1 CHAPTER-1 INTRODUCTION M/s Bravo Sponge Iron Pvt. Ltd. has existing 1x95 TPD & 1x100 TPD DRI kiln producing 62,400 TPA Sponge Iron for sale village- Mahuda, P.O- Rukni, Puruliya District of West Bengal 1.0 Importance of the project to the country and region TMT rod and bar products are normally used in constructional/structural work so products have demand for development of infrastructure of a country. Steel is a basic commodity for all industrial activity and its consumption marks industrial prosperity. The steel industry has tremendous forward and backward linkages in terms of material flow, income and employment generation. Steel is a core industry and thus its demand is strongly linked to the overall economic activity of the nation. Given the inherent long-term potential of the Indian economy and its cyclical nature, the long-term prospects of the steel industry are fairly comfortable. The demand and production has been growing at a healthy rate for the last few years and the forecast for the next decade and half is also very promising. It has been estimated by certain major investment houses such as Credit Suisse that India s steel consumption will continue to grow at 16 % rate annually fuelled by demand for construction projects worth US $1 trillion. The scope for raising the total consumption for steel is huge, Per capita consumption of steel at current levels is about 65 kg. As a comparison per capita steel consumption in China is 430 kg and the world steel consumption per capita average is 180 kg. By the demand at 7 % and 8 % GDP growth is estimated to be 123 million tons and million tons respectively. Taking a mean figure of 130 million ton, there is a need of 65 million ton in 10 years time. This translates into an average growth requirement of about 10 million tons per year. Ministry of steel has projected that steel capacity in the country is likely to be million tons by Further based on the status of MOUs signed by private producers with various State Govt., it is expected that India s steel capacity would be nearly 293 million tons by Global Steel Scenario: Steel is a key driver of the world's economy. The industry directly employs more than two million people worldwide, with a further two million contractors and four million people in supporting industries. In 1950-India and China had same level of per capita consumption of steel. But then India remained mostly stagnant whereas China went about Industrialization and increased its production as well as consumption. However India improved between 1997 to 2003, but steel then per capita steel has remained very low in comparison to China. 1

2 In 2007 World steel output reached million metric tons and showed a growth of 7.5% over previous year. China remained World s largest crude steel producer in 2007 producing million metric tons and USA India occupied 5 th position producing million metric tons for the second consecutive year. In 2013 the world crude steel production reached 1606 million tons and showed a growth of 3% over (Source: World Steel Association or WSA) China remained the world s largest crude steel producer in 2013 (779 mt) followed by Japan (111 mt), the USA (87 mt) and India (81 mt) at the 4th position. WSA has projected Indian steel demand to grow by 3.3% in 2014 as compared to global steel use growth of 3% and Chinese growth of 3.1%. For 2015, further recovery is projected for world (3.3%) and India (4.5%) and a slowing down for China (2.7%). Per capita finished steel consumption in 2013 is estimated at 225 kg for world and 515 kg for China. 1.2 Domestic Steel Scenario: The Indian steel industry has entered into a new development stage from , riding high on the resurgent economy and rising demand for steel. Rapid rise in production has resulted in India becoming the 4 th largest producer of crude steel and the largest producer of sponge iron or DRI in the world. As per the report of the Working Group on Steel for the 12 th Plan, there exist many factors which carry the potential of raising the per capita steel consumption in the country, currently at 59.2 kg. These include among others, an estimated infrastructure investment of nearly a trillion dollars, a projected growth of 2

3 manufacturing from current 8% to 11-12%, increase in urban population to 600 million by 2030 from the current level of 400 million, emergence of the rural market for steel currently consuming around 10 kg per annum buoyed by projects like Bharat Nirman, Pradhan Mantri Gram Sadak Yojana, Rajiv Gandhi Awaas Yojana among others. At the time of its release, the National Steel Policy 2005 had envisaged steel production to reach 110 million tons by However, based on the assessment of the current ongoing projects, both in Greenfield and Brownfield, the Working Group on Steel for the 12 th Plan has projected that the crude steel steel capacity in the county is likely to be 140 mt by and has the potential to reach 149 mt if all requirements are adequately met. The National Steel Policy 2005 is currently being reviewed keeping in mind the rapid developments in the domestic steel industry (both on the supply and demand sides) as well as the stable growth of the Indian economy since the release of the Policy in The liberalization of industrial policy and other initiatives taken by the Government have given a definite impetus for entry, participation and growth of the private sector in the steel industry. While the existing units are being modernized/expanded, a large number of new steel plants have also come up in different parts of the country based on modern, cost effective, state of-the-art technologies. In the last few years, the rapid and stable growth of the demand side has also prompted domestic entrepreneurs to set up fresh Greenfield projects in different states of the country. Crude steel capacity was 102 mt in and India, the 4 th largest producer of crude steel in the world, has to its credit, the capability to produce a variety of grades and that too, of international quality standards. The country is expected to become the 2 nd largest producer of crude steel in the world by , provided all requirements for creation of fresh capacity are adequately met. Further based on the status of MOUs signed by private producers with various State Govt., it is expected that India s steel capacity would be nearly 293 million tons by [Source: Ministry of Steel] Importance of various units DRI KILN Sponge iron is the metallic form of iron and Scarp substitute produced from reduction of iron oxide below the fusion temperature of iron ore ( C) by utilizing hydrocarbon gases or carbonaceous fuels as coal. The reduced product having high degree of metallization exhibits a honeycomb structure, due to which it is named as sponge iron. As the iron ore is in direct contact with the reducing agent throughout the reduction process, it is often termed as direct reduced iron (DRI). 3

