An Update on the Transformation Plan, School Finances, and the Vision for Education Facilities Plan for 21 st Century Learning Presentation to the
|
|
- Barbara Dorsey
- 8 years ago
- Views:
Transcription
1 An Update on the Transformation Plan, School Finances, and the Vision for Education Facilities Plan for 21 st Century Learning Presentation to the Citizens of Sandusky, Ohio Tuesday, January 19, 2016 Wednesday, January 20, 2016 Sandusky High School Cafeteria 6:00 pm
2 THANK YOU TO THE SANDUSKY COMMUNITY 1
3 Gina Deppert, Brigitte Green-Churchwell, Martha Murray, Jeff Krabill, Kate Vargo, Thomas Patterson, and Dr. Eugene T.W. Sanders 2
4 PRIDE TRADITION EXCELLENCE PURPOSE: The purpose of our meeting is to update the Citizens of Sandusky, Ohio about the upcoming proposals regarding the Transformation Plan, Financial Status, and the 2016 School Facilities Vision for the Sandusky City Schools. 3
5 GOALS FOR OUR MEETING TODAY: 1. Provide an overview of activities since November 2014 that has resulted in the facilities proposals and an overview of the district s financial stability. 2. Communicate that the facilities recommendation is based on the district's academic goals, called The Transformation Plan. 3. Communicate all of the significant aspects of the facilities plan, including the rationale, vision, logic, configuration, proposals, options on location, the historic nature of this facilities opportunity, and our partnership with Ohio Facilities Construction Commission (OFCC). 4. Provide comprehensive details on all cost factors associated with the proposals. 5. Continue our commitment to transparency and open dialogue on all issues associated with the facilities vision and to post all comments and questions on our website for observation and review by all members of the community. 4
6 5
7 GENERAL FUND OPERATING REVENUE TOTAL: $44,522,056 Other Revenue $6,680,849 15% FINANCIALS Sandusky City Schools General Fund Cash Balance expected to continue to increase each year. The General Fund Cash Balances are used as a Rainy Day reserve fund to offset emergencies. State Education Aid $19,068,579 43% Local Property Taxes $18,772,628 42% The Ohio Department of Education has increased funding to the district approximately 7.5% for the current school year. The Five Year Financial Forecast for the operating budget is projecting Sandusky City School to continue to remain financially stable 6
8 KEY TERMS TO UNDERSTAND Ohio Facilities Construction Commission (OFCC): A state agency in Columbus created to work with local school districts to build and renovate schools in the state of Ohio, as a result of the tobacco settlement dollars. Two key roles for the OFCC with our district will be to work as a partner with SCS to build schools and determine the percentage of local share that taxpayers will pay to receive the state share to build new buildings. Co-Funded Percentage: A co-funding percentage is determined by OFCC that will split the cost of the facilities program with the local school district citizens and the State of Ohio. The current cost sharing percentage for the Sandusky City School Residents is 36% and the State share is 64%. Local Funded Initiative (LFI): A cost that is not shared by the State of Ohio (OFCC) for the facilities program. This is a cost that the district citizens must cover 100% of the cost for items that the State will not co-fund based on the OFCC rules. Examples of facilities not co-funded include auditoriums, swimming pools, athletics facilities, and PreK rooms. 7
9 KEY TERMS TO UNDERSTAND (cont.) STEAM: Science, Technology, Engineering, Arts, and Mathematics Maintenance Millage: All OFCC projects in Ohio are required to have a financial amount set aside in order to ensure that there are dedicated funds to address building maintenance for the newly built facilities in the district. The OFCC (State of Ohio) has a required millage of.50 (or one-half mill). Abatement/Demo Budget: A specific financial amount will be dedicated to abating and demolishing school buildings and is a separate part of the each presented proposal. 8
10 CORE DESIGN VALUES OF THE FACILITIES VISION Emphasis on centralizing educational classes and students as a collective group (grade level being organized together to enhance educational attainment) Science labs at Sandusky High School to support the STEAM initiative (upgrade science labs at SHS for the first time since 1957) A commitment to PreK education for early childhood development Identifying Local Funded Initiative investments that support long-term goals for students and families Investment in the Frohman Planetarium to upgrade to a 21 st Science Center Learning Facility Partner with the City of Sandusky and interested business, civic, and social agencies to identify a purpose for historic buildings in the district 9
11 CORE DESIGN VALUES OF THE FACILITIES VISION (cont.) Room 300 and Room 301 at Sandusky High School redesigned for an enhanced learning environment Seek input and feedback on the facilities vision Communicate the facilities vision as a key economic and historic community development opportunity Present a consensus plan to the Board of Education for a formal partnership agreement with OFCC by Thursday, April 7, 2016 Consider placing a bond issue on the ballot for consideration for November
12 NOTES 11
13 Scenario 1: Build a PreK-6 school on the site next to Sandusky High School. Renovate current science labs at Sandusky High School. A local funded initiative would include the following upgrades: science labs, upgrades for the Frohman Planetarium at the Sandusky High School, Rooms 300 and 301 at Sandusky High School and technology upgrades to include wireless connectivity. This would also cover additional preschool classrooms that are not funded by the Ohio Facilities Construction Commission. * All millage projections include a required one half mill for maintenance of facilities. This is required by state mandate. ** Actual millage will be confirmed by the Erie County Auditor s Office. 12
14 Scenario 2: Build a new PreK-2 at the current Hancock Elementary site, and build a new 3-6 on the current Ontario Elementary site. Renovate current science labs at Sandusky High School. A local funded initiative would include the following upgrades: science labs, upgrades for the Frohman Planetarium at the Sandusky High School, Rooms 300 and 301 at Sandusky High School and technology upgrades to include wireless connectivity. This would also cover additional preschool classrooms that are not funded by the Ohio Facilities Construction Commission. * All millage projections include a required one half mill for maintenance of facilities. This is required by state mandate. ** Actual millage will be confirmed by the Erie County Auditor s Office. 13
15 Scenario 3: Build Global Education Center (GEC) on site next to Sandusky High School with indoor track and with a 50M swimming pool. Or build the GEC with a 3-6 building on site and have a PreK-2 building at either current Ontario Elementary or current Hancock Elementary. A local funded initiative would include the following upgrades: science labs, upgrades for the Frohman Planetarium at the Sandusky High School, Rooms 300 and 301 at Sandusky High School and technology upgrades to include wireless connectivity. The new PreK-2 building and a new 3-6 building will be co-funded from the Ohio Facilities Construction Commission. * All millage projections include a required one half mill for maintenance of facilities. This is required by state mandate. ** Actual millage will be confirmed by the Erie County Auditor s Office. 14
16 Scenario 4A: Build a new Sandusky High School This scenario involves demolishing the current Sandusky High School and building a brand new school on the current site. The construction of a new high school would include the current middle school student population and would essentially comprise a grade 7-12 configuration. Based upon the current square footage of the building, which is 380,000 square feet, the new high school would be reduced by 65,000 square feet because of the smaller enrollment numbers. In this scenario, Ohio Facilities Construction Commission would not co-fund the construction of a new auditorium, auxiliary gym, and natatorium. * All millage projections include a required one half mill for maintenance of facilities. This is required by state mandate. ** Actual millage will be confirmed by the Erie County Auditor s Office. 15
17 Scenario 4B: Renovate the Current Sandusky High School This scenario involves renovating the entire Sandusky High School. Renovation essentially means a new heating and air conditioning system and renovating the current structure. The renovation of our current high school would include the current middle school student population and would essentially be a grade 7-12 configuration. Based upon the current 380,000 square footage building, a renovated high school would cost additional Local Funded Initiative because our student enrollment is less than the square footage that Ohio Facilities Construction Commission will co-fund, resulting in additional cost to renovate the building. The required Local Funded Initiative for renovation will be $18,320, * All millage projections include a required one half mill for maintenance of facilities. This is required by state mandate. ** Actual millage will be confirmed by the Erie County Auditor s Office. 16
18 POTENTIAL IMPLICATIONS FOR ALL DISTRICT FACILTIES BASED ON VARIOUS SCENARIO OPTIONS Hancock Elementary and Ontario Elementary Schools will have new buildings, demolished, or repurposed for investment options based on the presented scenarios Mills Elementary School to be repurposed into the Adult Education and Career Center for Sandusky City Schools (allowing more space for Sandusky Middle School students) Osborne Elementary Schools identified as a repurposed facility in partnership with the City of Sandusky (potential repurpose as a mixed-used senior citizens facility) Venice Heights Elementary School to be repurposed into the Regional Center for Advanced Academic Studies (full-time gifted center with expansion options for program development) Jackson Junior High facility identified as a partial demolition, with goal of capitalizing on retaining the gymnasium and auditorium, and potential use as a transitional space Adams Junior High facility retained as a educational option and transitional space (retain vision for the Sandusky Digital Academy) 17
19 KEY NEXT STEPS AND TIMELINE Share and receive feedback from internal and external stakeholders (SCS faculty and staff, parents, students, business leaders, faith leader, elected officials, and interested citizens) Brief the Editorial Board of the Sandusky Register Communicate the facilities vision via district website, social media, and related local communications outlets Conduct community forums in January, February and March Communicate the key timeline of Thursday, April 7, 2016 as the date for the Board of Education to formalize a vote to partner with OFCC and the selection of a building scenario and specific locations Communicate and seek feedback at monthly school board meetings in February, March, and April
20
Frequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
More informationDesign and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
More informationWausau School District. Please vote! Referendum Tuesday, April 7, 2015. Our Mission To advance student learning, achievement, and success.
Wausau School District Referendum Tuesday, April 7, 2015 Please vote! Our Mission To advance student learning, achievement, and success. Background Shared Key Interests (Align to Referendum) May 2011 A
More informationSCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers
SCHOOL DISTRICT BUILDING RENOVATION 2016 Opportunity Questions and Answers WHAT IS THE ISSUE? Last year our School Board entered into a full-scale study of our educational facilities conducted by the Ohio
More informationA Closer Look at the CMS Bond Request
Charlotte-Mecklenburg Schools 2013 Bond Referendum Our Children. Our Schools. Our Future. A Closer Look at the CMS Bond Request On Nov. 5, Mecklenburg County voters will decide on a $290 million bond referendum
More informationPlanning for Our Future 10 YEAR FINANCIAL PLAN REVIEW
Planning for Our Future 10 YEAR FINANCIAL PLAN REVIEW AGENDA Mission/District Goals Operational Plan....Boone Hall FY11 Financial Activity Tim Dettwiller The Forecast.Tim Dettwiller The Proposed Plan...Tim
More informationBond Refusal in Broward County - Frequently Asked Questions
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. 1. Q: What is a General Obligation Bond referendum and
More information21 st CENTURY HIGH SCHOOLS
21 st CENTURY HIGH SCHOOLS 1 CO-LABS & ACTIVITIES What is a Co-Lab? A collaborative workshop session with stakeholder groups. These sessions were designed to examine opportunities and define parameters
More informationSpringfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)
Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval
More informationPROFILE INFORMATION. USD 230 Spring Hill 2015-16
PROFILE INFORMATION 2015-16 USD 230 Spring Hill School Finance Kansas State Department of Education Landon State Office Building 900 SW Jackson Street, Suite 356 Topeka, Kansas 66612-1212 www.ksde.org
More informationRSU 21 Board of Directors considering major renovation projects
RSU 21 Board of Directors considering major renovation projects On Monday, September 16, the RSU 21 Board reviewed proposals to renovate three schools within the district: Kennebunk High School, Mildred
More informationElection Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount
Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating
More informationVital Questions and Answers on Preserving the Quality of Our Schools and Protecting Our Quality of Life. Visit our website @ www.sarasotacbs.
Vital Questions and Answers on Preserving the Quality of Our Schools and Protecting Our Quality of Life. Visit our website @ www.sarasotacbs.com 1. Does the school district still need the 1 mill? The 1
More informationSecondary Educational Visioning Meeting 1
Secondary Educational Visioning Meeting 1 SANTA BARBARA UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN LPA PROJECT NO. 13200.10 DATE: April 1, 2014 TIME: 3:30-5:00 pm PLACE: District Office AGENDA Purpose
More informationGregory-Portland Independent School District. G-PISD BOND ELECTION November 6, 2012. Information Guide
G-PISD BOND ELECTION November 6, 2012 Information Guide Información en Español Información sobre la emisión de bonos del Gregory- Portland Independent School, el dia 6 de Noviembre 20012, es disponible
More informationBond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
More informationColorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org
Student Count Colorado School Finance Project Override, Sales Tax Dollars Purpose Comments BOND ELECTIONS: Alamosa 2,098 Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the
More information1.1. "Applicant" means an entity that submits an Application for Financial Assistance to the Board, including:
DEPARTMENT OF EDUCATION Division of Public School Capital Construction Assistance BUILDING EXCELLENT SCHOOLS TODAY GRANT PROGRAM 1 CCR 303-3 [Editor s Notes follow the text of the rules at the end of this
More informationCommunity Talks with the Superintendent Questions and Answers April 28, 2014
Community Talks with the Superintendent Questions and Answers April 28, 2014 The following questions were submitted during the Community Talks with the Superintendent meetings. The responses are below
More informationWhy does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?
Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831
More informationColorado School Finance Project 1200 Grant Street, Denver, Colorado 80203 303-860-9136 - Fax: 303-832-1086 - @COSFP - cosfp.org
BOND ELECTIONS: Alamosa Bond $4,990,000 Constructing, equipping and furnishing an athletic complex on the high school site, including locker rooms, an athletic storage building, a team building, track
More informationW. Burke Royster, Superintendent Greenville County Schools
W. Burke Royster, Superintendent Greenville County Schools People Students Processes Programs People Preparing Individuals for Dynamic Leadership Director of Academic Innovation and Technology Summer Academy/Upstate
More informationAdditional CCSD Dual Credit Class List. CEM 100 Construction Management (Credits); 3 AIT 200 Applied Industrial Technology Projects (Credits); 1-6
Additional CCSD Dual Credit Class List CEM 100 Construction Management (Credits); 3 AIT 200 Applied Industrial Technology Projects (Credits); 1-6 FY16 (School Year 15-16) Tentative Budget Carson City School
More informationFairfax County, Virginia. Bond. Referendum. Facts
Fairfax County, Virginia Bond Referendum Facts Election Day is Tuesday, November 3, 2015 VOTING INFORMATION A school bond referendum will be on the general election ballot Tuesday, November 3, 2015. Polls
More informationWyckoff Public Schools March 16, 2015
Wyckoff Public Schools March 16, 2015 Wyckoff School District 2015-2016 Budget Development Guiding Ideas: Continue to improve the quality of our educational programs Support and provide for award winning
More informationBallot Measures. Bremerton School District No. 100-C. Explanatory Statement (Prepared by the attorney for the district as prescribed by law.
Bremerton School District No. 100-C Capital Projects Levy The Board of Directors of Bremerton School District No. 100- C adopted Resolution No. 2015/2016-08 concerning capital projects and technology.
More informationEducational Practices REFERENCE GUIDE. Aligned to the AdvancED Standards for Quality Schools
Educational Practices REFERENCE GUIDE Aligned to the AdvancED Standards for Quality Schools Table of Contents Introduction... 3 Purpose and Direction... 4 Governance and Leadership... 5 Duties of the Governing
More informationThe search for a Visionary and Inspirational leader. for PRESIDENT of Lorain County Community College
The search for a Visionary and Inspirational leader for PRESIDENT of Lorain County Community College The District Board of Trustees and the Presidential Search Advisory Committee invite nominations and
More informationBensalem High School Renovation 2014-2016
Bensalem High School Renovation 2014-2016 Design Problems Inability to close off sections of the building during evening and weekend events. Concerns about the efficiency of staffing and supplying three
More informationVote November 3 rd Mail In Ballot Only
Vote November 3 rd Mail In Ballot Only AZ SCHOOL ORGANIZATION & HISTORY OF SCHOOL CONSOLIDATION Arizona s school organization and school boundaries are more than 100 years old and have grown through random
More informationREQUEST FOR QUALIFICATIONS ARCHTECTURAL SERVICE FEBRUARY 20, 2015 JACKSONVILLE PUBLIC SCHOOL DISTRICT 117
Introduction The Board of Education for Jacksonville School District 117 is soliciting Statements of Interest and Qualifications pursuant to 50 ILCS 510/0.01 from qualified firms to provide comprehensive
More informationBERKELEY UNIFIED SCHOOL DISTRICT. MEASURE I GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2015
PERFORMANCE AUDIT June 30, 2015 Berkeley, California PERFORMANCE AUDIT June 30, 2015 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 BERKELEY UNIFIED SCHOOL DISTRICT...
More informationMEMPHIS COMMUNITY SCHOOLS. Welcomes You. An introduction to the school system and city of Memphis, Michigan
MEMPHIS COMMUNITY SCHOOLS Welcomes You An introduction to the school system and city of, Michigan Community Schools Our schools Community Schools have changed considerably in recent years. In 2001, a new
More informationExecutive Summary. Donelson Christian Academy. Mr. Keith Singer, Headmaster 300 Danyacrest Drive Nashville, TN 37214
Mr. Keith Singer, Headmaster 300 Danyacrest Drive Nashville, TN 37214 Document Generated On March 18, 2014 TABLE OF CONTENTS Introduction 1 Description of the School 2 School's Purpose 4 Notable Achievements
More informationPath to a New Horizon:
Path to a New Horizon: Bond Committee Report & Preliminary Recommendations Board of Education July 9, 2015 Bond Committee Peter Spadafore, Co-chair, LSD Board President Nancy Mahlow, Co-chair, Eastside
More informationWayne Local Schools Business Plan Notes (2012-2016) SUBMITTED MAY OF 2012
Please visit the Ohio Department of Education website at ftp://ftp/ode.state.oh.geodac/5-yrforecast/ Wayne Local Schools Business Plan Notes (2012-2016) SUBMITTED MAY OF 2012 The following are the assumptions
More informationPAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation
More informationNotre Dame Catholic Academy. School Year 2015-2016
Notre Dame Catholic Academy School Year 2015-2016 Back To School Night Agenda Introductions NDCA Board of Directors NDCA Faculty Academy Update Building Improvements Universal Pre-Kindergarten Program
More informationAiken County Proposed 1 % SALES TAX
Aiken County Proposed 1 % SALES TAX Aiken County is bigger than you think Aiken County Rhode Island Aiken County is actually 28 square miles larger than the state of Rhode Island. Aiken County School buses
More informationManchester Board of Education. Proposed Elementary School Facilities Plan April 2, 2014
Manchester Board of Education Proposed Elementary School Facilities Plan April 2, 2014 What does BOE want to achieve? All elementary school students in a 21 st century learning environment Sustainable
More informationDetailed information about Ohio s school income tax can be found here:
FAQ s Chardon Schools Issue 4 on the May 4, 2010 Ballot Is there a new tax being proposed to fund our schools? Yes. It was determined by a majority vote of the Chardon School Board, with supporting research
More informationCommunity Center Master Plan
Marin City Community Center Master Plan MCCSD Board Meeting: Preferred Option Presentation Thursday, November 6, 2014 AGENDA Master Plan - Schedule - Vision Core Principles Iterative process - Project
More informationPK-12 Public Educational Facilities Master Plan Evaluation Guide
PK-12 Public Educational Facilities Master Plan Evaluation Guide About this Evaluation Guide Educational Facility Planning Improves Schools and Saves Money Proper planning of school facilities is critical
More informationFayette County Schools Reconfiguration and Realignment
Fayette County Schools Reconfiguration and Realignment Response to Questions: 1. What will happen to Collins Middle next year? Will the students stay split up for three more years? Yes, in the current
More informationCapital Override Election - Frequently Asked Questions
Attachment L Capital Override Election - Frequently Asked Questions 1. What is a capital override? A capital override is a special election requesting voter approval for a secondary tax levy to pay for
More informationMASTER FACILITIES PLAN EVALUATION CHECKLIST
1.0 VISION The Standard: The MFP should provide a clear, inspiring vision for the District s public facilities that will be broadly acceptable to its citizens. The plan must build confidence in DCPS ability
More informationAmong other things, completion of the project will allow expansion at the campus to include 6 th -8 th graders and serve over 1,000 students.
1003 K Street NW Suite 700 Washington, DC 20001 202.223.4505 phone 202.223.4504 fax www.kippdc.org May 2, 2014 REQUEST FOR PROPOSAL ( RFP ) FOR CONSTRUCTION MANAGEMENT SERVICES FOR AN EXPANSION PROJECT
More informationCentinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
More informationSchool Facilities Referendum Recommendations
Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation
More informationPresented by The Facilities Management Group TFMG / TFMG Architecture, PC. in conjunction with EMTEC Engineers, LLC
Presented by The Facilities Management Group TFMG / TFMG Architecture, PC in conjunction with EMTEC Engineers, LLC Why are we here today? To solicit public comments to help us create the Comprehensive
More informationTipp City Exempted Village Schools. Miami County
Tipp City Exempted Village Schools Miami County Assumptions for Five-Year Financial Forecast Projected Fiscal years July 1, 2014 through June 30, 2019 Forecast provided by: Tipp City Exempted Village School
More informationEducational Practices Reference Guide. Aligned to the Advance ED Standards for Quality Schools
Aligned to the Advance ED Standards for Quality Schools February 2010 Table of Contents Page Number Introduction 3 Vision and Purpose 4 Governance and Leadership Duties of the Governing Authority 4 Role
More informationTo inspire every student to think, to learn, to achieve, to care
Our Mission To inspire every student to think, to learn, to achieve, to care MESSAGE FROM OUR SUPERINTENDENT Our Dedication to Excellence Harry Bull, Jr., Ed.D. We are dedicated to excellence every day.
