1 Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV Leadership Group: Courts Justice Administration Department: Circuit Court Division: Court Business Project Sponsor: John Cooperrider Date Requested: 4/14/8 PM Customer No. 312 Request Type: New Development IT Team Name: Courts IT Team No: B Project Manager/Leader: Rick Perry Account Number: Account Description: Circuit Court System Customer Name: Circuit Court Grant Funded? No Mandate? No Mandate Source: Project Goal To make video conferencing available to each courtroom by use of a mobile video conferencing solution so that court proceedings can allow participation by parties in the case or witnesses via a video conference. Business Objective To make video conferencing technology available in courtrooms. Major Deliverables Install dedicated LAN connections in courtrooms. Mobile video conferencing unit Create process by which calls are requested and set up User training Approach - TBD Follow PMO standards and processes Design Changes Implement Changes Test changes Deploy to production Form Rev. 9/1/26 Page 1 Project Rev. 4/15/28

2 Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV Benefits See Return on Investment (ROI) Analysis Document Impact Number of Users Divisions Leadership Groups 25 Judges Court Business Courts Justice Administration Risk Business Environment Technical Environment Assumptions Staffing IT Staffing: resources will be available for the hours indicated per the attached project plan. Other Staffing: additional staffing will be available as follows: Role: Name Hours per Day Project Sponsor: John Cooperrider As needed Facilities Court house Technical Form Rev. 9/1/26 Page 2 Project Rev. 4/15/28

3 Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV Funding Information Technology Other Priority TBD Constraints Exclusions Form Rev. 9/1/26 Page 3 Project Rev. 4/15/28

4 Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV PROJECT PHASE AUTHORIZATION Phase(s): Total Estimated Application Services Hours: Cost: Total Estimated Technical Systems Hours: Cost: Total Estimated egovernment Services Hours: Cost: Total Estimated CLEMIS Hours: Cost: Total Estimated Internal Services Hours: Cost: IT Application Services Division Manager Approval: IT Technical Systems Division Manager Approval: IT egovernment Services Division Manager Approval: IT CLEMIS Division Manager Approval: IT Internal Services Division Manager Approval: IT Management Approval: Approved: Yes No Reason: Project Sponsor Approval: Title: PROJECT SUMMARY Authorized Development (see above) Hours: Cost: Preliminary Estimated Development for Future Phases Hours: Cost: Grand Total Estimated Development Hours: Cost: Form Rev. 9/1/26 Page 4 Project Rev. 4/15/28

5 Department of Information Technology Project Scope and Approach Project Name: Project ID: DB8312CV Customer Acceptance of Product: PROJECT COMPLETION AUTHORIZATION Title: Project Office Review: Form Rev. 9/1/26 Page 5 Project Rev. 4/15/28

6 As Of: April 14, 28 Description Year 1 Year 2 Project Summary Year 3 Year 4 Year 5 Year 6 Total Benefits/Savings: Tangible Benefits Subtotal: 6, 6, 6, 6, 6, 6, 36, Cost Avoidance Subtotal: Costs: Development Services Subtotal: Subtotal: Software Subtotal: Subtotal Training Subtotal: Other Subtotal: Annual Statistics: Annual Total Savings 6, 6, 6, 6, 6, 6, 36, Annual Total Costs Annual Return on Investment 6, 6, 6, 6, 6, 6, 36, Annual Costs/Savings Ratio.%.%.%.%.%.% Project Cumulative Statistics: Cumulative Total Savings 6, 12, 18, 24, 3, 36, 36, Cumulative Total Costs Cumulative Return on Investment 6, 12, 18, 24, 3, 36, 36, Cumulative Cost/Savings Ratio.%.%.%.%.%.%.% Year Positive Payback Achieved State or Federal Mandate? Signatures: NO PAYBACK Benefits Reviewed By Project Sponsor Costs (including IT Resources) Reviewed By Information Technology Project Manager Costs (including IT Resources) Reviewed By Technical Services Manager ROI.xls/Project Summary Date Printed: 4/17/28 Page 1 REV: April 14, 28

7 Savings Detail As Of: April 14, 28 Benefit/Savings Description Project Savings Category Budget Category/Funding Source Unit Desc Units Rate per Unit Total Savings Annual Multiplier Savings of at least $1 on approximately 1/3 of monthly MH cases Tangible Benefit ANN 6 1 6, ROI.xls/Savings Detail Date Printed: 4/17/28 Page 2 REV: April 14, 28

8 As Of: April 14, 28 Benefit/Savings Description Project Savings Category Savings Detail Affects Project ROI? Potential Savings Extensions Y1 Y2 Y3 Y4 Y5 Y6 Y1 Y2 Y3 Y4 Y5 Y6 Savings of at least $1 on approximately 1/3 of monthly MH cases Tangible Benefit x x x x x x 6,. 6,. 6,. 6,. 6,. 6,. ROI.xls/Savings Detail Date Printed: 4/17/28 Page 3 REV: April 14, 28

9 As Of: April 14, 28 Benefit/Savings Description Year 1 Year 2Savings Summary Year 3 Year 4 Year 5 Year 6 Total Tangible Benefit: Save Transport Cost on at least 5 cases per month 6, 6, 6, 6, 6, 6, 36, Tangible Benefits Subtotal: 6, 6, 6, 6, 6, 6, 36, Cost Avoidance: Cost Avoidance Subtotal: Savings Total: 6, 6, 6, 6, 6, 6, 36, ROI.xls/Savings Summary Date Printed: 4/17/28 Page 4 REV: April 14, 28

10 As Of: April 14, 28 Cost Detail Cost Description Project Cost Category Budget Category/Funding Source Unit Desc Units Rate per Unit Total Cost IT Hours - New Development Development Svcs IT Hours - System Maintenance Development Svcs 122 User Hours - New Development Development Svcs User Hours - PTNE/OT Development Svcs Contractor Professional Services Development Svcs PC System - Acquisition PC System - Maintenance 2,34 Notebook - Acquisition Notebook - Maintenance 2,372 Mini Notebook - Acquisition Mini Notebook - Maintenance 2,196 Laserprinter 1 - Acquisition Laserprinter 1 - Maintenance 1,14 Laserprinter 2 - Acquisition Laserprinter 2 - Maintenance 1,28 Laserprinter 3 - Acquisition Laserprinter 3 - Maintenance 1,86 Image Workstations - Acquisition Image Workstations - Maintenance 3,496 Terminals - Acquisition Terminals - Maintenance 644 PRTR w/term ID - Acquisition PRTR w/term ID - Maintenance 1,72 PRTR w/o TERM ID - Acquisition PRTR w/o TERM ID - Maintenance 1,72 PC Maintenance User Owned 2,34 Printer Maintenance User Owned 1,72 Package Software - Acquisition Software Package Software - Maintenance Software Business Objects Access Software Term Emulation SFTW-Acquisition Software Term Emulation SFTW-Maintenance Software Server - Acquisition/Upgrade Annual Multiplier Affects Y1 Y2 ROI.xls/Cost Detail Date Printed: 4/17/28 Page 5 REV: April 14, 28

11 As Of: April 14, 28 Cost Detail Cost Description Project Cost Category Budget Category/Funding Source Unit Desc Units Rate per Unit Total Cost Server - Maintenance Server Sftwre - Acquisition/Upgrade Server Sftwre - Maintenance TBD TBD TBD TBD Internet Access 18 Project Staff Training Training User Training Training Annual Multiplier Affects Y1 Y2 ROI.xls/Cost Detail Date Printed: 4/17/28 Page 6 REV: April 14, 28

12 As Of: April 14, 28 Cost Detail s Project ROI? Potential Cost Extensions Cost Description IT Hours - New Development IT Hours - System Maintenance User Hours - New Development User Hours - PTNE/OT Contractor Professional Services PC System - Acquisition PC System - Maintenance Notebook - Acquisition Notebook - Maintenance Mini Notebook - Acquisition Mini Notebook - Maintenance Laserprinter 1 - Acquisition Laserprinter 1 - Maintenance Laserprinter 2 - Acquisition Laserprinter 2 - Maintenance Laserprinter 3 - Acquisition Laserprinter 3 - Maintenance Image Workstations - Acquisition Image Workstations - Maintenance Terminals - Acquisition Terminals - Maintenance PRTR w/term ID - Acquisition PRTR w/term ID - Maintenance PRTR w/o TERM ID - Acquisition PRTR w/o TERM ID - Maintenance PC Maintenance User Owned Printer Maintenance User Owned Package Software - Acquisition Package Software - Maintenance Business Objects Access Term Emulation SFTW-Acquisition Term Emulation SFTW-Maintenance Server - Acquisition/Upgrade Project Cost Category Development Svcs Development Svcs Development Svcs Development Svcs Development Svcs Software Software Software Software Software Y3 Y4 Y5 Y6 Y1 Y2 Y3 Y4 Y5 Y6 ROI.xls/Cost Detail Date Printed: 4/17/28 Page 7 REV: April 14, 28

13 As Of: April 14, 28 Cost Detail s Project ROI? Potential Cost Extensions Cost Description Server - Maintenance Server Sftwre - Acquisition/Upgrade Server Sftwre - Maintenance TBD TBD TBD TBD Internet Access Project Staff Training User Training Project Cost Category Training Training Y3 Y4 Y5 Y6 Y1 Y2 Y3 Y4 Y5 Y6 ROI.xls/Cost Detail Date Printed: 4/17/28 Page 8 REV: April 14, 28

14 As Of: April 14, 28 Cost Summary Cost Description Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total Development Services: IT Hours - New Development IT Hours - System Maintenance User Hours - New Development User Hours - PTNE/OT Contractor Professional Services Development Services Subtotal: : Subtotal: Software: Software Subtotal: : Subtotal Training: Training Subtotal: Other: Other Subtotal: Costs Total: ROI.xls/Cost Summary Date Printed: 4/17/28 Page 9 REV: April 14, 28

15 Date Assumptions Description As Of: April 14, 28 ROI.xls/Assumptions Date Printed: 4/17/28 Page 1 REV: April 14, 28

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: CJCC Business Intelligence Project ID: DJ6351BI Leadership Group: Courts Department: Circuit Court Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Secure Email Server Project ID: TBD Leadership Group: Finance/Admin Department: Health & Human Services Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Visa PCI Audit - Assessment Project ID: DE5188PI Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Circuit Court Mobile App Project ID: DB2312MA Leadership Group: Courts Department: Circuit Court Division: Business

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Enterprise Content Management Proof of Concept Project ID: DE7188CM Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Desktop Software Audit Compliance Phase 1 Project ID: TN2186SI Leadership Group: Information Technology Steering

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Facilities Space Allocation Program Project ID: TBD Leadership Group: Land Department: Facilities Management

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: Information Technology Steering Committee Department: Information Technology Division: Technical Systems and Networking Project Sponsor: Date Requested: 6/26/6 PM Customer No. 186 Request

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Rewrite Separate OTC from ECommerce Environment Project ID: DJ4182OE Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: P & R Electronic File Conversion, Storage and Retrieval Project ID: Leadership Group: Land Department: Parks

More information

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Oracle Consolidation Project ID: T3186OC Leadership Group: IT Steering Committee Department: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: SharePoint Document Mgmt. Proof of Concept Project ID: DE8187DP Leadership Group: IT Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Document Management Strategy Project ID: DE0187DM Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: CSTAR Appointment Scheduler Replacement Project ID: DB6174CS Leadership Group: Courts Department: Public Services

More information

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: IVR Platform Upgrade Project ID: D90186IV Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: SQL Server Services Enhancements Project ID: T3186SE Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Project ID: D8111VC Leadership Group: Finance/Administration Department: Health and Human Services Division:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Applicant System RFP Project ID: DB3154AS Leadership Group: Finance and Administration Department: Human Resources

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Microsoft Enterprise Deployment Program 211-12 Project ID: T6186ED Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Audit Management System Project ID: DB4112AS Leadership Group: Finance / Admin Department: County Executive

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: TeamSite to SharePoint Assessment Project ID: DE0187TA Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Remote Access Management Project ID: TP186RA Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Social Media Expansion Project ID: DE1187SM Leadership Group: I.T. Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Change and Release Management Integration Project ID: DH6181CM Leadership Group: Internal Services Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Audit Data Analytics Software Project ID: DA2112DA Leadership Group: Finance / Admin Department: County Executive

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Windows Backup/Recovery Improvement Project ID: T35186BR Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Devices Security Strategy Implementation Project ID: TN2186BY Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Database Project ID: DR0181CI Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Professional ecommerce Package Project ID:DE1187PP Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Database / Asset Management Program Project ID: DR181CI Leadership Group: IT Steering

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Device Management Project ID: TN5186MD Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Project ID: D971LT Leadership Group: Land Department: Treasurer s Office Division: Tax Administration Project

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Service Center Knowledge Base Project ID: DH6181KB Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Reverse Proxy Standardization Project ID: T62186RP Leadership Group: Information Technology Steering Committee

More information

Oakland County - Information Technology Project Scope and Approach

Oakland County - Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Backup Strategy / Backup Services Replacement Project ID: T62186BK Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Load Balancer System Implementation Project ID: T64186LB Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: IT Asset Inventory Phase 2 Project ID: T6186A2 Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Prototype Project ID: DH6181CP Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Print Management Project ID: TN186PM Leadership Group: Information Technology Steering Committee Department:

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Econ Dev & Comm Affairs Web Site Project ID:D10192EW Leadership Group: Land Leadership Group Department: Economic

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Disaster Recovery Redesign Project ID: T64186DR Leadership Group: Information Technology Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Reqts & RFP Project ID: DH6181CR Leadership Group: Internal Services Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Collaborative Asset Management System Program Project ID:D96611DC Leadership Group: Land Department: Drain Commissioner

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Change Management Integration Project ID: DR0181CM Leadership Group: IT Steering Committee Department: Information

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Server Systems Management Software Implementation Project ID: T62186SS Leadership Group: Information Technology

More information

Project Scope and Approach

Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Server Systems Management Software Implementation Project ID: T60186SS Leadership Group: Information Technology

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: CLEMIS Department: Information Technology Division: Clemis Project Sponsor: R. Daddow / J. Sullivan Date Requested: 5/30/2006 PM Customer No. 431 Request Type: New Development IT Team

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: Active Directory Federation Services (ADFS) Upgrade Project ID: TP5186AD Leadership Group: IT Steering Committee

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Leadership Group: Finance / Admin Department: Human Resources and Health & Human Services Division: Administration Project Sponsor: Malcolm Brown Date Requested: 3/7/2016 PM Customer No. 151 & 161 Request

More information

Oakland County Michigan Information Technology (IT) Strategic Plan

Oakland County Michigan Information Technology (IT) Strategic Plan 1.0 INTRODUCTION Oakland County Michigan Information Technology (IT) Strategic Plan The Oakland County Information Technology (IT) Strategic Plan, similar to all strategic planning, is an ongoing process.

More information

FTA OVERSIGHT PROGRAMS

FTA OVERSIGHT PROGRAMS U.S. Department of Transportation Federal Transit Administration FTA OVERSIGHT PROGRAMS FTA Region IV 2008 Conference 1 Session Outline Annual Grantee Assessment Oversight Activities Reviews (General,

More information

How To Write A Project Management Plan

How To Write A Project Management Plan Enter Project Name Project Management Plan (PMP) Kickoff Month, Day, Year 1 Purpose The Project Management Plan (PMP) is a formal, approved document used to manage project execution. The PMP documents

More information

White Paper. Making the case for PPM

White Paper. Making the case for PPM Introduction There are many reasons why organizations decide to implement project portfolio management solutions, but typically it is to help senior management confidently and consistently answer questions

More information

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814

California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814 IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9

More information

IT Onsite Service Contract Proposal. For. <<Customer>> Ltd

IT Onsite Service Contract Proposal. For. <<Customer>> Ltd IT Onsite Service Contract Proposal For Ltd 1 of 14 I N T R O D U C T I O N This Service Contract for Onsite Deskside PC Support (this Service Contract ) is made effective as of February 5th,

More information

Finance & Information Management Network Operations

Finance & Information Management Network Operations Finance & Information Management Network Operations Accessing Advance via External Affairs remote access system, Citrix. 1. Using a web browser, it s possibly to access Advance without the application

More information

TIME KEEP LEGAL BILLING SOFTWARE REQUIREMENTS SPECIFICATION

TIME KEEP LEGAL BILLING SOFTWARE REQUIREMENTS SPECIFICATION TIME KEEP LEGAL BILLING SOFTWARE REQUIREMENTS SPECIFICATION 1. Introduction: This document defines the Software Requirements Specification (SRS) for the Time Keep Legal Billing software application. This

More information

Development Experience Clearing House Submissions Form AID 590-7

Development Experience Clearing House Submissions Form AID 590-7 Administration of Justice Support Project American Mideast Education and Training Services, Inc. 1730 M Street, NW, Suite 1100 Washington, DC 20036-4505 Development Experience Clearing House Submissions

More information

Project Charter Updated

Project Charter Updated Enterprise IT Service Management Pilot Proof of Concept Project Charter Updated Prepared By: M. Riley & J. Foster Date of Publication: March 13, 2006 Date Last Revised: April 25, 2007 PMO CH1, 8/01 Document

More information

Attorneys: Frequently Asked Questions about E-filing

Attorneys: Frequently Asked Questions about E-filing Attorneys: Frequently Asked Questions about E-filing Case Access What if you need an old file or case? When you are e-filing, you should be able to search for all cases, open or closed, to submit a new

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland Cunty Department f Infrmatin Technlgy Prject Scpe and Apprach Prject Name: Web-Based Permanency Database Prject ID: DB1314PD Leadership Grup: Curts Department: Circuit Curt Divisin: Family Prject

More information

Cleveland SIU Videoconferencing

Cleveland SIU Videoconferencing Project Overview Commander Tomba, Cleveland SIU is in full support and welcomes a video conferencing solution in the Scientific Investigation Unit (SIU). Commander Tomba will work to secure the proper

More information

TERMS OF REFERENCE. Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI)

TERMS OF REFERENCE. Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI) TERMS OF REFERENCE Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI) 1 Contracting Agency: Coordinating Agency: Place: United Nations Development

More information

Cleveland 3D Court Videoconferencing

Cleveland 3D Court Videoconferencing Project Overview Cleveland 3-D conducts felony hearings Monday thru Friday from 8:30 AM 12:00 PM with misdemeanors following. Occasionally the hearings run overtime typically every 6-8 weeks due to staffing.

More information

Project Management Plan for

Project Management Plan for Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...

More information

THE INFORMATION TECHNOLOGY (IT) UNIT OR DEPARTMENT IN THE MINISTRY OF EDUCATION. Issues of function, organization and staffing. By Alex Twinomugisha

THE INFORMATION TECHNOLOGY (IT) UNIT OR DEPARTMENT IN THE MINISTRY OF EDUCATION. Issues of function, organization and staffing. By Alex Twinomugisha THE INFORMATION TECHNOLOGY (IT) UNIT OR DEPARTMENT IN THE MINISTRY OF EDUCATION Issues of function, organization and staffing By Alex Twinomugisha Global E Schools and Communities Initiative (GeSCI) Copyright

More information

Software Cost. Discounted STS Rate Units Total $0.00 $0.00 $0.00 $0.00 Total $0.00

Software Cost. Discounted STS Rate Units Total $0.00 $0.00 $0.00 $0.00 Total $0.00 Cost Form This cost form has been provided to assist respondents in submitting costs associated by deliverable. Remember that all costs are to be the firm, fixed price of the deliverable and project total.

More information

Functional Area 3. Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011)

Functional Area 3. Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011) Functional Area 3 Skill Level 301: Applications Systems Analysis and Programming Supervisor (Mercer 1998 Job 011) Description: Supervises activities of all applications systems analysis and programming

More information

A Guide to. Procedures in. Family Court

A Guide to. Procedures in. Family Court Inside this Guide A Guide to 1 Information before You Start 2 Starting a Family Case Application (General) Simple Application Divorce only Joint Application 3 Answers Procedures in Family Court 4 Financial

More information

ARKANSAS DEPARTMENT OF EDUCATION RULES GOVERNING THE ISSUANCE OF SUBPOENAS BY THE ARKANSAS STATE BOARD OF EDUCATION

ARKANSAS DEPARTMENT OF EDUCATION RULES GOVERNING THE ISSUANCE OF SUBPOENAS BY THE ARKANSAS STATE BOARD OF EDUCATION ARKANSAS DEPARTMENT OF EDUCATION RULES GOVERNING THE ISSUANCE OF SUBPOENAS BY THE ARKANSAS STATE BOARD OF EDUCATION 1.00 REGULATORY AUTHORITY 1.01 These rules shall be known as the Arkansas Department

More information

Technology Services Division Infrastructure Major Deliverables by Calendar Year

Technology Services Division Infrastructure Major Deliverables by Calendar Year Technology Services Division Infrastructure Major Deliverables by Calendar Year Year 2002 Network INFRASTRUCTURE Green Screen Technology DELIVERABLES Migrated courthouse network devices to Multi-Protocol

More information

NMMSS Upgrade Progress

NMMSS Upgrade Progress NMMSS Upgrade Progress Dan Farmer Technical Manager NMMSS Upgrade WSRC May 23, 2007 Document Number: WSRC-CP-2006-00027 Outline Project Organization Project Methodology Current Status of Software Development

More information

County Name Circuit Court Pre-Assessment Survey AOC Contexte System

County Name Circuit Court Pre-Assessment Survey AOC Contexte System 2011-11-21 11:17:06 1.5 1 (18) ARKANSAS SUPREME COURT ADMINISTRATIVE OFFICE OF THE COURTS County Name Circuit Court Pre-Assessment Survey AOC Contexte System Document Draft Date: 11/21/2011 Assessment

More information

2012 implementation. Scope Statement A high-level project description of the project (i.e. statement of work)

2012 implementation. Scope Statement A high-level project description of the project (i.e. statement of work) Project Charter 2012 HR-002 Electronic Recruitment Software Project Manager: Manager Human Resources Sponsor: Dean Screpnek, General Manager Corporate Services Budget Condition: Unfunded Scope Statement

More information

Q Are the current Digital Court Reporters employees of the Court?

Q Are the current Digital Court Reporters employees of the Court? Listed below are the 13 th Judicial Circuit s responses to questions submitted by potential respondents to the ITN for Digital Court Reporting Monitoring and Transcription Service. All follow-up questions

More information

State of Minnesota Firewall Rule Update Questions

State of Minnesota Firewall Rule Update Questions State of Minnesota Firewall Rule Update Questions 1. What is the security policy that specifies how source, destination, and service in the rule base are to be treated? DEED is currently developing policies

More information

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage

Companion Notes for LTC Process Flowcharts. Notes for Initiation Stage Companion Notes for LTC Process Flowcharts Contents Notes for Initiation, Planning, Execution/Production and Close Stages Glossary and Acronyms Page 1 4 5 6 Notes for Initiation Stage Purpose The purpose

More information

PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development

PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development December 2015 1. Getting Started with PPM Life Cycle 2. PPM Life Cycle Process 3. PPM V2.0 and Project Types

More information

Year 100.0% 91.5% 87.0% 90.5% 88.0% 90.0% 86.8% 85.0% 82.5% 79.5% 75.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0%

Year 100.0% 91.5% 87.0% 90.5% 88.0% 90.0% 86.8% 85.0% 82.5% 79.5% 75.0% 80.0% 70.0% 60.0% 50.0% 40.0% 30.0% 20.0% 10.0% Associate Degree, Computer Technology - Information Technology and Related Certificates: SLO Analysis 2011-12 Through 2013-14 Cumulative, 4 SLO's Disaggregated 100.0% 90.0% 80.0% 86.8% 90.5% 82.5% 91.5%

More information

Project Management Guidelines

Project Management Guidelines Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of

More information

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT FOLLOW UP REVIEW TO AUDIT OF COURTROOM AUTOMATION Karleen F. De Blaker Clerk of the Circuit Court Ex officio County Auditor Robert W. Melton, CPA*, CIA,

More information

Admissions CRM Project Charter

Admissions CRM Project Charter PMO Anne Milkovich 1/26/2015 Page 1 of 5 Student enrollment among traditional undergraduate Freshmen has declined by about 10% over the last six years, a source of concern for institutional leadership.

More information

Project Charter. 1. Project Stakeholders: Position Title/Name/Organization Phone E-mail

Project Charter. 1. Project Stakeholders: Position Title/Name/Organization Phone E-mail Project Charter Project Name: Eliminate Pharos Print Quota for Student, Faculty, and Staff Project Start Date: 1/19/2011 Project Sponsor: Dr. M. Leatherbury Project End Date: 8/11/2011 : 1. Project Stakeholders:

More information

Discovery Depositions 1 Part I: Practical Considerations in Planning and Preparing to Take a Discovery Deposition

Discovery Depositions 1 Part I: Practical Considerations in Planning and Preparing to Take a Discovery Deposition Discovery Depositions 1 Part I: Practical Considerations in Planning and Preparing to Take a Discovery Deposition Purpose of Depositions: Perpetuate testimony Discover knowledge of facts and observations

More information

Information Technology Strategic Plan Final Presentation

Information Technology Strategic Plan Final Presentation City of Boise, ID Information Technology Strategic Plan Final Presentation August 28, 2012 Pacific Technologies, Inc. Practical planning. Positive change. City of Boise, ID IT Strategic Plan Final Presentation

More information

Areas of Law Criminal

Areas of Law Criminal Areas of Law Criminal Part 2 Please complete this if you are applying f approval f the Criminal jurisdiction (including duty solicit and police detention legal assistance) PART 2 Section 1 Experience in

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

Driving the Green Data Center Strategy in Established Environments

Driving the Green Data Center Strategy in Established Environments Driving the Green Data Center Strategy in Established Environments November 2008 Agenda Green IT defined Arrow Green Initiatives Data Center Other Initiatives Green Challenges Green IT Optimal use of information

More information

Forfeiture/Post-Vest% Rates Report

Forfeiture/Post-Vest% Rates Report Forfeiture/Post-Vest% Rates Report Beginning with the Equity Edge 7.1 program, the Valuation Forfeiture Rates report has been renamed the Forfeiture/Post-Vest % Rates report. This updated report includes

More information

Measuring the ROI of Faronics Deep Freeze

Measuring the ROI of Faronics Deep Freeze Measuring the ROI of Faronics Survey Analysis August 27, 2009 Intelligent Solutions for ABSOLUTE Control www.faronics.com Tel: 1-800-943-6422 Fax: 1-800-943-6488 Tel: +1-604-637-3333 Fax: +1-604-637-8188

More information

Enterprise Governance and Planning

Enterprise Governance and Planning GEORGIA TECHNOLOGY AUTHORITY Title: Enterprise Operational Environment PSG Number: SO-10-003.02 Topical Area: Operations / Performance and Capacity Document Type: Standard Pages: 5 Issue Date: July 15,

More information

INFORMATION TECHNOLOGY PROJECT REQUESTS

INFORMATION TECHNOLOGY PROJECT REQUESTS INFORMATION TECHNOLOGY PROJECT REQUESTS Guidelines & Instructions for Maryland State Agencies Revised Two Step PPR/PIR Approval Process Fiscal Year 2013 Table of Contents Part 1: Overview... 2 1.1 Introduction...

More information

Metro Health Giving Time Back to Its Care Providers with VMware Horizon View

Metro Health Giving Time Back to Its Care Providers with VMware Horizon View IDC ExpertROI Spotlight Metro Health Giving Time Back to Its Care Providers with VMware Horizon View Sponsored by: VMware Matthew Marden January 2014 Randy Perry Overview Metro Health is an integrated

More information

ADMINISTRATIVE OFFICE OF THE COURTS

ADMINISTRATIVE OFFICE OF THE COURTS Pamela Harris, State Court Administrator 410-260-1295 ADMINISTRATIVE OFFICE OF THE COURTS MARYLAND JUDICIAL CENTER 580 TAYLOR AVENUE ANNAPOLIS, MARYLAND 21401 Amendment #1 Request For Proposals K15-0048-89

More information

Customer Collaboration

Customer Collaboration Customer Collaboration We are now Unify. Formerly known as Siemens Enterprise Communications, Unify continues to be one of the world s largest communications software and services firms. This document

More information

IDC ExpertROI SPOTLIGHT

IDC ExpertROI SPOTLIGHT IDC ExpertROI SPOTLIGHT New Relic Yields 314% ROI for Global Technology Manufacturer Sponsored by New Relic Randy Perry September 2013 Overview As this global technology manufacturer has aggressively embraced

More information

ITEM FOR FINANCE COMMITTEE

ITEM FOR FINANCE COMMITTEE For discussion on 12 April 2002 FCR(2002-03)3 ITEM FOR FINANCE COMMITTEE CAPITAL WORKS RESERVE FUND HEAD 710 - COMPUTERISATION Social Welfare Department New Subhead Implementation of Information Systems

More information

Description. Need Statement

Description. Need Statement Description Brief description of the proposed project: CDVA is currently operating in a "Fat Client" environment for all office automation product applications. CDVA is committed to it's strategic goal

More information

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments. OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager

More information

Technology Services Allocation Model

Technology Services Allocation Model Allocation Model Version 2 for FY13-14 Model Review & Changes This is a brief overview of the to help explain the following: - The various models / funding sources - The methodology in calculating allocation

More information