REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND

Size: px
Start display at page:

Download "REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND"

Transcription

1 North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-5-04 REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND Thomas Simbro 1 and Richard (Bo) Botteicher 2 1 Sr. Project Engineer, Wright-Pierce, Providence, RI 2 Sr. Product Engineer, Underground Solutions, Inc., Denver, CO ABSTRACT: In April 2009, a major structural failure was discovered on the Long Wharf Sewer Force Main in the City of Newport, Rhode Island. The existing 36 pre-stressed concrete cylinder pipe (PCCP) conveys 80% of the City s wastewater for processing and crosses beneath the historic as well as main tourist center of the City. A fulllength condition assessment revealed the existing 36 PCCP force main had major internal & external deterioration beyond the location of where the initial structural failure had occurred. Faced with making emergency repairs at the peak of tourist season, City officials, C. B. Utility and Wright-Pierce, the consulting engineer for the City, looked into trenchless options for pipeline replacement in Newport's downtown areas. After careful evaluation, structural slipline solutions with thermoplastic pipe were chosen as the most beneficial alternative. Maintaining maximum flow capacity was critical, so a sliplined pipe needed to provide the greatest inner diameter while fitting into the existing 36 force main. A 30 DR25 FPVC pipe demonstrated that flow capacity for the combined slipline and dig & replace sections could be maintained due to the higher flow coefficient of the smoother PVC versus the rougher surface of the degraded PCCP line. Sliplining operations commenced on August 17, 2009, near the end of the busy summer season and C.B. Utility maintained a tight schedule for the project. The new 30 line was grouted in place, pressure tested, and connected to the direct bury PVC bell-andspigot segment of the force main. The line was placed into service within schedule on October 28, INTRODUCTION If you are a utility manager in a tourist community, you know your worst nightmare is a utility failure that could disrupt the tourist season. That nightmare hit the City of Newport, Rhode Island (City) on April 7 th, 2009 when a leak was discovered in the City s Long Wharf Force Main (LWFM). The Long Wharf Pumping Station (LWPS), which feeds the LWFM, is the City s main pumping facility serving 80% of entire service area of Newport. In addition, the LWPS also receives the wastewater flow from Middletown's Wave Avenue pumping station. The LWFM is approximately 9,500 feet long and discharges directly to the Newport's Wastewater Treatment Facility located on JT Connell Hwy. Along the 36" force main route are five interconnections from bordering tributary sewer areas: the Dyre Street PS force main; the Navy Training Station PS force main; and three interconnections at the WWTP site namely the Coddington Point PS force main, the Coddington Cove pressure sewer and the Middletown Coddington Highway pressure sewer. The general layout of the existing LWFM is shown in Figure 1. Paper A

2 Figure 1. Existing LWFM alignment and major tie-in and appurtenance locations. The Long Wharf Pumping Station and these five interconnections account for the entire influent flow to the wastewater treatment facility making the 36" force main one of the City's most vital infrastructure components. The LWFM was constructed in the 1970s of pre-stressed concrete cylinder pipe (PCCP). The force main transports wastewater approximately 9,500 feet from the LWPS to the City s Treatment Facility. The original force main was constructed with no in-line isolation valves and no viable means of by-pass interconnection along its route. 2. ASSESSMENT OF THE PIPELINE The City and United Water hired C. B. Utility Company to install a temporary by-pass system and to make necessary repairs due to the discovered leak. The City retained Wright-Pierce to assist in the LWFM repair. To start, a hydraulic analysis was performed and recommendations were given to the LWFM repair contractor, C. B. Utility, for the large scale station by-pass pumping system. A first attempt at a limited by-pass in Long Wharf and America s Cup Ave. area could not be completed due to excessive groundwater inflow. After consultation with C. B. Utility and Wright-Pierce, the City authorized a complete by-pass of the 36" force main shown in Figure 2. The bypass consisted of three 18 polyethylene (PE) pipes, approximately 10,000 LF each, to circumvent the exiting alignment. The bypass ran along the railroad ROW and track, and the railroad was actually used to construct the line using a crane on a railcar to load PE pipe for fusion assembly of the lines. This complete by-pass allowed for a thorough inspection of the pipeline and for any and all necessary LWFM repairs. The City was aware that aging PCCP has a history of failure in both water and wastewater applications due to corrosion; including most recently and locally the Providence Water transmission main in Cranston and the Barrington / East Providence wastewater force main high profile failures. Paper A

3 Figure 2. Bypass alignment used for LWFM rehabilitation and replacement project. Due to these known PCCP concerns and with the full by-pass completed and in operation, an internal and external pipeline condition assessment was performed through test pits and CCTV inspection. Hammer testing at test pits along Long Wharf revealed early signs of exterior pipe corrosion from the pipe springline to the invert due to chlorides in the tidally influenced groundwater near the Narragansett Bay. The CCTV pipe interior inspection of nearly the entire force main length revealed concrete deterioration from hydrogen sulfide gas; the worst case conditions at high points where pitted areas had exposed the pipe's steel barrel, also in early stages of corrosion. In addition, the buried 36" pipe fittings and plug valve at the Long Wharf pumping station site appeared improperly restrained to handle the LWFM's operating pressures. After the conclusion of the pipeline assessment, and with the advantage of a full by-pass in place, the City decided to move forward with a proactive approach to fully replace the entire 9,500 foot force main. 3. SELECTION OF A REHABILITATION METHOD Based upon the results of the pipeline condition assessment and the pipeline's critical importance in the overall City infrastructure, the City requested that C. B. Utility, with Wright-Pierce engineering support, provide repair alternatives for the entire LWFM. Several options for pipeline replacement were evaluated. A key design consideration was to preserve the hydraulic capacity of the new replacement force main consistent with the City s CSO long-term control plan. Additionally, City officials were understandably concerned with the potential disruption that construction activities would have on its historic downtown during the height of tourist season. The following five alternatives were considered: Scenario 1. 36" Cured-In-Place Pipe (CIPP) Liner Scenario 2. 30" Sliplining Scenario 3. 36" Ductile Iron Pipe Dig & Replace Scenario 4. 36" PVC Pipe Dig & Replace Scenario 5. Hybrid 30" Sliplining (Downtown) and 36" PVC Dig & Replace (Railroad Right of Way and Cross-Country) Paper A

4 In addition to the pipeline alternatives above, each design alternative would include full replacement of the access man way & air release manholes and include in-line isolation valves, which were deficient in the existing LWFM alignment. Two trenchless methods were selected for consideration in order to address one of the primary concerns of the project, namely the impact that construction may have on the downtown area. One was sliplining and the other was CIPP. Sliplining is a very simple low-dig installation methodology, by where a new whole pipe or conduit is slipped into an existing pipe or conduit in need of rehabilitation. The benefits of the is installation methodology are that it provides a new pipeline, independent and fully structural regardless of the host pipe or the condition of the host pipe, and it utilizes the existing utility alignment, thus limiting the crowding of an existing utility corridor. The major downside of the methodology is that it requires that the new pipe be smaller than the original host pipe in terms of flow area. This can be offset by the relative smoothness of the new pipeline compared to the old host pipe, however, the reduction of the flow area must be considered in the design of the new line compared to the old. There are many pipe products for use with sliplining technology but for this size pipe and known alignment considerations on this project, Fusible PVC (FPVCP) provided the greatest inner diameter or flow area compared to the constrained outer diameter, thus providing the most flow area for a pipe that could reasonably be installed in the existing pipeline. Additionally, with the use of ductile iron pipe sizing standard materials, such as ductile iron fittings, pipe, and PVC pipe, connections were very simple and straightforward for the construction of the line. CIPP is a rehabilitation methodology in which a resin impregnated tube is inverted into an existing pipe or conduit, and then formed to the inside of the existing host pipe or conduit while it is cured. This creates a close-fit liner on the inside of the existing pipeline in need of rehabilitation. The benefits of CIPP technology is that it has a very small construction footprint, it provides a new corrosion resistant lining in the existing pipe, and has a shorter construction schedule window than other methods. The primary limitations of this technology are that it is still relies on the structural integrity of the host pipe, and it will not stop external corrosion. This second point was a major concern on this project. The City requested that Wright-Pierce perform a hydraulic evaluation of each repair alternative, excluding the CIPP method due to the exterior corrosion concern, in order to assess their potential impacts relative to CSO occurrences. Included in Table 1 is a summary of the proposed rehabilitated and replaced LWFM hydraulic analysis, for scenarios 2 through 5, not including scenario 1, CIPP. Table 1. Hydraulic analysis of the rehabilitation and repair scenarios. Existing Scenario No. 2 Scenario No. 3 Scenario No. 4 Scenario No. 5 Long Wharf Existing Conditions 30" FPVCP 36" DI Pipe 36" PVC Pipe Hybrid Pump Station 36" PCCP Sliplining Dig & Replace Dig & Replace 30" / 36" PVC Operation (C=100) (C=150) (C=130) (C=150) (C=150) 1 Pump 9.41 MGD 9.51 MGD 9.81 MGD 9.86 MGD 9.60 MGD 2 Pumps MGD MGD MGD MGD MGD Paper A

5 Figure 3. Hybrid Alternative Repair Plan including sliplining and dig and replace methods. Figure 4. Hybrid Alternative Repair Profile including sliplining and dig and replace methods. Paper A

6 Based upon the estimated construction costs, scheduling and hydraulic analysis, the most advantageous alternative appeared to be the Hybrid 30" Sliplining in the Downtown area and 36" PVC Dig & Replace in the railroad ROW and cross-country sections as shown in Figures 3 and 4. The hybrid LWFM alternative offered the following preferred features: 1. Greater hydraulic capacity over existing 36" PCCP. By using smooth pipe wall PVC pipe, the hybrid 30 FPVCP and 36 PVC force main replacement actually achieved a slightly better hydraulic capacity than the original 36 concrete pipe, while also providing superior corrosion resistance. 2. Reduced community and societal impacts. Sliplining in the downtown area would have less impact on residents and commercial properties than conventional dig & replace construction. 3. Reduced conflict possibility with existing utilities. Sliplining in the downtown area would greatly reduce the conflicts with adjacent underground utilities over conventional dig & replace construction. 4. Limited dewatering requirements. Sliplining in the downtown area would limit potential exposure to having to maintain and remediate construction dewatering operations. 5. Low cost. The hybrid alternative estimated construction costs were one of the lowest of the alternatives evaluated. 6. Compact schedule. The pipe and appurtenant materials were generally available in the shortest time period in respect to performing the work as quickly as possible. 4. SLIPLINE CONSTRUCTION The bypass piping, having been installed after the initiation event and through the assessment phase of the project, allowed full access to the existing 36 PCCP host pipe during the rehabilitation and replacement phase as well. Sliplining was chosen as a means to limit the excavation required along the alignment and in highly congested or critical areas, however direct bury, dig and replace methodology was also utilized where it made the most sense as part of the hybrid alternative selected. In the end, of the ~9,300 LF of pipe that was designated to be rehabilitated and/or replaced for the project, less than half of it, or ~3,890 LF was actually sliplined. Slipline methodology was mainly used in those areas of the highest congestion, where dig and replace methods would have had the biggest impact on the community and on the schedule. In the downtown area, the existing 36 PCCP was sliplined with 30 DR 25 FPVCP supplied by Underground Solutions. Construction excavation was reduced to just the sliplining entry and exit pits. The sliplined portions included a record 1/3-mile segment (1,810 LF) single pull for 30 FPVCP. The remaining 3,800 linear feet of force main was replaced with 36 DR25 PVC bell and spigot pipe utilizing conventional dig and replace methods along an existing railroad corridor, with a final connection at the wastewater treatment facility headworks. Sliplining and general project operations commenced August 17, 2009, near the end of the busy summer season. UGSI provided an on-site construction supervisor to assist C.B. Utility with planning and coordination in order to maintain the tight schedule in relation to fusion and installation. Fusion work began in earnest on August 18, The project was broken into roughly 13 segments, based on installation methodology and location along project. Of the 13 segments, 6 of these were slipline runs of FPVCP, and the rest of the piping was bell and spigot PVC, dig and replace installation. Table 2, illustrates the way the project was segregated based on actual installation of the segments described. This can be compared to Figure 4 for a graphic illustration of how the line was completed. Of note, while the downtown section was designated to be all slipline installation, certain sections were open cut due to existing alignment bends, appurtenances, and limitations of the project sites. Table 2. Segmentation of the project by installation method and lengths. All values are to the nearest 10 feet. Pipeline Segment Stations Installation method Approximate Length 1 Sta to Sta Open Cut 100 LF 2 Sta to Sta Slipline 100 LF 3 Sta to Sta Slipline 380 LF 4 Sta to Sta Open Cut 60 LF 5 Sta to Sta Slipline 640 LF Paper A

