Reliability Strategy and Plan
|
|
|
- Dustin McCormick
- 10 years ago
- Views:
Transcription
1 Reliability Strategy and Plan 1 Reliability Strategy and Plan Major Coverage in Module Equipment Asset Management Planned Maintenance: Integration of Maintenance Techniques Continuous Improvement Techniques and Programs Company Examples 2 1
2 Relationship Between Production, Assets, and Maintenance Primary Input (Materials, Labor, Energy) Primary Output (End Product) Production Asset Maintenance 3 Equipment Asset Management Strategic concept that goes beyond equipment maintenance Includes every stage in the lifecycle of production and manufacturing equipment assets. Design Operation Maintenance Repair 4 2
3 Equipment Asset Management Reduction in maintenance cost is accomplished by reducing the need for maintenance. Design for the service Fabricate with proper materials Correct installation Assure lubrication Eliminate chronic problems Enforce proper repair procedures Includes Preventive Maintenance (PM), Predictive Maintenance (PdM) and even Reactive Maintenance (RM) in an optimum combination. Elements such as Total Productive Maintenance (TPM) and Reliability Centered Maintenance (RCM) are used. 5 Focus of Manufacturing and Maintenance Period Market and Manufacturing Maintenance Pre 1945 Assembly Lines Reactive Production for stock Corrective Economic expansion Reactive 1950's Ever increasing demand Corrective Investments in more assets 1960's More innovations Reactive Increased complexity of assets Preventive Expanding infrastructure 1970's Market saturation Reactive Paradigm shift from vendor to customer Preventive Condition monitoring Active/proactive 1980's Customer is the dominant force Reactive MRP I/MRP II/JIT Preventive Condition monitoring Predictive Proactive 1990's Global competition Reactive Optimize manufacturing efficiency by MES/ Preventive ERP/TQM implementation in the workplace Predictive Network business objects TPM/RCM Proactive Integration with design and engineering Integration with open business systems Integration with open control systems Source:: SQL Systems Inc. 6 3
4 Maintenance Strategy Integration of complementary techniques to meet the goals of optimum equipment reliability and availability for the least maintenance and operating cost. 7 APPROACH TO MAINTENANCE UNPLANNED PLANNED REACTIVE MAINTENANCE PROACTIVE MAINTENANCE PREVENTIVE MAINTENANCE PREDICTIVE MAINTENANCE 8 4
5 Purchasing Engineering Accounting Storeroom Operations//Manufacturing Maintenance manager Benefits of a Planned Maintenance System Top management BENEFITS Reduce the size and scale of repairs Reduce downtime Increase accountability for all cash spent Reduce number of repairs Increase equipment s useful life Increase operator, mechanic, and public safety Increase consistency and quality of output Reduce overtime Increase equipment availability Reduce number of backup and standby units Increase control over parts and reduce inventory level Improve information available for equipment specification Lower maintenance costs (better use of labor/materials) Lower overall cost/product unit Source: NASA 9 Reactive Maintenance (RM) Also known as breakdown, run to failure maintenance. Maintenance is performed only after the equipment fails. If it ain t broke, don t fix it When it breaks, we ll fix it Little time, effort, or expense is allocated for maintenance until it is absolutely necessary. When this is the sole type of maintenance practiced: - High percentage of unplanned activities - High replacement part inventories - Inefficient use of maintenance effort A purely reactive maintenance strategy ignores the many opportunities to influence equipment survivability. Typical examples are electronic circuit boards and light bulbs. Justifiable in particular circumstances: - Does not produce critical delays; - Does not sacrifice safety; - Does not significantly increase costs. 10 5
6 Decision Flow Chart for Preventive Maintenance (PM) Is monitored, scheduled maintenance or inspection required for safety, insurance or regulation? No Will the breakdown be more costly than prevention? No Is equipment in the critical path for manufacturing? No Is backup equipment unavailable? No Will the breakdown adversely affect delivery or customer service? No Will the breakdown further damage the equipment? No REACTIVE MAINTENANCE JUSTIFIED P R E V E N T I V E M A I N T E N A N C E 11 Preventive Maintenance (PM) Also known as Time-based or Interval-based Maintenance. Maintenance activities are performed on a calendar or operating time interval basis to extend the life of the equipment and prevent failure. Performed without regard to equipment condition. Assumes that the condition of the equipment and its need for maintenance is correlated with time. This means that most items can be expected to operate reliably for a period X, and then wear out. 12 6
7 Age-related Failures Typical graph of single-piece and simple items such as tires, brake pads, compressor blades, etc. Predictable relationship between age and failure is true in some instances: Equipment that comes in direct contact with product Equipment with visual signs of wear and corrosion 13 Patterns of Equipment Failure Graphs show conditional probability of failure against operating age % equipment Type conforming A. Bathtub 4% B. Wearout 2% C. Gradual rise 5% D. Initial increase 7% E. Uniform failure 14% F. Infant Mortality 68% Source: Aladon Ltd. 14 7
8 Preventive Maintenance Failure rate (failure/time) is used as a guide to establish task periodicities. MTBF = reciprocal of failure rate only in the special case of exponential life model (constant failure rate case) It provides only the average age at which failure occurs, not the most likely age. Can result in unnecessary maintenance. PM can be costly and ineffective when it is the sole type of maintenance practiced. 15 Preventive Maintenance (cont.) Preventative maintenance is only effective in the wear-out phase. If you are in the constant failure phase, and you replace a part you often move back to the infant mortality phase, with a higher failure rate. 16 8
9 What Maintenance Tasks Are Performed? Checking and cleaning Inspecting Adjustments Lubrication Parts replacement and servicing Calibration Repair of components and equipment 17 Examples of PM Car maintenance Change oil per instructions in the manual Undercoating the car with rust-proofing Schedule regular tune-ups Equipment with direct product contact Machine tooling, screw conveyors, furnace refractories, pump impellers, etc. 18 9
10 Predictive Maintenance (PdM) Also known as Condition- Based Maintenance. Uses non-intrusive testing techniques, visual inspection and performance data to assess machinery condition. Replaces arbitrarily timed maintenance tasks with maintenance that is scheduled when warranted by equipment condition. 19 Benefits of Predictive Maintenance Helps reduce cost and improve reliability: Frequency based preventive maintenance can be delayed if PdM monitoring shows it is not necessary yet; Equipment with indicators of probable failure prior to scheduled PM activity are identified and scheduled for maintenance prior to failure; Equipment with conditions that if not repaired will lead to catastrophic failure are detected and repaired at a fraction of the catastrophic failure repair cost
11 Benefits of Predictive Maintenance Improves mean-time-to repair due to prediction of failure Reduces inventory levels due to the avoidance of premature parts replacement and the ability to predict parts requirements Improves loading of resources and provides reduced overtime levels due to reduced emergency maintenance Gives the engineer/technician insight into the location and cause of the impending failure, reducing diagnosis time if the equipment is permitted to run to failure 21 Methods to Assess Condition of Systems/Equipment Includes intrusive and non-intrusive methods Vibration Analysis Tribology and Lubrication Thermal Imaging and Temperature Measurement Flow Measurement Electrical Testing and Motor Current Analysis Leak Detection Valve Operation Corrosion Monitoring Process Parameters Visual Observations 22 11
12 Turbines Pumps Condensers Valves Motor, Turbine Generators Heavy Equipment/Cranes TECHNOLOGIES APPLICATIONS Electrical Systems Transformers Tanks, Piping Diesel Generators Heat Exchangers Circuit Breakers Electric Motors Vibration analysis Lubricant, Fuel Analysis Wear Particle Analysis Bearing Temp. Analysis Performance Monitoring Ultrasonic Monitoring Ultrasonic Flow Infrared Thermography Non-destructive Testing Visual Inspection Insulation Resistance 23 Source: NASA Vibration Monitoring and Analysis One of the most commonly used techniques. Helps determine the condition of rotating equipment and structural stability in a system. Applicable to all rotating equipment; e.g., motors, pumps, turbines, compressors, engines, bearings, gearboxes, shafts, etc. Conditions monitored: wear, imbalance, misalignment, mechanical looseness, bearing damage, belt flaws, cavitation, fatigue, etc
13 Infrared Thermography (IRT) Application of infrared detection instruments to identify pictures of temperature differences It is a non-contact technique Attractive for identifying hot/cold spots in energized electrical equipment, large surface areas such as boilers and building walls, and other areas where stand off temperature measurement is necessary. 25 Lubricant and Wear Particle Analysis Is performed for three reasons: To determine the mechanical wear condition To determine the lubricant condition To determine if the lubricant has become contaminated There are a wide variety of tests that will provide information regarding one or more of these areas. Standard analytical tests include: visual and odor, viscosity, % solids/water, spectrometric metals, infrared spectroscopy, particle counting, analytical ferrography, etc
14 Passive (Airborne) Ultrasonics Airborne ultrasonic devices operate in a frequency range of 20kHz- 100kHz and heterodyne the high frequency signal to the audible range to allow the operator to hear changes in noise associated with leaks, corona discharges, and other high frequency events. Examples include bearing ring and housing resonant frequency excitation caused by insufficient lubrication and minor defects. 27 Non-Destructive Testing (NDT) Evaluates material properties and quality of manufacture for high-value components or assemblies without damaging the products or its function. Examples are: radiography, ultrasonic testing (imaging), magnetic particle testing, dye penetrant, hydrostatic testing and electromagnetic induction testing 28 14
15 Non-Destructive Testing (NDT) Radiography ( or X-Ray): Detection of deep-surface defects. One of the most powerful NDT techniques available in industry. Depending on the strength of the radiation source, can provide a clear representation of discontinuities or inclusions in material several inches thick. Applicable to metal components including weld points. Ultrasonic Testing (Imaging) (UT): Detection of deep sub-surface defects Alternative of complementary technique to radiography. Based on the difference in the wave reflecting properties of defects and the surrounding material 29 Non-Destructive Testing (NDT) Ultrasonic Testing (cont.) Applicable to same components as X-Ray testing. Specialized applications for plastics or composite materials are common. Preferred method over radiography due to expense and safety precautions required by radiography. Magnetic Particle Testing (MT): Detection of shallow sub-surface defects. Useful during localized inspections of weld areas and specific areas of high stress or fatigue loading The major advantage is its portability and speed of testing. Applicable to materials that conduct electric current and magnetic lines of flux. Most effective in welded areas
16 Non-Destructive Testing (NDT) Dye Penetrant (DP): Detection of surface defects in non-porous materials. Allows large areas to be quickly inspected. Simplest NDT technique in which to gain proficiency Hydrostatic Testing: Method for detecting defects that completely penetrate pressure boundaries. Typically conducted prior to delivery or operation of completed systems or sub-systems that act as pressure boundaries. Applicable in components and assembled systems that contain fluids or gases. 31 Non-Destructive Testing (NDT) Electromagnetic Induction Testing or Eddy Current Testing: Provides a portable and consistent method for detecting surface and shallow sub-surface defects in metal components, such as cracks, seams, holes or lamination separation). A set of magnetizing coils are used to induce electrical currents into the component being tested. Used for monitoring the thickness of metallic sheets, plates and tube walls. Also coating thickness. In more production oriented applications, this technique can determine material composition, uniformity and thickness of materials being produced
17 Most Commonly Used PdM Techniques Vibration monitoring rotating equipment Oil analysis detect residual metal particles Thermography identifying plant hot spots Shock pulse measurement bearings Ultrasonics X-ray scanning spot leaks and faults 33 Predictive and Proactive Maintenance Premature Failures Random Failures Wear-out Failures Probability of Failure Condition Monitoring identifies early detection of degradation for Predictive Maintenance Proactive maintenance reduces the risk of failure Time 34 17
18 Proactive Maintenance (PAM) Improves maintenance through better design, installation, maintenance procedures, workmanship, and scheduling. Employs the following basic techniques to extend machinery life: Specifications for new/rebuilt equipment Precision rebuild and installation Failed-Part Analysis (FPA) Root-Cause Failure Analysis (RCFA) Reliability Engineering Rebuild certification/ verification Age exploration Recurrence Control 35 Failed-Part Analysis (FPA) Involves visually inspecting failed parts after their removal to identify the root causes of their failures More detailed technical analysis may be conducted when necessary to determine the root cause of a failure. Example: Failed-bearing analysis provides methods to categorize defects such as scoring, color, fretting, and pitting and to relate those findings to the most probable cause of failure 36 18
19 Root-Cause Failure Analysis (RCFA) Proactively seeks the fundamental causes that lead to facility and equipment failure. Goals are: Find the cause of the problem quickly, efficiently, and economically Correct the cause of the problem, not just its effect Provide information that can help prevent the problem from recurring Instill a mentality of fix forever 37 Age Exploration (AE) Provides a methodology to vary key aspects of the maintenance program to optimize the process. The AE process examines the applicability of all maintenance tasks in terms of: Technical content: Review tasks to ensure that all identified failure modes are addressed and that the existing tasks produce the desired amount of reliability Performance interval: The task performance interval is continuously adjusted until the rate at which resistance to failure declines is determined. Task grouping; Tasks with similar periodicity are grouped together to minimize time spent on the job and outages 38 19
20 Characteristics of Proactive Maintenance Uses feedback and communications to ensure that changes in design or procedures are rapidly made available to designers and managers Employs a life-cycle view to maintenance and supporting functions Ensures that nothing affecting maintenance occurs in isolation Employs a continuous process of improvement Integrates functions which support maintenance into maintenance program planning Uses root-cause failure analysis and predictive analysis to maximize maintenance effectiveness Adopts an ultimate goal of fixing the equipment forever Periodic evaluation of the technical content and performance interval of maintenance tasks (PM and PdM) 39 Summary of Different Maintenance Techniques Description Benefits Shortcomings Fix or replace a device Suitable for non-critical and low Potential safety hazards Reactive when it breaks cost equipment Increased costs due to unplanned maintenance and shutdowns Scheduling maintenance Reduces reactive maintenance Does not eliminate unexpected activities based on equipment problems Preventive arbitrary time intervals Provides structure to maintenance actions Wastes resources Large inventory Assesses the equipment's Predicts when a device is likely to Does not always detect the root Predictive health through diagnostics fail cause of a problem testing and/or on-line monitoring Saves time and money Uses information provided Prolong operating life of equipment Proactive through predictive methods to find and isolate the source Minimize risk of random failure of equipment problems Source: Fisher-Rosemount 40 20
21 Implementation of Planned Maintenance Step 1: Evaluate equipment and understand current conditions Step 2: Restore deterioration and correct weaknesses. Step 3: Build an information management system. Step 4: Build a preventive maintenance system. Step 5: Build a Predictive maintenance system. Step 6: Evaluate the planned maintenance system. 41 Step 1: Evaluate Equipment and Understand Current Conditions 1. Prepare or update equipment logs 2. Evaluate equipment: Establish evaluation criteria, prioritize equipment, and select planned maintenance equipment and components 3. Define failure ranks 4. Understand situation: measure number, frequency, and severity of failures; MTBFs; maintenance costs; breakdown maintenance rates, etc. 5. Set maintenance goals (indicators, methods of measuring results) 42 21
22 Step 1: Evaluate/Understand Current Conditions To decide which equipment receives planned maintenance, prepare equipment logs and prioritize equipment. Equipment logs are raw data for evaluating equipment. Must have design data and show equipment s operating and maintenance history. Evaluate each piece of equipment in terms of its effect on safety, quality, operability, maintainability, etc. Rank equipment (as A, B, or C, for example) and perform maintenance on all units ranked A or B, as well as those for which zero failure is a legal requirement. 43 Step 1 (Cont.) Obtain data on failure numbers, frequencies, and severities, and on MTBFs, MTTRs (mean time to repair), maintenance costs, etc. Set goals for reducing these through planned maintenance. Rank failures as major, intermediate, or minor depending on their effect on equipment. Obtain data on failure numbers, frequencies and severities, MTBFs,etc. Set goals for reducing these through planned maintenance
23 Example Criteria for Evaluating Equipment Attribute Evaluation Criterion Rank Safety: Equipment failure poses explosion risk or other A Effect of failure hazards; equipment failure causes serious pollution on people and Equipment failure might adversely affect the environment B environment Other equipment C Equipment failure has a major effect on quality (could lead Quality: to product contamination or abnormal reactions and produce A Effect of failure out-of-spec product) on product quality Equipment failure produces quality variations that can be B put right by the operator comparatively quickly Other equipment C Equipment with major effect on production, without standby Operation: provision, whose failure causes previous and subsequent A Effect of failure processes to shut down completely on production Equipment failure causes only partial shutdown B Equipment failure has little effect or no effect on production C Equipment takes 4+ hours or costs $2,400+ to repair, or A Maintenance: fails three or more times per month Time and cost of Equipment can be repaired in under 4 hours at a cost of B repair between $240 and $2,400 or fails less than three times/month Equipment costs less than $240 to repair or can be left C unrepaired until a convenient opportunity arises Source: Nippon Zeon Co., PM Prize Lecture Digest 45 Examples of Planned Maintenance Goals Indicator Improvement Goal A equipment.. 0 Failures by equipment ranking B equipment.1/10 of indicator during baseline period C equipment..1/2 of indicator during baseline period Major failures 0 Failures by failure ranking Intermediate failures 1/10 indicator during baseline period Minor Failures 1/2 indicator during baseline period Failure downtime x 100 Equipment failure severity operating time (For A equipment or less) Failure stops x 100 Equipment failure frequency operating time (For A equipment..0.1 or less) Planned M. jobs completed x 100 Planned maintenance total planned maintenance (90% or more) achievement rate jobs scheduled 46 23
24 Step 2: Reverse Deterioration and Correct Weaknesses 1. Establish basic conditions, reverse deterioration and abolish environments causing accelerated deterioration. 2. Conduct focused improvement activities to correct weaknesses and extend lifetimes. 3. Take measures to prevent identical or similar failures from occurring. 4. Introduce improvements to reduce process failures. 47 Step 2: Reverse Deterioration and Correct Weaknesses (Cont.) Equipment exposed to accelerated deterioration for many years can fail unexpectedly at irregular intervals. The first step in the planned maintenance program is to restore accelerated deterioration, correct major weaknesses, and restore equipment to its optimal condition. This is achieved by operations and maintenance working together in the spirit of cooperation 48 24
25 Step 2: Program for the Production Department 1. Deterioration prevention: Operate equipment correctly Maintain basic equipment conditions (cleaning, lubrication) Make adequate adjustments (during operation and setup) Record data on breakdowns and other malfuntions Collaborate with maintenance department to study and implement improvements 2. Deterioration measurement (using the 5 senses) Conduct daily inspections 49 Step 2: Program for the Production Department 3. Equipment restoration Make minor repairs (simple parts replacement and temporary repairs) Report promptly and accurately on breakdowns and other malfunctions Maintaining basic equipment conditions and daily inspection cannot be addressed by the maintenance staff alone. They are most effectively handled by those closest to the equipment --- the operators
26 Step 3: Build an information management system 1. Build a failure data management system 2. Build an equipment maintenance management system (machinery-history control, maintenance planning, inspection planning, etc.) 3. Build an equipment budget management system 4. Build systems for controlling drawings, technical data, etc. 51 Step 3: Building an Information Management System Building a failure data management system will assist teams in determining failure frequency, downtime, etc. for individual processes or types of equipment. The information helps prioritize improvements and prevent recurrence. The system should include the following data: - date and time of failure - failure rank - equipment model - failed component - nature of failure - cause of failure - action taken - effect on production - time and number of personnel required for repair 52 26
27 Step 3 : Building an Information Management System Data should be analyzed and made available at regular intervals in the form of periodic failure summaries and equipment failure lists. A computerized maintenance management system (CMMS) cannot function effectively if major and intermediate failures persist. Therefore, construct a failure data management system, first. Build the equipment maintenance management system when major and intermediate failures no longer recur 53 Step 3: Computerized Maintenance Budget Management Must generate the following kinds of information: Budget summaries for different types of maintenance work that compare budgeted and actual expenditure Work and materials usage schedules providing information on work plans, costs, projected materials usage, etc. Job priority lists that include information on maintenance work priorities, projected downtimes, costs, etc. Charts that compare predicted downtime losses with maintenance costs and help measure maintenance effectiveness(cost of maintaining equipment vs. predicted losses from failure) 54 27
28 Step 3: Controlling Technical Information and Drawings A technology management system should control all information that relates to: - maintenance ( including design standards) - technical reports - important literature - checking standards - mechanical design calculation programs - equipment diagnosis criteria, etc. Design the drawing control system to file and retrieve maintenance drawings, equipment logs, detailed drawings of parts to inspect, piping layouts, flow diagrams, catalogs, etc. 55 Step 4: Build a Preventive Maintenance System 1. Prepare for periodic maintenance (control standby units, spare parts, measuring instruments, lubricants, drawings, technical data, etc.) 2. Prepare preventive maintenance system flow diagram (see next page). 3. Select equipment and components to be maintained, and formulate a maintenance plan. 4. Prepare or update standards (material standards, work standards, inspection standards, acceptance standards, etc.). 5. Improve shutdown maintenance efficiency and strengthen control of subcontracted work 56 28
29 Select equipment for preventive maintenance Prepare preventive maintenance manuals and checking/inspection sheets Preventive Maintenance Flow Diagram Determine maintenance work and interval Prepare for preventive maintenance NO Perform preventive maintenance Was the maintenance interval appropriate? Failure Analyze failure Was the maintenance work appropriate? Prepare report NO Revise maintenance work/spares Add to equipment history, and file Source: Nishi Nihon Sugar 57 Step 4: Selecting Equipment and Components for Preventive Maintenance Assess the equipment designated for planned maintenance and select equipment for PM from: Equipment that, by law, requires periodic inspection Equipment with maintenance intervals determined by experience Equipment that requires regular checking due to its importance to the process Equipment with an established replacement interval based on the serviceable life of its components Important equipment for which it is difficult or impossible to detect or correct abnormalities during operation 58 29
30 Step 4. Preparing Maintenance Plans Base maintenance plans on mid-range (5 year) production plans Detail the plant/section shutdown maintenance along with the preventive maintenance for individual equipment items Include plans for opportunity maintenance (maintenance performed on machines whenever they are shut down for other reasons) 59 Step 4: Formulating Preventive Maintenance Standards To ensure that people perform preventive maintenance accurately and efficiently, formulate the following kinds of standards: Material selection standards Work estimating standards Spare-parts control standards (standby units, general parts, tools and testing equipment) Lubricant control standards Lubricant supply control standards Safety standards 60 30
31 Step 4: Improving the Efficiency of Shutdown Maintenance Standard practice in many process industries Can consume up to half of a company s annual maintenance budget because it includes equipment modification, cost of stopping and restarting the plant, as well as the cost of maintaining equipment that cannot be opened during normal operation Can also include the implementation of investment projects Involves almost every department within the company (safety, purchasing, accounting, production, engineering, and maintenance) 61 Step 4: Work Breakdown Structure for Shutdown Maintenance Prepare an on-site work operation sheet in network form A bar type operation sheet conceals the relationships among different tasks and the effect of delays on the overall project while a network diagram clearly shows the relationships among different tasks and critical path can be checked constantly. Prepare a network diagram (PERT or CPM) Shorten the process Reduce shutdown maintenance costs 62 31
32 Step 5: Build a Predictive Maintenance System 1. Introduce equipment diagnostics (train diagnosticians, purchase diagnostic equipment, etc.) 2. Prepare predictive maintenance system flow diagram 3. Select equipment and components for predictive maintenance, and expand gradually 4. Develop diagnostic equipment and technology 63 Step 5: Build a Predictive Maintenance System Characterized by a combination of three tasks: Surveillance: monitoring machinery condition to detect incipient problems Diagnosis: isolating the cause of the problem Remedy: performing corrective action If the last task is not performed, then the monitoring efforts (gathering data and performing analysis) are wasted
33 Select equipment for PdM Inside limits Choose optimum monitoring methods Measure condition periodically Collect data Acceptable Record data Do trend analysis Outside limits Set up a PdM process Steps for a PdM Program Determine acceptable condition limits No fault located Unacceptable Machine baseline measurements Fault located Perform condition analysis Correct fault Source: IRD Mechanalysis, Inc. 65 Step 5: Equipment Selection Review of equipment performance histories Criticality of each machine Types of failures Outlook for continued failures Select a manageable number of machines Determine what, how, when and where to measure Choose parameters that best indicate machine condition and failure progression Choose appropriate instruments and techniques for measuring Make decisions about how often to monitor and where on the equipment to take measurements 66 33
34 Step 5: Frequency of PdM tasks should be based on the failure period (or P-F interval) Source: Aladon Ltd. The frequency of PdM tasks has nothing to do with the frequency of failure and nothing to do with the criticality of the item. The frequency of PdM is based on the fact that most failures do not occur instantaneously, and that it is often possible to detect that the failure is occurring during the final stages of deterioration. 67 Step 5: Frequency of PdM tasks should be based on the failure period (or P-F interval) The amount of time to elapse between the point where the potential failure occurs and the point where it deteriorates into a functional failure is known as the P-F interval The P-F interval governs the frequency with which the predictive task must be done. The checking interval should be less than the P-F interval if we wish to detect the potential failure before it becomes a functional failure. Source: Aladon Ltd
35 Step 5: Set up a PdM Process Develop systems for establishing inspection schedules and handling data Develop program for training personnel Put in place a structured means of communication to relay information about equipment condition to those planning and scheduling repair activities Set the levels or limits that represent normal operating conditions for all parameters to be monitored Map out monitoring routes Give identification numbers to the machines Mark points to be monitored on the machines 69 Step 5: Determining acceptable condition limits Obtain baseline measurements to establish the condition of the machinery Compare actual measurements to the standards set While baseline measurements are being taken, machines operating outside established limits will be found. Investigate, diagnose and correct faults before machines are included in program Begin periodic monitoring 70 35
36 Step 5: Periodic Condition Monitoring Entails taking measurements on a schedule; collecting, recording, and trending (charting) the data Analyze the trended information to detect progressive problems and identify faults that require corrective action As the program continues, reassess points being monitored and original limits set 71 Step 6: Evaluate the Planned Maintenance System 1. Evaluate the planned maintenance system 2. Evaluate reliability improvement; number of failures and minor stops, MTBF, failure frequency, etc. 3. Evaluate maintainability improvement: preventive maintenance rate, predictive rate, MTTR, etc. 4. Evaluate cost savings: decrease in maintenance expenditures, improvement in distribution of maintenance funds 72 36
37 Continuous Improvement Techniques and Programs Reliability Centered Maintenance (RCM) On-going process which determines the optimum of reactive, preventive, predictive and proactive maintenance practices in order to provide the required reliability at the minimum cost Total Productive Maintenance (TPM) Plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through the use of employee involvement, employee empowerment, and closed-loop measurement of results 73 Reliability Centered Maintenance (RCM) Reliability Centered Maintenance Reactive Maintenance Preventive Maintenance Predictive Maintenance Proactive Maintenance Small items Non-critical Inconsequential Unlikely to fail Redundant Subject to Wearout Consumable Replacement Failure pattern known Random failure Patterns not subject to wear PM induced failures RCFA FMEA AE 74 37
38 Historical Evolution of RCM RCM finds its roots in the early 1960 s. Initial development was done by the North American civil aviation industry. Airlines realized that many of their maintenance philosophies were not only too expensive but actually dangerous. Industry re-examined everything they were doing to keep their aircraft air-borne. In the mid-1970 s the US Department of Defense commissioned a report on the subject from the aviation industry. This report was written by Stanley Nowlan and Howard Heap (United Airlines) and published in It is still one of the most important documents available today. 75 Historical Evolution of RCM The work demonstrated that a strong correlation between age and failure did not exist. Therefore, the basic premise of preventive (time-based) maintenance was false for the majority of the equipment. Development of new technologies in the late 1980s made it possible to determine the actual condition of equipment, and not rely upon estimates of when it might fail based upon age (condition-based monitoring)
39 RCM Analysis What does the system or equipment do? What functional failures are likely to occur? What are the likely consequences of these functional failures? What can be done to prevent these functional failures? RCM decision logic tree based on the answers to these questions 77 RCM Decision Logic Tree Will failure of the facility or equipment item have a direct and adverse effect on safety or critical mission operations? Is the item expendable? Yes No No Yes Can redesign solve the problem permanently and cost effectively? No Yes Is there predictive technology (e.g. vibration testing or thermography) that will monitor the condition and give sufficient warning(alert/alarm) of an impending failure? Redesign No Yes Is PdM cost and priority-justified? Is there an effective PM task that will minimize functional failure? No Yes Is establishing redundancy cost and priority-justified? No Yes Install redundant Accept risk unit(s) Install PM task and schedule No Yes Define PdM task and schedule 78 Source: NASA 39
40 RCM Principles RCM is function oriented Seeks to preserve system or equipment function RCM is system focused More concerned on maintaining system function than individual component function RCM is reliability centered Relationship between operating age and the failures experienced is important RCM acknowledges design limitations Maintenance can, at best, achieve and maintain the level of reliability for equipment which is provided by design. RCM recognizes that maintenance feedback can improve original design RCM is driven by safety and economics Safety first, then cost-effectiveness 79 RCM Principles RCM defines failure as any unsatisfactory condition Loss of function (operation ceases) or loss of acceptable quality (operation continues) RCM uses a logic tree to screen maintenance tasks RCM tasks must be effective RCM acknowledges 3 types of maintenance and run-to-failure PM, PdM, and failure-finding (one of the several aspects of proactive maintenance) RCM is a living system It gathers data from the results achieved and feeds this data back to improve design and future maintenance. This feedback is an important part of the Proactive Maintenance element of the RCM program RCM tasks must be applicable The tasks must reduce the number of failures or ameliorate secondary damage 80 40
41 RCM Goals and Objectives Identify for each system and equipment the failure modes and their consequences Determine the most cost-effective and applicable maintenance technique to minimize the risk and impact of failure 81 Example RCM Analysis Brief example of the RCM methodology and the type of data required to conduct an RCM analysis Develop an equipment data sheet which includes both vendor and CMMS identification numbers. Additional information included: Number of units installed Item description Function(s) Functional Failures Failure Modes Failure Effects Historical data 82 41
42 Definitions Functional Failures Descriptions of the various ways in which a system or subsystem can fail to meet the functional requirements designed into the equipment Failure modes Equipment and component-specific failures that result in functional failure of the system or subsystem. Not all failure modes or causes warrant preventive or predictive maintenance because the likelihood of their occurring is remote or their effect is inconsequential. 83 RCM Information Sheet May be started at either the component, subsystem, or system level. For example, a chilled water system would have four RCM information sheets: Bldg. XX Chilled Water System Function Functional Failures Failure Modes Maintenance (M) or Operations (O) Total loss of flow Motor failure Both Provide chilled Pump failure Both water at specified Catastrophic leak M flow rate and Blocked line M temperature to Valve out of position Both support computer Insufficient flow Pump cavitation O operations Drive problem M Blocked line M Valve out of position Both Instrumentation M Chilled water Chiller failure Both temperature too high Low refrigerant M Fouled heat exchanger M Instrumentation problem M Cooling Tower problem M Valve out of position Both 1. System Data Sheet Source: NASA 84 42
43 Each of the individual components which make-up the chilled water system would have a sheet similar to Table 2 Electric Motor Function: To provide sufficient power to pump 300 gpm of chilled water Component Functional Failure Failure Mode Source of Failure Stator Motor will not turn Insulation failure Insulation contamination Excessive current Open winding Voltage spike Phase imbalance Excessive temperature Rotor Motor will not turn Burnt rotor Insulation contamination Excessive current Wrong speed Excessive vibration Excessive temperature Imbalance Bearings Motor will not turn Bearing seized Fatigue Improper lubrication Misalignment Imbalance Electrical pitting Contamination Excessive thrust Excessive temperature Motor controller Motor will not turn Contractor failure Mainline contact failure Control circuit failure Wrong speed VFD malfunction Loss of electrical power Cabling failure Overloads/fuse Motor will not turn Device burned out Excessive current Excessive torque Poor connection Shaft/coupling Pump will not turn Shaft/coupling Fatigue sheared Misalignment Excessive torque 2. Electric Motor Failures Sheet Source: NASA 85 A table similar to table 3 should be prepared to select the maintenance strategy to be followed in order to address each failure mode ant its root cause. This sheet will be extensive for even the simplest of systems. Root Cause of Failure Mode for Electric Motor Bearings Failure Mode Mechanism Reason Root Cause Comments Lubrication Contamination Seal failure Bearing seized Cleanliness (This includes Insufficient Oil leak seals, shields, Procedural lubrication Excessive Procedural system, and Wrong type Procedural lock nuts.) Fatigue Metallurgical Inherent Excessive temp. Excessive load Imbalance Misalignment Fit-up Application Surface distress Installation Procedural Contamination See lubrication Storage Procedural Electrical Insulation Welding 3. Failure Mode Identification Sheet 86 43
44 Table 4 provides an abbreviated Root Cause Failure Sheet for electric motor stators Root Cause Failure Mode for Electric Motors (Electrical) Failure Mode Mechanism Reason Root Cause Comments Oxidation Age Inherent Stator insulation Environment Chemical attack resistance reading Overheating Excessive current Power quality zero ohms. Phase imbalance Short on/off cycle Low voltage Overloaded Contamination Environment Moisture Improper lube Process related Fatigue Excessive Lack of winding vibration support Phase imbalance Imbalance Misalignment Resonance 4. Root Cause Failure Sheet 87 Use of Formal RCM Due to the extensive up front effort required, a formal rigorous RCM analysis should be for: Case 1: Systems and components that are truly unique Where consequences of failure are completely unacceptable Failure modes are not understood. Case 2: Iterative process has not produced the desired level of reliability Life cycle cost for maintaining the desired level of reliability is excessive 88 44
45 Establish RCM Team Is equipment or system unique and/or pose exceptional risk due to failure? Apply RCM Logic Tree to systems No Yes Perform rigorous RCM analysis No Write PM tasks Is equipment reliability acceptable? Yes Identify required Predictive technologies Can the condition monitoring technique be performed by in house personnel? No Yes Contract for condition monitoring services Procure PdM equipment & training Develop monitoring routes, alarms and intervals Iterative RCM Process Perform surveys of equipment Review monitoring routes, alarms and intervals Is equipment reliability acceptable? No Source: NASA Review in two years Yes 89 Key Success Factors for Implementing RCM Clear project goals Management support and a commitment to introduce a controlled maintenance environment Union involvement Good understanding of RCM philosophy by plant staff Pilot RCM applications to demonstrate success and build support Sufficient resources for both the review and subsequent implementation of recommendations Clear documentation of results to facilitate acceptance of recommendations Integration with PdM maintenance capability 90 45
46 RCM Implementation Phases Assess maintenance capability and environment Customize training Conduct awareness training Conduct facilitator and team member training Conduct pilot applications Transfer training Institutionalize RCM review Target physical resources Develop project plans Estimate costs/benefits Revise plans and training program Develop living program plan Implement system improvements Implement living program Phase 1: Prepare Phase 2: Demonstrate Phase 3: Execute Source: Uptime, Productivity Press 91 Total Productive Maintenance (TPM) Cross-functional team activities to eliminate unnecessary or unplanned downtime and equipment-related quality problems, and improve machine operability and maintainability. Rigorous preventive maintenance program to control deterioration -- carried out cooperatively by operations and maintenance personnel. Training to upgrade operations and maintenance skills among production and maintenance personnel. Team activities to improve maintenance management and maintenance operations efficiency (maintenance planning,visual systems, etc.) Information systems to support the development of new equipment that is easier to operate, adjust and maintain, with lower life-cycle costs and higher reliability 92 46
47 Strategies for Implementing TPM 1. Provide for small group activities (autonomous maintenance) 2. Perform planned maintenance 3. Implement early equipment management 4. Involve everyone through continuous training 5. Maximize equipment effectiveness 93 Autonomous Maintenance Autonomous maintenance includes any activity performed by the production department that has a maintenance function and is intended to keep the plant operating efficiently in order to meet production plans. Goals: Prevent equipment deterioration through correct operation and daily checks Bring equipment to its ideal state through restoration and proper management Establish the basic conditions needed to keep equipment well-maintained 94 47
48 Establishing Basic Equipment Conditions Eliminates Causes of Accelerated Deterioration FAILURE Natural Deterioration (inherent lifetime) Accelerated Deterioration (artificially induced) Extend Lifetimes Eliminate Causes Corrective Corrective Maintenance Maintenance Prevent errors by improving operability Improve maintainability and repair quality Improve safety and reliability Corrective Establishment Maintenance of basic conditions Cleaning: eliminate all dust and dirt Lubricating: keep lubricants clean and repaired Tightening: keep nuts and bolts secure 95 The Importance of Cleaning Cleaning is a form of inspection in TPM. Its purpose is not merely to clean but expose hidden defects or equipment abnormalities. Harmful Effects of Inadequate Cleaning Failure Dirt and foreign matter penetrates rotating parts, sliding parts, pneumatic an hydraulic systems, electrical control systems, and sensors, etc., causing loss of precision, malfunction, and failure as a result of wear, blockage, frictional resistance, electrical faults, etc. Quality Defects Quality defects are caused either directly by contamination of the product with foreign matter or indirectly as a result of equipment malfunction. Accelerated Accumulated dust and grime make it difficult to find and rectify cracks, Deterioration excessive play, insufficient lubrication, and other disorders, resulting in accelerated deterioration. Speed Losses Dust and dirt increase wear and frictional resistance, causing speed losses such as idling and under performance
49 Daily Checking Ensures that abnormalities are detected and dealt with as soon as possible. Lubrication checkpoints Lubrication Storage - Are lubricant stores always kept clean, tidy, and well-organized by thorough application of the 5S principles? - Are lubricant containers always capped? - Are lubricant types clearly indicated and is proper stock control practiced? Lubrication Inlets - Are grease nipples, speed-reducer lubricant ports, and other lubricant inlets always kept clean? - Are lubricant inlets dustproofed? - Are lubricant inlets labeled with the correct type and quantity of lubricant? Oil level Gauges - Are oil-level gauges and lubricators always kept clean, and are oil levels easy to see? - Is the correct oil level clearly marked? - Is equipment free of oil leaks, and are oil pipes and breathers unobstructed? Automatic - Are automatic lubricating devices operating correctly and Lubricating Devices supplying the right amount of lubricant? - Are the oil or grease pipes blocked, crushed or split? Lubrication Condition - Are rotating parts, sliding parts, and transmissions (e.g. chains) always clean and well-oiled? - Are the surroundings free of contamination by excess lubricant? 97 Daily Checking (Cont.) Checkpoints for Nuts and Bolts Slight Defects - Are any nuts or bolts loose? - Are any nuts or bolts missing? Bolt lengths - Do all bolts protrude from nuts by 2-3 thread lengths? Washers - Are flat washers used on angle bars and channels? - Are tapered washers used where parts are subject to variation? - Are spring washers used where parts are subject to vibration? - Are identical washers used on identical parts? Attachment of Nuts - Are bolts inserted from below, and are nuts visible from and Bolts the outside? - Are devices such as limit switches secured by at least two bolts? - Are wing nuts on the right way around? True daily inspection means being alert enough to spot anything out of the ordinary while operating the equipment or patrolling the plant and being able to deal it with and report it correctly. Requires easily-understood standards and high operator skills
50 Steps to Implementing Autonomous Maintenance 1. Perform initial cleaning 2. Address contamination sources and inaccessible places 3. Establish cleaning and checking standards 4. Conduct general equipment inspection 5. Perform general process inspection 6. Systematic autonomous maintenance 7. Practice full self- management 99 Planned Maintenance System Showing Allocation of Responsibility Planned Maintenance PM PdM Specialized maintenance Autonomous maintenance Specialized maintenance Autonomous maintenance Planned servicing Periodic servicing Periodic inspection Periodic checking Periodic checking Daily checking & servicing Opportunity maintenance Continuous monitoring Periodic diagnosis Daily checking and diagnosis Detecting signs of abnormality Complete/Partial shutdown maintenance --Alarms --Trend monitoring --Interlocks OSI SDI RM Specialized maintenance Autonomous maintenance OSI: On-stream inspection (non-destructive) SDI: Shutdown inspection
51 Operations Group Responsibilities 20% Operations Materials 80% Maintenance Labor Supervision Source: TPM by Terry Wireman An operations group can assume about one-fifth of the work performed by the maintenance group 101 Early Equipment Management Good equipment management techniques improve the use of capital assets and extend their life cycle. The objective is to maximize the return on a company s total investment in equipment. Individuals and groups must understand their role in equipment management, so that they know how their activities impact the total life cycle of the equipment. Traditionally, the equipment management function is divided into five phases: Specification; Procurement: Startup or Commissioning; Operation, and Disposal
52 Typical Phases of Equipment Management Phase Responsibility Costs Analytical Effort Specification Management and Costs are minimal, typically High effort. Most of the technical engineering less than 5 % of total life-cycle effort spent on the equipment is in cost. However, this is the phase the specification phase. Too much where the majority of the life- effort is spent on controlling the cycle cost is defined. Poor purchase cost and not enough on specification and design leads controlling the operational cost to higher total life-cycle costs. Procurement Purchasing with Costs can appear to be high, but Most effort is spent on contract engineering reserving are typically only a small terms and vendor prices. Little veto power percentage of the operating effort is spent on ensuring conticost. nuing vendor support and incentivebased performance guarantees. Startup Launch team Costs can be relatively high. This is end of engineering involveconsisting of repre- Most of the launch cost is ment. Engineering and the vendor sentatives from typically due to delays in the are motivated to rush through the engineering, produc- startup schedule representing effort to get to the next project. tion, and maintenance lost opportunity when production Most analytical effort is spent on with assistance by is delayed redesigns or fixes to original the vendor if dictated design errors. The fixes are by the contract for typically tactical and not strategic. purchase Operation Production and Costs are by far the largest of Little or no analytical resource is maintenance any phase, typically as high as available. Engineering is working 80% of the total life-cycle cost. on projects, maintenance is fighting These costs are rarely analyzed or fires, and production is pressed for controlled as equipment schedule compliance. performance tends to steadily decline. Disposal Maintenance Costs in terms of lingering Little or no analytical work or liabilities can be enormous. Costs planning is performed unless there can be minimal if sufficient up- are hazards associated with disposal. front engineering is performed. Source: Productivity Inc. 103 TPM Equipment Management Life Cycle Small Group Cross-functional Activities Specification Procurement Startup Operation Disposal Engineering Purchasing Team Production/Maint. Maintenance Company Policies and Rules Source: Productivity Press
53 Early Equipment Management and Maintenance Prevention (MP) Design During equipment specification and procurement, TPM focuses on lowering total life-cycle cost through the use of Maintenance Prevention design. Maintenance Prevention Design: Minimizes future maintenance costs and deterioration losses of new equipment by taking into account (during planning and construction) maintenance data on current equipment and new technology and by designing for high reliability, maintainability, economy, operability, and safety. 105 Training to Boost Operating and Maintenance Skills Basic policy is to develop specialist skills through an active program of on-the-job training and self-development, supported by off-the-job training. Equipment-competent operators must acquire the following abilities: To detect equipment abnormalities and effect improvements To understand equipment structure and functions and be able to discover the causes of abnormalities To understand the relationship between equipment and quality and be able to predict quality abnormalities and discover their causes To understand and repair equipment
54 Maintenance Skills Training Maintenance professionals must be able to: Instruct operators in correct handling, operating and daily maintenance of equipment Correctly assess whether equipment is operating normally or not Trace the causes of abnormalities and restore normal operation correctly Improve equipment and component reliability, lengthen equipment lifetimes Understand equipment diagnostics and use and standardize them Optimize the preceding activities and make them as cost-effective as possible 107 Maximize Equipment Effectiveness Primary measure of performance in TPM is overall equipment effectiveness (OEE) and overall plant effectiveness (OPE). OEE measures the effective utilization of capital assets by expressing the impact of equipment related losses. Eight types of equipment/plant losses are tracked: Shutdown loss: is the time lost when production stops for planned annual shutdown maintenance or periodic servicing. Production adjustment loss: is time lost when changes in supply and demand require adjustment in production plans. Equipment failure loss: is time lost when a plant/equipment stops because equipment loses its specified functions
55 Maximizing Equipment Effectiveness (Cont.) Process failure losses: is when a plant/equipment shuts down as a result of factors external to the equipment, such as changes in the physical or chemical properties of the substances being processed. Normal production losses: are rate losses that occur during normal production at plant/equipment startup, shutdown, and changeover. Abnormal production losses: are rate losses that occur when a plant/equipment operate at less than ideal speed. Quality defect losses: include time lost in producing rejectable product, physical loss in scrap, and financial losses due to product downgrading. Reprocessing losses: are recycling losses that occur when rejected material must be returned to a previous process/equipment to make it acceptable. 109 Overall Plant Effectiveness Is the product of the availability, performance rate, and quality rate. Is a comprehensive indicator of a plant s condition that takes into account operating time, performance and quality. Availability: Is the operating time expressed as a percentage of the calendar time Availability = Calendar time - (shutdown loss + major stoppage loss) X 100 Calendar time Shutdown losses = Shutdown maintenance loss + production adjustment loss Major stoppage loss= equipment failure loss + production failure loss
56 Overall Plant Effectiveness (Cont.) Performance rate: Expresses the actual production rate as a percentage of the standard production rate. The standard production rate is equivalent to a plant s design capacity and is the intrinsic capacity of a particular plant. The actual production rate is expressed as an average. Performance rate = Average actual production rate X 100 (%) Standard production rate Quality rate: Expresses the amount of acceptable product (total production less downgraded product, scrap, and reprocessed product) as a % of total production Quality rate = Production quantity - (quality defect loss + reprocessing loss) X 100 Production quantity 111 OEE Example Calculation Calendar Time: Operating Time: A. Availability = 24 hours x 30 days 24 hours x 27 days 24 x 27 x 100 = 90% 24 x 30 Actual Production Volume Standard Production Volume 1000 tons/hour Days Volume Total Total Actual Production Rate = 23900/27 = 885 tons/day B. Performance Rate = 885/1000 =.885 C. If 100 ton of rejectable product are produced, then Quality Rate = 23800/23900 =.996 = C D. OEE = 0.90 x x =.793 or 79.3%
57 Overall Plant Effectiveness World Class Maintenance Requires: Availability 90 % Performance Efficiency 95 % Rate of Quality Products 99 % In-order-to yield an OEE 85 % 113 OPE and the Structure of Losses Calendar time (A) Working Time (B) Operating time (C) Net operating time (D) Effective operating time (E) Major stoppage losses Shutdown losses Performance losses Defect losses (1) Shutdown (2) Production adjustment (3) Equipment failure (4) Process failure (5) Normal production (6) Abnormal production (7) Quality defect (8) Reprocessing Availability = Calendar time - (1) (2) (3)(4) x 100 Calendar time = C x 100(%) A Performance rate= Average actual production rate x 100 Standard production rate = D x 100(%) C Quality rate= Production amount - (7) (8) x 100 Production amount = E x 100(%) D Overall Plant Effectiveness = Availability x Performance rate x Quality rate Source: Productivity Inc
58 Company Examples Eastman Chemical Company Integration to Life Cycle Cost RBM Implementation Reliability Journey Reactive Strategic Plan Preventive Measures Organization Predictive Focus Organizational Proactive Goals Linkage Benchmarking Strategy Education Results Expected Case for Change Culture Principles R&D Managing Results 115 Source: Charles Bailey, Eastman Chemical Company E. I. Dupont Widely recognized for outstanding safety record as well as its vigorous approach to benchmarking. Learned of TPM processes before most other North American companies. Organized an internal staff function, the Corporate Maintenance Leadership Team (CMLT), responsible for helping plants improve equipment management. Decided that maintenance needed to be view strategically in order for it to support overall corporate goals. Developed a vision of success and the establishment of a process to achieve that vision. Established an internal award system that recognizes excellence in equipment management
59 3M Company Excellence in Maintenance Advanced Planning and Scheduling System Predictive Maintenance Preventive Maintenance Performance Tracking and and Measurement System System Excellence in Maintenance Maintenance Conscious Engineering Employee Involvement Employee Education Training & Development Computerized Maintenance Management System
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
uptimeplus.co.uk predictive maintenance strategy galileo Supported by
uptimeplus.co.uk predictive maintenance strategy galileo Supported by Why galileo? The search for an alternative maintenance methodology is a result of general lack of visibility on asset s reliability,
Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions
Online Hydro Machinery Monitoring Protection, Prediction and Performance Monitoring Solutions 2011, Emerson Process Management. The contents of this publication are presented for informational purposes
What is Reliability Centered Maintenance? A Brief History of RCM
What is Reliability Centered Maintenance? Maintenance Reliability-Centered Maintenance (RCM) is the process of determining the most effective maintenance approach. The RCM philosophy employs Preventive
On-line PD Monitoring Makes Good Business Sense
On-line PD Monitoring Makes Good Business Sense An essential tool for asset managers to ensure reliable operation, improve maintenance efficiency and to extend the life of their electrical assets. Executive
A Practical Guide to Maximizing Machine Uptime
A Practical Guide to Maximizing Machine Uptime Every day, maintenance professionals across the world face the challenge of pushing maximum machine potential while at the same time, keeping repairs at a
WHAT IS INFRARED (IR) THERMOGRAPHY
WHAT IS INFRARED (IR) THERMOGRAPHY IR Thermography is the technique of producing pictures called from the invisible thermal radiation that objects emit. This is a non-contact means of identifying electrical
Equipment Performance Monitoring
Equipment Performance Monitoring Web-based equipment monitoring cuts costs and increases equipment uptime This document explains the process of how AMS Performance Monitor operates to enable organizations
Autonomous Maintenance
Autonomous Maintenance TPM & Autonomous Maintenance I run it, you fix it! I fix it, you run it! What is Maintenance? Why is Possible Utilization Rate Necessary? One way to look at Lean (JIT) production
Ultrasound Condition Monitoring
Ultrasound Condition Monitoring Whitepaper Alan Bandes UE Systems, Inc. Abstract: Instruments based on airborne/structure borne ultrasound technology offer many opportunities for reducing energy waste
The Basics of Predictive / Preventive Maintenance
The Basics of Predictive / Preventive Maintenance Maintenance costs, as defined by normal plant accounting procedures, are normally a major portion of the total operating costs in most plants. Traditional
Enhance Power Equipment Reliability with Predictive Maintenance Technologies
Enhance Power Equipment Reliability with Predictive Maintenance Technologies November 2012/1910DB1208 by S. Frank Waterer, Electrical Engineerinig, Fellow Schneider Electric USA, Inc. Make the most of
Trouble Shooting. Pump
Trouble Shooting Pump Trouble Possible Cause Remedy Oil leaking in the area of water pump crankshaft Worn crankshaft seal, bad bearing, grooved shaft, or failure of retainer o-ring. Excessive play on crankshaft
Pump Maintenance - Repair
Pump Maintenance - Repair Brian Trombly Mo Droppers Cummins Bridgeway, Gaylord, Mi The basic centrifugal pump consists of two main elements: 1. The rotating element which includes an impeller and a shaft.
Preventive and Predictive Maintenance
Preventive and Predictive Maintenance 700ZB00102 4-1 Preventive/Predictive Maintenance The guiding principle of PPM is the regular and systematic application of engineering knowledge and maintenance attention
Proactive Asset Management with IIoT and Analytics
Proactive Asset Management with IIoT and Analytics by Ralph Rio in Industrial Internet of Things, Analytics & Big Data Summary The Industrial Internet of Things (IIoT) with advanced analytics, offers new
INSPECTION AND TESTING OF EMERGENCY GENERATORS
INSPECTION AND TESTING OF EMERGENCY GENERATORS Certification requirements NFPA 101(00), Sec. 7.9.2.3 requires that emergency generators be installed, tested and maintained in accordance with NFPA 110,
543-0032-00, 943-0032-00. User s Manual
543-0032-00, 943-0032-00 User s Manual 1 Comfort Alert Diagnostics Faster Service And Improved Accuracy The Comfort Alert diagnostics module is a breakthrough innovation for troubleshooting heat pump and
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER Raymond E. Tuttle and Robert R. Pete EG&G Florida BOC-035 Kennedy Space Center FL 32899 (407) 867-5705!qq, Abstract:
Asset Management 101
Asset Management 101 Part 1: Maintenance Strategy Overview Larry Covino Product Line Leader, Strategic Partnerships Bently Nevada Asset Condition Monitoring, GE Energy, [email protected] Michael Hanifan
in-service inspections www.sgs.com
in-service inspections www.sgs.com Minimising down -time for wind turbines One of the major concerns in investing in wind farm projects is related to turbine availability, which represents the risk of
Interactive Computer Based Courses
These SKF Self-Learning Tools (SLT) are a onestop interactive solution for students at various levels including the students of mechanical and other engineering streams. They eliminate the need to take
Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6
Table of Contents (MEC 6)... 1 Function: Operate Vessel Machinery and Systems... 1 Diesel engines.... 1 Operational procedures.... 3 Operate and monitor a vessel s engines and auxiliary equipment.... 4
HAZARD RISK ASSESSMENT
HAZARD RISK ASSESSMENT Mt Grace Batchelor Magnesium Project A hazard risk assessment was undertaken to identify and assess the consequences of unplanned incidents that may pose safety, environmental risks,
Acuren s Vision: To be a Trusted Partner by Providing Programs that clearly reduce our client s cost to operate.
. Acuren s Vision: To be a Trusted Partner by Providing Programs that clearly reduce our client s cost to operate. Acuren is a leader in inspection and asset evaluation with non-destructive evaluation
PBX Series Quick Fit Connector Bimetallic Steam Traps
6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
COMMON EQUIPMENT FAILURES AND CAUSES. How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler.
COMMON EQUIPMENT FAILURES AND CAUSES How breakdowns can impact the bottom line. A handy reference guide from Hartford Steam Boiler. A WORLD THAT DEPENDS ON EQUIPMENT. Businesses, institutions and municipalities
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents
Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...
Customer Support Agreements
Cleveland Brothers Product Support Customer Support Agreements Maximize Uptime Minimize Risk Insulate Prices Increase Profitability Let a CSA go to WORK for your company CUSTOMER SUPPORT AGREEMENTS A CSA
Chapter 7 Hydraulic System Troubleshooting
Chapter 7 Hydraulic System Troubleshooting General The following troubleshooting information is provided as a general guide to identify, locate and correct problems that may be experienced with the hydraulic
At Bently Nevada Corporation (BNC) we know one. Establishing a Lubricant Analysis Program. Joshua Hutton. John Kitchens.
Establishing a Lubricant Analysis Program Authored by: Rett Jesse Manager, North American Services Bently Nevada Corporation e-mail: [email protected] Joshua Hutton Summer Intern, BNC Student at Cal
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
Installation and safety instructions for AC/DC built-in devices
The device type and date of manufacture (week/year) can be found on the device rating plate. In the event of any queries about the device, please quote all the details given on the rating plate. For further
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE By David Stevens, Technical Manager & Trainer, AVT Reliability Balancing cost reduction and efficiency improvement targets is a common source
2012 Americas School of Mines
www.pwc.com 2012 Americas School of Mines Maximizing Asset Management From Work Plan to Financial Performance Doug Stretton, Paul Ingram May 17, 2012 Presentation Summary Maximizing mining assets is often
employed to ensure the continuing reliability of critical systems.
4 Regulations 1989, Regulation 4, places a duty on employers to provide safe systems for their workers: Regulation 4 of the Electricity at Work Regulations 1989 Systems, work activities and protective
Aftermarket Technical Service Solutions for Pumping Technologies
Aftermarket Technical Service Solutions for Pumping Technologies HIGH QUALITY OEM PARTS, SERVICE, REPAIR, UPGRADES + RE-RATES: DELIVERING VALUE FOR OUR CUSTOMERS SPX - An Introduction SPX is a Fortune
Appendix B Audit Forms for PdM Program Assessment
Copyright 2008 MasteringMaintenance.com. All rights reserved. Appendix B Audit Forms for PdM Program Assessment Contents include audit forms for assessing the following elements of a PdM Program: Overall
Reliability centered maintenance: managing cost and risk
Maintaining data center performance Lower Your Cost I Lower Your Risk I Enable Your Business Reliability-Centered Maintenance Whitepaper May 2012 Dave Whitcomb/RTKL Reliability centered maintenance: managing
Chapter 5 Types of Maintenance Programs
Chapter 5 Types of Maintenance Programs 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com
Equipment Breakdown. The extended property coverage you need for the equipment you rely on.
Equipment Breakdown The extended property coverage you need for the equipment you rely on. Equipment Breakdown When it comes to protecting the equipment and machinery you need to keep your business operating
13 common causes of motor failure
13 common causes of motor failure Application Note What to look for and how to improve asset uptime Motors are used everywhere in industrial environments and they are becoming increasingly complex and
Installation Instructions for Alarm Module Kit A043F059
Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line
Understanding maintenance strategies
2002 Emerson Process Management. All rights reserved. View this and other courses online at www.plantwebuniversity.com. Maintenance 101 Understanding maintenance strategies Overview Why do I need a strategy?
DiscPlus DX195 and DX225 Air Disc Brakes
Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures
Hydraulic Troubleshooting PRESENTED BY
Hydraulic Troubleshooting PRESENTED BY NORMAN KRONOWITZ Introduction Welcome to the CMA/Flodyne/Hydradyne s Hydraulic Troubleshooting presentation. We will introduce many aspects of troubleshooting hydraulic
10 tips for getting more reliability from your air-conditioning system [reliability]
10 tips for getting more reliability from your air-conditioning system [reliability] A guide for installers, specifiers, contractors and architects February 2010 10 tips for getting more reliability from
14. Troubleshooting Guide
14. Guide 14.1 Refrigeration Cycle System In order to diagnose malfunctions, ensure the air conditioner is free from electrical problems before inspecting the refrigeration cycle. Such problems include
Asset Management Acceptance Testing Asset Control Parts and Equipment Sales
Your MRO Supplier Acceptance Testing We Provide Total Maintenance Support to all Rotating Equipment, Process Control Systems, and Stand Alone Units through Programs Our Services Condition Based Maintenance
AC Electric Motors best practice
If you want to learn more about best practice machinery maintenance, or world class mechanical equipment maintenance and installation practices, follow the link to our Online Store and see the Training
Reliability. The Essentials of Eliminating Downtime of your Electric Motor. Asset Management? Or, Maintenance Management, Re-branded?
for maintenance reliability and asset management professionals feb/march 14 Reliability The Essentials of Eliminating Downtime of your Electric Motor Asset Management? Or, Maintenance Management, Re-branded?
DC MOTOR ANALYSIS & TROUBLESHOOTING
DC MOTOR ANALYSIS & TROUBLESHOOTING By Don Shaw Condition assessment of DC motors requires a basic understanding of the design and operating characteristics of the various types available: the series motor,
How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later
How to ANALYZE AND COMMUNICATE PREVENTIVE MAINTENANCE - ADDRESS NOW - OR PAY LATER Tuesday, February 22, 2012, 10:15 a.m. 11:30 a.m. John Poytress Moderator Clovis USD Doug Halverson Presented by Clovis
SINGLE PHASE MOTORS. INSTALLATION AND MAINTENANCE MANUAL March 21, 2006
SINGLE PHASE MOTORS INSTALLATION AND MAINTENANCE MANUAL March 21, 2006 Irvine, California (800) 474-0520 Indianapolis, Indiana (800) 866-7973 Hamilton, Ontario (800) 809-0330 e-mail: [email protected]
Operations & Maintenance 201 Using online monitoring and predictive diagnostics to reduce maintenance costs
2003 Emerson Process Management. All rights reserved. View this and other courses online at www.plantwebuniversity.com. Operations & Maintenance 201 Using online monitoring and predictive diagnostics to
SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets
SKF Asset Management Services Your trusted resource for life cycle support and sustainability of physical assets SKF Asset Management Services People, processes and technology to optimize asset efficiency
Intelligent Vibration Monitoring
Diagnostic Systems Condition Based Monitoring Diagnostic Systems Condition Based Monitoring Intelligent Vibration Monitoring efector Octavis for real-time vibration monitoring Solutions for Predictive
The State Fire Marshal's Office and the VDH/Office of Licensure and Certification. Generator Testing in Nursing Facilities
Generator Testing in Nursing Facilities Introduction Recent emergencies and natural disasters have emphasized the need to ensure that nursing facilities have an adequate EPSS in place should the loss of
Action Plan Template HVAC Page 1
Action Plan Template HVAC Page 1 Once Establish expected HVAC system efficiency - Write down the expected efficiency of HVAC systems to use as a baseline - Add this information to maintenance plan documentation
Hydraulic Trouble Shooting
Hydraulic Trouble Shooting Hydraulic systems can be very simple, such as a hand pump pumping up a small hydraulic jack, or very complex, with several pumps, complex valving, accumulators, and many cylinders
TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES
1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine
Unit LT01 Carry Out Routine Lift Truck Maintenance
Unit LT01 Carry Out Routine Lift Truck Maintenance UNIT OVERVIEW This unit is about conducting routine maintenance, adjustment and replacement activities as part of the periodic servicing of Lift Trucks.
RCM Success Starts with CMMS
RCM Success Starts with CMMS Ruth Olszewski, President CMMS data group, inc. 5701 N. Sheridan Road, Suite 17Q Chicago, Illinois 60660 Phone: (773) 275-8846 Fax: (801) 991-6567 [email protected]
FAILURE MODES AND EFFECT ANALYSIS (FMEA)
FAILURE MODES AND EFFECT ANALYSIS (FMEA) INTRODUCTION While defining the functions and desired standards of performance of an asset, the objectives of maintenance with respect to that asset are defined.
Online Transformer Insulation Monitoring System BushingGard Product Focus. Maximizing Transformer Uptime and Reliability
Online Transformer Insulation Monitoring System BushingGard Product Focus Maximizing Transformer Uptime and Reliability Critical Energy Transfer... Large power transformers are found around the world at
ELECTRICAL SAFETY RISK ASSESSMENT
ELECTRICAL SAFETY RISK ASSESSMENT The intent of this procedure is to perform a risk assessment, which includes a review of the electrical hazards, the associated foreseeable tasks, and the protective measures
Manual for Fire Suppression & Methane Detection System
Manual for Fire Suppression & Methane Detection System Fogmaker North America Post address: 150 Gordon Dr Exton, PA 19341 Delivery address: 150 Gordon Dr Exton, PA 19341 Tel: 610-265-3610 Fax: 610-265-8327
Evaluate, Clean, and Tune Guidance
Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system
3.4.4 Description of risk management plan Unofficial Translation Only the Thai version of the text is legally binding.
- 1 - Regulation of Department of Industrial Works Re: Criteria for hazard identification, risk assessment, and establishment of risk management plan B.E. 2543 (2000) ---------------------------- Pursuant
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19
Table of Contents Overview 1 Pump Disassembly 2 Control Disassembly / Reassembly 7 Pump Reassembly 13 Adjustment Procedures DR Control 19 Adjustment Procedures DRG Control 20 Adjustment Procedures DFR
BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap
1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
Preventive Maintenance. State Energy Assessment Workshop By: DTE Energy Partnership & Services
Preventive Maintenance State Energy Assessment Workshop By: DTE Energy Partnership & Services Do you know? World wide research has shown that one of the reasons causing 80% of the accidents is deficient
Safety Requirements Specification Guideline
Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:[email protected] -1- Summary Safety Requirement
This chapter is devided into two sections:
This chapter is devided into two sections: Page Installation requirements........................................................................ 127 The installation process..........................................................................
RecipCOM. Expertise, reciprocating compressor monitoring and protection tailored to your needs
RecipCOM Expertise, reciprocating compressor monitoring and protection tailored to your needs Do your reciprocating compressors have sufficient protection? Due to the increasing demands on availability
Backup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
AC-Synchronous Generator
Design Description AC Generators come in two basic types synchronous and non-synchronous. Synchronous generators lock in with the fundamental line frequency and rotate at a synchronous speed related to
Classification and Qualification STANDARDS
Classification and Qualification STANDARDS HVAC Series Classification Title Class Code Date Established Date Revised Operating Engineer Building Service Engineer Air Conditioning/Refrigeration Mechanic
Roller Chain Coupling
Roller Chain Coupling Features 1. Simple structure A roller chain coupling consists of one duplex roller chain and two sprockets for a simplex chain. Handling is very simple as both the shafts (driving
7.1 Safety Precautions-Aircraft and Workshop 3 3 3. 7.2 Workshop Practices 3 3 3
Note: This module does not apply to category B3. Relevant subject matters for category B3 are defined in module 7B. 7.1 Safety Precautions-Aircraft and Workshop 3 3 3 Aspects of safe working practices
BEARINGS, TYPES & SERVICEABILITY LIMITS, FAILURE MODES
Training Title BEARINGS, TYPES & SERVICEABILITY LIMITS, FAILURE MODES Training Duration and Dates 5 days training Bearings, Types and Serviceability Limits, Failure Modes 5 01 05 Sep $3,750 Abu Dhabi,
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
The Leading Reward of Maintenance Management
Halting the Cycle of Break & Fix: The Leading Reward of Maintenance Management Eric Hancock Practice Leader for Operations & Asset Management Jacobs Engineering Group Inc. Best Maintenance Strategies t
MAINTENANCE PRODUCTS AND SERVICES S O S SM. Services
MAINTENANCE PRODUCTS AND SERVICES S O S SM Services Know More. Do More. Maintaining your Cat engines and machines is one of your top priorities. A good place to start is with S O S Services oil analysis
DIESEL FUEL CONDITIONING
COD FILTRATION DIESEL FUEL CONDITIONING REMOVE WATER & PARTICLES TO EXTEND FUEL INJECTOR LIFE & INCREASE COMBUSTION ENGINE FUEL EFFICIENCY Remove free water to saturation point with high single pass efficiency
Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.
Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water
S O SSM. Fluid Analysis Program. your equipment? The S O S Program was introduced by Caterpillar in 1971
S O SSM Fluid Analysis Program The S O S Program was introduced by Caterpillar in 1971 and soon became recognized as the leader in oil analysis. Its concept was simple reduce unnecessary downtime and the
Mechanical Installation
Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s
PdM Overview. Predictive Maintenance Services
PdM Overview Predictive Maintenance Services Objective Assessments Maximize Uptime, Lower Costs Predictive Maintenance (PdM) solutions from Rexnord Industrial Services help manage the condition of your
Maintenance Plan. Many of the individual components of a comprehensive maintenance program are listed below, along with brief descriptions.
Maintenance Plan Introduction Maintenance is the cornerstone of asset sustainability. An effective preventive maintenance program, combined with good operational practices, will reduce the need for much
Contingency Plan. Facility Name
Contingency Plan Facility Name This plan is reviewed annually and amended whenever changes occur that will significantly affect the ability of this facility to respond to an emergency situation. This includes
Operations, Maintenance, and Commissioning
Operations, Maintenance, and Commissioning Building 54, Pearl Harbor Naval Facilities Engineering Command, Hawaii www.femp.energy.gov/training 1 www.femp.energy.gov/training eere.energy.gov Objectives
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary
