REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005

Size: px
Start display at page:

Download "REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005"

Transcription

1 REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United States Environmental Protection Agency Region IX, Order for Compliance CWA

2 CONTENTS INTRODUCTION... 1 Project Scope... 1 Project Background... 1 HOW THIS DOCUMENT IS ORGANIZED... 2 PURPOSE OF THE PROGRAM... 2 GOALS ESTABLISHED FOR THE PROGRAM... 3 REVISED SHORT-TERM AND LONG-TERM CURRENT PRACTICES FOR THE SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAMS... 3 Short-Term Plan for Periodic Inspection and Assessment of Sewers and Maintenance Holes... 3 Long-Term Plan for Periodic Inspection and Assessment of Sewers and Maintenance Holes... 3 Short-Term Plan for Follow-up Procedures to Blockages... 3 Long-Term Plan for Follow-up Procedures to Blockages... 5 Short-Term Plan for Pipe Condition and Assessment... 5 Priority # Priority # Priority # Long-Term Plan for Pipe Condition and Assessment... 6 Short-Term Plan for Inspection Methods Used, Including Direct Visual Inspection and CCTV Inspection... 7 Long-Term Plan for Inspection Methods Used, Including Direct Visual Inspection and CCTV Inspection... 7 Short-Term Plan for Identifying the Inspection Schedule Including an Estimation of How Many Maintenance Holes and Miles of Pipe to be Inspected Each Year for the Next 5 Years... 8 Long-Term Plan for Identifying the Inspection Schedule Including an Estimation of How Many Maintenance Holes and Miles of Pipe to be Inspected Each Year for the Next 5 Years... 8 Short-Term System for Timely Evaluation of Inspection... 9 Long-Term System for Timely Evaluation of Inspection Results DOCUMENTATION EMERGENCY RESPONSE TO SEWER SPILLS STAFF TRAINING REQUIRED TO ENSURE PROPER IMPLEMENTATION PROGRAM QUALITY AND QUANTITY PERFORMANCE MEASURES RESOURCES REQUIRED TO IMPLEMENT THE PROGRAM... 13

3 PROGRAM FOR CONTINUING PROGRAM IMPROVEMENT IDENTIFY RESPONSIBLE PERSON OR ORGANIZATION UNIT SYSTEM PROGRAM AUDIT LIST OF ATTACHMENTS (REFERENCE DOCUMENTS) ATTACHMENT A ATTACHMENT B ATTACHMENT C ATTACHMENT D ATTACHMENT E ATTACHMENT F ATTACHMENT G ATTACHMENT H ATTACHMENT I ATTACHMENT J ATTACHMENT K ATTACHMENT L ATTACHMENT M EPA ADMINISTRATIVE ORDER IMPLEMENTATION PLAN FOR COMPLIANCE CAPO BEACH PRIORITY REPAIR LIST CAPO BEACH HOT SPOT CLEANING LOG CAPO BEACH HOT SPOT REPAIRS CCTV INSPECTION FORM DANA POINT HOT SPOT CLEANING LOG DANA POINT PRIORITY REPAIRS MAINTENANCE HOLE INSPECTION FORM OTHER REPAIRS LIST SEWER REHABILITATION PROGRAM SUMMARY SOUTH COAST HOT SPOT CLEANING LOG SOUTH COAST HOT SPOT REPAIRS

4 INTRODUCTION The South Coast Water District (SCWD) retained Brown and Caldwell (BC) to compile and organize the documents supporting its existing Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Programs into a Summary Report. The purpose of this report is to present the existing program, support documents and long-term plans for continued regulatory compliance. The summary found in this report is consistent with the requirements identified in the United States Environmental Protection Agency (EPA) Region IX, Order for Compliance CWA Additionally, SCWD s Revised Short-Term and Long-Term Strategies for Sewer Pipe Inspection and Condition Assessment, which was developed by BC in accordance with the Implementation Plan for Compliance, and submitted to the EPA on February 10, 2004, is also presented. Project Scope This summary report provides a brief synopsis of the program, defines the purpose of the program and identifies the person in SCWD responsible for the program components. The Sewer Pipe Inspection and Condition Assessment Program include eleven specific components, including: I. Purpose of the Program II. Goals Established for the Program III. Revised Short-Term and Long-Term Practices for the Sewer Pipe Inspection and Sewer Condition Assessment Programs IV. Documentation that Supports the Program (SOPs, Ordinance, etc.) V. Emergency Response to Sewer Spills VI. Staff Training Required to Ensure Proper Implementation VII. Program Quality and Quantity Performance Measures VIII. Resources Required to Implement the Program IX. Program for Continuing Program Improvement X. Identify Responsible Person or Organizational Unit XI. System Program Audit Project Background SCWD provides water and sewer service to approximately 40,000 residents in the communities of Dana Point, South Laguna Beach, north coastal San Clemente, and a portion of San Juan Capistrano. Its wastewater collection system collects and conveys four (4) million gallons a day (mgd) of wastewater from residences and businesses to two treatment plants via a 136-mile system of pipelines, which includes 14 lift stations and 3 miles of force mains. SCWD is permitted as a satellite wastewater collection agency to collect and convey wastewater for treatment to the South Orange County Wastewater Authority under a National Pollution Discharge Elimination Permit issued by the San Diego Regional Water Quality Control Board (RWQCB). The RWQCB is authorized to enforce the Federal Clean Water Act (CWA) in south Orange County and the western portions of San Diego and Riverside counties.

5 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 2 EPA issued a Finding of Violation and Order for Compliance (Order) on September 30, The Order requires that the SCWD take aggressive measures to reduce the number of sewage spills from its collection system. The Order establishes five plans that must be prepared by SCWD. On February 10, 2004, SCWD submitted an Implementation Plan for Compliance with EPA Order CWA during a meeting with EPA in San Francisco. The document requested that EPA accept the revised implementation plan and that the timelines contained in the EPA Order be modified accordingly. On February 28, 2004, EPA notified SCWD that the revised deadlines contained in the Implementation Plan for Compliance with EPA Order CWA were acceptable. HOW THIS DOCUMENT IS ORGANIZED A summary of SCWD s programs is presented in the following sections, which are organized in accordance with the 11 components enumerated above. These programs, processes and procedures are described in detail in a variety of documents prepared by SCWD. It is not SCWD s intent, nor is it practical to include detailed documents containing thousands of pages in this summary. Instead, for each component, the purpose, goals, and documentation are referred to and the actual reference documents are presented as electronic links. In the reference documents section, document titles that appear as blue text and are underlined have been electronically attached to this summary document. The attached documents can be assessed by using the control key (Ctrl) and clicking on the title. REFERENCE DOCUMENTS (LINKS TO ELECTRONIC DOCUMENTS) EPA Administrative Order.pdf Implementation Plan for Compliance.pdf Strategic Plan.pdf PURPOSE OF THE PROGRAM The purpose of the sewer pipe inspection and condition assessment program is to ensure that the gravity lines within the wastewater collection system gravity lines are maintained in a manner that achieves SCWD s established customer service, regulatory compliance, asset management and work management strategic goals.

6 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 3 GOALS ESTABLISHED FOR THE PROGRAM The overall goals of the sewer pipe inspection and condition assessment programs are as follows: Protect public health and the environment through prevention of sanitary sewer overflows and by meeting water quality standards; Periodically inspect below grade sanitary collection system assets following hot spot cleaning and post construction requirements; Evaluate structural defects in accordance with a set defect criteria; and Add defective assets immediately to the sewer rehabilitation funding mechanism for necessary repairs. REVISED SHORT-TERM AND LONG-TERM CURRENT PRACTICES FOR THE SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM Short-Term Plan for Periodic Inspection and Assessment of Sewers and Maintenance Holes SCWD conducts periodic inspection and assessment of the sewers and maintenance holes (MHs) as part of its system-wide preventive maintenance program. Daily logs and monthly logs are completed identifying the linear footage of hot spots cleaned, pipelines CCTV d and the number of manholes inspected. Long-Term Plan for Periodic Inspection and Assessment of Sewers and Maintenance Holes As discussed in the Long Term Plan for Pipe Condition and Assessment, SCWD will establish an information-based cleaning program that will include periodic inspection and assessment of the sewers and MHs. Long-Term Strategy: Implement condition rating system as identified in the Pipe Condition and Assessment Program. Short-Term Plan for Follow-up Procedures to Blockages All personnel are required to have a copy of the Sanitary Sewer Overflow Prevention Plan (SSOPP) and Sanitary Sewer Overflow Response Plan (SSORP) in the SCWD vehicle at all times. All sanitary personnel participate in periodic SSOPP/SSORP training and review sessions, and personnel are required to sign and initial the document to acknowledge their understanding of the

7 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 4 SSOPP/SSORP. The SSOPP/SSORP are living documents, which are referenced and crosschecked for completeness, reviewed on a regular basis and updated as needed. The documents are also reviewed after each sanitary sewer overflow (SSO) event. The SSOPP/SSORP was last updated in June 2004, at which time copies were provided to the San Diego Regional Water Quality Control Board (RWQCB) (Region IX) in compliance with Regional Board Order Review and revisions to the SSOPP/ SSORP will be made as needed; however, formal review of the documents will be completed on a bi-annual basis. The typical sequence of activities to be followed by maintenance crews when responding to blockages is to evaluate, remediate, mitigate and report (see Emergency Response to Sewer Spill). In addition, CCTV is frequently used in collection system lines to assist in establishing the cause of failure and determining the required repair. The repair occurs the same day as the overflow (unless there are extenuating circumstances). All overflow incidents are reported to the Regional Board (Region IX) regulatory agency as described in the SSOPP/SSORP. If a spill is estimated to be greater than 1000-gallons or the SSO reaches Waters of the U.S. the following SSO report information and documentation are provide to the RWQCB. 1. Final SSO Report (as established by the RWQCB) 2. Preliminary SSO Report 3. SSO Debriefing Team Meeting Memorandum 4. Photographs of SSO 5. Sewer Line Maintenance History 6. Location Map 7. Orange county Department of Health Services SSO Notifications 8. Ocean Water Test Sample Results Follow up procedures regarding sewer lateral are investigated by SCWD. According to SCWD s Ordinance No. 197, Article 8, Section The lateral service connection shall be maintained in good condition free of grease, roots, and other obstructions in accordance with District Ordinance 190; and the maintenance of the lateral is the responsibility of the owner of the property from the structure to the mainline in the street owned by the District, including the saddle or actual point of connection to the mainline. SCWD utilizes CCTV to inspect the sewer main upstream and downstream of the sewer lateral connection to identify whether SCWD s main pipeline is or is not responsible for problems regarding the private sewer lateral. Response procedures for SSOs from private sewer laterals are to evaluate, remediate, mitigate, and report. The procedures are the same for SSOs caused by private sewer laterals as they are for the SCWD collection system.

8 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 5 Long-Term Plan for Follow-up Procedures to Blockages SCWD will continue to implement the follow-up procedures identified in the short-term plan or as required by the SSORP and the regulatory agencies. As part of the long-term plan, information regarding a spill and location of the spill will be incorporated into the future CMMS program. This will assist with creating specific work orders to provide the required 0preventative maintenance at the specific pipe segments where the spill occurred. Long-Term Strategy: Continue existing methods for Follow-up Procedures to Blockage Short-Term Plan for Pipe Condition and Assessment SCWD completed a video survey in April 2004 of all gravity sewer lines in the Capistrano Beach service area, Dana Point service area, and the South Coast service area. As a result of the video survey, a list of necessary repairs were developed and separated into priority one, two and three projects, with priority one being the most urgent. The ranking of repairs was developed based on review and analysis of the video survey and is organized by sewer run (from manhole to manhole). The video survey uses a defect rating system to assist in the analysis. The rating system includes a severity index that assigns numerical values to every defect that occurs in sewer lines according to the level of damage, obstruction or infiltration to the pipe. Defect scores range from 0 to 1000; with 0 meaning no damage and 1000 meaning pipe section has collapsed. After analyzing the defects in a particular sewer run, staff classifies the run into one of the three levels of urgency as mentioned above. The criteria for each priority classification are as follows. Priority #1: Repairs that need to be completed within the next one to six months. 1. Line is broken, missing sections, severed, and/or ready to collapse. Lines in this priority usually contain defects that score over 400 on the severity index. Typical defects and scores include: Broken Pipe (500), Hole in Pipe (500), Separated Joint, Severe (475), and Offset Joint, Severe (425). 2. Lines whose level of damage falls on the borderline between priority 1 and 2 remain priority 1 if their flows are greater than half full under peak flow conditions. Priority #2: Repairs that need to be completed within the next 6 to 12 months. 1. Line is damaged but still functioning and contains cracks and moderate offsets and separations. Lines in this priority usually contain defects that score between 350 and 400 on the severity index. Typical defects and scores include: Multiple Cracks at Joint (360); Separated Joint, Medium (350); and Offset Joint, Medium (350).

9 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 6 2. Lines whose level of damage falls on the borderline between priority 1 and 2 remain priority 2 if their flows are less than half full under peak flow conditions. Priority #3: Repairs that need to be completed within the next 12 to24 months. 1. Line has smaller cracks/minor separations/offsets/differing materials, and minor to moderate defects that will continue to deteriorate. This line should be monitored on a regular basis. Lines in this priority usually contain defects that score below 350. Typical defects and scores include: Circumferential Crack (350), Longitudinal Crack (350), Offset Joint, Slight (250), and Sags (233). SCWD has completed all Priority 1 repairs for the entire system. Priority 2 repairs have been completed for Capo Beach and Dana Point service areas. Priority 3 repairs will begin in September/ October for the Capo Beach service area. SCWD is currently working on completing the Priority 3 repairs identified. SCWD s current strategy for identifying repairs is to identify additional repairs through in-house regular CCTV inspections, annual cleaning, and on-going inspection of current hot spot locations. Priority repairs or pipe segments requiring repair or rehabilitation are placed on an Other Repair list. The pipe segments included on the Other Repair list are repaired, replaced, or rehabilitated within 6 months or sooner if the pipe presents a more critical danger of collapse. Long-Term Plan for Pipe Condition and Assessment SCWD s strategy is to establish a condition rating for all pipe segments throughout the system. SCWD s operation staff will be trained to assess each televised pipe segment using the newly developed ABCD rating system, described below. Inspection Frequency Cleaning Rating Condition (CCTV) Frequency A Good Every 5 years Every 3 years B Fair Every 2 years Every 2 years C Poor Annually Annually/ Biannual/ Quarterly D Failed Fix Immediately The goal is to reduce the potential for structural failure and to reduce the potential for blockages caused by failed pipe material falling in the flow path. The rating system will become an integral part of the development of maintenance schedules and the need for repair, replacements and rehabilitation. The rating system will incorporate the current Priority 1, 2, and 3 ranking procedure with its newly developed A, B, C, D system. Those pipe segments determined by SCWD to be ranked as C and is a known hot spot location will remain on a quarterly cleaning cycle.

10 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 7 Schedule for Completing Long-Term Strategy: SCWD anticipates program training and implementation of CCTV operations staff to begin in Fiscal Year 2006/2007. Short-Term Plan for Inspection Methods Used, Including Direct Visual Inspection and CCTV Inspection SCWD budgeted $750,000 for CCTV inspection of the entire 136 miles of gravity sewer pipeline. The video inspections of the entire collection system are complete. This video inspection provides the baseline assessment of SCWD s collection system. SCWD owns and maintains its own 2001 Pearpoint video inspection equipment. This video equipment is used regularly to inspect repaired pipe segments, hot spot areas and new or potential trouble spots, to verify success of repairs, condition of pipelines and need for repairs. Generally, all repaired segments and hot spot areas are video inspected for verification prior to removal from quarterly tracking lists and placed on annual maintenance. System-wide CCTV for each of the service areas was contracted to an outside firm and was completed for all service areas in April SCWD will continue to use CCTV randomly and on an as-needed basis to inspect potential problem areas, verify pipe conditions, provide random quality control checks, and provide pipe assessments. As of April 2005, SCWD has inspected approximately 10% of the collection system (annual basis). Long-Term Plan for Inspection Methods Used, Including Direct Visual Inspection and CCTV Inspection SCWD will continue using the current video inspection method (CCTV) to update the assessment of the SCWD collection system, per the Long-Term Plan for Pipe Condition and Assessment. SCWD anticipates that approximately 15% to 20% of the collection system will be televised each year by in-house staff. SCWD plans to complete a CCTV reassessment goal for the collection system over a period of 5 to 6 years. SCWD plans to utilize the future CCTV video recording to assess pipe condition and incorporate a modified cleaning schedule based on the condition and rating of each pipe segment. The videobased assessment data will populate the future Computer Maintenance Management System (CMMS) and the Geographic Information System (GIS). This enables the use of an informationbased system for scheduling inspections. CCTV is an essential element to of the collection system assessment program. To maintain this capability, SCWD will replace and maintain CCTV equipment as required.

11 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 8 Schedule for Completing Long-Term Strategies: In-house training and implementation of CCTV of approximately 15% to 20% of the collection system with new rating system to begin in Fiscal Year 2006/2007. Short-Term Plan for Identifying the Inspection Schedule Including an Estimation of How Many Maintenance Holes and Miles of Pipe to be Inspected Each Year for the Next 5 Years The SCWD service area has approximately 136 miles of pipeline and 3,408 MHs. All maintenance holes are visually inspected during the annual system-wide cleaning program. The need for additional inspection and maintenance will be an information-based program established with the results of the CCTV inspection, grease management results, root management identification, and additional on-going annual maintenance and cleaning of the collection system. Long-Term Plan for Identifying the Inspection Schedule Including an Estimation of How Many Maintenance Holes and Miles of Pipe to be Inspected Each Year for the Next 5 Years The goal is to develop the GIS and a CMMS that becomes the basis of an asset management program. These tools would provide a method to estimate the quantity of maintenance holes and pipe lengths that must be inspected annually for the next 5-years. Geographic Information System (GIS) SCWD plans to phase the implementation of a comprehensive GIS system for its water, recycled water, and sewer systems. Several components are currently being implemented, including: Acquisition of the County of Orange s assessor parcel maps Conversion of the data for all sewer, water and recycled water assets, and performing the following tasks: i. Designing and developing databases for capturing key attributes of these systems; ii. iii. iv. Digitizing all water, recycled water, and sewer assets; Scanning all the SCWD As-Builts and linking them to the digitized infrastructure for easy retrieval and reference; and Developing a GIS application interface with overall management, query and reporting capabilities. Documentation of known easements with cross-reference information Installation and training

12 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 9 One of the key benefits of this program will be to help with the ongoing Operations & Maintenance (O&M) activities of these facilities. Implementing the GIS assists in managing the system s human and material resources as effectively as possible while achieving regulatory compliance and delivering a high level of service to customers. Other benefits include: Ensuring facilities and equipment availability; Maintaining equipment and facilities reliability; and Maintaining the value of the investment. SCWD has currently completed the GIS of the Capistrano Beach Service Area. Completion of the GIS for the Dana Point and South Coast Service areas is expected to be completed by December Computer Maintenance Service System (CMMS) SCWD recently had a kick-off meeting for the development of the CMMS. The RFP covers such areas as the selection and management of a CMMS vendor; development of the system implementation plan, provision of technical resources; assessment of current maintenance practices; establishment of industry best maintenance practices in association with SCWD staff and overall management and oversight of the CMMS implementation program from selection through to final delivery to SCWD. The primary function of the CMMS will be to enable SCWD to efficiently and cost-effectively manage system assets, equipment and facilities by minimizing long-term costs of owning, operating, maintaining and replacing SCWD assets while ensuring reliable and uninterrupted service. The CMMS will facilitate optimization of time/ labor resources required to operate, maintain and manage the infrastructure and facilities. Information provided by the CMMS are essential for assetbased maintenance activities and for supporting long-term business decisions. Implementation of the CMMS is anticipated to begin June Schedule for Completing Long-Term Strategies: Completion of GIS for the sewer system of Dana Point and South Coast Service areas is anticipated for December Implementation of CMMS is anticipated to begin June Evaluation of the implementation of asset management into the CMMS will be considered by January Short-Term System for Timely Evaluation of Inspection Results SCWD began CCTV of the entire collection system in October CCTV of the entire system was completed in April Initial results of the ongoing CCTV effort for the Capistrano Beach service area were received October SCWD initiated an immediate evaluation of CCTV results

13 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 10 by dedicating a full-time employee (see Identify Responsible Person or Organization Unit) and retained additional consulting assistance to complete the evaluation of the video survey. The results from all service areas were completed in April 2004 and it is anticipated that the complete evaluation will be completed by July Long-Term System for Timely Evaluation of Inspection Results SCWD will continue to dedicate a full-time employee to evaluate the internal video survey results. In addition, all CCTV crew members will be trained to evaluate each pipe segment, using the new method of Pipe Condition and Assessment described above. In addition, SCWD will utilize outside services to review and verify video survey results, as required. DOCUMENTATION SCWD conducts routine CCTV inspection of its gravity conveyance system following hot spot cleaning inspections, repairs, and replacements of pipe segments. CCTV inspection provides continuous inspection of up to 1,000 feet of pipe. CCTV is well suited for determining joint conditions, root intrusion, sources of infiltration, and locating structural deficiencies. Inspection documentation is made on inspection log forms, which are reviewed by the Sanitary Collection Supervisor or Senior O&M personnel and are supplemented with videotape. The TV Inspection Form provides a detailed logging of defects encountered during the inspection. Maintenance holes (MHs) inspections are completed during the annual sewer system cleaning. MH inspections include visual inspections of the surface, rungs, structural defects, indication of roots, insects, debris buildup, cover, and odor. Inspections of MHs are documented on the Manhole Inspection Form. In addition, SCWD has established a priority ranking of repairs (discussed in Current Practices). Based on the ranking, the rehabilitation and replacement have been prioritized for completion within the next 1 to 24 months. Lists of Priorities 1, 2, and 3 and Other Repairs have been developed for all service areas within South Coast Water District. Each list identifies the physical location, the CD number, upstream and downstream manholes, comments, length of repair, action taken and date completed. A summary of totals of Priority Repairs has also been developed. REFERENCE DOCUMENTS (LINKS TO ELECTRONIC DOCUMENTS) Capo Beach Hot Spot Cleaning Log.pdf Capo Beach Hot Spot Repairs.pdf Capo Beach Other Repairs Completed.pdf Capo Beach Priority-1.pdf

14 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 11 Capo Beach Priority-2.pdf Capo Beach Priority-3.pdf CCTV Inspection form.pdf Dana Point Hot Spot Cleaning Log.pdf Dana Point Hot Spot Repairs.pdf Dana Point Other Repairs Completed.pdf Dana Point Priority-1.pdf Dana Point Priority-2.pdf Dana Point Priority-3.pdf Maintenance Hole Inspection Form.pdf Sewer Rehabilitation Program Summary.pdf South Coast Hot Spot Cleaning Log.pdf South Coast Hot Spot Repairs.pdf South Coast Other Repairs Completed.pdf South Coast Priority-1.pdf South Coast Priority-2.pdf South Coast Priority-3.pdf EMERGENCY RESPONSE TO SEWER SPILLS Overflows may be detected by SCWD personnel or by the public. SCWD is responsible for receiving notification from the public of sanitary sewer overflows from the collection system, and for dispatching the on-call duty personnel. When a call is received, the responding crew completes the Sanitary Department Spill Procedures Check List. During regular business hours (7:30 AM-5:00 PM), the SCWD Collection System Department is able to respond within 30 minutes of the initial call. After regular business hours, the SCWD Collection System Department responds within 45 minutes. Once the collection system operations and maintenance crew is dispatched, the crews immediately check the manhole downstream of the location to verify whether the spill is associated with the main sewer pipeline or the service lateral. In either instance, the main sewer pipeline is hydro flushed to clear any blockages. If it is determined that the spill is being caused by a service lateral, the water service to the service lateral location is immediately turned off to prevent further overflow. If an overflow has occurred, personnel initiate spill containment and control, take necessary photographs, and complete the necessary spill procedures and reporting identified in the SSORP.

15 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 12 REFERENCE DOCUMENTS (LINKS TO ELECTRONIC DOCUMENTS) Emergency Spill Procedure Check List.pdf RWQCB SSO Report Form.pdf SOP - Emergency Response.pdf SSOPP AND SSORP.pdf STAFF TRAINING REQUIRED TO ENSURE PROPER IMPLEMENTATION The SCWD Sanitary Department ensures that operations and maintenance staff have the skills, knowledge and abilities required to correctly undertake the work that they are assigned. Goals established in the Strategic Plan are to: Promote an efficient and productive workforce, and Attract and retain a skilled workforce. Supervisors conduct weekly safety meetings with SCWD personnel. In addition, annual training is provided to the collection system staff. Personnel are certified through outside organizations and seminars in varying fields, which include: CWEA Collection System Certification CPR and First Aid Training Confined Space Entry Certification Fall Protection Training Heavy Equipment Training Sexual Harassment Training Defensive Driving Seminar Traffic Control and Flagger Seminar (every 2 years) Back Safe Program (every 2 years) Sanitary Operations personnel attend several training sessions for the Pearpoint equipment, which include: Five-day training, operations and safety seminar for the CCTV camera; One-day training with the Flexi-data computer program for the CCTV camera; and Five-day training and certification program on the camera and program.

16 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 13 Two operations personnel have been sent through the NASSCO Pipeline Assessment Certification Program. Additionally, the collection system personnel are required to carry the SSOPP and SSORP in the District vehicle. Refresher training on both the SSOPP and the SSORP is required and conducted periodically or whenever the documents are modified or updated. REFERENCE DOCUMENTS (LINKS TO ELECTRONIC DOCUMENTS) NASSCO Pipeline Assessment Program.pdf SSOPP AND SSORP.pdf PROGRAM QUALITY AND QUANTITY PERFORMANCE MEASURES NASSCO Certified personnel complete in-house condition assessments. Prioritizations of the defective pipe segments are determined by the specified scoring of defects (see Pipe Condition and Assessment). SCWD calibrates the remote-reading footage counter every six months to ensure measured distances and to minimize percent error. CCTV inspections conducted post-installation of spot repairs and pipe segments by outside contractors and in-house personnel are completed to determine if the installation was completed per contract documents and all-laterals are re-established, as required. Pipe defects identified are brought to a supervisor s attention at the end of the workday. Additionally, joint testing is used to test the integrity (tightness or leakage) of individual pipe joints. Testing is performed by applying a pre-determined pressure to the entire circumference of chosen pipe joints. A joint passes the test if it can hold the required pressure, otherwise the joint fails the test and the joint is sealed with grout. RESOURCES REQUIRED TO IMPLEMENT THE PROGRAM The complete inspection of the wastewater collection system was contracted through an outside contractor. One contract person and one SCWD staff member are completing analysis and prioritization of the video inspection. SCWD owns and operates one truck that contains Pearpoint camera, service lateral camera attachment, and all associated computer program equipment. Typically, the truck requires two staff members to operate. Three people are required for heavy traffic areas. The truck is fully equipped with required traffic control equipment, 1000-feet of cable, camera, VHS recording equipment,

17 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 14 television, and program equipment. The TV inspection form is an electronic form that is complete for each line segment following the completion of CCTV. The form is generated with the defects identified during the inspection. The CCTV truck has been sufficient in completing the quarterly hot spot inspections, contractor pipeline replacement projects, on-going collection system reviews and as-needed emergency inspections established by SCWD. PROGRAM FOR CONTINUING PROGRAM IMPROVEMENT SCWD includes in the annual budget and sends personnel to CMOM conferences and other collection system educational conferences. New technology or methods obtained from the conferences are discussed with senior staff to determine whether the information obtained would be beneficial to the existing programs. All modifications are discussed with all personnel at weekly staff meetings. Pearpoint sends periodic updates for existing camera equipment. Senior personnel review all product updates to determine whether updates should be implemented into SCWD s programs. SCWD reviews the success and effectiveness of the programs and redoes the SOPs as necessary and this is documented in the notes of the meetings. IDENTIFY RESPONSIBLE PERSON OR ORGANIZATION UNIT The Sanitary Collection Department consists of one supervisor, three Senior Operation and Maintenance (O&M) personnel, one Mechanic, two O&M II, and six O&M I, as shown on the organization chart. Crews are assigned to specific work duties, including lift station O & M, pipeline cleaning and pipeline video activity.

18 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 15 In addition, Tom Richards (Special Projects) has been dedicated to the CCTV Assessment of the SCWD Collection System. Job descriptions for all personnel in the Sanitary Collection Department have been identified in the SSOPP and SSORP. Each description includes: Definition, Distinguishing Characteristics, Supervision Received and Exercised, Examples of Duties, Qualifications, and Experience and Training Guidelines. REFERENCE DOCUMENTS (LINKS TO ELECTRONIC DOCUMENTS) SSOPP AND SSORP.pdf

19 Revised Short-Term and Long-Term Sewer Pipe Inspection and Condition Assessment Program 16 SYSTEM PROGRAM AUDIT SCWD plans to audit the Sewer Pipe Inspection and Condition Assessment Programs on a two-year basis. The audits will be a formalized review process of the purpose, goals, procedures, documentation, and required training presented in this summary. The audit will determine the effectiveness of the existing programs and the need to improve or update as required by existing equipment and the advancement of technology. SCWD s long-term strategy is to develop a condition rating for all pipe segments throughout the system. The goal of the rating system is to identify the need for future sewer system pipe inspections and condition assessments.

20 ATTACHMENT A EPA ADMINISTRATIVE ORDER

21 ATTACHMENT B IMPLEMENTATION PLAN FOR COMPLIANCE

22 ATTACHMENT C CAPO BEACH PRIORITY REPAIR LIST

23 ATTACHMENT D CAPO BEACH HOT SPOT CLEANING LOG

24 ATTACHMENT E HOT SPOT REPAIRS

25 ATTACHMENT F CCTV INSPECTION FORM

26 ATTACHMENT G DANA POINT HOT SPOT CLEANING LOG

27 ATTACHMENT H DANA POINT PRIORITY REPAIRS

28 ATTACHMENT I MAINTENANCE HOLE INSPECTION FORM

29 ATTACHMENT J OTHER REPAIRS LIST

30 ATTACHMENT K SEWER REHABILITATION PROGRAM SUMMARY

31 ATTACHMENT L SOUTH COAST HOT SPOT CLEANING LOG

32 ATTACHMENT M SOUTH COAST HOT SPOT REPAIRS

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing CCTV INSPECTION OF SEWER LINES PART 1 GENERAL 1.1 SECTION INCLUDES A. CCTV Inspections 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02731 Sanitary Gravity Sewer Line Testing

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan and Condition Assessment Plan 4.1 Introduction 4.1.1 Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding

More information

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0

More information

Sewer System Management Plan (SSMP) Development Guide

Sewer System Management Plan (SSMP) Development Guide J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Utilizing CCTV equipment, equipment use training, NASSCO PACP defect coding, and infrastructure program management software

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements

More information

City of Los Altos Sewer System Management Plan

City of Los Altos Sewer System Management Plan City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,

More information

SEWER SYSTEM MANAGEMENT PLAN

SEWER SYSTEM MANAGEMENT PLAN EL TORO WATER DISTRICT SEWER SYSTEM MANAGEMENT PLAN STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ OCTOBER 2014 TABLE

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

SAWS SSO Reduction Program

SAWS SSO Reduction Program SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN

Element 3: OVERFLOW EMERGENCY RESPONSE PLAN Element 3: OVERFLOW EMERGENCY RESPONSE PLAN The section of the SSMP discusses the City s overflow emergency response plan, which is included in full in Appendix B. This section fulfills the Overflow Emergency

More information

Sanitary Sewer Smoke Testing

Sanitary Sewer Smoke Testing Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

ORDINANCE NO. 15 BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY: ORDINANCE NO. 15 Amending Chapter 60 of the Code of Ordinances of Kansas City, Missouri, entitled Sewers and Sewage Disposal by adding Sections 60-349 through 60-360; and establishing an effective date.

More information

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES Adopted by Resolution No. 2012-132 Dated December 18, 2012 1 TABLE OF CONTENTS PURPOSE... 3 I. WHEN INSPECTION IS REQUIRED (PMC 13.20.050, 13.20.060,

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

Sanitary District No.5 of Marin County SSMP

Sanitary District No.5 of Marin County SSMP 2014 Sanitary District No.5 of Marin County SSMP Tony Rubio Sanitary District No.5 of Marin County 6/1/2014 INTRODUCTION...7 SSMP Requirement Background...7 Document Organization...7 District Service Area

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

Addressing SSOs in Austin, Texas: Initial Call to Final Fix

Addressing SSOs in Austin, Texas: Initial Call to Final Fix Addressing SSOs in Austin, Texas: Initial Call to Final Fix Gopal K. Guthikonda, P.E., Barbara L. Wilde, Steven W. Schrader, P.E., and Rajendra P. Bhattarai, P.E. Austin Water Utility City of Austin 2600

More information

Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM

Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.

More information

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations

FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations FWEA Utility Council Sanitary Sewer Overflow (SSO) Enforcement Policy Recommendations Purpose and Objective The FWEA Utility Council formed the SSO Sub-Workgroup to provide a venue to discuss the increase

More information

CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN

CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN CITY OF CORONADO SEWER SYSTEM MANAGEMENT PLAN June 2009 Prepared For: The City of Coronado Public Services 101 B Avenue Coronado, California 92118 Prepared By: 9275 Sky Park Court, Suite 200 San Diego,

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE CITY OF CLAYTON SEWER SYSTEM MANAGEMENT PLAN (SSMP) PROPOSALS MUST BE RECEIVED BY: FRIDAY, 01/17/2014 AT 4:00 PM SSMP Request for Proposal Released 12/18/2013

More information

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment WATER AND SEWER UTILITY OPERATION AND MAINTENANCE Although sewage systems the operation and maintenance of public utilities are not considered themselves are not a chronic sources of stormwater pollution,

More information

Unauthorized Discharges and Sanitary Sewer Overflows

Unauthorized Discharges and Sanitary Sewer Overflows TCEQ REGULATORY GUIDANCE Field Operations Support Division RG-395 Revised April 2011 Unauthorized Discharges and Sanitary Sewer Overflows What does this document cover? The Texas Commission on Environmental

More information

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011 MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City

More information

Number 2014-20 September 2014 SEWER LIABILITY

Number 2014-20 September 2014 SEWER LIABILITY Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the

More information

Sewer System Management Plan (SSMP)

Sewer System Management Plan (SSMP) Sewer System Management Plan (SSMP) City of Santa Ana Water Resources Division 4/10/2014 Prepared Under the Supervision of: Nabil Saba, P.E. Water Resources Manager Table of Contents/Definitions/Abbreviations

More information

COLLECTION SYSTEM SETTLEMENT AGREEMENT

COLLECTION SYSTEM SETTLEMENT AGREEMENT COLLECTION SYSTEM SETTLEMENT AGREEMENT Wastewater Collection System Rehabilitation and Replacement Report and Plan A deliverable of the Settlement Agreement and Final Order between the city of Los Angeles

More information

Section 2651 Television Inspection

Section 2651 Television Inspection Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection

More information

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title: READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions

More information

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN

Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN Sanitary Sewer Overflow Response Plan Working Committee SANITARY SEWER OVERFLOW RESPONSE PLAN I. PURPOSE The Municipality / Authority has structured this Sanitary Sewer Overflow Response Plan to satisfy

More information

Gravity Line Preventative Maintenance Program

Gravity Line Preventative Maintenance Program Gravity Line Preventative Maintenance Program Lexington-Fayette Urban County Government Department of Environmental Quality Division of Water Quality December 2011 Gravity Line Preventative Maintenance

More information

Sanitary Sewer Management Plan

Sanitary Sewer Management Plan Ramona Municipal Water District Sanitary Sewer Management Plan Revised July 14, 2009 Prepared by: Alice Benson Wastewater Operations Manager Jon Miller Wastewater Collection Supervisor Table of Contents

More information

Sewer System Management Plan SSMP

Sewer System Management Plan SSMP Sewer System Management Plan SSMP Revised August 2014 Originated July 2009 TABLE OF CONTENTS Introduction... 1 System Description... 1 Document Organization... 1 Goal... 3 Organization... 4 Authorized

More information

Honorable Mayor and Members of the City Council

Honorable Mayor and Members of the City Council Office of the City Manager CONSENT CALENDAR July 19, 2011 To: From: Honorable Mayor and Members of the City Council Phil Kamlarz, City Manager Submitted by: Andrew Clough, Acting Director, Public Works

More information

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates Private Sewer Lateral Inspection and Repair Program SEWER SYSTEM- BACKGROUND 116 miles of gravity sanitary sewer pipelines 1 mile of force main

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

Honorable Mayor and Members of the City Council

Honorable Mayor and Members of the City Council Office of the City Manager CONSENT CALENDAR December 13, 2011 To: From: Honorable Mayor and Members of the City Council Christine Daniel, Interim City Manager Submitted by: Andrew Clough, Director, Public

More information

Irvine Ranch Water District Sewer System Management Plan June 2013

Irvine Ranch Water District Sewer System Management Plan June 2013 Irvine Ranch Water District Sewer System Management Plan June 2013 Preparation Supported By: Table of Contents Chapter 1 Introduction... 1-1 1.1 Organization of SSMP... 1-1 1.2 System Overview... 1-1 1.3

More information

Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005

Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005 Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005 1 of 30 Executive Summary Seattle Public Utilities (SPU) currently experiences an average of 80 mainline sanitary sewer

More information

Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers

Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers These guidelines outline inspection, reporting and acceptance requirements for newly constructed rigid and flexible

More information

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,

More information

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards

Work Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL

More information

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS

MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS MODEL WEB CONTENT FOR CITY SANITARY SEWER DEPARTMENTS The following information is designed to be used in conjunction with the Sewer Toolkit, located in the Wastewater section of the Florida Rural Water

More information

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High

More information

LEAD COLLECTION SYSTEMS WORKER

LEAD COLLECTION SYSTEMS WORKER LEAD COLLECTION SYSTEMS WORKER Class specifications are intended to present a descriptive list of the range of duties performed by employees in the class. Specifications are not intended to reflect all

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

SEWER SYSTEM MANAGEMENT PLAN

SEWER SYSTEM MANAGEMENT PLAN SEWER SYSTEM MANAGEMENT PLAN Prepared for San Bernardino Community College District February, 2010 SEWER SYSTEM MANAGEMENT PLAN Prepared for the San Bernardino Community College District Holmes International

More information

What the State of N.C. Wants You to Know About FOG: Permits, SSO Reporting and Other Requirements

What the State of N.C. Wants You to Know About FOG: Permits, SSO Reporting and Other Requirements What the State of N.C. Wants You to Know About FOG: Permits, SSO Reporting and Other Requirements Wednesday, December 12 th, 2012 Deborah Gore NC DENR PERCS Unit Supervisor Michael Leggett, PE NC DENR

More information

EAST BAY REGIONAL SEWER PROGRAM

EAST BAY REGIONAL SEWER PROGRAM EAST BAY REGIONAL PRIVATE SEWER LATERAL PROGRAM The East Bay Regional Private Sewer Lateral Program is a joint effort to protect San Francisco Bay. This guidebook explains the program and provides guidelines

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY

COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

SANITARY SEWER MANAGEMENT PLAN (SSMP)

SANITARY SEWER MANAGEMENT PLAN (SSMP) SANITARY SEWER MANAGEMENT PLAN (SSMP) CITY OF DEL MAR CALIFORNIA SANITARY SEWER MANAGEMENT PLAN (SSMP) David L. Scherer Public Works Director Tuesday, April 6, 2010 Date Signed Prepared in the PUBLIC WORKS

More information

Emergency Response Plan

Emergency Response Plan Emergency Response Plan Third revised version placed in the Public Document Repository on July 1, 2011 I certify under penalty of law that this document and all attachments were prepared under my direction

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

Sanitary Sewer Overflows Response to EPA Rule Making

Sanitary Sewer Overflows Response to EPA Rule Making Massachusetts Water Resources Authority Sanitary Sewer Overflows Response to EPA Rule Making October 15, 2010 MASSACHUSETTS WATER RESOURCES AUTHORITY SUMMARY OF EPA RULE MAKING SUMMARY OF MWRA, ADVISORY

More information

Phased Assessment Strategy for Sewers

Phased Assessment Strategy for Sewers Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure

More information

SECTION 7 UNDERDRAIN SERVICE

SECTION 7 UNDERDRAIN SERVICE SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations

More information

Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update

Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update Appendix 1 Statewide Sanitary Sewer Overflow Reduction Program Annual Compliance Update EXECUTIVE DIRECTOR S REPORT State Water Resources Control Board May 2010 1 TABLE OF CONTENTS 1. INTRODUCTION 3 2.

More information

City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue North Clearwater, FL 33760 Phone: (727) 518-3076

City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue North Clearwater, FL 33760 Phone: (727) 518-3076 POCTS # (To be assigned by City of Largo Environmental Control.) City of Largo Environmental Services Department Environmental Control Program 5100 150 th Avenue rth Clearwater, FL 33760 Phone: (727) 518-3076

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

GIS Applications for Regulatory Compliance

GIS Applications for Regulatory Compliance 4 GIS Applications for Regulatory Compliance Uzair (Sam) M. Shamsi Many cities in the world especially in the United States and Canada are dealing with regulatory enforcement actions for sewer overflows,

More information

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets *Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes

More information

BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT

BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT BOLINAS COMMUNITY PUBLIC UTILITY DISTRICT SEWER SYSTEM MANAGEMENT PLAN DEVELOPMENT PLAN AND SCHEDULE GOALS AND ORGANIZATION INTERIM DOCUMENT April 2008 TABLE OF CONTENTS List of Tables... 4 List of Figures...

More information

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,

More information

Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009)

Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009) Summary of Key Changes to Metro Water Services (MWS) Spill and Overflow Response Plan (2007 comparison to 2009) The following are examples of key additions and/or modifications of issues and practices

More information

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

Tim Schneller, P.E. GBA Engineers and Architects

Tim Schneller, P.E. GBA Engineers and Architects Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.

More information

South Tahoe Public Utility District Job Description

South Tahoe Public Utility District Job Description South Tahoe Public Utility District Job Description JOB TITLE: Underground Sewer Repair I & II UPDATED: 1/18/12 EFFECTIVE: 1/1/12 DEPT: Underground Sewer Repair APPROVED STPUD: NH APPROVED LOCAL 39: CS

More information

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014)

Office of Environment, Health and Safety (EH&S) - Sanitary Sewer Overflow Incident Form (rev. 12/2014) STEP 1 Immediately call EH&S at (510) 642-3073 with the following details of the incident: Name of First Responder Phone Number of First Responder Location of Spill Is the spill potentially greater than

More information

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION. and Civil Action No.

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION. and Civil Action No. UNITED STATES DISTRICT COURT WESTERN DISTRICT OF TEXAS SAN ANTONIO DIVISION UNITED STATES OF AMERICA, and Civil Action No. STATE OF TEXAS, Plaintiffs, v. SAN ANTONIO WATER SYSTEM, Defendant. CONSENT DECREE

More information

WCD believes the success of its CMOM program hinges on three important factors:

WCD believes the success of its CMOM program hinges on three important factors: Introduction Fairfax County Wastewater Collection Division (WCD) is using a capacity, management, operation and maintenance (CMOM) approach based on the EPA-recommended model to abate sanitary sewer overflows

More information

SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY

SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY SCOPE OF WORK SEWER LINE CLEANING FOR CITY OF THE OF HUNTINGTON BEACH PROPERTY A. General The City of Huntington Beach is an urban city with a population of 197,000 residents. It contains approximately

More information

Sanitary Sewer Management Plan (SSMP)

Sanitary Sewer Management Plan (SSMP) Sanitary Sewer Management Plan (SSMP) SALT LAKE CITY DEPARTMENT OF PUBLIC UTILITIES Table of Contents Preface 1 Goals... 3 Definitions and General Requirements.. 4 Part 1 Organization 6 1.1 SLCDPU Organization...

More information

Sanitary Sewer Overflow Report Form

Sanitary Sewer Overflow Report Form Preliminary report Final report Revised final report Sanitary Sewer Overflow Report Form Sanitary Sewer Overflow Sequential Tracking Number: Reported to: Sent Regional Board a fax Left Regional Board a

More information

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010 A. Purpose The purpose of this policy is to explain how and why sewer or stormwater backups occur, what to do in the event a homeowner

More information

EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs

EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs EPA Region 4 Introduction to Conducting Evaluations of Municipal Wastewater Collection System Management, Operation, and Maintenance Programs Version 1.0 PURPOSE & DISCLAIMER This document is the work

More information

Interactive Decision Tree Automates Sewer Rehabilitation Planning

Interactive Decision Tree Automates Sewer Rehabilitation Planning Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda

More information