1 MEASUREMENTS OF THRUST LOAD IN CABLE SYSTEMS SEMI-RIGIDLY INSTALLED IN DUCT / MANHOLE STRUCTURES Riccardo BODEGA, Prysmian Cables and Systems, The Netherlands, [email protected] Henk GEENE, Prysmian Cables and Systems, The Netherlands, [email protected] Frank FRENTZAS, ComEd Chicago, USA, [email protected] Angelo DE ANGELIS, ComEd Chicago, USA, [email protected] Jos VAN ROSSUM, Prysmian Cables and Systems, The Netherlands, [email protected] Nathan KELLEY, Prysmian Power Cables and Systems, USA, [email protected] ABSTRACT This paper describes an experimental approach for testing the suitability of racking systems to be used for the fixation of cables and joints in duct/manhole structures. To this purpose, thermo-mechanical forces that will occur in operation can be reproduced on a cable system of reduced length, which is fixed on a test installation composed of a full-size duct/manhole structure. Forces can be applied and measured at the cable while the racking system is monitored. This can be done for several test conditions, including asymmetric load. Preliminary results indicate that this testing method can provide an effective picture of the suitability of the racking system, including the tracking of eventual weak spots. phase. Secondly, practical situations such as the presence of bends in the cable route and/or the positioning of the cable cleats have a strong effect the behaviour of the semi-rigid installation. For these reasons, an experimental approach has been chosen for the characterization of racking systems. After estimating the maximal cable thrust assuming the installation fully rigid, a mechanical load can be applied on a sample of the semi-rigidly installed cable system. To that purpose, the test facility described in this paper has been constructed. KEYWORDS Duct, manhole, cable joint, installation, semi-rigid installation, thrust forces, racking system. INTRODUCTION Duct/manhole structures are often used for the installation of cable systems, especially in North America. In such structures the cable system is considered semi-rigidly installed. In a manhole, the cable system is generally fixed on a racking system, to avoid uncontrolled cable bending, see figure 1. Inside the manhole the cable is then restrained from any movement due to thermal expansion. On the other hand, in a duct, the small clearance between outer surface of the cable and inner surface of the duct only allows the socalled snaking of the cable, see figure 2. Consequently, the cable may develop a thrust load when heated and its components may be subjected to compressive strain. Thrust forces on HV cables can be as high as several tons, depending on the cable type, on the duct characteristics and on the temperature rise. Therefore, appropriate racking systems are required for a proper fixation of the cable and of the cable joints. A racking system can be considered appropriate if the reactions of the cable and joints are limited when thermo-mechanical forces that will occur in operation are applied to the cable. However, an estimation of the cable system reactions is rather difficult for cables installed in duct/manholes. Firstly, the calculation of thrust forces for a ducted system requires a quite sophisticated modelling [1] and a number of input data that are not always known during the design Figure 1: Rigid installation of Click-fit joints a manhole. Figure 2: Snaking of a loaded HV cable inside a duct.
2 BACKGROUND The thermo-mechanical behaviour of a cable system depends on many factors. Firstly, thermo-mechanical properties are affected by the characteristics of the cable itself (e.g. cable construction and materials). Secondly, the type of installation is crucial for the definition of the thermomechanical behaviour of the cable system. Another important aspect that has a key role in this context is the temperature. In particular the following parameters are essential: the maximal temperature at the cable conductor, the ambient temperature, the variation of ambient temperature and the temperature during cable installation. All the features mentioned above are critical for the new 345kV XLPE 1600 mm 2 Cu (Milliken construction) cable circuit that will be installed in Chicago (ComEd, USA) [2]. The cable system will be installed in ducts with a nominal diameter of 6 (152.4 mm). This will allow a clearance of 28 mm between cable and inner wall of the duct. Consequently, limited cable snaking will be possible inside the ducts. The manhole size for this project will be 26 feet long (7.92 m). The environment conditions in Chicago, where the ambient temperature may drastically vary between winter and summer, are also unfavourable. Moreover, the cable circuit is expected to experience the maximal current load during the hot season. This will produce heavy heating cycles that will mechanically stress the cable for a long-lasting period. Therefore, the thermo-mechanical suitability of the cable system had to be proven. This has been successfully done in the framework of a type test. During the type test, the cable system was subjected to 20 daily heating cycles, with a maximum conductor temperature up to 110 C in a critical U -shaped cable bend [3]. Figure 3 shows the 345 kv cable system during the type test. On the other hand, for the study of the cable system reactions inside the manholes, a specific experimental test methodology needed to be defined, including the construction of a purposely-made test facility. TEST FACILITY FOR CHARACTERIZATION OF RACKING SYSTEMS The test installation consists of the cable system fixed inside a full-size concrete manhole, which is connected by means of ducts to two manholes of reduced size. In each small manhole, a hydraulic cylinder can load the cable up to 100 kn compression force (pulling force is also possible, but up to 40 kn). The forces are transmitted from the hydraulic cylinders to the cable conductor via two pressure sensors (load cells). The load cells communicate with a laptop, where all the measured data are stored and displayed. Any eventual movement of the racking system can be recorded by means of a camera, which is also connected to the data storage system. In Figure 4, a picture of a 345 kv cable systems fixed on the test racking system is shown. The drawing of the whole test installation is represented in Figure 5. In Table 1, the main characteristics of the test setup are described, whereas its schematic diagram is represented in Figure 6. In addition to the characterization of the racking system, the test installation has been used to prove the feasibility of install the cable and the joint inside a manhole/duct structure of the size anticipated for the project. Figure 4: 345 kv XLPE 1x1600mm 2 Cu (Milliken construction) cable system fixed on the test racking system. Figure 3: 345 kv XLPE 1x1600mm 2 Cu (Milliken construction) cable and accessories during type test. Table 1: Main characteristics of the test set-up adopted in the present work. Component Main characteristics Length 25 m Voltage 345 kv Cable Conductor 1x1600 mm 2 Cu, Mill Insulation XLPE Outer diameter 130 mm Joint Type Click-Fit CFJ(X)-420 Voltage 400 kv Duct length 4 m at each side of the manhole Material PVC Size 6.23 (158 mm) Material concrete Manhole Dimensions 8535 x 2745 x 2435 mm (lxwxh) Racking system Modular struts made of stainless steel. (Light version)
3 Figure 5: Drawing of the test facility for the characterization of racking systems. Figure 6: Schematic diagram of the test set-up. CALCULATION OF THE MAXIMAL LOAD Firstly, the load to be applied to the cable needed to be calculated. This has been done considering the worst possible case the cable system can experience during operation. 1 st heat cycle Practice has shown that the heaviest load occurs during the first heating cycle [4]. After this, a reasonable reduction of the mechanical stress occurs. In Figure 7 an example of this phenomenon is shown. Therefore the load at the first cycle has been considered for the calculation, together with the most critical temperature conditions. In addition, being the clearance between the actual cable and duct is relatively small, the load has been calculated assuming the installation is fully rigid. By considering all those features, a maximal load, of approximately 50 kn has been estimated. 20 th heat cycle Figure 7: Plot of thrust forces as function of the temperature during heat cycles. TEST PROCEDURE AND TEST CONDITIONS Test procedure Two different types of load have been tested in this investigation: symmetric and asymmetric load. Symmetric load means that the cable system is equally compress at both cable ends. Asymmetric load means the pressure applied at one cable ends is different from the other. In this situation the stress unbalance is taken by the cable cleats. Asymmetric load will
4 occur in practice when bends and/or slopes are present in the cable circuit. Another situation that may lead to asymmetric load is that in which the manholes are not equally distant along the cable route. During both types of load, the cable cleats will experience lateral forces due to the fact that the cable system partially yields under the applied load. During testing, the load was applied gradually, in steps of a few kn s, allowing a short time between them to let the structure stabilize on the new stress level. At the end of the each test, the original position of the cable system was restored. This was done by pulling back the pistons into the hydraulic cylinder. Test conditions All tests have been performed at ambient temperature. However, since the rigidity of the cable system depends on temperature, tests at elevated temperature have been scheduled for the close future. Asymmetric load Asymmetric load led to two main consequences. Firstly, under a load with a 10 kn asymmetric unbalance, (60kN 50kN), the horizontal beam holding the joint moved in the direction of the unbalance. It is to be noticed the horizontal beam holding the cable joint is not supported by a vertical beam. This is shown in Figure 7. In the picture, the disconnected vertical beam is used as a reference. Before test After test PRELIMINARY RESULTS Initially, a light version of the racking system has been tested. This was done in order to determine the weak spots of the structure. In this way improvements can be implemented in the final design of the structure. All results presented here are relative to the light version of the racking system. Symmetric load Tests performed with a symmetrical load, did not show any major movement of cable. Moreover, no visual disturbance could be observed at the racking system. This result demonstrates that the structural requirements for the system are moderate when symmetric loading conditions exist. Figure 7: Movement of the horizontal joint support under the effect of an asymmetric load. (Horizontal joint support and vertical beam not connected) Another consequence of asymmetric loading was found. The vertical beams connected to the horizontal cable supports bent when an unbalanced force of 10 kn was applied (applied forces at cable ends: kn). Figure 8 shows this phenomenon. Support 2 Support 2 Support 1 Before test After test After test Figure 8: Bending of vertical beams under the effect of 10 kn asymmetric load (50 60 kn).
5 When the structure was asymmetrically loaded, an interesting result was found. Once the load unbalance is applied, the structure reacts in such a way to minimize it. In fact the higher force measured at one end of the cable decreased in time, while the lower force measured at the other cable end increased. This let believe that, in practice, asymmetric load will have minor consequences than what observed during the test, since the mechanical loads takes several hour to develop in the reality. Nevertheless, it is important to prevent movements of the cable as a result of asymmetrical forces to affect the interface between cable and joint. This can be achieved by a proper coordination between cable system and racking and/or by locking the conductor inside the joint (core locking mechanism). CONCLUSIONS The suitability of racking systems for the fixation of HV cable systems in duct/manholes can be assessed by means of the experimental approach described in this paper. In particular, the presented test installation is able to detect eventual weak spots of the supporting structure. Thanks to this information, improvements can be included in the final design of the racking system. Preliminary results point out that the tested structure experiences the most critical stresses when the cable system is subjected to asymmetric load. Prysmian Cable and Systems is considering upgrading the present test installation and defining new test conditions. In particular the behaviour of new types of racking systems will be investigated when the cable system experiences elevated temperatures and during long-lasting load cycles. REFERENCES [1] WG 21.01, Laying and installation of high voltage extruded cables systems literature evaluation data comparison, Electra 156, 1994 [2] J. van Rossum Cigre, Group Ref. B1, Pref. Subject 1, Question No 3, [3] Insulated Cable Engineers Association, Inc. Standard for extruded insulation power cables rated above 46 through 345 kv, ICEA S , [4] D. Boende, H. Geene, W. Sloot, 400 kilovolts over the cable, Energie Techniek No 10, jaargang 1999.
Discussion Group C32D: Support of transmission cables in manholes
Discussion Group C32D: Support of transmission cables in manholes IEEE Insulated Conductors Committee Meeting May 22-25, 2011 St. Petersburg Beach, Florida 1 Agenda This Meeting Introduction Review of
Gulf Cable & Electrical Ind. Co.
CONTENTS INTRODUCTION PRODUCT RANGE I PRODUCT DATA TABLES XLPE INSULATED 600/1000V CABLES Two Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 1 Three Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC 2 Four Core Cables CU/XLPE/PVC/LC/PVC/SWA/PVC
State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress
0611-048-Mep229 12/12/06 6:44 Page 22 State, trends and evolutions of HV/EHV power cables systems and contributions of SC B1 to their ongoing progress Reinhard SCHROTH, Chairman of SC B1 2002-2006 High
KNOW YOUR OPTIONS: 69 KV XLPE POWER CABLE
Know Your Options: 69 kv XLPE Power Cable 3 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both
High Voltage Systems. Today. The history of cables
High Voltage Cables High Voltage Systems Today Prysmian Cables and Systems B.V. is part of the Prysmian Group, a leading player in the industry of high-technology cables and systems for energy and telecommunications,
KNOW YOUR OPTIONS: 230 KV POWER CABLES
KNOW YOUR OPTIONS: 230 KV POWER CABLES 71 CONDUCTOR MATERIAL AND SIZE Conductor material is a matter of both customer preference and required current carrying capacity At 230 kv, copper is most common
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO
IEEE POWER ENGINEERING SOCIETY CHICAGO CHAPTER THE OKONITE COMPANY WEDNESDAY JANUARY 11, 2006 JIM FITZGERALD ENGINEERING LINGO WHEN YOU HEAR AN ENGINEER SAY A NUMBER OF DIFFERENT APPROACHES ARE BEING IMPLEMENTED
HV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
Section 5 161 kv Power Cables
Know Your Options: 161 kv Power Cable 61 material and size material is a matter of both customer preference and required current carrying capacity Copper conductor common for larger loads When both copper
Comparative study for cables and busbars
Comparative study for cables and busbars Preliminary considerations To compare the prices of two categories of product as different as traditional cables and busbars, it is necessary to make some preliminary
4 IX D N E P P A Installation methods Current-carrying capacity and voltage drop for cables Reference method IET Wiring Matters
8 Appendix 4 of BS 7671 by Mark Coles Appendix 4, Current-carrying capacity and voltage drop for cables and flexible cords, has seen significant changes with the publishing of BS 7671:2008. This article
EHV Cable Installation Technology for Tunnels and Ducts in Japan. S. TSUCHIYA T. IIDA Y. MORISHITA Tokyo Electric Power Company
21, rue d Artois, F-75008 PARIS B1_109_2012 CIGRE 2012 http : //www.cigre.org EHV Installation Technology for Tunnels and Ducts in Japan S. TSUCHIYA T. IIDA Y. MORISHITA Tokyo Electric Power Company Kansai
ACCESSORIES FOR HV CABLES WITH EXTRUDED INSULATION
ACCESSORIES FOR HV CABLES WITH EXTRUDED INSULATION Ref: WG 21.06 (TB 177) JTF 21.15 (TB 210) TF B1.10 (Electra 212) Henk Geene Presentation overview Accessories function Accessory design Accessory types
APPLICATION ORIENTED DESIGN OF CABLES
APPLICATION ORIENTED DESIGN OF CABLES Mrs. Rohini Bhattacharyya, Dubai cables Ltd.P. O. Box 11529,Dubai. [email protected] Mr. Nawaf Ahmad Al Mohaideb Dubai Cables Ltd. P. O. Box 11529, Dubai. [email protected]
Two different types of cables are used in primary airfield lighting circuits: - unshielded cables and - shielded cables
Two different types of cables are used in primary airfield lighting circuits: - unshielded cables and - shielded cables Classically both cables have a single AWG 8 copper conductor or a cross section of
Cable Installation Notes
Cable Installation Notes June 2006 Table of Contents Cable Pulling... 2 Bending Radius... 2 Pulling Tension... 3 Friction... 3 Installation with Rollers... 4 Installation without Rollers... 4 Pulling Tension
Unarmored Variable Frequency Drive (VFD) Cable Termination Guide
Authorized Distributor Unarmored Variable Frequency Drive (VFD) Cable Termination Guide Be Certain with Belden A Step-by-Step Look at the Connection/Termination of Unarmored VFD Cables Terminating Unarmored
FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR
FLEXIBLE INDUSTRIAL CABLES H07RN-F TENAFLEX SR Standards : CENELEC HD 22.4 NF C 32-102-4 DIN VDE 0282-1 and VDE 0282-4 BS 6007 and BS 6500 IEC 60245-4 Rated voltage Rated voltage: 450/750 V (Use up to
CALEFFI. Compact automatic flow rate regulator with polymer cartridge. 127 series 01166/09 GB
Compact automatic flow rate regulator with polymer cartridge 127 series REGISTERED BS EN ISO 9001:2000 Cert. n FM 21654 UNI EN ISO 9001:2000 Cert. n 0003 CALEFFI 01166/09 GB Function The AUTOFLOW devices
The Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011
The Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011 Duncan Wilmot, Technical Manager, Cladtek International, Australia
EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS
ENGINEERING COMPONENTS EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS Structural members: struts and ties; direct stress and strain,
MECHANICAL AND THERMAL ANALYSES OF THE CABLE/ STRAND STRAIN TEST FIXTURE
TD-01-001 January 6, 2000 MECHANICAL AND THERMAL ANALYSES OF THE CABLE/ STRAND STRAIN TEST FIXTURE Michela Fratini, Emanuela Barzi Abstract: A fixture to assess the superconducting performance of a reacted
Carlon Expansion Fittings for PVC Rigid Nonmetallic Conduit
Carlon Expansion Fittings for PVC Rigid Nonmetallic Conduit All construction materials expand and contract with fluctuations in temperature. These temperature changes affect polyvinyl chloride (PVC) more
Material test chamber with mechanical convection
FP series 400 Material test chambers Material test chamber with mechanical convection A BINDER material test chamber with mechanical convection of the FP series provides reliably short drying times and
Incubator with mechanical convection
BF series 400 Incubators and cooling incubators Incubator with mechanical convection The BINDER incubator of the BF series with mechanical convection is suitable for all gentle incubation applications,
EDS 02-0027 11KV TRIPLEX CABLE
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: EDS 02-0027 ENGINEERING DESIGN STANDARD EDS 02-0027 11KV TRIPLEX CABLE Network(s): EPN, LPN, SPN Summary:
AORC Technical meeting 2014
http : //www.cigre.org B1-1055 AORC Technical meeting 2014 220 kv Long Distance Underground HVAC Cable Circuit NAVEED RAHMAN Nexans Olex Melbourne, Australia SUMMARY In 2009, the Victorian state government
Knürr Miracel. Knürr Miracel. 19 Network and Server Rack Platform 1.12 to 1.22 1.11
Knürr Miracel 19 Network and Server Rack Platform 1.12 to 1.22 1.11 19" Server Rack: Knürr Miracel Strong points 1.13 Knürr Miracel ASP ASP/Server Rack 1.16 Knürr Miracel Server Rack 1.18 Knürr Miracel
KINETICS RISER SUPPORT SYSTEMS
RISER DESIGN INPUT GUIDE There are many factors that impact the design of a Riser support system. Because many of these factors are not items that the Engineers at KNC can guess at and because they have
Fault location on power cables. Fault location on power cables
Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables
CURRENT RATINGS MORE THAN A CABLE
CURRENT RTINGS Updated for the 17th Edition of the IEE Wiring Regulations MORE THN CBLE C O M P N Y EI CBLES, DURHM ROD, BIRTLEY, CO DURHM. DH3 2R Tel: +44 (0)191 410 3111 Fax: +44 (0)191 410 8312 E-mail:
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
The University of Birmingham (Live System)
The University of Birmingham (Live System) Behaviour of Structural Insulated Panels (SIPs) under both short-term and long-term loadings Yang, Jian; Rungthonkit, Prathan Document Version Author final version
Session 14 Cable Support Systems
Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load
UGVCL/SP/591/11KV HT AB CABLE
TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched
DELHI METRO RAIL CORPORATION LIMITED. (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III. Contract: - CE -16 VOLUME-6
DELHI METRO RAIL CORPORATION LIMITED (A Joint Venture of Govt. of India & GNCTD) MASS RAPID TRANSPORT SYSTEM PHASE III TURNKEY PROJECT OF DESIGN, SUPPLY, LAYING, JOINTING, TESTING AND COMMISSIONING OF
Cables, Cable Laying & Accessories Manual
Distribution Business Cables, Cable Laying & Accessories Manual Database ref: File Ref: Title Page & Revision Log For Cables & Access v4 - Nov 2003.doc Manual Name: Cables & Accessories Manual Version
Cable Consulting International
Cable Consulting International Brian Gregory BSc, CEng, MIEEE, FIEE Technical Director www.cableconsulting.net Alan Williams BSc, CEng, MIEE Senior Consultant 1 FEASIBILITY STUDY for 500 kv AC UNDERGROUND
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct
HERZ-Thermal Actuators
HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01
Heating oven with mechanical control
ED series 53 Drying ovens / Heating ovens Heating oven with mechanical control The strength of the BINDER ED series heating oven: routine drying and sterilization applications up to 300 C (572 F). Thanks
SPACE CHARGE ACCUMULATION UNDER THE EFFECTS OF TEMPERATURE GRADIENT ON SOLID DIELECTRIC DC CABLE
ISBN 978--658-9 Proceedings of the 6 th International Symposium on High Voltage Engineering Copyright c 9 SAIEE, Innes House, Johannesburg SPACE CHARGE ACCUMULATION UNDER THE EFFECTS OF TEMPERATURE GRADIENT
Underground Cable Temperature Monitoring in the Real World
Underground Cable Temperature Monitoring in the Real World Executive Summary Background Brain Storming Possible Causes to Duct Bank Over Heating Mitigating Duct Bank Overheating DTS Installation for Duct
Check-list for auditors. Audit visit at candidate registered laboratories
Check-list for auditors Audit visit at candidate registered laboratories 1 Contents Introduction Laboratory documentation required by the standard(s), available for inspection by the auditor Items to be
Ampacity simulation of a high voltage cable to connecting off shore wind farms
Ampacity simulation of a high voltage cable to connecting off shore wind farms Eva Pelster 1, Dr. David Wenger 1 1 Wenger Engineering GmbH, Einsteinstr. 55, 89077 Ulm, [email protected] Abstract:
ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION
ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION by Richard Laney Introduction Elevator traveling cable is a vital link between the elevator car and controller. In conventional elevators, all power and signal
Development of a 500-kV DC XLPE Cable System
by Satoru Maruyama *, Noboru Ishii *, Michihiro Shimada *, Shinji Kojima * 2, Hideo Tanaka * 3, Mitsumasa Asano * 4, Tetsuya Yamanaka * 4, and Shin ichi Kawakami * 4 This paper describes development work
TubeTrace, ThermoTube
TubeTrace, ThermoTube and Custom CEMS Tubing Bundles INSTALLATION PROCEDURES English Units TubeTrace & ThermoTube Tubing Bundles Receiving, Storing and Handling... 1. Inspect materials for damage incurred
ENERGY. TECWATER S1BN8-F 0,6/1 kv. Cable for Water Application
ENERGY TECWATER S1BN8-F 0,6/1 kv Cable for Water Application Technical Data Electrical parameters Thermal parameters Trademark Type designation Specification Approval Application Rated voltage Maximum
MV CABLE TYPE C 33-226
MV CABLE TYPE C 33-226 Standards : CENELEC HD 620 C 33-226 Rated voltage Rated voltage : 12/20 (24) kv Design 1 Stranded aluminium, class 2 conductor 2 Extruded conducting screen on conductor 3 XLPE insulation
Next Generation Data Center Infrastructure
Next Generation Data Center Infrastructure ICE Cube Modular Data Center Installation Overview and Service Offerings on365, Weldon Road, Loughborough, Leicestershire, LE11 5RN email: [email protected]
No Heat. No Flames. No Shoving. No Special Tools. 3M Cold Shrink. 3M Cold Shrink. Medium Voltage Joints & Terminations. 3M Cold Shrink Joint
M Cold Shrink Medium Voltage Joints & Terminations M Cold Shrink Joint Splice bodies 00% factory tested - ensures reliability Capacitive Stress Relief No Heat No Flames No Special Tools No Shoving Unique
Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors
20000 Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors 23000 22000 21000 20000 09000 08000 07000 06000 05000 04000 03000 02000 01000 823 Notes 824 Technical
Cable Condition Monitoring to Improve Reliability
Cable Condition Monitoring to Improve Reliability by Hilary Marazzato, Ken Barber, Mark Jansen, and Graeme Barnewall Olex Australia Page 1-1 - Cable Condition Monitoring of Improve Reliability Hilary Marazzato,
Heating oven with mechanical convection
FD series 53 Drying ovens / Heating ovens Heating oven with mechanical convection A BINDER FD series heating oven is always used when fast drying and sterilization is required. Thanks to its fully homogeneous
INTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60502-1 Second edition 2004-04 Power cables with extruded insulation and their accessories for rated voltages from 1 kv (U m = 1,2 kv) up to 30 kv (U m = 36 kv) Part 1: Cables
RESULTS OF ICARUS 9 EXPERIMENTS RUN AT IMRA EUROPE
Roulette, T., J. Roulette, and S. Pons. Results of ICARUS 9 Experiments Run at IMRA Europe. in Sixth International Conference on Cold Fusion, Progress in New Hydrogen Energy. 1996. Lake Toya, Hokkaido,
AMSC s Superconductor Cable Technologies for Electric Utilities
International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,
CABLE ACCESSORIES 110-220 kv
CABLE ACCESSORIES 110-220 kv Termination 110 kv Technical description Termination MKB 126 / 145 with composite type insulator uses for cable line joints with other elements of power-supply systems. Termination
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
M. GELDON Brugg Kabel CZ. Ing. D. RÚŽEK PREdistribuce. Switzerland Czech Rep. Czech Rep. Czech Rep., Switzerland Germany
21, rue d Artois, F-75008 PARIS Paper number CIGRE 2012 http : //www.cigre.org 6 characters (to be provided later) Correlation between calculated transmission capacity and actual one D. WALD* Eifelkabel
Real-Time Temperature Monitoring of 13.7 kv Breaker Outputs Using Fiber Optic
Real-Time Temperature Monitoring of 13.7 kv Breaker Outputs Using Fiber Optic Patrice Dionne (Fiber Optic Specialist, Qualitrol) Gustavo de Souza Fernandes (Maintenance Administration, PETROBRAS, UTE-MLG)
Network Standard Advice No. 1420C 9/6/2011
Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides
Effect of design parameters on temperature rise of windings of dry type electrical transformer
Effect of design parameters on temperature rise of windings of dry type electrical transformer Vikas Kumar a, *, T. Vijay Kumar b, K.B. Dora c a Centre for Development of Advanced Computing, Pune University
THE PATHWAY TO POWER HIGH-VOLTAGE CABLES
THE PATHWAY TO POWER HIGH-VOLTAGE CABLES TABLE OF CONTENTS HIGH-VOLTAGE CABLES 3 Advantages of XLPE-insulated cable systems 3 PROPOSAL 4 Cable systems 4 Providing System Solutions 4 Continuous temperature
Force measurement. Forces VECTORIAL ISSUES ACTION ET RÉACTION ISOSTATISM
Force measurement Forces VECTORIAL ISSUES In classical mechanics, a force is defined as "an action capable of modifying the quantity of movement of a material point". Therefore, a force has the attributes
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
Field Application Note
Field Application Note Reverse Dial Indicator Alignment RDIA Mis-alignment can be the most usual cause for unacceptable operation and high vibration levels. New facilities or new equipment installations
International Journal of Engineering Research-Online A Peer Reviewed International Journal Articles available online http://www.ijoer.
RESEARCH ARTICLE ISSN: 2321-7758 DESIGN AND DEVELOPMENT OF A DYNAMOMETER FOR MEASURING THRUST AND TORQUE IN DRILLING APPLICATION SREEJITH C 1,MANU RAJ K R 2 1 PG Scholar, M.Tech Machine Design, Nehru College
Series 8146/5-V37 and Series 8150/5-V37
www.stahl.de > Clear assignment safe technology easy installation > Intelligent structure only one rotary actuator for frequency-controlled drives ) 20 ms leading auxiliary contact for safe motor disconnection
A Study of a MV Cable Joint
SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol. 7, No. 1, May 2010, 1-11 UDK: 621.315.35:537.212 A Study of a MV Cable Joint Radiša Dimitrijević 1, Neda Pekarić-Nađ 2, Miodrag Milutinov 3 Abstract: Construction
DOUBLE STAINLESS STEEL TUBE DTS FIBER OPTIC CABLE FTSF-FSUTS(DTS)
DOUBLE STAINLESS STEEL TUBE DTS FIBER OPTIC CABLE FTSF-FSUTS(DTS) Double Jelly Filled Stainless Steel Tube General Description This document specifies non armour sensing fiber cable with double stainless
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU
ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:
Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in
REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory
PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall
PERFORMANCE TEST REPORT Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall Report No.: Test Dates: 04/17/12 Through: 04/18/12 Report Date: 06/13/12 130 Derry Court
e-mobility Special cables for electric vehicles Coroplast Fritz Müller GmbH & Co. KG Tapes Cables Cable Assemblies
www.echtzeit.com e-mobility Coroplast Fritz Müller GmbH & Co. KG Tapes Cables Cable Assemblies Special cables for electric vehicles Wittener Straße 271 D-42279 Wuppertal Phone +49(0)202.2681.228 Fax +49(0)202.2681.360
T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A
T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test
bi directional loading). Prototype ten story
NEESR SG: Behavior, Analysis and Design of Complex Wall Systems The laboratory testing presented here was conducted as part of a larger effort that employed laboratory testing and numerical simulation
WWW.CABLEJOINTS.CO.UK THORNE & DERRICK UK TEL 0044 191 490 1547 FAX 0044 477 5371 TEL 0044 117 977 4647 FAX 0044 977 5582 WWW.THORNEANDDERRICK.CO.
able leats Section 6 able leats for Power Transmission ables Glass reinforced composite cable cleats general information type able cleat U type able cleat (channel mounted) T type able cleat (trefoil configuration)
How To Make A Fronius Cl Power Inverter
Fronius CL PV central inverter with Fronius MIX concept Modular system. Maximum yield. The Fronius CL combines high-yield power electronics with the unique, modular system design of up to 15 identical
Real Time Monitoring of Power Cables by Fibre Optic Technologies Tests, Applications and Outlook
Real Time Monitoring of Power Cables by Fibre Optic Technologies Tests, Applications and Outlook LUTON Marie-Hélène SAGEM SA, Activité Câbles Rue de Varennes Prolongée 77876 Montereau Cedex France Phone
Temperatures of Bundled Electrical Cables Installed in Bored Holes in Residential Wood Framing
Temperatures of Bundled Electrical Cables Installed in Bored Holes in Residential Wood Framing Copper Development Association Inc. 260 Madison Avenue New York, NY 16 SUMMARY As part of a larger study of
Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE)
Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE) Nearshore CPT is not as difficult as it might seem. Most CPT companies do already have most of the necessary equipment
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
WIRE AND CABLE ENGINEERING GUIDE
DC Hi Pot Testing Excerpt from PRYSMIAN S WIRE AND CABLE ENGINEERING GUIDE (FOR INFORMATIONAL PURPOSES ONLY) Page 1 of 6 DC HIGH POTENTIAL TESTING DC Hi-Pot testing can be applied as a withstand test (a
Solid shape molding is not desired in injection molding due to following reasons.
PLASTICS PART DESIGN and MOULDABILITY Injection molding is popular manufacturing method because of its high-speed production capability. Performance of plastics part is limited by its properties which
Airplane wing test stand for simulating the airstream. Airbus Deutschland GmbH
Airplane wing test stand for simulating the airstream Airbus Deutschland GmbH 2 1 Airplane wing test stand for simulating the airstream Hänchen ist standard In test stands at Airbus in Bremen, Hänchen
HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities
HIGH- AND EXTRA-HIGH-VOLTAGE GLOBAL CABLE SYSTEM SOLUTIONS Rely On Our Experience... Experience Our Capabilities RELY ON OUR EXPERIENCE... EXPERIENCE OUR CAPABILITIES For close to half a century, Silec
P4 Stress and Strain Dr. A.B. Zavatsky MT07 Lecture 3 Statically Indeterminate Structures
4 Stress and Strain Dr... Zavatsky MT07 ecture 3 Statically Indeterminate Structures Statically determinate structures. Statically indeterminate structures (equations of equilibrium, compatibility, and
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
A Review of Engineering Recommendations P15, P17 and P27 (Transformers, Cables and Overhead Lines)
A Review of Engineering Recommendations P15, P17 and P27 (Transformers, Cables and Overhead Lines) DOCUMENT NUMBER CLNR-L263 AUTHORS David Miller, Northern Powergrid Duncan Yellen and Daniel Hollingworth,
How To Use A Ds340 (Dsp)
Ideal for monitoring dust levels in the exhaust gas of industrial combustion or air filtration processes. Innovative Dynamic Detection Principle (DDP) measurement technique Immune to gradual reductions
HEAVY DUTY STORAGE GAS
Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many
PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING
PERFORMANCE EVALUATION OF WATER-FLOW WINDOW GLAZING LI CHUNYING DOCTOR OF PHILOSOPHY CITY UNIVERSITY OF HONG KONG FEBRUARY 2012 CITY UNIVERSITY OF HONG KONG 香 港 城 市 大 學 Performance Evaluation of Water-flow
SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.
SCHEDULE ' A' TECHNICAL SPECIFICATION FOR 11/22/33KV H.T.XLPE POWER CABLE FOR DISTRIBUTION NETWORK IN MAHARASHTRA (SPECIFICATION NO.MM/I/HTXLPE/2006) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
Integrated Development and Assessment of New Thermoplastic High Voltage Power Cable Systems
21, rue d Artois, F-75008 PARIS B1-215 CIGRE 2012 http : //www.cigre.org Integrated Development and Assessment of New Thermoplastic High Voltage Power Cable Systems Mike FAIRHURST (1), Ankit GOWADIA (1),