1 Request for Qualifications Construction Management at Risk Services Bismarck Public Schools Bismarck, North Dakota December 1, 2014

2 Request for Qualifications Construction Management at Risk Services Bismarck Public Schools Bismarck Public Schools request statements of qualifications for Construction Management at Risk services for the athletic complex project to be located at Legacy High School. To receive the Request for Qualifications (RFQ) submittal instructions, please contact the Bismarck Public Schools Business and Operations Manager by either of the following methods: Mail: Business and Operations Manager Bismarck Public Schools 806 North Washington Street Bismarck, North Dakota Telephone: Fax: Questions regarding the content of the Request for Qualifications submittal instructions can be directed to the Business and Operations Manager, Darin Scherr ( ). Nine (9) copies of the completed response must be received no later than 2:00 p.m., Local Time, Wednesday, December 31, 2014, at the office of the Business and Operations Manager. Dated this 5 th day of December 2014 /s/ Darin Scherr Darin Scherr, Business and Operations Manager Bismarck Public School District #1 806 North Washington Street Bismarck, North Dakota 58501

3 Request for Qualifications Submittal Instructions Construction Management at Risk Services Bismarck Public Schools Bismarck, North Dakota December 1, 2014

4 I. INTRODUCTION Bismarck Public Schools request statements of qualifications for construction management services for coordination and construction for an athletic complex to be located at Legacy High School. II. SCOPE OF SERVICES a. This project is governed by the Bismarck Public School Board and has assigned the following people to serve on the committee that will make a recommendation to the full school board. Selection Committee 1. Matthew Sagsveen, Board Member 2. Karl Lembke, Board Member 3. Tamara Uselman, Superintendent 4. Darin M. Scherr, Business and Operations Manager 5. Jim Haussler, Activities Director 6. Jason Mittlestadt, Assistant Director of Facilities 7. James Devine, Architect 8. Lon Romsaas, Registered Engineer 9. Alvie Jarratt, Contractor b. A masterplan for the construction of the athletic fields and support buildings on the existing Legacy High School site, which is approximately 40 acres, was completed this fall to determine the layout and site amenities. The masterplan has defined the necessary site amenities, which include a combined synthetic turf football and soccer field, a synthetic track, track & field event venues, practice football fields, practice soccer field, a synthetic turf baseball field, a grass baseball field, a synthetic turf softball field, a grass softball field, multiple tennis courts, and patron parking. The site is broken into two main entry points, one serving the football field/track/soccer fields and the other serving the baseball and softball diamonds. The main entry to the football/track/soccer complex includes ticketing, concessions, and a restroom facility located south of the grandstands. The grandstands are designed to accommodate 3,500 fans. Atop the grandstands is a pressbox designed to accommodate the viewing of all sports on the field. Below the pressbox is a storage room for the facility. Nestled between the gameday baseball diamond, and the football field, is another restroom facility which serves both venues, as well as providing additional storage for the facility. The entrance serving the baseball and softball diamonds also includes a ticketing booth, restroom facility, and concessions. The remainder of the buildings on the site

5 include dugouts for baseball and softball, as well as a press box and storage, located at the baseball diamond. A copy of the preliminary site layout is attached to this document. c. The project construction cost is currently estimated at $11,200,000. This estimate does not include A/E fees or Construction Management fees. d. The project is scheduled to commence in the spring of The project is currently scheduled to be broken into three phases to accommodate available funds by Bismarck Public School District. The phasing per the current masterplan is as follows: Phase One; General site improvements, turf football/soccer field, synthetic track, field lighting, parking lot, grass baseball field, grass softball fields, dugout structures for grass fields, shot put and discus, long jump/triple jump, and pole vault, East Entrance Building, partial site fencing, site utilities, and associated walks. Work for Phase One is anticipated to commence in the spring of 2015 and be complete in the fall of Phase Two; Turf baseball and softball fields, field lighting, dugouts for baseball and softball turf fields, West Entrance Building, site utilities, remainder of site fencing and associated walks. Work for Phase One is anticipated to commence in the spring of 2016 and be complete in the fall of Phase Three; Grandstand bleachers at football/soccer field, press box and storage building, North Restroom/Storage building, grandstands at baseball field, press box and storage at baseball field, bullpens at baseball field, bleachers for softball and baseball diamonds, tennis courts, tennis court lighting, and remainder of site walks and site utilities. Work for Phase One is anticipated to commence in the spring of 2017 and be complete in the fall of The development in each phase will be further refined by cost estimate analysis by the Construction Manager at Risk and available funds by the District. The amenities in each phase are subject to change based on budget and refined needs of the District. e. Subcontractor selection process will be discussed with the Construction Manager, the Architect and the Owner upon selection of the Construction Manager. f. Formal interviews will be held if needed. It is the intention of the selection committee to interview up to three firms.

6 g. The contract for the work shall be AIA Document A Owner/Construction Manager as Constructor Agreement Cost of Work Plus Fee with GMP. The requirements of AIA Document A General Conditions of the Contract for Construction shall also apply to this Construction Management at Risk Contract. The Construction Manager at Risk (CMAR) responsibilities shall include cost estimating, development of schedules, oversight of the design process, review of drawings for constructability and coordination, and full construction responsibility. The Construction Manager at Risk shall hold all construction and trade contracts. The CMAR shall be able to construct portions of the project that they typically perform under their own forces, although the CMAR may be required to bid these portions of the work. Upon completion of the Contract Documents, all aspects of the project shall be competitively bid and the Construction Manager at Risk will prepare and submit a Guaranteed Maximum Price with Performance and Payment Bonds. The synthetic field turf and track material is contracted under a Cooperative Purchasing agreement between Bismarck Public School District and a turf manufacturer. The Construction Manager at Risk shall coordinate with the turf manufacturer and installer. h. The selection committee will make a recommendation to the full school board of the top firm based on a combination of proposals submitted in addition to the physical interview of the firm. i. A masterplan of the site layout, including preliminary floor plans of the support buildings is attached to this proposal. A general Geotechnical report for the site is available. Additional site borings specific to the building and field locations is currently in proposal stage and will be available when completed. A site survey of the site has also been completed and has been utilized for preliminary site grading and layout. III. SUBMITTAL REQUIREMENTS AND SELECTION CRITERIA Bismarck Public Schools requests the following material for use in the selection of a professional construction management company: A. Past Performance a. Demonstrated experience and excellence in projects with comparable scale, complexity, and function. b. Proven capabilities for providing construction management services. Firms are asked to submit appropriate graphic material supporting comparable

7 projects as a Construction Manager, Design Build Contractor, or General Contractor (may be the same projects). B. Recent/Current and Projected Workload of the Person or Firm The selection committee shall evaluate the recent, current, and projected workload of the firm based on the following criteria: a. Agreement, unless prevented by circumstances outside of the firm's control, to retain the construction manager and other team members on the project until all work under this contract is complete. b. Availability of all personnel included in Section B. C. Related Experience on Similar Projects Recent Relevant Work: List up to three projects completed within the past five years, or currently under construction that most closely resemble this project. a. Firms are asked to submit examples of projects indicating: i. Name and phone number of Owner s representative ii. Name and phone number of Architect s representative iii. Name of your project manager D. Safety Record of the Person or Firm. E. Familiarity of the location Indicate your familiarity of the location of the project. F. Anticipated Fees and Expenses a. Indicate your intent to complete the Work within the negotiated fee and include general references where this has been accomplished. b. Present an outline of the basic work plan anticipated to accomplish the work. G. Compliance with State and Federal Law State your compliance with state and federal law. IV. PROCEDURES FOR SUBMISSIONS A. Construction Managers wishing to be considered shall submit nine (9) copies of their qualification materials no later than 2:00 p.m., Local Time, Wednesday, December 31, 2014, at the office of the: Business and Operations Manager Bismarck Public Schools 806 N. Washington Street Bismarck, North Dakota, 58501

8 B. Sequence of Events: The following represents the sequence of events contemplated in the qualification and selection procedure established for retaining an architect: Advertise for proposals December 5, 2014 Proposals due December 31, 2014 Review Responses and January 1 st 4 th, 2015 prepare shortlist Interview Selected Candidates Week of January 5, 2015 Recommendation January 12, 2015 to the School Board Selection Notification January 13, 2015 END OF REQUEST FOR QUALIFICATIONS

9 Firm evaluated: Date: Evaluator: A. Past Performance (25 points) Evaluate the firm for past performance based on the following: a. Demonstrated experience and excellence in projects with comparable scale complexity and function. b. Proven capabilities for providing construction management services. Firms are asked to submit appropriate graphic material supporting comparable projects as a Construction Manager, Design Build Contractor, or General Contractor (may be the same projects). Excellent (20-25 points) Very Good (13-19 points) Good (6-12 points) Fair (0-5 points) RFQ Response Interview Comments: B. Recent/Current and Projected Workload of the Person or Firm (25 points) Evaluate the recent, current, and projected workload of the firm based on the following criteria: a. Agreement, unless prevented by circumstances outside of the firm s control, to retain the construction manager and other team members on the project until all work under this contract is complete. b. Availability of all personnel included in Section B. Excellent (20-25 points) Very Good (13-19 points) Good (6-12 points) Fair (0-5 points) RFQ Response Interview Comments:

10 C. Recent Relevant Work: List up to five projects completed within the past five years, or currently under construction that most closely resemble this project. a. Firms are asked to submit examples of projects indicating: i. Name and phone number of Owner s representative ii. Name and phone number of Architect s representative iii. Name of your project manager. Excellent (20-25 points) Very Good (13-19 points) Good (6-12 points) Fair (0-5 points) RFQ Response Interview Comments: D. Company safety record (5 points) Excellent (4-5 points) Very Good (3 points) Good (2 points) Fair (0-1 points) RFQ Response Interview Comments: E. Familiarity of the location. (10 points) Indicate the firm s familiarity of location of the project. Excellent Very Good Good Fair (8 10 points) (5 7 points) (2 4 points) (0 1 point) RFQ Response Interview Comments:

11 F. Anticipated Fees and Expenses (5 points) Excellent (4-5 points) Very Good (3 points) Good (2 points) Fair (0-1 points) RFQ Response Interview Comments: G. Compliance with State and Federal Law (5 points) Excellent (4-5 points) Very Good (3 points) Good (2 points) Fair (0-1 points) RFQ Response Interview Comments:

12 BISMARCK PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT AT RISK POINT RECAP Maximum Submission Interview Total A. Past Performance 25 B. Recent/Current and Projected 25 workload C. Recent Relevant Work 25 D. Company Safety Record 5 E. Familiarity of the Location 10 F. Anticipated Fees 5 F. Compliance with State 5 and Federal Law 100 Ranking of Firm: (circle one) Comments:

13 CONCRETE SIDEWALKS (PURPLE) 2 TURF FOOTBALL/SOCCER FIELD 3 SYNTHETIC TRACK 4 TURF BASEBALL FIELD 5 TURF SOFTBALL FIELD 6 EAST ENTRANCE BUILDING 7 NORTH RESTROOMS 8 GRANDSTANDS AND PRESS BOX 9 WEST ENTRANCE BUILDING 10 BASEBALL PRESS BOX AND STANDS BASEBALL DUGOUTS 12 SOFTBALL DUGOUTS 7 13 TENNIS COURTS 14 GRASS SOCCER FIELD GRASS PRACTICE FIELDS GRASS BASEBALL FIELD 17 GRASS SOFTBALL FIELD PARKING LOT Legacy High School Bismarck Public Schools Athletic Fields - Site Plan Black TO Box Entrance NOT SCALE - Option 2 20 SHOT PUT 21 LEGACY HIGH SCOPE OF WORK DISCUS

14 70'-0" 20'-0" 35'-0" 15'-0" 20'-0" CONCESSIONS 450 SF 24'-0" x 19'-4" FAMILY 70 SF 7'-3" x 10'-0" JANITOR 70 SF 8'-8" x 8'-4" 65'-0" VEST. 103 SF 6'-2" x 16'-8" MEN 672 SF 54'-5" x 12'-2" VEST. 103 SF 6'-2" x 16'-8" 35'-0" 5'-0" WOMEN 1050 SF 68'-0" x 15'-10" ENTRANCE GATES 10'-0" 10'-0" MECH'L/ELEC'L 144 SF 15'-4" x 9'-4" TICKETS 159 SF 17'-0" x 9'-4" 16 Scale: 3/32" = 1'-0" Preliminary - Not for Construction 30'-0" 35'-0" 5'-0" BPS Athletic Fields - East Entrance Building (3,234 SF) N

15 40'-0" JANITOR 73 SF 5'-10" x 12'-6" MEN 338 SF 31'-7" x 10'-10" WOMEN 588 SF 38'-0" x 16'-10" 60'-0" MAIN ELEC'L 118 SF 8'-0" x 14'-8" STORAGE 715 SF 29'-4" x 24'-4" WATER ENTRY 73 SF 8'-0" x 9'-0 71 BPS Athletic Fields - North Restrooms and Storage Building (2,108 SF) Scale: 3/32" = 1'-0" N Preliminary - Not for Construction

16 51'-8" 20'-0" 50'-0" 275'-0" SEATING FOR 3,500 1:12 1: '-6" BPS Athletic Fields - East Grandstands & Press Box - Site Plan Scale: 1" = 20'-0" N Preliminary - Not for Construction

17 20'-0" 23'-10" 20'-0" STORAGE 998 SF 23'-5" x 48'-0" CORRIDOR 78 SF 6'-10" x 11-5 COACH 125 SF 11'-0" x '-0" 39'-0" ELECTRICAL 85 SF 6'-0" x 14-0 MEDIA 166 SF 11'-10" x 14-0 STORAGE 869 SF 24'-2" x 48'-0" MECH'L/ELEC'L 148 SF 9'-11" x 14'-10" CORRIDOR 78 SF 6'-10" x 11-5 COACH 125 SF 11'-0" x 11-5 BPS Athletic Fields - East Grandstands & Press Box - First Floor Plan (2,041 SF) Scale: 1/8" = 1'-0" N Scale: 1/8" = 1'-0" BPS Athletic Fields - East Grandstands & Press Box - Second Floor Plan (687 SF) N Preliminary - Not for Construction

18 38'-0" CONCESSIONS 243 SF 27'-0" x 9'-0" JANITOR 73 SF 8'-4" x 9'-0" MEN 345 SF 30'-0" x 10'-4" 45'-0" WOMEN 384 SF 30'-0" x 12'-0" 7'-5" 5'-0" ENTRANCE GATES TICKETS MECH'L/ ELEC'L STORAGE 93 SF 73 SF 124 SF 11'-2" x 8'-4" 8'-8" x 8'-4" 14'-10" x 8'-4" 91 BPS Athletic Fields - West Entrance Building (1,474 SF) Scale: 3/32" = 1'-0" N Preliminary - Not for Construction

19 10'-0" 10'-0" MECH'L/ELEC'L 80 SF 8'-0" x 10'-0" 32'-0" 32'-0" PRESS BOX 240 SF 8'-0" x 30'-0" STORAGE 155 SF 8'-0" x 19'-4" BPS Athletic Fields - North Baseball Field Press Box & Grandstands - First Floor Plan (240 SF) Scale: 3/32" = 1'-0" N BPS Athletic Fields - North Baseball Field Press Box & Grandstands - Second Floor Plan (240 SF) Scale: 3/32" = 1'-0" N Preliminary - Not for Construction

20 40'-0" 12'-0" DUGOUT 440 SF 38'-9" x 11'-4" TRENCH DRAIN 11 1 BPS Athletic Fields - North Baseball Field Dugouts (440 SF) Scale: 3/16" = 1'-0" Preliminary - Not for Construction

21 36'-0" 8'-0" DUGOUT 254 SF 34'-9" x 7'-4" 12 1 BPS Athletic Fields - Softball and Baseball Field Dugouts (254 SF) Scale: 3/16" = 1'-0" Preliminary - Not for Construction

stadium designs BLRB architects TACOMA // SPOKANE // PORTLAND // BEND

stadium designs BLRB architects TACOMA // SPOKANE // PORTLAND // BEND stadium designs TACOMA // SPOKANE // PORTLAND // BEND about blrb architects Founded in 1953, BLRB is a mid-size regional firm with offices throughout the Northwest in Tacoma, Spokane, (Washington) Portland

More information

RFQ of CM/General Contractors Event Level Club Renovation

RFQ of CM/General Contractors Event Level Club Renovation RFQ of CM/General Contractors Event Level Club Renovation SUMMARY Tampa Bay Sports and Entertainment invites your firm to submit qualifications in accordance with this RFQ. We are seeking proposals for

More information

Request for Qualifications (RFQ) City of Farmersville, Texas Parks Planning and Development Services

Request for Qualifications (RFQ) City of Farmersville, Texas Parks Planning and Development Services Request for Qualifications (RFQ) City of Farmersville, Texas Parks Planning and Development Services Purpose The City of Farmersville is soliciting Statement of Qualifications for a Parks Planner from

More information

Please note that the attached forms will be used to evaluate the proposals as well as the interview itself.

Please note that the attached forms will be used to evaluate the proposals as well as the interview itself. CITY OF RAPID CITY RAPID CITY, SOUTH DAKOTA 57701 Public Works Department Engineering Services Division 300 Sixth Street Telephone: (605) 394-4154 FAX: (605) 355-3083 Web: www.rcgov.org November 12, 2013

More information

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield

More information

Cubs Charities Diamond Project

Cubs Charities Diamond Project Cubs Charities Diamond Project 2016 Request for Proposals A thriving community is a healthy community one which offers youth the chance to play, supports the civic spirit of sportsmanship and embraces

More information

1. PROJECT DESCRIPTIONS.

1. PROJECT DESCRIPTIONS. SAN ELIZARIO INDEPENDENT SCHOOL DISTRICT REQUEST FOR PROPOSALS FOR FOR CONSTRUCTION MANAGER AT RISK FOR NEW FIELDHOUSE AND STEM BUILDING ADDITION AT SAN ELIZARIO HIGH SCHOOL AND NEW SUPPORT SERVICES BUILDING

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR) For the Project: CITY OF KATY NEW KATY FIRE STATION #2 Issued: August 13, 2015 Katy Fire Station #2 August 13, 2015 Page 1 of 17 Request

More information

REQUEST FOR COMPETITIVE SEALED PROPOSALS STADIUM IMPROVEMENTS, DATA CENTER PROJECT AND/OR BASEBALL/SOFTBALL COMPLEX PROJECT FOR DRIPPING SPRINGS ISD

REQUEST FOR COMPETITIVE SEALED PROPOSALS STADIUM IMPROVEMENTS, DATA CENTER PROJECT AND/OR BASEBALL/SOFTBALL COMPLEX PROJECT FOR DRIPPING SPRINGS ISD REQUEST FOR COMPETITIVE SEALED PROPOSALS BASEBALL/SOFTBALL COMPLEX PROJECT FOR DRIPPING SPRINGS ISD The Dripping Springs Independent School District ( DSISD or the District ) is requesting Competitive

More information

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho

Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho Independent School District No. 1 Strive Achieve Succeed Go Beyond Lewiston, Idaho REQUEST FOR QUALIFICATIONS Independent School District No. 1, Lewiston, Idaho ( District ) is seeking responses from individuals

More information

Eanes Independent School District

Eanes Independent School District EANES INDEPENDENT SCHOOL DISTRICT 601 Camp Craft Road Austin, Texas 78746 Request for Qualifications Construction Manager at Risk Services Eanes Independent School District Construct a District Operations

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES Big Rapids Public Schools Building Program 2005 OWNER Big Rapids Public Schools 21034 15-Mile Road Big Rapids, Michigan 49307 PHONE: (231) 796-2627

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES TO ASSIST WITH AN EDUCATIONAL NEEDS ASSESSMENT OF BEAVER DAM HIGH SCHOOL ~ October 2015 ~ Issuing Agency: Beaver Dam Unified School District Educational

More information

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT

REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT REQUEST FOR QUALIFICATIONS PROJECT / PROGRAM MANAGEMENT CONSULTANT DUE: January 9, 2015 @ 5:00 PM Lopez Island School District 86 School Road Lopez Island, WA 98261 Contact: Bill Evans, Superintendent

More information

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School

Request for Qualifications. Owner s Project Manager. Design and Construction of a New School Facility. K~8 Charter School Request for Qualifications Owner s Project Manager Design and Construction of a New School Facility K~8 Charter School 26 Madeira Avenue New Bedford, MA 02746 REQUEST FOR QUALIFICATIONS (RFQ) Issued: 4/16/2014

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES)

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES) REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC SERVICES) Return Completed Qualifications To: Twin Falls School District No. 411 Administrative Office 201 Main Avenue West Twin

More information

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011

Centinela Valley Union High School District. Measure CV Masterplan Update June 2011 Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS ADVERTISEMENT FOR BIDS Bids will be received at the office of the Niles City School District, 100 West Avenue, Niles, Ohio, 44446 until 12:00 PM on Friday, March 22, 2013 and will be opened and read immediately

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: School District Board + OFCC Project Name Wellington New K-8 EM/MS Response Deadline

More information

UC Riverside Spring Track Classic March 26-28, 2015 / UC Riverside Track and Field Stadium

UC Riverside Spring Track Classic March 26-28, 2015 / UC Riverside Track and Field Stadium UC Riverside Spring Track Classic March 26-28, 2015 / UC Riverside Track and Field Stadium Meet and Entry Information Daniel Newell I Meet Director I Email: dnewell@ucr.edu Invited Teams: Cal State Fullerton,

More information

SPONSORSHIP PROPOSAL 2014-2015

SPONSORSHIP PROPOSAL 2014-2015 HOUGHTON COLLEGE ATHLETICS SPONSORSHIP PROPOSAL 2014-2015 One Willard Avenue Houghton, NY 14744 P 585.567.9556 F 585.567.9365 brianna.allen@houghton.edu athletics.houghton.edu THE HIGHLANDER EXPERIENCE

More information

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR A New High School Competition Gym RFP No. 052015-036 PROPOSALS ARE DUE 10:00

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519 REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR PIERSON ELEMENTARY REPLACEMENT SCHOOL PROJECT NO. 164519 School Board of Volusia County Florida Facilities Services 3750 Olson Drive, Daytona Beach

More information

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For Construction Management Services for the Renovation and Expansion of Portsmouth Middle School INVITATION The City of Portsmouth,

More information

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE

N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE N O T I C E REQUEST FOR STATEMENT OF QUALIFICATIONS RFQ#1610-007 POLICE DEPARTMENT PARKING GARAGE The City of Frisco is seeking qualification statements from experienced engineering, architecture, and

More information

IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011

IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011 IDALIA SCHOOL DISTRICT RJ-3 REQUEST FOR QUALIFICATIONS (RFQ) CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING (CM/GC) SERVICES DECEMBER 14, 2011 PROJECT: New PK-12 School Facility Idalia, Colorado Idalia School

More information

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117

REQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117 Introduction The Board of Education for Jacksonville School District 117 is soliciting Statements of Interest and Qualifications pursuant to 50 ILCS 510/0.01 from qualified firms to provide comprehensive

More information

Millersville University Athletic Facilities Priority Usage Guidelines Revised 4/16/14. Policy and Procedures

Millersville University Athletic Facilities Priority Usage Guidelines Revised 4/16/14. Policy and Procedures Millersville University Athletic Facilities Priority Usage Guidelines Revised 4/16/14 Policy and Procedures Campus Recreation will partner with, Wellness and Sport Sciences, Dining & Conference Services

More information

CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015

CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015 CONSTRUCTION MANAGEMENT SERVICES for the new REPLACEMENT NORTH DORCHESTER HIGH SCHOOL Dorchester County Public Schools December 9, 2015 Dorchester County Public Schools is intending to engage the services

More information

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition

Request for Proposal No. RFP02658. Project Construction Management Services. for. Capital Levy BTA IV Project: Ingraham High School Classroom Addition Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP02658

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO. 164514 Contact: Mr. Tom Brown, Senior Construction Project Manager Facilities Services,

More information

SELECTED SPECIAL EVENTS PROJECTS

SELECTED SPECIAL EVENTS PROJECTS 1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) Administration of Project: School District Board + OFCC Project Name Groveport Madison High School Response Deadline 10/17/2014 4:00pm local time Project

More information

RFQ-2-13-06 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT (AT RISK) SERVICES

RFQ-2-13-06 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT (AT RISK) SERVICES RFQ-2-13-06 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT (AT RISK) SERVICES WICKHAM PARK COMMUNITY CENTER Parkway Drive, Melbourne, Florida 32935 The Brevard County Board of County Commissioners

More information

REQUESTS FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES. for SCHOOL FACILITIES PROJECTS. Issued: Thursday, July 30, 2009

REQUESTS FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES. for SCHOOL FACILITIES PROJECTS. Issued: Thursday, July 30, 2009 REQUESTS FOR QUALIFICATIONS for CONSTRUCTION MANAGEMENT SERVICES for SCHOOL FACILITIES PROJECTS Contract No.: NT-0024-M01 for the Thomas G Connors Elementary School Hoboken, NJ Issued: Thursday, July 30,

More information

Redevelopment of the King George V Sports & Community Precinct

Redevelopment of the King George V Sports & Community Precinct Redevelopment of the King George V Sports & Community Precinct Dated: 23 rd May 2014 Historical Information October 2007 Fire in the Original Cresswell Beakley Grandstand Mid 2008 @ Leisure completed a

More information

REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES REQUEST FOR QUALIFICATIONS (RFQ) DIVISION OF THE STATE ARCHITECT INSPECTOR OF RECORD SERVICES 1. STATEMENTS OF QUALIFICATIONS REQUESTED The San Bernardino Community College District (District) Facilities

More information

Specific heat conditions will determine activity restrictions during practice according to the following:

Specific heat conditions will determine activity restrictions during practice according to the following: Keller ISD Athletics Notification of temperature Staff Athletic Trainer will obtain weather report from National Weather service by 9:00am each morning for morning workouts. The Head Coach of the affected

More information

CONNECTICUT STATE DEPARTMENT OF EDUCATION Division of Finance and Internal Operations Bureau of School Facilities

CONNECTICUT STATE DEPARTMENT OF EDUCATION Division of Finance and Internal Operations Bureau of School Facilities Form ED046 Instructions Page 1 of 5 CONNECTICUT STATE DEPARTMENT OF EDUCATION Division of Finance and Internal Operations Bureau of School Facilities Request for School Construction Progress Payments (ED046)

More information

REQUEST FOR PROPOSAL FOOD TRUCK SERVICES March 17, 2015

REQUEST FOR PROPOSAL FOOD TRUCK SERVICES March 17, 2015 320 W. Jackson Avenue Naperville, IL 60540 (630) 848-5000 www.napervilleparks.org REQUEST FOR PROPOSAL FOOD TRUCK SERVICES March 17, 2015 Qualified vendors are invited to submit a proposal, subject to

More information

Douglas County School District CMAR RFP Addendum #1- Sharing of Inquires September 8, 2010 ** Please Acknowledge you received this addendum in your proposal INQUIRIES RECEIVED 1. In Article 7, Item A,

More information

can seem daunting at the start. The entire process can take up to three years. Before you embark

can seem daunting at the start. The entire process can take up to three years. Before you embark FACILITY DESIGN: AN ARCHITECT S PERSPECTIVE Jeffrey L. Bruce, FASLA President Jeffrey L. Bruce & Company LLC Landscape Architects & Planners Facility design is a collaboration between the owner and architect.

More information

Request for Qualifications 2015-162

Request for Qualifications 2015-162 Kitsap County Human Services Department Request for Qualifications 2015-162 Architectural and Project Management Services - Kitsap County Work Release Facility Remodel Response Deadline: November 17, 2015

More information

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached

Corrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered

More information

Design-Build Project for A Soccer Complex in Creve Coeur Park Industry Information Meeting. Monday June 6, 2016 St Louis County Council Chambers

Design-Build Project for A Soccer Complex in Creve Coeur Park Industry Information Meeting. Monday June 6, 2016 St Louis County Council Chambers Design-Build Project for A Soccer Complex in Creve Coeur Park Industry Information Meeting Monday June 6, 2016 St Louis County Council Chambers Welcome Sign in sheet / handouts - Introductions - Project

More information

Mid Michigan Community College

Mid Michigan Community College Mid Michigan Community College REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT/CONSTRUCTOR SERVICES PART 1 -- GENERAL INSTRUCTIONS A. PROJECT DESCRIPTION Mid Michigan Community College (the "Owner")

More information

CUSD Facility Audit Standards March 6, 2009

CUSD Facility Audit Standards March 6, 2009 General Overview- All Clovis USD district support facilities, primary and secondary campuses built prior to 2001 will be evaluated in (3) basic areas. (1) Compare to newer campus building standards and

More information

Construction Management At-Risk

Construction Management At-Risk Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction

More information

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital

Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital Request for Proposal East Tower Nursing Unit and Infrastructure Upgrade Grossmont Hospital June 21, 2007 The Grossmont Healthcare District (GHD) will accept proposals for Architectural and Engineering

More information

New WMHS Construction Management Firm

New WMHS Construction Management Firm New WMHS Construction Management Firm RFQ Schedule November 5, 2013 Board Meeting Approval to Advertise and use revised RFQ Week December 9, 2013 Ad runs in local papers (Thursday Dec. 12 th ) Week December

More information

NOTICE TO CM/GC Companies

NOTICE TO CM/GC Companies NOTICE TO CM/GC Companies Facilities and Construction Management Jefferson County School District R-1 (Jeffco) is pre-qualifying Construction Manager/General Contractors for CM/GC services for a new K-6

More information

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT

REQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,

More information

DINUBA UNIFIED SCHOOL DISTRICT. 1327 East El Monte Way Dinuba CA 93618. Request for Qualifications For Construction Management Services

DINUBA UNIFIED SCHOOL DISTRICT. 1327 East El Monte Way Dinuba CA 93618. Request for Qualifications For Construction Management Services DINUBA UNIFIED SCHOOL DISTRICT 1327 East El Monte Way Dinuba CA 93618 Request for Qualifications For Construction Management Services Request for Qualifications Issued: March 28, 2014 Deadline for Submittal

More information

Project Proposal: Field Design for Swarthmore College Softball. Kelly Siano

Project Proposal: Field Design for Swarthmore College Softball. Kelly Siano Project Proposal: Field Design for Swarthmore College Softball Kelly Siano Swarthmore College, Department of Engineering Advisor: Faruq Siddiqui Engineering 90 Senior Design Submitted December 6, 2006

More information

Florida State Ticket Marketplace. Gary Huff, Associate Director Florida State University Athletics Administration

Florida State Ticket Marketplace. Gary Huff, Associate Director Florida State University Athletics Administration Florida State Ticket Marketplace Gary Huff, Associate Director Florida State University Athletics Administration Abstract With the advent of digital ticketing - tying admission to events to a unique bar

More information

Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida

Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida Young H. Kwak, Ph.D. 1 and Randall Bushey, P.E. 2 Abstract The traditional

More information

Athletics Party Tax Deductions - Table 5 Overview

Athletics Party Tax Deductions - Table 5 Overview HIGHER EDUCATION ACT REPORTING Reporting of Institutional Information Concerning Intercollegiate Athletics Programs All coeducational institutions of higher education that participate in any Federal student

More information

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Primary Author: Laura McCluskey 4801 N Career Ave Sioux Falls, SD

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

ADAIR COUNTY BOARD OF EDUCATION CLASSIFIED SALARY SCHEDULE 2015-2016

ADAIR COUNTY BOARD OF EDUCATION CLASSIFIED SALARY SCHEDULE 2015-2016 CLASSIFIED SALARY SCHEDULE YEARS EXPERIENCE POSITION HOURS PER DAY 0-1 2-4 5-7 8-14 15-19 20+ Instructional Asst., Secretaries, Attendance clerks (extra.50 hr) Data Entry Assistants 186-220 Days 6.5 $

More information

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS

CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS CHAPTER 48-01.2 PUBLIC IMPROVEMENT BIDS AND CONTRACTS 48-01.2-01. Definitions. In this chapter, unless the context otherwise requires: 1. "Agency construction management" means a public improvement delivery

More information

Emergency Action Plans (EAP)

Emergency Action Plans (EAP) Emergency Action Plans (EAP) Cheel Arena Emergency Action Plan Emergency Personnel: Certified Athletic Trainer, team physicians and Ambulance services will be on site for men s hockey games. Certified

More information

Guide to Writing Your Athletic Department Report/Overview

Guide to Writing Your Athletic Department Report/Overview Guide to Writing Your Athletic Department Report/Overview Distributed by the NJCAA to Member Colleges October 2006 TABLE OF CONTENTS Overview of Athletic Programs...4 Athletic Department Staff...5 Athletic

More information

Puget Sound Regional Council

Puget Sound Regional Council PSRC Request for Qualifications for On-Call Services for Communication and Public Involvement Consultant Services Solicited by the Released: September 15, 2009 Submissions Due: 4:00pm, October 6, 2009

More information

Questions and Answers

Questions and Answers Questions and Answers 1. Can pictures be inserted in the Request for Qualifications package? Do they count toward the number of pages submitted? A. Yes, you can insert photos as long as the total page

More information

PORT OF KENNEWICK. Request for Qualifications. Planning, Environmental and Consulting Services for Port Comprehensive Plan

PORT OF KENNEWICK. Request for Qualifications. Planning, Environmental and Consulting Services for Port Comprehensive Plan PORT OF KENNEWICK Request for Qualifications Planning, Environmental for Port Comprehensive Plan The ( Port ) is in the process of evaluating the most effective use of the Port s properties in and around

More information

Public Building Commission of Chicago. Board Meeting August 20, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013 Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting

More information

UNION CITY BOARD OF EDUCATION 3912 BERGEN TURNPIKE UNION CITY, NEW JERSEY 07087 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES

UNION CITY BOARD OF EDUCATION 3912 BERGEN TURNPIKE UNION CITY, NEW JERSEY 07087 REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT SERVICES UNION CITY BOARD OF EDUCATION 3912 BERGEN TURNPIKE UNION CITY, NEW JERSEY 07087 REQUEST FOR QUALIFICATIONS for CONSTRUCTION MANAGEMENT SERVICES for the Sara M. Gilmore Elementary School Renovation and

More information

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES

GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES REQUEST FOR QUALIFICATIONS GENERAL CONTRACTOR / CONSTRUCTION MANAGER SERVICES NEW DINING HALL MONTANA STATE UNIVERSITY Bozeman, Montana PPA NO. 15-0103 Campus Planning, Design & Construction Plew Building

More information

Section II. Data Collection

Section II. Data Collection Section II. Data Collection Overview: Three methods were developed to collect data for this study: A meeting with competitive and recreational sport stakeholders. Each stakeholder was asked to respond

More information

2016 WOODY WILSON HS INVITATIONAL INFORMATION PACKET

2016 WOODY WILSON HS INVITATIONAL INFORMATION PACKET 2016 WOODY WILSON HS INVITATIONAL INFORMATION PACKET LOCATION DATE FACILITIES TIMING ENTRIES University of California, Davis Woody Wilson Track (Map enclosed) Friday, Apr. 15, 2016 The Woody Wilson High

More information

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION LEGEND RENOVATION ADDITION DRIVE IMPROVEMENTS WIDEN BUS LOOP ROAD TO WEST PROVIDE SECURE ADMINISTRATION ENTRANCE REPLACE AGING ELECTRICAL PANELS RENOVATE SPACE FOR FIVE (5) SCIENCE CLASSROOMS CONVERT EXISTING

More information

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT AT RISK A NEW CONSTRUCTION DELIVERY METHOD For PUBLIC SCHOOLS Senate Bill 914, ratified by the General Assembly December 6, 2001, made more changes to the public bidding and construction

More information

Samford University - Facts and Trivia

Samford University - Facts and Trivia SAMFORD SPORTS MARKETING 800 Lakeshore Drive Birmingham, AL 35229 Phone: 205.726.2966 Fax: 205.726 2132 www.samfordsports.com UNIVERSITY Quick Facts about Samford University Founded by a group of educational,

More information

PANOLA COLLEGE REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK (2 STEP PROCESS)

PANOLA COLLEGE REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK (2 STEP PROCESS) (2 STEP PROCESS) OPENING DATE: AUGUST 21, 2013 TIME: 3:00 P.M. LOCATION: Panola College Magnolia Room, Administration Bldg. 1109 West Panola Carthage, TX 75633 TELEPHONE: (903) 693-2023 Request for Qualifications

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

OHLONE COMMUNITY COLLEGE BOND MEASURE G

OHLONE COMMUNITY COLLEGE BOND MEASURE G Monthly Report OHLONE COMMUNITY COLLEGE BOND MEASURE G Fremont, California June 2014 TABLE OF CONTENTS 1. Executive Summary 2. Safety Status 3. Schedule Status 4. Design Progress 5. Construction Progress

More information

Equity in Athletics 2014. Screening Questions

Equity in Athletics 2014. Screening Questions Equity in Athletics 2014 Screening Questions Please answer these questions carefully as your responses will determine which subsequent data entry screens are appropriate for your institution. 1. How will

More information

TROY UNIVERSITY ATHLETIC TRAINING DEPARTMENT EMERGENCY PHONE NUMBERS

TROY UNIVERSITY ATHLETIC TRAINING DEPARTMENT EMERGENCY PHONE NUMBERS TROY UNIVERSITY ATHLETIC TRAINING DEPARTMENT EMERGENCY PHONE NUMBERS Campus Police 334-670-3215 University Police Cell Phone..334-670-1999 Troy Police..334-566-0500 Haynes Ambulance..334-566-0518 Care

More information

University of Wisconsin-Madison Rec Sports Facilities Master Plan

University of Wisconsin-Madison Rec Sports Facilities Master Plan University of Wisconsin-Madison Rec Sports Facilities Master Plan Bill Elvey, Associate Vice Chancellor, UW Facilities Planning & Management John Horn, Director, UW Recreational Sports Gary Brown, Director,

More information

REQUEST FOR QUALIFICATIONS. 2013 Concrete Rehabilitation Program. Various Locations within the City of Centennial PROJECT NO.

REQUEST FOR QUALIFICATIONS. 2013 Concrete Rehabilitation Program. Various Locations within the City of Centennial PROJECT NO. REQUEST FOR QUALIFICATIONS 2013 Concrete Rehabilitation Program Various Locations within the City of Centennial PROJECT NO. 2013-RFQ-13-01-01 Request for Qualifications due: Date: Friday, January 11, 2013

More information

Broad Run Athletics Sponsorship and Advertising Kit

Broad Run Athletics Sponsorship and Advertising Kit Broad Run Athletics 2014-2015 Academic Year Be a SPARTAN Supporter; Be part of the Broad Run History. Broad Run High School Dear Spartan Supporter, Broad Run High School has grown to be one of the best

More information

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT ADVERTISEMENT: REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT The WALTON COUNTY SCHOOL DISTRICT will receive

More information

Request of Qualification Proposal for Construction Management Services

Request of Qualification Proposal for Construction Management Services Request of Qualification Proposal for Construction Management Services Dated June 10, 2014 Table of Contents Overview 3 Introduction 4 Scope of Construction Managers Services 4 Submission of Qualifications

More information

Architectural Consulting Services for a New Automotive Building. Lakes Region Community College, Laconia, NH

Architectural Consulting Services for a New Automotive Building. Lakes Region Community College, Laconia, NH LRC14 1A REQUEST FOR QUALIFICATIONS Architectural Consulting Services for a New Automotive Building and Master Plan for future Marine and Mobil Diesel Technologies Programs and at a later date Design Services

More information

IT Optimization Consulting Services for Organizational Change Management (OCM)

IT Optimization Consulting Services for Organizational Change Management (OCM) IT Optimization Consulting Services for Organizational Change Management (OCM) April 5, 2013 REQUEST FOR QUOTATION MINORITY BUSINESS ENTERPRISE (MBE) PREFERRED State Term Schedule Table of Contents 1.

More information

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT Project Description and Scope The City and County of Broomfield, Colorado (Broomfield) hereby solicits this Request for Qualifications (RFQ) to prequalify and shortlist up to five (5) foundation repair

More information

PLANNING TOOL FOR FUTURE LEAGUE NEEDS

PLANNING TOOL FOR FUTURE LEAGUE NEEDS Facility surveys may also be entered online at: http://facilitysurveymuscocom LITTLE LEAGUE BASEBALL & SOFTBALL NATIONAL FACILITY SURVEY 2016 District #: (if needed) (if needed) City: State: President:

More information

General Contractor Pre-qualification Requirements

General Contractor Pre-qualification Requirements General Contractor Pre-qualification Requirements Trevor Arnett / Clark Atlanta University Atlanta, Georgia Project Description Trevor Arnett is an existing historic building constructed in 1931 as a library

More information

Town of Montreat Buncombe County, North Carolina

Town of Montreat Buncombe County, North Carolina Town of Montreat Buncombe County, North Carolina Request for Qualifications For Professional Architectural Services In Providing Design Services for the Construction a New Montreat Town Hall January 9,

More information

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES. PARKVIEW ELEMENTARY SCHOOL October 2014

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES. PARKVIEW ELEMENTARY SCHOOL October 2014 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES PARKVIEW ELEMENTARY SCHOOL October 2014 I. PROJECT INFORMATION A. Name: Bellingham School District Parkview Elementary School B. Location: 3033 Coolidge

More information

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the

More information

REQUEST FOR QUOTES: Marketing Agency of Record

REQUEST FOR QUOTES: Marketing Agency of Record REQUEST FOR QUOTES: Marketing Agency of Record RELEASE DATE: March 5, 2012 DEADLINE FOR SUBMISSIONS: March 21, 2012 EE Request for Quotes Marketing Agency of Record March 5, 2012 i Contents BACKGROUND...

More information

LUBBOCK CHRISTIAN ATHLETIC BOOSTER CLUB

LUBBOCK CHRISTIAN ATHLETIC BOOSTER CLUB LUBBOCK CHRISTIAN ATHLETIC BOOSTER CLUB BYLAWS ARTICLE I NAME The name of the association shall be the Lubbock Christian High School Athletic Booster Club. ARTICLE II MISSION STATEMENT The mission of the

More information

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments.

OBJECTIVE To establish procedures for administration of construction manager agreements, including negotiation, contracting and payments. OP-B-11-D2 ADMINISTRATION OF CONSTRUCTION MANAGER AGREEMENTS SPECIFIC AUTHORITY Sections 240.209(3)(p), 1001.74, 1013.46, F. S. OBJECTIVE To establish procedures for administration of construction manager

More information

Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services

Executive Office for Administration & Finance. Request for Qualifications For Construction Management Services Executive Office for Administration & Finance Request for Qualifications For Construction Management Services Massachusetts State Project (Project Number) (Full Project Name and Location), Massachusetts

More information

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name RH-Renovations Summer 2013 Response Deadline 1/03/13

More information

KHSAA TITLE IX RE-VISIT FINAL AUDIT REPORT. (For schools re-visited during the 2013-2014 school year)

KHSAA TITLE IX RE-VISIT FINAL AUDIT REPORT. (For schools re-visited during the 2013-2014 school year) KHSAA Form T76 REV.9/13 KHSAA TITLE IX RE-VISIT FINAL AUDIT REPORT (For schools re-visited during the 2013-2014 school year) 1. Completed Required Forms School: Beechwood Prepared By: Gary W. Lawson Date

More information

Stanford University Presents The Stanford Track & Field Invitational April 1-2, 2016 Cobb Track and Angell Field COLLEGE/OPEN ENTRY INFORMATION

Stanford University Presents The Stanford Track & Field Invitational April 1-2, 2016 Cobb Track and Angell Field COLLEGE/OPEN ENTRY INFORMATION Stanford University Presents The Stanford Track & Field Invitational April 1-2, 2016 Cobb Track and Angell Field COLLEGE/OPEN ENTRY INFORMATION DIRECT ALL COMMUNICATION TO: Jess Riden - Meet Director Stanford

More information

Lake Charles Ward 3 Recreation Improvements To University Park

Lake Charles Ward 3 Recreation Improvements To University Park DATE APRIL 2015 Drawing Index A0.0 Cover Survey A1.0 Site Plan & Details A2.0 Pool Area Site Plan & Demo Plan A2.1 Pool Area Building Improvements A2.2 Pool Area Elevations & Wall Section A3.0 Basketball

More information