an evaluation matrix that compares estimated costs for acquisition of right-of-way and easements, and construction costs associated with each pond site. Include costs associated with the outfall for each potential pond site. Include preliminary soil borings for each potential pond site. 7

12 5.7 Preliminary Line and Grade Design (Optional Service) At a minimum, the CONSULTANT will perform the following: Prepare conceptual design plans for 15% Line and Grade of the selected corridor as requested by the COUNTY. Plan view shall be presented on the aerial base maps in roll plot format. The desirable scale is 1 inch = 200 feet, but the scale may be adjusted if this produces unusually large or small drawings, as approved by the COUNTY. Profile shall be prepared in roll plot format for the mainline roadway and major connecting roadways based on the profile survey. Typical sections, cross sections, drainage maps, conceptual maintenance of traffic plan and other drawings shall be prepared on 11 inch x 17 inch sheets. Prepare preliminary cross sections at 1000-foot intervals along the mainline roadway. Required cross section information shall include: existing ground line, survey baseline, baseline ground elevation, design high water and seasonal high water information, floodplain elevations, proposed roadway template, identified unsuitable materials, proposed right-of-way lines, station numbers and scale. Upon completion of preliminary data collection including survey and geotechnical information, the consultant will complete the task in 60 calendar days. 6.0 FINAL CORRIDOR ALIGNMENT REPORT Prepare the Final Corridor Alignment Report incorporating any modifications requested by the County. The transmittal letter shall certify the adequacy and completeness of the final report. Prepare a Recommended Alignment Map on the aerial base maps and provide in roll plot and display board format suitable for use at BOCC meeting and other meetings. 7.0 CULTURAL RESOURCE ASSESSMENT MEMORANDUM 7.1 Archeological and Historical Resources Conduct probability analysis to determine if any archeological or historical resources are likely to be in the proposed corridor from the Florida Master Site Files. 8.0 ENVIRONMENTAL ASSESMENT MEMORANDUM 8.1 Permitting Establish the environmental permitting requirements for the proposed project. 8

13 8.2 Wetlands A desktop Geographic Information Systems (GIS) analysis of all available wetlands data will be analyzed to locate and evaluate the size and type of wetlands that may be impacted by the proposed alignment(s) and storm water management facilities. Prepare a written assessment of the current condition and relative value of the function of wetlands and surface waters using the U. S. Army Corps of Engineers (USACE) Field Identification Forms and Florida Department of Environmental Protection (FDEP) Uniform Mitigation Assessment Method (UMAM) forms for each wetland assessed. Present the data in tabular form showing each impacted wetland, size of impacted wetlands, impact type and size of mitigation requirements. Also, identify all wetlands within the project corridor that will not be impacted. 8.3 Wildlife and Habitat A desktop Geographic Information Systems (GIS) analysis of available wildlife and habitat data will be analyzed determine any Threatened or Endangered Species or critical habitat that may be impacted by the proposed project. 8.4 Floodplains Estimate potential impacts to floodplains and identify mitigation options. 8.5 Environmental Assessment The Environmental Assessment analysis, including the research, determinations and recommendations, shall be documented in the corridor analysis documentation. 9.0 PRELIMINARY CONTAMINATION 9.1 Data Collection Environmental contamination services for the proposed corridor begin with a site reconnaissance followed by a review of previous reports and historical data, including the Polk County Soil Survey, and USGS Topographic Maps, historical aerial photographs, and regulatory database reports. We do not anticipate any field testing associated with this project. Conduct a visual site reconnaissance of the project corridor, and locate and coordinate utility clearance and maintenance of traffic. Evaluate each potential right-of-way acquisition parcel for contamination risk and rate sites in accordance with the FDOT Contamination Risk Evaluation system and prepare Site Review Checklists for those parcels that are considered potential sources of contamination. Document site specific data for those potential right-of-way acquisition parcels that currently are, or may have previously been, involved in activities where hazardous or petroleum-related materials/substances/wastes may have adversely impacted the property. 9

14 Review and analyze historical and current aerial photographs, maps and land use information for the potential for previous practices or activities that may have involved hazardous materials or waste that could impact the proposed project. Conduct a computerized database search of agency maintained records to document any permitting, use and citing of known releases or storage systems of hazardous materials, substances or wastes and petroleum related constituents maintained by the United States Environmental Protection Agency and the Florida Department of Environmental Protection. Evaluate hydrogeologic features of surface and subsurface waters for potential contaminant migration pathways. Document existing monitoring wells along the corridor that may be associated with contaminated sites. 9.2 Preliminary Contamination Memorandum Prepare a Preliminary Contamination Memorandum that documents the research, analysis and recommendations, and how these influence the alternative alignments PRELIMINARY GEOTECHNICAL TECHNICAL MEMORANDUM 10.1 Required Minimum Testing and Analysis Review readily available published soils information. Perform site reconnaissance and limited field testing services for confirmation of the collected published data. Perform one (1) Standard Penetration Test (SPT) boring to a depth of 15 feet below existing site grades at each proposed alternate pond location (a total of 16 SPTs). In each boring, samples will be collected and SPT resistances will be measured virtually continuously for the top 10 feet and on intervals of 5 feet thereafter. In addition, perform one (1) hand auger boring to depths on the order of 5 to 10 feet below grade at each of the proposed alternate pond locations to obtain Seasonal High Groundwater Table (SHGWT) estimates. Perform one hand auger/power auger boring to depths on the order of 5 to 10 feet below grade along the proposed roadway alignment at intervals of approximately 1,000 feet in order to provide SHGWT estimates to support the project Line and Grade assessment. Visually classify and stratify recovered soil samples in the laboratory using the American Association of State Highway and Transportation Officials (AASHTO) Soil Classification System in general accordance with the American Society for Testing and Materials (ASTM) Test Designation D Perform limited laboratory tests on selected representative samples to develop the soil legend for the project. Measure observed groundwater levels and estimate seasonal high groundwater levels at each boring location. Prepare a formal engineering report and Roadway Soil Survey Sheet, which summarizes the course of study pursued, the field and laboratory data 10

15 generated, the subsurface conditions encountered and the Geotechnical recommendations for the design and construction of the project Additional Testing Additional testing and analysis if deemed necessary and authorized by the COUNTY could include: 5-Foot soil borings at 500 foot intervals along the corridor and within potential pond sites. Measure observed groundwater elevations and estimate seasonal high ground water levels at each soil boring location. Measure observed groundwater elevations and estimate seasonal high ground water levels at each soil boring location MEETINGS 11.1 BOCC Workshops CONSULTANT shall make an oral presentation to the Board of County Commissioners for approval of the recommended alignment. The presentation shall describe the typical section and alignment, and the design and construction schedules and budgets. The presentation shall also include a discussion of factors influencing the development and selection of the recommended design ADDITIONAL SERVICES At the COUNTY s option, the CONSULTANT may be requested to provide other additional project related services. If requested, these services will be added by Change Order or other agreement and the fees for these additional services shall be negotiated for a fair, competitive and reasonable cost, considering the scope and complexity of the work. Additional services include but are not limited to Bridge Development Reports, Bridge Hydraulic Report, etc. At the COUNTY s option, the CONSULTANT may be requested to provide services for final design and preparation of construction plans and documents. If requested, these services will be added by Change Order or other agreement and the fees for these additional services shall be negotiated for a fair, competitive and reasonable cost, considering the scope and complexity of the work GENERAL REQUIREMENTS 13.1 Liaison Office The COUNTY and the CONSULTANT will designate a Liaison Office and a Project Manager who shall be the representative of their respective organizations for the Project. While it is expected the CONSULTANT shall seek and receive 11

16 advice from various state, regional, and local agencies, the final direction on all matters of this project remain with the COUNTY Project Manager Key Personnel The CONSULTANT s work shall be performed and directed by the key personnel identified in the proposal presentations by the CONSULTANT. Any changes in the personnel shall be subject to review and approval by COUNTY Progress Reports Meet with the COUNTY at least monthly and provide a written Progress and Schedule Status Report describing the work performed on the project. A copy of the Progress and Schedule Status Reports shall be included with each monthly invoice from the CONSULTANT. The COUNTY Project Manager will determine whether the work of sufficient quality and quantity to justify the requested payment Correspondence Copies of all written correspondence between the CONSULTANT and any party pertaining specifically to this contract shall be provided to the COUNTY for their records within one (1) week of the receipt or mailing of said correspondence Professional Endorsement All design, reports, technical memoranda and work products shall be prepared under the supervision of a Professional Engineer, Certified Planner, Professional Surveyor and Mapper, or Certified Property Appraiser, as appropriate and as required by COUNTY standards. The COUNTY reserves the right to approve, or disapprove, the CONSULTANT s project staff Computer Automation The project shall be developed using Computer Aided Drafting and Design (CADD) systems. Plans and maps shall be delivered in AutoCAD format; other documents shall be delivered in Microsoft Office format Coordination with Other Consultants Coordinate with other parties performing design and/or construction work to assure coordinated interface and schedule between projects CONTRACT PERFORMANCE SCHEDULE All services called for in this agreement shall be completed 360 calendar days after the date of the Notice to Proceed COMPENSATION The CONSULTANT will perform the above Scope of Services for a Not to Exceed amount of $158, (This total includes optional services $8, ) 12

17 The CONSULTANT shall submit monthly invoices. Fees shall be invoiced according to Master Consulting Agreement Amendment 6. Additional work requested by the COUNTY or due to unforeseen circumstances will be added to this CSA by Change Order or other subsequent authorization. Work done in excess of the current authorized amount will not be compensated. 13

18

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Engineering Design Services for the Preliminary (Design) Engineering 1. Imlay City Road Imlay City Road at Wilder Road (signal modernization), Lapeer Township 2. Imlay City Road Imlay

More information

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 CENTRAL NEW YORK REGIONAL PLANNING AND DEVELOPMENT BOARD 126 NORTH SALINA

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Preliminary Plan Application and Checklist

Preliminary Plan Application and Checklist ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:

More information

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR

SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR 1. ANY MAP OR PLAN THAT SHOWS: Property Lines. NJSA 45:8-28(e), NJAC 13:40-1.3, 13:40-5.1 Locations of Existing Buildings

More information

Brevard County Public Works Finance and Contracts Administration

Brevard County Public Works Finance and Contracts Administration Brevard County Public Works Finance and Contracts Administration Public Works Survey & Mapping Division Review Check Sheet for Land Acquisition, Drainage, Roadway and Pedway Expansion, Asbuilts, Maintenance

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

Washington City Subdivision Development Application Checklist 435-656-6325

Washington City Subdivision Development Application Checklist 435-656-6325 Application Checklist 1 Washington City Subdivision Development Application Checklist 435-656-6325 1) Wednesday Staff and Developer Meeting. *Call to schedule an appointment. A. Statement of project intent

More information

APPENDIX I DEVELOPMENT PROCESS CHECKLIST

APPENDIX I DEVELOPMENT PROCESS CHECKLIST APPENDIX I DEVELOPMENT PROCESS CHECKLIST Bureau of Indian Affairs, Western Regional Office 400 N. 5 th St., Two AZ Center/Phoenix, AZ 85004/Telephone/website PRE-DEVELOPMENT PROCESS CHECKLIST This checklist

More information

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow

Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil

More information

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246

05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION

More information

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way

Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way Public Works Department Utility Coordination Procedures for Hillsborough County Construction Projects within County Rights-of-Way October 2015 HillsboroughCounty.org HILLSBOROUGH COUNTY Office of the County

More information

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES I. PURPOSE OF REQUEST. The City of Edgewood is requesting statements of qualifications from professional consulting firms licensed

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

APPLICATION FOR TENTATIVE MAPS

APPLICATION FOR TENTATIVE MAPS APPLICATION FOR TENTATIVE MAPS Planning Division 38250 Sierra Highway Palmdale, CA 93550 (661) 267-5200 [email protected] Tentative Case No.: Date: Received by: Print Name INSTRUCTIONS TO

More information

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY AND DESIGN

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY AND DESIGN I-95 (SR 9) from I-10 to Georgia State Line- Managed Lane Study FIN No:435576-1-12-01 Federal Project #: TBD Duval and Nassau Counties, Florida SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT

More information

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.: SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)

Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way) Flood Control District of Maricopa County (District) 2801 W. Durango Street Phoenix, AZ 85009 Telephone: 602-506-4583 or 602-506-5476 Fax: 602-506-1663 Right-of-Way Permit Application Process (Plans that

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

Electronic Signature and Fee Payment Confirmation

Electronic Signature and Fee Payment Confirmation Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

Development Variance Permit Application Package

Development Variance Permit Application Package When do I need a Development Variance Permit? Development Variance Permit Application Package If my proposed development does not meet the standards set out in the Zoning Regulation Bylaw on matters that

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS QUALITY ASSURANCE and QUALITY CONTROL PROCESS GUIDE for PROJECT MANAGERS MDOT Trunkline Projects January 2005 TABLE OF CONTENTS Discussion.. 2 Scope Verification Meeting..... 3 Overview 3 Procedure...

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES Joint City-County Planning Commission of Barren County, Kentucky 126 East Public Square City Hall Glasgow, KY 42141 A. PURPOSE:

More information

University of Northern Iowa Design Documents Standards. October 2014

University of Northern Iowa Design Documents Standards. October 2014 University of Northern Iowa Design Documents Standards October 2014 2014 UNI BUILDING AND DESIGN STANDARDS 1.1 CONTRACT DOCUMENT FORMAT 1.1.1 The Electronic Word Programs used for the Project manual shall

More information

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE 1.0 INTRODUCTION In early 2010, the Town of Ajax was provided with updated floodplain mapping for Carruthers Creek, based on a Regional Storm event (i.e., Hurricane Hazel), prepared by the Toronto and

More information

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES Site Analysis Floyd Zimmerman, FASLA Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 Sensitive owners and designers understand that from the facility user s perspective,

More information

NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS

NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS NCDOT MAPPING GUIDELINES FOR PLANNING AND DESIGN ACTIVITIES MAPPING PRODUCTS FOR ROADWAY DESIGN AND PDEA STEPS FOR REQUESTING MAPPING PRODUCTS DESIGN TYPE DEFINITIONS YEARLY MAPPING NEEDS REQUEST DESCRIPTION

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval:

CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS. Conditional Use Permit Approved by Board of Supervisors Date of approval: CHECKLIST FOR TELECOMMUNICATION TOWER CO-LOCATION APPLICATIONS Conditional Use Permit Approved by Board of Supervisors Date of approval: Site Plan Approval: Date of approval: Fees: $4,000 Licensed Co-location

More information

TRAFFIC IMPACT ANALYSIS (TIA)

TRAFFIC IMPACT ANALYSIS (TIA) GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (TIA) FOR REZONING APPLICATIONS AND OTHER DEVELOPMENT APPROVALS REQUIRING TRANSPORTATION IMPACT ANALYSIS IN SUMTER COUNTY, FLORIDA July 17, 2007 PURPOSE AND APPLICABILITY

More information

Hazardous Materials in Project Development

Hazardous Materials in Project Development Hazardous Materials in Project Development Environmental Documentation TxDOT Environmental Affairs Division Release Date: 2/2014 510.01.DS Version 1 Table of Contents Overview... 3 Assessment Type and/or

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM DATE: December 04, 1996 This document is subject to change. If in doubt, verify current status with Technical Services

More information

A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way

A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way 1 Introduction Q uestar Corporation is an integrated natural gas company headquartered in Salt Lake City, Utah. Through subsidiaries

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

City of Valdosta Land Development Regulations. Table of Contents

City of Valdosta Land Development Regulations. Table of Contents TITLE 1 ADMINISTRATION Chapter 102 General Provisions 102-1 Title 102-2 Purpose 102-3 Authority 102-4 Jurisdiction 102-5 Application of Ordinance 102-6 Relationship to Existing Ordinances 102-7 Powers

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

1161.01 CONFORMITY WITH PLANS; DRAINAGE.

1161.01 CONFORMITY WITH PLANS; DRAINAGE. CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: April 17, 2014...Agenda Item *3 Company: Docket No. Minnesota Power E015/GP-13-978 In the Matter of the Application of Minnesota

More information

Wildlife Habitat Conservation and Management Program

Wildlife Habitat Conservation and Management Program Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife 2015 Table of Contents 1. Introduction Purpose of the habitat program Objective

More information

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10) CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements

More information

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53 STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53 These instructions define the survey and platting criteria unique

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST

EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST EXETER TOWNSHIP SKETCH PLAN APPLICATION CHECKLIST Submission Checklist: Items A through G ARE REQUIRED for the first submission of a Sketch Plan. Only Item C is required for the submission of revisions

More information

8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS

8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS ARTICLE 8 APPENDICES 8.1 APPENDIX A. SUBDIVISION DATA REQUIREMENTS 8.1.1 Pre-application Process, Data Requirements a. Sketch Plan. A sketch plan may be prepared by the subdivider which shows the proposed

More information

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise: 14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation

More information

Weed Survey and Mapping

Weed Survey and Mapping Weed Survey and Mapping The primary objective of weed surveying and mapping is to accurately identify and delineate land with populations of invasive plants or noxious weeds. These surveys allow land managers

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Civil Engineering Design

Civil Engineering Design ES050 Introductory Engineering Design and Innovation Studio Civil Engineering Design Prof. Jon Southen November 18, 2009 Goals and Objectives of this lecture Provide introduction to engineering design

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of

More information

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project

More information

Basic Elements of Reading Plans

Basic Elements of Reading Plans Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws

More information

Planning for Casey s Community

Planning for Casey s Community 2 July 2013 ITEM 2 ATTACHMENT 1 Council Report from Meeting This information is circulated separately. Council Meeting Page 9 Amendment C143 to the Casey Planning Scheme Revisions to various areas within

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Public Information & Public Scoping Meeting

Public Information & Public Scoping Meeting Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Comanche Trail Pipeline Project. September 2015

Comanche Trail Pipeline Project. September 2015 Comanche Trail Pipeline Project September 2015 2 Comanche Trail Pipeline Project The Comanche Trail Pipeline is a Texas intrastate pipeline (1) designed to transport 1.1 billion cubic feet per day of clean-burning

More information

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. SCHEDULE OF CONSULTANT S SERVICES Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter. Project (Insert name and description

More information

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?

Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations? Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design

More information

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D

Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...

More information

SECTION 7 UNDERDRAIN SERVICE

SECTION 7 UNDERDRAIN SERVICE SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

DEVLOPMENT APPLICATION PROCEDURES

DEVLOPMENT APPLICATION PROCEDURES DEVLOPMENT APPLICATION PROCEDURES Bylaw No. 2444 and amendments thereto CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amending bylaws have been consolidated

More information

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This

More information

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS

CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information