Reliability centered maintenance: managing cost and risk
|
|
|
- Ashlyn Simmons
- 10 years ago
- Views:
Transcription
1 Maintaining data center performance Lower Your Cost I Lower Your Risk I Enable Your Business Reliability-Centered Maintenance Whitepaper May 2012 Dave Whitcomb/RTKL Reliability centered maintenance: managing cost and risk In this whitepaper we will answer the question, How much maintenance is enough? Conventional data center maintenance programs have been based on a combination of recommendations from original equipment manufacturers (OEM) and best practices that have been adopted by industry groups and trade associations. Historically, there is very little empirical or statistical engineering science behind them. OEMs believe that more frequent maintenance means lower risk at least for their equipment. But is this true? OEM recommendations have become the de-facto maintenance standard because they are required to support warranties, and are bundled into comprehensive service contracts that can easily be renewed for many years. Even after warranties expire, data center operators may be reluctant to risk a service disruption from failure to follow the OEM recommended maintenance. Until now, operators have not had the benefit of a scientific method to make data backed decisions about alternatives to OEM recommendations. Studies indicate that a large percentage of data center failures occur while changing states during planned maintenance, leading data center operators to question whether following OEM prescribed tasks and frequencies may actually incur both higher cost and higher risk. 1
2 Long recognized as a best practice in the aerospace and telecommunication industries, Reliability Centered Maintenance (RCM) is a new concept being applied to data centers. Critical systems performance requirements and energy demands of data centers continue to increase at the same time economic and environmental pressures are forcing data center operators to reconsider how they meet cost and reliability goals. A quantitative approach The RCM approach consists of actions and procedures that result in greater reliability and lower life-cycle costs. Minimizing unnecessary and potentially risky disruption while maximizing the durability and systems level health. RCM is the only quantitative approach that provides a rational for maintenance to minimize unnecessary and potentially risky disruption while maximizing the durability and health. A failure, which is defined as the cessation of function or performance, can occur at the systems level, sub-system level, component level or even at the parts level. The core purpose of any maintenance program is to avoid failures at all levels, preserving function and performance continuity. RCM uses analytical processes to determine the proper balance of planned and unplanned maintenance, in addition to assessing other activities that comprise an integrated failure management strategy across the entire operation. Preventive and corrective maintenance RCM focuses on two types of maintenance: preventive and corrective. Preventive actions are taken to preserve functionality (to protect safety, or reduce the cost of repair), and to reduce unplanned downtime or impacts to mission-critical performance. Corrective maintenance responds to failures after they occur. RCM incorporates Preventive Maintenance and Corrective Maintenance activities, along with Predictive Testing & Inspection (PT&I) and other actions (e.g., redesign, procedural changes or technology upgrades) to provide an optimal balance to achieve greater reliability and lower life-cycle costs. For a discussion of the history, philosophy, approach and outcomes of RCM, refer to the article, Reliability Centered Maintenance: A New Approach to Reduce Data Center Risk & Cost, Mission Critical magazine May/June 2012 issue. The remainder of this white paper focuses on how organizations can approach implementing an RCM program. 2 Reliability centered maintenance: managing cost and risk
3 Capability Maturity Model process As the data center industry responds to ever increasing demands for availability, performance and cost-efficiency, sophisticated management models become more relevant. The Capability Maturity Model (CMM) provides a paradigm to assess operating performance. In systems engineering, the five CMM levels are defined as: Level 0 not performed Level 1 performed informally Level 2 planned and tracked Level 3 well-defined Level 4 quantitatively controlled Level 5 continuously improving As shown in Figure 1 below, applying the principles of RCM can help organizations advance CMM levels and deliver the reliability data center owners now demand. CMM is a pathway for growth in capabilities and organizational maturity and there are no short cuts. Appropriate processes and procedures must be established to move an organization further up the model. RCM analysis helps to identify whether current systems are sufficient to support a comprehensive PT&I plan. Once the foundational elements are in place, implementing an RCM program will allow organizations to reap the benefits and attain what was once only an aspirational goal: guaranteed uptime. Figure 1: Capability Maturity Model in data center operations * Aware: Systemized O&M, supplemental contracts Marginal: Reactive operationals, repair on failure Absence: No operational staff Guaranteed uptime Best-in-class: Reliability centered maintenance program Proactive: Performance trending analysis to ID problems Active: Integrated O&M in CMMS system Figure 1 Processes and procedures that must be established to move an organization further up the model and allow them to reap the benefits and attain the goal of guaranteed uptime. Reliability centered maintenance: managing cost and risk 3
4 Transitioning to an RCM approach How do you transition to RCM? Conventional maintenance programs are designed around preventing the failure of each of the individual components of the system. A key shift in thinking is letting go of preserving equipment function. RCM is focused on preserving overall system function. It prioritizes operation of the system as a whole, even if that means allowing certain non-critical components to fail when they do not impact data center performance. RCM fosters a holistic view across the operation that leads to the optimal use of maintenance resources. Implementation There are many good reference guides that can help data center operators transition to the RCM process. One of the most commonly used is SAE JA1012: A Guide to the Reliability-Centered Maintenance (RCM) Standard. The NASA RCM Guide also details a successful RCM approach for organizations to leverage as a roadmap. Rolling out an effective RCM program is a multi-faceted initiative. It involves all functional areas of the organization, including maintenance, facilities, operations, risk management, human resources and purchasing. As with any significant initiative, executive sponsorship is critical. The four elements of a successful RCM program implementation include: 1. Planning and preparation, including identifying the purpose or need for the effort, and development of the plan. 2. The core analysis process, including assessment of failure modes, effects and criticality analysis (FMECA), Significant Function Selection and RCM task evaluation and selection. 3. Analysis implementation and recommendations that result from the process. 4. Sustaining the recommendations and evaluating feedback. Planning and preparation Planning is vital to the success of broad-base initiatives such as RCM. In the planning stage, the RCM leadership team will need to: Establish acceptable levels for the various categories of failure consequences Develop ground rules and assumptions Establish team members ongoing responsibilities 4 Reliability centered maintenance: managing cost and risk
5 Obtain training and certification as needed Identify the hardware breakdown or partition that will be used to facilitate technical analysis Identify and obtain resources and tools Pursue contract support if needed Ensure buy-in from management and key stakeholders. Implementing RCM requires a systematic approach that extends from initial planning through many aspects of day-to-day operations within an organization. The next stage and the cornerstone of everything that follows is the analysis process. RCM analysis The seven-step process The seven-step approach to RCM analysis provides a useful guideline to help organizations shift their thinking from the conventional maintenance mindset. RCM combined with a critical analysis allows organizations to: Design the system for redundancy as needed to maintain critical function Define a focused, cost-effective preventive maintenance program. By following the steps illustrated in Figure 2 on page 6, organizations can evaluate and balance financial, system risk, safety and reliability considerations. RCM fosters a holistic view across the operation that leads to the optimal use of maintenance resources. Reliability centered maintenance: managing cost and risk 5
6 Figure 2. The seven-step RCM process # Steps Reliability Centered Maintenance: Preserving overall system function Conventional maintenance: Preserve equipment function 1 System selection focus: 80/20 rule Data centers are no exception to the 80/20 principle: about 20 percent of the elements in the environment represent 80 percent of the risk of a significant or critical system failure. Organizations should identify those components with the greatest potential critical risk and take the time to drill down on the specifics of analyzing, monitoring, tracking and maintaining them. At the same time, identifying non-critical, low-risk and/or replicated components means that maintenance staff do not waste time on activities that yield little or no benefit from a risk- or cost-management perspective. Minimal discrimination between the different component profiles and priorities. 2 System boundary definition Identifying the mechanical and physical boundaries of the facility, system and sub-systems and where inputs/outputs cross those boundaries is one aspect of the RCM analysis process. Not considered. 3 System description and functional block diagram To assess system parameters, the RCM analysis also looks at a description of each component of the system (its function, performance specifications, tolerances, etc.). This helps establish a baseline status of the system against which ongoing performance or degradation can be measured. Functional diagrams are used to identify the critical path of the system: which components are included in the essential through-line functioning and which components are merely supporting elements (or non-critical components). Not considered. 4 Functions and functional failures Since the goal of RCM is to preserve system function, it is critical to assess and define the required functions of the system, what components and equipment provide or support that function, and what functional level is acceptable. Understanding the root causes of failure is also a key component, including consideration of factors such as wear, overload and fatigue. Component functions are not considered. 5 Failure mode effects analysis The next step in RCM analysis is defining the effect of failures: if X fails, then Y occurs. In some cases, the consequences of a failure are minimal (e.g., in the case of redundant components) until a certain threshold is reached. Identifying critical versus non-critical failures helps focus attention on those maintenance tasks that are essential. Minimal correlation of failure modes to preventive maintenance tasks. 6 Logic tree analysis A logic tree analysis leads data center managers through a very structured analysis of risk to establish the acceptable failure thresholds. There are some components that should be left in place after failure until the threshold is reached. The impact of hands-on maintenance intervention prior to reaching that threshold does not improve reliability; in fact, it can even have a negative impact on overall system performance due to maintenance downtime or the introduction of error into the system. An example of logic tree analysis is shown in Figure 3, below. Does not assess or assign criticality. 7 Task selection focus: preventive maintenance When critical versus non-critical failures are clearly identified, a preventive maintenance regimen can be designed that focuses efforts on preventing and managing critical failures and monitoring failure thresholds, while eliminating unnecessary maintenance tasks. Preventive maintenance strategy is unfocused at best. 6 Reliability centered maintenance: managing cost and risk
7 Logic tree analysis An RCM decision logic tree helps data center managers to determine the type of maintenance appropriate for any given sub-system or equipment item. The result of this analysis indicates whether a particular piece of equipment should be maintained reactively (Accept risk and Install redundant units), through a preventive maintenance approach (Define PM task and schedule) or monitor and take maintenance action based on predictions of imminent failure (Define PT&I task and schedule). Figure 3. RCM logic decision tree Will failure of the facility or equipment items have a direct and adverse effect on safety or critical mission operations? No Yes Is the item expendable? Can redesign solve the problem permanently and cost effectively? Yes No No Yes Is there a PT&I technology (e.g. vibration testing or thermography) that will monitor condition and give sufficient warning (alert/ alarm) of an impending failure? Redesign No Yes Is PT&I cost and priority justified? No Yes Is there an effective PM task that will minimize functional failures? No Yes Is establishing redundancy cost and priority justified? No Yes Accept risk Install redundant unit(s) Define PM tasks Define PT&T task and schedule Reliability centered maintenance: managing cost and risk 7
8 The analysis process ultimately yields one of four possible courses of action for any sub-system or component: 1. Monitor and take action in response to specific conditions (conditionbased maintenance) 2. Perform interval (time- or cycle-) based actions (preventive maintenance) 3. Determine that maintenance action will not reduce the probability of failure, so install redundant systems (if redesign is not a solution) 4. Take no action and implement a repair only following a failure (Run-to- Fail). Implementation Once the core analysis is completed, the result is a list of tasks and recommendations that must be effectively implemented into a comprehensive maintenance program. The next activity packaging includes grouping maintenance tasks to establish schedules and protocols for inspections and phase maintenance of equipment. Effective packaging allows an organization to efficiently maximize the value of the maintenance program, saving both time and cost. Implementing RCM requires the integration of operational and maintenance requirements and the dovetailing of activities to increase efficiency. Sustaining and evaluating To realize the full benefit from RCM, a regimen of monitoring and continuous process improvement must be employed. SAE JA1011 describes this as the living program aspect of a legitimate RCM process. Sustaining the benefits of RCM requires effective use of feedback as the vehicle for continuous improvement and fine tuning of an organization s chosen failure management strategy. No RCM process can predict every future event, or predict changes to the operating environment. By continuing to gather information and accrue experience over time, initial (often conservative) assumptions can be refined. Successful RCM programs allow both maintenance and operations crews to improve execution, and enable them to respond rapidly to new or unpredicted issues and events. Data and measurements Another key determinant of RCM success is the use and availability of data. RCM can be accomplished with minimal hard data if personnel have thorough knowledge of the equipment and its maintenance and operational history. Better data yields better results. Organizations need to be wary of misused data, which can lead to unsubstantiated decisions. Care must be taken to balance data, knowledge and reasonable experienced judgment to yield the optimal decisions. 8 Reliability centered maintenance: managing cost and risk
9 Relevant RCM data includes: What are the acceptable levels of performance? It is unreasonable to design a maintenance program that says equipment must be maintained like new. Equipment will degrade, and users must establish an acceptable level of degradation around which to build the failure management strategy. Are there compensating provisions? Compensating provisions should be documented in the FMECA and are critical to ensuring the correct failure management strategy is developed. If a function is protected, a greater degree of risk may be acceptable than if it is unprotected. What are the detection methods that will alert when a component has failed, or will help determine the underlying failure condition? This information is important both to separate hidden and evident functions, and to establish the options to pursue in terms of the failure management strategy. What are the characteristics of failure? Is there some condition that precedes failure in a predictable manner and that can be detected? If so, organizations can pursue various forms of on-condition tasks. The potential to use many proven detection technologies such infrared or vibration analysis are contingent upon understanding these precursors. Can the time between potential and functional failure be defined to a reasonable degree? Measures like crack and flaw growth rates are instrumental in establishing appropriate inspection intervals. Analyzing degradation curves and similar data that help establish patterns of failure progression will pay dividends in the form of a safe and effective strategy. Have engineers developed fatigue lives or wear out curves? Can the maintenance organization track individual items to establish a probability of failure pattern? Are individual items tracked? Organizations should collect data on maintenance actions from the pilot report of a problem to the ultimate identification of the failure mode and corrective action. Limited data on a sample of the population is often more reliable and usable than huge amounts of cursory information. Can analysis link costs, downtime and operational impacts to the associated failures and repairs? Reasonable estimates will often suffice, but good data will yield better results. A key determinant of RCM s success is the use and availability of data. Personnel should have thorough knowledge of the equipment s maintenance and operational history. Better data yields better results. Reliability centered maintenance: managing cost and risk 9
10 Summary Once an organization has decided to undertake RCM, the following planning steps can be applied to any implementation: Establish the team and develop the RCM plan Early successes with RCM can help establish new patterns and a culture that will solicit the commitment needed to gain the maximum benefit organizationwide. Gather maintenance engineer and operator input Obtain technical and maintenance data Perform the RCM analysis Identify the various options Package the PM tasks and age exploration requirements Take steps to implement other actions as applicable Develop and issue the necessary manuals and specifications Gather feedback to update and refine the implementation Update the analysis based on the new information or changes to the equipment or operating context Repeat the process periodically where potential for improvements are identified. RCM success is best accomplished over the long haul. If RCM becomes nothing more than creating and documenting justification for decisions already made, it will quickly lose relevance and value. However, early successes with RCM can help establish new patterns and a culture that will solicit the commitment needed to gain the maximum benefit organization-wide. 10 Reliability centered maintenance: managing cost and risk
11 About Skanska Skanska s Mission Critical Center of Excellence (COE) offers a radically different delivery method. Our full complement of strategies and tools provides our clients with greater options to plan, design, construct and operate their facilities. Our approach integrates an in-depth focus on business needs and leverages a wide-range of technologies and tools. This approach has proven invaluable in advancing our clients capacity planning efforts, improving asset utilization and dramatically reducing energy consumption portfolio-wide. Skanska USA is one of the largest, most financially sound construction networks in the country serving a broad range of industries including healthcare, education, sports, data centers, government, aviation, transportation, and water/wastewater. Headquartered in New York with 36 offices across the country, Skanska USA employs approximately 9,400 people who are committed to sustainable construction and an injury-free workplace. Reliability centered maintenance: managing cost and risk 11
12 Skanska USA Building Inc Fifth Avenue 32nd Floor New York, NY P: Author Lee Kirby Vice President, Strategic Operations For more information, please contact us at or check our web site at 12 Reliability centered maintenance: managing cost and risk
Reliability-Centered Maintenance: A New Approach
Page 1 of 6 Reliability-Centered Maintenance: A New Approach Reducing data center risk and cost By Lee Kirby June 05, 2012 In today s complex data center environment, operators must continuously juggle
Proactive Asset Management with IIoT and Analytics
Proactive Asset Management with IIoT and Analytics by Ralph Rio in Industrial Internet of Things, Analytics & Big Data Summary The Industrial Internet of Things (IIoT) with advanced analytics, offers new
The Leading Reward of Maintenance Management
Halting the Cycle of Break & Fix: The Leading Reward of Maintenance Management Eric Hancock Practice Leader for Operations & Asset Management Jacobs Engineering Group Inc. Best Maintenance Strategies t
Asset Management 101
Asset Management 101 Part 1: Maintenance Strategy Overview Larry Covino Product Line Leader, Strategic Partnerships Bently Nevada Asset Condition Monitoring, GE Energy, [email protected] Michael Hanifan
Changing Metrics and Mindsets in the Warehouse Part Two: Optimizing the ROI of Forklift Fleet Management Through Phased Implementation
Crown Connectivity Series Changing Metrics and Mindsets in the Warehouse Part Two: Optimizing the ROI of Forklift Fleet Management Through Phased Implementation Introduction Crown has been providing forklift
Transit Asset Management MBTA Initiatives
Transit Asset Management MBTA Initiatives Standing Committee on Audit and Finance March 3, 2015 1 Agenda TAM overview MAP 21 requirements MBTA TAM initiatives: Asset Management Plan Decision Support Tool
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER Raymond E. Tuttle and Robert R. Pete EG&G Florida BOC-035 Kennedy Space Center FL 32899 (407) 867-5705!qq, Abstract:
Master big data to optimize the oil and gas lifecycle
Viewpoint paper Master big data to optimize the oil and gas lifecycle Information management and analytics (IM&A) helps move decisions from reactive to predictive Table of contents 4 Getting a handle on
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material,
ASSET Connect. The next level in Critical Environment Operational Efficiency
Connect The next level in Critical Environment Operational Efficiency 10-30% is the potential efficiency gain from optimized Data Centers and Critical Environments Operational Efficiency of Your Critical
What is Reliability Centered Maintenance? A Brief History of RCM
What is Reliability Centered Maintenance? Maintenance Reliability-Centered Maintenance (RCM) is the process of determining the most effective maintenance approach. The RCM philosophy employs Preventive
Chapter 9 Reliability Centered Maintenance
Chapter 9 Reliability Centered Maintenance Marvin Rausand [email protected] RAMS Group Department of Production and Quality Engineering NTNU (Version 0.1) Marvin Rausand (RAMS Group) System Reliability
Industry Solution. Predictive Asset Analytics at Power Utilities
Industry Solution Predictive Asset Analytics at Power Utilities Overview With pressure from new regulations and consumers, operating with the highest levels of efficiency, reliability and safety is a top
of The New England Water Works Association
Journal Our 132nd Year of The New England Water Works Association Volume 127 No. 2 June 2013 PUTNAM WATER TREATMENT PLANT AQUARION WATER COMPANY OF CONNECTICUT GREENWICH, CONNECTICUT New England Water
Better-performing Assets Make Companies
Better-performing Assets Make Better-performing Companies Skillful asset management can improve EBITDA as much as 15-25% A sset performance management encompasses all maintenance activities that extend
Scheduled Maintenance
Scheduled Maintenance Scheduled Maintenance Scheduled maintenance is planned component repair or replacement, often triggered by preventive maintenance inspections, pre- trip and post- trip inspections,
UPTIME MAGAZINE. june/july15 JUNE/JULY 2015. uptimemagazine.com
june/july15 UPTIME MAGAZINE JUNE/JULY 2015 uptimemagazine.com AM Developing Plans Creating Value From Physical Assets by Mark Ruby 46 june/july 15A sset management plans form the cornerstone of an effective
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
A Code of Practice for Highway Structures An Asset Management Approach
A Code of Practice for Highway Structures An Asset Management Approach Dick Feast Principal Consultant Whole Life Asset Management Amey Infrastructure Services The Code of Practice Code of Practice for
Risk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
Elevator Service Preventive or Predictive
www.wipro.com Elevator Service Preventive or Predictive Market Differentiation Through Remote Monitoring Data and a Predictive Service Program Russell Gray Sr. Consultant, Business Process Group Aftermarket
Asset management systems increase reliability and efficiency
A PublicAtion of the international Society of AutomAtion Asset management systems increase reliability and efficiency Make use of technology to overcome barriers to better maintenance practices By Augie
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy The decision to outsource equipment maintenance during times of economic boom is based on the desire of a company to
Benchmarking VoIP Performance Management
Benchmarking VoIP Performance Management March 2008 Page 2 Executive Summary Aberdeen surveyed 159 organizations to identify best practices for managing Voice over Internet Protocol (VoIP). This report
SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets
SKF Asset Management Services Your trusted resource for life cycle support and sustainability of physical assets SKF Asset Management Services People, processes and technology to optimize asset efficiency
Utilizing Real-Time Information in Enterprise Asset Management Systems
Utilizing Real-Time Information in Enterprise Asset Management Systems Jason Barath Matrikon Inc. December 2006 Utilizing Real-Time Information in Enterprise Asset Management Systems Today, industries
The future of industrial asset management: New opportunities for oil and gas, power generation and aviation industries
Point of View Generating manufacturing Impact The future of industrial asset management: New opportunities for oil and gas, power generation and aviation industries Defining the right operating model for
Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER
Automated IT Asset Management Maximize organizational value using BMC Track-It! WHITE PAPER CONTENTS ADAPTING TO THE CONSTANTLY CHANGING ENVIRONMENT....................... 1 THE FOUR KEY BENEFITS OF AUTOMATION..................................
Chapter 5 Types of Maintenance Programs
Chapter 5 Types of Maintenance Programs 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that
Forklift Fleet and Operator Management: Optimizing Return through Phased Implementation
Forklift Fleet and Operator Management: Optimizing Return through Phased Implementation Table of Contents Introduction 2 Defining Objectives 3 Reducing Fleet Costs 4 Optimizing Productivity and Improving
WHITE PAPER. Automated IT Asset Management Maximize Organizational Value Using Numara Track-It! p: 813.227.4900 f: 813.227.4501 www.numarasoftware.
WHITE PAPER By Tony Thomas Senior Network Engineer and Product Manager Numara TM Software Inc. ADAPTING TO THE CONSTANTLY CHANGING IT ENVIRONMENT The challenge in controlling the corporate IT infrastructure
Fundamentals of Asset Management. Step 8. Optimize Capital Investment A Hands-On Approach
Fundamentals of Asset Management Step 8. Optimize Capital Investment A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 Fourth of 5 core questions 4. What are my best O&M and CIP investment
Big Data Engineer Position Description
Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Micron Quality Manual
Micron Quality Manual The Quality Management System (QMS) is an integral component in allowing Micron to achieve the next level in Quality Control and in delivering Total Quality Excellence to our customers.
Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems
Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems 800.982.2388 1 Introduction Calibration, maintenance and validation activity, despite operating within the same department
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ENTERPRISE RISK MANAGEMENT FRAMEWORK COVENANT HEALTH LEGAL & RISK MANAGEMENT CONTENTS 1.0 PURPOSE OF THE DOCUMENT... 3 2.0 INTRODUCTION AND OVERVIEW... 4 3.0 GOVERNANCE STRUCTURE AND ACCOUNTABILITY...
Critical Steps to Help Small and Mid-Sized Businesses Ensure CRM Success
Critical Steps to Help Small and Mid-Sized Businesses Ensure CRM Success Table of Contents Abstract............................................ 3 CRM Drivers and Benefits............................. 4
The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.
CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision
RCM Success Starts with CMMS
RCM Success Starts with CMMS Ruth Olszewski, President CMMS data group, inc. 5701 N. Sheridan Road, Suite 17Q Chicago, Illinois 60660 Phone: (773) 275-8846 Fax: (801) 991-6567 [email protected]
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE By David Stevens, Technical Manager & Trainer, AVT Reliability Balancing cost reduction and efficiency improvement targets is a common source
Business resilience: The best defense is a good offense
IBM Business Continuity and Resiliency Services January 2009 Business resilience: The best defense is a good offense Develop a best practices strategy using a tiered approach Page 2 Contents 2 Introduction
Implementation of Computerized Maintenance Management System in National Iranian Gas Company and sub-companies
Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Implementation of Computerized Management System in National Iranian
Data Management Practices for Intelligent Asset Management in a Public Water Utility
Data Management Practices for Intelligent Asset Management in a Public Water Utility Author: Rod van Buskirk, Ph.D. Introduction Concerned about potential failure of aging infrastructure, water and wastewater
White Paper Operations Research Applications to Support Performance Improvement in Healthcare
White Paper Operations Research Applications to Support Performance Improvement in Healthcare Date: April, 2011 Provided by: Concurrent Technologies Corporation (CTC) 100 CTC Drive Johnstown, PA 15904-1935
Project Risk Management: IV&V as Insurance for Project Success
Project Risk Management: IV&V as Insurance for Project Success Introduction Software development projects can be expensive and risky: Ever more complex mission-critical requirements lead to increasingly
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
A Framework for Developing and Evaluating Data Center Maintenance Programs
A Framework for Developing and Evaluating Data Center Maintenance Programs White Paper 178 Revision 0 by Bob Woolley > Executive summary Inadequate maintenance and risk mitigation processes can quickly
Predictive Analytics uses data
Predictive Analytics in Equipment Reliability Programs Predictive Analytics in conjunction with Threat Based Maintenance (TBM ) reduces and, in some cases, can eliminate the need to perform time-based
IHE Patient Care Device (PCD) Technical Framework White Paper
Integrating the Healthcare Enterprise 5 IHE Patient Care Device (PCD) Technical Framework White Paper 10 Overview and Profile Roadmap Version 1.0 15 20 September 1, 2009 Copyright 2009: IHE International
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
From the White Board to the Bottom Line
Thought Leadership Institute From the White Board to the Bottom Line The case for pursuing process maturity through business process management. 1 From the White Board to the Bottom Line Table of contents
Features. Emerson Solutions for Abnormal Situations
Features Comprehensive solutions for prevention, awareness, response, and analysis of abnormal situations Early detection of potential process and equipment problems Predictive intelligence network to
Application Support Solution
Application Support Solution White Paper This document provides background and administration information on CAI s Legacy Application Support solution. PRO00001-MNGMAINT 080904 Table of Contents 01 INTRODUCTION
How To Consolidate A Data Center
Data Center Consolidation is fundamental to being prepared for the dramatic evolution in ICT technology, as well as fluctuating and unpredictable business demands. Avoiding the potential pitfalls is of
Big Data Services From Hitachi Data Systems
SOLUTION PROFILE Big Data Services From Hitachi Data Systems Create Strategy, Implement and Manage a Solution for Big Data for Your Organization Big Data Consulting Services and Big Data Transition Services
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard
White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard Abstract: This white paper outlines the ITIL industry best practices methodology and discusses the methods in
Organizing for the Cloud
Organizing for the Cloud Your business is ready to reap the rewards of the softwaredefined cloud era. Is your IT organization ready to deliver? By Kevin Lees, Principal Architect, VMware Global Operations
IT Service Provider and Consumer Support Engineer Position Description
Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
SUPPORTING PATIENT CENTRIC CARE WITH INTEGRATED ASSET & SERVICE MANAGEMENT
TRUSTED ADVISORS TO HEALTHCARE AND LIFE SCIENCE EXECUTIVES SUPPORTING PATIENT CENTRIC CARE WITH EXECUTIVE SUMMARY Healthcare providers are under increased pressures to enhance patient care and improve
P3M3 Portfolio Management Self-Assessment
Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction
Real-Time Demand Side Energy Management
Real-Time Demand Side Energy Management Annelize Victor Sr. Business Consultant Aspen Technology, Inc. Houston, TX Michael Brodkorb Business Development Manager Aspen Technology España, S.A. Barcelona,
From RCM to CMMS: How to implement the RCM recommendations in EXP and Maximo. Presented October 14, 2009 Chung Yee Keong
From RCM to CMMS: How to implement the RCM recommendations in EXP and Maximo Presented October 14, 2009 Chung Yee Keong Challenges Today Doing the right minimum work to maximize asset performance Enabling
RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE
RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE For Facilities and Collateral Equipment DRAFT National Aeronautics and Space Administration FINAL September 2008 TABLE OF CONTENTS 1.0 Preface...1-1 1.1
Performance Management for Enterprise Applications
performance MANAGEMENT a white paper Performance Management for Enterprise Applications Improving Performance, Compliance and Cost Savings Teleran Technologies, Inc. 333A Route 46 West Fairfield, NJ 07004
Five steps to a successful material handling CMMS implementation
Five steps to a successful material handling CMMS implementation Upgrade maintenance operations with improved efficiency, quality and reduced overhead automation that delivers Five steps to a successful
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)
PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3) 1st February 2006 Version 1.0 1 P3M3 Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value
Review of Toronto Transit Commission Bus Maintenance and Shops Department, Phase Two Audit Progress on Implementation of Audit Recommendations
AUDITOR GENERAL S REPORT ACTION REQUIRED Review of Toronto Transit Commission Bus Maintenance and Shops Department, Phase Two Audit Progress on Implementation of Audit Date: June 11, 2015 To: From: Wards:
University of Hawaii Information Technology Services Strategic Plan May 22, 2015. Looking Forward to 2020 and Beyond [V15-1]
University of Hawaii Information Technology Services Strategic Plan May 22, 2015 [V15-1] I. Introduction This Information Technology Services (ITS) Strategic Plan, Looking Forward to 2020 and Beyond, updates
COMPREHENSIVE ASSET MANAGEMENT STRATEGY
COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY
Striking the balance between risk and reward
Experience the commitment Striking the balance between risk and reward in payments modernization Staying competitive in financial services requires meeting everincreasing customer expectations for digital
I N D U S T R Y S P O T L I G H T. T h e Grow i n g Appeal of Ad va n c e d a n d P r e d i c ti ve Analytics f o r the Utility I n d u s t r y
(% of respondents) I N D U S T R Y S P O T L I G H T T h e Grow i n g Appeal of Ad va n c e d a n d P r e d i c ti ve Analytics f o r the Utility I n d u s t r y October 2014 Sponsored by SAP Advanced
Optimization of Clinical Engineering in Private Healthcare
Optimization of Clinical Engineering in Private Healthcare Speaker: James Herbert Organisation: Medi-Clinic Southern Africa Job Title: Technical Specialist - Clinical Engineering About the Speaker: James
TULSA'S UTILITY ENTERPRISE INITIATIVE: USING TECHNOLOGY, STRATEGY AND ASSET MANAGEMENT TO DRIVE LONG TERM PERFORMANCE
TULSA'S UTILITY ENTERPRISE INITIATIVE: USING TECHNOLOGY, STRATEGY AND ASSET MANAGEMENT TO DRIVE LONG TERM PERFORMANCE Lauren Brookey, UEI Chair, Board Steve Steckler, Project Manager, IMG Rebel Group Matt
Over 70,000 RELIABILITY CENTERED MAINTENANCE (RCM2 TM ) TRAINING COURSES
RELIABILITY CENTERED MAINTENANCE (RCM2 TM ) TRAINING COURSES Comprehensive, progressive and practical training solutions tailored to your organization Over 70,000 people have attended Aladon Training Courses
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Roadmap to Energy Efficiency. for. Water and Wastewater Utilities
Roadmap to Energy Efficiency for Water and Wastewater Utilities Prepared by: Howard Steiman, P.E. ([email protected]) and Paul Doran, P.E. ([email protected]) R. W. Beck, Inc. 550 Cochituate Road Meditech
INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM
INCORPORATING CONDITION ASSESSMENT INTO A COMPREHENSIVE ASSET MANAGEMENT PROGRAM Tony Urquhart Vice President MWH Business Solutions Suite 700, 380 Interlocken Crescent Broomfield, CO 80304 ABSTRACT In
www.pwc.com Balancing Uptime and Working Capital: Maintenance and Inventory Strategies in Mining
www.pwc.com Balancing Uptime and Working Capital: Maintenance and nventory Strategies in Mining Session Agenda ntroduction Overview of Maintenance Strategies in Mining Overview nventory Management Strategies
Process Intelligence: An Exciting New Frontier for Business Intelligence
February/2014 Process Intelligence: An Exciting New Frontier for Business Intelligence Claudia Imhoff, Ph.D. Sponsored by Altosoft, A Kofax Company Table of Contents Introduction... 1 Use Cases... 2 Business
Best Practices in Release and Deployment Management
WHITEPAPER Best Practices in Release and Deployment Management Mark Levy Through 2016, a lack of effective release management will contribute up to 80% of production incidents in large organizations with
Measurement Information Model
mcgarry02.qxd 9/7/01 1:27 PM Page 13 2 Information Model This chapter describes one of the fundamental measurement concepts of Practical Software, the Information Model. The Information Model provides
Data Centers That Deliver Better Results. Bring Your Building Together
Data Centers That Deliver Better Results Bring Your Building Together 1 Meeting the high demands of your data center Meeting the increasing heat loads associated with growing computational needs requires
Business Intelligence Analyst Position Description
Business Intelligence Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
Availability Management: A CA Service Management Process Map
TECHNOLOGY brief: AVAILABILITY MANAGEMENT Availability : A CA Process Map Malcolm Ryder ARCHITECT CA SERVICES Table of Contents Executive Summary 1 SECTION 1: CHALLENGE 2 Simplifying ITIL How to Use the
Computing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
National Education Technology Standards
National Education Technology Standards Objectives Satisfied by Each Deliverable in the Program 1 Basic operations and concept Students demonstrate a sound understanding of the nature and operation of
Pragmatic Business Service Management
Pragmatic Business Service Management Written by Quest Software, Inc. White Paper Copyright Quest Software, Inc. 2007. All rights reserved. This guide contains proprietary information, which is protected
Proactive Performance Management for Enterprise Databases
Proactive Performance Management for Enterprise Databases Abstract DBAs today need to do more than react to performance issues; they must be proactive in their database management activities. Proactive