E18 Grimstad-Kristiansand Efficient Construction of 61 Bridges. Bridge Conference, Oslo, 10. November 2009 Carsten Lehmann

Size: px
Start display at page:

Download "E18 Grimstad-Kristiansand Efficient Construction of 61 Bridges. Bridge Conference, Oslo, 10. November 2009 Carsten Lehmann"

Transcription

1 E18 Grimstad-Kristiansand Efficient Construction of 61 Bridges Bridge Conference, Oslo, 10. November 2009 Carsten Lehmann

2 Contractual Organisation Concession Contract (PPP / OPS) Sundt AS Design & Construction Contract Seite 2

3 Scope of Works Roads: 38,5 km 4-lane Motorway E18 > 60km Side and Access Roads 11 Departures to Side Roads > 22 Deposits for Surplus Material 5 Deposits for Sulphuric Rock 2600 acre Tree-Cutting 5 Mio m³ Solid Rock to Explosives ton asphalt Seite 3

4 Scope of Works Tunnels: 7 Excavated Tunnels (Excavation by Blasting) 3 Drill & Blast Units Total Excavated Length: 12km Longest Tunnel: 2.200m m³ Blasted Rock Rock Bolts m³ Shotcrete m² Lining Elements Seite 4

5 Scope of Works Bridges and Structures: 61 Bridges 30 Concrete Structures 1 Cut & Cover Tunnel m³ Concrete to Reinforcement Steel 600to Prestressing Steel m² Formwork 28 Tower Cranes Seite 5

6 General Information Key Element of the Transport Corridor between Norway and the European Continent Largest Infrastructure Project in Norway Seite 6

7 Time Schedule 38,5 km 38 Months Seite 7

8 Bridge Construction Reddelskanalen und Tjore Bru 2x 4-span Prestressed Concrete Bridges 2x 3-span Concrete Bridges Bridge Length: Max. Pier Height: 115m and 38m 15m Seite 8

9 Bridge Construction Verven Bru 2x 5-span Prestressed Concrete Bridges Bridge Length: Max. Pier Height: 260m 55m Seite 9

10 Bridge Construction Kaldvell Bru 2 Composite Bridges with Steel Arch and Concrete Deck Bridge Length: Arch Span: 128m 93m Seite 10

11 Bridge Construction Bjellandsvad Bru 2 Prestessed Concrete Bridges Bridge Length: 400m Max. Height: 55m Seite 11

12 Bridge Construction Nottangen bro Prestressed Concrete Bridge Bridge Length: 220 m Max. Height: 20 m Seite 12

13 Work Preparation 1. Evaluation of Constraints Check contractual requirements, access to site, rig area, environment, traffic management 2. Classification of Bridges Standardization of bridges (Design), Classif. by bridge type, geometry and resources 3. Scheduling a. Detailed Bridge Schedules b. Fitting to Overall Schedule (consideration of bottlenecks and requirements from other trades) c. Grouping and Linking of Bridges d. Scheduling of Resources Cranes, scaffolding and formwork based on final work order e. Scheduling of Design just in time Seite 13

14 Evaluation of Constraints Contract SVV Handbooks, Norwegian Standard Traffic Management PPP Contract, Appendix A (Functional Description) PPP Contract, Appendix B (Technical Description) PPP Contract Technical Solutions Exceeding Scope Of Handbooks Technical Solutions Deviating from Handbooks Seite 14

15 Evaluation of Constraints Contract SVV Handbooks, Norwegian Standard Traffic Management PPP Contract, Appendix A (Functional Description) Technical Solutions Clarified in Design Approval Process, Technical Clarification with VD PPP Contract, Appendix B (Technical Description) Technical Solutions Determined in Design Process PPP Contract PPP Contract, Appendix H (Technical Specification) Technical Solutions Predetermined by Contract Seite 15

16 Evaluation of Constraints Contract Traffic Management Risdal Bridge Phase 0 Oct Traffic on existing E 18 In Construction Under Traffic Completed Seite 16

17 Evaluation of Constraints Contract Traffic Management Risdal Bridge Phase 1 Nov In Construction Under Traffic Completed Diversion Risdal Bridge Seite 17

18 Evaluation of Constraints Contract Traffic Management Risdal Bridge Phase 2 Dec Jan In Construction Under Traffic Completed Traffic on North side existing bridge E18 Widen the E 18 on the north side Risdal Bridge Local Road Build South side on new alignment Seite 18

19 Evaluation of Constraints Contract Traffic Management Risdal Bridge Phase 3 Jan Jun In Construction Under Traffic Completed Traffic on North side existing bridge E18 Widen the E 18 on the north side Risdal Bridge Local Road Build South side on new alignment Seite 19

20 Evaluation of Constraints Contract Traffic Management Risdal Bridge Phase 4 15 Jun Oct In Construction Under Traffic Completed Traffic on North side existing bridge E18 Widen the E 18 on the north side Risdal Bridge Local Road Build South side on new alignment Seite 20

21 Evaluation of Constraints Contract Traffic Management Risdal Bridge Final Situation In Construction Under Traffic Completed Seite 21

22 Classification of Bridges Bridge Type Bridge Geometry Site Resources Installation Total Along E18 Across E18 Outside E18 Type 1. Concrete slab bridge Concrete beam bridge Concrete box girder Concrete arch Steel arch w/conc. Slab Copy of existing Extension exiting Seite 22

23 Classification of Bridges Bridge Type Bridge Geometry Resources Similar cross section Similar length Similar Substructure Seite 23

24 Classification of Bridges Bridge Type Bridge Geometry Resources Due to the similarities of the bridge structures they could be built in a chain by using the same equipment: Formwork according cross section Scaffolding due to similar span length and height Crane with same requirements Same working team (supervisor and labour) Seite 24

25 Scheduling Detail Schedule Overall Check Grouping Resources Design Construction time approx. 5-6 month per bridge => a chain of 4 bridges is possible! Seite 25

26 Scheduling Detail Schedule Overall Check Grouping Risdal Bridge: Part of section 1 Handover July 2008 Bridge is part of traffic management => internal milestone for Finalization June 2007 => 1. bridge of the chain Resources Design Brønningsmyr Bridge: Part of section 5 Handover July 2009 Bridge is independant of any traffic => internal milestone for Finalization Dec 2007 => 3. or 4. bridge of the chain Langåsen bridge: Part of section 5 Handover July 2008 Old E18 has to be relocated before start Sep => Internal milestone for earliest start => 4. bridge of the chain Morholt bridge: Part of section 1 Handover July 2008 Bridge is independant of any traffic => Internal milestone March 2008 due to Handover => 2. bridge of the chain Seite 26

27 Scheduling Detail Schedule Overall Check Grouping Resources Design Risdal Morholt Use of same: Formwork according cross section Scaffolding due to similar span length and height Crane with same requirements Working team (supervisor and labour) Brønningsmyr Langåsen Seite 27

28 Scheduling Detail Schedule Overall Check Grouping Resources Design Seite 28

29 Scheduling Detail Schedule Overall Check Grouping Resources Design Remaining bridges are built independant due to the long construction period or their special design Seite 29

30 Scheduling Detail Schedule Overall Check Grouping Resources Design Add Schedule for e.g. use of scaffolds Seite 30

31 Scheduling Detail Schedule Overall Check Grouping Resources Design Add Schedule for e.g. use of scaffolds Seite 31

32 Scheduling Detail Schedule Overall Check Grouping Resources Design Due to the short preparation time between Contract Award and Start of Construction the design had to be done parallel to the construction - just in time The target was to have the final design available 3 months before the construction start of a bridge Strong link between construction schedule and design schedule! Advantages: + Time saved by parallel Design and Work Preparation + Generative feedback between parallel work preparation and design process improves the opportunities of value engineering + Experiences from construction progress can be considered in the ongoing design progress Seite 32

33 Construction Phase 1. Organisation - Organisation chart - Labour 2. Scheduling / Controlling - Update of detail schedules - Feedback to overall schedule - Update of the schedules 3. Interface Management - Delays - Mass transports Seite 33

34 on Jan To rka Jan Kor sgaar d B er nhard P awlitschko Natasja Smits Project Dir ector Contract Director Technical Director As sistant E 05/07 09/09 28 E 11/07 10/09 24 E 01/08 09/09 21 L 08/06 09/09 38 Admin.+Finance Department Liv Roeyneland Dagmar Lange Beate Snemyr Ass istant Adm in.+financ e M anager As sis tant L 01/07 10/09 34 E 11/07 05/10 31 L 08/06 05/10 46 Surv ey Contrac t Scheduling + Wor k Prep. PR M anagement Claim Management Design D epartment Design Contract Environment D epartment HSE Depar tment QA Department Final Documentation Department Controlling Department IT M anagement Carsten Lehmann Kyrre Lian Peter R edgrave Meike G ehrke Andres Zachlehner A nette Falkum M ar tin Schreck Naveed Hussain Michael Schütte Bertram Tantz Guntram Feder Ole K. Thomassen Sc heduling + Work Preparation PR M anager Claim Manager Survey Coordinator Des ign Manager As s is tant OpEnv. Manager QA-HSE M anager Project Controller IT Manager ITAdminis trator IT Adminis trator E 08/06 01/09 30 E 06/06 09/09 39 E 04/08 04/09 13 S 09/06 08/09 36 E 07/06 12/08 30 L 10/06 06/08 20 L 08/06 04/09 33 E 03/07 11/09 32 E 11/06 05/09 31 E 07/06 01/09 30 E 07/06 11/09 40 L 02/07 12/08 23 M aximilian Tr ommer Martin M agerl Lisa Kr istjandottir Lone Sørensen Katar zyna A lfsen Anne Gundersen Anja Sørensen Bertram Tantz Carola Hüge G rit Schütte Vibeke M agnussen Marie Sunnarvik NN Work Preparation Dep. Surv. C o./cad G en. DCC Design DCC Road and E&M Environmental Engineer HSE Engineer+Reporting Doc ument Control IT Work Estim ate Senior Ac countant Senior A cc ountant Junior Ac c ountant Ac countant E 08/07 01/09 17 S 09/06 08/09 36 L 08/06 06/08 22 L 07/07 06/08 12 L 09/07 12/08 16 L 12/06 11/09 36 L 12/06 06/08 19 E 08/06 09/09 38 E 08/06 11/09 40 E 09/06 08/09 36 L 09/06 01/09 28 E 05/08 01/09 9 Niels Roesgaard Nancy Koedderitz DC E18 Des ign JV Vera Stroth Geor ge Lessak Anke Str ich Anke Strich Elise Bjørneseth Erika Fr itsch Lucyna Arnvar d Pooja Sood Contrac t Adm inistration CAD Drainage and E& M Landsc ape Architec t Doc ument Control Adminis tration Reporting Pers onnel Adm inis tration PersonnelAdm inistration Pers onnel Adminis tration PersonnelAdm.As s. E 10/06 04/10 43 S 02/07 12/08 23 L 04/08 07/09 16 L 08/07 08/09 25 E 09/06 09/09 37 L 08/06 12/08 28 E 11/06 12/08 26 L 05/07 12/08 20 L 02/08 12/08 10 Steffen G iese Sven M ueller Tzu-Yun (Sonia) Huang Joanna Gucw a ElinA ndersson Elin Andersson Daniel M artens Christina Zeh NN Dan S ør ensen Contrac t Adm inistration CAD Road Des ign as -built /G eolog. Laboratory As s is tant Ass istant As sistant Proc urement Procurem ent Proc urement Procurem ent E 09/07 12/08 16 S 10/07 06/09 21 E 11/07 09/09 23 L 07/07 12/08 18 L 08/06 10/09 39 E 02/08 04/09 14 E 11/06 12/08 26 L 05/08 12/08 8 E 09/06 12/08 27 Markus Kemme Andreas Weidemann Sebastian Wollnik Inger M yrlund Thea van Gemerden CAD as -built CAD as -built CAD as -built Rec eptionis t Receptionis t S 04/08 08/09 17 S 02/08 07/08 5 E 02/08 09/09 19 L 07/07 01/09 19 L 11/07 03/08 4 André Martaler Elena Tscherkassow Lilian G onzales Michael Nowak Ivana Ondrackova Mirella Nowak Survey ing Unit as -built CAD as -built CAD as -built Offic e Ass istant Offic e As sis tant Offic e Ass istant S 03/08 08/09 17 S 04/08 07/08 4 L 03/08 09/09 19 L 08/06 09/09 37 L 08/07 12/08 16 L 11/07 12/08 14 Matthias Wals Surveying Unit Fixpoints S 01/08 05/09 17 Asphalt Section Karl Ludw ig K ley Har ald Weidinger Jürgen Mohs DC E18 Karin Mikkelsen Jeanette Birkholm Steffen Höppner SebastianG löckner Christian Lausch Construction M anager Coordinator Road Des ign Coord. Reg. 1 on request HSE Engineer QA Engineer Laboratory M anager Estimator Com mercialadmin. E 06/07 10/09 29 S 09/07 06/09 22 S 11/07 08/08 10 E 10/07 12/08 15 E 09/06 07/09 34 E 08/07 05/09 22 E 09/07 12/08 16 E 12/07 09/09 22 Thomas Süssmeier Kim Eriksen Oliver Kias Christoph Wagner Lars Kramper Ørjan Lerbak Jörg Neef F. N.-Farzian / S. Rand. Asphalt Prod.+Cons truc tion Site Engineer Supervisor As phalt Surv ey ing Unit Roads 1 Des ign Coord. Reg. 2 Quality Controller Laboratory Engineer EW Laboratory Eng. As phalt E 11/07 12/09 26 E 01/08 01/09 12 E 01/08 05/09 17 S 01/07 06/09 30 L 01/07 10/08 21 L 12/07 12/08 Road Fur niture Section M arkus Ecker t Wolfgang H artw ig Tarjei Ravn NN NN Jesper M agnussen Surveying Unit Roads 2 Design Coord. Reg. 3+4 Quality Controller Laboratory Technican EW Laboratory Eng. Asphalt Sec tion M anager / Team Leader S 01/08 06/09 18 S 11/07 08/08 10 L 08/07 09/08 14 E 05/08 12/08 8 L E 06/06 10/09 41 Uwe Warkentien Norbert Döberl Mariam Jamshed NN Ola Johansson Marco S tegert Sigbjørn B oye Jan Winnberg Bernd Lewandowski Surveying Unit Roads 3 Design Coordinator Document Handling Laboratory Ass. Asphalt Site Engineer Servic e Team Superv is or Service Team Sup. Natural Stone Wall Supervis or A sph. / Defor. Forem an S 09/07 06/08 9 E 02/08 10/08 9 L 10/07 12/08 15 L E 12/06 12/08 25 E 10/07 12/08 15 L 01/08 12/08 11 L 04/07 05/09 26 E 08/07 12/08 17 Michale Reinhart Dirk Fouquet Surveying Unit Roads 4 Traffic Management E S Peter Wagner Earthworks Section Surveying Unit Roads 5 Hagen Escher Sec tion M anager / Team Leader Rainer Kiessling Sven Helmich E 09/07 12/08 16 Geologist Surveying Unit Roads 6 JohannRiedl Meike Züllighoven S 11/07 08/08 10 S Supervis or Work Preparator E 08/07 08/09 25 E 09/07 12/08 15 Georg B inder Karl-Heinz Bielmeier Walter Noack ChristianNagl Heiko K raus Region ManagerSec t. 1 Site Engineer Site Engineer Site Engineer Supervis or Earthworks E 