4 IF The various types of Induction Furnaces used for Steel making are medium frequency and high frequency. Mild steel, Stainless Steel and low and high alloy Steel can be made from these furnaces. Raw materials used are DRI, Pig Iron & Scarp. Charge is heated by eddy current.alloying elements are added as per the requirement and the induction furnaces are provided with matching billet casters. Rolling Mill: Steel Billets/blooms from Billet Caster are cut to desired sizes and either fed to hot rolling mill for processing or transferred to raw material shed stored. Cold Billets are transferred to roller table and pushed through the Reheating furnaces which are heated and soaked up to C The Billets/blooms are then processed through roughing mill, intermediate mills and finishing mills to get the finished rolled products. Re heating of Billets will be done in reheating furnace by burning surplus BF gas. Then rolled products are cropped & caught in required commercial length by hot saws. Location Map of project site 4

5 Satellite imagery of location-bravo Sponge Iron pvt. Limited 5

6 Justification of the project The company produces steel Billets in its existing unit which is a semi finished product and unless same are converted to marketable products, the project is less profitable. Again TMT Bar has high market demand for its utilization in construction work. Hence expansion of Bravo Sponge Iron Pvt Ltd is justified. Undoubtedly the development of this industrial project will give rise to the production of finished products like construction material which is in demand. In the meanwhile generation of various wastes would also take place from the project and there by environmental degradation is anticipated. However the use of advanced technology and proper management, planning and application of meticulous Environment management plan, shall substantially reduce environmental problems and the project shall becomes acceptable as it leads to socio-economic development of the region. Authorization M/s. BRAVO Sponge Iron Pvt. Limited has entrusted M/S, a NABET accredited their expansion project. A Grade Environment consultant Bhubaneswar for preparation of TEFR for 6

7 In accordance to the scope of work, M/s. team visited the project site at- At-Mahuda, P.O- Rukni, in Puruliya District of West Bengal. During their visit the team collected information on site and availability of infrastructure facilities like raw materials, water, power and transportation facilities available for the existing unit and space available for expansion. The representative of M/s. Bravo Sponge iron Pvt. Limited accompanied team during visit to their site. ACKNOWLEDGEMENT GLOBAL EXPERTS, Bhubaneswar expresses its deep gratitude to management of M/s. Bravo Sponge Iron Pvt. Limited for entrusting the assignment of making report and providing all documents required for submission of form-1 and TEFR and for the active interest and cooperation extended by the concerned officials of M/s Bravo Sponge Iron Pvt Ltd. 7

8 2.1 SITE LOCATION CHAPTER-2 SITE AND INFRASTRUCTURE A Plant is set up at a place, where men, machinery and material are brought together to manufacture the product. The success and failure of an Industry greatly depends on its location. Therefore location must be based on careful consideration of all the factors that are essentially needed for successful running of an Industry which may provide maximum advantage. The most important factors on which the selection of site depends are 1) Proper Geological region, 2) Appropriate location in the region. The location of an Industry is determined by following factors. a) Availability of Raw materials nearby b) Availability of Industrial vacant land for Industry and its expansion in future. c) Availability of water needed for the Industry. d) Availability of power. e) Nearness to market. f) Availability of Labor. g) Good transport facility. h) Suitable climate and Topography. Location of the proposed project site fulfils all the above conditions to a large extent. The site is located at At- Mahuda, P.O-Rukni in the district Puruliya of West Bengal The plant location and Latitude ' 53.49" N & Longitude ' 49.70" E. 2.2 LAND The company has already acquired acres land and running the existing plant, vacant space in it will be utilized to accommodate expansion project. The total land use will be as follows. LAND USE PATTERN Sl.N FACILITIES AREA IN ACRES o. 1 Plant Facilities Office Admin Building Canteen RMH & Storage Dispatch & Parking Bay Green belt Water Storage Internal Roads Fuel Storage Solid Waste Disposal Vacant Space 2.69 TOTAL (As provided by Project Proponent) 8

9 All raw materials are proposed to be received through Rail and in dump trucks and unloaded in the raw material receiving yard. Sufficient space is earmarked to cater to the needs of all the units of the plant. Different plant units will be laid out considering the need of optimized earthwork, rational material flow, economy of operations and the space requirements for rational development. The general layout of the proposed plant has been developed keeping in the view the following factors: Smooth & uninterrupted flow of materials in accordance with the technological requirements Contours & gradient of the site Optimum lead for transport of materials & for service lines Predominant wind direction Logistic approach in location of technological units as well as service facilities Safety clearances & statutory provisions The major consideration that has been given for making layout is given below. The storage facility and raw material & isolating areas have been located near the main processing area. But care has been taken to see that expansion will not be hampered in future. The processing areas are situated at the centre of plant so that all other required material can be easily available; the area of processing has been such that movement of worker & flow of material within the processing unit, location of equipment & their maintenance easy. The storage facility has been nearer to the processing area so that the production flows from department to storage easy. A space has been reserved for loading & unloading of product. Proper regard has been shown in placement of each of services like the distribution of water, power refrigeration unit & electricity. Adequate green belt in 33% of total land within the plant boundary and on the periphery of the proposed project will be developed to reduce pollution load on environment as it acts as a sink of dust and noise pollution load. Connectivity Project area is 0.5 km from SH-12, 0.5 km from SH-8 and 28 km from NH-60A 9

10 PROCESS DESCRIPTION CHAPTER-3 PROCESS DESCRIPTION M/s Bravo Sponge Iron Limited has an existing running unit producing Sponge Iron for sale for external consumption. The Project Proponent now proposes expansion of this unit to enhance the capacity of the unit by backward and forward integration. Project configuration and product mix has been given below. PROJECT CONFIGURATION SL NO FACILITY CONFIGURATION CAPACITY PRODUCT ENDUSE 1 DRI kiln 1x100 TPD 1x95 TPD Existing Expansion 62,400 TPD Sponge Iron Use in IF 2 DRI 2x100 TPD 64,000 TPD Sponge Iron Use in IF 3 IF 4x15 T 1,92,000 TPA Hot Metal Use in CCM 4 CCM Matching 1,90,000 TPA Billet Use in RM 5 Rolling Mill 600 TPD 1,90,000 TPA TMT Bar/ Rod 6(a) CPP WHRB 8 MW Power Internal Use 6(b) CPP AFBC 10 MW Power Internal Use Sale 10

11 FLOW SHEET Raw material requirement (Existing + Expansion) Sl.No Material Quantity in TPA Source 1 DRI Grade Iron Ore 85,508 Jharkhand/ Odisha 2 Lime stone / Dolomite 820 TPA Local purchase/ M.P 3 Coal(DRI) 78,500 TPA Eastern Coal Field 4 Coal(AFBC) 42,150 TPA Eastern Coal Field 5 Pig 22,500 TPA Local purchase 6 Scarp 12,000 Local purchase Power requirement for the unit inclusive of existing UNIT CONSUMPTION IN MW DRI 3.2 IF & CCM 9.0 Rolling mill 2.0 Power plant internal consumption 1.8 Lighting & Auxiliary 2.0 Total power requirement

12 Power requirement Captive power generation Power to be purchased MW MW Nil WATER REQUIREMENT (Existing+Proposed) UNIT TOTALMAKE UP m 3 /Day DRI 315 IF 120 ROLLING MILL 150 POWER PLANT(Air Cooled) 600 Drinking & Sanitation 30 Green Belt 20 TOTAL 1235 Water requirement for the proposed project comes to about. 1,235 m 3 /day. 12

13 CHAPTER-4 ENVIRONMENTAL MANAGEMENT PLAN Industries do pollute the environment. Nevertheless industrial growth has been receiving tremendous boost all over the world. Over 60-75% of the pollution in the world is related to industrial production and consumption of fossil fuel and the developed countries have the major share in it. The present global model of development for prosperity is directly linked to industrial growth and hence even the developing countries have to initiate industrial development for their progress, although most of them are lagging far behind the others. AIR ENVIRONMENT Sl. No Section/Unit Operation 1. Raw Material and scrap Handling Stock, crushing, screening, conveyor transfer & charging etc. 2 DRI kilns Reduction of 4 SMS (IF)& Billet casting Unit pellet/iron ore with lime and coal Melting of pig, hot metal, scrap & Ferro Alloys using O 2 & lime. Casting of refined liquid steel in moulds of billet 5 AFBC Generation of Steam from coal and waste heat from BF and Coke-oven Emission released waste generated Fugitive dust emission Particulate matter,co 2, SO 2 and NO X Water vapor Waste water containing iron scales, CO 2, Oil & grease from scrap. EOF and LF slag. TSP, CO 2, SO 2, NOx and generation of fly and bed ash Types of pollution Air pollution Noise pollution Heat & Air pollution Air, thermal, Water & soil pollution Air pollution Land pollution Pollution control measures Bag filter & 35m stack WHRB, ESP and high stack Water scrubber, settling pond, Fume extraction scrubber and Bag house with 55m stack Flue gas Lime scrubber, ESP & stack 13