7 6 Sta to Sta Open Cut 180 LF 7 Sta to Sta Slipline 840 LF 8 Sta to Sta Open Cut 360 LF 9 Sta to Sta Slipline 1,810 LF 10 Sta to Sta Open Cut 360 LF* 11 Sta to Sta Open Cut 570 LF 12 Sta to Sta Slipline 120 LF 13 Sta to Sta Open Cut 3,780 LF Slipline Total 3,890 LF Open Cut Total 5,410 LF *Segment 10 was an alternate alignment section and is an estimate on actual pipe length per the stationing, not actual distance. The following section describes the slipline segments that were performed. Descriptions can be referred to Table 2, and Figures 3 and 4. Segment 1 tied into the Long Wharf Pumping Station and the force main piping there. It utilized dig and replace methods. Segments 2 and 3 where slipline installations from a single insertion pit, pulling each length of the pipe in opposite directions. Pipe was fused and staged along Long Wharf drive in the vicinity of the Newport Marriott. Construction progressed with the cooperation of the Newport Marriott facility, allowing limited and temporary closure to several of the accesses to the property while the pipe was fused, staged, and then installed. Figure 5 shows the fusion and staging of several runs near the Newport Marriott. Figure 6 shows insertion of one of the slipline runs at this location. Figure 5. Fusion and staging, as well as insertion pit construction near the Newport Marriott on Long Wharf Drive. Paper A

8 Segment 4 was an angled vertical crossing under a major sewer tunnel which then crosses a portion of America s Cup Ave. before turning North in America s Cup Ave. This area utilized the dig and replace method due to the bends in the existing alignment. Segment 5 was a 640 LF slipline installation in the northbound inside lane of traffic of America s Cup Ave. This section was fused on the shoulder of the roadway in the diagonal parking area prior to insertion. Segment 6 was 120 LF of open cut which crossed from northbound inner to southbound outer lanes and back again in America s Cup Ave as it changes direction. Dig and replace was used here due to the bends in the existing alignment. Slipline installation methodology was used in segment 7 for a total of 840 LF. Fusion and installation took place in America s Cup Ave., as pipe was fused in one lane of traffic and then installed. It was staged in 3 pipe strings of approximately 280 LF each and then intermediate fusion joining was performed during the insertion. Segment 8 was an open cut, dig and replace segment along the road curve of America s Cup Ave. into Farewell St. for a total length of 360 LF. Bends in the existing alignment and then the turn to go North on Farewell St. made it easier to open cut than slipline. Figure 6. Slipline insertion near the Newport Marriott on Long Wharf Drive. The longest stretch of slipline installation came in segment 9. A total of 1,820 LF of pipe was installed along Farewell St., a very busy thoroughfare and highly congested roadway. This stretch of construction also included approximately 200 LF of additional sliplining, which extended the pipeline beyond an existing bend and past a busy ramp exchange with Highway 183 and Farewell St. 36 PVC bell and spigot piping was installed at this location through the intersection and beyond, prior to the sliplining activity. This allowed what was originally designed as a ~1,620 LF slipline to stretch to ~1,810 LF in one shot. This also marked an alignment change for the original pipeline, as this moved the alignment North along Farewell St. prior to the new alignment jog that was created over to JT Connell Hwy before it connected back to the existing pipeline as it crosses under Highway 138 and runs north along the JT Connell Hwy. The pipe was fused into 6 segments averaging 240 to 360 LF, which then required 5 intermediate fusion joints to be performed upon installation. These length restrictions were due to limited laydown area along the side of Farewell St. A section of the existing pipe was also exhumed and cut at the high point in this section to install an access and air release valve assembly. The ~1,800 LF pipe string was cut at those locations twice to allow for those installs. The 30 pipe was cut and opened up to allow the insertion of the gate valves, access man way tees, and ductile iron pipe pup pieces before being recoupled. Paper A

9 Segment 10 is the open cut installation of this new stretch of pipeline, approximated at 360 LF based on the existing pipeline stationing. Segment 11 crossed underneath Hwy 138 to get to the ramp crossing and segment 12 was a slipline installation under the ramp. There was a casing location here, and in-pit fusion was utilized to install the pipe, as there was no room for layout of a pipe string. The 120 LF long installation was completed 20 LF at a time, as sections of pipe were lowered into the fusion machine in the pit, fused, and then pushed through the fusion machine and into the alignment. This completed the slipline portions of the project, roughly at station ~55+20 then the rest of the project was dig and replace construction utilizing 36 PVC bell and spigot piping. All of the sliplined sections utilized an 800 G Grundoburst pipe bursting hydraulic ram (800 G) to perform the insertions and pull the pipe into place. A 10 ton TT Technologies, Inc. Grundowinch was also used to pull the pipe bursting rods for the 800 G into the existing alignment, which is faster and less work than pushing them into place with the 800 G. The new sliplined 30 sections were grouted in place by the Elastizell Corporation, using a cellular type grout mix, which is a highly flowable, highly air-entrained grout that is ideal for pumping longer distances and filling the annulus between the existing LWFM and the new pipe. The sliplined sections were also hydrostatically pressure tested to 100 psi after installation and then connected to the direct bury PVC bell-and-spigot segments of the force main. Aside from tie-in connections, the only other appurtenances installed on the pipeline were air release valves, combination air release and vacuum valves, and access man way tees, which allowed manned entry into the new pipeline if required. Each of these assemblies was similar in scope and installation. Sections of the pipeline were assembled using ductile iron pup pieces, a tee to facilitate the appurtenance, and gate valves on either side. These gate valves then tied into the PVC piping in the alignment. In total, there was one air release assembly, one combination air release and vacuum assembly and three access man way tee assemblies used in the sliplined section of the project. Scheduling was critical on the project and in the end construction of the 9,500 force main replacement was completed on schedule on October 28, 2009 when the new pipeline was commissioned and placed into service. 5. SUMMARY In April 2009, a leak prompted the discovery of major structural problems with the Long Wharf Sewer Force Main in the City of Newport, Rhode Island. This primary conduit is absolutely essential for the operations of the City s wastewater infrastructure and it would need to be replaced. Faced with constructing this emergency project at the peak of the tourist season, City officials, C. B. Utility and Wright-Pierce, the consulting engineer for the City, looked into trenchless options for pipeline replacement in Newport's downtown areas and ultimately selected a structural slipline solution with FPVCP to maintain required flow and provide a new pipeline. Sliplining operations commenced on August 17, 2009, near the end of the busy summer season and C.B. Utility maintained a tight schedule for the project. The new 30 line was grouted in place, pressure tested, and connected to the direct bury PVC bell-and-spigot segments of the force main. The line was placed into service on schedule on October 28, Paper A

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE

More information

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T3-05 Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR

LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES

CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-02 WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW Mark Oberschmidt, P.E., Stantec,

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel

Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel OAWWA 73 rd Annual Conference Condition Assessment of a 48 PCCP Water Main Within an Abandon Subway Tunnel By Jason DeLaet, P.E. Supervising Engineer Greater Cincinnati Water Works & Michael J. Livermore

More information

Dewatering - Time and Cost Relief by way of Trenchless Construction

Dewatering - Time and Cost Relief by way of Trenchless Construction North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to

More information

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets *Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

San Antonio, TX July 28, 2011

San Antonio, TX July 28, 2011 Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,

More information

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to

More information

Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

Flowtite Jacking Pipe

Flowtite Jacking Pipe U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe

More information

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C. 111 Wheatfield Drive, Suite 1 Milford, Pennsylvania 18337 (570) 296-2765 fax: (570) 296-2767 e-mail: mhepa@mhepc.com RICHARD D. McGOEY, P.E. (NY &

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

BROOKS BRIDGE WATERLINE REHABILITATION

BROOKS BRIDGE WATERLINE REHABILITATION The North American Society (NASTT) and the International Society for Trenchless Technology (ISTT) International No-Dig Show 2009 Toronto, Ontario Canada March 29 April 3, 2009 Paper C-3-02 BROOKS BRIDGE

More information

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS

SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.

More information

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic

More information

SECTION IX SLIP LINING PIPELINES

SECTION IX SLIP LINING PIPELINES AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...

More information

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,

More information

Trenchless Construction Technology and Issues

Trenchless Construction Technology and Issues Trenchless Construction Technology and Issues Dr. Mohammad Najafi, P.E., F. ASCE Director, Center for Underground Infrastructure Research & Education (CUIRE) Professor and Director of Construction Engineering

More information

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES

NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES North American Society for Trenchless Technology 2008 No-Dig Conference & Exhibition Dallas, Texas April 27 May 2, 2008 NON-CIRCULAR SEWER LINER INSTALLATION AND FUTURE PROJECTS IN LOS ANGELES Brad Jenson

More information

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,

More information

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION 5: SANITARY SEWER SYSTEM DESIGN SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities

More information

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost

More information

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands Waste Management Infrastructure Rehabilitation in the U.S. Virgin Islands The United States Virgin Islands is a group of islands in the Caribbean that are an insular area of the United States. The islands

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

Working together to improve beach water quality. Fixing our. public and private. sewers

Working together to improve beach water quality. Fixing our. public and private. sewers Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

Sewer systems: Failures and rehabilitation

Sewer systems: Failures and rehabilitation Water Utility Journal 8: 17-24, 2014. 2014 E.W. Publications Sewer systems: Failures and rehabilitation C. N. Damvergis Hellenic Association of Hydraulic Works and Water Resources Management Consulting

More information

Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering

Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering Sliplining and Microtunneling of Large Diameter Pipelines Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering HOBAS Pipe USA,

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Pipeline Replacement using Relining

Pipeline Replacement using Relining Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

SASTT contact details:

SASTT contact details: SASTT contact details: Web: www.sastt.org.za President: Andries Lötz Tel: (011) 688 1483 Fax: (011) 688 1524 E-mail: alotz@jwater.co.za Honorary director: Joop van Wamelen Tel: (012) 567 4026 Fax: 086

More information

Prestressed Concrete Pipe Fitness for Service and Repair

Prestressed Concrete Pipe Fitness for Service and Repair Prestressed Concrete Pipe Fitness for Service and Repair Rasko Ojdrovic rpojdrovic@sgh.com 781-907-9231 IAEA - EPRI 15 October 2014 www.sgh.com SGH Pipeline Experience More than 25 years of research, analysis,

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

Waste Collection Systems

Waste Collection Systems Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION

APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 APPLICATION OF GLASS-REINFORCED PLASTIC TO SEWER REHABILITATION Lynn Osborn 1 1 ArmourGRiP Product

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved

More information

SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE

SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

The leader in trenchless rehabilitation

The leader in trenchless rehabilitation The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers

More information

Introduction to Pressure Pipe Rehabilitation with CIPP

Introduction to Pressure Pipe Rehabilitation with CIPP Introduction to Pressure Pipe Rehabilitation with CIPP Founded in early 1990 s RS Technik is a global leader in the rehabilitation of underground pipes RS Technik uses Cured-in- Place (CIPP) technology

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains August 2, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to PCCP Inspections, Monitoring and Repair/Replacement 2 PCCP Management

More information