01/08 06/08 5 E 08/07 09/09 26 E 08/07 08/09 25 E 02/08 08/09 18 E 09/07 01/09 17 Sven Thomas Heiko Töpfer Oskar Kr enner Thomas Lorenz Ulrik Andersen Region ManagerSec t. 2 Site Engineer Supervisor Earthworks Foreman Tec hnic al Serv ic es E 06/07 02/09 21 E 09/07 01/09 17 E 08/07 01/09 18 E 08/07 12/08 17 E 03/08 12/08 10 M artin Häusler Jens Wedemann Uwe Dietz Wilfr ed Schmidt Bernt Wilhelmsen Region ManagerSec t. 3 Site Engineer Supervisor Earthworks Supervis or E arthwork s Supervis or Earthworks E 08/07 02/09 19 E 02/08 01/09 12 E 12/07 01/09 14 E 02/08 05/09 16 L 08/07 01/09 18 Sandro Winter Andreas Kämpfer Dirk Plock Klaus Langkow ski Jøl Arne Suggelia Region ManagerSec t. 4 Site Engineer Site Engineer Supervis or D rainage Supervis or Drainage E 07/07 09/09 27 L 08/07 08/09 25 E 11/07 08/09 21 E 07/07 08/09 26 L 08/07 12/08 16 Poul Wulff Udo Hilbert Plant Manager Site Eng. Asp./Plant Coord. E 02/08 05/09 15 E 01/08 07/09 19 Bettina Müller Uwe K rümmling Lutz Rublack Blast Control Assistant BlastMaster Blast Master L 03/08 12/08 10 E 08/07 12/08 17 E 08/07 12/08 17 Ole Morton Hogås Alexander M oser Torsten Jungtoft Blast Controller BlastController Blast Controler E 09/06 12/08 28 E 08/07 12/08 17 E 10/07 12/08 15 S Structure Section Niklas Vetter Marcel G roebel Jun WenZhu Diana John Ingolf Jensen Anders Häll Christian Ulrich Sec tion M anager / Team Leader on request Survey ing Unit Bridges Struc tural Engineer Environmental Engineer HSE Engineer QA Engineer Com mercialadmin. E 10/06 03/09 30 S 09/06 12/08 28 E 08/07 09/08 14 L 08/07 06/08 11 E 12/06 12/08 25 L 09/07 01/09 17 E 09/07 12/08 16 Kim Laursen NN G. Zehetm./C. Hagen DC E18 Knud Hegelund Gabi Lehmann Lutz N ietner M ario Friedr ich Form work Adminis tration Engineering Des ign Coordinator HSE Engineer QA Engineer Concrete Tec hnology Foreman Concrete R ep. E 02/08 09/08 8 E 04/08 01/09 10 E 10/07 08/08 11 L 11/07 01/09 15 E 01/08 01/09 13 M aren Ber gmann Peter Fr antz en Helmut Fercher Bo Steendahl Site Engineer Superv is or Supervisor Q A Engineer Concrete E 11/06 02/09 28 E 08/07 01/09 18 E 03/08 01/09 11 E Dar uosh M inooei Andreas Wendt M ichael A lburg Site Engineer Supervisor Supervisor S 06/07 02/09 21 E 04/07 04/08 13 E 03/08 01/09 11 M ario Per issutti Rolf Bitter Site Engineer Supervisor E 02/07 02/09 24 E 07/07 12/08 18 Andreas Weinhart Markus Schrieber Site Engineer Supervisor E 03/08 02/09 12 E 02/07 12/08 23 FabianLenz Erik G rønhøj Thorkild Larsen Site Engineer Supervisor Supervisor E 10/07 02/09 17 E 04/07 01/09 22 E 07/07 01/09 19 R.Pellegrini/G. Z ehetm. HermannSattlberger Hans-JuergenKr atz Site Engineer Supervisor Supervisor E 01/07 02/09 26 E 07/07 12/08 18 E 01/07 12/08 24 Silvio Kassin Peter Heller Torsten Henschel Site Engineer Supervisor Supervisor E 12/07 01/09 14 E 05/07 09/08 17 E 10/06 12/08 27 Dieter Herbert Hans Saxler Rudolf H alubek Site Engineer Supervisor Supervisor E 09/07 01/09 17 E 12/07 10/08 11 E 10/06 12/08 27 M artin Rogenhofer Werner Schw ingel Benny Nielsen Site Engineer Supervisor Supervisor E 09/07 02/09 17 E 08/06 01/09 30 E 05/07 07/08 14 ErichM ehring Bronilsaw Bur dz y JanZielinski Yard Manager Storekeeper Storekeeper E 09/07 12/08 16 S 12/07 11/08 12 S 01/08 11/08 11 ChristianSchmidt Uwe H lawatsch Surveying Unit Bridges Machine maint./conc.rep. E 10/06 12/08 26 S 09/07 12/08 16 Tunnel Section A ndreas Reinisch Stefan Degelmann Dirk Niemann Ulrich Ziemann DC E18 M ichael G rausen Siegfried Fleissner Sec tion M anager / Team Leader Chief Geologist Survey ing Unit Tunnel 1 Des ign Coordinator on request HSE Engineer QA Engineer on reques t on reques t E 08/06 03/09 32 E 07/06 04/09 33 S 02/08 11/08 10 E 10/06 07/08 21 E 09/06 03/09 31 S 11/06 04/09 30 Andre Pas Sven Knappe Erw inpartoll Anke Degelmann Silvio Wilke Site Engineer Tunnel Superv is or Tunnel Supervisor Tunnel/Lining Geologis t Survey ing Unit Tunnel 2 E 09/06 10/08 26 E 12/06 10/08 23 E 06/07 03/09 21 L 01/07 04/09 28 S Car stenrosskamp Alois Himpler M ax Fastenmeier Erich Podaber Huber tkalhammer Marcus Zibell Site Eng. Lining/Portals Superv is or Lining Supervisor Portals Supervis or P ortals Geologis t Survey ing Unit Tunnel 3 E 08/06 03/09 31 E 06/07 08/08 15 E 10/07 06/08 9 E 02/08 03/09 13 S 01/08 04/08 4 S Slobodan Martinovic Technical Site Services E Christiane Mögele Geologist L E + M Section Stefan Konetschny Knut Henningsen DC E18 Knud Hegelund NN Sec tion M anager / Team Leader on reques t Des ign Coordinator HSE Engineer QA Engineer on reques t on reques t E 07/06 10/09 39 E 08/07 06/09 23 E KnutHenningsen Sen. Elec tric alengineer E 07/07 05/09 01/08 02/ /07 09/09 28 NN Elec tric al Engineer E 05/08 07/09 15 NN Torsten Jonas Alois Lang Not shown: Trainees E + M Coordinator Superv is or Supervisor E 04/08 09/09 18 E 02/08 07/09 17 E 10/07 07/ /08 09/ /08 11/ /08 04/08 06/ /07 06/08 03/08 03/09 06/ /08 08/ /07 01/ /08 06/09 05/08 06/ Status : Organisation Construction Manager for Interfaces Support team on site: - Logistic: Coordination of formwork, crane, scaffolding, equipment - Survey - Contractual Tea m Roa d - Design Management - Quality (incl. own repair team) - HSE - Environment Section Manager for Structures Tea m Struc ture Construction teams on site: - to construct 61 bridges and 18 culverts - CJV implemented 15 teams with 0,5-1 site engineer, 1 supervisor (and 1 forman) Bridge Section - all employees of CJV Tea m Tunne l additional: - up to 3 Subcontractors for labour teams (more than 300 labour for bridges parallel on site) Tea m E + M Seite 34

35 Scheduling / Controlling Progress Reports: 1. Biweekly detail schedules submitted by Site Engineer Seite 35

36 Scheduling / Controlling Progress Reports: 1. Biweekly detail schedules submitted by Site Engineer 2. Main figures => monthly concrete comparison with forecast Seite 36

37 Scheduling / Controlling Progress Reports: 1. Biweekly detail schedules submitted by Site Engineer 2. Main figures => monthly concrete comparison with forecast Update of Schedules 1. Monthly update of detail bridge schedules and overall bridge schedule 2. Monthly recheck of interfaces with Earth-, Road-, Tunnel- and E&M works 3. Update overall schedule Seite 37

38 Interface Management Interfaces with time consequences for bridges: Traffic Management 1. Changes to the original concepts due to local restrictions Earthworks Bridges 1. Delays in accessability 2. Delays in finishing of blasting around the bridges (safety distance) 3. Soil conditions are different and result in changes of the foundation concept 4. Bridges needed for logistic (mass haulage) Tunnel Earthwork - Bridges 1. Tunnel precut and bridge are close together with difficult coordination of the work => Changes in Schedule! Seite 38

39 Interface Management Seite 39

40 Conclusions Efficient Construction of 61 Bridges Preparation 1.Evaluation of constraints 2.Standardization of bridges 3.Detailed work preparation On site 1.Organisation with key personell on site (including design) 2.Controlling of progress and identification of obstruction asap. 3.Check the interfaces to third parties and identify new interfaces 4.Contemporary update of the complete schedule Seite 40

41 E18 Grimstad-Kristiansand Efficient Construction of 61 Bridges Bridge Conference, Oslo, 10. November 2009 Carsten Lehmann

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

GLOBAL ORGANISATIONAL STRUCTURE

GLOBAL ORGANISATIONAL STRUCTURE GLOBAL ORGANISATIONAL STRUCTURE President, CEO Sten Kjelstrup Executive, CFO Secretary to the Management Jeanette Dyekjær Product Development Henning Jørgensen Executive Vice President, CFO Global Finance,

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million

More information

Coastal Highway Route E39 Project

Coastal Highway Route E39 Project Coastal Highway Route E39 Project Teknologidagene 22th September 2015 Trondheim Kjartan J Hove/ Jørn Arve Hasselø/ Harald I. Johnsen Norwegian Public Roads Administration Coastal Highway Route E39 E39

More information

GLOBAL ORGANISATIONAL STRUCTURE

GLOBAL ORGANISATIONAL STRUCTURE GLOBAL ORGANISATIONAL STRUCTURE President, CEO Sten Kjelstrup Secretary to the Management Jeanette Dyekjær President, CEO HR Sten Kjelstrup Vice President Product Development & Technical Service Henning

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

The Follo Line Project

The Follo Line Project The Follo Line Project Longest. UrbAN. Complex. Faster. 2015/1 Norwegian National Rail Administration the follo line project 1 2 the follo line project The project The Follo Line Project is currently the

More information

Danske Bank s organisation 2013

Danske Bank s organisation 2013 Danske Bank s organisation 2013 CEO Thomas F. Borgen Chairman of the Executive Board Personal Banking Tonny Thierry Andersen* Banking Lars Mørch* Corporates & Institutions Thomas F. Borgen* Group Risk

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Forensic engineering of a bored pile wall

Forensic engineering of a bored pile wall NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Forensic engineering of a bored pile wall Willem Robert de Bruin Geovita AS, Norway,

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Protecting IP Assets Worldwide Material Science & Technology 2004

Protecting IP Assets Worldwide Material Science & Technology 2004 Protecting IP Assets Worldwide Material Science & Technology 2004 Norbert Hansen Korbinian Kopf September 26-29, 2004 New Orleans, Louisiana Page 1 Protecting IP Assets Worldwide National Patent Protection

More information

How To Run A Power Station In Danesborg

How To Run A Power Station In Danesborg Presentation of Energinet.dk April 2008 1 Presentation of Energinet.dk Agenda 10:00 12:00 Welcome and presentation of Energinet.dk /Peter Jørgensen Wind integration - challenges /Antje Orths R&D in environment-friendly

More information

Rogaland på Børs August 30 th 2010

Rogaland på Børs August 30 th 2010 BADGER EXPLORER ASA Rig-less Exploration - A Game Changer Rogaland på Børs August 30 th 2010 Kjell Erik Drevdal, CEO, ked@bxpl.com, +47 916 43 552 www.bxpl.com 1 Badger Explorer ASAs History Company established

More information

Member Nation Report 2010 from Denmark.

Member Nation Report 2010 from Denmark. Member Nation Report 2010 from Denmark. The has during the year 2010 arranged 6 member meetings including two technical site visits. The first technical site visit covered the 5.3 km long Leipzig City

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 Agenda Introduction G.A. & F.C. Wagman History Process used to prepare 3D models Estimating

More information

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs - Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

Final Results SDC 8 - Köpenhamn 2013-08-25

Final Results SDC 8 - Köpenhamn 2013-08-25 Final Results SDC 8 - Köpenhamn 2013-08-25 Results for SDC 8 - Köpenhamn OPEN results MATCH MATCH REG 1 100.00 642.6230 13. Carsten Samuelsen +Open - U DNK sonos 2 96.96 623.0713 64. Pär Hylander +Open

More information

The Task. for. PERI Construction-Exercise 2003

The Task. for. PERI Construction-Exercise 2003 The Task for PERI Construction-Exercise 2003 Entitled to participate all educational institutions for civil engineering and construction management. The work must be based on the outlined project and can

More information

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED

More information

Software Quality and Software Testing in Internet Times

Software Quality and Software Testing in Internet Times Dirk Meyerhoff, Begona Laibarra, Rob van der Pouw Kraan, Alan Wallet (Eds.) Software Quality and Software Testing in Internet Times With Contributions of Stale Amland, Walter Bischofberger, Arnim Buch,

More information

situation and funding volume

situation and funding volume Beilstein-Institut FACTS AND FIGURES 77 Funding Report 2009 2013 FACTS AND FIGURES Financial situation and funding volume The asset management of the Beilstein-Institut is focused on capital preservation

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 Mainroad 4 Järvenpää Lahti PPP Project 1997 2012 FINLAND 27.5.2013 27.5.2013 Seppo Mäkinen Mainroad 4 Järvenpää -

More information

M.S. in Civil Engineering

M.S. in Civil Engineering M.S. in Civil Engineering M.S. in Civil Engineering Degree Requirements Students who do not have a bachelor's degree in civil engineering, but who want to obtain a master's degree in civil engineering

More information

FULL YEAR 2014 TOTAL STEEL IMPORTS UP 38% FROM 2013 Finished Steel Import Market Share 30% in December

FULL YEAR 2014 TOTAL STEEL IMPORTS UP 38% FROM 2013 Finished Steel Import Market Share 30% in December News Release FOR IMMEDIATE RELEASE January 27, 2015 CONTACT Lisa Harrison 202.452.7115/ lharrison@steel.org FULL YEAR 2014 TOTAL STEEL IMPORTS UP 38% FROM 2013 Finished Steel Import Market Share 30% in

More information

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr. Civil Engineer Public Power Corporation, Greece Public Power Corporation

More information

Geologist 2 Bachelor (B.Sc.) Geology Driver s Cl. 5 4 to 6 years. Professional/Vocational (DEP)

Geologist 2 Bachelor (B.Sc.) Geology Driver s Cl. 5 4 to 6 years. Professional/Vocational (DEP) Transportation to Chibougamau (potentially sub-contracted) Truck Driver n/d Trucking Driver's Cl. 1 1 to years Mining Engineering Mine Superintendent 1 Bachelor (B.Sc.) Mine Engineering Mining Engineer

More information

Final Results SDC 4 - Växjö 2013-06-30

Final Results SDC 4 - Växjö 2013-06-30 Final Results SDC 4 - Växjö 2013-06-30 Results for SDC 4 - Växjö OPEN results MATCH MATCH REG 1 100.00 575.6464 78. Robert Kunst +Open - U SWE bangatbeep 2 99.27 571.4647 85. Mattias Gustafsson -Open -

More information

Entreprenørdagen 14. mars 2011

Entreprenørdagen 14. mars 2011 Entreprenørdagen 14. mars 2011 Program 1130 1200 Velkommen og litt å bite i Dagsorden 1200 Info om Fellesprosjektet v/ PL Taale Stensbye 1230 Entreprisene v/ Byggelederne 1330 Kontrakter/anleggsbetingelser

More information

BASICS OF SCHEDULING

BASICS OF SCHEDULING Performance:SlideS01.doc BASICS OF SCHEDULING ( planning accomplishment management ) temporary dust road monolithic R.C.wall drain body new embankment (widening) old embankment topsoil loadbearing subsoil

More information

Slab Track Austria. System ÖBB-PORR elastically supported slab

Slab Track Austria. System ÖBB-PORR elastically supported slab Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.

More information

1.0 Examples on common security provisions/common welfare provisions

1.0 Examples on common security provisions/common welfare provisions 1.0 Examples on common security provisions/common welfare provisions Demands for quality Who Period A. Traffic areas on the site 1. Access roads to the site For heavy traffic from the machinery Main contractor

More information

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

SECOND PENANG BRIDGE PROJECT

SECOND PENANG BRIDGE PROJECT INTRODUCTION PROJECT PARTICULARS Jambatan Kedua (JKSB), a wholly-owned company of the Minister of Finance, Incorporated (MoF Inc.) was appointed as the concessionaire for the Second Penang Bridge Project

More information

Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden

Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden Transportudvalget 2013-14 TRU Alm.del endeligt svar på spørgsmål 192 Offentligt Surveillance Report Package / Item: Bascule span to the Railway bridge Jernbanebroen over Limfjorden Supplier: Purpose of

More information

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled

More information

Services and their Composition

Services and their Composition Andreas Schönberger, Oliver Kopp, Niels Lohmann (eds.) Services and their Composition 4th Central European Workshop on Services and their Composition 4. Zentral-europäischer Workshop über Services und

More information

A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru

A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru International Timber Bridge Conference Lillehammer, Norway September 12-15, 2010 A new 4-lane Mjoesbridge built in timber? In Norwegian : Mjøsbru A summary of a workshop study Presented by : Ove Solheim

