Thoughts on Warm Mix Asphalt production (..among other things!)

Size: px
Start display at page:

Download "Thoughts on Warm Mix Asphalt production (..among other things!)"

Transcription

1 Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate

2 Contents of presentation Brief status for road maintenance in Norway (National and County roads Rv + Fv) Paving contracts (NPRA) Environmental requirements in contracts NPRA experiences with Warm Mix Asphalt (only WAM foam ) Conclusions

3 Key data for National roads (Rv) in Norway Key figures for National roads in Norway Length: 27,300 km 10,600 bridges (270 km total) 800 tunnels (780 km total) 350,000 signs 240,000 culverts Annual expenditure (maintenance): 640 million (2008) Annual expenditure (new roads): 1,430 million (2008) Estimated maintenance backlog: 1,750 million (2007) Estimated design related backlog (curvature, width, gradient etc): 58,000 million (2007)

4 Expenditure Maint. & Operations on National roads (RV) (~5 000 mill NOK/year on ~ km) Some of the main areas (2008): Winter 800 mill NOK Pavements Drainage Tunnels Bridges & quays Road furniture etc

5 Maintenance backlog National roads ( km): estimated at almost million NOK (Jan.2008) Walkways and bicycle paths 1,2 % Drainage facilities 7,1 % Tunnels 14,2 % Road foundation 21,6 % Bridges and quays 19,6 % Pavements 16,2 % Road furniture etc 20,2 %

6 Some examples of Maintenance Backlog on the Norwegian Road Network This is bad economy both for the road user and road owner!

7 Length (km) Mill NOK (2007 price level) Expenditure pavements - National roads (Rv) Development of pavement condition on National roads (Rv) Poor Very poor

8 Plan of action for enviromental responsibilty in public procurement ( ) Public sector has a special responsibility to lead by example (procurement for ~250 billion NOK/year) Should use our position to promote environmentally friendly solutions NPRA has started work on how to move forward Policy group with contractor participation intiated 2008 Involves all our procurement, not only pavement materials or energy consumption

9 Panel for Public Procurement Initiated by Dep. of Enviornment Mandate: to advice the public sector and others on how to incorporate environmental aspects in the procurement process Have developed criteria for specific groups of products: Among these are Construction and Buildings The proposed criteria show that this is not an easy field: Quite vague and non-quantifiable Methods for quantifying environmental impact (e.g.lca) still too uncertain to be used in procurement process?

10 PAVEMENTS: In practice many requirements pull in different directions Energy/ LCA Noise Homogenity COSTS Wear Resistance Friction Pavement Colour Dust Deformation Durability Temperature sensitivity

11 Allocation of paving contracts (NPRA) Traditional: NPRA specifies solutions and lowest price gets the contract Performance based= lowest LCC (based on rutting performance) R&D contracts: innovative techniques etc. Challenge: How can we improve our fulfillment of environmental goals without compromising other goals?

12 Contract requirements relevant to use of WMA No formal obstacles to Warm Mix Asphalt Design guide (hb018): Minimum requirement for temperature can deviated from when alternative production techniques are used The challenge is to gain enough experience with WMA so that it is used when appropriate and with acceptable fulfillment of other criteria (e.g. LCC)

13 NPRA s experiences with WAM foam pavements (Source: Geir Berntsen, formerly NPRA Eastern Region) WAM WAM

14 Area (m2) WAM - paved area in Eastern Region Year

15 Ton WAM - Quantity (tons) Year

16 Rut depth (mm) Rv152, Hp3, Km Akershus %-value Mean value WAM Date

17 Rv152 Hp (Wam 2003)

18 Rv152 Hp (Wam 2003)

19 Rv152 Hp (Wam 2003)

20 Rut depth (mm) Rv152, Hp1, Km Akershus ,5 years 90 %-value Mean value 10 WAM 5 10,5 years 0 Date

21 Akershus Rv152 Hp (Wam 2001)

22 Akershus Rv152 Hp (Wam 2001)

23 Akershus Rv152 Hp (Wam 2001)

24 Rut depth (mm) Rv152, Hp7-8, Km 5, , Length km Akershus ,3 mm/year 3,0 mm/year %-value Mean value 10 WAM 5 HAM (Ska 16) 0 Date

25 Akershus Rv152 Hp7/ (Wam 2003)

26 Akershus Rv152 Hp7/ (Wam 2003)

27 Rut depth (mm) 30 Rv152, Hp8, Km , Length km Akershus 90 %-value Mean value WAM 5 Lost 5 year in lifetime 0 Date

28 Akershus Rv152 Hp (Wam 2003) Not much cracking, only rutting

29 Rut depth (mm) Rv152, Hp8, Km Km , Length km Akershus %-value Mean value WAM Lost 3,5 year in lifetime Date

30 Akershus Rv152 Hp (Wam 2003)

31 Rut depth (mm) Fv82, Hp1, Km Km , Length km Akershus %-value Mean value WAM Date

32 Akershus Fv82 Hp (Wam 2001)

33 Akershus Fv82 Hp (Wam 2001)

34 Akershus Fv82 Hp (Wam 2001)

35 Conclusions NPRA is open towards using Warm Mix Asphalt No formal restrictions (Design Guide-Hb018 etc) but... Our (limited) experiences are varied LCC must be acceptable (!) Must be made a win-win situation Our contracting must in the future include environmental criteria in a better way than today (includes a lot more than only pavements)...the question is how?

Road Asset Management Research Program In Finland

Road Asset Management Research Program In Finland Langfassung / long version Road Asset Management Research Program In Finland Abstract Mr. Vesa Männistö, M.Sc. (Statistics) Inframan Ltd Länsituulentie 10, 02100 Espoo, Finland Tel +358-9-8567 7715, fax

More information

Pavement Management Implementation: Success Stories for Maryland Counties

Pavement Management Implementation: Success Stories for Maryland Counties Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer

More information

Status of Asset Management in the Roads Sector. L Kannemeyer

Status of Asset Management in the Roads Sector. L Kannemeyer Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE

More information

Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC)

Sub-Saharan Africa Transport Policy Program (SSATP) Output- and Performance-based Road Contracts (OPRC) Sub-Saharan Africa Transport Policy Program (SSATP) Work in Progress and New Developments in RMF Output- and Performance-based Road Contracts (OPRC) (Based on presentations by Schliessler/Gericke WB) Olav

More information

Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands

Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands Monitoring of primary road network Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands The Netherlands Mainport to EU 41.526 km² area 17 million

More information

How Pavement Preservation is Incorporated Into our Asset Management Program A City Perspective

How Pavement Preservation is Incorporated Into our Asset Management Program A City Perspective How Pavement Preservation is Incorporated Into our Asset Management Program A City Perspective Morgan Jones City of Markham PPRA Fall Meeting October, 2015 Overview Background on Markham s Pavement Management

More information

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Best Practices for RAP Management 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Outline Current RAP usage and practices Motivations for using

More information

Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate

Rural Road Maintenance Handbook Module 16 Rural Road Maintenance Cost Estimate After fulfilling Module 16, you will be able to: Understand the structure of cost estimating sheets and the steps to establish a cost estimate for rural road maintenance Establish cost estimate Self -

More information

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing. CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed

More information

Noise Abatement Political Background

Noise Abatement Political Background Noise Abatement Political Background Advanced Noise Reduction Rob Hofman Dienst Verkeer en Scheepvaart (DVS) 2 Netherlands 34.000 km 2 land Capital Amsterdam Population density 3 16 million inhabitants,

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

CHAPTER 8 ROAD SURFACE PROPERTIES

CHAPTER 8 ROAD SURFACE PROPERTIES CHAPTER 8 ROAD SURFACE PROPERTIES 230 8.1 Introduction: The road user desires a road surface where he can drive safe and comfortable. This requires a pavement structure with enough stiffness, a fast run-off

