1 1.0 INTRODUCTION In early 2010, the Town of Ajax was provided with updated floodplain mapping for Carruthers Creek, based on a Regional Storm event (i.e., Hurricane Hazel), prepared by the Toronto and Region Conservation Authority (TRCA) and R.J. Burnside & Associates Limited. The updated mapping redefines the depth and extent of flood waters for the creek, the effects of which are most pronounced in the lower reaches of the watershed. Notably, a Spill Area has now been identified extending from the main Carruthers Creek channel upstream of Shoal Point Road bridge through a significant portion of the Pickering Beach neighbourhood south of Seabreeze Road to Lake Ontario. For the purpose of this proposal, the Flood Remediation Area, shall be bounded by Audley Road to the east, Bayly Street to the north, Pickering Beach Road to the west and Lake Ontario to the south. The Watershed Area for this study is the entire Carruthers Creek watershed as delineated on Figure BACKGROUND The Carruthers Creek watershed extends north from Lake Ontario for approximately 17 km and has a drainage area of approximately 3650 ha. The watershed is elongated in a north-south direction with a length to width ratio of approximately 8 to 1. The upper reach is agricultural and the lower reaches are presently developed with a mixture of residential, commercial and industrial. The Toronto Region Conservation Authority (TRCA) has recently undertaken a comprehensive process to revise flood plain mapping along a number of creek systems across its jurisdiction. The updated Carruthers Creek flood plain mapping is a component of TRCA s ongoing work to identify and protect flood vulnerable areas based on updated mapping and modeling techniques governed by the Ministry of Natural Resources. This project is an Environmental Assessment (EA) which shall: i) review and update the hydrology for the watershed as required; ii) identify potential risks to the hydrology for the watershed including approved urban areas and the long term potential for urbanization in the Carruthers Headwaters; iii) identify options to mitigate the downstream flood risks based on existing, approved and potential urban developments within the watershed; iv) and identify solution(s) to mitigate/remediate the risk of flooding within the watershed, and in particular, the Flood Remediation Area. 2.1 BACKGROUND DOCUMENTS The following documents shall be provided to the successful Proponent upon selection. However, during the Proposal period, these documents are available for viewing at the Town s Planning and Development offices or the TRCA offices, on request: R.J. Burnside & Associates Limited Toronto Region and Conservation Authority, Summary Report for Digital Floodplain Mapping Carruthers Creek Spill Analysis, December, 2009; (available at TRCA)

2 R.J. Burnside & Associates Limited Summary Report for Digital Floodplain Mapping Carruthers Creek, and Millers Creek Watersheds, Toronto Region and Conservation Authority, August, 2007; (available at TRCA) Philips Engineering, Carruthers Creek Hydrology Update for Toronto and Region Conservation Authority, March, 2007; (available at TRCA) Carruthers Creek Master Drainage Plan September 1991 by Totten Sims Hubicki Associates Carruthers Creek Stormwater Management Strategy June1994 by Totten Sims Hubicki Associates Carruthers Creek Stormwater Management Strategy Synopsis Report June1995 by Totten Sims Hubicki Associates Carruthers Creek Stormwater Management Strategy June 1999 Addendum 1 by Totten Sims Hubicki Associates Topographic data; Town of Ajax Official Plan (see Draft Amendment No. 38 to the Town of Ajax Official Plan (revised Environment policies); Town of Ajax Staff Report for General Government Committee dated April 22, 2010 (see City of Pickering Official Plan (see Durham Regional Official Plan (see also Proposed Amendment 128 to the Durham Regional Official Plan, and the draft Decision of the Ministry of Municipal Affairs and Housing dated March 12, 2010 (see also TRCA Flood Plain Mapping and HEC-RAS Computer Model; (available at TRCA) Watershed Plan for the Duffins and Carruthers Creeks and State of the Watershed Report (see Maps of significant environmental features can be found in the Town s Official Plan (see

3 2.2 CLASS ENVIRONMENTAL ASSESSMENT STATUS The Town has classified this undertaking as a Schedule C initiative under the Class EA process as outlined in Municipal Class Environmental Assessment document prepared by the Municipal Engineers Association (MEA) dated October, 2000 as amended in Schedule C projects include all phases and require, at a minimum, two mandatory points of contact with the public and relevant review agencies. The Proponent shall thoroughly review the project and confirm in its Proposal that the EA classification is correct. If the Proponent is of the opinion that the project should be classified differently, then this shall form part of the bid document, and brought to the attention of the Town s Project Manager accordingly. 3.0 SCOPE OF SERVICES 3.1 PROJECT MANAGEMENT TEAM The Project Management Team, consisting of the Proponent s Project Manager (or their designated alternates), will lead the project, with the support of the Town s Project Manager, and the TRCA s Project Manager. The Proponent s Project Manager will guide the tasks and functions of any other affected groups. The Proponent s Project Manager will make all day-to-day decisions, address requests for information, and provide direction to project staff. The Town s Project Manager and the TRCA s Project Manager are to be: kept informed of progress regularly. It is expected that there will be monthly progress reports for the duration of the project; copied on all correspondence; advised of significant problems/issues, options considered and solutions adopted; consulted regarding deviations from standards, specifications and procedures prior to their implementation; involved in any meetings with stakeholders, if available; advised of any potentially controversial issues; and consulted prior to changes of the project schedule. The successful Proponent will be responsible for co-coordinating all activities and submittals with this Project Management Team. The successful Proponent should expect that any design aspect that affects an agency would have to be reviewed, commented upon and/or approved by that entity prior to its acceptance by the Town. 3.2 PUBLIC INVOLVEMENT The successful Proponent will be responsible for guiding the public involvement in accordance with Schedule C of the Municipal Class Environmental Assessment Act. The public at large will be provided opportunities to offer input at various stages. Most contact will be through direct interaction with affected property owners and other interested parties.

4 Public Information Centres (PICs) are required to offer stakeholders an opportunity to comment on the Alternative Solutions (Phase 2 PIC No. 1) and the Design Concepts for the Preferred Solution (Phase 3 - PIC No. 2). Other approaches, such as newsletters, web site, etc., should also be used to inform the public at the major milestones of the project. The successful Proponent will be responsible for arranging the advertisement of public notices, circulation to interested parties, and coordinating public meetings. The successful Proponent will, upon direction from the Town of Ajax and the TRCA: prepare the Public Notices and direct the above noted Public Information Centres; make presentations to Ajax Council and Committees (including two progress meetings at General Government Committee, two update meetings before the Town s Environmental Advisory Committee, one public meeting to present the completed study at Community Affairs and Planning Committee, and one presentation before Council); prepare all the necessary presentation and circulation documents; address comments and respond to questions from interested stakeholders. Although the successful Proponent will be expected to lead the public involvement activities, Town and TRCA staff will play an active role in the program and are committed to participating at all public forums. In many instances, the Town and successful Proponent will work together to do such tasks as: facilitate public forums; maintain the project contact list; prepare notices, newsletters and brochures for publication; and respond to inquiries 4.0 SCOPE OF WORK The scope of work for this project will be to carry out a Class EA planning and design process along with completion of the preliminary detailed design documents for implementation of the recommendations. The Proponent will be responsible for all aspects of work. Proposals submitted in response to this RFP shall describe the work required to provide these Services, and may be rejected if the requirements are not addressed to the Town s satisfaction. The tasks described in the following subsections may not be inclusive and are not listed in any particular order. Proponents may suggest additional items that they feel would benefit the project. Proponents are also encouraged to identify and make recommendations about the order, efficiency and appropriateness of the tasks listed below. Measures that would make the most effective use of the available resources and/or would expedite completion of the Services should also be noted. 4.1 GENERAL SERVICES The successful Proponent shall provide General Services to effectively initiate the project, manage the project, involve the public and to obtain field data. The successful Proponent will be required to assume responsibility for all services offered in its Proposal regardless of whether or not the Proponent performs them in-house. The Proponent will be fully responsible for adherence by sub-consultants to all provisions of the contract. The successful Proponent will

5 be the sole point of contact for contractual matters, including payment of any or all charges resulting from the contract. 4.2 PROJECT INITIATION The successful Proponent shall meet with the Town s Project Manager, TRCA s Project Manager and other Town staff at the outset of the assignment to obtain relevant background information and confirm the extent of services, work program and project schedule outlined in the Proposal. Following the meeting, the successful Proponent shall submit an updated work program and project schedule to the Town s Project Manager within two weeks for approval, reflecting any changes discussed. Assemble a project contact list in consultation with Town s Project Manager, and notify review agencies and other stakeholders on the list of project initiation by letter or other appropriate method of communication (i.e. newsletter, etc.). 4.3 PROJECT MANAGEMENT The successful Proponent shall arrange, attend, prepare and issue minutes for, and provide written responses to questions raised at all meetings with Town staff, review agencies and other stakeholders. The Proponent shall issue correspondence resulting from the meeting (minutes, responses, etc.) within five (5) business days. The successful Proponent shall prepare reports, submit plans, specifications, and applications to the Town, affected review agencies, and other stakeholders to secure required approvals, permits or clearances. This may require the Proponent to prepare draft and final agreements, attend meetings and pay required fees (to be recovered through disbursements). Where appropriate, the Proponent shall obtain and integrate comments on documents produced. The successful Proponent shall prepare and submit a monthly Progress Report including work completed that month, anticipated work for the following month, issues and concerns, and any potential changes to scope, budget or schedule. 4.4 PUBLIC CONSULTATION The successful Proponent shall conduct the external consultation program, including but not restricted to: discussions and correspondence with all stakeholders; meetings, negotiations, external presentations (including presentation material and dry runs ), and associated minutes/correspondence; preparation of public notices, newsletters (budget for a minimum of three newsletter updates of project status for circulation to the Flood Remediation Area residents) and brochures in the Town s format; preparation, operation and follow-up for Public Information Centres and Community Meeting, including displays, venue booking and payment (to be recovered through disbursements), dry runs, set-up, attendance, minutes/summary, and responses to comments; and

6 satisfaction of Municipal Freedom of Information and Protection of Privacy Act requirements for the above. The external consultation elements are subject to pre-approval and participation by the Town. The successful Proponent shall plan and budget for a minimum of two (2) Public Information Centre and one (1) Community Meeting in their Proposals. The Proponent shall produce all display material (including drawings) for these meetings in appropriate paper and digital (pdf) formats in advance for the Town s review and approval. The Proponent shall create and lead a power point presentation and provide paper overview material for the meetings. The Proponent shall provide the final digital material to the Town the next business day following the Public Information Centre or Community Meeting. The Town may post this material to its web site. The successful Proponent shall also plan and budget for Committee of Council (3), Council (1) and Town s Environmental Advisory Committee meetings (2). The Proponent shall prepare a presentation for each of the meetings describing the proposed design solutions, the impact of the project (including any major public concern) and the Environmental Study Report (ESR). Committee meetings are typically held at night starting at 7:00 PM. 4.5 SITE INVESTIGATIONS AND FIELD REVIEWS The successful Proponent shall carry out all necessary field work not provided by the Town, to identify flood management measures in the most cost-effective way. This will include any additional topographical survey requirements, water crossings, storm sewer sizes and inverts. Arrange for Permission to Enter through the Town s Project Manager prior to commencing fieldwork on public or private property not owned by the Town. Geotechnical information may be required to evaluate the feasibility of some of the proposed solutions. 4.6 CLASS EA SERVICES Identify and verify factors causing the increased flood vulnerability in the lower Carruthers Creek watershed. Identify opportunities to reduce and mitigate the flood risk in the this area, specifically as it relates to flood vulnerable properties, infrastructure needs and improvements, public safety, required remedial works and policy approaches and best practices. Phase 1 Identification of Problems or Opportunities Compile an inventory of the natural, social, planning and economic environments within the watershed from the background data, and from field and secondary source investigations, and produce relevant mapping of environmental constraints. Fieldwork shall be conducted during the appropriate season(s) and be of sufficient scope to satisfy requirements for necessary approvals Phase 2 Selection of Preferred Solution Select the preferred solution to the identified problems and/or opportunities (Phase 2 Selection of Preferred Solution). In completing this task, the Consultant shall develop and evaluate a range of alternatives, including but not limited to:

7 Do nothing; Physical modifications and improvements to existing facilities, structures and stream channels, including those within or near the Flood Remediation Area; New facilities, structures and modifications for managing the Regional Storm event; Recommendations that responds to potential urbanization within the Carruthers Creek Headwaters and the potential impacts to downstream; and Operational or structural improvements. Each alternative will be evaluated based on a series of criteria to be developed jointly by the Consultant, TRCA and the Town, falling into the following general categories: Social environment (i.e. land use, noise, heritage, agricultural land, etc.) Natural environment (i.e. woodlots, creeks, wetlands, wildlife, birds, vegetation, air quality, etc.) Technical (i.e. hydrology, hydraulics, structural adequacy, etc.) Cost (i.e. capital, operating, maintenance, etc.) Prepare a Need and Justification Report summarizing the findings of Phases 1 and 2. The Consultant shall confirm that the appropriate Municipal Class EA schedule is being followed for the project in the Report. Phase 3 Select the preferred design concept for the preferred solution. In completing this task, the Consultant shall identify and evaluate a range of alternatives (Selection of Preferred Design Concept). Prepare the preliminary design for the preferred design concept (Phase 3 Selection of Preferred Design Concept and supply a cost estimate). The section below further details the tasks required for this activity. Phase 4 Prepare an ESR to document the Class EA planning and design process completed (Preparation of ESR). Documentation shall be in accordance with Chapter A.4.2 of the Municipal Class EA and shall include the following items: A summary of environmental concerns and commitments in tabular form. The final preliminary design drawings, cost estimates, and the completed Project Criteria Sheet, as described below.

8 A technical appendix containing all background reports prepared during the study and the details of the public involvement program, including all comments received. Respond to inquiries about the ESR, including any appeal requests. 4.7 PRELIMINARY SOLUTION(S) The Proponent shall prepare solutions for improvements within the watershed, including preliminary design solutions for the Flood Remediation Area. The preliminary design phase for the Flood Remediation Area will determine the type of flood management solution(s) required, approximate limits of construction, criteria, property acquisition requirements, cost, items quantities, specifications and the need for utility relocations. The design will provide sufficient information to enable property acquisition, utility relocation, tender for construction and permit applications. Cost estimates shall also be produced by the Consultant for budgeting purposes. 4.8 TASKS: Carruthers Creek Watershed Hydrology Update a. Review Philips Engineering, Carruthers Creek Hydrology Update for Toronto and Region Conservation Authority, March 2007 b. Assemble an inventory of watershed characteristics, such as stormwater management controls, flow gauge and rain gauge locations, existing and future land uses, topographic data, and soil information. c. Update the TRCA s Visual Otthymo Hydrologic model for the Carruthers Creek Watershed. Verify the model reflects the current land use ((Existing Official Plans(OPs) (based on the existing Durham of Region, City of Pickering and Town of Ajax Official Plans), subcatchment boundaries, reach network and all constructed and planned stormwater management facilities. d. Perform calibration and validation of the Existing Official Plans (OPs) Condition model for water quantity using meteorological and flow data. A minimum of three (3) storm events for a period of 2007 through 2009 should be selected for calibration and validation. Data from multiple meteorological stations within the Carruthers Creek watershed and adjacent areas should be applied in a spatially distributed manner for both calibration and validation. Consultants should describe in their proposal the methodologies that will be considered for distributed application of meteorological data. Meteorological and streamflow data for calibration and validation are available from the TRCA and Meteorological Service of Canada, which will be provided by the TRCA. Figure 1 shows the location of the rain gauges and stream flow stations. Calibration should be achieved by adjusting appropriate modeling parameters within accepted ranges conforming to typical modeling practices. The primary

9 focus of calibration should be to match simulated peak flows and overall hydrograph volumes to observed flows for the selected events Calibration and validation should include comparisons of simulated and observed peak flow rates and volumes for all selected events. As a minimum, a graphical comparison of simulated and observed hydrographs for calibration and validation events should be provided as well as tabular comparisons of associated peak flows and volumes. The model calibration must be presented to and approved by Town of Ajax and TRCA prior to moving forward to the modeling of future land use scenarios. e. Using the calibrated Existing OPs Condition model, confirm whether the 12 hour Atmospheric Environment Service (AES) design storm distribution is still appropriate for the watershed and if not, select a more appropriate distribution. Based on the calibrated Existing Condition model, the 2, 5, 10, 25, 50 and 100 year design flows will be estimated using the chosen storm distribution. The Regional flows will be estimated using the Regulatory storm event for the watershed (Hurricane Hazel). As per MNR procedures the routing effect of stormwater management facilities will be removed from the simulation of Regional flows. f. Using the calibrated Existing OPs Condition model as a base, develop a hydrologic model for a Potential Future watershed development as set out in Durham Region s adopted Regional Official Plan Amendment (ROPA) 128 (Growing Durham) which although has not received Provincial Approval, (i.e. the north east Pickering lands) land use scenarios for the watershed. The model will reflect future development, approved stormwater management plans including, as a minimum, additional stormwater management facilities. Where stormwater management facilities have not yet been sized for planned development areas, they will be sized in accordance with current quantity control criteria for the Carruthers Creek watershed. Stormwater management facilities must be depicted in the model in the same manner they are depicted in the Existing Condition model. g. Run the Existing OPs Condition and Potential Future Condition models with the selected storm distribution as identified in Task e, and estimate the 2 to 100 year and the Regional flows. As per MNR procedures the routing effect of stormwater management facilities will be removed from the simulation of Regional flows. h. Present graphical and tabular comparisons for the Existing OPs, and Potential Future Conditions at the points of interest Update SWM Flood Flow Criteria for Watershed Area a. Present tabular comparisons of the Existing OPs, and Potential Future flows with Philips Engineering (2007) results. b. Confirm if the SWM Flood Flow Criteria presented in the Phillips Engineering (2007) Hydrology Update are applicable. If not, provide updated SWM Flood Flow Criteria for the 2 to100 year design storm events.

10 c. Complete a Regional Storm flow analysis and determine if Regional SWM controls are required, If so, develop SWM Flood Flow criteria Assess impacts to TRCA Flood Line Mapping for Watershed Area a. Review TRCA s Flood Line Mapping and HEC-RAS model and assess if any of the existing map sheets need to be updated based on Task b. Update all applicable map sheets for the Watershed Area as a result of the findings and detail the costs separately Hydrology Update Report for Watershed Area a. Prepare a standalone Hydrology Update Report to the Town of Ajax and TRCA documenting Tasks to with recommendations and policies for the Watershed Area Review Existing Hydraulic Model of Flood Remediation Area a. Review and comment on R.J. Burnside & Associates Limited Toronto Region and Conservation Authority, Summary Report for Digital Floodplain Mapping Carruthers Creek Spill Analysis, December b. Based on Task 4.8.3, if required, update existing hydraulic model and floodplain mapping for the Flood Remediation Area. c. Characterize flood plain conditions within the Flood Remediation Area, including identification of structures within the flood plain, flood plain depth assessment, and identify flooding conditions (i.e. return period, Regional Event). d. Identify policies and criteria to be applied to existing, new development and redevelopment in the Flood Remediation Area to help achieve TRCA flood plain management objectives Develop an Emergency Preparedness Plan for the Flood Remediation Area, Specific to Flooding Hazards a. Identify emergency ingress/egress points into and out of the Flood Remediation Area. b. Emergency assess points should conform to Ministry of Natural Resources Hazard Guidelines, specifically relating to flood hazards. c. Identify/recommend roles and responsibilities within the Flood Remediation Area at the local and regional municipal level. d. Provide an Emergency Response Plan incorporating a, b and c above.

11 4.8.7 Identify and prepare a Flood Remediation and Capital Works Plan/Report with solution(s) to Mitigate Flooding in the Flood Remediation Area a. Provide the necessary expertise for flood management and remediation to serve the best interests of the public, with due consideration for environmental concerns, capital cost(s) and operating efficiencies in accordance with current state of the art and acceptable engineering standards established by the Town and other applicable regulatory agencies; b. Identify any adverse environmental impacts affecting private or public lands and recommend mitigation/remediation measures; c. If necessary, identify any land or easement(s), permanent and working, necessary to implement the preferred flood management strategy. Conduct a title search to identify adjacent property owners. Assist in negotiations of permission to enter private lands for construction purposes, easements and purchases by providing technical information for use by the Town. Prepare Registered Plans (R-Plans) if required. d. Provide proposed solution(s) for the Flood Remediation Area in accordance with all applicable design standards and criteria including but not limited to: Town of Ajax; Region of Durham; Ministry of Natural Resources; Ministry of Environment; and Toronto & Region Conservation Authority. e. Prepare a geotechnical report if required in support of the proposed solutions. f. Prepare a tree inventory plan of trees that maybe required to be removed to accommodate the preferred solution(s). g. In coordination with Town and TRCA staff, develop a prioritized Implementation Plan with consideration to levels of mitigation/remediation versus cost for the proposed solutions. h. Provide an allowance to undertake a Stage 2 archaeological assessment, if required, to determine the presence of prehistoric and historic archaeological resources, and any implications for design and/or construction of the preferred solution(s). i. Review and update any environmental protection and mitigation measures outlined in the ESR requested by agencies and incorporate relevant provisions into the preliminary design. j. Prepare a Preliminary Design and Report for the Flood Remediation Area, documenting key assumptions, information sources, and design parameters used in preparing the design, and the rationale for any deviations from the

12 recommended values. following: The proposed design features should include the i. Stormwater and Flood design; ii. Impacts, if any to existing sewer systems; iii. Structures, flood diversion features and foundations; iv. Local drainage; v. Proposed and existing topography; vi. Utilities; vii. Property; viii. Maintenance requirements; ix. Landscaping; x. Construction issues, such as staging, new construction techniques, construction operations/sequence, contract sequencing, etc.; xi. Environmental protection and mitigation measures; and xii. Appendices containing supporting reports and other documentation (i.e. minutes and correspondence). k. Prepare quantity and cost estimates for the Preliminary Design and Report. l. Identify innovative funding mechanisms from various levels of government to implement the proposed solutions. m. Identify the necessary approval process for all proposed flood mitigation/ remediation infrastructure. Provide traceable and defensible analysis/data. n. Circulate and secure approvals of the final Preliminary Design Report from the Town and applicable regulatory agencies as required for approval. o. Provide existing utility location information, identify relocation requirements and related costs. As part of this task, the Proponent shall update the drawings with the location of all affected utilities. p. The Proponent shall provide presentations to Ajax Council, Committees of Council and Town s Environmental Advisory Committee at key milestones in the project and will provide Council with notice and information on the public meetings. The Proponent shall guide the public involvement in the process and at Community Meetings and PICs in accordance with the Environmental Assessment Act and will be responsible for arranging the advertisement of public notices, circulation to interested parties, and meeting coordination. q. Public Meetings. The Proponent will prepare the public notice, lead the presentations and direct public meetings along with providing all the necessary presentations and circulation documents and addressing any questions or concerns from the public. r. The successful Proponent will prepare status reports and update the project schedules monthly.

13 s. Develop concept designs, showing principal features for the preferred flood remediation strategy. t. Prepare a Hydraulic Assessment ensuring that the preferred solution(s) will have no adverse impacts to New Regional Flood lines in the area. TRCA modeling (HEC-RAS) and associated flood line mapping are to be used in the analysis. u. Assess internal drainage to ensure localized flooding within flood remediated lands does not occur. v. Prepare a Fluvial Assessment of Carruthers Creek by a qualified fluvial geomorphologist for the preferred solution(s). w. If the preferred solution(s) strategy includes works associated with the Shoal Point Road bridge, the Consultant shall prepare a preliminary design of the Shoal Point Road bridge and approaches. The preliminary design shall include: Bridge Assessment Report, for the existing bridge, proposed bridge, pedestrian bridge and phasing for installation. Determine the appropriate sizing to accommodate terrestrial wildlife passage and fluvial geomorphic process. Prepare concept drawings and cost estimates for the preferred solution(s). Conduct a cost-benefit analysis, including calculating costs incurred as a result of flooding to the area, to determine the most cost-effective scenario for the Town and TRCA to consider Complete a Municipal Class Environmental Assessment as outlined in 4.6 for the Flood Remediation Area.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON 22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:

More information

Thank you to all of our 2015 sponsors: Media Partner

Thank you to all of our 2015 sponsors: Media Partner Thank you to all of our 2015 sponsors: Media Partner Channel Naturalization: Planning and Implementation in Peel Region TRIECA March 25 & 26, 2015 Peel Region Channel Remediation Strategy An Urban Context

More information

Bowmanville Marsh Habitat Restoration and Public Access Project

Bowmanville Marsh Habitat Restoration and Public Access Project Bowmanville Marsh Habitat Restoration and Public Access Project Terms of Reference for Detailed and Conceptual Design Works December 2015 1.0 Background and Purpose The Bowmanville Marsh Habitat Restoration

More information

City of Pickering. Whitevale Master Drainage Plan Municipal Class Environmental Assessment Report

City of Pickering. Whitevale Master Drainage Plan Municipal Class Environmental Assessment Report City of Pickering Whitevale Master Drainage Plan Municipal Class Environmental Assessment Report Environment City of Pickering Whitevale Master Drainage Plan Municipal Class Environmental Assessment Report

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM

SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM SCHNEIDER CREEK REMEDIATION CLASS ENVIRONMENTAL ASSESSMENT ADDENDUM PUBLIC MEETING FEBRUARY 8 TH, 2012 The City of Kitchener and Grand River Conservation Authority (GRCA) are undertaking an Environmental

More information

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)

More information

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events

City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering

More information

Section 5 Floodplain Management Tools

Section 5 Floodplain Management Tools 5.1 Floodprone Areas One of the major elements of the Master Plan is the updated 100-year floodplain and floodway boundary maps. This information provided the most up-to-date tools to protect homes and

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

The answers to some of the following questions are separated into two major categories:

The answers to some of the following questions are separated into two major categories: Following the recent flooding events for Front Range communities in Colorado, property owners, communities, and the National Flood Insurance Program are being presented with some new challenges in the

More information

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices : A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it

More information

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES

City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES City of Edgewood REQUEST FOR QUALIFICATIONS 2016 ON-CALL CONSULTANT SERVICES I. PURPOSE OF REQUEST. The City of Edgewood is requesting statements of qualifications from professional consulting firms licensed

More information

Restoration Planning and Development of a Restoration Bank

Restoration Planning and Development of a Restoration Bank Restoration Planning and Development of a Restoration Bank Black Creek Pioneer Village, South Theatre 8:30 a.m. to 3:30 p.m. Habitat Restoration and Environmental Monitoring Projects Section Restoration

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC.

Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. BIBLIOGRAPHY Acres & Associated-July 1996, Scoping and Sensitivity Analysis on Flood Protection Options for West Don Lands Site, prepared for ORC. Acres Consulting Services Limited, March 1983, Keating

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and

Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Pioneer Park Stormwater Management Rehabilitation Project Town of Richmond Hill Engineering and Public Works Department Design, Construction and Water Resources Division Presentation Outline Background

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

How To Protect A Floodplain From Flooding

How To Protect A Floodplain From Flooding EXECUTIVE SUMMARY This Class Environmental Assessment (Class EA) was undertaken to examine alternative flood protection systems, and their environmental effects, for the elimination of the flood risk on

More information

FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT)

FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT) Bolton Special Policy Area (SPA) Study FLOOD RISK ASSESSMENT REPORT EXISTING CONDITIONS (DRAFT) June 213 Table of Contents 1. Introduction... 1 2. Purpose and Scope of the SPA Study... 3 2.1 Study Purpose...

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013

REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 REQUEST FOR PROPOSALS CENTRAL NEW YORK ECONOMIC DEVELOPMENT REAL ESTATE SITE PROFILE DATA BASE SYRACUSE, NEW YORK MARCH 25, 2013 CENTRAL NEW YORK REGIONAL PLANNING AND DEVELOPMENT BOARD 126 NORTH SALINA

More information

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study

K6- Report. Downtown Brampton Special Policy Area Comprehensive Flood Risk and Management Analysis and Downtown Etobicoke Creek Revitalization Study bramptonca BRAMPTON FlOWef City K6- Report Committee of Council Committee of the Council of The Corporation of the City of Brampton Date: March 25, 2013 COMMITTEE OF COUNCIL DATE: Apfi(3,2Qf3 File: P26SB

More information

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:

In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section: Click here to access definitions SECTION 12 FLOODPLAIN LANDS 12.1 INTERPRETATION In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM Guidance for Flood Risk Analysis and Mapping Changes Since Last FIRM May 2014 This guidance document supports effective and efficient implementation of flood risk analysis and mapping standards codified

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Burnt River Black River and Gull River Flood Contingency Plan

Burnt River Black River and Gull River Flood Contingency Plan Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project.

The purpose of this meeting is to inform the public of the updates to the project, and to get input before the finalization of the project. The purpose of this meeting is inform the public of the updates the project, and get input before the finalization of the project. The following panels describe the purpose and hisry of the project, along

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Preparing, Reviewing and Using Class Environmental Assessments in Ontario

Preparing, Reviewing and Using Class Environmental Assessments in Ontario Code of Practice Preparing, Reviewing and Using Class Environmental Assessments in Ontario Legislative Authority: Environmental Assessment Act, RSO 1990, chapter E.18 January 2014 This Code of Practice

More information

Website Design, Development and Support Services. Request for Proposal For The Corporation of the Town of Gore Bay

Website Design, Development and Support Services. Request for Proposal For The Corporation of the Town of Gore Bay Website Design, Development and Support Services Request for Proposal For The Corporation of the Town of Gore Bay Issue Date: November 10 th 2015 Closing: December 4 th 2015 1 PROJECT OVERVIEW You have

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool.

Please click on the tutorial most fitting of your expertise in order to learn about the features of the visualization tool. Introduction Welcome to the Indian Creek Conservation Reserve Program (CRP) visualization tool. This tool was developed by the University of Iowa - Institute for Hydroscience and Research (IIHR) as part

More information

Prepared by. Drew Davidge

Prepared by. Drew Davidge Flood Damage Estimation in the Upper Thames River Watershed CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions Project Report VII. August 2005 Prepared

More information

2015 -- H 6042 S T A T E O F R H O D E I S L A N D

2015 -- H 6042 S T A T E O F R H O D E I S L A N D LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO TOWNS AND CITIES -- RHODE ISLAND COMPREHENSIVE PLANNING AND LAND USE ACT Introduced

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Phases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby

Phases 2 & 3, & Addendum Urban Structure Plan Options for West Whitby 7. 5 A d v a n t a g e s a n d D i s a d v a n t a g e s Table 22 summarizes the advantages and disadvantages of each option based on the evaluation of Table 16. Dillon Consulting Limited Page 75 Table

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

West London Dyke Flood Control Structure Master Plan Appendix A

West London Dyke Flood Control Structure Master Plan Appendix A West London Dyke Flood Control Structure Master Plan Appendix A Introduction The West London Dyke runs along the west bank of the North Branch of the Thames River from Oxford Street to the forks of the

More information

PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM

PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER, COLORADO U.S. Army Corps of Engineers Omaha District Northwestern Division 1 PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER,

More information

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL

TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL INTRODUCTION The Town of Harrisburg is committed to establishing an interconnected, multimodal transportation system that increases mobility, safety, connectivity,

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

SITE PLAN APPROVAL PROCESS INTRODUCTION

SITE PLAN APPROVAL PROCESS INTRODUCTION SITE PLAN APPROVAL PROCESS INTRODUCTION File Manager System for Site Plan Approval Process Site Plan Control in the City of London The City of London utilizes site plan control to ensure high quality site

More information

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD July 2007 ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD POCKET GUIDE PIBS 6278e The Drinking Water Quality Management Standard (DWQMS) was developed in partnership between the Ministry of the Environment

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Functional Servicing and Storm Water Management Report PUBLIC WORKS TABLE OF CONTENTS 1. INTRODUCTION...1 2.

More information

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to:

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to: DUDLEY CREEK FLOOD REMEDIATION UPDATE Executive Leadership Team Member responsible: Officer responsible: Author: Director, Council Facilities and Infrastructure Unit Manager, Stormwater and Land Drainage

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Regional Wellness Needs Assessment Guidelines

Regional Wellness Needs Assessment Guidelines TRI-COUNCIL REGIONAL WELLNESS NEEDS ASSESSMENT Regional Wellness Needs Assessment Guidelines Vision Statement: Come for the work, stay for the lifestyle. Mission Statement: Support a culture of well-being

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Management of flooding downstream of dams

Management of flooding downstream of dams Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of

More information

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT

REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT REQUEST FOR PROPOSAL to provide ON-CALL ENVIRONMENTAL CONSULTING SERVICES for the RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar. 1 II. Introduction.. 2 III. Inquires.

More information

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

Presentation Program Outline

Presentation Program Outline Presentation Program Outline IRWM Program Background San Diego IRWM Planning 2013 IRWM Update Integrated Flood Management Flood Management Planning Study IRWM Program Background What is IRWM? Collaborative

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Request for Proposal. Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA

Request for Proposal. Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA Request for Proposal Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA 1 Table of Contents: Section A: Project Scope... 3 Section B: Background...

More information

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study

TITLE: [Name of municipality] Storm Water Abatement Feasibility Study TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

4 SPADINA SUBWAY EXTENSION UPDATE

4 SPADINA SUBWAY EXTENSION UPDATE 4 SPADINA SUBWAY EXTENSION UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendations contained in the following report June 13, 2006, from the

More information

ELEMENT 4 - FUTURE LAND USE ELEMENT

ELEMENT 4 - FUTURE LAND USE ELEMENT ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible

More information

Integrated Restoration Prioritization

Integrated Restoration Prioritization Integrated Restoration Prioritization Habitat Restoration and Environmental Monitoring Projects Section Restoration Services Division Definition Restoration Prioritization is a process of combining various

More information

Request for Proposal for Financial Advisor City of Milwaukee, Wisconsin Water Works

Request for Proposal for Financial Advisor City of Milwaukee, Wisconsin Water Works Request for Proposal for Financial Advisor City of Milwaukee, Wisconsin Water Works I. Summary The City of Milwaukee (City) seeks to engage a Financial Advisor to assist the City in selecting a Sell Side

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

HOUSE BILL 987. Read and Examined by Proofreaders: Sealed with the Great Seal and presented to the Governor, for his approval this

HOUSE BILL 987. Read and Examined by Proofreaders: Sealed with the Great Seal and presented to the Governor, for his approval this M HOUSE BILL (lr) ENROLLED BILL Environmental Matters/Education, Health, and Environmental Affairs Introduced by Delegates Hucker, Bobo, Carr, Frush, Gilchrist, Glenn, Gutierrez, Holmes, Kramer, Lafferty,

More information

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. PUBLIC COMMENT ON THE COUNTY LAND USE CODE D. PUBLIC

More information

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL OCTOBER, 2013 TABLE OF CONTENTS 1. CHECKLIST PAGE NO. 2. CHECKLIST DETAILS A. Design Path 3 B. Property Acquisition 6 C. Outside

More information

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria Memorandum TO: FROM: Michael Bergstrom and Robin Cole City of Bellevue Nancy Bird, AICP EDAW, Inc. DATE: July 23, 2008 RE: Technical Memorandum No. 1: Environmental Approach and Decision Making Criteria

More information

Class Environmental Assessment for Remedial Flood and Erosion Control Projects

Class Environmental Assessment for Remedial Flood and Erosion Control Projects Class Environmental Assessment for Remedial Flood and Erosion Control Projects Conservation Ontario January 2002 Amended September 2009 Proposed Amendments December 2012 TABLE OF CONTENTS Order in

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Parkhill Road Sewage Pumping Station Class EA Study

Parkhill Road Sewage Pumping Station Class EA Study Parkhill Road Sewage Pumping Station Class EA Study Public Information Centre October 4, 2011 6:30 pm 8:30 pm Westmount Public School DRAWING ON EXPERIENCE BUILDING ON STRENGTH Sewage Pumping Station (SPS)

More information

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES Site Analysis Floyd Zimmerman, FASLA Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 Sensitive owners and designers understand that from the facility user s perspective,

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD

ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD September 2007 ONTARIO'S DRINKING WATER QUALITY MANAGEMENT STANDARD POCKET GUIDE PIBS 6278e The Drinking Water Quality Management Standard (DWQMS) was developed in partnership between the Ministry of the

More information

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing 11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT #19 MEMORANDUM COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT TO: SUBJECT: John C. Phillips, City Manager Downtown Riverfront Park Preliminary Design (Armory Park) REVISED Scope of Services Schreiber Anderson

More information