More information

INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2

INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2 INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2 Hyun Cho 1, Ki Hwan Lee 1, Song Hyon Lee 1, Ta Lee 1, Hyun Jun Cho 1, Sung Hoon Kim 2 and

More information

Hitachi s Involvement in Nuclear Power Plant Construction in Japan

Hitachi s Involvement in Nuclear Power Plant Construction in Japan Hitachi s Involvement in Nuclear Power Plant Construction in Japan 48 Hitachi s Involvement in Nuclear Power Plant Construction in Japan Naoki Kajiyama Kenji Hamamura Koichi Murayama OVERVIEW: To protect

More information

Construction of precast reinforced concrete structures. Prefabricated reinforced concrete construction:

Construction of precast reinforced concrete structures. Prefabricated reinforced concrete construction: Construction of precast reinforced concrete structures István VidovszkyPhD definition 2 Prefabricated reinforced concrete construction: Construction of RC components of buildings, the majority of which

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Virginia Approach Spans

Virginia Approach Spans Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel

More information

PRELIMINARY STEEL IMPORTS INCREASE 17% IN JANUARY Import Market Share 32% in January

PRELIMINARY STEEL IMPORTS INCREASE 17% IN JANUARY Import Market Share 32% in January News Release FOR IMMEDIATE RELEASE February 25, 2015 CONTACT: Lisa Harrison 202.452.7115/ lharrison@steel.org PRELIMINARY STEEL IMPORTS INCREASE 17% IN JANUARY Import Market Share 32% in January Washington,

More information

Quality Management Manual

Quality Management Manual Seite 1 von 21 Quality Management Manual SECTOR Cert Gesellschaft für Zertifizierung mbh This document is a copy of the approved original document and applies within the frame of a controlled distribution

More information

HONG KONG ZHUHAI MACAO LINK

HONG KONG ZHUHAI MACAO LINK Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 1485 1492 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction HONG KONG ZHUHAI MACAO LINK N.HUSSAIN

More information

CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions

CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions CROSSING THE OSLOFJORD - AN EARLY STRATEGIC ANALYSIS - Technical challenges and consideration of Feasible solutions Ove Solheim MSc - Norwegian Public Roads Administration ABSTRACT Feasibility studies

More information

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL

HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone

More information

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental

More information

Qualification Round. aps/place/totlandsvegen. .3146935,5.3736578,17z 9 Jan 2016. /data=!3m1!4b1!4m2!3m 1!1s0x463cf9b4d025cec

Qualification Round. aps/place/totlandsvegen. .3146935,5.3736578,17z 9 Jan 2016. /data=!3m1!4b1!4m2!3m 1!1s0x463cf9b4d025cec +53,+5224+Nesttun/@60Tradisjonell 5 12A LAUKELAND Marius Johansen FØRDE FØRDE BOGESKYTTARKLUBB 23 Oct 2004 Page 1/13 +53,+5224+Nesttun/@60Recurve 5 11A TØSDAL Karl-Ludvik FANA FANA BUESKYTTERKLUBB 22 Jun

More information

Application Form - Contracting Firm

Application Form - Contracting Firm Application Form - Contracting Firm This form is for civil construction and general contracting companies to apply for membership of Civil Contractors New Zealand Company s details CCNZ Branch you want

More information

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW 2005 New York City Bridge Conference September 12-13, 2005 REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW The Novoarbatsky Bridge across the Moskva River had been built in 1957 Plan of the bridge Steel

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

The Construction of a New Roskilde Fjord Link. Information Meeting October 30th 2014 13.00-16.00 Park Inn Hotel, Copenhagen S

The Construction of a New Roskilde Fjord Link. Information Meeting October 30th 2014 13.00-16.00 Park Inn Hotel, Copenhagen S The Construction of a New Roskilde Fjord Link Information Meeting October 30th 2014 13.00-16.00 Park Inn Hotel, Copenhagen S Agenda Welcome Jens Jørgen Holmboe, Construction & Maintenance Director Background

More information

1,045 m length of the Deh Cho Bridge

1,045 m length of the Deh Cho Bridge Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it

More information

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA LOAD TESTING OF SOME NEW BRIDGES IN LATVIA Edmunds Akimovs, Civ.Eng., Bridge Engineer, Consulting Company Inzenierbuve, Address: Azenes st. 20, Riga, LV1048, Latvia. E-mail: eakimovs@inzenierbuve.lv Ainars

More information

Quality Control and Quality Assurance Guide

Quality Control and Quality Assurance Guide Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...

More information

Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets

Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets January 2011 Edition All rights reserved. No part of this publication

More information

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering

Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering Construction Management Thesis Requirements: Fall 2008 Department of Architectural Engineering AE 481W: Senior Thesis Faculty Consultants Michael Horman, Ph.D. (Spring Only) 211 Engineering Unit A 863

More information

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width

Numerical Analysis of the Moving Formwork Bracket Stress during Construction of a Curved Continuous Box Girder Bridge with Variable Width Modern Applied Science; Vol. 9, No. 6; 2015 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Numerical Analysis of the Moving Formwork Bracket Stress during Construction

More information

THEMATIC REVIEW ON ADULT LEARNING

THEMATIC REVIEW ON ADULT LEARNING THEMATIC REVIEW ON ADULT LEARNING DENMARK Visit of 7-14 November 2000 PROGRAMME AND PARTICIPANTS Monday 6 November Copenhagen Location: Uddannelsesstyrelsen (Education Authority) 15:00-17:00 Meeting with

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

QUALIFICATION DETAILS

QUALIFICATION DETAILS Qualification Title QUALIFICATION DETAILS New Zealand Certificate in Rigging (Level 4) with optional strands in Construction Rigging and Telecommunications Rigging Version 1 Qualification type Certificate

More information

Introduction. Eurocodes. Specification. Cost

Introduction. Eurocodes. Specification. Cost Introduction Eurocodes Specification Cost Structural Eurocodes BS EN 1990 (EC0): BS EN 1991 (EC1): Basis of structural design Actions on Structures BS EN 1992 (EC2): BS EN 1993 (EC3): BS EN 1994 (EC4):

More information

TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company

TBMs for Norwegian Hydropower projects. Sindre Log The Robbins Company TBMs for Norwegian Hydropower projects Sindre Log The Robbins Company Who am I? Sindre Log M.Sc. Civil engineering, NTNU Specializations in tunneling, geology and Project management Working out of Oslo,

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Asset Management Policy for Major PFI Projects

Asset Management Policy for Major PFI Projects Asset Management Policy for Major PFI Projects Agenda Asset Management Drivers Typical AM positioning in Motorway PFI Asset management Strategy Works Planning and Scheduling Innovation & Risk Mitigation

More information

Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014

Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014 Maliakos Kleidi Project Construction & Challenges faced Presentation to ELAC 2014 Dimosthenis Papakrivopoulos, Civil Engineer, Deputy Project Director of MKCJV 09.05.2014 Index Introduction The Project

More information

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects Contents The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects September 2014 Japan International Cooperation Agency (JICA) i Contents ii Contents The Guidance for the

More information

Global Logistics Management

Global Logistics Management Global Logistics Management Sustainability, Quality, Risks Edited by Wolfgang Kersten, Thorsten Blecker, and Heike Flämig With Contributions by Adel Al-Mansi, Hatem Aldarrat, Dagoberto Alves de Almeida,

More information

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source.

Business Unit. Tunnelling & Civil Engineering. Infrastructure solutions from a single source. Business Unit Tunnelling & Civil Engineering Infrastructure solutions from a single source. 6 14 20 4 Innovative solutions on a sound basis 6 Tunnelling Setting new standards Transportation tunnels Power

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China

Field Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

BIM course Infrastructure Project

BIM course Infrastructure Project BIM course Infrastructure Project Manu Marttinen Site Manager NCC Roads Oy Date NCC Roads Oy 1 Contents 1. Housing Projects vs. Infrastructure Projects 2. Different assigments and roles in construction

More information

Norwegian Public Roads Administration. Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH

Norwegian Public Roads Administration. Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH Norwegian Public Roads Administration Photo: Håkon Matre HARDANGER BRIDGE INFORMATION ENGLISH Golden Gate 1937 - Norwegian parliament 2006 It s 1937: The longest suspension bridge in the world, the Golden

More information

Reinforced Concrete Slab Design Using the Empirical Method

Reinforced Concrete Slab Design Using the Empirical Method Reinforced Concrete Slab Design Using the Empirical Method BridgeSight Solutions for the AASHTO LRFD Bridge Design Specifications BridgeSight Software TM Creators of effective and reliable solutions for

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Analysis II Façade Redesign: Architectural Precast Panels

Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed

More information

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège First 14-storey wood building in the world at Bergen in Norway R. B. Abrahamsen 1 First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen

More information

Lectures taught in English at HFU last update March 2012

Lectures taught in English at HFU last update March 2012 Lectures taught in English at HFU last update March 2012 Bachelor Level SS = Summer Semester (Mid-March to July) WS = Winter Semester (October to February) Campus Furtwangen SS WS 1 Faculty of Computer

More information

BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE. 1. Introduction. Mario Klanfar*, Darko Vrkljan*

BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE. 1. Introduction. Mario Klanfar*, Darko Vrkljan* AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Mario Klanfar*, Darko Vrkljan* BENEFITS OF USING MOBILE CRUSHING AND SCREENING PLANTS IN QUARRYING CRUSHED STONE 1. Introduction Mobile crushers

More information

Multi-Modal Logistics Hub (MMLH) in Yanbu

Multi-Modal Logistics Hub (MMLH) in Yanbu Multi-Modal Logistics Hub (MMLH) in Yanbu 2nd RCYCI Forum program 5 January 2016 Agenda Multi-Modal Logistics Hub (MMLH) study outcome in 2014 Education and employment requirements in MMLH Current status

More information

Update on Construction Output Statistics

Update on Construction Output Statistics Update on Construction Output Statistics Kate Davies Expenditure, Household and Economic Statistics Division Kat Pegler Prices Division 1. Introduction This article describes the interim solution for construction

More information

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design. A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed

More information

How To Manage The County Of Simcoe'S Infrastructure

How To Manage The County Of Simcoe'S Infrastructure Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset

More information

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule 763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule Description: This work shall reflect a Contractor s anticipated work plan for constructing the project using a Critical Path Method Project

More information

Conceptual Cost Estimate of Road Construction Projects in Saudi Arabia

Conceptual Cost Estimate of Road Construction Projects in Saudi Arabia Jordan Journal of Civil Engineering, Volume 7, No. 3, 2013 Conceptual Cost Estimate of Road Construction Projects in Saudi Arabia Assistant Professor, Civil Engineering Department, Hail University, Hail,

More information

CROSS-BORDER INVESTMENTS WITH GERMANY- TAX, LEGAL AND ACCOUNTING

CROSS-BORDER INVESTMENTS WITH GERMANY- TAX, LEGAL AND ACCOUNTING CROSS-BORDER INVESTMENTS WITH GERMANY- TAX, LEGAL AND ACCOUNTING In Honour of Detlev J. Plltz Published by the Partners of Flick Gocke Schaumburg Editorial Team: Prof. Dr. Thomas Rödder, Dr. Jochen Bahns

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009. Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing

More information