RCM Success Starts with CMMS
|
|
|
- Pauline Fox
- 9 years ago
- Views:
Transcription
1 RCM Success Starts with CMMS Ruth Olszewski, President CMMS data group, inc N. Sheridan Road, Suite 17Q Chicago, Illinois Phone: (773) Fax: (801)
2
3 RCM Success Starts with CMMS Abstract The degree to which RCM analysis can contribute to profitability is directly variable with the quality and accuracy of the CMMS data on which the analysis is based. Because the technique is rigorous, its over-use will defeat the purpose and lead to cost overruns instead of savings. The way to optimize the RCM return is to apply the analysis strictly to the equipment and systems that will pay off from it, and to know this we must rely on the CMMS. This paper provides guidance for ensuring that the equipment data and history residing in a CMMS are complete and accurate; so that RCM analysis will be a success and positively impact a company s bottom line, not hurt it. Introduction According to John Moubray, Reliability-Centered Maintenance [is] a process used to determine the maintenance requirements of any physical asset in its operating context. 1 In order to determine the maintenance requirements for an asset, operating data describing the way the asset is or has been performing requires analysis. In the case of equipment, information on the way the asset is or has been performing equates to equipment history. When a plant is small enough, relying on one s memory to track equipment history can be enough. In plants where the relationship between personnel and assets is not one-to-one, however, relying on one s memory to track equipment data and history is a strategy prone to failure. Rather than memory, using a CMMS provides a reliable place to store information. When maintenance data is tracked completely and accurately, CMMS is a key factor in determining candidates that will benefit most from RCM analysis.
4 2 RCM Success Starts with CMMS Ensuring Complete and Accurate CMMS Data Support The most important part of ensuring complete and accurate CMMS data is getting support for the system. If there is no buy-in from those involved with maintaining the system and from top management, the CMMS is destined for failure. Top management and users should be educated on how CMMS paints an accurate picture of where time and money is being lost or saved in a maintenance department, helping target areas where efforts, such as RCM analysis, should be focused. In addition, they should understand that CMMS is one of the few investments that keeps paying back year after year through the automation of manual processes such as generating PMs and reports, procuring stocked parts, locating parts, gathering part information, building work order history, etc. A company also must understand that, in addition to the initial investment of the CMMS, additional resources such as time, training, and additional staff are needed to gain maximum value from the system. The most common failure of maintenance software is purchasing the software and not committing sufficient time and resources to the planning, implementation, and full execution of it. Oftentimes, the success of CMMS is assigned to just one person. That person is made responsible for the selection, planning, implementation, data collection, data entry, data analysis, and maintenance of the CMMS. If this is the case, the person and the CMMS have been set up for failure. A group effort is needed to support the CMMS and ensure its success. Tools and strategies need to be engaged that send out a message to the organization that top management supports the CMMS and that it is a priority. Strategic Planning Strategic planning is an important part of ensuring complete and accurate CMMS data. For new CMMS implementations, thorough up-front planning insures that CMMS will benefit an organization long term. For CMMS packages currently in operation, strategic planning should be performed to achieve continuous CMMS improvement. Core Team To perform and support strategic planning for a CMMS, a core team should be formed. The core team not only helps set goals but also helps manage the CMMS. At least one member of the core team should originate from the maintenance department, and ideally, personnel from other departments such as purchasing, production, MIS/IT, and upper management should be involved. Once the core team has been established, a brainstorming session should be held to identify each member s particular goals for the CMMS. These goals will guide how the CMMS is implemented, utilized, and maintained. Each goal should be clearly defined, and each goal should have a person responsible and a target date assigned to it. In addition, specific responsibilities of each core team member should be defined. It is up to the core team to plan and implement the CMMS. They must decide which CMMS modules are going to be used, when they will be used, how those modules will be used, who will use each module, who will manage the data of each module, and who will generate and analyze the reports and graphs that can be generated from those modules.
5 RCM Success Starts with CMMS 3 CMMS Selection To integrate RCM and other methodologies, a company must have a CMMS with the appropriate functions. With over 250 different CMMS software packages available on the market today, systems range in scope and complexity. Part of CMMS planning may include the purchase of a new CMMS package or the upgrade of an existing CMMS. Up-front research is mandatory for ensuring that the right CMMS is selected for a plant. For example, if failure analysis is to be performed, select only from packages that include failure analysis capabilities. If predictive maintenance is to be performed, select only from packages that include a predictive maintenance module that can house data such as vibration, oil analysis, and infrared thermography data. The most important feature of a CMMS, however, is reporting capabilities. Define the reports that are needed to meet business objectives, and select only from packages that include these reports. Ensure that all business requirements have been defined before reviewing any software package. During software demonstrations, have the software vendor demonstrate how each requirement can be fulfilled for verification purposes. Training As with any tool, users are only as good as the training that they receive on software. In order to be effective at maintaining CMMS data, users must be provided solid training. A CMMS can save thousands of dollars when used to its potential, and expert training facilitates its full use. With expert training, end users are able to take full advantage of the features and functions the software has to offer, making work easier and more efficient. The biggest impact expert training has is shaping users attitudes. Rather than feeling frustrated and confused by a new software package, users can be excited by the possibilities the software has to offer and motivated to use it to its potential. Training builds comfort and confidence. The more comfortable and confident end users are with the software, the better the software will be used and the more the organization will benefit. Expert training minimizes CMMS problems and increases data accuracy. Expert training takes place in an environment where making mistakes is welcome and part of the learning process. It helps avoid making mistakes on a live database that can be costly and time-consuming to repair. And expert training ensures complete and accurate CMMS data because end users learn which data is critical to CMMS analysis and what it takes to collect and maintain it. For on-going training, a tutorial database should be set up so that users can use it to try out and test different areas of the software without hurting the live database. The tutorial database can also be used to train new users. Entity Identification Identifying and tagging entities such as assets/equipment, meters, maintenance stores items, and stock locations communicates important information to a maintenance department, as well as the organization as a whole, quickly and efficiently. Labeling items also helps ensure that a CMMS is updated with accurate information. Guesswork is eliminated when entities are properly identified. If a barcode solution is utilized, any item that can be identified with a barcode must be labeled.
6 4 RCM Success Starts with CMMS Key CMMS Information Once CMMS goals have been defined, the information to be collected and analyzed to achieve those goals must be identified. If the goal is to minimize maintenance costs, then all maintenance cost data needs to reside in the CMMS. If the goal is to reduce downtime, then all downtime data needs to reside in the CMMS. If the goal is to perform root-cause analysis, then all root-cause analysis data needs to reside in the CMMS. If the goal is to determine how frequently a piece of equipment fails, all information regarding equipment failures need to reside in the CMMS. Key CMMS information for RCM analysis is that related to equipment and work orders. Critical Areas Equipment Work Orders Key Information Equipment Work Order Type Labor Hours Parts Usage Comments Reason for Outage (RFO) Downtime All equipment that has work performed on it must exist in the CMMS. If equipment hierarchies exist in the plant, equipment hierarchies also must exist in the CMMS so that similar groups of equipment can be compared to each other to determine which group needs the most attention. Equipment Components All work order types must exist in the CMMS so that work can be easily classified. All maintenance employees and contractors that work on a plant s equipment must exist in the CMMS. All labor hours, both in-house and contacted, spent on a piece of equipment then can be charged back to a piece of equipment, building accurate equipment history. All parts data used to
7 RCM Success Starts with CMMS 5 maintain equipment, including stock locations, must be set up in the CMMS. Parts then can be checked out and charged back to the piece of equipment, building accurate equipment history. In addition, if a piece of equipment is failing due to a defective part, data will exist for failure analysis for both the equipment and the part. All comments, reason for outages and downtime pertaining to work performed must exist in the CMMS for future analyses. It must be made clear that for a realistic accounting of costs, the downtime considered should be process downtime rather than equipment downtime. Example: an undersized breaker trips and immediately is reset. Equipment downtime may be minutes; however, process downtime (defined as return to on-spec production) may be hours or even days. At the other end of the scale, a spared machine that suffers repeated failures may not affect production. Thus, simply looking at downtime might lead to a false conclusion about the overall cost of a given failure. Getting initial maintenance data into a CMMS may seem overwhelming; however, data collection and population are achievable tasks. Goals should be set and small steps should be taken to achieve those goals. Rewards need to be given out once goals are met. Standard Operating Procedures The best way to ensure that desired data is properly collected and entered into a CMMS is via the use of standard operating procedures (SOPs). SOPs increase process efficiency by reducing variation, clearly stating what the procedure is and policy on how it is to be carried out. Variation can be detrimental to operations because it leads to waste and unnecessary cost. Once an SOP has been created, it can be perfected over time to further minimize variation. In addition, SOPs ensure efficient training and quality control. SOPs need to be established for all CMMS work processes to ensure that complete and accurate data exists in the CMMS. Complete and accurate CMMS data is needed so that accurate analyses and decisions can be made to achieve business goals and objectives. An SOP that has the greatest impact on the ability to select the highest value candidates for RCM analysis using CMMS data is one that states the following: 1) No work is to be performed without a work order. 2) All work order information is to reside in the CMMS. This SOP ensures that 100% of all maintenance activity is tracked in the system. Tracking 100% of all work performed paints an accurate and clear picture of what is being done to maintain a plant. The more that is tracked accurately, the better any analysis will be. If specific data is needed to ensure that a goal is met, an SOP must be created to support that goal.! Process Downtime: In order to reduce downtime, an SOP should be created specifying that all downtime associated with any work performed is to be recorded on a work order. The amount of downtime needs to be determined so that procedures can be put in place to reduce downtime.! Parts: In order to reduce material handling and procurement costs, as well as part shortages, an SOP should be created stating that all parts associated with work performed are to be recorded on the work order so that part history can be recorded. Part history is needed to determine, at a minimum, the demand and quality of a part, the minimum and maximum stock level, and optimal reorder quantity.
8 6 RCM Success Starts with CMMS! Labor: In order to determine which piece of equipment or equipment system is capturing the most labor hours, an SOP should be created stating that all time associated with work performed is to be recorded on a work order. Both in-house and contractor labor are to be included.! Type of Work: In order to determine what type of work is performed on a piece of equipment or an equipment system, an SOP should be created specifying that the work order type must be defined for all work orders. Because a piece of equipment has the most labor hours charged to it does not mean that the piece of equipment is failing the most. It may be the case where the majority of the work performed is required and/or planned. Knowing the type of work is critical to failure analysis.! Root-Cause or RCM Analysis: In order to perform meaningful root-cause or RCM analysis, an SOP should be created stating that for all equipment failures, if applicable, a reason for outage, a solution, downtime, and work order comments are to be recorded on the work order.! Work Order Comments: Probably the most important piece of information on a work order is the comments. Comments become useless, however, if they are not specific. An SOP should be created stating that work order comments should include, at a minimum, what the problem was, what the cause of the problem was, what was done to correct the problem, and what could prevent this failure from recurring again. A phrase such as operating satisfactorily is unacceptable because it gives no description of what was found, what repairs were made, what problems were encountered, or any deviations found during reassembly and reinstallation. Operating satisfactorily does not indicate to planner s equipment information that should be included on future work orders such as clearances at maximum tolerances for when the machine is next repaired.! Task Instructions: Another SOP to be established is that all work must be accomplished in strict accordance with the task instructions. If the procedure is incomplete or incorrect, there must be a safe, simple, and effective procedure to make changes to the instructions. Only by demanding that even the most experienced follow the procedure do you assure uniform quality and the institutional knowledge necessary to maximize effectiveness. Once SOPs have been created to specify what data is needed for CMMS and RCM success, the method of data collection needs to be determined. Will data be collected manually or electronically? Once this has been determined, an SOP needs to be created to support the methodology. Once the method of data collection has been determined, procedures need to be put in place to ensure that the information is properly deposited into the CMMS. If data collection is to occur manually, who will update the CMMS? Will maintenance workers or a data entry clerk update the CMMS? If data collection is to occur electronically, who will oversee the upload of electronic data? How frequently will the CMMS be updated? Once determined, SOPs need to be created to support these processes. An SOP also needs to be created for reviewing and closing out work orders. The purpose of the review is to authorize that the work order is complete, based on criteria, and that SOPs were followed while entering work order data. To perform this task, the ideal choice is a reliability professional or someone with reliability training, since this person has a direct motivation for ensuring data accuracy.
9 RCM Success Starts with CMMS 7 Once accurate and complete information resides in the CMMS and is readily available, it must be analyzed. Reports and graphs must be generated, and SOPs need to be created to support work processes for generating reports and graphs. An SOP stating who is responsible for generating each report and graph, the frequency at which they are generated, the person responsible for analysis, and the person responsible for taking corrective action on information found in the analysis needs to be defined. This procedure is critical to help determine the best candidates for RCM analysis. To ensure that graphs and reports are beneficial, grouping criteria such as equipment types, work order types, inventory types, etc. must be well thought-out in advance and documented via an SOP. This will ensure that data is presented in a format that is consistently easy to analyze. For example, if downtime is to be grouped by equipment type or by work order type, then all equipment and work order types need to defined via an SOP and set up in the CMMS. To ensure data integrity and accurate sorting, data entry standards need to be established for all key CMMS information. Define SOPs for adding a new piece of equipment, inventory item, PM task, etc. to the CMMS to ensure that new data is entered properly and consistently. This ensures that data standards are followed. The more standardized the data in a CMMS is, the better it will be utilized. SOPs are critical for guiding and directing CMMS-related activities, but the act of developing them alone does not ensure complete and accurate CMMS data. Workers must have a way of being held accountable for following the procedures and be able to give input and feedback on the way activities are performed. They must be educated on the importance of the data and they must be given ownership of the data. If barriers (lack of time, resources, typing skills, etc.) to complete and accurate CMMS data exist, it is important those barriers be eliminated. If the lack of time or lack of resources exists, the addition of a staff member or a barcode solution may be needed. If typing skills are lacking, a typing tutor may be needed. Again, employees are only as good as the training they receive on tools they are given. Process Streamlining The greatest contributor to streamlining CMMS processes is via the use of a barcoding solution. Barriers to having complete and accurate data may exist if maintenance job information has to be recorded on a work order and updated in the CMMS manually, both of which require time and quality to ensure effectiveness. Another barrier may exist if there is a lack of resources available to perform data entry. Those barriers can be broken down with a barcoding solution. A barcoding solution uses scanners to replace manual data entry collection and entry and deposits data in a CMMS with a click of a button. Both efficiency and accuracy are greatly increased with the use of a barcode solution. Today s barcoding solutions can capture both planned work and emergency work. + = Undocumented Information Barcode Solution Results
10 8 RCM Success Starts with CMMS Example: Data Entry Time (per work order) Before: After: Change: 34 seconds 1.9 seconds 97% reduction One company wanted to increase the use of its CMMS and measured process efficiency by adapting a barcoding solution. Without barcoding, it took an average of 34 seconds to enter data for each work order. With barcoding, the time was reduced to 1.9 seconds per work order, a 97% reduction. In this example, a time study was performed while a data entry clerk with swift typing skills updated work orders. In different scenarios, maintenance technicians, rather than data entry clerks, update work orders. When another time study was performed while a maintenance technician with slow typing skills was updating work orders, the average time that it took the technician to update a work order was roughly 10 minutes. In this example, software that was not user friendly also retarded the process; however, the cost savings of a barcode solution still applies regardless of the friendliness of the software. Like CMMS packages, barcoding solutions can vary widely in features and functions. A barcoding solution contributes most effectively to identifying the best candidates for RCM analysis if it tracks both planned and unplanned work orders. For work orders, the barcode solution should track the following information: Automatically timed labor hours Parts transactions Reason for outage Downtime information Meter readings Work order comments The data accepted by the barcoding solution should conform to a plant s data standards, and hardware should be rugged and durable enough to withstand the conditions of a maintenance environment. Using CMMS Data for RCM Prioritizing Candidates Once it is ensured that CMMS data is up to date and complete, it can be used to prioritize candidates for RCM analysis. Risk Ranking Risk ranking can help select the highest-value candidates for RCM analysis. Time spent performing RCM analysis on low-risk equipment or systems is, in most cases, not worth the time spent. Focusing on high-risk equipment is a more effective approach. With risk defined as probability times consequences, the risk rank process assigns numerical values to a variety of factors that together establish a priority for attention such as RCM. In an operating facility, probability originates from equipment history how often has a given piece of equipment failed in the past. Another reliable indicator of equipment failure is part issues. Consequences are
11 RCM Success Starts with CMMS 9 effect. In the risk ranking process, a failure that constitutes a threat to safety or the environment has a high ranking depending on specific consequences such as production interruptions, effects on quality, and cost come next depending on the specific circumstances. In this fashion, equipment that may have a high history of failure but minimal consequences will be ranked realistically with equipment at the opposite end of the range high consequences and low probability. Failure Indicators Several failure indicators themselves can be used to prioritize equipment for RCM. Failure Indicators High maintenance costs Most emergency work High frequency of failures Highest amount of downtime CMMS Resource Work Order Cost Summary report Work Order Analysis graph Mean Time Between Failure (MTBF) report Work Order Analysis graph To prioritize equipment for RCM analysis by maintenance costs, review a work order cost summary report, grouped by equipment and sort it by total cumulative cost. The equipment with the highest maintenance cost will be identified. Work Order Cost Summary Report To prioritize equipment by the amount of emergency work performed, run a graph showing only unplanned (emergency) work, and group the graph by equipment number. The equipment with the most unplanned work will be identified.
12 10 RCM Success Starts with CMMS Work Order Chart (emergency) To prioritize equipment for by that which is failing most frequently, run a Mean Time Between Failure (MTBF) report. Sort this report in ascending order so that equipment failing most frequently appears at the top of the report. In the following Mean Time Between Failure report, only work orders without a task appear in the report. (The software used to generate this report assumes that if a work order has a task, it is a planned work order and should not be reflected in this report as a failure. Planned work such as a routine PM or adjustment that requires lock out tag does not constitute a failure just because the equipment is not available.) Mean Time Between Failure Report To prioritize equipment by that with the highest amount of downtime, run a work order analysis graph that shows downtime, grouped by equipment number.
13 RCM Success Starts with CMMS 11 Work Order Analysis Graph (downtime) A combination of these reports and graphs and/or other reports and graphs is needed for further analysis so that optimal decisions can be made. For example, a piece of equipment at the top of the work order cost summary list may be there because of costly parts rather than a significant amount of unplanned work due to reliability-related issues. In any case, equipment in the greatest need of RCM analysis will be identified as long as the data upon which the reports and graphs are based is complete and accurate. Performing Analysis After equipment has been prioritized for RCM analysis, more detailed information on the selected equipment should be reviewed. Failure information such as failure detection, reasons for outage, intensity of failure, frequency of failure, failure effects, and failure consequences can be found in the CMMS. Failure Information CMMS Data CMMS Function CMMS Analysis Tool Failure Detection Downtime Maintenance Costs Unplanned/ Emergency Work Parts Issues Employee Module Equipment Module Inventory Module Work Order Module Failure Analysis Module Reason for Outage Reason for Outage Work Order Module Failure Analysis Module Intensity of Failure Frequency of Failure Work Order Comments Downtime Mean Time Between Failure (MTBF) Work Order Module Work Order Module Downtime Reports/Graphs Work Order Cost Summary Reports Work Order Analysis Graphs Reason for Outage Reports/Graphs Work Order Reports Downtime Reports MTBF Reports
14 12 RCM Success Starts with CMMS Failure Effects Work Order Comments Work Order Module Work Order Reports Failure Consequences Work Order Costs Work Order Comments Work Order Module Work Order Cost Summary Reports Work Order Analysis Graphs Work Order Reports Taking Action The main goal of performing RCM analysis is to determine a course of action to improve maintenance processes. Outside of CMMS, there is opportunity and potential value to be recovered from reliability improvement projects directed to eliminating chronic defects that necessitate work. Eliminating chronic defects is a potential source of much greater value than improving PM, work procedures, or implementing CBM. Within a CMMS, however, corrective action such as adjustments to maintenance activities can be made. RCM Analysis Equipment Prioritization High Frequency of Failure/ Common Reasons for Failure/ Process Downtime CMMS Actions Priority Assignments Adjusted PMs Adjustment in Task Instructions Adjustment in Parts Used Inventory Adjustments The same prioritization determination for RCM analysis should be applied to maintenance activities. In the CMMS, reassign priorities to equipment, PM tasks, and work orders based on the data found. Some CMMS software packages assign a weight to a work order based on work priority, equipment priority, and other criteria. Work orders reflecting the highest priority should be attended to first. If a high frequency of failure appears, indicating the need for adjustments in preventative maintenance, new PMs can be set up and/or existing ones can be adjusted. For example, if a piece of equipment is found to fail based on over-lubrication, the frequency of existing lubrication PMs can be decreased. Additionally, CBM may be applied to reduce the number of PMs within the CMMS. If a common reason for failure is related to how a maintenance activity is performed, the process change can be included as part of task instructions. If a piece of equipment has excessive process downtime as a result of parts shortages, inventory EOQs and minimum and maximum stock levels should be adjusted in the CMMS. Procedures may need to be changed or better enforced to ensure that parts are properly checked out and charged to the correct work order. If a piece of equipment has excessive process downtime due to part quality, a different vendor may be selected and reflected in the CMMS. If a common reason for failure is incorrect part usage, the correct part can be added to the equipment s spare parts list.
15 RCM Success Starts with CMMS 13 Summary A CMMS contributes critically to RCM analysis by providing equipment data and history, however, many steps must be taken to ensure that the data existing in CMMS is complete and accurate. In order for RCM to be successful, CMMS data must be complete and accurate. For optimum RCM effectiveness, RCM analysis should be prioritized only for equipment and systems that will pay off from it. CMMS also allows for action to be taken based on the results of an RCM analysis. In tandem, successful RCM analyses and successful CMMS systems will ensure that a company optimizes its return on assets. References 1 Moubray, John, Reliability-centered Maintenance, 2nd Edition, Industrial Press, 1997.
Asset management systems increase reliability and efficiency
A PublicAtion of the international Society of AutomAtion Asset management systems increase reliability and efficiency Make use of technology to overcome barriers to better maintenance practices By Augie
The Important Role of an Equipment Bill of Material The 2 nd in a series on Integrated Inventory Management
The Important Role of an Equipment Bill of Material The 2 nd in a series on Integrated Inventory Management As appeared in the January / February 08 issue of Reliable Plant 1. Introduction The principal
Increase Equipment Uptime Through Robust Enterprise Asset Management. For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry
Increase Equipment Uptime Through Robust Enterprise Asset Management For the Upstream, Midstream & Downstream Sectors of the Oil & Gas Industry The Oil & Gas industry is challenged with effectively maximizing
Maintenance Plan. Many of the individual components of a comprehensive maintenance program are listed below, along with brief descriptions.
Maintenance Plan Introduction Maintenance is the cornerstone of asset sustainability. An effective preventive maintenance program, combined with good operational practices, will reduce the need for much
Why Use Software for Calibration Management? Calibration White Paper. Beamex. INCLUDES CUSTOMER CASE STORY: Heineken España A.S.
Beamex Calibration White Paper [email protected] Why Use Software for Calibration Management? INCLUDES CUSTOMER CASE STORY: Heineken España A.S. Calibration management software can benefit all sizes of process
of The New England Water Works Association
Journal Our 132nd Year of The New England Water Works Association Volume 127 No. 2 June 2013 PUTNAM WATER TREATMENT PLANT AQUARION WATER COMPANY OF CONNECTICUT GREENWICH, CONNECTICUT New England Water
10426: Large Scale Project Accounting Data Migration in E-Business Suite
10426: Large Scale Project Accounting Data Migration in E-Business Suite Objective of this Paper Large engineering, procurement and construction firms leveraging Oracle Project Accounting cannot withstand
SKF Asset Management Services. Your trusted resource for life cycle support and sustainability of physical assets
SKF Asset Management Services Your trusted resource for life cycle support and sustainability of physical assets SKF Asset Management Services People, processes and technology to optimize asset efficiency
The Leading Reward of Maintenance Management
Halting the Cycle of Break & Fix: The Leading Reward of Maintenance Management Eric Hancock Practice Leader for Operations & Asset Management Jacobs Engineering Group Inc. Best Maintenance Strategies t
Five steps to a successful material handling CMMS implementation
Five steps to a successful material handling CMMS implementation Upgrade maintenance operations with improved efficiency, quality and reduced overhead automation that delivers Five steps to a successful
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy
6 Reasons Why Outsourcing Equipment Maintenance Is Your Best Hedge In A Down Economy The decision to outsource equipment maintenance during times of economic boom is based on the desire of a company to
d/b/a ENERGY KEEPERS, Inc. Power Plant Maintenance Engineer Negotiable depending on training, education, and experience
Position: Salary: Location: Employment Status: Supervised By: SXʷNQ EʔELS L SUW EČM / KSUKⱠIⱠMUMAⱠ ʾA K AⱠMUKWAʾITS, Incorporated d/b/a ENERGY KEEPERS, Inc. GENERAL SUMMARY Power Plant Maintenance Engineer
Improving. Summary. gathered from. research, and. Burnout of. Whitepaper
Whitepaper Improving Productivity and Uptime with a Tier 1 NOC Summary This paper s in depth analysis of IT support activities shows the value of segmenting and delegatingg activities based on skill level
Overview of EAM Services. A Fully Integrated Global EAM Service Provider
A Fully Integrated Global EAM Service Provider Table of Contents Strategy & Process Services Overview... p. 3 Asset Reliability Services Overview... p. 4 Systems & Technology Services Overview... p. 7
Hillsborough County Water
0407 FWRJ 3/20/07 4:23 PM Page 54 Selecting & Implementing a Comprehensive Asset Management System Celine A. Hyer Hillsborough County Water Resource Services (WRS) provides water, wastewater, and reclaimed
IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management
IBM Tivoli Software Maximo Asset Management Version 7.5 Releases Maximo Business Intelligence Work Packs Workorder, Asset Failure, Asset and Inventory Management Revision 4 Pam Denny Maximo Report Designer/Architect
Keeping Track of Fixed Assets with Microsoft Dynamics GP LEVERAGING MICROSOFT DYNAMICS GP AND BARCODE TECHNOLOGY
Keeping Track of Fixed Assets with Microsoft Dynamics GP LEVERAGING MICROSOFT DYNAMICS GP AND BARCODE TECHNOLOGY October 2011 ne Need to get a better handle on managing your fixed assets? Panatrack has
50 Questions before computerization
50 Questions before computerization Before computerization, as an organization, ask yourself: 1. Is there enough time, money and interest to involve all levels within the maintenance department and other
WHITE PAPER TOP 10 LOSING WAREHOUSE STRATEGIES AND HOW TO AVOID THEM
TOP 10 LOSING WAREHOUSE STRATEGIES AND HOW TO AVOID THEM Old habits can be hard to break, but when it comes to improving your warehouse management operations, you ll reap big rewards if you lose these
FIREWALL CLEANUP WHITE PAPER
FIREWALL CLEANUP WHITE PAPER Firewall Cleanup Recommendations Considerations for Improved Firewall Efficiency, Better Security, and Reduced Policy Complexity Table of Contents Executive Summary... 3 The
Chronos CMMS. System Overview
Chronos CMMS System Overview Chronos Computerized Maintenance Management System (Chronos CMMS) is a powerful and easy to use asset management software specially designed for intensive machinery driven
Enhance Production in 6 Steps Using Preventive Maintenance
Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using
QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015
QAD EAM - Maintenance Demonstration Guide August 4, 2015 EAM 2015 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management (EAM) Maintenance and shows how this functionality
Asset Management 101
Asset Management 101 Part 1: Maintenance Strategy Overview Larry Covino Product Line Leader, Strategic Partnerships Bently Nevada Asset Condition Monitoring, GE Energy, [email protected] Michael Hanifan
Your Business Doesn t Fit a Mold; Neither Should Your Software. Why Your Facility Needs CMMS Software. FaciliWorks 8i Web-based CMMS.
Why Your Facility Needs CMMS Software Improve productivity Control operations and maintenance costs Maximize asset uptime Prevent mistakes Become proactive Avoid legal obligations and liability Reduce
ENTERPRISE ASSET MANAGEMENT (EAM) The Devil is in the Details CASE STUDY
ENTERPRISE ASSET MANAGEMENT (EAM) The Devil is in the Details CASE STUDY 1 EXECUTIVE SUMMARY Enterprise Asset Management (EAM) is a strategy to provide an optimal approach for the management of the physical
WHITE PAPER. Kitting Can Optimize Inventory Management and Performance
WHITE PAPER Kitting Can Optimize Inventory Management and Performance Applied Industrial Technologies Corporate Headquarters 1 Applied Plaza Cleveland, OH 44115 216-426-4000 www.applied.com Applied Industrial
10 simple rules for buying a helpdesk system
TechExcel White Paper Follow these ten rules to get your helpdesk started on the right path. Whether you are buying for the first time or just replacing your current system, this whitepaper aims to provide
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS. Dr. Abdul-Mohsen Al-Hammad. I. Maintenance Management Systems
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS By Dr. Abdul-Mohsen Al-Hammad Outline I. Maintenance Management Systems II. Computerized Maintenance Management System. 2 1 I. Maintenance Management Systems
CMMS/EAM. Maintenance Solutions
CMMS/EAM Maintenance Solutions Superior Functionality. Fully Integrated Solution. Maximum System Support. Maximize Critical Assets Maintenance Software Solutions For nearly 40 years, CHAMPS has remained
Information Technology Asset Management: Control and Compliance
Information Technology Asset Management: Control and Compliance Information Technology Asset Management is the oversight and management of an organizations IT assets hardware, software and associated service
Lockout/Tagout (LOTO): Automating the process
Lockout/Tagout (LOTO): Automating the process By: Bryan K. Gay, Jr. CHAMPS Software, Inc. Lockout/Tagout (LOTO): Automating the process Table of Contents 1. The traditional LOTO process 2. Why automate?
Integrated Reliability Programs = Integrated Data Management. White Paper. Design Maintenance Systems Inc.
Integrated Reliability Programs = Integrated Data Management White Paper Design Maintenance Systems Inc. Integrated Reliability Programs = Integrated Data Management An Integrated Reliability program starts
Effective Replenishment Parameters By Jon Schreibfeder
WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY Effective Replenishment Parameters By Jon Schreibfeder >> Compliments of Microsoft Business Solutions Effective Replenishment Parameters By Jon Schreibfeder
The Effect of Regular, Skilled Preventive Maintenance on Critical Power System Reliability
The Effect of Regular, Skilled Preventive Maintenance on Critical Power System Reliability A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Emerson Network Power has
Effective Replenishment Parameters. By Jon Schreibfeder EIM. Effective Inventory Management, Inc.
Effective Replenishment Parameters By Jon Schreibfeder EIM Effective Inventory Management, Inc. This report is the fourth in a series of white papers designed to help forward-thinking distributors increase
Maintenance Assessment Questionnaire. Please Print and Complete this Document.
Please Print and Complete this Document. When finished, you may mail this to our offices and we will be in contact with our recommendations. Manufacturing Solutions International Chattanooga Office 7704
Lean Kitting: A Case Study
Lean Kitting: A Case Study Ranko Vujosevic, Ph.D. Optimal Electronics Corporation Jose A. Ramirez, Larry Hausman-Cohen, and Srinivasan Venkataraman The University of Texas at Austin Department of Mechanical
FaciliWorks. Desktop CMMS Software. Making Maintenance Manageable
FaciliWorks Desktop CMMS Software Making Maintenance Manageable Why Your Facility Needs CMMS Software Improve productivity Control operations and maintenance costs Maximize asset uptime Prevent mistakes
Strategic Planning for Asset Management and Facility Maintenance?
Strategic Planning for Asset Management and Facility Maintenance? Do you know the book value and dollar value of Assets that the company owns and responsible for? Example: Now that you have determined
Supporting Lean Maintenance
Supporting Lean Maintenance Combining Best Practices with Technology for Superior Results TECHNOLOGY MANAGEMENT SOLUTIONS 2010 An Industry White Paper from Technology Management Solutions Supporting Lean
Predictive Maintenance
PART ONE of a predictive maintenance series Predictive Maintenance Overview Predictive maintenance programs come in all shapes and sizes, depending on a facility s size, equipment, regulations, and productivity
Supply Chain Optimization
White Paper Supply Chain Optimization Maintenance Repair and Operations (MRO) supply chain, when given serious consideration at all, is frequently seen as a challenge a high-cost, but necessary evil to
The Six Key Decisions For Effective Network Management By Rich Schiesser in conjunction with Harris Kern s Enterprise Computing Institute
The Six Key Decisions For Effective Network Management By Rich Schiesser in conjunction with Harris Kern s Enterprise Computing Institute This article will present six key decisions that an infrastructure
Express Technology. Maintenance Solutions www.expresstechnology.com 251.929.3200. 2011 Express Technology Inc.
EQUIPMENT MANAGEMENT PREVENTATIVE MAINTENANCE BREAKDOWN MAINTENANCE DOWNTIME TRACKING WORK ORDERS MAINTENANCE HISTORY PARTS INVENTORY PARTS RECEIVING PURCHASE ORDERS Express Technology Maintenance Solutions
ABB Process Automation Service Services that add life to your systems and processes
ABB Process Automation Service Services that add life to your systems and processes Services that add life to your systems and processes ABB has world-class experience in specifiying, installing, maintaining,
M O B I L E E A M E Q U I P M E N T M A I N T E N A N C E
M O B I L E E A M E Q U I P M E N T M A I N T E N A N C E O v e r v i e w Maintenance technicians are often on the move and need quick access to information about assets and equipment repairs, but carrying
Beyond EDI: Leverage the cloud to improve electronic business transactions
Beyond EDI: Leverage the cloud to improve electronic business transactions Connect with more suppliers, reduce transaction costs and grow your business with an EDI solution that puts everyone on the same
IBM Tivoli Netcool network management solutions for enterprise
IBM Netcool network management solutions for enterprise The big picture view that focuses on optimizing complex enterprise environments Highlights Enhance network functions in support of business goals
Data Management Practices for Intelligent Asset Management in a Public Water Utility
Data Management Practices for Intelligent Asset Management in a Public Water Utility Author: Rod van Buskirk, Ph.D. Introduction Concerned about potential failure of aging infrastructure, water and wastewater
Sterile Processing University, LLC MODULE 25: INVENTORY CONTROL & MANAGEMENT [Ambulatory Surgery]
Sterile Processing University, LLC MODULE 25: INVENTORY CONTROL & MANAGEMENT [Ambulatory Surgery] Copyright Sterile Processing University, LLC 2012 All Rights Reserved. This material may not be copied
Address IT costs and streamline operations with IBM service request and asset management solutions.
Service management solutions To support your IT objectives Address IT costs and streamline operations with IBM service request and asset management solutions. Highlights Help service desk technicians become
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER
IMPLEMENTING A RELIABILITY CENTERED MAINTENANCE PROGRAM AT NASA'S KENNEDY SPACE CENTER Raymond E. Tuttle and Robert R. Pete EG&G Florida BOC-035 Kennedy Space Center FL 32899 (407) 867-5705!qq, Abstract:
The Role of CMMS. A white paper on the selection and implementation of computerized maintenance management systems. Prepared by:
A white paper on the selection and implementation of computerized maintenance management systems Prepared by: Mike Crain Manager, Industrial Technologies Northern Digital, Inc. [email protected]
PEOPLESOFT MAINTENANCE MANAGEMENT
PEOPLESOFT MAINTENANCE MANAGEMENT KEY BENEFITS Streamline Maintenance Operations Manage Full Asset Lifecycle Lower Total Cost of Ownership Oracle s PeopleSoft Maintenance Management completes the Enterprise
Predictive Maintenance in a Mission Critical Environment
March 2009 Predictive Maintenance in a Mission Critical Environment This paper discusses the need to proactively protect mechanical and electrical support systems in data processing centers and data storage
Content Sheet 3-1: Equipment Management Overview
Content Sheet 3-1: Equipment Management Overview Role in quality management system Equipment management is one of the essential elements of a quality management system. Proper management of the equipment
Position Classification Standard for Supply Clerical and Technician Series, GS-2005. Table of Contents
Position Classification Standard for Supply Clerical and Technician Series, GS-2005 Table of Contents SERIES DEFINITION... 2 EXCLUSIONS... 2 OCCUPATIONAL INFORMATION... 2 DISTINGUISHING BETWEEN SUPPLY
PdM Overview. Predictive Maintenance Services
PdM Overview Predictive Maintenance Services Objective Assessments Maximize Uptime, Lower Costs Predictive Maintenance (PdM) solutions from Rexnord Industrial Services help manage the condition of your
Best Practices in Mobilizing IT Asset Management
make IT mobile White Paper Best Practices in Mobilizing IT Asset Management Executive Summary 1 Mobilizing IT Asset Management as a Process Improvement 2 Determining if RFID is Right for Your ITAM Environment
Optimization of Clinical Engineering in Private Healthcare
Optimization of Clinical Engineering in Private Healthcare Speaker: James Herbert Organisation: Medi-Clinic Southern Africa Job Title: Technical Specialist - Clinical Engineering About the Speaker: James
Inventory Performance Management INVENTORY TRENDS INVENTORY PLANNING INVENTORY POSITION & ANALYSIS & OPTIMIZATION & PROJECTIONS
Performance Management INVENTORY TRENDS INVENTORY PLANNING INVENTORY POSITION & ANALYSIS & OPTIMIZATION & PROJECTIONS A significant cost to manufacturing, distribution and retail businesses is the inventory
The 19 reasons to invest in a CMMS
The 19 reasons to invest in a CMMS Background Asset management has become a hot topic in recent years, probably because it can have such a significant impact on the profitability of an asset intensive
Information Needed for Effective Asset Management
Emerson Reliability Consulting White Paper Information Needed for Effective Asset Management Bruce Hawkins, CMRP Director of Technical Excellence, Emerson Reliability Consulting Effective asset management
State of Michigan Document Imaging Guidelines
State of Michigan Document Imaging Guidelines Responsibility of Source Document Owners to Monitor the Work With limited human resources, the time it takes to maintain, process, and store records is becoming
SaaS. Web-Based, SaaS Purchasing Model Lives Up To Its Promises. Invoice Approval. Purchasing. Receiving. Inventory Control Purchasing Requisitions
Web-Based, SaaS Purchasing Model Inventory Control Purchasing Requisitions Receiving RFQ SaaS Invoice Approval Receiving Purchasing Inventory Control Invoice Approval In a challenging business environment
QUICK FACTS. Replicating Canada-based Database Support at a New Facility in the U.S. TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES
[ Energy Services, Managed Services Offering/ Network Infrastructure Services ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Oil and natural gas Revenue: Approximately $5.2
Facilities Planning & Management Maintenance Repair Parts Policies & Procedures
Facilities Planning & Management Policies & Procedures Revised 10/2013 Facilities Planning & Management Policies & Procedures PURCHASE REQUESTS cspolicy1.wpd 1-4 ISSUES FROM STOCK cspolicy2.wpd 5-7 MONTHLY
Computerized Maintenance Management System CMMS Best Practices Study
July 2011 Price: $399.00 Computerized Maintenance Management System CMMS Best Practices Study Reliabilityweb.com Reliability Roadmap Asset Management White Paper Series www.reliabilityweb.com www.cmmscity.com
MAXIMO 7 TRAINING GUIDE INVENTORY MANAGEMENT FLORIDA INTERNATIONAL UNIVERSITY. 3451 NE 1 st Ave M1008 Miami, FL 33137
MAXIMO 7 TRAINING GUIDE INVENTORY MANAGEMENT FLORIDA INTERNATIONAL UNIVERSITY 3451 NE 1 st Ave M1008 Miami, FL 33137 TABLE OF CONTENTS TABLE OF CONTENTS...2 I CHAPTER 1 INVENTORY MANAGEMENT...3 1 OBJECTIVES...
Better-performing Assets Make Companies
Better-performing Assets Make Better-performing Companies Skillful asset management can improve EBITDA as much as 15-25% A sset performance management encompasses all maintenance activities that extend
Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems
Regulatory Asset Management: Harmonizing Calibration, Maintenance & Validation Systems 800.982.2388 1 Introduction Calibration, maintenance and validation activity, despite operating within the same department
INTRODUCTION TO MANUFACTURING EXECUTION SYSTEMS MES CONFERENCE & EXPOSITION. Baltimore, Maryland
INTRODUCTION TO MANUFACTURING EXECUTION SYSTEMS MES CONFERENCE & EXPOSITION JUNE 4-6, 2001 Baltimore, Maryland Michael McClellan President MES Solutions Incorporated Terrebonne, Oregon 97760 541 548 6690
TPM at the heart of Lean - March 2005 Art Smalley
TPM at the heart of Lean - March 2005 Art Smalley Total Productive Maintenance (TPM) has been a very important tool for equipment intensive manufacturing sectors. It is a key means for increasing machine
Enable better decision making by managing your assets in one simple system
Enable better decision making by managing your assets in one simple system PDS has developed the most effective way of collecting and analysing the condition of your assets. Maintenance is often overlooked
control manual Optimal maintenance decisions for asset managers by andrew k.s. jardine and neil montgomery 44 Industrial Engineer
control manual Optimal maintenance decisions for asset managers by andrew k.s. jardine and neil montgomery 44 Industrial Engineer Most of us are familiar with the effort involved in purchasing a new car.
PROJECT TRACKING and CONTROL
PROJECT TRACKING and CONTROL 1 Outline of Project Tracking & Control 2 Project Planning & Control Context 3 Realistic and Measurable Plans Create Measurable Plans! 4 Data Sources for Project Tracking 5
Asset Management Best Practices
Asset Management Best Practices Summary of a Five-Part Series on Maintenance Best Practices A series of white papers dedicated to Asset Management Best Practices. Maximize Asset Performance. Improve Operating
Operations & Maintenance 101 Maintenance Strategies and Work Practices to Reduce Costs
2003 Emerson Process Management. All rights reserved. View this and other courses online at www.plantwebuniversity.com. Operations & Maintenance 101 Maintenance Strategies and Work Practices to Reduce
Guidance for the Quality Assurance of Fire Protection Systems
Guidance for the Quality Assurance of Fire Protection Systems Prepared for: Office of Energy Research Office of Environment, Safety and Health Technical Support Prepared by: Roy F. Weston, Inc. October
Building a Business Case for Industrial Software Projects Helps Ensure Success
APRIL 18, 2013 Building a Business Case for Industrial Software Projects Helps Ensure Success By Ralph Rio Keywords EAM, CMMS, Business Case Overview To get executive support for your next project, tie
Maximizing return on plant assets
Maximizing return on plant assets Manufacturers in nearly every process industry face the need to improve their return on large asset investments. Effectively managing assets, however, requires a wealth
Computerized Maintenance Management and Enterprise Asset Management Best Practices by Terrence O'Hanlon, CMRP Reliabilityweb.com
RELIABILITYWEB.COM SOLUTION ORIENTED ASSET RELIABILITY PO Box 07070 Ft. Myers FL 33919 Reliabilityweb.com Reliability Roadmap Asset Management White Paper Series Computerized Maintenance Management and
New Fleet Management Software System
New Fleet Management Software System The Fleet Services staff received training in October 2003, and early 2004, in preparation for the installation of a new fleet management software system. Training
The Role of Information Technology in Plant Reliability
The Role of Information Technology in Plant Reliability From P/PM Technology, June, 1999 By Robert Matusheski, Meridium, Inc. Information technologies (IT), in the context of this paper, include all computer
Optimizing Inventory in Today s Challenging Environment Maximo Monday August 11, 2008
Optimizing Inventory in Today s Challenging Environment Maximo Monday August 11, 2008 1 Agenda The Value Proposition Case Studies Maximo/DIOS Offering Getting Started Q&A 2 Current Inventory Management
Creating a Business Continuity Plan for your Health Center
Creating a Business Continuity Plan for your Health Center 1 Page Left Intentionally Blank 2 About This Manual This tool is the result of collaboration between the Primary Care Development Corporation