IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER
|
|
|
- Clare Spencer
- 10 years ago
- Views:
Transcription
1 IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER Raymond E. Tuttle and Robert R. Pete EG&G Florida BOC-035 Kennedy Space Center FL (407) !qq, Abstract: Maintenance practices have long focused on time based "preventive maintenance" techniques. Components were changed out and parts replaced based on how long they had been in place instead of what condition they were in. A reliability centered maintenance (RCM) program seeks to offer equal or greater reliability at decreased cost by insuring only applicable, effective maintenance is performed and by in large part replacing time based maintenance with condition based maintenance. A significant portion of this program involved introducing non-intrusive technologies, such as vibration analysis, oil analysis and I/R cameras, to an existing labor force and management team. This paper discusses what is involved in an RCM program and how EG&G is implementing it at Kennedy Space Center on the facilities maintenance program. It discusses technical tools, management tools and people issues involved in achieving the goal of "better, faster, cheaper" in the facilities arena. Key Words: Maintenance; Metrics; RCM; Reliability The maintenance program is an integrated, closed loop, continuous improvement process that includes life cycle maintenance planning, asset risk assessment, runtime, calendar & condition based maintenance, outage coordination, facility condition assessment and cost accounting. The maintenance program is proactive in nature, reliability centered and is a true asset management program. Program effectiveness is measured in terms of asset availability, reliability and life cycle cost. An essential element in the program is the computerized maintenance management system (CMMS) with the capability to interface electronically with subject matter specific software such as predictive maintenance software programs for vibration analysis. The software provides the traditional productivity and maintenance cost reports as well as asset condition and maintenance requirements reports. It generates work orders based on asset condition triggers and time based or usage based preplanned frequencies. The asset inventory, with pertinent data including risk codes and RCM analysis information, is contained in the CMMS. This enables Maintenance Engineers to trend equipment failures for further analysis, and is the means of continually improving the C.> C_> <_C> I Di:..;.,:_ )'4 :;.-*.: I DTIC Q1A'rryT IITOPIlTD 1
2 effectiveness of the assigned levels of maintenance associated with an asset or definable group of assets. Components The Maintenance Program is a closed loop process that ensures continuous program improvement. The first functional component of the process is an accurate inventory of assets included in the maintenance program. It is critical to know what is being maintained and have it accurately identified in the CMMS. Life Cycle Planning ensures the function of the assets is clearly defined, understood and documented and maintenance requirements are planned for the designed life of the asset. This occurs during the design process for new assets and is documented taking into account such things as ease of access to components, minimization of special tooling, incorporation of data for predictive maintenance condition trending, etc. Consideration is also given to the expected life of materials specified in the design and program maintenance requirements resulting from expiration of the materials useful life (i.e. repainting structures on a 7-8 year cycle, replacing roofing systems on 20 year cycles, etc.). The more routine recurring maintenance including preventive tasks (service, inspections and minor repair) and predictive testing will be identified utilizing the RCM methodology. For existing assets, this takes place during the RCM analysis. Once the asset inventory is established and entered into the computerized information system and the function of the individual or defined group of assets is clearly understood and documented a risk assessment is performed. The risk assessment of the impact of a loss of function of the asset is performed to determine the appropriate asset risk category. Assets fall within four basic risk categories (high, medium, low or negligible) based on the lack of ability to support mission or the cost involved should there be a loss of asset function. This risk assessment is the first step in developing maintenance requirements under an RCM methodology. A significant component of the program in terms of cost effectiveness is the methodology for determining maintenance requirements. The RCM philosophy is a departure from traditional methods of determining maintenance requirements. RCM logically incorporates the most effective mix of reactive, preventive, predictive and proactive maintenance practices and draws on their respective strengths. RCM applies the four maintenance practices where each is most appropriate based on the consequences of failure and the resulting impact to mission. This combination produces optimum reliability at minimum maintenance cost and the combined benefits far exceed those resulting from using any one maintenance practice. RCM incorporates the principle that any maintenance task performed must be proven to be applicable and effective. Applicable implies that, of the competing tasks, the selected task is the most cost effective option. Effective means that the performance of the task will prevent, mitigate or detect the onset of a failure or discover a hidden failure that has already occurred.
3 During an RCM analysis, engineers use a decision logic tree to assign the proper mix of maintenance. Figure 1. Failure mode identified. RCM DECISION No verifiable redundancy Consider'ach of the or back-up available LOGIC TREE following type tasks. I o Servicing Will the failure result HII SK in a risk Category A -Loss of lifdserious injury o Inspection/test to incident?e -Loss of shuttle/payload verify operations or I c-lossdamage of a shuttle system detect hidden failure. Task(s) selected should prevent or major assembly/component o Predictive maintenance failure occurrence. YES NO task of3ome type to Will th ai ue detect deterioration/ Will in a the rik failure CateogyB results -Major eniomtar operational, impending failure Tasks(s) selected must be incident? environmental, or appicable and costs should political consequences. o Repair to reduce be less than total impact costs. yes I NO probability of failure occurrence. LOW RIS Will the failure result -Minor operationial, o Item replacement to Task(s) selected must be in a risk Category C environmental, or reduce probability of applicable and costs should incident? political consequences failure occurrence, be less than total impact costs. : WI Is one or a combination C falls into risk G L of PM tasks applicable No PM -Inconvenience and cost effective for the applicable risk consequence? Soccurred.. APPLICABLE - Task will prevent, mitigate or detect the onset ofa failure or discover a hidden failure that has already Implement Redesign is EFFECTIVE - Among competing candidates, the selected task is the task/tasks. required most cost effective option. This decision logic tree focuses on sustaining the reliability of assets in support of a defined mission. The RCM analysis is structured to implement the principle that no maintenance task will be performed unless it is justified. The criteria for justification are safety, reliability and cost effectiveness in deferring or preventing a specific failure mode. Because RCM is reliability based, statistical analysis and conditional probabilities of failure are important in determining the consequences of failure. The primary objective is to maintain the inherent reliability designed into the asset. The product of the RCM analysis is work procedures for both preventive and predictive maintenance that are captured in the CMMS. The performance schedule is also generated in the CMMS as a basis for initiating preventive/predictive maintenance. The next program component, Facility Condition Assessment (FCA), is important to maintenance engineers and managers as it provides feedback on asset maintenance effectiveness. The FCA is an asset inspection and engineering analysis of maintenance history, failure trends, any root cause failure analysis that might have been performed and any open or planned work requirements. The purpose of the FCA is to validate
4 maintenance requirements identified during life cycle planning, review and revise the effectiveness of the assigned mix of predictive, preventive and reactive maintenance, identify any new asset deficiencies that may have been detected during the assessment process, review planned maintenance work and review energy issues, if applicable. Another important part of the FCA is validating the mission of the asset. Program requirements changes many times drive asset mission changes. When mission changes occur, the level of assigned maintenance may require adjustment due to changes in asset criticality. We perform FCAs on a five year cycle to coincide with the budget cycle. Knowing the asset mission, the asset maintenance history, the identified and planned maintenance requirements and the current condition of the asset, work can be prioritized and programmed for performance over the budget cycle. Existing maintenance procedures can be validated and adjusted as required, monitoring programs implemented and tests conducted on assets to further evaluate any suspected problems. The FCA provides a structured process for validating, justifying and prioritizing maintenance requirements. An appropriate level of maintenance can not be assigned to an asset unless the consequences of failure of that asset are clearly understood. RCM forces focus on the product of a system, rather then on individual items within a system. As a result, many items which are critical to a system operation are found to have backups or work-arounds designed into the system, so a failure or loss of an individual item does not result in a system failure. An example of this may be in electric power distribution, where power to a specific facility is critical. The loss of the feeder cable will result in no power through that cable. It will not result in a power loss to the facility, however, because the facility has duel power feed from independent circuits, an emergency backup generator and an UPS. The system does not fail, only the component. Risk assessment is the first step in determining maintenance levels. Four risk levels have been established, based on the consequences of failure; high, medium, low and no risk. High and medium risk codes are often associated with catastrophic failures, but because of the economic impact costs smaller failures can also fall into this area. If a facility suffers a loss of utilities and has no secondary feed (either onsite or portable), the people in that building will have to stop work and leave. This "impact cost", different from a repair cost, while not obvious to maintainers is real and must be a factor in evaluating the risk level. The RCM analysis is structured to implement the principle that no maintenance task will be performed unless it can be justified. The criteria for justification are safety, reliability, and cost effectiveness in deferring or preventing a specific failure mode. Because RCM is reliability based, statistical analysis and conditional probabilities of failures are important in determining the consequences of failure. The primary objective is to maintain the inherent reliability designed into the equipment. Figure 2 graphically ties all the parts together.
5 INTEGRATED MAINTENANCE PROGRAM MODEL 100 YEARS DESIGN! CONSTRUCT ACTIVATE < REFURB. > <REPLACE> < > PROGRAMMED - ROOF REFURBISHMENT - EXTERIOR STRUCTURE PAINTING + PREDICTIVE -THERMOGRAPHY ON PWR PANELS -AND THE ROOF - VIBRATION DATA ON PUMPS * PREVENTIVE - A/C FILTER REPLACEMENT? RUN TO FAILURE - RESTROOM EXHAUST FANS O CONDITION ASSESSMENT - FACILITIES / SYSTEMS / EQUIPMENT Figure 2 In this model, it has been determined during the design that the facility is expected to support its defined function for 100 years. The roof of the facility, given the climate the facility will be subjected to, will require major refurbishment after approximately 20 years of service. Therefore, as part of the life-cycle plan, a major refurbishment is identified 20 years from date of facility activation. In addition, while determining the exterior paint specifications, historical data and engineering studies indicate facilities require repainting every five years. This, too, is added to the life-cycle plan as identified program level maintenance requirements. Infrared thermography is also identified on a frequent basis. It is used to perform a condition assessment of the roof and the electrical panels throughout the facility in lieu of previously assigned labor intensive PM tasks. Air filters are replaced on a regularly scheduled basis.
6 Predictive Maintenance, also known as Predictive Testing and Inspection (PT&I), can determine the condition of the equipment and provide various trend indicators. Interpretation of these indicators allows potential functional failure to be forecast so corrective maintenance can be performed to preclude failure. Working as a complement to the PM program a PT&I program can: o Help determine the condition of a component and identify required repairs before that component fails. o Conserve resources by performing maintenance on an as-required basis rather than on a calendar frequency or a run-time basis. o Minimize down time. The effectiveness of each applicable PT&I test is examined to determine which test or combination of tests will be used. Any test by itself may not give a good representation of the overall condition of each piece of equipment on the system. However, certain combinations will give a very good indication of equipment condition. Comparisons with previous tests provides trend data useful in condition assessment analysis. Historically, the focus of maintenance has been the Preventive Maintenance (PM) program. Electrical and mechanical equipment experience deterioration over time that eventually causes it to fail. PM is used to slow this deterioration, ensuring the equipment's operational life. A properly conducted program reduces overall operating costs, aids mission effectiveness, safety, and assures the continued preservation, usefulness, and performance of assets. The PM program, coupled with the other elements of the overall maintenance program, allows engineers to be aware of equipment condition so that sufficient time is available for the systematic planning and scheduling of required repair work. Preventive maintenance consists of the planned and scheduled maintenance tasks that are periodically performed on equipment to avoid a breakdown. The frequency is based on calendar date, rate of utilization (routine), or condition which is determined by trending data collected through the application of PT&I technologies. The PM program consists of the following: o Inspections of mechanical, electrical and other physical structures, installed equipment and systems such as motors, pumps, compressors, faucets, light switches, etc. o Inspections are performed on a periodic, pre-determined basis in aneffort to determine the degree of operating efficiency and whether equipment deficiencies exist. o Routine servicing of equipment including lubrication, cleaning and changing filters, minor adjustments and parts replacement, and condition reporting. o Formalized evaluation and work generation system which ensures discovered, uncorrected deficiencies are entered into the normal planning and scheduling system.
7 Run-to-failure is a reactive component because it is based on the premise that no maintenance task that improves the reliability of the F/S/E in a cost effective manner has been identified. Users call a trouble desk to report breakdowns on run-to-failure items. When the corrective action required is beyond the scope of a trouble call, if engineering is required, or if material must be ordered, the trouble call is changed to a repair work order. As with other work orders, labor, materials and material costs are tracked in a CMMS. This information is then sent to a computer history file which can be retrieved later for use in F/S/E condition assessments, making repair/replace decisions, failure trending, and other engineering analysis. Maintenance Effectiveness The effectiveness of the maintenance program must be measured and validated. Long term effectiveness is monitored through the facility condition assessment while short term effectiveness is determined using failure trending analysis, which highlights failure trends on like equipment. This advanced notice gives time to take action to prevent catastrophic failures. Failure trending codes are developed by maintenance engineers with support from field technicians. These codes are used by the technicians in the field to track and classify failures and are recorded in the CMMS. The coding structure, coupled with existing report filter capabilities, allows a relatively quick analysis of failure data. If a problem is suspected, a more detailed analysis is performed. Reports provide information on the following elements: 1) number of loss-of-function events; 2) cause of loss; 3) disposition of cause; and 4) corrective action taken. PROGRAM MEASUREMENTS (METRICS) The following metrics are reported to measure the progress and of cost effectiveness of the maintenance program. a. Equipment Availability % = Hours System/Equipment is Available to Run at Capacity Total Hours During the Reporting Time Period b. Maintenance Overtime Percentage % = Total Maintenance Overtime Hours During Period Total Regular Maintenance Hours During Period c. Percent of Emergency Work to Routine Work %= Total Emergency Hours Total Maintenance Hours
8 d. Percent of Faults Found in Thermographic Survey %= Number of Faults Found Number of Devices Surveyed e. Total cost of maintenance per year Figure 3 shows some results obtained by the program as measured by two metrics S $ " X $ $ INFY 94 EIFY95g,, 961 ACTUAL MAINTENANCE COSTS $29-1 $283 $27 $26--I $ 25, " $23- $22- $21- $20, FY92 FY93 SFY91 FY94 FY95 FY96
9 Lessons Learned Many of the lessons we learned are available from existing texts, both technical and management. It is perhaps inevitable that lessons have to be learned individually in order to be understood, and so many of the lessons presented here are of an obvious nature. By far our biggest finding was the value of repetition. By definition, a cycle of continuous improvement implies doing the same thing over and over and getting a bit better each time. Implementing a reliability centered maintenance program involves changing the way people think and work. Training, explanations, briefings, analysis, making changes and tracking results were done on an individual basis, shop by shop. Selecting a visible, intuitive initial technology is also an important point. Laser alignment was easily demonstrated, learned and understood; vibration monitoring is more involved and less readily grasped. I/R cameras are so advanced the operation is simple; point and shoot technology allows anyone to actually see the temperature difference between a loose connection and a proper one. As we were able to show results, we began to build a cadre of supporters who functioned as champions in their own right. When we began this project, we went through a developmental phase, an implementation phase and are now in an operational mode. It is no longer a phase - we have achieved a shift in the way we do business. The very nature of the process ensures it will repeat itself over and over - a cycle of continuous improvement. This program is not something we do - it is a way of getting things done in an efficient, cost effective and risk appropriate manner. Acknowledgments This work is supported by the Kennedy Space Center of the National Aeronautics and Space Administration.
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy The decision to outsource equipment maintenance during times of economic boom is based on the desire of a company to
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
What is Reliability Centered Maintenance? A Brief History of RCM
What is Reliability Centered Maintenance? Maintenance Reliability-Centered Maintenance (RCM) is the process of determining the most effective maintenance approach. The RCM philosophy employs Preventive
The Leading Reward of Maintenance Management
Halting the Cycle of Break & Fix: The Leading Reward of Maintenance Management Eric Hancock Practice Leader for Operations & Asset Management Jacobs Engineering Group Inc. Best Maintenance Strategies t
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
Chapter 5 Types of Maintenance Programs
Chapter 5 Types of Maintenance Programs 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that
The Basics of Predictive / Preventive Maintenance
The Basics of Predictive / Preventive Maintenance Maintenance costs, as defined by normal plant accounting procedures, are normally a major portion of the total operating costs in most plants. Traditional
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
Reliability centered maintenance: managing cost and risk
Maintaining data center performance Lower Your Cost I Lower Your Risk I Enable Your Business Reliability-Centered Maintenance Whitepaper May 2012 Dave Whitcomb/RTKL Reliability centered maintenance: managing
Data Management Practices for Intelligent Asset Management in a Public Water Utility
Data Management Practices for Intelligent Asset Management in a Public Water Utility Author: Rod van Buskirk, Ph.D. Introduction Concerned about potential failure of aging infrastructure, water and wastewater
Operations, Maintenance, and Commissioning
Operations, Maintenance, and Commissioning Building 54, Pearl Harbor Naval Facilities Engineering Command, Hawaii www.femp.energy.gov/training 1 www.femp.energy.gov/training eere.energy.gov Objectives
Better-performing Assets Make Companies
Better-performing Assets Make Better-performing Companies Skillful asset management can improve EBITDA as much as 15-25% A sset performance management encompasses all maintenance activities that extend
How to Analyze and Communicate Preventive Maintenance Address Now or Pay Later
How to ANALYZE AND COMMUNICATE PREVENTIVE MAINTENANCE - ADDRESS NOW - OR PAY LATER Tuesday, February 22, 2012, 10:15 a.m. 11:30 a.m. John Poytress Moderator Clovis USD Doug Halverson Presented by Clovis
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets
SKF Asset Management Services Your trusted resource for life cycle support and sustainability of physical assets SKF Asset Management Services People, processes and technology to optimize asset efficiency
Statement Of Work. Data Center Thermography Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Thermography Assessment Data Center Thermography Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits
uptimeplus.co.uk predictive maintenance strategy galileo Supported by
uptimeplus.co.uk predictive maintenance strategy galileo Supported by Why galileo? The search for an alternative maintenance methodology is a result of general lack of visibility on asset s reliability,
RCM Success Starts with CMMS
RCM Success Starts with CMMS Ruth Olszewski, President CMMS data group, inc. 5701 N. Sheridan Road, Suite 17Q Chicago, Illinois 60660 Phone: (773) 275-8846 Fax: (801) 991-6567 [email protected]
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
Reliability-Centered Maintenance: A New Approach
Page 1 of 6 Reliability-Centered Maintenance: A New Approach Reducing data center risk and cost By Lee Kirby June 05, 2012 In today s complex data center environment, operators must continuously juggle
Appendix B Audit Forms for PdM Program Assessment
Copyright 2008 MasteringMaintenance.com. All rights reserved. Appendix B Audit Forms for PdM Program Assessment Contents include audit forms for assessing the following elements of a PdM Program: Overall
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE. By David Stevens, Technical Manager & Trainer, AVT Reliability
SWITCHING STRATEGIES: MOVING TO CONDITION- BASED MAINTENANCE By David Stevens, Technical Manager & Trainer, AVT Reliability Balancing cost reduction and efficiency improvement targets is a common source
RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE
RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE For Facilities and Collateral Equipment DRAFT National Aeronautics and Space Administration FINAL September 2008 TABLE OF CONTENTS 1.0 Preface...1-1 1.1
Information Needed for Effective Asset Management
Emerson Reliability Consulting White Paper Information Needed for Effective Asset Management Bruce Hawkins, CMRP Director of Technical Excellence, Emerson Reliability Consulting Effective asset management
We re Happy with Our CMMS. Should We Be?
We re Happy with Our CMMS. Should We Be? Upcoming Webinars Sept 2013: Multiple FM Software Applications: Is Consolidation or Integration the Answer? Oct 2013: Dec 2013: Jan 2014: Maintenance Outsourcing:
Maintenance Assessment Questionnaire. Please Print and Complete this Document.
Please Print and Complete this Document. When finished, you may mail this to our offices and we will be in contact with our recommendations. Manufacturing Solutions International Chattanooga Office 7704
ASSET MANAGEMENT PROGRAM EVALUATION BEST PRACTICES
1.0 Corporate Asset Management Program 1.1 Vision and Support 1.2 Resource Management 1.3 Strategic Asset Management Plan 1.4 Communications 2.0 Customer Service and Risk Management 2.1 Levels of Service
INSPECTION AND TESTING OF EMERGENCY GENERATORS
INSPECTION AND TESTING OF EMERGENCY GENERATORS Certification requirements NFPA 101(00), Sec. 7.9.2.3 requires that emergency generators be installed, tested and maintained in accordance with NFPA 110,
Asset Management 101
Asset Management 101 Part 1: Maintenance Strategy Overview Larry Covino Product Line Leader, Strategic Partnerships Bently Nevada Asset Condition Monitoring, GE Energy, [email protected] Michael Hanifan
QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015
QAD EAM - Maintenance Demonstration Guide August 4, 2015 EAM 2015 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management (EAM) Maintenance and shows how this functionality
Five steps to a successful material handling CMMS implementation
Five steps to a successful material handling CMMS implementation Upgrade maintenance operations with improved efficiency, quality and reduced overhead automation that delivers Five steps to a successful
Backup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
WHITE PAPER. Automated IT Asset Management Maximize Organizational Value Using Numara Track-It! p: 813.227.4900 f: 813.227.4501 www.numarasoftware.
WHITE PAPER By Tony Thomas Senior Network Engineer and Product Manager Numara TM Software Inc. ADAPTING TO THE CONSTANTLY CHANGING IT ENVIRONMENT The challenge in controlling the corporate IT infrastructure
Facilities Maintenance Standards rev 9-1-2015
Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will
Overview of EAM Services. A Fully Integrated Global EAM Service Provider
A Fully Integrated Global EAM Service Provider Table of Contents Strategy & Process Services Overview... p. 3 Asset Reliability Services Overview... p. 4 Systems & Technology Services Overview... p. 7
TechExcel. ITIL Process Guide. Sample Project for Incident Management, Change Management, and Problem Management. Certified
TechExcel ITIL Process Guide Sample Project for Incident Management, Management, and Problem Management. Certified Incident Management Red Arrows indicate that the transition is done automatically using
Comparison of CMS Preventive Maintenance Regulations
Comparison of CMS Preventive Maintenance Regulations CMS Regulations Before December 2, 2011 From: State Operations Manual - Appendix A - Survey Protocol, Regulations and Interpretive Guidelines for Hospitals
Optimizing M&R Investment Strategies using the BUILDER Sustainment Management System
Optimizing M&R Investment Strategies using the BUILDER Sustainment Management System Scott McDonald Project Manager Atkins North America JETC - 20 July 2013 Aurora, CO US Army Corps of Engineers Federal
Preventive Maintenance. Learning Objectives: Howdy! Learning Objectives Cont:
Preventive Maintenance Fountain of Youth for HVAC Successful Learning Environment Bonus Strategies James D. McClure, P.E. Action Planning Guide As you listen to this presentation, use the chart in your
Optimization of Clinical Engineering in Private Healthcare
Optimization of Clinical Engineering in Private Healthcare Speaker: James Herbert Organisation: Medi-Clinic Southern Africa Job Title: Technical Specialist - Clinical Engineering About the Speaker: James
Equipment Performance Monitoring
Equipment Performance Monitoring Web-based equipment monitoring cuts costs and increases equipment uptime This document explains the process of how AMS Performance Monitor operates to enable organizations
Reliability Modeling Software Defined
Reliability Modeling Software Defined Using Titan Reliability Modeling Software May 30, 2014 Prepared by: The Fidelis Group 122 West Way, Suite 300 Lake Jackson, TX 77566 Fidelis Group, LLC All Rights
Problem Management Fermilab Process and Procedure
Management Fermilab Process and Procedure Prepared for: Fermi National Laboratory June 12, 2009 Page 1 of 42 GENERAL Description Purpose Applicable to Supersedes This document establishes a Management
Root-cause analysis, often called RCA, is a way of thinking about how to
Special Feature by Mark Lautenschlager, P.E. Using Root-Cause Analysis to Find Underlying Causes of Bad Outcomes Root-cause analysis, often called RCA, is a way of thinking about how to fix problems. By
Five Nines and Infrared (IR) Testing at Data Centers
Five Nines and Infrared (IR) Testing at Data Centers By Gregory R. Stockton 99.999% uptime five nines. That is what IT (information technology) customers are looking for. Uptime or availability at data
Proactive Asset Management with IIoT and Analytics
Proactive Asset Management with IIoT and Analytics by Ralph Rio in Industrial Internet of Things, Analytics & Big Data Summary The Industrial Internet of Things (IIoT) with advanced analytics, offers new
City of Olympia Water System Plan Update
Appendix 12- City of Olympia Water System Plan Update Technical Memorandum: October 8, 214 66 Columbia Street NW Suite 2 Olympia, WA 981 This page left intentionally blank. Table of Contents Introduction...
Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
HVAC Repair and Maintenance Strategies by Ron Prager
HVAC Repair and Maintenance Strategies by Ron Prager (Demystifying HVAC) The PRSM editorial board recently raised the question of the best, strategic approach to HVAC maintenance. Of course, there is no
d/b/a ENERGY KEEPERS, Inc. Power Plant Maintenance Engineer Negotiable depending on training, education, and experience
Position: Salary: Location: Employment Status: Supervised By: SXʷNQ EʔELS L SUW EČM / KSUKⱠIⱠMUMAⱠ ʾA K AⱠMUKWAʾITS, Incorporated d/b/a ENERGY KEEPERS, Inc. GENERAL SUMMARY Power Plant Maintenance Engineer
RISK MITIGATION THROUGH STRATEGIC MAINTENANCE AND RELIABILITY
RISK MITIGATION THROUGH STRATEGIC MAINTENANCE AND RELIABILITY Manufacturing plants today contain numerous equipment items that require some form of maintenance to help deliver company output and profit.
21 st Century Facilities
Electrical Testing 21 st Century Facilities Facility Owners face tough challenges 24 X 7 reliability needed Non linear loads cause harmonics VFD Computers Switching transients disrupt operations Less customer
Recommended For. Introduction to Asset Efficiency Optimisation
E-Learning Courses Learn at your own place and pace with SKF e-learning courses. These courses cover a wide range of product and technology topics and complement the courses taught by our specialist training
PREVENTIVE MAINTENANCE AND FACILITY MANAGEMENT
1 PREVENTIVE MAINTENANCE AND FACILITY MANAGEMENT An Introduction to Facility Management Strategies for Alaskan Schools Presented By Mike Gaede Building Management Specialist 2 Discussion Topics Overview
Total Productive Manufacturing (TPM) Organizing for Maximum Equipment Productivity
Total Productive Manufacturing () Organizing for Maximum Equipment Productivity Robert C. Leachman CSM Program University of California at Berkeley October, 2013 Goals Increase overall equipment efficiency
Applying ITIL v3 Best Practices
white paper Applying ITIL v3 Best Practices to improve IT processes Rocket bluezone.rocketsoftware.com Applying ITIL v. 3 Best Practices to Improve IT Processes A White Paper by Rocket Software Version
The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.
CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision
Automating ITIL v3 Event Management with IT Process Automation: Improving Quality while Reducing Expense
Automating ITIL v3 Event Management with IT Process Automation: Improving Quality while Reducing Expense An ENTERPRISE MANAGEMENT ASSOCIATES (EMA ) White Paper Prepared for NetIQ November 2008 IT Management
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
Enhance Production in 6 Steps Using Preventive Maintenance
Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using
PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions
PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy
BLUESTAR INFRARED. Description: Thermal Properties Comparison. Project Location: Client: 759 South Federal Hwy 225 Bayshore Drive 800-216-1820
BLUESTAR INFRARED We Bring Bad Things to Light SERVING ALL OF FLORIDA Infrared Inspection Services 24 Hour Emergency Service I n f r a r e d I n s p e c t i o n R e p o r t 772-215-8794 Description: Thermal
ARC VIEW. Emerson Asset Optimization Business Breaks New Ground. Summary. A Business of Vital Strategic Importance.
ARC VIEW JANUARY 22, 2009 Emerson Asset Optimization Business Breaks New Ground By Larry O Brien Summary Emerson continues to put significant emphasis on its Asset Optimization business, a strategic element
A Framework for Developing and Evaluating Data Center Maintenance Programs
A Framework for Developing and Evaluating Data Center Maintenance Programs White Paper 178 Revision 0 by Bob Woolley > Executive summary Inadequate maintenance and risk mitigation processes can quickly
MONROE COUNTY SCHOOLS POSITION DESCRIPTION Title: Electronics Technician Building Control Systems
GENERAL DESCRIPTION To use technology to monitor and control the District s utility consumption in a manner that produces an acceptable atmosphere for learning while achieving reduced utilization and conservation
WHAT IS INFRARED (IR) THERMOGRAPHY
WHAT IS INFRARED (IR) THERMOGRAPHY IR Thermography is the technique of producing pictures called from the invisible thermal radiation that objects emit. This is a non-contact means of identifying electrical
Advansoft ODM 4.0 - PLANT MOBILE DATA MANAGEMENT & DECISION SUPPORT SYSTEM
Advansoft ODM 4.0 - PLANT MOBILE DATA MANAGEMENT & DECISION SUPPORT SYSTEM ODM - the Missing Piece of Puzzle to the success of your operation & maintenance business system implementation, which helps to
The Role of Information Technology in Plant Reliability
The Role of Information Technology in Plant Reliability From P/PM Technology, June, 1999 By Robert Matusheski, Meridium, Inc. Information technologies (IT), in the context of this paper, include all computer
BEST PRACTICE GUIDE TO MAXIMIZE ROI OF ENERGY MANAGEMENT SYSTEMS. Bob Zak SVP, Facility Solutions Ecova
BEST PRACTICE GUIDE TO MAXIMIZE ROI OF ENERGY MANAGEMENT SYSTEMS Bob Zak SVP, Facility Solutions Ecova April 2013 BEST PRACTICE GUIDE TO MAXIMIZE ROI OF ENERGY MANAGEMENT SYSTEMS Once your organization
Answer Key- Property Maintenance for Managers - Skill Check #1
Check #1 Instructions Read the questions below and complete the answers. This skill check covers information in Chapter 1 of the Participant Guide. You may use your book to complete this skill check. Once
Proactive Monitoring of Friction Management Systems Reduces Costs and Downtime
Proactive Monitoring of Friction Management Systems Reduces Costs and Downtime By: Nicholas Dryer and David Mintskovsky Abstract The latest research shows that friction management systems reduce friction
Process Safety Management Program
Process Safety Management Program Title: Compliance Guidelines for Management System to Address Action Items Document #: PSM-SY-UN-017 Issued: 09/24/2014 Responsible Dept.: EHS Version: New Approved By:
Directory. Maintenance Engineering
2 / 17 INDEX 1.0 INTRODUCTION... 3 2.0 MAINTENANCE POLICY... 4 2.1 MAINTENANCE MISSION... 5 2.2 CRITICAL SUCCESS FACTORS AND KEY RESULT AREAS... 6 2.3 OBJECTIVES... 7 3.0 MAINTENANCE ENGINEERING SERVICES...
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
FIELD MAINTENANCE SERVICE
FIELD MAINTENANCE SERVICE About Servicing The Patterson Group Products Patterson Pump Company is one of America s leading pump companies. Our roots are deep and our commitment to quality and service is
Improving. Summary. gathered from. research, and. Burnout of. Whitepaper
Whitepaper Improving Productivity and Uptime with a Tier 1 NOC Summary This paper s in depth analysis of IT support activities shows the value of segmenting and delegatingg activities based on skill level
Chapter 9 Reliability Centered Maintenance
Chapter 9 Reliability Centered Maintenance Marvin Rausand [email protected] RAMS Group Department of Production and Quality Engineering NTNU (Version 0.1) Marvin Rausand (RAMS Group) System Reliability
Industry Solution. Predictive Asset Analytics at Power Utilities
Industry Solution Predictive Asset Analytics at Power Utilities Overview With pressure from new regulations and consumers, operating with the highest levels of efficiency, reliability and safety is a top
ISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
Predictive Maintenance Strategy for Building Operations: A Better Approach
Predictive Maintenance Strategy for Building Operations: A Better Approach by Robert Hemmerdinger Executive summary Maintenance costs account for almost as large a percentage of a facility s operating
50 Questions before computerization
50 Questions before computerization Before computerization, as an organization, ask yourself: 1. Is there enough time, money and interest to involve all levels within the maintenance department and other
Instructions for Participating in ASHRAE s. Operations & Performance Management Professional (OPMP) Certification Program
Instructions for Participating in ASHRAE s Operations & Performance Management Professional (OPMP) Certification Program Effective date: 10/06/2009 Related Resources Resources available to help prepare
Mechanical Engineering Technician- Plant Technician
Mechanical Engineering Technician- Plant Technician A competent Mechanical Engineering Technician- Plant Maintenance is expected to: 1. Ability to plan and execute work in a safe and responsible manner
2012 Americas School of Mines
www.pwc.com 2012 Americas School of Mines Maximizing Asset Management From Work Plan to Financial Performance Doug Stretton, Paul Ingram May 17, 2012 Presentation Summary Maximizing mining assets is often
NPS s Use of Maximo in Managing its Asset Portfolio
NPS s Use of Maximo in Managing its Asset Portfolio Where are we now, and where are we going? November 17, 2014 1 2 Mount McKinley Denali National Park National Park Service Park Facility Management Division
A Code of Practice for Highway Structures An Asset Management Approach
A Code of Practice for Highway Structures An Asset Management Approach Dick Feast Principal Consultant Whole Life Asset Management Amey Infrastructure Services The Code of Practice Code of Practice for
Business Plan: Fleet Services
Business Plan: Fleet Services How does this service contribute to the results identified in the City of London Strategic Plan? A Strong Economy A Green and Growing City Fleet Services owns and manages
FACILITIES MAINTENANCE
Program Direction and Accountability 1. The district s maintenance and operations department has a mission statement and goals and objectives that are established in writing. a. The maintenance department
Elevator Malfunction Anyone Going Down?
Elevator Malfunction Anyone Going Down? Lessons Learned Volume 04 Issue 41 2004 USW Purpose Elevator Malfunction - Anyone Going Down? To conduct a small group lessons learned activity to share information
CA Service Desk Manager
PRODUCT BRIEF: CA SERVICE DESK MANAGER CA Service Desk Manager CA SERVICE DESK MANAGER IS A VERSATILE, COMPREHENSIVE IT SUPPORT SOLUTION THAT HELPS YOU BUILD SUPERIOR INCIDENT AND PROBLEM MANAGEMENT PROCESSES
Epicor. Service Management
Epicor Service Management Inspiring better customer service with the right technology. Epicor Service Management Epicor Service Management optimizes customer service with timely response to customer requests
ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists
Incident ITSM Maturity Model 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident process exists Incident policies governing incident Incident urgency, impact and priority
Fire Alarm Systems Certification
Fire Alarm Systems Certification The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 2.1 Submittal Preparation
Use your troubleshooting superpowers for good Application Note
Use your troubleshooting superpowers for good Application Note Unleash your full troubleshooting powers with innovative new tools from Fluke. You ve got skill. You ve got experience. Now you have some
Plan Number. 1624- A Cross Beam Dr. Charlotte, NC 28217 704.771.1020. www.charlottemechanical.com. Simplified Service Plan. Air Conditioning.
Plan Number 1624- A Cross Beam Dr. Charlotte, NC 28217 704.771.1020 www.charlottemechanical.com Simplified Service Plan Air Conditioning And Heating System PARTS, LABOR, & EMERGENCY REPAIR Effective Date: