1 SPECIFICATION FOR MILD STEEL PIPE SPECIFICATION SAJH PS / MS / 001 (Rev.4.0 / ) QUALITY ASSURANCE DEPARTMENT SAJ HOLDING SDN. BHD.

2 SAJH SPECIFICATIONS FOR MILD STEEL PIPE Contents Page Contents General Material Process of Manufacturing Thickness and Diameter Lengths Work Test Surface Preparation Bitumen Enamel Wrapping Coating Internal Lining Unwrapped Pipes Pipe Ends Specials Samples and Test Samples Packing Test Certificates Markings Pre delivery inspection Certification Schedule of Stores

3 SAJH SPECIFICATION FOR MILD STEEL PIPES 1.0 General 1.1 The specification is applicable to Mild Steel pipes for water supply systems and shall conform to BS 534:1990 and BS 3601: These specifications will provide necessary information on the product dimension and requirements for the supply of pipes. 1.3 For flange, refer to BS 4504 Section PN Material 2.1 The steel used shall be made from carbon steel plate to BS 3601: The steel shall show on ladle analysis the composition as given in Table 2 of BS 3601:1987 for the steel grade specified. 2.3 Product analysis is required for each batch produced and shall be part of document during delivery. The permitted deviations for such analysis will be as in Table 3 of BS 3601: Process of Manufacture 3.1 The tubes shall be manufactured by either longitudinal welding internally and externally or, spiral seam formed around the circumference of the pipe. 3.2 Method of welding will be either by: Electric Resistance Weld (ERW) of Steel Grade 430 manufactured from hot or cold flat rolled strip, longitudinally welded continuously by the passage of an electric current across the abutting edges or along the edges; or Submerged Arc Weld (SAW) of Steel Grade 430 manufactured from plate, sheet or strip with either single or double longitudinal seam or spiral seam and welded across the abutting edges by an automatic submerged arc welding process using at least two runs, one of which shall be on the inside of the tubes. The tubes shall be welded, hot finished or cold finished. 3

4 3.3 Repairs to weld seam is allowed and the manufacturer shall have the option of using Ultrasonic or other suitable non destructive testing method of the weld areas or at least 10% of each diameter and thickness manufactured at a place chosen by the manufacturer. 3.4 Concession will be given for pipes made with 6 mm or less thick plates to be longitudinally welded with one deep penetration weld form the external face only but this concession will be immediately withdrawn if evidence shows that penetration was incomplete. 3.5 The weld metal shall have a smooth finish and shall not stand more than 1.5 mm above of the pipe shell internally or externally. 3.6 The weld metal on the external surfaces of the ends of all plain ended pipes shall be machined flush with the external surfaces of the pipes shell for a sufficient distance of facilitate jointing with couplings. 4.0 Thickness And Diameter 4.1 Thickness of steel pipe shells and the finished internal diameter of the pipes shall be as Table A on page The outside diameter of pipes shall be within a tolerance of ± 1%, except for pipe ends and sized pipes which shall be truly circular within a tolerance ± 1.6 mm. 5.0 Lengths 5.1 Standard length for straight pipes of nominal diameters 450 mm and above shall be 9 mm and standard length for straight pipe of nominal diameters less than 450 mm shall be 6 meters. 5.2 The maximum variation in length from the standard length shall be kept to the minimum possible within the normal method of manufacture. 6.0 Work Test 6.1 The contractor shall carry out hydraulic tests on all pipes before they are lines or coated or use for making specials. 6.2 The hydraulic test pressure shall be carried our in accordance with the requirements as specified in BS

5 6.3 As control for weld quality, the Supplier shall be required to submit radiographs of the 3% of all welds for the approval of the Superintending Officer. The Superintending Officer will advise the Contractor where requires the radiographs to be taken. The minimum lengths of weld to be radio graphed at any one location shall be 300 mm. The clearance and acceptance of these radiographs shall be in accordance with A.P.I. standard Materials which show injurious defects at the place of manufacture or at site or which prove to be defective when applied in service shall be completely repaired by the Supplier at no extra cost. 6.5 Injurious defects shall include cracks, leaks, laminations, lack of complete penetration, lack of complete fusion, dents exceeding one eight of the specified wall thickness and undercutting or reduction in pipe wall thickness adjacent to a weld exceeding 0.8 mm in depth. 6.6 Slag inclusions and gas pockets or voids shall be considered to be minor imperfections and may be accepted if the maximum size and distribution do not exceed the limits shown in Tables 7.1 and 7.2 and Figures 7.2 and 7.3 of A.P.I standard 5LS The pipe shall be tested prior to leaving the manufacturer s work and the Contractor shall produce the test certificates certifying that the pipes comply fully with the requirement of the Contract. 6.8 Where radiographic examination reveals defects in the welds, the Superintending Officer will either the length of pipe containing such defects or will permit the Contractor to carry out repairs and to submit radiographs of repairs for approval. 7.0 Surface Preparation 7.1 Priming Immediately and not later than 15 minutes after each pipe or special has been cleaned to bare metal, a uniform thin coat of primer compatible with the coating materials to be used shall be cold applied by flooding coating, spraying or brushing complying to BS 4147 or BS The primer shall be allowed to dry properly before the coating materials is applied but if more than 96 hours elapse before coating or if the primer become dead, powdery or crumbly, it shall be cleaned off and the pipe or specials shall be re primed. 5

6 Table A: Thickness of Steel Pipe Shell and Internal Diameter Outside Diameter (O.D) (mm) minal Diameter (ND) (mm) Minimum minal Thickness (mm) Concrete Lining Thickness (mm) Bitumen Enamel Wrapping (mm) Mass Per Length (Plain End) Hydraulic Test Pressure (Steel430)

7 8.0 Bitumen Enamel Wrapping 9.0 Coating 8.1 The pipes shall be covered with a layer of bitumen containing a mineral filler applied hot in accordance to BS4147 and inner wrapping of glass tissue and outer wrapping of bitumen impregnated reinforced glass tissue in the longitudinal direction with parallel glass threads spaced 9.5 mm apart. It shall be impregnated with a material fully compatible with the coating materials to give a finished thickness of 0.75 mm. 8.2 The glass tissue wrapping shall be wound spirally or circumferentially with an overlap. There shall be not less than 1 mm of enamel between the pipe surface and the inner wrapping. 9.1 Lined pipes shall be given one coat of water resistant white wash immediately following the bitumen coating. 9.2 The white wash shall be mixed as specified under section 2.5 of AWWA.C Internal Lining 10.1 All steel pipes shall be lined internally to the thickness as specified with concrete made from ordinary Portland Cement and fine aggregate The materials used for lining, time method of lining and curing of the finishing lining shall comply with Clause 29 of BS 534:1990 and shall be carried out to the satisfaction of the Superintending Officer The pipe shall be charged in a single operation and spun at suitable speed to achieve a minimum rate of radial acceleration of 250 m/s² until the uniform thickness of concrete lining given in the table below has been attained over the whole of the inner surface with the exception of stop backs for jointing The finish surface of the lining shall be smooth and free from irregularities Curing records should provide to show that 21 days have elapsed since date of lining before delivery The manufacturing and testing of test cubes shall comply with Clause 29.5 of BS 534:

8 11.0 Unwrapped Pipes 11.1 The internal lining shall be similar to the requirement of wrapped pipes The outer shall have two layers of primer coat of Red Lead Oxide and two layer of final coat of light green colour Zinc Chromate Pipe Ends 12.1 The weld metal on the external surfaces of the ends of all ended pipes shall be machined flush with external surfaces of the pipe shell for a sufficient distance to facilitate jointing with couplings or steel collars At the ends of all spigot and socket ended pipes the weld metal shall be similarly machined externally on the spigot end and internally on the socket end of the pipe The concrete lining and the external coating of the pipes to be jointed by welding shall be committed for sufficient distance from the ends to prevent damage to the protection during site welding The external coating of pipes to be jointed by mechanical couplings or flange adapters shall be omitted for a sufficient distance from the ends to permit assembly of the joints but the concrete lining shall extend to the end of the pipes or specials The unlined surfaces shall be protected with a suitable approved rust inhibitor or bitumen primer during manufacture so that extensive cleaning of the surface is not required after jointing on site Specials 13.1 Specials shall conform to the appropriate dimensions as Section 4 of BS 534:1990. Specials shall be formed from straight pipes butt-welded by metal arc process The coating and lining on the straight pipe shall be cut back from the points to welded or cut for sufficient distance to ensure that no material intended to remain part of the coating is damaged by the cutting or welding process Welding of specials shall be of standard equal to that of straight pipes and are subjected to a 100% radiographic test All fillet welds shall be subjected to air tests appropriate an/or magnetic crack detection test The outside diameter of specials shall conform to the outside diameter of the standard straight pipes The ends of pipe-ended specials shall be truly circular and shall conform to the tolerance required for fitting of mechanical couplings and flange adaptors. 8

9 14.0 Samples And Test on samples 14.1 The Contractor shall submit samples of such materials as may be required by the Superintending Officer and shall carry out of the specified tests directed by the Superintending Officer at the palace of manufacture or on the site or at a laboratory approved by the Superintending Officer Samples shall be submitted and tests carried our sufficiently early to enable further samples to be submitted and tested if required by the Superintending Officer The Contractor shall prepare the necessary test pieces and supply all labour, appliance, testing apparatus and everything necessary for the carrying out of all specified tests The cost of the samples and of conducting all the specified tests on the samples shall be deemed to include in the Contracts Rates The Contractor shall give the Superintending Officer fourteen days notice in writing of date on which any of the samples will be ready for testing or inspection at the place of manufacture or at an approved laboratory and unless the Superintending Officer shall attend at the appointed place within the said fourteen days the test may proceed in his absence Provided that the Contractor shall in any case submit to the Superintending Officer within seven days of every test three certified copies of the test readings Approval by the Superintending Officer as to the placing of orders for materials or as to samples or tests shall not prejudice any of the Superintending Officer s powers under the Contract nor relieve the Contractor of any of his obligations under the contract Test Certificates 15.1 Certificates in duplicate shall be provided by the Contractor for each complete pipe and special supplied giving the process of manufacture and the results of the specified tests Similar certificates in duplicate shall provided by the contractor in respect of materials to be used in the manufacture of the pipes giving the process of manufacture, chemical analysis (where relevant) and the results of the specified tests The material shall be suitably marked to enable it to be identified from references on the certificates. 9

10 16.0 Packing All pipe ends shall be packed and covered accordingly with suitable methods and material as to protect against damage Marking 17.1 All pipe supplied shall have the following marking on the outside of pipe: Outside diameter (in mm) The weight in Kilogram Length of the pipe (in M) SAJH lettering Manufacturer s distinguishing mark and date of manufacture Pipe Series / Batch Numb 18.0 Pre Delivery Inspection and Evaluation a) It is the responsibility of the tenderer to inform SAJH for inspection purposes during manufacturing and before delivery. b) SAJH reserve the right to inspect and witness the testing of product offered. c) At any time, when requested, the supplier is to provide SAJH a sample of the product offered for evaluation purposes. All costs shall be borne by the supplier. d) If at any time the supplier fails to deliver the required sample, the product is deemed fail to meet the specifications Certification a) Manufacturer of supplier are required to provide a copy of the certificate and testing report from SIRIM, IKRAM or other recognised certification body. b) Tests report required shall be those tests conducted within a year period. c) SAJH have the right to refuse offer or reject supply if the documents required are not enclosed. 10

11 SCHEDULE OF STORES 11

12 SAJ Holdings Sdn. Bhd. (A) Schedule of Stores for Supply and Delivery of Wrapped Mild Steel Pipes (Spigot and Socket) To SAJH Specification PS/MS/001 For The Period Of. Year(s) Outside Diameter (mm) minal Diameter (mm) TOTAL TENDERED In the capacity of:.. Adress:. 12

13 SAJ Holdings Sdn. Bhd. (B) Schedule of Stores for Supply and Delivery of Wrapped Mild Steel Pipes (Plain Ended) To SAJH Specification PS/MS/001 For The Period Of. Year(s) Outside Diameter (mm) minal Diameter (mm) TOTAL TENDERED In the capacity of:.. Adress:. 13

14 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes To SAJH Specification PS/MS/001 For The Period Of. Year(s) Outside Diameter (mm) minal Diameter (mm) TOTAL TENDERED In the capacity of:.. Adress:. 14

15 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials Unwrapped 1 Bend, Mild Steel Plain Ended: a) 100mm x 22 ½ deg b) 100mm x 45 deg c) 100mm x 90 deg d) 150mm x 22 ½ deg e) 150mm x 45 deg f) 150mm x 90 deg g) 200mm x 22 ½ deg h) 200mm x 45 deg i) 200mm x 90 deg j) 250mm x 22 ½ deg k) 250mm x 45 deg l) 250mm x 90 deg m) 300mm x 22 ½ deg n) 300mm x 45 deg o) 300mm x 90 deg p) 350mm x 22 ½ deg q) 350mm x 45 deg r) 350mm x 90 deg s) 400mm x 22 ½ deg t) 400mm x 45 deg u) 400mm x 90 deg v) 450mm x 22 ½ deg w) 450mm x 45 deg x) 450mm x 90 deg y) 500mm x 22 ½ deg 15

16 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials Unwrapped..1 Bend, Mild Steel Plain Ended : z) 500mm x 45 deg aa) ab) ac) ad) ae) af) ag) ah) ai) aj) ak) al) am) 500mm x 90 deg 600mm x 22 ½ deg 600mm x 45 deg 600mm x 90 deg 700mm x 22 ½ deg 700mm x 45 deg 700mm x 90 deg 800mm x 22 ½ deg 800mm x 45 deg 800mm x 90 deg 900mm x 22 ½ deg 900mm x 45 deg 900mm x 90 deg TOTAL TENDERED 16

17 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials Unwrapped 5 Tee, Offtake Flange a) 100mm x 100mm x 100mm b) 100mm x 100mm x 75mm c) 100mm x 100mm x 50mm d) 150mm x 150mm x 150mm e) 150mm x 150mm x 100mm f) 150mm x 150mm x 75mm g) 150mm x 150mm x 50mm h) 200mm x 200mm x 200mm i) 200mm x 200mm x 150mm j) 200mm x 200mm x 100mm k) 200mm x 200mm x 75mm l) 200mm x 200mm x 50mm m) 250mm x 250mm x 250mm n) 250mm x 250mm x 200mm o) 250mm x 250mm x 150mm p) 250mm x 250mm x 100mm q) 250mm x 250mm x 75mm r) 250mm x 250mm x 50mm s) 300mm x 300mm x 300mm t) 300mm x 300mm x 250mm u) 300mm x 300mm x 200mm v) 300mm x 300mm x 150mm w) 300mm x 300mm x 100mm x) 300mm x 300mm x 75mm y) 300mm x 300mm x 50mm 17

18 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials Unwrapped..5 Tee, Offtake Flange (con t) z) 350mm x 350mm x 350mm aa) 350mm x 350mm x 300mm ab) 350mm x 350mm x 250mm ac) 350mm x 350mm x 200mm ad) 350mm x 350mm x 150mm ae) 350mm x 350mm x 100mm af) 400mm x 400mm x 400mm ag) 400mm x 400mm x 350mm ah) 400mm x 400mm x 300mm ai) 400mm x 400mm x 250mm aj) 400mm x 400mm x 200mm ak) 400mm x 400mm x 150mm al) 400mm x 400mm x 100mm am) 450mm x 450mm x 450mm an) 450mm x 450mm x 400mm ao) 450mm x 450mm x 350mm ap) 450mm x 450mm x 300mm aq) 450mm x 450mm x 250mm ar) 450mm x 450mm x 200mm as) 450mm x 450mm x 150mm at) 450mm x 450mm x 100mm au) 500mm x 500mm x 500mm av) 500mm x 500mm x 450mm aw) 500mm x 500mm x 400mm ax) 500mm x 500mm x 350mm 18

19 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials..5 ay) az) ba) bb) bc) bd) be) bf) bg) bh) bi) bj) bk) bl) bm) bn) bo) bp) bq) br) bs) bt) bu) bv) Unwrapped Tee, Offtake Flange (con t) 500mm x 500mm x 300mm 500mm x 500mm x 250mm 500mm x 500mm x 200mm 500mm x 500mm x 150mm 500mm x 500mm x 100mm 600mm x 600mm x 600mm 600mm x 600mm x 550mm 600mm x 600mm x 500mm 600mm x 600mm x 450mm 600mm x 600mm x 400mm 600mm x 600mm x 350mm 600mm x 600mm x 300mm 600mm x 600mm x 250mm 600mm x 600mm x 200mm 600mm x 600mm x 150mm 600mm x 600mm x 100mm 600mm x 200mm (OD: x x 219.1)mm 700mm x 700mm x 700mm 700mm x 700mm x 750mm 700mm x 700mm x 650mm 700mm x 700mm x 600mm 700mm x 700mm x 550mm 700mm x 700mm x 500mm 700mm x 700mm x 450mm 19

20 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials..5 bw) bx) by) bz) ca) cb) cc) cd) ce) cf) cg) ch) ci) cj) ck) cl) cm) cn) co) cp) cq) cr) cs) ct) cu) Unwrapped Tee, Offtake Flange (con t) 700mm x 700mm x 400mm 700mm x 700mm x 350mm 700mm x 700mm x 300mm 700mm x 700mm x 250mm 700mm x 700mm x 200mm 700mm x 700mm x 150mm 700mm x 700mm x 100mm 800mm x 800mm x 800mm 800mm x 800mm x 750mm 800mm x 800mm x 700mm 800mm x 800mm x 650mm 800mm x 800mm x 600mm 800mm x 800mm x 550mm 800mm x 800mm x 500mm 800mm x 800mm x 450mm 800mm x 800mm x 400mm 800mm x 800mm x 350mm 800mm x 800mm x 300mm 800mm x 800mm x 250mm 800mm x 800mm x 200mm 800mm x 800mm x 150mm 800mm x 800mm x 100mm 900mm x 900mm x 900mm 900mm x 900mm x 850mm 900mm x 900mm x 800mm 20

21 SAJ Holdings Sdn. Bhd. (C) Schedule of Stores for Supply and Delivery of Unwrapped Mild Steel Pipes Specials..5 cv) cw) cx) cy) cz) da) db) dc) dd) de) df) dg) dh) di) Unwrapped Tee, Offtake Flange (con t) 900mm x 900mm x 750mm 900mm x 900mm x 700mm 900mm x 900mm x 650mm 900mm x 900mm x 600mm 900mm x 900mm x 550mm 900mm x 900mm x 500mm 900mm x 900mm x 450mm 900mm x 900mm x 400mm 900mm x 900mm x 350mm 900mm x 900mm x 300mm 900mm x 900mm x 250mm 900mm x 900mm x 200mm 900mm x 900mm x 150mm 900mm x 900mm x 100mm 21

22 1 Bend, Mild Steel Plain Ended: a) 100mm x 22 ½ deg b) 100mm x 45 deg c) 100mm x 90 deg d) 150mm x 22 ½ deg e) 150mm x 45 deg f) 150mm x 90 deg g) 200mm x 22 ½ deg h) 200mm x 45 deg i) 200mm x 90 deg j) 250mm x 22 ½ deg k) 250mm x 45 deg l) 250mm x 90 deg m) 300mm x 22 ½ deg n) 300mm x 45 deg o) 300mm x 90 deg p) 350mm x 22 ½ deg q) 350mm x 45 deg r) 350mm x 90 deg s) 400mm x 22 ½ deg t) 400mm x 45 deg u) 400mm x 90 deg v) 450mm x 22 ½ deg w) 450mm x 45 deg x) 450mm x 90 deg y) 500mm x 22 ½ deg 22

23 ..1 Bend, Mild Steel Plain Ended : z) 500mm x 45 deg aa) ab) ac) ad) ae) af) ag) ah) ai) aj) ak) al) am) 500mm x 90 deg 600mm x 22 ½ deg 600mm x 45 deg 600mm x 90 deg 700mm x 22 ½ deg 700mm x 45 deg 700mm x 90 deg 800mm x 22 ½ deg 800mm x 45 deg 800mm x 90 deg 900mm x 22 ½ deg 900mm x 45 deg 900mm x 90 deg TOTAL TENDERED 23

24 Bend, Mild Steel Double 2 Flange : a) 100mm x 22 ½ deg b) 100mm x 45 deg c) 100mm x 90 deg d) 150mm x 22 ½ deg e) 150mm x 45 deg f) 150mm x 90 deg g) 200mm x 22 ½ deg h) 200mm x 45 deg i) 200mm x 90 deg j) 250mm x 22 ½ deg k) 250mm x 45 deg l) 250mm x 90 deg m) 300mm x 22 ½ deg n) 300mm x 45 deg o) 300mm x 90 deg p) 350mm x 22 ½ deg q) 350mm x 45 deg r) 350mm x 90 deg s) 400mm x 22 ½ deg t) 400mm x 45 deg u) 400mm x 90 deg v) 450mm x 22 ½ deg w) 450mm x 45 deg x) 450mm x 90 deg y) 500mm x 22 ½ deg 24

25 Bend, Mild Steel Double..2 Flange (Con t) : z) 500mm x 45 deg aa) ab) ac) ad) ae) af) ag) ah) ai) aj) ak) al) am) 500mm x 90 deg 600mm x 22 ½ deg 600mm x 45 deg 600mm x 90 deg 700mm x 22 ½ deg 700mm x 45 deg 700mm x 90 deg 800mm x 22 ½ deg 800mm x 45 deg 800mm x 90 deg 900mm x 22 ½ deg 900mm x 45 deg 900mm x 90 deg TOTAL TENDERED 25

26 3 Tee, All Flange a) 100mm x 100mm x 100mm b) 100mm x 100mm x 75mm c) 100mm x 100mm x 50mm d) 150mm x 150mm x 150mm e) 150mm x 150mm x 100mm f) 150mm x 150mm x 75mm g) 150mm x 150mm x 50mm h) 200mm x 200mm x 200mm i) 200mm x 200mm x 150mm j) 200mm x 200mm x 100mm k) 200mm x 200mm x 75mm l) 200mm x 200mm x 50mm m) 250mm x 250mm x 250mm n) 250mm x 250mm x 200mm o) 250mm x 250mm x 150mm p) 250mm x 250mm x 100mm q) 250mm x 250mm x 75mm r) 250mm x 250mm x 50mm s) 300mm x 300mm x 300mm t) 300mm x 300mm x 250mm u) 300mm x 300mm x 200mm v) 300mm x 300mm x 150mm w) 300mm x 300mm x 100mm x) 300mm x 300mm x 75mm y) 300mm x 300mm x 50mm 26

27 ..3 Tee, All Flange (con t) z) 350mm x 350mm x 350mm aa) 350mm x 350mm x 300mm ab) 350mm x 350mm x 250mm ac) 350mm x 350mm x 200mm ad) 350mm x 350mm x 150mm ae) 350mm x 350mm x 100mm af) 400mm x 400mm x 400mm ag) 400mm x 400mm x 350mm ah) 400mm x 400mm x 300mm ai) 400mm x 400mm x 250mm aj) 400mm x 400mm x 200mm ak) 400mm x 400mm x 150mm al) 400mm x 400mm x 100mm am) 450mm x 450mm x 450mm an) 450mm x 450mm x 400mm ao) 450mm x 450mm x 350mm ap) 450mm x 450mm x 300mm aq) 450mm x 450mm x 250mm ar) 450mm x 450mm x 200mm as) 450mm x 450mm x 150mm at) 450mm x 450mm x 100mm au) 500mm x 500mm x 500mm av) 500mm x 500mm x 450mm aw) 500mm x 500mm x 400mm ax) 500mm x 500mm x 350mm 27

28 ..3 Tee, All Flange (con t) ay) 500mm x 500mm x 300mm az) 500mm x 500mm x 250mm ba) 500mm x 500mm x 200mm bb) 500mm x 500mm x 150mm bc) 500mm x 500mm x 100mm bd) 600mm x 600mm x 600mm be) 600mm x 600mm x 550mm bf) 600mm x 600mm x 500mm bg) 600mm x 600mm x 450mm bh) 600mm x 600mm x 400mm bi) 600mm x 600mm x 350mm bj) 600mm x 600mm x 300mm bk) 600mm x 600mm x 250mm bl) 600mm x 600mm x 200mm bm) 600mm x 600mm x 150mm bn) 600mm x 600mm x 100mm bo) 700mm x 700mm x 700mm bp) 700mm x 700mm x 750mm bq) 700mm x 700mm x 650mm br) 700mm x 700mm x 600mm bs) 700mm x 700mm x 550mm bt) 700mm x 700mm x 500mm bu) 700mm x 700mm x 450mm bv) 700mm x 700mm x 400mm bw) 700mm x 700mm x 350mm 28

29 ..3 Tee, All Flange (con t) bx) 700mm x 700mm x 300mm by) 700mm x 700mm x 250mm bz) 700mm x 700mm x 200mm ca) 700mm x 700mm x 150mm cb) 700mm x 700mm x 100mm cc) 800mm x 800mm x 800mm cd) 800mm x 800mm x 750mm ce) 800mm x 800mm x 700mm cf) 800mm x 800mm x 650mm cg) 800mm x 800mm x 600mm ch) 800mm x 800mm x 550mm ci) 800mm x 800mm x 500mm cj) 800mm x 800mm x 450mm ck) 800mm x 800mm x 400mm cl) 800mm x 800mm x 350mm cm) 800mm x 800mm x 300mm cn) 800mm x 800mm x 250mm co) 800mm x 800mm x 200mm cp) 800mm x 800mm x 150mm cq) 800mm x 800mm x 100mm cr) 900mm x 900mm x 900mm cs) 900mm x 900mm x 850mm ct) 900mm x 900mm x 800mm cu) 900mm x 900mm x 750mm cv) 900mm x 900mm x 700mm 29

30 ..3 Tee, All Flange (con t) cw) 900mm x 900mm x 650mm cx) 900mm x 900mm x 600mm cy) 900mm x 900mm x 550mm cz) 900mm x 900mm x 500mm da) 900mm x 900mm x 450mm db) 900mm x 900mm x 400mm dc) 900mm x 900mm x 350mm dd) 900mm x 900mm x 300mm de) 900mm x 900mm x 250mm df) 900mm x 900mm x 200mm dg) 900mm x 900mm x 150mm dh) 900mm x 900mm x 100mm 4 Tee, Plain Ends, Mild Steel a) 100mm x 100mm x 100mm b) 100mm x 100mm x 75mm c) 100mm x 100mm x 50mm d) 150mm x 150mm x 150mm e) 150mm x 150mm x 100mm f) 150mm x 150mm x 75mm g) 150mm x 150mm x 50mm h) 200mm x 200mm x 200mm i) 200mm x 200mm x 150mm j) 200mm x 200mm x 100mm k) 200mm x 200mm x 75mm l) 200mm x 200mm x 50mm 30

31 Tee, Plain Ends, Mild Steel..4 (con t) m) 250mm x 250mm x 250mm n) 250mm x 250mm x 200mm o) 250mm x 250mm x 150mm p) 250mm x 250mm x 100mm q) 250mm x 250mm x 75mm r) 250mm x 250mm x 50mm s) 300mm x 300mm x 300mm t) 300mm x 300mm x 250mm u) 300mm x 300mm x 200mm v) 300mm x 300mm x 150mm w) 300mm x 300mm x 100mm x) 300mm x 300mm x 75mm y) 300mm x 300mm x 50mm z) 350mm x 350mm x 350mm aa) ab) ac) ad) ae) af) ag) ah) ai) aj) ak) 350mm x 350mm x 300mm 350mm x 350mm x 250mm 350mm x 350mm x 200mm 350mm x 350mm x 150mm 350mm x 350mm x 100mm 400mm x 400mm x 400mm 400mm x 400mm x 350mm 400mm x 400mm x 300mm 400mm x 400mm x 250mm 400mm x 400mm x 200mm 400mm x 400mm x 150mm 31

32 ..4 al) am) an) ao) ap) aq) ar) as) at) au) av) aw) ax) ay) az) ba) bb) bc) bd) be) bf) bg) bh) bi) bj) Tee, Plain Ends, Mild Steel (con t) 400mm x 400mm x 100mm 450mm x 450mm x 450mm 450mm x 450mm x 400mm 450mm x 450mm x 350mm 450mm x 450mm x 300mm 450mm x 450mm x 250mm 450mm x 450mm x 200mm 450mm x 450mm x 150mm 450mm x 450mm x 100mm 500mm x 500mm x 500mm 500mm x 500mm x 450mm 500mm x 500mm x 400mm 500mm x 500mm x 350mm 500mm x 500mm x 300mm 500mm x 500mm x 250mm 500mm x 500mm x 200mm 500mm x 500mm x 150mm 500mm x 500mm x 100mm 600mm x 600mm x 600mm 600mm x 600mm x 550mm 600mm x 600mm x 500mm 600mm x 600mm x 450mm 600mm x 600mm x 400mm 600mm x 600mm x 350mm 600mm x 600mm x 300mm 32

33 ..4 bk) bl) bm) bn) bo) bp) bq) br) bs) bt) bu) bv) bw) bx) by) bz) Ca) Cb) cc) cd) ce) cf) cg) ch) ci) Tee, Plain Ends, Mild Steel (con t) 600mm x 600mm x 250mm 600mm x 600mm x 200mm 600mm x 600mm x 150mm 600mm x 600mm x 100mm 700mm x 700mm x 700mm 700mm x 700mm x 750mm 700mm x 700mm x 650mm 700mm x 700mm x 600mm 700mm x 700mm x 550mm 700mm x 700mm x 500mm 700mm x 700mm x 450mm 700mm x 700mm x 400mm 700mm x 700mm x 350mm 700mm x 700mm x 300mm 700mm x 700mm x 250mm 700mm x 700mm x 200mm 700mm x 700mm x 150mm 700mm x 700mm x 100mm 800mm x 800mm x 800mm 800mm x 800mm x 750mm 800mm x 800mm x 700mm 800mm x 800mm x 650mm 800mm x 800mm x 600mm 800mm x 800mm x 550mm 800mm x 800mm x 500mm 33

34 ..4 cj) ck) cl) cm) cn) co) cp) cq) cr) cs) ct) cu) cv) cw) cx) cy) cz) da) db) dc) dd) de) df) dg) dh) Tee, Plain Ends, Mild Steel (con t) 800mm x 800mm x 450mm 800mm x 800mm x 400mm 800mm x 800mm x 350mm 800mm x 800mm x 300mm 800mm x 800mm x 250mm 800mm x 800mm x 200mm 800mm x 800mm x 150mm 800mm x 800mm x 100mm 900mm x 900mm x 900mm 900mm x 900mm x 850mm 900mm x 900mm x 800mm 900mm x 900mm x 750mm 900mm x 900mm x 700mm 900mm x 900mm x 650mm 900mm x 900mm x 600mm 900mm x 900mm x 550mm 900mm x 900mm x 500mm 900mm x 900mm x 450mm 900mm x 900mm x 400mm 900mm x 900mm x 350mm 900mm x 900mm x 300mm 900mm x 900mm x 250mm 900mm x 900mm x 200mm 900mm x 900mm x 150mm 900mm x 900mm x 100mm 34

35 5 Tee, Offtake Flange a) 100mm x 100mm x 100mm b) 100mm x 100mm x 75mm c) 100mm x 100mm x 50mm d) 150mm x 150mm x 150mm e) 150mm x 150mm x 100mm f) 150mm x 150mm x 75mm g) 150mm x 150mm x 50mm h) 200mm x 200mm x 200mm i) 200mm x 200mm x 150mm j) 200mm x 200mm x 100mm k) 200mm x 200mm x 75mm l) 200mm x 200mm x 50mm m) 250mm x 250mm x 250mm n) 250mm x 250mm x 200mm o) 250mm x 250mm x 150mm p) 250mm x 250mm x 100mm q) 250mm x 250mm x 75mm r) 250mm x 250mm x 50mm s) 300mm x 300mm x 300mm t) 300mm x 300mm x 250mm u) 300mm x 300mm x 200mm v) 300mm x 300mm x 150mm w) 300mm x 300mm x 100mm x) 300mm x 300mm x 75mm y) 300mm x 300mm x 50mm 35

36 ..5 Tee, Offtake Flange (con t) z) 350mm x 350mm x 350mm aa) 350mm x 350mm x 300mm ab) 350mm x 350mm x 250mm ac) 350mm x 350mm x 200mm ad) 350mm x 350mm x 150mm ae) 350mm x 350mm x 100mm af) 400mm x 400mm x 400mm ag) 400mm x 400mm x 350mm ah) 400mm x 400mm x 300mm ai) 400mm x 400mm x 250mm aj) 400mm x 400mm x 200mm ak) 400mm x 400mm x 150mm al) 400mm x 400mm x 100mm am) 450mm x 450mm x 450mm an) 450mm x 450mm x 400mm ao) 450mm x 450mm x 350mm ap) 450mm x 450mm x 300mm aq) 450mm x 450mm x 250mm ar) 450mm x 450mm x 200mm as) 450mm x 450mm x 150mm at) 450mm x 450mm x 100mm au) 500mm x 500mm x 500mm av) 500mm x 500mm x 450mm aw) 500mm x 500mm x 400mm ax) 500mm x 500mm x 350mm 36

37 ..5 Tee, Offtake Flange (con t) ay) 500mm x 500mm x 300mm az) 500mm x 500mm x 250mm ba) 500mm x 500mm x 200mm bb) 500mm x 500mm x 150mm bc) 500mm x 500mm x 100mm bd) 600mm x 600mm x 600mm be) 600mm x 600mm x 550mm bf) 600mm x 600mm x 500mm bg) 600mm x 600mm x 450mm bh) 600mm x 600mm x 400mm bi) 600mm x 600mm x 350mm bj) 600mm x 600mm x 300mm bk) 600mm x 600mm x 250mm bl) 600mm x 600mm x 200mm bm) 600mm x 600mm x 150mm bn) 600mm x 600mm x 100mm bo) 600mm x 200mm (OD: x x 219.1)mm bp) 700mm x 700mm x 700mm bq) 700mm x 700mm x 750mm br) 700mm x 700mm x 650mm bs) 700mm x 700mm x 600mm bt) 700mm x 700mm x 550mm bu) 700mm x 700mm x 500mm bv) 700mm x 700mm x 450mm 37

38 ..5 Tee, Offtake Flange (con t) bw) 700mm x 700mm x 400mm bx) 700mm x 700mm x 350mm by) 700mm x 700mm x 300mm bz) 700mm x 700mm x 250mm ca) 700mm x 700mm x 200mm cb) 700mm x 700mm x 150mm cc) 700mm x 700mm x 100mm cd) 800mm x 800mm x 800mm ce) 800mm x 800mm x 750mm cf) 800mm x 800mm x 700mm cg) 800mm x 800mm x 650mm ch) 800mm x 800mm x 600mm ci) 800mm x 800mm x 550mm cj) 800mm x 800mm x 500mm ck) 800mm x 800mm x 450mm cl) 800mm x 800mm x 400mm cm) 800mm x 800mm x 350mm cn) 800mm x 800mm x 300mm co) 800mm x 800mm x 250mm cp) 800mm x 800mm x 200mm cq) 800mm x 800mm x 150mm cr) 800mm x 800mm x 100mm cs) 900mm x 900mm x 900mm ct) 900mm x 900mm x 850mm cu) 900mm x 900mm x 800mm 38

39 ..5 Tee, Offtake Flange (con t) cv) 900mm x 900mm x 750mm cw) 900mm x 900mm x 700mm cx) 900mm x 900mm x 650mm cy) 900mm x 900mm x 600mm cz) 900mm x 900mm x 550mm da) 900mm x 900mm x 500mm db) 900mm x 900mm x 450mm dc) 900mm x 900mm x 400mm dd) 900mm x 900mm x 350mm de) 900mm x 900mm x 300mm df) 900mm x 900mm x 250mm dg) 900mm x 900mm x 200mm dh) 900mm x 900mm x 150mm di) 900mm x 900mm x 100mm 6 Tee, Invert Level a) 100mm x 100mm x 100mm b) 150mm x 150mm x 100mm c) 200mm x 200mm x 100mm d) 250mm x 250mm x 100mm e) 300mm x 300mm x 100mm f) 350mm x 350mm x 100mm g) 400mm x 400mm x 100mm h) 450mm x 450mm x 100mm i) 500mm x 500mm x 100mm j) 600mm x 600mm x 100mm 39

40 ..6 Tee, Invert Level (con t) k) 700mm x 700mm x 100mm l) 800mm x 800mm x 100mm m) 900mm x 900mm x 100mm 7 Collar a) 100mm dia. b) 150mm dia. c) 200mm dia. d) 250mm dia. e) 300mm dia. f) 350mm dia. g) 375mm dia. h) 400mm dia. i) 450mm dia. j) 500mm dia. k) 550mm dia. l) 600mm dia. m) 700mm dia. n) 800mm dia. o) 900mm dia. 40

41 8 Reducer/Taper Plain Ended a) 150mm x 100mm b) 200mm x 100mm c) 200mm x 150mm d) 250mm x 100mm e) 250mm x 150mm f) 250mm x 200mm g) 300mm x 100mm h) 300mm x 150mm i) 300mm x 200mm j) 300mm x 250mm k) 350mm x 100mm l) 350mm x 150mm m) 350mm x 200mm n) 350mm x 250mm o) 350mm x 300mm p) 400mm x 150mm q) 400mm x 200mm r) 400mm x 250mm s) 400mm x 300mm t) 400mm x 350mm u) 450mm x 200mm v) 450mm x 250mm w) 450mm x 300mm x) 450mm x 350mm y) 450mm x 400mm 41

42 Reducer/Taper Plain Ended..8 (con t) z) 500mm x 200mm aa) 500mm x 250mm ab) 500mm x 300mm ac) 500mm x 350mm ad) 500mm x 400mm ae) 500mm x 450mm af) 600mm x 200mm ag) 600mm x 250mm ah) 600mm x 300mm ai) 600mm x 350mm aj) 600mm x 400mm ak) 600mm x 450mm al) 600mm x 500mm am) 600mm x 550mm an) 700mm x 200mm ao) 700mm x 250mm ap) 700mm x 300mm aq) 700mm x 350mm ar) 700mm x 400mm as) 700mm x 450mm at) 700mm x 500mm au) 700mm x 550mm av) 800mm x 200mm aw) 800mm x 250mm ax) 800mm x 300mm 42

43 Reducer/Taper Plain Ended..8 (con t) ay) 800mm x 350mm az) 800mm x 400mm ba) 800mm x 450mm bb) 800mm x 500mm bc) 800mm x 550mm bd) 900mm x 200mm be) 900mm x 250mm bf) 900mm x 300mm bg) 900mm x 350mm bh) 900mm x 400mm bi) 900mm x 450mm bj) 900mm x 500mm bk) 900mm x 550mm 9 Reducer/Taper Double Flange a) 150mm x 100mm b) 200mm x 100mm c) 200mm x 150mm d) 250mm x 100mm e) 250mm x 150mm f) 250mm x 200mm g) 300mm x 100mm h) 300mm x 150mm i) 300mm x 200mm j) 300mm x 250mm k) 350mm x 100mm 43

44 Reducer/Taper Double Flange..9 (con t) l) 350mm x 150mm m) 350mm x 200mm n) 350mm x 250mm o) 350mm x 300mm p) 400mm x 150mm q) 400mm x 200mm r) 400mm x 250mm s) 400mm x 300mm t) 400mm x 350mm u) 450mm x 200mm v) 450mm x 250mm w) 450mm x 300mm x) 450mm x 350mm y) 450mm x 400mm z) 500mm x 200mm aa) 500mm x 250mm ab) 500mm x 300mm ac) 500mm x 350mm ad) 500mm x 400mm ae) 500mm x 450mm af) 600mm x 200mm ag) 600mm x 250mm ah) 600mm x 300mm ai) 600mm x 350mm aj) 600mm x 400mm 44

45 ..9 ak) al) am) an) ao) ap) aq) ar) as) at) au) av) aw) ax) ay) az) ba) bb) bc) bd) be) bf) bg) bh) bi) Reducer/Taper Double Flange (con t) 600mm x 450mm 600mm x 500mm 600mm x 550mm 700mm x 200mm 700mm x 250mm 700mm x 300mm 700mm x 350mm 700mm x 400mm 700mm x 450mm 700mm x 500mm 700mm x 550mm 800mm x 200mm 800mm x 250mm 800mm x 300mm 800mm x 350mm 800mm x 400mm 800mm x 450mm 800mm x 500mm 800mm x 550mm 900mm x 200mm 900mm x 250mm 900mm x 300mm 900mm x 350mm 900mm x 400mm 900mm x 450mm 45

46 ..9 bj) bk) Reducer/Taper Double Flange (con t) 900mm x 500mm 900mm x 550mm 10 Reducer/Taper FL/PE a) 150mm FL x 100mm PE b) 200mm FL x 100mm PE c) 200mm FL x 150mm PE d) 250mm FL x 100mm PE e) 250mm FL x 150mm PE f) 250mm FL x 200mm PE g) 300mm FL x 100mm PE h) 300mm FL x 150mm PE i) 300mm FL x 200mm PE j) 300mm FL x 250mm PE k) 350mm FL x 100mm PE l) 350mm FL x 150mm PE m) 350mm FL x 200mm PE n) 350mm FL x 250mm PE o) 350mm FL x 300mm PE p) 400mm FL x 150mm PE q) 400mm FL x 200mm PE r) 400mm FL x 250mm PE s) 400mm FL x 300mm PE t) 400mm FL x 350mm PE u) 450mm FL x 200mm PE v) 450mm FL x 250mm PE 46

47 ..10 Reducer/Taper FL/PE (con t) w) 450mm FL x 300mm PE x) 450mm FL x 350mm PE y) 450mm FL x 400mm PE z) 500mm FL x 200mm PE aa) 500mm FL x 250mm PE ab) 500mm FL x 300mm PE ac) 500mm FL x 350mm PE ad) 500mm FL x 400mm PE ae) 500mm FL x 450mm PE af) 600mm FL x 200mm PE ag) 600mm FL x 250mm PE ah) 600mm FL x 300mm PE ai) 600mm FL x 350mm PE aj) 600mm FL x 400mm PE ak) 600mm FL x 450mm PE al) 600mm FL x 500mm PE am) 600mm FL x 550mm PE an) 700mm FL x 200mm PE ao) 700mm FL x 250mm PE ap) 700mm FL x 300mm PE aq) 700mm FL x 350mm PE ar) 700mm FL x 400mm PE as) 700mm FL x 450mm PE at) 700mm FL x 500mm PE au) 700mm FL x 550mm PE 47

48 ..10 Reducer/Taper FL/PE (con t) av) 800mm FL x 200mm PE aw) 800mm FL x 250mm PE ax) 800mm FL x 300mm PE ay) 800mm FL x 350mm PE az) 800mm FL x 400mm PE ba) 800mm FL x 450mm PE bb) 800mm FL x 500mm PE bc) 800mm FL x 550mm PE bd) 900mm FL x 200mm PE be) 900mm FL x 250mm PE bf) 900mm FL x 300mm PE bg) 900mm FL x 350mm PE bh) 900mm FL x 400mm PE bi) 900mm FL x 450mm PE bj) 900mm FL x 500mm PE bk) 900mm FL x 550mm PE 11 End Cap a) 100mm dia. b) 150mm dia. c) 200mm dia. d) 250mm dia. e) 300mm dia. f) 350mm dia. g) 375mm dia. h) 400mm dia. 48

49 ..11 End Cap (con t) i) 450mm dia. j) 500mm dia. k) 550mm dia. l) 600mm dia. m) 700mm dia. n) 800mm dia. o) 900mm dia. 12 Flange (PN16) a) 100mm dia. b) 150mm dia. c) 200mm dia. d) 250mm dia. e) 300mm dia. f) 350mm dia. g) 375mm dia. h) 400mm dia. i) 450mm dia. j) 500mm dia. k) 550mm dia. l) 600mm dia. m) 700mm dia. n) 800mm dia. o) 900mm dia. 49

50 13 Blank Flange a) 100mm dia. b) 150mm dia. c) 200mm dia. d) 250mm dia. e) 300mm dia. f) 350mm dia. g) 375mm dia. h) 400mm dia. i) 450mm dia. j) 500mm dia. k) 550mm dia. l) 600mm dia. m) 700mm dia. n) 800mm dia. o) 900mm dia. 50

51 14 Short Piece- Plain Ended Straight Pipe Prov. Qty a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long c) 150mm dia x not exceeding 1.0m long d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long m) 400mm dia x not exceeding 1.0m long n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long 51

52 ..14 Short Piece- Plain Ended Straight Pipe (con t) Prov. Qty x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long aa) 750mm dia x not exceeding 1.0m long ab) 750mm dia. x exceeding 1.0m not exceeding 2.0m long ac) 800mm dia x not exceeding 1.0m long ad) 800mm dia. x exceeding 1.0m not exceeding 2.0m long ae) 850mm dia x not exceeding 1.0m long af) 850mm dia. x exceeding 1.0m not exceeding 2.0m long ag) 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long 15 Short Piece Plain And Flanged Ended Straight Pipe a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long c) 150mm dia x not exceeding 1.0m long d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long 52

53 Short Piece- Plain And Flanged Ended Straight Pipe..15 (con t) m) 400mm dia x not exceeding 1.0m long Prov. Qty n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long aa) 750mm dia x not exceeding 1.0m long ab) 750mm dia. x exceeding 1.0m not exceeding 2.0m long ac) 800mm dia x not exceeding 1.0m long ad) 800mm dia. x exceeding 1.0m not exceeding 2.0m long ae) 850mm dia x not exceeding 1.0m long af) 850mm dia. x exceeding 1.0m not exceeding 2.0m long ag) 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long 53

54 16 Short Piece Double Flanged Straight Pipe Prov. Qty a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long c) 150mm dia x not exceeding 1.0m long d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long m) 400mm dia x not exceeding 1.0m long n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long 54

55 ..16 Short Piece Double Flanged Straight Pipe (con t) y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long aa) ab) ac) ad) ae) af) ag) 750mm dia x not exceeding 1.0m long 750mm dia. x exceeding 1.0m not exceeding 2.0m long 800mm dia x not exceeding 1.0m long 800mm dia. x exceeding 1.0m not exceeding 2.0m long 850mm dia x not exceeding 1.0m long 850mm dia. x exceeding 1.0m not exceeding 2.0m long 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long Short Piece Plain Ended Straight Pipe With 17 Puddle Flange a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long c) 150mm dia x not exceeding 1.0m long d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long m) 400mm dia x not exceeding 1.0m long Prov. Qty 55

56 Short Piece Plain Ended Straight Pipe With..17 Puddle Flange (con t) n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long aa) ab) ac) ad) ae) af) ag) 750mm dia x not exceeding 1.0m long 750mm dia. x exceeding 1.0m not exceeding 2.0m long 800mm dia x not exceeding 1.0m long 800mm dia. x exceeding 1.0m not exceeding 2.0m long 850mm dia x not exceeding 1.0m long 850mm dia. x exceeding 1.0m not exceeding 2.0m long 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long Short Piece Plain And Flange Ended Straight 18 Pipe With Puddle Flange a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long Prov. Qty 56

57 Short Piece Plain And Flange Ended Straight..18 Pipe With Puddle Flange (con t) c) 150mm dia x not exceeding 1.0m long Prov. Qty d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long m) 400mm dia x not exceeding 1.0m long n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long 57

58 ..18 aa) ab) ac) ad) ae) af) ag) Short Piece Plain And Flange Ended Straight Pipe With Puddle Flange (con t) 750mm dia x not exceeding 1.0m long 750mm dia. x exceeding 1.0m not exceeding 2.0m long 800mm dia x not exceeding 1.0m long 800mm dia. x exceeding 1.0m not exceeding 2.0m long 850mm dia x not exceeding 1.0m long 850mm dia. x exceeding 1.0m not exceeding 2.0m long 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long Short Piece Double Flange Ended Straight Pipe With 19 Puddle Flange a) 100mm dia x not exceeding 1.0m long b) 100mm dia. x exceeding 1.0m not exceeding 2.0m long c) 150mm dia x not exceeding 1.0m long d) 150mm dia. x exceeding 1.0m not exceeding 2.0m long e) 200mm dia x not exceeding 1.0m long f) 200mm dia. x exceeding 1.0m not exceeding 2.0m long g) 250mm dia x not exceeding 1.0m long h) 250mm dia. x exceeding 1.0m not exceeding 2.0m long i) 300mm dia x not exceeding 1.0m long j) 300mm dia. x exceeding 1.0m not exceeding 2.0m long k) 350mm dia x not exceeding 1.0m long l) 350mm dia. x exceeding 1.0m not exceeding 2.0m long m) 400mm dia x not exceeding 1.0m long n) 400mm dia. x exceeding 1.0m not exceeding 2.0m long o) 450mm dia x not exceeding 1.0m long Prov. Qty 58

59 Short Piece Double Flange Ended Straight Pipe With..19 Puddle Flange (con t) p) 450mm dia. x exceeding 1.0m not exceeding 2.0m long Prov. Qty q) 500mm dia x not exceeding 1.0m long r) 500mm dia. x exceeding 1.0m not exceeding 2.0m long s) 550mm dia x not exceeding 1.0m long t) 550mm dia. x exceeding 1.0m not exceeding 2.0m long u) 600mm dia x not exceeding 1.0m long v) 600mm dia. x exceeding 1.0m not exceeding 2.0m long w) 650mm dia x not exceeding 1.0m long x) 650mm dia. x exceeding 1.0m not exceeding 2.0m long y) 700mm dia x not exceeding 1.0m long z) 700mm dia. x exceeding 1.0m not exceeding 2.0m long aa) 750mm dia x not exceeding 1.0m long ab) 750mm dia. x exceeding 1.0m not exceeding 2.0m long ac) 800mm dia x not exceeding 1.0m long ad) 800mm dia. x exceeding 1.0m not exceeding 2.0m long ae) 850mm dia x not exceeding 1.0m long af) 850mm dia. x exceeding 1.0m not exceeding 2.0m long ag) 900mm dia x not exceeding 1.0m long ah) 900mm dia. x exceeding 1.0m not exceeding 2.0m long 59

DHL EXPRESS CANADA E-BILL STANDARD SPECIFICATIONS

DHL EXPRESS CANADA E-BILL STANDARD SPECIFICATIONS DHL EXPRESS CANADA E-BILL STANDARD SPECIFICATIONS 1 E-Bill Standard Layout A B C D E F G Field/ DHL Account Number Billing Customer Name Billing Customer Address Billing Customer City Billing Customer

More information

Acceptance Page 2. Revision History 3. Introduction 14. Control Categories 15. Scope 15. General Requirements 15

Acceptance Page 2. Revision History 3. Introduction 14. Control Categories 15. Scope 15. General Requirements 15 Acceptance Page 2 Revision History 3 Introduction 14 Control Categories 15 Scope 15 General Requirements 15 Control Category: 0.0 Information Security Management Program 17 Objective Name: 0.01 Information

More information

Future Trends in Airline Pricing, Yield. March 13, 2013

Future Trends in Airline Pricing, Yield. March 13, 2013 Future Trends in Airline Pricing, Yield Management, &AncillaryFees March 13, 2013 THE OPPORTUNITY IS NOW FOR CORPORATE TRAVEL MANAGEMENT BUT FIRST: YOU HAVE TO KNOCK DOWN BARRIERS! but it won t hurt much!

More information

Vehicle Identification Numbering System 00.03

Vehicle Identification Numbering System 00.03 Vehicle Identification Numbering System 00.03 IMPORTANT: See Subject 050 for the vehicle identification numbering system for vehicles built before May 1, 2000. Federal Motor Vehicle Safety Standard 115

More information

SYABAS STANDARD SPECIFICATION FOR PIPE LAYING WOKS

SYABAS STANDARD SPECIFICATION FOR PIPE LAYING WOKS D - STEEL PIPES AND SPECIALS 1.0 GENERAL REQUIREMENTS 1.1 Scope This section of the Specifications covers the requirements for the manufacture and testing of welded steel pipes together with fittings complete

More information

Pattern Co. Monkey Trouble Wall Quilt. Size: 48" x 58"

Pattern Co. Monkey Trouble Wall Quilt. Size: 48 x 58 .............................................................................................................................................. Pattern Co..........................................................................................

More information

www.ktmschnellversand.de

www.ktmschnellversand.de w.ktmschnellversand.de INDEX SPARE CONNECTORS AA-AR SPARE CONNECTORS AS-BK SPARE CONNECTORS BL-BZ SPARE CONNECTORS CA-CP 1x 2x 3x 4x SPARE CONNECTORS CQ-DM SPARE CONNECTORS DN-EL 5x 6x x x All information

More information

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved

More information

UK ResiEMEA Version 2.0.0

UK ResiEMEA Version 2.0.0 The following is Fitch Ratings file layout and fields for UK mortgage pools submitted to the Fitch Ratings UK RMBS Group as of 9 September 2009. Please e-mail mortgage files to the appropriate person in

More information

CUSCINETTI MONTANTE MAST ROLLERS

CUSCINETTI MONTANTE MAST ROLLERS TIPO A - TYPE A TIPO B - TYPE B TIPO C - TYPE C TIPO BE - TYPE BE TIPO E - TYPE E TIPO AA - TYPE AA TIPO L - TYPE L TIPO F - TYPE F TIPO BT - TYPE BT TIPO BK - TYPE BK 1 TIPO N - TYPE N TIPO W- TYPE W

More information

LIST OF DISPOSABLE PLANTS & MACHINARIES LYING AT HOWRAH WORKS

LIST OF DISPOSABLE PLANTS & MACHINARIES LYING AT HOWRAH WORKS Enclosure-I LIST OF DISPOSABLE PLANTS & MACHINARIES LYING AT HOWRAH WORKS Group Machines in the Group QTY. Group Reserve (In If Bidding For, State "YES" EMD Submitted (In AA Hydraulic Pump Cap: 100 gpm

More information

Transient Voltage Suppressor SMBJ5.0 - SMBJ440CA

Transient Voltage Suppressor SMBJ5.0 - SMBJ440CA Features: Glass passivated junction Low incremental surge resistance, excellent clamping capability 600W peak pulse power capability with a 10/1,000μs waveform, repetition rate (duty cycle): 0.01% Very

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter

More information

Safety. Fire Resistant. Gas Cylinder

Safety. Fire Resistant. Gas Cylinder All Cabinets Ship Flyer CAB09...Many in 48 hrs. Heavy Duty All Welded CABINETS 31 Models Safety Fire Resistant Spill Containment Gas Cylinder Made in USA Distributed By: Our Quality Serves You Longer JAMCO

More information

SOLICITATION/CONTRACT/ORDER FOR COMMERICAL ITEMS

SOLICITATION/CONTRACT/ORDER FOR COMMERICAL ITEMS SOLICITATION/CONTRACT/ORDER FOR COMMERICAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30 2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. RFQ NUMBER 6.

More information

French Journey Day Trains Valid for sales and travel from April 15, 2011 until further notice

French Journey Day Trains Valid for sales and travel from April 15, 2011 until further notice French Journey Day Trains TGV Routes: Paris- Avignon, Bordeaux, Dijon, Lourdes, Lyon, Marseille, Nice, St Pierre Des Corps, Strasbourg Teoz Routes (TJC): Clermont Ferrand - Limoges -Toulouse - Bordeaux

More information

GK Packing System Welding Instructions

GK Packing System Welding Instructions GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de Welding instructions

More information

Service Instruction. 1.0 SUBJECT: ECi Accessory Cases for Lycoming 4-Cylinder engines with single magneto configurations and TITAN 361 Engines

Service Instruction. 1.0 SUBJECT: ECi Accessory Cases for Lycoming 4-Cylinder engines with single magneto configurations and TITAN 361 Engines Title: Service Instruction ECi Accessory Cases Installed on Engines S.I. No.: 03-1 Page: 1 of 7 Issued: 2/28/2003 Revision: 2 (4/13/2009) Technical Portions are FAA DER Approved. 1.0 SUBJECT: ECi Accessory

More information

SPECIFICATIONS FOR STEEL PIPE

SPECIFICATIONS FOR STEEL PIPE SPECIFICATIONS FOR STEEL PIPE Published pipe standards serve three functions. 1. They dictate manufacturing and testing requirements and prescribed methods of measuring the required mechanical and physical

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

CIRCLE COORDINATE GEOMETRY

CIRCLE COORDINATE GEOMETRY CIRCLE COORDINATE GEOMETRY (EXAM QUESTIONS) Question 1 (**) A circle has equation x + y = 2x + 8 Determine the radius and the coordinates of the centre of the circle. r = 3, ( 1,0 ) Question 2 (**) A circle

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

SPECIFICATION FOR PIPEWORKS

SPECIFICATION FOR PIPEWORKS SPECIFICATION SAJH WS / PW / 001 (Rev.1.0 / 06.2007) QUALITY ASSURANCE DEPARTMENT CONTENTS PAGE NO. 1.0 GENERAL 1 1.1 Order for Pipes and Specials 1 1.2 Approvals 1 1.3 Hauling and Handling 1 1.4 Records

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

JIS G3445 Carbon steel tubes for machine structural purposes

JIS G3445 Carbon steel tubes for machine structural purposes JIS G3445 arbon steel tubes for machine structural purposes 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for machinery, automobiles,

More information

APPENDIX R INFECTIOUS WASTE TREATMENT FACILITY PERMIT TO INSTALL APPLICATION

APPENDIX R INFECTIOUS WASTE TREATMENT FACILITY PERMIT TO INSTALL APPLICATION INFECTIOUS WASTE TREATMENT FACILITY PERMIT TO INSTALL APPLICATION Submittal Procedure - Submit four copies of the Permit to Install application (two copies to Central Office and two copies to the appropriate

More information

Content. Document no: D#39832. Version: 4/16/2014

Content. Document no: D#39832. Version: 4/16/2014 VI&VA-Interface Introduction Content Content 1. Introduction 3 2. History 3 3. VI&VA-Interface for CodX PostOffice V2013.06 and V2013.09 3 4. VI&VA-Interface for CodX PostOffice V2013.11 13 5. VI&VA-Interface

More information

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure. Recommend Approval: Team Leader Date Division Chief Date Approved: Director Date Maryland Department of Transportation State Highway Administration Office of Materials Technology MARYLAND STANDARD METHOD

More information

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :- Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and

More information

TIMETABLE SYSTEM A NOTE FOR MODULE ORGANISERS AND TIME-TABLERS

TIMETABLE SYSTEM A NOTE FOR MODULE ORGANISERS AND TIME-TABLERS UNIVERSITY OF EAST ANGLIA TIMETABLE SYSTEM A NOTE FOR MODULE ORGANISERS AND TIME-TABLERS Timetable planning for the 2010/11 academic year and beyond will be undertaken in accordance with a new Basic scheme

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

Caps STANDARD WEIGHT Inches / Pounds

Caps STANDARD WEIGHT Inches / Pounds Standard Caps you are here: Home > Weldbend Catalog > Fittings > Caps Caps STANDARD WEIGHT Inches / Pounds For Metric Units >Click Here Nominal Pipe Size Outside Inside Wall Thickness (T) Length (E) Pipe

More information

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900 September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation

More information

3200 Series End Drive Flat and Cleated Belt Conveyors

3200 Series End Drive Flat and Cleated Belt Conveyors 00 Series End Drive Flat and Cleated Belt Conveyors Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 0 975 Cottonwood Ave. TEL: -800-97-8664 TEL: 6-67-7600

More information

How To Run A Test Lab In Rourkela

How To Run A Test Lab In Rourkela TESTING LABORATORY ROURKELA 1. Background: Keeping in view of the growing demand of quality of the products of the industries, Govt. has established Testing Laboratory, Rourkela, under the Directorate

More information

Oil and Gas Pipeline Design, Maintenance and Repair

Oil and Gas Pipeline Design, Maintenance and Repair Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg

More information

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines

More information

Specifications for Programs: 737, 747, 757, 767, 777, 787

Specifications for Programs: 737, 747, 757, 767, 777, 787 = Performed by GKN BAC 5000 AN General Sealing 6-262, 6-265, 6-267, 6-270 PSD for 787 Only: 6-242, 6-269, 6-271 PSD for 777 Only: 6-261,6-264, 6-266, 6-269, 6-271 BAC 5004 L Installation of Permanent Fasteners

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

T.10.928 - NEW WAREHOUSE AND OFFICE INDEX 1. WATER SUPPLY...4 1.1. GENERAL...4 1.1.1. General requirements...4 1.1.2. Macau Codes...4 1.2. GLOSSARY OF TERMS...4 1.2.1. Fitting...4 1.2.2. Flexible joint...4

More information

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels

AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI CHEMICAL COMPOSITION LIMITS: Nonresulphurized Carbon Steels AISI No. 1008 1010 1012 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 10 1026 1027 1029 10 1035 1036 1037 1038 1039 10 1041 1042 1043

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding 7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:

More information

Specification for Pipe Coating Repairs Offshore

Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND

More information

CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe :

CEG/GP/1534/257/RFQ27016/ [01] Technical specification for NB 350 CB pipe : [01] Technical specification for NB 350 CB pipe : Size :- NB 350 Plain End, ID 336 MM, OD 406 mm, Length - 5.3 meters +/- 25 mm Outer shell : Rolled and welded from 5 mm thick carbon steel coil / plates

More information

Specification for Rotary Drill Stem Elements

Specification for Rotary Drill Stem Elements Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

CATHODIC PROTECTION SYSTEM DESIGN

CATHODIC PROTECTION SYSTEM DESIGN CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of

More information

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. OSNA -10 Copper-Nickel Lined Pipes Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. KME Germany AG & Co. KG Copper-Nickel Lined Pipes [GB] Member of the KME Group

More information

Victims Compensation Claim Status of All Pending Claims and Claims Decided Within the Last Three Years

Victims Compensation Claim Status of All Pending Claims and Claims Decided Within the Last Three Years Claim#:021914-174 Initials: J.T. Last4SSN: 6996 DOB: 5/3/1970 Crime Date: 4/30/2013 Status: Claim is currently under review. Decision expected within 7 days Claim#:041715-334 Initials: M.S. Last4SSN: 2957

More information

2200 Series End Drive Conveyors

2200 Series End Drive Conveyors 00 Series End Drive Conveyors Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 0 975 Cottonwood Ave. TEL: -800-397-8664 TEL: 6-367-7600 Hartland, WI 5309-000

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

INDIAN STANDARDS (BIS) ON WELDING

INDIAN STANDARDS (BIS) ON WELDING ** IS 82:957 Glossary of terms relating to welding and cutting of Sep 2008 metals 2 IS 83:986 Scheme of symbols for welding (revised) Sep 2008 3 IS 84:2004 Covered electrodes for manual metal arc welding

More information

ENGLISH FORK GUIDE 2013

ENGLISH FORK GUIDE 2013 FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,

More information

DESCRIPTION. Stud Bolts for Pressure-Temperature Piping 2-1. General Purpose End-to-End Studs 2-2. Tap End Stud Bolts 2-3. Double End Stud Bolts 2-4

DESCRIPTION. Stud Bolts for Pressure-Temperature Piping 2-1. General Purpose End-to-End Studs 2-2. Tap End Stud Bolts 2-3. Double End Stud Bolts 2-4 DESCRIPTION PAGE B7 Studs and Nuts Stud Bolts for Pressure-Temperature Piping 2-1 General Purpose End-to-End Studs 2-2 Tap End Stud Bolts 2-3 Double End Stud Bolts 2-4 Sigma Fasteners, Inc. Section 2 STUD

More information

SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE

SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE SECTION 02612 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Furnishing and installing nonreinforced concrete sewer pipe. Provide concrete sewer pipe less than 12 inches in diameter, and in other sizes

More information

The consensus of the Pharmacy Practice Model Summit Am J Health-Syst Pharm. 2011; 68:1148-52 This list of the Pharmacy Practice

The consensus of the Pharmacy Practice Model Summit Am J Health-Syst Pharm. 2011; 68:1148-52 This list of the Pharmacy Practice The consensus of the summit The consensus of the Pharmacy Practice Model Summit Am J Health-Syst Pharm. 2011; 68:1148-52 This list of the Pharmacy Practice Model Summit s 147 points of consensus about

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,

More information

VOLUME AND SURFACE AREAS OF SOLIDS

VOLUME AND SURFACE AREAS OF SOLIDS VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b

More information

NEOSHO COUNTY COMMUNITY COLLEGE MASTER COURSE SYLLABUS. Medical Administrative Aspects

NEOSHO COUNTY COMMUNITY COLLEGE MASTER COURSE SYLLABUS. Medical Administrative Aspects NEOSHO COUNTY COMMUNITY COLLEGE MASTER COURSE SYLLABUS COURSE IDENTIFICATION Course Code/Number: ALMA 120 Course Title: Medical Administrative Aspects Division: Applied Science (AS) Liberal Arts (LA) Workforce

More information

NATIONAL INSTITUTE OF BIOLOGICALS

NATIONAL INSTITUTE OF BIOLOGICALS Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in

More information

NRFs administrasjon TLF 22 43 76 60 post@vvsnrf.no. Norske Rørgrossisters Forening. Efficientinformation logistics. Terje Røising General Manager

NRFs administrasjon TLF 22 43 76 60 post@vvsnrf.no. Norske Rørgrossisters Forening. Efficientinformation logistics. Terje Røising General Manager NRFs administrasjon TLF 22 43 76 60 post@vvsnrf.no Terje Røising General Manager Morten Svensen Technical Manager Efficientinformation logistics Iren Bjerklund Database Operator NRF Excel sheet. The following

More information

Metal Pressfitting Pipe Systems

Metal Pressfitting Pipe Systems VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing

More information

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS

SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences

More information

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049 Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal

More information

TABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe. 4 Alloy Pipe & Tube. 6 Chrome-Moly Pipe. 7 Low-Temp Pipe

TABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe. 4 Alloy Pipe & Tube. 6 Chrome-Moly Pipe. 7 Low-Temp Pipe PRODUCT CATALOG TABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe 4 Alloy Pipe & Tube 6 Chrome-Moly Pipe 7 Low-Temp Pipe 9 Services amerpipe.com 1.800.316.5737 sales@amerpipe.com 18333

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

DATING YOUR GUILD 1952-1960

DATING YOUR GUILD 1952-1960 DATING YOUR GUILD 1952-1960 YEAR APPROXIMATE LAST SERIAL NUMBER PRODUCED 1953 1000-1500 1954 1500-2200 1955 2200-3000 1956 3000-4000 1957 4000-5700 1958 5700-8300 1959 12035 1960-1969 This chart displays

More information

Above Ground Fittings. Below Ground Fittings. tooling

Above Ground Fittings. Below Ground Fittings. tooling C O N T E N T S Above Ground Fittings Crimp House Entry Tee 3 Crimp House Entry Tee Body 3 Building Entry Tee 3 Factory Entry Elbow 4 Meter Box Adaptors Crimp C Clip Meter Box Adaptor 4 Crimp Stab-in Meter

More information

Chapter 5 - Aircraft Welding

Chapter 5 - Aircraft Welding Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

Quick response concealed horizontal sidewall sprinkler

Quick response concealed horizontal sidewall sprinkler January 1, 2011 Sprinkler 63a 1. DESCRIPTION Viking Quick Response Concealed Horizontal Sidewall Sprinkler VK408 is a small solder link and lever spray sprinkler designed for installation on concealed

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

Baker & Taylor, Inc. Electronic Data Interchange (EDI) Implementation Guide for Publishers. Revised 2011

Baker & Taylor, Inc. Electronic Data Interchange (EDI) Implementation Guide for Publishers. Revised 2011 Electronic Data Interchange (EDI) Implementation Guide for Publishers Revised 2011 PUBLISHER IMPLEMENTATION GUIDELINE FOR EDI TO OUR PROSPECTIVE TRADING PARTNERS This Implementation Guide is provided with

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

EQUITIES DIRECTIVES. 3 July 2015

EQUITIES DIRECTIVES. 3 July 2015 EQUITIES DIRECTIVES 3 July 2015 JSE Limited Reg No: 2005/022939/06 Member of the World Federation of Exchanges JSE Limited I 2014 VERSION CONTROL Equities Directives 22 August 2005 As amended by Date Notice

More information

EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES

EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES Prepared for AIR LOGISTICS, INC. Azusa, California September 2005 Revision 1 STRESS ENGINEERING SERVICES, INC. Houston, Texas

More information

Community College of Philadelphia Calling Code 218 Employer Scan Client Approved: November 17, 2005 Region (CIRCLE) City MSA

Community College of Philadelphia Calling Code 218 Employer Scan Client Approved: November 17, 2005 Region (CIRCLE) City MSA Community College of Philadelphia Calling Code 218 Employer Scan Client Approved: November 17, 2005 Region (CIRCLE) City MSA Zip V0 V1 V2 Month/ Day/ Year of Contact: Business Name: Address: V3 City: V4

More information

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04 BROWN MINNEAPOLIS TANK PAGE 1 OF 7 PURPOSE: Create and Drawing Uniformity Create, explain, and establish a standard bill of materials to be placed on every drawing (except the overall tank elevation and

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

2. Division 05 Structural Steel Framing for steel framework requirements

2. Division 05 Structural Steel Framing for steel framework requirements SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

General Allowances for Insulation & Cladding

General Allowances for Insulation & Cladding TRADE OF Industrial Insulation PHASE 2 Module 1 Sheet Metal and Insulation Fundamentals UNIT: 4 General Allowances for Insulation & Cladding Produced by In cooperation with subject matter expert: Michael

More information

Copper and Copper Alloy Tube, Pipe and Fittings

Copper and Copper Alloy Tube, Pipe and Fittings Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

UGVCL/SP/591/11KV HT AB CABLE

UGVCL/SP/591/11KV HT AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

Puddle Flange. FRANK Puddle Flange

Puddle Flange. FRANK Puddle Flange Puddle Flange FRANK Puddle Flange The problem Problems keep on occurring when connecting pipes during construction work. Pipes laid in the ground must be introduced into concrete walls or shafts. In many

More information

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg,

More information

7200 Series Sanitary End Drive Conveyors

7200 Series Sanitary End Drive Conveyors 7200 Series Sanitary End Drive Conveyors Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 20 975 Cottonwood Ave. TEL: 1-800-397-8664 TEL: 262-367-7600

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information