14 Water environment Sl. No Section/Unit Operation Emission released waste generated Types of pollution Pollution control measures 1 SMS (IF)& Melting of pig, Water vapor Waste Water & soil Water Billet casting hot metal, scrap water containing pollution scrubber, Unit & Ferro Alloys iron scales, CO 2, settling pond, using O 2 & lime. Casting of refined Oil & grease from scrap. IF and LRF scrubber liquid steel in slag. moulds of billet 2. AFBC Generation of generation of fly Water & soil Ash settling Steam burning by coal, ash slurry pollution by leaching pond with impervious Dolchars for use bottom in Turbo generator SOLID WASTE AND ITS MANAGEMENT Solid waste in the form of dust, slag, scrap and ash will be generated from this Steel plant and shall pollute the environment unless managed properly. Following solid waste will be generated from the proposed project. Mitigation measure is given below. Solid waste Quantity in TPA Mitigation measure Char 41,280 TPA Use in AFBC IF Slag 33,500 TPA To be used in Land fill Fly Ash (WHRB) 38,105 Sold to Cement Plant & Brick Manufacturing Fly Ash (AFBC) 36,105 TPA Sold to Cement Plant & Brick Manufacturing Bottom Ash 5,687 TPA Cement Plant/ Land facilities Rain water Harvesting M/s Bravo Sponge Iron Pvt. Ltd will go for rain water harvesting from the project area to reduce consumption of fresh water make up and specially to meet lean season deficit of river water. The average annual rain fall of the project area is about 1445 mm=1.45m Total project area is19.69 acres=67,460.98m 2. Hence with 50% loss towards evaporation & percolation about 48,638.66m 3 of rain water can be harvested per annum and stored in Rain water harvesting pond. Rain water harvested can meet the plant requirement of about 40 days. 14

15 Greenbelt Green belt has already been developed in about 33% area of the total land and it has been developed all around the plant boundary and by the side on internal roads. This will serve as dust sink of the project and will not allow the excess sound level of project to go out. Local species of trees having good canopy area will be selected for developing green belt in consultation with forest department. NOISE POLLUTION MANAGEMENT The noise pollution management will be taken up in following manner By selecting low noise generating equipment, which would have below 85 db A at 1m distance. This is taken care at the equipment design stage. By isolating the noise unit from the working personnel s continuous exposure by providing acoustic aids for plant personnel. Use of PPE like ear muff etc. By administrative & safety measures, providing noise level monitoring, remedial measures, providing noise safety appliances. The noise impact on the surrounding environment during the construction phase will be within acceptable limits. The operation of high noise generating equipment shall be restricted during the night time. Various measures proposed to reduce noise pollution include reduction of noise at source, provision of acoustic lagging for the equipment and suction side silencers, selection of low noise equipment and isolation of noisy equipment. The plant personnel in noisy area will be provided with high noise reduction aid such as ear muffler & also the duration of exposure of the personnel will be limited as per the norms. Thick green belt development is planned for the attenuation of noise pollution and to maintain ambient noise quality within the statutory limit Carbon Credit Opportunities through CDM activities Carbon credit is a generic term to assign a value to a reduction or offset of greenhouse gas emissions, usually equivalent to one ton of carbon dioxide equivalent (CO2-e). The Waste heat from DRI Kiln shall be utilized for the generation of of electrical power through Waste Heat Recovery Boiler (WHRB). This power generation would have required Tons of coal per hour MW power generations from WHRB can save about 54,761 Tons per annum of coal burning as thus atmospheric emission of pollutants will be reduced. With a saving of these amounts of coal shall reduce the CO 2 emission. These activities shall make the company to eligible for availing carbon credit facilities. Cost towards Environment Management At least 4% of total project cost i.e. about 6.2 crores will be spent towards Environment pollution control with which ESP, Bag filter, Tailing pond and ash pond etc will be installed along with other plant machineries. 15

16 CHAPTER-5 ESTIMATATION OF PROJECT COST AND TIME SCHEDULE PROJECT COST DISTRIBUTION: Facilities Estimated Project Cost (LAKHS) Land & Site development Civil Buildings Structure Buildings Plant machinery & Electrical 12, Erection & installation Waste Heat cleaning System Miscellaneous Fixed Assets Contingencies Engineering & Consultancy Charges Working Capital Total Amount 15,634 Project schedule It is expected that after getting EC tenders will be floated for equipments and other activities and establishment and commissioning will be completed in 3yr of time. Employment opportunities For the proposed project activities skilled and unskilled manpower will be needed. This will temporarily increase the employment opportunity. Secondary jobs are also bound to be generated to provide day-to-day needs and services to the work force. This will also temporarily increase the demand for essential daily utilities in the local market. The manpower requirement for the proposed project will generate some permanent jobs and secondary jobs for the operation and maintenance of plant. This will increase direct / indirect employment opportunities and ancillary business development to some extent 16

17 for the local population. This phase is expected to create a beneficial impact on the local socio-economic environment. About 350 people will get direct employment in various grades. This figure includes employment in technical, operation, maintenance, finance, commercial, personnel and general administration. ESC (Enterprise Social Commitment) The company will utilize Rs.8 crores i.e.5% of total project cost of Rs 157 crores towards ESC activities, this fund shall be utilized over a period of 5 years of profitable production. The allocation of fund will be mainly based on public demand during Public Hearing and socio-economic study of the project area. The project has several beneficial impacts which will obviously improve the socioeconomic conditions of the locality. Those are mainly Improvement in infrastructure facilities Improved business opportunity Direct & indirect Employment opportunity Revenue generation to central & state government. Allocation of 5 % of the project cost towards the ESC When there will be and industry there will be some negative impact whatever small it may be due to implementation of pollution control system and management. When the same is superimposed with the project benefits that include employment, trade & business opportunity, infrastructure development, greenbelt development and peripheral development, which trickle down to lower strata of population the TIS (Total Impact Score) comes out to be positive indicating the clear acceptability of the project. 17

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

1.3 Properties of Coal

1.3 Properties of Coal 1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

John KW Hou, Ph.D. World- Wide Director, Industry Solutions Member of IBM Industry Academy IBM Corporation. José R. Favilla Jr

John KW Hou, Ph.D. World- Wide Director, Industry Solutions Member of IBM Industry Academy IBM Corporation. José R. Favilla Jr 1 A Big Data Approach to Optimize Energy Efficiency in the Steel Industry John KW Hou, Ph.D. Manager, IBM Center of Competence, Metals IBM Corporation José R. Favilla Jr World- Wide Director, Industry

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

(M/s. Sundaram Steels Pvt Ltd )

(M/s. Sundaram Steels Pvt Ltd ) EXECUTIVE SUMMARY For Expansion of existing DRI Kiln Plant from x90 TPD to 72,000 TPA (CC Billet) at B-7, Bokaro Industrial Area, Village Baldih, District Bokaro, Jharkhand (M/s. Sundaram Steels Pvt Ltd

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Iron and Steel Manufacturing

Iron and Steel Manufacturing Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron

More information

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements Introduction Objective: to estimate the CO2 emissions produced by road surface construction

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros: P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation

More information

Residential & Commercial Sectors Overview CLIMATE

Residential & Commercial Sectors Overview CLIMATE CLIMATE TECHBOOK Residential and Commercial Emissions in the United States Greenhouse gas (GHG) emissions data can be reported either by economic sector, which includes electric power generation as a separate

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting

Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting THE ROLE OF TECHNOLOGY & INNOVATION IN ENERGY SAVING AND CO2 REDUCTION IN INDIAN IRON & STEEL INDUSTRY Ministry Of Steel Government Of India Innovation For Cool Earth Forum (ICEF) 2 nd Annual Meeting 7-8

More information

Bioenergy. A sustainable energy source.

Bioenergy. A sustainable energy source. Bioenergy. A sustainable energy source. The natural energy cycle Skellefteå Kraft strongly believes that bioenergy will play an important role in future Swedish energy production. Its raw material consists

More information

ACTIVATED CARBON PLANT IN KERALA

ACTIVATED CARBON PLANT IN KERALA PROJECT PROFILE ON ACTIVATED CARBON PLANT IN KERALA Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR ACTIVATED CARBON PLANT INTRODUCTION Activated Carbon is the carbon produced

More information

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility

RECOVERING RESOURCES FOR ALL. Integra North Energy Recovery Facility RECOVERING RESOURCES FOR ALL Integra North Energy Recovery Facility Integra North Energy Recovery Facility (ERF) was the first of its kind to be built in Hampshire and one of the leading examples of best

More information

A clean energy solution from cradle to grave

A clean energy solution from cradle to grave Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

Optimizing DRI production using natural gas

Optimizing DRI production using natural gas Optimizing DRI production using natural gas The MIDREX Process - The world s most reliable CONTENTS 2 MIDREX NG - NATURAL GAS-BASED IRONMAKING 3 THE MIDREX REFORMER 5 BENEFITS OF THE MIDREX REFORMER 6

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question1 Read the following article from the Fremont Gazette and answer the questions that follow. (a) Identify and describe TWO water-related environmental

More information

This fact sheet provides an overview of options for managing solid

This fact sheet provides an overview of options for managing solid What Is Integrated Solid Waste Management? This fact sheet provides an overview of options for managing solid waste, identifies the important issues you should consider when planning for solid waste management,

More information

Carbon Footprint of CMC Hospital for 2013

Carbon Footprint of CMC Hospital for 2013 Carbon Footprint of CMC Hospital for 2013 Carbon footprint of CMC Hospital campus was estimated for the year 2011 and 2012 and the total CO2e emission was estimated at 15271.74 CO2e tons and 15456.61 CO2e

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

Hot billet charging saves millions of energy costs and helps to increase rolling mill productivity considerably.

Hot billet charging saves millions of energy costs and helps to increase rolling mill productivity considerably. Hot billet charging saves millions of energy costs and helps to increase rolling mill productivity considerably. Authors: Volker Preiß - Billet Yard Operation Manager BSW Sebastian Ritter Project Engineer

More information

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility

RECOVERING RESOURCES FOR ALL. Integra South East Energy Recovery Facility RECOVERING RESOURCES FOR ALL Integra South East Energy Recovery Facility Integra South East Energy Recovery Facility (ERF) is the third of its kind to be built in Hampshire and is a leading example of

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY

NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY NAS: A REFERENCE IN THE STAINLESS STEEL INDUSTRY Cristobal Fuentes CEO of NAS Investor and Analyst s Day London, 8 th November 2011 Table of Contents I. Company Overview II. Raw Materials III. Integrated

More information

SINTERING AND PELLETISATION OF INDIAN IRON ORES

SINTERING AND PELLETISATION OF INDIAN IRON ORES SINTERING AND PELLETISATION OF INDIAN IRON ORES By SURESH KUMAR* & T.M. SRINIVASAN** 1 * Vice President, Mineral Enterprises Limited, Bangalore ** Managing Director, FerroGreen Technologies Pvt. Ltd. Bangalore

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data

Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data 1. Introduction A worldwide movement to control global warming is under way. In 1997, the Kyoto Protocol became the world

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary

More information

M/s. D.S. Alloyd Pvt. Ltd.

M/s. D.S. Alloyd Pvt. Ltd. PRE-FEASIBILITY REPORT FOR PROPOSED MANUFACTURING OF MANGANESE OXIDE & EXPANSION OF VARIOUS FERRO ALLOYS AT C-235, MIDC BUTIBORI, DISTRICT NAGPUR, (M.S.) M/s. D.S. Alloyd Pvt. Ltd. EIA Consultant: Pollution

More information

Environmental Performance Data Calculation Standards

Environmental Performance Data Calculation Standards Environal Performance Data Calculation Standards Subject Period: April 1, 2012 March 31, 2013 Scope : Fujitsu and Fujitsu Group (For details, refer to the List of Companies Covered by the Report on Environal

More information

13.2.4 Aggregate Handling And Storage Piles. 13.2.4.1 General

13.2.4 Aggregate Handling And Storage Piles. 13.2.4.1 General 13.2.4 Aggregate Handling And Storage Piles 13.2.4.1 General Inherent in operations that use minerals in aggregate form is the maintenance of outdoor storage piles. Storage piles are usually left uncovered,

More information

How To Make Calcium Carbide

How To Make Calcium Carbide 11.4 Calcium Carbide Manufacturing 11.4.1 General Calcium carbide (CaC 2 ) is manufactured by heating a lime and carbon mixture to 2000 to 2100 C (3632 to 3812 F) in an electric arc furnace. At those temperatures,

More information

Recent Development of the Indian Cement Industry...

Recent Development of the Indian Cement Industry... Recent Development of the Indian Cement Industry... by R. Gupta, N. Muthuswami India is the largest Democracy in the World with a stable government representing the whole nation (now in the region of 1.21

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

This is Outokumpu Tornio Site

This is Outokumpu Tornio Site Investor visit, 7th October 2015 Hannu Hautala, SVP - Business Line Tornio This is Outokumpu Tornio Site October 7, 2015 1 October 7, 2015 2 We believe that all accidents are preventable. Our target is

More information

SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS

SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS SEATTLE STEAM COMPANY FREQUENTLY ASKED QUESTIONS What products/services does Seattle Steam provide? The company provides thermal energy (heat) produced at two central heating plants in downtown Seattle.

More information

Thermal & Biogas Production In Egypt. By Prof. Dr. Ahmed Abd El-Ati Ahmed Egypt - GBEP Focal Point

Thermal & Biogas Production In Egypt. By Prof. Dr. Ahmed Abd El-Ati Ahmed Egypt - GBEP Focal Point Thermal & Biogas Production In Egypt By Prof. Dr. Ahmed Abd El-Ati Ahmed Egypt - GBEP Focal Point Some Related Socioeconomic indicators : The total land area is 1 Million Km 2. 97 % of the total area is

More information

A Green Idea. Reclaiming Urban Wood Waste And Urban Forest Debris. For Fuel/Combustion & Renewable Energy

A Green Idea. Reclaiming Urban Wood Waste And Urban Forest Debris. For Fuel/Combustion & Renewable Energy A Green Idea Reclaiming Urban Wood Waste And Urban Forest Debris For Fuel/Combustion & Renewable Energy Presentation Edward Kalebich Chief Operating Officer Robbins Community Power Facility located Chicago

More information

Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011

Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011 Environmental Health and Safety Aspects in the Cement Industry Antonio Jose Cumbane (PhD) Maputo, 31 st May 2011 Content The Mozambique Cement Industry Cement manufacturing Environmental Health and Safety

More information

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Matti Rautanen Manager, External Networks, Power-wide R&D Tutkimuksella tulevaisuuteen- seminaari Kaukolämpöpäivät, Kuopio 29.8.2013

More information

Arecibo Resource Recovery Project

Arecibo Resource Recovery Project Arecibo Resource Recovery Project Energy Answers International, Inc., through its subsidiary, Energy Answers Arecibo, LLC, is developing a 77 MW Resource Recovery Project to generate renewable energy and

More information

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS RTP TM /ADVANCED CYCLE VS. COMBUSTION STEAM CYCLES OR WHY NOT SIMPLY COMBUST? For decades, the only commercial option available for the production

More information

Swallow Street recycling facts and figures in partnership with Bywaters

Swallow Street recycling facts and figures in partnership with Bywaters Regent Street Direct Swallow Street recycling facts and figures in partnership with Bywaters 2013 Swallow Street produced 76 tonnes of cardboard Mission Recycling Ltd: Paper and Cardboard Paper of all

More information

Post Graduate Diploma Program

Post Graduate Diploma Program Post Graduate Diploma Program in ENERGY MANAGEMENT and AUDIT JADAVPUR UNIVERSITY KOLKATA INDIA Table of Contents Aim and Scope of the Program Course Structure Course Content Faculties & Facilities Admission

More information

NATURAL GAS IN COMMERCIAL BUILDINGS

NATURAL GAS IN COMMERCIAL BUILDINGS OCTOBER 2012 TECHNOLOGY NATURAL GAS IN COMMERCIAL BUILDINGS Discussion Questions: 1. If natural gas promises lower operating costs, lower emissions, and greater efficiency over utility grid delivered electricity,

More information

Fact Sheet on China s energy sector and Danish solutions

Fact Sheet on China s energy sector and Danish solutions Fact Sheet on China s energy sector and Danish solutions 1. EXPANSION WITH RENEWABLE ENERGY: China focuses on a massive expansion with non fossil energy that is renewable energy and nuclear energy. The

More information

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

Putting a chill on global warming

Putting a chill on global warming Carbon capture and storage Putting a chill on global warming SABINE SULZER SULZER PUMPS MARKUS DUSS SULZER CHEMTECH Whenever fuel is burned, carbon dioxide (CO ) is emitted into the atmosphere. The subsequent

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Egypt & Climate Change

Egypt & Climate Change Egypt & Climate Change Eng. Ahmed El Gohary Advisor to the Egyptian Minister of Investment OECD - Paris April - 2010 1 Egypt Area : about 1.2 million km 2 Capital : Cairo Total population: about 84.5 millions

More information

The Global Ferrous Scrap Metal Markets

The Global Ferrous Scrap Metal Markets The Global Ferrous Scrap Metal Markets Joseph C. Pickard Chief Economist and Director of Commodities Institute of Scrap Recycling Industries, Inc. Platts 2 nd Annual Scrap Seminar March 11, 2013 Chicago,

More information

JSW ISPAT STEEL LIMITED

JSW ISPAT STEEL LIMITED 1.0 INTRODUCTION EXECUTIVE SUMMARY JSW Ispat Steel Limited (JSWISL) is contemplating to expand the integrated steel plant to 5.0 MTPA from existing 3.0 MTPA at Geetapuram, Dolvi in Raigad (MS). The existing

More information

12.5: Generating Current Electricity pg. 518

12.5: Generating Current Electricity pg. 518 12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical

More information

Assignment 8: Comparison of gasification, pyrolysis and combustion

Assignment 8: Comparison of gasification, pyrolysis and combustion AALTO UNIVERSITY SCHOOL OF CHEMICAL TECHNOLOGY KE-40.4120 Introduction to biorefineries and biofuels Assignment 8: Comparison of gasification, pyrolysis and combustion Aino Siirala 309141 Assignment submitted

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE ON MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR MODERN COLD STORAGE INTRODUCTION Cold Storage is a special kind of room, the temperature

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace Content 1. Technical overview cogeneration plant and heating network 2. Investment of the facility 3. Experiences

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

Statement of Lawrence W. Kavanagh Vice President, Environment and Technology American Iron and Steel Institute Washington, D.C.

Statement of Lawrence W. Kavanagh Vice President, Environment and Technology American Iron and Steel Institute Washington, D.C. Statement of Lawrence W. Kavanagh Vice President, Environment and Technology American Iron and Steel Institute Washington, D.C. Submitted for the Record Committee on Small Business U.S. House of Representatives

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal 19 Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal TAKAO HASHIMOTO *1 KOICHI SAKAMOTO *2 YOSHIKI YAMAGUCHI *3 KOJI OURA *4 KENICHI ARIMA *5 TAKESHI SUZUKI *6 Mitsubishi

More information

Data and Trends. Environmental protection and Safety

Data and Trends. Environmental protection and Safety Data and Trends Environmental protection and Safety 2006 EMS-GRIVORY Performance Polymers EMS-GRIVORY Extrusion Polymers EMS-GRILTECH EMS-PRIMID EMS-PATVAG EMS-SERVICES Data and Trends 2006 Protection

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable. MINI OIL MILL 1.0 INTRODUCTION Consumption of edible oils is increasing year after year and India imports large quantities every year. Different types of oilseeds are grown in the country like groundnuts,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 6 (Sep. - Oct. 2013), PP 25-29 Performance of the Boiler and To Improving the Boiler Efficiency

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery

More information

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden

Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden Södra Näs Vimmerby Energi AB Biomass District Heating Plant, Sweden Vimmerby Energi AB, a energy company owned by the municipality of Vimmerby. The company Vimmerby Energi AB is serving the municipality

More information

Air quality and biomass installations. A briefing for local authorities

Air quality and biomass installations. A briefing for local authorities Air quality and biomass installations A briefing for local authorities March 2011 Published by BioRegional Development Group BedZED Centre, 24 Helios Road, Wallington, Surrey SM6 7BZ. www.bioregional.com

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

University of Iowa Power Plant

University of Iowa Power Plant University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...

More information

Environment Situation in Timor-Leste

Environment Situation in Timor-Leste Environment Situation in Timor-Leste Historically; 1. East-Timor or Timor-Leste, the Portuguese name of the country. 2. It was colonialised by Portuguese 450 years and Occupied by Indonesian 24 years.

More information

Ecological Aspects of Oil Shale Processing

Ecological Aspects of Oil Shale Processing Abstract Ecological Aspects of Oil Shale Processing Y. Zhirjakov, Institute of Oil Shale Research Tallinn Technical University Tallinn, Estonia 26 th Oil Shale Symposium Oil shale belongs to lean and environmentally

More information

China s CO2 Emission Scenario Toward 2 degree global target. Jiang Kejun. Energy Research Institute, China

China s CO2 Emission Scenario Toward 2 degree global target. Jiang Kejun. Energy Research Institute, China China s CO2 Emission Scenario Toward 2 degree global target Jiang Kejun Energy Research Institute, China PUBLIC CONFERENCE Victoria University, Thursday 26 June, 214 1 ERI, China Framework of Integrated

More information

Well Positioned for the Future

Well Positioned for the Future Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments

More information

Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855

Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855 Quanzhou City Licheng Huangshi Machinery Co., Ltd - Garbage incineration Quanzhou city Licheng Huangshi Machinery Co., Ltd VANCOUVER ENVIRONMENTAL MACHINERY INVESTMENT LTD TEL:0086-595-22493855 0086-595-22413855

More information

Waste to Energy in Düsseldorf. for a clean city.

Waste to Energy in Düsseldorf. for a clean city. Waste to Energy in Düsseldorf for a clean city. Waste Management in Düsseldorf. Düsseldorf s public utilities company known as Stadtwerke Düsseldorf operates a waste to energy plant (WtE) that has been

More information

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based)

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) vill Gejamuda, tehsil & Dist-Raigarh, (Chattisgarh) CONTENTS 1.0 Introduction

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &