Deep Excavations ABSTRACT INTRODUCTION. KEYWORDS: deep excavation; retaining wall; earth pressure; anchor.

Size: px
Start display at page:

Download "Deep Excavations ABSTRACT INTRODUCTION. KEYWORDS: deep excavation; retaining wall; earth pressure; anchor."

Transcription

1 Deep Excavations M. Ufuk Ergun Department of Civil Engineering, Middle East Technical University, Ankara, Turkey ABSTRACT All major topics in the design of in-situ retaining systems for deep excavations in urban areas are outlined. Type of wall, water related problems and water pressures, lateral earth pressures, type of support, solution to earth retaining walls, types of failure, internal and external stability problems, displacements of walls and adjacent ground, instrumentation of deep excavation projects are summarized. Sequence of the subjects are given in order of design steps. KEYWORDS: deep excavation; retaining wall; earth pressure; anchor. INTRODUCTION Number of deep excavation pits in city centers are increasing every year. Buildings, streets surrounding excavation locations and design of very deep basements make excavations formidable projects. This chapter has been organized in such a way that subjects related to deep excavation projects are summarized in several sections in the order of design routine. These are types of in-situ walls, water pressures and water related problems. Need for dewatering is discussed in some cases. Earth pressures in cohesionless and cohesive soils are presented in two different categories. Ground anchors, struts and nails as supporting elements are explained. Anchors are given more emphasis compared to others due to widespread use observed in the recent years. Stability of retaining systems are discussed as internal and external stability. Solution of walls for shears, moments, displacements and support reactions under earth and water pressures are obtained making use of different methods of analysis. A pile wall supported by anchors is solved by three methods and the results are compared. Global stability issues are also referred. Type of wall failures, observed wall movements and instrumentation of deep excavation projects are summarized. Finally a design routine is described for preparing deep excavation projects. Topics related to construction methods do not take place in the chapter.

2 Bouquet TYPES OF EARTH RETAINING WALLS 1.1 Introduction More than several types of in-situ walls are used to support excavations. The criteria for the selection of type of wall are size of excavation, ground conditions, groundwater level, vertical and horizontal displacements of adjacent ground and limitations of various structures, availability of construction, cost, speed of work and others. One of the main decisions is the water-tightness of wall. The following types of in-situ walls will be summarized below; 1. Braced walls, soldier pile and lagging walls 2. Sheet-piling or sheet pile walls 3. Pile walls (contiguous, secant) 4. Diaphragm walls or slurry trench walls 5. Prefabricated diaphragm walls 6. Reinforced concrete (cast-in-situ or prefabricated) retaining walls 7. Soil nail walls 8. Cofferdams 9. Caissons 10. Jet-grout and deep mixed walls 11. Top-down construction 12. Partial excavation or island method 1.2 Braced Walls Excavation proceeds step by step after placement of soldier piles or so called king posts around the excavation at about 2 to 3 m intervals. These may be steel H, I or WF sections. Rail sections and timber are also used. At each level horizontal waling beams and supporting elements (struts, anchors, nails) are constructed. Soldier piles are driven or commonly placed in bored holes in urban areas, and timber lagging is placed between soldier piles during the excavation. Various details of placement of lagging are available, however, precast units, in-situ concrete or shotcrete may also be used as alternative to timber. Depending on ground conditions no lagging may be provided in relatively shallow pits. Historically braced walls are strut supported. They had been used extensively before the ground anchor technology was developed in 1970 s. Soils with some cohesion and without water table are usually suitable for this type of construction or dewatering is accompanied if required and allowed. Strut support is commonly preferred in narrow excavations for pipe laying or similar works but also used in deep and large excavations (See Fig 1.1). Ground anchor support is increasingly used and preferred due to access for construction works and machinery. Waling beams may be used or anchors may be placed directly on soldier piles without any beams.

3 Bouquet Sheet-piling or Sheet Pile Walls Sheet pile is a thin steel section (7-30 mm thick) mm wide. It is manufactured in different lengths and shapes like U, Z and straight line sections (Fig. 1.2). There are interlocking watertight grooves at the sides, and they are driven into soil by hammering or vibrating. Their use is often restricted in urbanized areas due to environmental problems like noise and vibrations. New generation hammers generate minimum vibration and disturbance, and static pushing of sections have been recently possible. In soft ground several sections may be driven using a template. The end product is a watertight steel wall in soil. One side (inner) of wall is excavated step by step and support is given by struts or anchor. Waling beams (walers) are frequently used. They are usually constructed in water bearing soils. Steel sheet piles are the most common but sometimes reinforced concrete precast sheet pile sections are preferred in soft soils if driving difficulties are not expected. Steel piles may also encounter driving difficulties in very dense, stiff soils or in soils with boulders. Jetting may be accompanied during the process to ease penetration. Steel sheet pile sections used in such difficult driving conditions are selected according to the driving resistance rather than the design moments in the project. Another frequently faced problem is the flaws in interlocking during driving which result in leakages under water table. Sheet pile walls are commonly used for temporary purposes but permanent cases are also abundant. In temporary works sections are extracted after their service is over, and they are reused after maintenance. This process may not be suitable in dense urban environment. Figure 1.1: Braced walls; plan, section and inside views

4 Bouquet 08 4 Figure 1.2: Steel and reinforced concrete sheet piles 1.4 Pile Walls In-situ pile retaining walls are very popular due to their availability and practicability. There are different types of pile walls (Fig. 1.3). In contiguous (intermittent) bored pile construction, spacing between the piles is greater than the diameter of piles. Spacing is decided based on type of soil and level of design moments but it should not be too large, otherwise pieces of lumps etc. drop and extra precautions are needed. Cohesive soils or soils having some cohesion are suitable. No water table should be present. Acceptable amount of water is collected at the base and pumped out. Common diameters are 0.60, 0.80, 1.00 m. Waling beams (usually called breasting beams ) are mostly reinforced concrete but sheet pile sections or steel beams are also used. Tangent piles with grouting in between are used when secant piling or diaphragm walling equipment is not available (i.e. in cases where ground water exists). Poor workmanship creates significant problems. Secant bored pile walls are formed by keeping spacing of piles less than diameter (S<D). It is a watertight wall and may be more economical compared to diaphragm wall in small to medium scale excavations due to cost of site operations and bentonite plant. There is also need for place for the plant. It may be constructed hard-hard as well as soft-hard. Soft concrete pile contains low cement content and some bentonite. Primary unreinforced piles are constructed first and then reinforced secondary piles are formed by cutting the primary piles. Pile construction methods may vary in different countries for all type of pile walls like full casing support, bentonite support, continuous flight auger (CFA) etc. 1.5 Diaphragm Walls Diaphragm wall provides structural support and water tightness. It is a classical technique for many deep excavation projects, large civil engineering works, underground car parks, metro pits etc. especially under water table. These reinforced concrete diaphragm (continuous) walls are also called slurry trench walls due to the reference given to the construction technique where excavation of wall is made possible by filling and keeping the wall cavity full with bentonitewater mixture during excavation to prevent collapse of the excavated vertical surfaces. Wall thickness varies between 0.50 m and 1.50 m. The wall is constructed panel by panel in full depth.

5 An Bouquet 08 5 Panel lengths are 2 m to 10 m. Short lengths (2-2.5 m) are selected in unstable soils or under very high surcharges. Nowadays depth of panels exceeded 100 m, excavation depths exceeded 50 m. Different panel shapes other than the conventional straight section like T, L, H, Y, + are possible to form and used for special purposes. Panel excavation is made by cable or kelly supported buckets and by a recent design called cutter or hydrofraise which is a pair of hydraulically operated rotating disks provided with hard cutting tools. Excavation in rock is possible. Slurry wall technique is a specialized technique and apart from the bucket or the frame carrying the cutter equipment like crawler crane, pumps, tanks, desanding equipment, air lifts, screens, cyclones, silos, mixers, extractor are needed. Tremie concrete is placed in the slurry starting from the bottom after lowering reinforcement cages. Joint between the panels is a significant detail in water bearing soils and steel pipe, H-beam or water stops are used (Fig 1.4). Piles Intermittent (Contiguous) bored pile wall Breasting Beam grouted in water bearing soils OR b. Tangent bored pile wall Breasting Beam c) Secant bored pile walls Figure 1.3: Types of pile wall

6 Bouquet 08 6 Stop end pipe Figure 1.4: Stop Joints between the panels in diaphragm walls End I - beam Waterstop 1.6 Prefabricated Diaphragm Walls Same principles apply as the diaphragm walls, with bentonite-cement suspension in the trenches. Then prefabricated panels are placed inside the trench and the slurry mixture is set. The panels are excavated to the depth required for tightness, while the prefabricated elements are placed only to the depth required for ground retaining (Fig. 1.5). Concrete prefabricated panels may be designed quite thin by the use of good quality concreting and reinforcement. Sheet piles or prefabricated steel slabs may also be used. 1.7 Reinforced Concrete (Cast In-Situ or Prefabricated) Retaining Walls-Excavation in Stages It is a common type of staged excavation wall usually supported by ground anchors (Fig. 1.6). Soils with some cohesion are suitable because each stage is first excavated before formwork and concrete placement. No water table or appreciable amount of water should be present. Sometimes micropile support is given if required due to expected cave-ins. Figure 1.5 Section view of prefabricated diaphragm wall Figure 1.6: Reinforced concrete retaining walls - excavation in stages

7 Bouquet Soil Nail Walls Similar to the method above excavation is made step by step (1.5 to 2 m high). Shotcrete is common for facing and wiremesh is used. Soft facing is also possible making use of geotextiles. Hole is drilled, ordinary steel bars are lowered, and grout is placed without any pressure. Soil should be somewhat cohesive and no water table or significant water flow should be present. 1.9 Cofferdams Cofferdam is a temporary earth retaining structure to be able to make excavation for construction activities. It is usually preferred in the coastal and sea environment like bridge piers and abutments in rivers, lakes etc., wharves, quay walls, docks, breakwaters and other structures for shore protection, large waterfront structures such as pump houses, subjected to heavy vertical and horizontal loads. Sheet piling is commonly used in various forms other than conventional walls like circular cellular bodies or double walls connected inside and filled with sand. Stability is maintained by sheeting driven deeper than base, sand body between sheeting and inside tie rods. Earth embankments and concrete bodies are also used. Contiguous, tangent, secant piles or diaphragm walls are constructed in circular shapes, and no internal bracing or anchoring is used to form a cofferdam. Reinforced concrete waling beams support by arching (Fig. 1.7). Shafts are also made with this method. Large excavations or project details may require additional lateral support Caissons Caisson construction is restricted to major foundation works because of large construction cost. Caissons sunk in water are more common than land caissons. Sea caisson is a cellular or single piece concrete structure constructed on land and towed to site and sunk by filling inside (Fig. 1.8). Land caisson is an open concrete section at the top and bottom, and it is lowered into its position by excavating inside and adding in-situ concrete section on top. Caisson may be advantageous to other systems in cases where the soil contains large boulders which obstruct penetration of piles or bored piles, and large lateral forces may necessitate a massive structure. There are also pneumatic caissons where excavation is carried out under air pressure. Figure 1.7: No internal bracing or anchoring is required due to arching

8 Bouquet 08 8 Figure 1.8: Types of caissons 1.11 Jet Grout and Deep Mixed Walls Retaining walls are made by single to triple row of jet grout columns or deep mixed columns. There is a soil mixed wall (SMW) technique specially developed for wall construction where H sections are used for reinforcement. Single reinforcing bar is placed in the central hole opened for jet grout columns. Anchors, nails or struts may be used for support Top Down Construction Retaining structure (generally diaphragm wall) is designed and constructed as permanent load bearing walls of basement. Piles or barettes are similarly placed to complete the structural frame. Top slab is cast at the ground surface level, and excavation is made under the slab by smaller sized excavators and continued down forming basement slabs at each level. There are special connection details. Top down method is preferred in highly populated city centers where horizontal and vertical displacements are very critical, and anchors and struts are very difficult to use due to complex underground facilities and lifeline structures and site operations are difficult to perform Partial Excavation or Island Method It is possible to give strut support to retaining walls at a later stage after constructing central sections of a building in large size excavations. Core of the structure is built at the central part making sloped excavations at peripheral areas and then the core frame is used to give support to walls (Figure 1.9). It may be more practical and construction time may be less compared to conventional braced system. This method may not be suitable in soft and weak soils due to stability and deformation problems during sloped excavations.

9 Bouquet 08 9 In-situ retaining wall Sloped excavation Figure 1.9: Partial excavation or Island method 2. WATER PRESSURES ACTING ON RETAINING SYSTEMS AND RELATED PROBLEMS 2.1 Introduction The presence of water or water table is one of the most important criteria for the choice of the type of wall and construction method. Site investigation studies frequently report water in borehole logs but sometimes it may not be clear whether it is a water table, a perched level, a significant source of water, leakage from a water main, surface water infiltration or due to granular pockets and lenses. If there is plenty of water a watertight type of wall has to be selected otherwise water seeping through the wall is drained off. Most municipalities do not allow pumping and groundwater lowering. If the excavation is located at an area without such a restriction it may be economical to lower groundwater table and to select a wall which is not watertight. This procedure was common in the past decade. In open areas there may not be need for walls, and sloped excavation and dewatering will suffice. Groundwater lowering causes both total and differential settlements of structures if relatively compressible soils are present. 2.2 Soil Investigations Technical data related to existing groundwater conditions should be investigated, and the need for groundwater control in making the excavation, planning a dewatering system to meet the job requirements and its effect on adjacent structures, specifications, monitoring and the necessity for recharge of the exterior water table should be assessed. Soil investigations generally include determination of piezometric levels, presence of perched, depressed or artesian water levels, detailed description of soil layers, grain size analyses of aquifer soils. Depending on the project more detailed investigations may be made like borehole permeability tests, water pressure tests, well pumping tests and observation wells. Local studies on groundwater regime are also helpful if available.

10 Bouquet Water Pressure on Walls No water pressure is considered on walls through which water can pass. Drainage measures are taken inside the excavation pit at every and final stages. Acceptable amount of water should be drained this way. Water pressure acting on watertight walls shows variations depending on type of soils throughout depth and below base of wall. If there is no seepage beneath the base due to impermeable soil or impervious grout slab (blanket) hydraulic pressure distributions prevail (Fig. 2.1, cases 2 and 3). If there is seepage into the excavation through the base in case of permeable soil (case 1) flow should be acceptable and there should not be any risk of piping (See Fig. 2.2 for piping check). Flow of water exerts a hydrodynamic pressure in addition to hydrostatic pressure. As it flows downwards on the active side of the wall it increases effective overburden pressure. Reverse effect occurs on the passive side and effective overburden and earth pressures are reduced. The effect on the passive overburden is more significant as far as the passive resistance is concerned. In other words, water pressures on the active side are reduced compared to hydrostatic values and increased on the passive side. Approximate estimation of water pressure during steady seepage without sketching flow nets is shown in Fig. 2.3 (Padfield and Mair, 1984). This method is not suitable for narrow trench like excavations, and use of flow nets are recommended. Very permeable soils cause high flows, and should not be allowed. The flow, drainage and pumping out result in drops in water levels outside the excavation. Recharge wells may be required outside the walls if drops in water level are not allowed. If there are compressible soils in the profile, buildings and lifeline structures are expected to settle due to groundwater lowering. Watertight Wall Watertight Wall GWT GWT GWT Permeable Permeable 1. Deep Permeable Soil Impermeable 2. Impermeable Soil Relatively Near the Base Watertight Wall Watertight Wall GWT GWT GWT GWT Figure 2.1: Water Permeable pressure acting on watertight walls show variations Impermeable depending on the type of soils throughout the depth and base of the wall Grouted Permeable Soil 3. Deep Permeable Soil Deep Slab or Blanket 4. Pressure Gradient Beneath the Base

11 Bouquet Ld 2 h w : difference of water head h w : difference of water head w γ Ld L d : penetration length l: length of stream line 1 u 2 γw hw γ : submerged unit weight of soil a)terzaghi s formula w 2 γ L d F s u γ w h w G s : specific gravity of soil particle b) critical hydraulic e: void ratio gradient expression ic Fs i G s 1 l 1 e h Figure 2.2: Potential of piping can be estimated by either a) Terzaghi s formula or b) critical hydraulic gradient expression w γ l γ w h w Figure 2.3: Approximate estimation of water pressure during steady seepage

12 Bouquet Dewatering Dewatering methods are applied in cases where there is need for control of water pressures and/or flow. Fig. 2.4 shows some dewatering schemes using wells and wellpoints in permeable soils. Mainly, base pressure gradients and/or flow are reduced or eliminated. Several methods are available. Detailed description of dewatering works can be seen in CIRIA (1993), CIRIA (1986) and Powers (1992). Common techniques are: a. Shallow ditches, training walls, sumps and pumps b. Single-staged or multi-staged well points c. Shallow or deep wells Water flow problems may sometimes be encountered in excavation projects unexpectedly. These are flow through flaws on the watertight walls, from unidentified perched levels, sources or pockets through non-watertight walls, through soil-wall interface under artesian conditions or leakage from anchor holes. Impermeable Figure 2.4: Examples of dewatering schemes using wells and wellpoints in permeable soils

13 Bouquet EARTH PRESSURES ON IN-SITU RETAINING WALLS 3.1. Introduction Earth pressures on in-situ retaining walls are rather different than those on ordinary retaining walls due to the supporting elements. Free displacement of walls are not allowed. Type of support affects the distribution of earth pressure. Strut loads were measured in strutted excavations in many countries in the past, and recommendations were given. Ground anchor technology is relatively new, and data on instrumented anchored walls for total lateral pressure and for water pressure are being accumulated. Earth pressure diagrams on strutted and anchored walls are expected to be somewhat different due to stiffer support conditions in the former. Theoretical approaches will also be discussed Earth Pressure Distributions on Walls Terzaghi and Peck (1967) and Peck (1969) based on load measurements on struts recommend the pressure distribution shown in Figure 3.1 for cohesionless soils. It is a uniform pressure and given by Eq. 3.1; p = 0.65 K A γ t H 3.1 where K A is the active earth pressure coefficient, H is the height of wall. Unit weight (γ t ) is described as the bulk unit weight in the original references. Since braced excavations were generally dewatered in the past projects the unit weight in the expression was described as wet or bulk. If wall is watertight and water table is present, buoyant unit weight should be used under water table and water pressure should be added. + water pressure γ t = wet unit weight of soil, buoyant under water K A = (1-sin φ ) / (1+ sin φ ) = tan 2 (45- φ /2) φ = angle of internal friction Figure 3.1: Earth Pressure Envelope on Wall, Granular Soil, Terzaghi and Peck (1967) and Peck (1969)

14 Bouquet The rectangular diagram proposed in the figure is not an actual pressure distribution but an envelope obtained by plotting the measured strut loads converted to pressure distribution at each stage of excavation including the final depth covering all distributions. It is also called apparent pressure distribution. It is regarded as a conservative approach because strut loads calculated by such an envelope are generally greater than the measured loads. Rectangular envelope with p = 0.2 γ t H is also recommended by Twine and Roscoe (1996) based on more recent field measurements. Similarly use of submerged unit weight below water table and addition of water pressure is recommended. Data on cohesive soils are classified for soft to medium stiff clays and stiff clays separately. Terzaghi and Peck (1967) and Peck (1969) recommendations are summarized in Fig Twine and Roscoe (1996) differentiates flexible and stiff walls (i.e. sheet pile walls vs. secant R.C. pile walls alike) in their recommendations for clay soils (Fig. 3.3). It is seen that envelopes are greater in case of stiff walls. Anchor or nail supported walls may show higher lateral displacements, and stress increases at the upper levels of walls may be somewhat less compared to the distributions on strutted walls. However, there are no documented comparisons. In the solution of anchored walls by finite element, boundary element, finite difference softwares or simpler spring models the analyses may be repeated without assigning pre-tensions initially like in case of nail supported walls and then assign the calculated reactions as pre-tensions. Soft to medium clays 0.25*H Stiff fissured clays 0.25*H H N 0.75*H 5 6 N H 4 C u 4cu Where K AT 1 m ; N = Stability number; t H H when N 1.0*KAT* t*h H 4 m= 1.0; when N 5 ~ 6 m = 0.4. C u H Figure 3.2 Apparent Pressure Distributions for Soft to Medium and Stiff Clays, Terzaghi and Peck (1967) and Peck (1969) C u C u H 0.5*H 0.25*H 0.2~0.4* t*h

15 Bouquet Figure 3.3: Earth pressure distribution on flexible and rigid walls for clay soils (Twine and Roscoe, 1999) Katsura et.al.(1995) summarizes Japanese codes on lateral earth pressures on walls based on strut load measurements and earth pressure cell measurements (Fig. 3.4). There are also recommendations on selection of the type of distribution in relation to height of braced walls. Distributions based on pressure cell records are recommended for all heights but distributions by strut load measurements are not found suitable for walls higher than 15 m, they may be used for walls of m height depending on conditions of the ground and construction and recommended for heights less than 10 m. Another common case is an alluvial profile where clay, silt, sand layers mixed in different proportions lie in different thicknesses. If a dominant layer is present one of the above distributions may be selected, otherwise a theoretical approach like Coulomb s earth pressure expression may be followed making use of effective parameters, submerged unit weights and added water pressure. Effect of different surcharge loads on walls may be calculated by stress distributions in elastic medium (e.g. NAVFAC 1982). For the upper limit of very rigid walls the distributions are doubled. Wide surcharge loads may also be converted to equivalent heights of soil layer.

16 Bouquet Figure 3.4: Lateral pressure distribution diagrams based on earth pressure cells on wall (Katsura et.al., 1995) 4. SUPPORTING ELEMENTS 4.1 Ground Anchors Introduction Ground anchor is a common type of supporting element used in the design and construction of in-situ retaining walls. It is an installation that is capable of transmitting an applied tensile load to a load bearing stratum which may be a soil or rock. A summary about ground anchors will be given in this section. Types, capacity, design, construction and quality control will be reviewed Types and Capacity of Anchors Temporary anchor and permanent anchor are the main types and as the names imply the former is used in temporary works and usually a period of maximum two years are assigned as the design life. Design life of a permanent anchor is the same as the life of structure. Corrosion protection details and factors of safety are the main differences between the two types. Section of

17 Bouquet an anchored wall, details of anchors are shown in Fig Free length is a function of height of the wall. Fixed length is selected according to type of soil and it varies between 3 m and 10 m. Fixed length is the tensile load bearing part of an anchor in soil. There are different mechanisms of stress transfer from the fixed anchor zone to surrounding ground. It is usually referenced as bond stress and depends on soil type and grouting procedure. Excepting special constructions in fixed part of anchors like under reams in stiff clays, jet grouted bodies or inflated aluminum bags, most common type of construction is cement (and water) grout with some additives. Very stiff, hard soils and rocks may be grouted without pressure. Many soils may be grouted but grouting pressure, water cement ratio (w/c) and additives play major role depending on the permeability and stiffness of the soil. Fixed length of anchor enlarges in diameter with increasing grout pressure. Grout permeates or fractures or pushes the soil around depending on type of soil, grout and pressure level. Coarse and fine grained granular soils, alluvial soils and weak rocks are generally grouted with several bars of pressure through casing or using packer. Stiff cohesive soils and fine cohesionless soils may be grouted at higher pressures (greater than bars) to form highly fractured larger fixed end bodies to obtain higher capacities. Post-grouting techniques through tube and manchette (sleeve tubing) or double/triple tubing are used. Main possibilities in failure of a single anchor are failure of ground/grout interface, tendon itself or grout/tendon interface. Minimum safety factors recommended for design of individual anchors are summarized in Table 4.1 (BS8081). Table 4.1: Minimum safety factors recommended for design of individual anchors Type of anchor Ground/grout interfa Tendon Grout/tendon or encapsulation interface Temporary anc Permanent anch Note: * 2.5 if no tests are available # 3.0 if no tests are available Capacity of anchors in cohesionless soils depends on average grain size (D 50 ), uniformity coefficient (C U ), relative density (R D ), fixed length, diameter of drill hole, method of grout injection (primary/secondary) and grout pressure. Higher D 50, C U, R D and grout pressure result in higher capacities. Fixed lengths of 4 to 8 m are in use and 6 m seems to be a lower limit of recommendation for fine to medium sands, and the lower limit may be less for gravelly soils. Permeability and grout characteristics (i.e. water-cement ratio, pressure) are key factors for capacities. At lower pressure levels (less than 1 MPa) and higher pressures (more than 2 MPa) capacities from 400/500 to 1400/1700 kn are observed in fine to medium sands and dense coarser sands and gravels respectively. This wide range is due to enlargement of the drill hole and more grout intrusion in coarser soils. Calculations by soil mechanics principles cannot explain these capacities. Best way is to perform tests on design anchors. Load capacity of anchors in clays is low compared to sandy and gravelly soils. Fixed anchor lengths in design are usually 7-8 m. Application of low grouting pressure (less than 1 MPa) and use of casing tubes may be beneficial to the capacity. Casing tubes also prevent formation of remolded soft cohesive film on borehole surface in layered soils which reduces capacity significantly. Capacity of anchors can be increased in stiff fissured clays using high pressure grouting and post-grouting. High pressure causes hydrofracturing and/or penetration of grout into existing fissures. Using bells or under-reams in the fixed anchor zone in stiffer clays (c U >90 kpa) also increases capacity. Tremie grouted straight shafts in very stiff or hard soils yield sufficient

18 Bouquet capacities similar to anchors in rock. Skin friction ( m) increases with decreasing plasticity and increasing consistency ((w L - w)/i P ). m range is from 50 to more than 400 kpa in stiff clays. Pressure grouting is also used in rock. Skin friction or bond values for variety of rocks can be found in BS(8081) and other references. Grout is in tension like the tendon, and it is assumed that ultimate bond stress between grout and tendon is uniform. For clean strands and deformed bars a limit of 2 MPa is recommended. Bond strength can be significantly affected by the surface condition of the tendon, particularly when loose and lubricant materials or loose rust, soil, paint are present at the interface. Minimum grout compressive strength of 30 MPa is recommended prior to stressing. At grout/encapsulation interface maximum ultimate bond is taken 3 MPa. Encapsulations are usually used in permanent anchor applications against corrosion, and single or double (concentric) corrugated plastic or metal ducts cover single or multi-unit tendons and grouted. Details at head, free length, seal between free and fixed lengths and fixed length vary in many different patented designs (See for example FIP,1986) Planning of Anchors Free length at each excavation stage and fixed length are selected. Fixed length in cohesionless and cohesive soils has been discussed in the previous section. It is usually kept constant in a project. Fixed length has to be placed outside the active wedge behind wall. It is customary to add an extra to free length (Fig. 4.2). This is especially useful in projects in stiff clays where deformations at the back of wall extend to distances three times the depth of excavation. Minimum spacing of anchors should be m and minimum distance of 2-3 m should be provided between the fixed lengths. An anchor density of 3-8 m 2 /anchor generally observed in projects depends on factors such as water pressure, type of soil, depth of excavation etc. If closely spaced anchors are used either adjacent anchors are designed at different angles with the horizontal like 10 o and 15 o or identical rows are not used (Fig. 4.3). Angles between 5 o and 25 o with the horizontal are normally selected unless fixed lengths are located in deeper competent layers. Two anchors may be placed at the same anchor head at different angles if required. It is considered a good practice to design positions of fixed lengths in a disorderly manner (Fig. 4.4). Another recommendation is to keep the whole fixed length in a single layer in layered soils if possible. Distance of fixed length to any adjacent foundation/underground service is recommended 3 m minimum. Spacing of anchors is controlled by type of wall, and vertical distance between rows is determined by a trial and error process (i.e. anchor capacity vs. spacing, reaction forces etc.). Anchors at convex corners may be planned like shown in Fig. 4.5.

19 Bouquet Figure 4.1: Anchor with strand tendon, examples of different corrosion protection

20 Bouquet x x: Extra distance allowed 45-ø /2 d Figure 4.2: Addition of an extra length to free length outside the active wedge Front view Figure 4.3: Use of staggered rows for closely spaced anchors Section view Figure 4.4: Design positions of fixed lengths in a disorderly manner

21 Bouquet Top view Figure 4.5: Layout of anchors at convex corners Materials and Construction Ordinary Portland cement is commonly used in grouting. It should be fresh and should be kept in damp free conditions. If there is a risk of chemical attack, sulphate resisting Portland cement should be used. Water/cement ratio is between and fluidifiers are generally used. Other additives like accelerators, retarders, expanders or antibleed agents may be used if required. Setting of grout after injection takes time, and early prestressing damages anchor. Although characteristics of cement and w/c ratio play role, a waiting period of minimum ten days is recommended to reach a grout strength of 30 MPa. Seven wire strands of 12.7 mm (0.5 ) and 15.7 mm (0.6 ) diameters and 3-5 in number are commonly used in urban excavation and support works. These have ultimate strengths of about MPa, and safety factors of 1.6 and 2.0 are recommended for temporary and permanent applications. Single bars are available from 26 mm to 50 mm diameter in 835/1030 and 1080/1230 MPa grades (ultimate/yielding) reaching over 1000 kn service loads. Method of drilling varies in different type of soils and rocks. Solid or hollow core augering is generally preferred in clays. Alluvial deposits of sand and clay may necessitate casing (with or without flushing). Cohesionless soils under water usually require casing. In loose silt and sand deposits under water driving casing tubes with detachable end pieces may be a good method rather than drilling. Pneumatic methods are generally employed in rock. 1/30 deviation (about 2 o ) should be expected in drilling works mm drilling diameter is commonly used. Collapse of material in boreholes should be carefully controlled. Tendon preparation is performed at site or in workshop, and the former is more common in case of temporary anchors. Installation (homing) requires mechanical aid for long anchors. Plastic or metal borehole centralizers must be used in every 1-3 m, and a nose cone helps lowering of the assembly. Plastic spacers /centralizers should be arranged such that a grout cover exists around tendon. Grouting method and pressure level significantly affect anchor capacity. Pumps should be displacement type and must be capable of exerting 1000 kpa. If high grout pressures are planned

22 Bouquet type of pump and all connections have to be carefully selected. Grout is prepared by high speed mixers in few minutes before taken into agitator where depending on additives used mixed slowly and pumped into hole before setting starts. Ideally grout properties like fluidity, density and bleed should be controlled by usual tests (i.e. flow cone, mud balance, graduated cylinder). Drilling, installation and grouting are recommended to be completed in the shortest possible time. Corrosion protection of anchors is a very important subject for permanent anchors and for temporary anchors in aggressive environment. There are single or double protection considerations with one or two concentric sheaths grout placed in between. There is a variety of protective coatings or coverings. Greases are commonly used. The principles of protection are the same for anchor head, free length and tendon bond length although details are different. Epoxy and polyester resins may be used in encapsulations. Cement grouts are common Testing There are three categories of anchor testing. These are proving tests, on-site suitability tests, and on-site acceptance tests. Proving testing program is a very detailed program, and generally is not relevant to standard excavation projects. Procedures (drilling, preparation of tendon assemblies, homing, grouting etc.), materials used in anchor technology and new materials, soil types, fixed lengths are changed and large number of tests are performed. On-site suitability tests are performed under identical conditions to working anchors before an anchor contract to check capacities and total meters in the project. If time is limited a similar program on project anchors may be performed. On-site acceptance test is a routine recommended to be performed on each project anchor, and is based on applying a greater (proof) load than project load (25 % and 50 % more for temporary and permanent anchors respectively) in a short time. It can be compared with on-site suitability tests which are performed in longer time. There are three criteria: a. proof load should not reduce more than 5 % in 15 min. b.calculated free tendon length (called apparent length) should match with the actual free length c. short term service behavior checks loss of project (or locking) load with time. Stages (a) and (b) combined take about minutes and stage (c) depends on selected time period. In medium and large sized projects it is a full time job for a crew. Details can be seen in BS Struts Introduction Strut is a compression member to provide temporary support to in-situ retaining walls in deep excavations. It is mostly a steel beam of various sections or a pipe. Reinforced concrete beams are seldom used. Struts usually span the width of excavation and in cases of very wide excavations vertical support is needed. It is an old support system compared to ground anchor which has been used since mid Seventies. Placement and removal of struts in multi-level systems interfere with construction, and it is the major disadvantage. It is relatively quicker compared to anchor support.

23 Bouquet General Information Experience gathered during the early metro construction activities in the U.S. and Europe till 1970 s still guides the present design principles. Apparent earth pressure envelopes proposed by Terzaghi and Peck(1967) and Peck(1969) based on measurement of strut loads in several projects are commonly used in the design of strutted support of excavations (See Section 3). Design of a strut support system includes: a. Preliminary specification of strut pattern (geometrical lay-out, horizontal/vertical spacings), b. Estimation of loads in different soils by methods of analysis, and selection of length, type, size, section of props, c. Design of strut-waling connections and waling beams. Design of a strutted retaining system is affected from several factors like sequence of excavation and placement of supports and their stiffness and wall stiffness. If span width is large steel strut section is generally preferred and in cases where depth of excavation is comparable to width, reinforced concrete may be an alternative. Steel H sections and pipes are common but availability and practical fabrication details govern the selection. Simple end details for tight placement, minimum cutting requirements during removal and least interference problems with construction activities are preferred. Short spans or trenches are supported by proprietary struts easily which are also capable of applying preloads. Preloads on stiff large sections may not be very effective. Horizontal and vertical spacing of struts is related to construction activities and both of them are kept as large as possible. 4 m to 5 m spacing is common but if side dimension or diameter of support is considered net distance between struts is somewhat less. Geometry of system depends on size and shape of excavation. Fig. 4.6 shows some examples. Poor detailing and mistakes during removal of struts are sometimes reported as the reason for damages and collapses. As far as unexpected (extra) movements of propped systems are considered; depth of excavation to first prop level, over-excavation, delays in prop support, loose installation are the common causes. Measurements on struts disclose that they are structurally overdesigned in many cases. Buckling due to excessive loading or insufficient capacity of section is not frequently encountered. Temperature changes cause increase or decrease in strut loads but level of safety factors for struts allocated in design and earth pressure envelopes usually compensate these changes. 4.3 Nails and Bolts Nails and bolts are used as supporting elements similar to anchors. They are also very similar in construction. Nail and bolt are the same inclusions but called with different names in soil and rock respectively. Main differences compared to anchors are: a) Ordinary reinforcing steel is used instead of prestressing strands and bar, b) Cement grout is filled into drillhole without any pressure,

24 Bouquet c) No prestressing is applied, nut or welding may be used at head on a plate, d) Mobilization of capacity starts when wall shows displacements(passive inclusion), e) Nail lengths are lower for the same wall height, nail design capacities are lower, f) Horizontal and vertical nail spacings are lower(1-2 m). Figure 4.6: Some examples for the geometry of strutted systems Assembly of bar tendon with centralizers and grouting tube is lowered into borehole. If nails are designed for permanent use they are protected along full length and at the head similar to permanent anchors. Nail capacities are low due to low tendon capacities ( kn allowable, st III approximately), and bond capacities are higher. It is interesting that displacements of nail supported walls are very similar to those of other walls. Nails may be employed on various types of in-situ walls but they are usually applied on shotcrete walls reinforced with one to three layers of wire mesh. Analysis of nailed walls is similar to that of anchored walls. Prestressing effects are ignored. There are also specialized softwares for the analysis of nailed walls, and nails are assumed to take axial loads only. Details are available for head plate, corrosion protection etc. 5. DISPLACEMENTS OF ADJACENT GROUND DUE TO DEEP EXCAVATIONS 5.1 Introduction When deep excavations are made and in-situ retaining walls are constructed horizontal and vertical displacements occur around the excavation pit. They have to be kept at acceptable limits otherwise damage to buildings, roads and underground facilities will occur. Large number of excavation pits are opened every year worldwide and some of them are instrumented. In this section expected displacements will be summarized in different soils. 5.2 Factors Affecting Wall movements There are several factors affecting wall movements. These are soil and groundwater conditions, changes in groundwater level, depth and shape of excavations, type and stiffness of wall and its supports, methods of construction of the wall and adjacent facilities, surcharge loads,

25 Bouquet duration of the wall and others. Studies like Clough and O Rourke (1990) and Long (2001) collected information on instrumented walls and categorized mainly according to type of soil. Type of wall is also indicated. 5.3 Researches on Wall Movements Table 5.1 shows maximum lateral wall movements and maximum vertical settlements behind walls normalized by excavation height. Soils are classified as soft soil or stiff soil. Cohesionless and cohesive soils are indicated. Effect of the factor of safety against base heave and the effect of the type of the supporting system is also considered. 5.4 Instrumentation of Deep Excavations Deep excavations are instrumented before any excavation works start. They are needed for controlling the behavior of wall and surrounding facilities. Displacements may not be detected by visual inspection up to a certain level. There are many instruments that can be installed as summarized in Table 5.2. Some of them are more frequently used in deep excavation projects. These are inclinometers, horizontal and vertical extensometers, piezometers and surveying methods to measure horizontal and vertical displacements of both wall and adjacent facilities. Inclinometers may be placed in boreholes and/or in piles and diaphragm walls. An extra number of instruments in each category must be allowed because damage occurs during construction activities. Load cells on struts or anchor heads may be very useful in checking the calculated project loads.

26 Bouquet Table 5.1: Maximum wall movements and vertical settlements behind walls

27 Bouquet Table 5.2: Instrumentation and monitoring of deep excavations 6. ANALYSIS OF SUPPORTED IN-SITU RETAINING WALLS 6.1. Introduction Analysis of walls involve both internal and external stability calculations. Solution of walls for support reactions, wall displacements, shears and moments is an internal stability problem. Overall or wedge stability and base stability calculations are in the external stability category. It may be appropriate to review failure modes of walls before discussing stability.

28 Bouquet Failure of Walls Failure of anchor supported walls are observed to occur in several ways. Modes of failure may be listed as follows: 1. Both anchor length and penetration depth is short. Wall fails like an overall stability failure but failure surface is located just behind anchors or at fixed length zone and below penetration depth. Failed mass is like the active wedge. 2. Overall stability failure. Slip surface is behind fixed length of anchors. Wall and anchors altogether rotate. This type of failure generally occurs in soft and weak soils and excavations in slopes. If instability detected at the time of project calculations longer anchor lengths and deeper embedment are designed. 3. Penetration depth is sufficient but anchors are short and a large mass containing fixed length zone separates from soil mass behind and tilts forward. 4. Wall may fail reaching its structural capacity due to overloading.some of the anchors may also get damaged (at the head or pull-out). 5. Insufficient number of anchors result in excessive anchor loads and anchors fail one by one leading to complete wall failure. 6. Excessive deformations on very flexible walls sometimes cause problems at anchors and waling even if wall retains its stability. 7. Excessive base heave in soft soils may cause complete wall failure. This type of failure infact a bearing capacity failure due to unloading. 8. Accumulated vertical components of anchor forces cause bearing capacity failure of wall in soft soils. Vertical displacement of wall damages anchors. 9. Piping in cohesionless soils, if not prevented, causes boiling near base inside and loss of passive resistance, and water and soil transferred inside through large openings leads to failure of wall. 10. Undetected artesian pressures under relatively impervious soils may cause blow out of base resulting in submergence of excavation pit. If struts are used as supporting elements failure modes hold true except No s 1,3,8. In an additional mode wall height between the lowest strut and tip of embedded part may show excessive deformation or failure due to insufficient passive resistance and/or excessive loading.

29 Bouquet Internal Stability Cantilever and single supported walls may be solved by simple limit equilibrium assumptions using fixed earth support and free earth support methods respectively since penetration depth in the former is considerably greater than that in the latter. Analysis of multi-level anchored and strutted insitu retaining walls is a complex internal stability issue, and it is not usually attempted by manual calculations although it may be approximated by introducing hinges on the wall or making use of tributary areas of apparent distributions. Walls supported at more than single level are solved by one the following methods: 1. Approximate Methods: Wall may be solved by assuming an earth pressure distribution on a simply supported or continuous beam (wall) or sometimes considering an extra (virtual) support in the penetration depth. Support reactions, shear and moments of the beam are solved. 2. Multi-level supported walls may also be analyzed by employing a soil-structure interaction model (beam on elastic soil) either by a beam fully supported by springs (anchors and soil) or wall is represented by finite elements and anchors and soil along penetration depth by springs, and apparent earth pressure distributions act on the beam. Selection of horizontal moduli of subgrade reaction in different type of soils is needed together with anchor springs. Anchor spring can be formulated by the following expression; k = (AE/sL) cos β 5.1 where A and E are tendon area and modulus, s horizontal spacing of anchors, L free length, β angle between anchor axis and the horizontal. Spring moduli for walls recommended by (The German Society for Geotechnics, 2003) in relation to strain level for different soils are presented in Table 6.1. These values are for passive resistance of soils. 3. Finite element method is relatively a new technique for solution of walls. Full finite element mesh and elements for soil, wall and anchors are described and soil properties and soil models can be input. Soil properties like c, φ, E and wall characteristics are required. Moment, shear, displacements of wall and anchor reactions are presented and displacement vectors can be observed. Programs automatically solve in stages (i.e. every excavation and support level is solved and displacements are accumulated). In simple methods and methods use subgrade reaction critical stages should be checked if possible. 4. There are also finite difference, boundary element and other numerical techniques but not commonly used in geotechnical offices.

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 7 (Lecture 24 to 28) RETAINING WALLS Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5

More information

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically Foundation Engineering Lecture #23 Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically stabilized) - Slurry

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

Construction sites are dewatered for the following purposes:

Construction sites are dewatered for the following purposes: 9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require

More information

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

DESIGN AND CONSTRUCTION CONSIDERATIONS FOR DEEP EXCAVATION.

DESIGN AND CONSTRUCTION CONSIDERATIONS FOR DEEP EXCAVATION. DESIGN AND CONSTRUCTION CONSIDERATIONS FOR DEEP EXCAVATION. By: S.S. Gue & Y.C. Tan SSP Geotechnics Sdn Bhd 1.0 INTRODUCTION In Malaysia, deep basements have been extensively constructed, especially in

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1 INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

Contiguous Pile Wall as a Deep Excavation Supporting System

Contiguous Pile Wall as a Deep Excavation Supporting System Contiguous Pile Wall as a Deep Excavation Supporting System Venkata Ramasubbarao GODAVARTHI *, Dineshbabu MALLAVALLI, Ramya PEDDI, Neelesh KATRAGADDA, and Prudhvikrishna MULPURU Department of Civil Engineering,

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for: HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

Design and Construction of Auger Cast Piles

Design and Construction of Auger Cast Piles Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Figure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate

Figure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate Addendum HELICAL PULLDOWN Micropile (HPM) Introduction The HPM is a system for constructing a grout column around the shaft of a standard Helical Screw Foundation (see Figure A1). To begin the process,

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center PDHonline Course S151A (1 PDH) Steel Sheet Piling Instructor: Matthew Stuart, PE, SE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Construction Dewatering and Ground Freezing

Construction Dewatering and Ground Freezing UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Construction Dewatering and Ground Freezing

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Embedded Retaining Wall Design Engineering or Paradox?

Embedded Retaining Wall Design Engineering or Paradox? Embedded Retaining Wall Design Engineering or Paradox? A personal viewpoint by A.Y. Chmoulian, associate at Royal Haskoning Introduction Retaining wall design theory is a complicated subject with a long

More information

EXCAVATION and BASEMENT CONSTRUCTION. Introduction

EXCAVATION and BASEMENT CONSTRUCTION. Introduction EXCAVATION and BASEMENT CONSTRUCTION Introduction In general, excavation means to loosen and.take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Construction Technology 3

Construction Technology 3 www.beautiful-basements.co.uk Construction Technology 3 Assignment 2: Basement Construction Dr. Patrick Tang, School of Architecture and the Built Environment Michael Dernee C3089219 Abstract: In the brief

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362 California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,

More information

METHODS FOR ACHIEVEMENT UNIFORM STRESSES DISTRIBUTION UNDER THE FOUNDATION

METHODS FOR ACHIEVEMENT UNIFORM STRESSES DISTRIBUTION UNDER THE FOUNDATION International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 2, March-April 2016, pp. 45-66, Article ID: IJCIET_07_02_004 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=2

More information

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

Comprehensive Design Example 2: Foundations for Bulk Storage Facility Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS

THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS THE DEVELOPMENT OF DESIGN METHODS FOR REINFORCED AND UNREINFORCED MASONRY BASEMENT WALLS J.J. ROBERTS Technical Innovation Consultancy Emeritus Professor of Civil Engineering Kingston University, London.

More information

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers PDHonline Course C155 (2 PDH) Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers Instructor: Richard P. Weber, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA

More information

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

The International Workshop on Micropiles, 2007

The International Workshop on Micropiles, 2007 MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05 Dimensional and Structural Data for Elliptical Pipes 21/09/05 Page 1 of 15 1. Foreword This document details a method for the structural design of Stanton Bonna Elliptical pipes for the common conditions

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

Determination of Thermal Conductivity of Coarse and Fine Sand Soils

Determination of Thermal Conductivity of Coarse and Fine Sand Soils Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

System. Stability. Security. Integrity. 150 Helical Anchor

System. Stability. Security. Integrity. 150 Helical Anchor Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland

EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland EN 1997 1: Sections 10, 11 and 12 Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1997-1 Eurocode 7 Section 10 Hydraulic Failure Section 11 Overall Stability Section

More information

Deep Underground Basements for Major Urban Building Construction

Deep Underground Basements for Major Urban Building Construction Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Telephone: 412-221-4500 Facsimile: 412-221-3127 Deep Underground Basements for Major Urban Building Construction by Seth Pearlman, P.E.

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell

More information

Drained and Undrained Conditions. Undrained and Drained Shear Strength

Drained and Undrained Conditions. Undrained and Drained Shear Strength Drained and Undrained Conditions Undrained and Drained Shear Strength Lecture No. October, 00 Drained condition occurs when there is no change in pore water pressure due to external loading. In a drained

More information

Trench Rescue by Buddy Martinette

Trench Rescue by Buddy Martinette Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining

More information

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological

More information

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc) Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building

More information

Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle

Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com