Project Charter. 1. Project Stakeholders: Position Title/Name/Organization Phone
|
|
|
- Amos Caldwell
- 10 years ago
- Views:
Transcription
1 Project Charter Project Name: Eliminate Pharos Print Quota for Student, Faculty, and Staff Project Start Date: 1/19/2011 Project Sponsor: Dr. M. Leatherbury Project End Date: 8/11/2011 : 1. Project Stakeholders: List all applicable project stakeholders. Position Title/Name/Organization Phone Sponsor Representative Customer / User Representative(s) VP Information Technology Dr. M. Leatherbury IT Academic Coordinator Library Systems Coordinator Bob Samson Library See section [email protected] [email protected] [email protected] Page 1
2 2. Executive Summary Provide a brief overview of this project. Develop a business process to determine recovery costs, scheduling, and department reimbursement of print revenue Determine print charges necessary to break even based on the recovery cost (not intended to make a profit) Remove current free print quota from Pharos controlled printers and implement print charges 3. Project Purpose Explain the reason(s) for doing this project Business Need / Problem The Business Need / Problem is an issue or opportunity pertaining to the business which needs to be resolved / acted upon. State in specific terms the issue or opportunity this project will address. Often, the Business Need / Problem is a critical business issue or initiative in the Sponsoring Organization s Strategic Plan. Printing is increasing yearly and costs are escalating Reduction of printing is in line with the University s sustainability efforts Ref: Due to budget constraints, the University must save resources for essential services 3.2. Business Objectives Define the specific Business Objectives of the project that correlate to the strategic initiatives or issues identified in the Sponsoring Organization s Strategic Plan. Every Business Objective must relate to at least one strategic initiative or issue and every initiative or issue cited must relate to at least one project business objective. Strategic Plan Element Determine Design Process Determine Appropriate Charges Create Reimbursement Process Eliminate Existing Print Quota Project Business Objectives Cost to students should be enough to cover replacement costs of printers, maintenance costs, and pay for consumables (paper, toner) Devise a process for reimbursing departments for printing purchases in their labs Reduce paper usage and reduce current costs to departments Page 2
3 4. Project Overview 4.1. Project Description Describe the project focus, approach, customer(s), and the boundary limits of the project. To determine printing recovery costs, will gather current direct costs within for the last two years and correlate those to printer page counts, Pharos data, and CS Gold records. will work with stakeholders to devise a process to collect charges from client print jobs and reimburse departments. Pharos clients will no longer receive print quota on MavExpress Card. Pharos clients will add money to their MavExpress card to pay for Pharos printing Scope The Project Scope addresses the who, what, where, when, and why of a project. The scope will only encompass current printers managed by the Pharos Uniprint system. System change needs to be in place prior to the start of the Fall 2011 semester Assumptions Assumptions are statements taken for granted or accepted as true without proof. Assumptions are made in the absence of fact. List and describe the assumptions made in the decision to charter this project. It is assumed that: Printing demand will be streamlined The project has executive support for this sensitive initiative Current customers will initially be opposed to this change Appropriate departments will provide resources Data necessary for business process is captured and is accessible in Pharos University has necessary expertise to allocate reimbursement to departments We have adequate expertise and information for accurate cost recovery analysis MavExpress card will continue to be the method for print payment Process to add money is sufficiently streamlined Non-participants will want to join Change will not impact other processes 4.4. Constraints Constraints are boundary conditions that the project must stay within. List and describe the constraints applicable to this project. The question of subsidizing a portion of the quota is non-negotiable. UTA will no longer subsidize student printing Establishing printing costs and reimbursement processes must be established and well communicated prior to 8/11/2011 MavExpress will be the only way to pay for this printing Page 3
4 5. Project Requirements / Deliverables The Project Requirements / Deliverables define what the project must accomplish, including the customer/ user requirements and products / services to be provided by the project. Existing print quota in impacted labs must be disabled by Fall 2011 Estimate of cost recovery minimums Announcement to students no later than 4/15/2011 Process for determining Process for reimbursing departments for printing purchases in their labs Well communicated 6. Project Management Milestones and Deliverables Provide a list of Project Management Milestones and Deliverables. This list of deliverables is not the same as the products and services provided by the project, but is specific to the management of the project. An example of a Project Management Milestone is the Project Plan Completed. Milestone / Deliverable Estimated Date Responsible Individual Determine cost recovery 3/1/2011 Pam Tremaine, Create process for reimbursement 4/1/2011 Advertise plan 4/15/2011 Communications Plan Implemented 8/11/ Personnel & Other Resources Identify the personnel and other resources required by the project and/or committed to this project by the project sponsor. Additional resources may be committed upon completion of the detailed project plan. Resources Project Team Support Facilities Equipment Software Tools Other Description Erin Morgan Pam Tremaine Dustin Fu Katasha Sylvain Bob Samson MavExpress Representative Representatives of other impacted users groups Lab Support, Library Information Technology, Helpdesk, MavExpress ARDC, Davis Hall Impacted Printers, Kiosk machines Pharos Uniprint Software, MavExpress CS Gold Application Page 4
5 8. Project Risks Risks are statements of issues or problems that have the potential to arise but have not yet occurred. List and describe the initial risks for this project. Reliable method will not be found to correlate actual printer page counts, Pharos Print Server records, and CS Gold charges Disagreement on print cost between other impacted user groups Disagreement on appropriate accounting fund dispersal method Lack of an identified person to reimburse departments 9. Project Organization 9.1. Project Organization Chart Provide a graphic depiction of the project s organizational structure. The project s hierarchal diagram begins with the project sponsor and includes all project stakeholders. VP of Information Technology Dr. M Leatherbury Students Faculty Departments (Using Pharos) Administrative Support Bob Samson Library MavExpress Katasha Sylvain CS Gold Administrator Various Academic Departments OABS Steven English Pharos contractor Dustin Fu Labs Page 5
6 9.2. Roles & Responsibilities Describe the Roles and Responsibilities of all project stakeholders identified for this project. Stakeholder Title Name Roles & Responsibilities Sponsor Dr. Maurice Leatherbury Champions the project, mitigates high level issues and competing projects, provides financial backing for project Allocates resources, resolves issues, coordinates project resources and project activities, manages project risks, elevates issues to sponsor Student Representative Alaina Cardwell Liaison between project team and student body to provide input and feedback Faculty Representative TBD Liaison between project team and faculty to provide input and feedback Provides input and feedback into the design of the business process, including cost Pharos System Bob Samson / recovery analysis and departmental Administrators reimbursement. Testing and verification of newly designed business process Helpdesk Funda Everything Departmental Functional Leads MavExpress Departmental Reimbursement POC CS Gold Administrator Pharos contractor (TracSystems) Lab Support Lead Departments with Pharos printers TBD TBD OABS? Katasha Sylvain Steven English Dustin Fu Provides input and feedback into both the design of the cost recovery business process and departmental reimbursement business process. Testing and verification of newly designed business processes Understands process, provides technical expertise, generates technical options for application reconfiguration to accommodate new (which ones) business process Coordinates and or performs departmental reimbursement (Design or verification?) Understands process, provides technical expertise, generates technical options for application reconfiguration to accommodate new (which ones) business process Understands process, provides technical expertise, generates technical options for application reconfiguration and creates reports to accommodate new business process (cost recovery analysis and departmental reimbursement) Provides input and feedback into the design of the business process, including cost recovery analysis and departmental reimbursement. Provides technical support for testing and verification of newly designed business process Page 6
7 10. Approval Signatures The Signatures of the people below document acceptance and approval of the formal Project Charter. The Sponsor Representative must have the authority to commit the organization s resources to the project. The is empowered by this charter to proceed with the project as outlined in the charter. Position/Title Signature/Printed Name/Title Date Sponsor Representative Page 7
OE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
[BSU Mobile] [Version Number 1.2] Project Charter. Bridgewater State University Information Technology. BSU Mobile. Project ID: 209358
Project Charter Bridgewater State University Information Technology BSU Mobile Project ID: 209358 VERSION: [1.2] REVISION DATE: [10 May 2013] i Contents Section 1. Project Overview... 1 1.1 Problem Statement...
Organization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
How To Manage An Ipa Print Service At A College Of Korea
1 General Overview This is a Service Level Agreement ( SLA ) between and the Student Computer Labs to document: The technology services Student Computer Labs provides to the customer The targets for response
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
Advisory Council member responsibilities include:
GOVERNANCE AND OVERSIGHT OF THE KUALI PROJECT: The following provides a chart of the Governance and Oversight Structure for the Kuali Project. In addition to the below, is a Functional Council that includes
SOFTWARE PROJECT MANAGEMENT
SOFTWARE PROJECT MANAGEMENT http://www.tutorialspoint.com/software_engineering/software_project_management.htm Copyright tutorialspoint.com The job pattern of an IT company engaged in software development
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
Learning Management System (LMS) Solution
Learning Management System (LMS) Solution Project Manger: Joyce Crockett Project Start Date: 5/1/09 VERSION: 1.0 Project End Date: 1/29/2010 REVISION DATE: [DATE] Identify document changes. Version Date
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.
Guide to Preparing the SOFTWARE PROJECT MANAGEMENT PLAN R. Buckley CSc 190 Senior Project Department of Computer Science - College of Engineering and Computer Science California State University, Sacramento
Module 11 Stakeholder Management PMP Exam Questions
Module 11 Stakeholder Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 You are the project manager
Project Management Change Management Procedure
Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
Project Zeus. Risk Management Plan
Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related
Project Charter EMI Outreach July 25, 2011. OE Project Charter. 1.0 July 25, 2011 Draft w/ VC Denton comments included 1.1 11/02/2011 Proofed/edited
Project Charter EMI Outreach July 25, 2011 OE Project Charter Project Name: Energy Management: Marketing and Outreach Prepared by: Lisa McNeilly Date (MM/DD/YYYY): July 25, 2011 Project Charter Version
UTSA PeopleSoft Change Management Plan
UTSA PeopleSoft Change Management Plan IMPLEMENTING UTSHARE AT UTSA February 2013 v.1 Table of Contents UTSA PeopleSoft Change Management Plan 1.0 Overview... 2 Goals and Objectives... 2 Critical Success
SCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
Project Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1)
Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Date: October 1, 2014 Version: 3.1 DOCUMENT REVISION HISTORY Version Date Changes Updated By 0.1 02/13/014 Initial
Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
Project Roles and Responsibilities
Project s and This template can be used to define roles and responsibilities Below is a few typical examples of the different types of roles involved in delivering a project and their respective responsibilities.
EXAMPLE <PROJECT NAME> DATE
EXAMPLE DATE TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 2 1.1. Issue... 2 1.2. Anticipated Outcomes... 2 1.3. Recommendation... 2 1.4. Justification... 3 2. BUSINESS CASE ANALYSIS TEAM...
Information Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
2.1 Initiation Phase Overview
2.1 Initiation Phase Overview The is the conceptualization of the project. This section describes the basic processes that must be performed to get a project started. Accordingly, the purpose of the is
Project Team Roles Adapted for PAAMCO
Project Team Roles Adapted for PAAMCO Project Roles, Authority & Responsibilities Role a defined funciton assumed by or assigned to a person in the project Authority the right to apply project resources,
How To Write A Project Management Plan
Enter Project Name Project Management Plan (PMP) Kickoff Month, Day, Year 1 Purpose The Project Management Plan (PMP) is a formal, approved document used to manage project execution. The PMP documents
Standards for Developing and Implementing Administrative Systems at UC Davis
Page 1 of 7 Standards for Developing and Implementing Administrative Systems at UC Davis Introduction The purpose of this document is to describe Standards for Developing and Implementing Administrative
Project Plan for <project name>
Note: Text displayed in blue italics is included to provide guidance to the author and should be deleted or hidden before publishing the document. This template can be used at it is, or to complete and
California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814
IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9
MNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
Information Technology Project Management
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John Wiley & Sons, Inc. all rights reserved. Reproduction
ServiceNow Phase I: Service Desk Consolidation Project Charter
Prepared By: Jodi Muller and Rebecca Nguyen Date of Publication: 06/6/2011 Version 1.6 Table of Contents PROJECT OVERVIEW... 3 PROJECT SCOPE... 3 OUT OF SCOPE... 3 PROJECT APPROACH... 4 ESTIMATED COST...
Project Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
Information Technology Services ServiceNow: Change Management Phase I Project Charter
ServiceNow: Change Management Phase I Project Charter VERSION: 1.3 REVISION DATE: 9/28/2011 Approval of the Project Charter indicates an understanding of the purpose and content described in this deliverable.
IT1T Integrated Recruitment Systems 2015
UCD IT Services IT1T Integrated Recruitment Systems 2015 Project Initiation Document Version 1.0 2 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft
OE PROJECT CHARTER Business Process Management System Implementation
PROJECT NAME: PREPARED BY: DATE (MM/DD/YYYY): Andrea Lambert, Senior Business Process Consultant, OE Program Office 09/15/2014 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED
Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: [email protected] Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]
231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for
Achieve Economic Synergies by Managing Your Human Capital In The Cloud
Achieve Economic Synergies by Managing Your Human Capital In The Cloud By Orblogic, March 12, 2014 KEY POINTS TO CONSIDER C LOUD S OLUTIONS A RE P RACTICAL AND E ASY TO I MPLEMENT Time to market and rapid
EXECUTIVE BEHAVIORAL INTERVIEW GUIDE
EXECUTIVE BEHAVIORAL INTERVIEW GUIDE INTERVIEW GUIDE INSTRUCTIONS: This Interview Guide is intended to help hiring executives conduct behavioral interviews for executive classifications covered by the
Framework. 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP
PROJECT MANAGEMENT Framework 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP Topics 1. Benefits Of Project Management 2. Definitions 3. Roles 4. Project Process Groups 5. Best Practices
Software Test Plan (STP) Template
(STP) Template Items that are intended to stay in as part of your document are in bold; explanatory comments are in italic text. Plain text is used where you might insert wording about your project. This
Project Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
Capital Projects. Providing assurance over effective delivery of projects
Capital Projects Providing assurance over effective delivery of projects Governance and oversight Project Scope and change Reporting and communication Project risk and success factors Delivery Major projects
Software Project Management Plan (SPMP)
Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.
Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of: A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition 1 Topics for Discussion
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding
PSU Hyland OnBase Document Imaging and Workflow Services Level Memorandum of Understanding Table of Contents -I. Summary -II. Service Description-Scope of OnBase Document Imaging and Workflow Service Integration
PROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in this Project Scope Statement is implicitly excluded from the project. Create links to referenced documents (e.g., Link_To_ ) by using Insert
Project Management Planning
Develop Project Tasks One of the most important parts of a project planning process is the definition of activities that will be undertaken as part of the project. Activity sequencing involves dividing
Final. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
Understanding Software Project Management PMI fundamentals, Project Selection, Initial documents Emanuele Della Valle http://emanueledellavalle.
Planning and Managing Software Projects 2011-12 Class 3 Understanding Software Project Management PMI fundamentals, Project Selection, Initial documents Emanuele Della Valle http://emanueledellavalle.org
An Introduction to SharePoint Governance
An Introduction to SharePoint Governance A Guide to Enabling Effective Collaboration within the Workplace Christopher Woodill Vice President, Solutions and Strategy [email protected] 416-477-3945
DIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan
DEPARTMENT OF CORRECTION SUPPORT Management Services DIRECTIVE NUMBER: SUBJECT: Correctional Integration Systems Change PAGE NUMBER: 1 of 10 Adopted: 12-15-03 01.00.00. POLICY OF THE DEPARTMENT It is the
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
STUDENT TECHNOLOGY ENHANCEMENT PROGRAM PLAN 2005-2009
STUDENT TECHNOLOGY ENHANCEMENT PROGRAM PLAN 2005-2009 EXECUTIVE SUMMARY In an effort to upgrade and increase the availability of technology on the UL Lafayette Campus, the Student Government Association,
Chapter 3 Managing the Information Systems (IS) Project
Content Chapter 3 Managing the Information Systems (IS) Project Process of managing IS projects Skills required to be an effective project manager Skills and activities of a project manager during project
Information Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections
POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections Policy Subject: Policy Number: Project Management 1.1.5 Date of Issue: Authority: Effective Date: May 29, 2009 Signature on File
IT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
A software for project management process
MPRA Munich Personal RePEc Archive A software for project management process Logica Banica and Doina Rosca and Cristian Stefan University of Pitesti, Faculty of Economics, University of Craiova, Faculty
Project Management Plan. Project Management Plan Guide. Strategic Capital, Infrastructure and Projects
Project Management Plan Guide A guide to completing the Project Management Plan Strategic Capital, Infrastructure and Projects Prepared by: Andrew Segrott / Strategic Capital, Infrastructure and Projects
Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: IVR Platform Upgrade Project ID: D90186IV Leadership Group: Information Technology Steering Committee Department:
Project Charter Guide
Project Charter Guide Feedback and Questions To help maintain the currency of this document, feedback and questions are welcomed. Please contact: IT Project Review and Oversight Chief Information Officer
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Interagency Interoperability Oversight Group
Interagency Interoperability Oversight Group DOI-USDA/FS Access / Authentication Project Charter 1. Project Overview It is well known that the wildland firefighting community is a highly integrated, cooperative
PROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project. Project Name: Prepared by: BI - IT Governance Amy Winkel Date: 12/20/2010
Training Programs for Enterprise-Wide Change
Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business
Oakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Device Management Project ID: TN5186MD Leadership Group: Information Technology Steering Committee Department:
Develop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Agenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes
Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure
Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look
Welcome to the Data Analytic Toolkit PowerPoint presentation an introduction to project management. In this presentation, we will take a brief look at project management to understand the process and some
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
Enterprise Mobile Application Lifecycle
White Paper Enterprise Mobile Application Lifecycle Developing a Process for End to End Mobile Application Development Prepared by Daniel Maycock, Slalom Consultant Introduction With the increasingly vast
ITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
Oakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Configuration Management Database Project ID: DR0181CI Leadership Group: IT Steering Committee Department: Information
Facilities Portfolio Management Tool
2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...
Knowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