More informationThe Vision. The School District of Philadelphia Dr. Arlene C. Ackerman, Superintendent
The Vision The overall purpose of Summer Learning and More (S.L.A.M.) is to provide appropriate skill development in core subject areas and enrichment opportunities, resulting in an increase in student
More informationADDENDUM NUMBER 1 February 27, 2015 JAMES CITY COUNTY REQUEST FOR PROPOSAL # 15-6921 Architectural Services for New Middle School Facility
ADDENDUM NUMBER 1 February 27, 2015 JAMES CITY COUNTY REQUEST FOR PROPOSAL # 15-6921 Architectural Services for New Middle School Facility This Addendum is forwarded to provide answers to offerors questions,
More informationCONSOLIDATION. Herman #22, Neosho J3, Rubicon J6. Honoring the past, Embracing the future. Neosho JT3 School District PO Box 17 Neosho, WI 53059
Neosho JT3 School District PO Box 17 Neosho, WI 53059 Non-Profit Org U.S. Postage PAID Milwaukee, WI Permit No. 1 Herman #22, Neosho J3, Rubicon J6 CONSOLIDATION Herman l Neosho l Rubicon School District
More information166 tax.ohio.gov. Property Tax Tangible Personal Property. Taxpayer Taxpayers who own and use tangible personal property in business in Ohio.
Taxpayer Taxpayers who own and use tangible personal property in business in Ohio. Tax Base The tax is applied to tangible personal property used in business in Ohio (machinery, equipment, inventories).
More informationCORNELL SCHOOL DISTRICT 1099 MAPLE STREET CORAOPOLIS, PA 15108
CORNELL SCHOOL DISTRICT 1099 MAPLE STREET CORAOPOLIS, PA 15108 Administration: Mr. Aaron Thomas, Superintendent Mr. Doug Szokoly, High School Principal Mr. Jeffrey Carter, Elementary School Principal Mrs.
More informationMESSAGE FROM THE SUPERINTENDENT December 12, 2014
New Lenox School District 122 102 South Cedar Road, New Lenox, Illinois 60451 Phone 815-485-2169 Fax 815-485-2236 MESSAGE FROM THE SUPERINTENDENT December 12, 2014 Dear New Lenox School District 122 Families:
More informationHow To Improve A School In Ancient Ginghamshire
Projects Index Facility Study and Five Year Capital Improvements Plan 2012-2016... 2 Energy Conservation Program, House Bill 264... 3 New Rosemore Middle School... 4 Medical/Dental Addition, Lorain Correctional
More informationV I S I O N 2 0 2 0 REV. 1
V I S I O N 2 0 2 0 F A C I L I T I E S M A S T E R P L A N COAST COMMUNITY COLLEGE DISTRICT : CAMBRIDGE WEST PARTNERSHIP LLC : HPI ARCHITECTURE REV. 1 J u l y 2 0 1 5 T a b l e o f C o n t e n t s GOLDEN
More informationComponents 127th General Assembly 128th General Assembly
League of Women Voters of Ohio Comparison of the Components of the Education Provisions of Am. Sub. HB 119 (127th General Assembly) and Am. Sub. HB 1 (128th General Assembly) Updated February 2010 Components
More informationPUBLIC EDUCATION (Pre-K-12) IN MICHIGAN
Structure, Financing, and Goals adopted 1969, 1970, 1972; Section A.1.C. added 1993; LWVUS position on Equality of Opportunity adopted 1969, revised 1989; portions of the LWVUS positions on The Role of
More informationLee County School District
Lee County School District Interesting District Factoids How Many Schools Make Up Lee County Public Schools? For 2014/15 there are 120 schools in our District: 44 - Elementary 16 - Middle 13 - High 15
More informationKANSAS CITY BOARD OF ELECTION COMMISSIONERS
KANSAS CITY BOARD OF ELECTION COMMISSIONERS SAMPLE BALLOT SCHOOL AND SPECIAL ELECTION Instructions to Voters: Completely darken the oval to the left of your choice as shown. Use pencil, black or blue pen.
More informationHISTORY OF THE MADISON LOCAL SCHOOLS
HISTORY OF THE MADISON LOCAL SCHOOLS Early History 1815-1929 This brief history of the schools in Madison Township is included in this report in an effort to provide the reader with a background which
More informationDAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
More informationFORT HAYS STATE UNIVERSITY
FORT HAYS STATE UNIVERSITY Actual FY 2014 Agency Est. FY 2015 FY 2015 Agency Req. Agency Req. FY 2017 FY 2017 Operating Expenditures: State General Fund $ 32,656,997 $ 34,036,691 $ 33,988,112 $ 33,921,728
More informationCapacity Planning and Management. School Board Work Session March 16, 2011
Planning and Management School Board Work Session March 16, 2011 Agenda Revisions to Management Schedule Functional and Projections Trigger Metrics Purpose of Metrics Sample Metrics Sample Outcomes of
More informationPolicy Guide 2015. Supporting Student-centered Learning
Policy Guide 2015 The Colorado Education Association s commitment to quality public schools requires that we advocate for issues vital to children and public education. It is our responsibility to work
More informationSTATE PENNY FOR SCHOOL INFRASTRUCTURE AND PROPERTY TAX RELIEF: REVENUE PURPOSE STATEMENTS CARDINAL COMMUNITY SCHOOL DISTRICT
STATE PENNY FOR SCHOOL INFRASTRUCTURE AND PROPERTY TAX RELIEF: REVENUE PURPOSE STATEMENTS CARDINAL COMMUNITY SCHOOL DISTRICT BACKGROUND In 1998, the legislature created the school infrastructure local
More informationStrategic Plan: Reporting Dashboard
Strategic Plan: Reporting Dashboard Teaching and Learning The School District of West Salem provides innovative programming focused on the personal growth and development of each child and delivers a challenging
More informationWJJ Middle School Facility Study
WJJ Middle School Facility Study Revised Options and Budgets January 22, 2015 FOR DISTRIBUTION TO BC JANUARY 18, 2019 Comments 1. OSF Communications- We have reviewed the various options with staff and,
More informationWhy Invest in TCS? Turlock Christian Schools voted BEST Preschool and BEST Christian School in Stanislaus County. 209 Magazine
47 Years Why Invest in TCS? Our kids are our greatest gift; they are our legacy for future generations. There is no greater opportunity that helps to pass on the legacy from one generation to the next
More informationCherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
More informationImprove and expand short-term, intermediate and long-range planning to meet the academic needs of all students.
Improve and expand short-term, intermediate and long-range planning to meet the academic needs of all students. Enhance and expand a broad and effective program of ongoing communication with all local
More informationIndicators for Florida School District Best Financial Management Practices
Indicators for Florida School District Best Financial Management Practices January 1998 Office of Program Policy Analysis and Government Accountability Report No. 97-33 Contents Introduction... i Chapter
More informationPublic Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
More informationElmore-Morristown Unified Union (Working Title 5/5/15) Articles of Agreement. (date)
Elmore-Morristown Unified Union (Working Title 5/5/15) Articles of Agreement (date) Members of the Study Committee Stephanie Craig, Committee Co-Chair Morristown School Board Stuart Weppler, Committee
More informationMOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION
MOORESVILLE HIGH SCHOOL RENOVATION A CASE STUDY IN COMMUNICATION 02 THE KORTE COMPANY LISTEN BEFORE YOU BUILD The more things change, the more they stay the same. Today s children learn using computers,
More informationExecutive Summary. Southeast Career Technical Academy
Clark County School District Kerry Pope, Principal 5710 Mountain Vista Drive Las Vegas, NV 89120-2399 Document Generated On April 22, 2013 TABLE OF CONTENTS Introduction 1 Description of the School 2 School's
More informationMISSION STATEMENT VISION STATEMENT. Provide high quality, cost effective public services and leadership in creating a sustainable city.
MISSION STATEMENT Provide high quality, cost effective public services and leadership in creating a sustainable city. CITY OF BRAINERD VISION STATEMENT City Hall 501 Laurel Street Brainerd, MN 56401 Phone:
More information2015 LEVY CAMPAIGN TOOLKIT YES ON ISSUE #6!
2015 LEVY CAMPAIGN TOOLKIT YES ON ISSUE #6! KEY TALKING POINTS: Lancaster City Schools will ask voters to renew the district s current 1.5% earned income tax levy in the 2015 November election. The current
More informationSTATE OF MICHIGAN. Bond Qualification Process Overview. School Bond Qualification and Loan Program Bureau of Bond Finance
Michigan Department of Treasury 3160, (Rev. 4-06) STATE OF MICHIGAN Bond Qualification Process Overview School Bond Qualification and Loan Program Bureau of Bond Finance Michigan Department of Treasury
More informationSCHOOL DISTRICT LEVY LIMITATION AND CERTIFICATION CALENDAR
SCHOOL DISTRICT LEVY LIMITATION AND CERTIFICATION CALENDAR 2015 Payable 2016 Levy Date June 15, 2015 June 30, 2015 Deadline for districts to submit Career and Technical estimated expenditures. Deadline
More informationInvesting in the College of Human Resources and Education
Investing in the College of Human Resources and Education The College of Human Resources & Education: A State of Minds EDU: short for education, those three letters cap web addresses for the vast majority
More informationRICHMOND COUNTY PUBLIC SCHOOLS WARSAW, VIRGINIA 22572 SIX-YEAR IMPROVEMENT PLAN FOR RICHMOND COUNTY. 2009 Through 2015.
RICHMOND COUNTY PUBLIC SCHOOLS WARSAW, VIRGINIA 22572 SIX-YEAR IMPROVEMENT PLAN FOR RICHMOND COUNTY 2009 Through 2015 November, 2009 It is the policy of the Richmond County School Board not to discriminate
More informationExecutive Summary. Southwestern Consolidated School District of Shelby County. Paula Maurer, Superintendent 3406 W 600 S Shelbyville, IN 46176
Southwestern Consolidated School District of Shelby County Paula Maurer, Superintendent 3406 W 600 S Shelbyville, IN 46176 Document Generated On September 25, 2014 TABLE OF CONTENTS Introduction 1 Description
More informationUnderstanding School Choice in Alachua County: Funding School Choice in Florida
Understanding School Choice in Alachua County: Funding School Choice in Florida Florida has been a leader in developing both public and private school alternative programs to address the challenges of
More informationGUIDE TO OHIO S SCHOOL DISTRICT INCOME TAX Prepared by THE OHIO DEPARTMENT OF TAXATION JUNE 2013 TABLE OF CONTENTS
Gui det oohi o s SchoolDi st r i ct I ncometax Updat edjune2013 GUIDE TO OHIO S SCHOOL DISTRICT INCOME TAX Prepared by THE OHIO DEPARTMENT OF TAXATION JUNE 2013 TABLE OF CONTENTS General Filing On the
More informationAlbuquerque Public Schools 2015 Questionnaire for Board of Education Candidates
Albuquerque Public Schools 2015 Questionnaire for Board of Education Candidates The Board of Education is an elected body created according to the laws of the state of New Mexico to serve as the governing
More informationKennewick School District School Operations Renewal Levy. Vote Tuesday, February 11, 2014
Kennewick School District School Operations Renewal Levy Vote Tuesday, February 11, 2014 How is a levy different from a bond? LEVIES are for Learning Levies pay for basic education programs and services
More information1. Modernizing Ohio Classrooms and Curriculum
Reforming Ohio s Education System for the Modern Economy Outline of Governor Ted Strickland s Education Reform and Funding Plan, as Included in the FY 2010-2011 Biennial Budget Components of Governor Strickland
More informationHAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements
More informationPaired Performance Measures The output and outcome measures below must be paired as shown.
Guide to ARC Project Performance Measures Rev. Feb 2015 All ARC projects must have documented output and outcome performance measures. Estimated measures are included in project applications and actual
More informationappear to provide any additional information that was not already known within the GPPSS.
Integration of Instructional Technology in the Grosse Pointe Public School System Executive Summary In the Grosse Pointe Public School System, we are at a pivotal tipping where we must set the platform
More informationFlorida s School Recognition Program Technical Assistance for Pasco County Schools
Florida s School Recognition Program Technical Assistance for Pasco County Schools Developed By: The United School Employees of Pasco And The District School Board of Pasco County (Updated July 2014) Introduction
More informationWorking Families Success Network in Community Colleges College Logic Model Framework V4 June 18, 2014
Overview Working Families Success Network in Community Colleges The WFSN initiative is intended for colleges to: Embed an integrated set of services for students that reflect the three pillars of the WFSN
More informationLAB NOTES. February 6, 2015 BCPS IMPORTANT UPCOMING EVENTS
Steve Buettner, Principal Phone 410-887-7800 LAB NOTES February 6, 2015 Joanne Chapline, Assistant Principal Fax 410-887-7804 BCPS IMPORTANT UPCOMING EVENTS Focused on Success For Each Student February
More information