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE Danijel Tenžera, Krešimir Futivić, Boris Ukrainczyk Summary Bridge structures deteriorate with years of use and exposure to adverse environmental

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

Rehabilitation by cracking and seating of concrete pavement optimized by FWD analysis

Rehabilitation by cracking and seating of concrete pavement optimized by FWD analysis Rehabilitation by cracking and seating of concrete pavement optimized by FWD analysis H. C. Korsgaard & J. P. Pedersen Carl Bro Pavement Consultants, Kokbjerg 5, DK6000 Kolding M. Rasmussen Copenhagen

More information

Florida s Experience with Crumb Rubber

Florida s Experience with Crumb Rubber Florida s Experience with Crumb Rubber Jim Warren Executive Director Asphalt Contractors Association of Florida, Inc. www.floridaridesonus.org Slides Courtesy of FDOT State Materials Office Background

More information

HAMBURG WHEEL-TRACKING TEST

HAMBURG WHEEL-TRACKING TEST Test Procedure for HAMBURG WHEEL-TRACKING TEST TxDOT Designation: Tex-242-F Effective Date: September 2014 1. SCOPE 1.1 This test method determines the premature failure susceptibility of bituminous mixtures

More information

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS

PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS PERFORMANCE EVALUATION SYSTEM FOR BITUMINOUS BINDERS A. Vanelstraete, W. Teugels, Belgian Road Research Centre, Belgium, Nynas Bitumen, Belgium Abstract Understanding the behaviour and performance of bituminous

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

Louw Kannemeyer. Asset Management

Louw Kannemeyer. Asset Management Louw Kannemeyer Asset Management South African Road Network Authority Paved Gravel Total SANRAL 18,247 0 18,247 Provinces - 9 46,099 136,640 182,739 Metros - 8 51,682 14,461 66,143 Municipalities 37,691

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

Case Studies - Concrete Overlays

Case Studies - Concrete Overlays Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching

More information

Road Asset Management

Road Asset Management Road Asset Management A Tolling Experience July 2011 Barry King Construction & Asset Engineer ConnectEast Group Australia s largest road project ConnectEast EastLink is owned and operated by ConnectEast.

More information

Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald

Airfield Pavement Rehabilitation Planning Choosing the right fix. Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Airfield Pavement Rehabilitation Planning Choosing the right fix Rob McLure, M.Eng., P.Eng. Senior Associate Hatch Mott MacDonald Presentation Objective ¾ Review the pavement rehabilitation strategy development

More information

Paving Capitalization Work Categories and Treatments

Paving Capitalization Work Categories and Treatments Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

Key figures 2006. Norwegian Public Roads Administration

Key figures 2006. Norwegian Public Roads Administration Key figures 2006 Norwegian Public Roads Administration Table of contents About NPRA 4 Financial 7 Road sector challenges 8 Roads and traffic factsheet 2006 10 Principal activities 2006 13 Roadworks contractors

More information

GPR in use experiences from Finland. Jari Marjeta

GPR in use experiences from Finland. Jari Marjeta GPR in use experiences from Finland Jari Marjeta Carement Oy Independent, nationwide, infra sector company, which provides measuring services along with other consultant services = no heavy traditional

More information

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015 LADOTD Balanced Mixture Design Samuel Cooper III, Ph.D., P.E. Southeastern Asphalt User Producer Group November 6 9, 25 Williamsburg, Va. Acknowledgements LTRC Asphalt Research Group Jeremy Icenogle, Patrick

More information

Environmentally Friendly Pavements Final report

Environmentally Friendly Pavements Final report Environmentally Friendly Pavements Final report RAPPORTR A P P O R T Teknologiavdelingenk n o l o g i a v d e l i n g e n Nr. 2578 Vegteknologiseksjonen Dato: 2009-12-18 TEKNOLOGIRAPPORT nr. 2578 Tittel

More information

ASPHALT PAVEMENT RECYCLING

ASPHALT PAVEMENT RECYCLING HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel

More information

Phone: +47 22 96 55 55. Fax: +47 22 96 57 25. E-mail: Jacob.Mehus@byggforsk.no

Phone: +47 22 96 55 55. Fax: +47 22 96 57 25. E-mail: Jacob.Mehus@byggforsk.no The use of recycled concrete aggregates in the Norwegian building and construction industry Jacob Mehus MSc 1 Bente Lillestøl MSc 2 Gordana Petkovic PhD 3 Lars Skaare MSc 2 Edgar Dønaasen MSc 4 1 Norwegian

More information

Summary of Terminal Evaluation I Outline of the Project Project title: The Project for the Capacity Building of Road Maintenance

Summary of Terminal Evaluation I Outline of the Project Project title: The Project for the Capacity Building of Road Maintenance Summary of Terminal Evaluation I Outline of the Project Country: Kyrgyz Republic Project title: The Project for the Capacity Building of Road Maintenance Issue/Sector: Transportation Cooperation scheme:

More information

Infrastructure assets are distinguished from other capital assets because they normally:

Infrastructure assets are distinguished from other capital assets because they normally: 4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure

More information

Developing Critical Path Method Scheduling (CPM)

Developing Critical Path Method Scheduling (CPM) Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest

More information

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness

More information

DATA CENTRES. Camfil Farr Segment Brochure Data Centres Camfil Farr - Clean Air solutions

DATA CENTRES. Camfil Farr Segment Brochure Data Centres Camfil Farr - Clean Air solutions DATA CENTRES Camfil Farr Segment Brochure Data Centres Camfil Farr - Clean Air solutions Camfil Farr Leading the way in clean air Technology About Camfil Farr Camfil Farr is a world Leader in clean air

More information

Validity of Skid Resistance Data Collected Under Western Australian Conditions

Validity of Skid Resistance Data Collected Under Western Australian Conditions Validity of Skid Resistance Data Collected Under Western Australian Conditions Soet W.J. and Barnsley R. Main Roads Western Australia ABSTRACT Main Roads Western Australia manages an extensive arterial

More information

Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm

Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm Applied Mathematics Volume 2013, Article ID 252808, 5 pages http://dxdoiorg/101155/2013/252808 Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm Sangyum

More information

Le projet européen ECOLABEL

Le projet européen ECOLABEL 4/02/2015 Le projet européen ECOLABEL Agnès JULLIEN (Ifsttar) WP1 leader (key performance indicators) agnes.jullien@ifsttar.fr ECOLABEL PROJECT PROPOSED METHODOLOGY and KPIs Main concepts Development of

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation A View From The Bureau of Materials & Physical Research IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation HMA Issues HMA Issues HMA Issues HMA Issues a Technical Opinion Cautious HMA

More information

What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces

What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces What you measure is what you get? a novel approach for specifying and controlling acoustic quality of road surfaces Ard Kuijpers & Wout Schwanen M+P consulting engineers, Vught, the Netherlands. Jan van

More information

Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University

Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation

More information

Australian Standard. Bridge design. Part 1: Scope and general principles AS 5100.1 2004 AP-G15.1/04 AS 5100.1

Australian Standard. Bridge design. Part 1: Scope and general principles AS 5100.1 2004 AP-G15.1/04 AS 5100.1 AS 5100.1 2004 AP-G15.1/04 AS 5100.1 Australian Standard Bridge design Part 1: Scope and general principles This Australian Standard was prepared by Committee BD-090, Bridge Design. It was approved on

More information

Performance-Based Road Management and Maintenance Contracts Worldwide Experiences

Performance-Based Road Management and Maintenance Contracts Worldwide Experiences International Seminar on Road Financing and Investment Arusha, Tanzania, April 16 20, 2007 Performance-Based Road Management and Maintenance Contracts Worldwide Experiences by Dr. Gunter Zietlow 1 e-mail:

More information

NATURAL DISASTER ARRANGEMENTS JANUARY 2012 MONTH YEAR

NATURAL DISASTER ARRANGEMENTS JANUARY 2012 MONTH YEAR NATURAL DISASTER ARRANGEMENTS JANUARY 2012 MONTH YEAR TABLE OF CONTENTS Page Number 1 Introduction 3 Purpose of these Guidelines What Roads are eligible? What is a Declared Natural Disaster? Funding Responsibility

More information

APPENDIX B WARRANTY PERFORMANCE INDICATOR TABLES FOR VARIOUS END PRODUCTS

APPENDIX B WARRANTY PERFORMANCE INDICATOR TABLES FOR VARIOUS END PRODUCTS B-1 APPENDIX B WARRANTY PERFORMANCE INDICATOR TABLES FOR VARIOUS END PRODUCTS B-2 TABLE B1 Performance indicators for HMAC pavement (continued on next page) B-3 TABLE B1 (Continued) (continued on next

More information

Passive Fire Protection

Passive Fire Protection Firestopping Passive Fire Protection FS20 Firestop Compound 6 hour fire rated penetration seals for electrical and mechanical services FS20 Firestop Compound FS20 Firestop Compound is a Fire-Rated Penetration

More information

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post

More information

CURRENT PRACTICE SHEET

CURRENT PRACTICE SHEET CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

Operating Instructions

Operating Instructions CS101 CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS101 as a safety reversing or presence detection system. The CS101 requires that a vehicle be moving for

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund

Concept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation

More information

How To Manage A Road In Australia

How To Manage A Road In Australia ASFINAG Asset Management System (EMS) Gerhard Eberl (ASFINAG) Alfred Weninger-Vycudil (PMS-Consult GmbH) September 2010 Introduction 2 Austria at a glance Capital Vienna Total Area: 83,872 (115 th ) 32,383

More information

Review of Civil Plant Management, Civil Construction Supervision, Civil Project Management, and Road Construction unit standards

Review of Civil Plant Management, Civil Construction Supervision, Civil Project Management, and Road Construction unit standards Page 1 of 8 Field Engineering and Technology Review of Civil Plant, Civil Construction, Civil Project, and Road Construction unit standards Existing classification Subfield Domain ID Civil Plant Operation

More information

2015 OPERATIONAL PROGRAMS SCHEDULE

2015 OPERATIONAL PROGRAMS SCHEDULE Project Manager Service Provider Timeline/Status DWQMS Internal Audit BluMetric Environmental DWQMS External Audit Off-site audit - November 6th 2015 SAI Global On-site audit - December 15th - 16th 2015

More information

THE HISTORY OF CONCRETE PAVING BLOCKS IN NORWAY.

THE HISTORY OF CONCRETE PAVING BLOCKS IN NORWAY. THE HISTORY OF CONCRETE PAVING BLOCKS IN NORWAY. by Haldor Grayston - pavement consultant, GRAYS TON AS, Stavanger, Norway. Summary Norway is a small country with a small production of paving products.

More information

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 Florentina Mihai, BEng, GDipMgt, MIEAust Main Roads Western Australia Neville Binning,

More information

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS

LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555

More information

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule 763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule Description: This work shall reflect a Contractor s anticipated work plan for constructing the project using a Critical Path Method Project

More information

State Roads Infrastructure Asset Management Policy

State Roads Infrastructure Asset Management Policy State Roads Infrastructure Asset Management Policy Department of State Growth State Roads Asset Management Policy Foreword from the Minister for Infrastructure Asset maintenance is also central to their

More information

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013

NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 NETLIPSE NETWORK MEETING 27-28.5.2013 Seppo Mäkinen Finnish Transport Agency 27.5.2013 Mainroad 4 Järvenpää Lahti PPP Project 1997 2012 FINLAND 27.5.2013 27.5.2013 Seppo Mäkinen Mainroad 4 Järvenpää -

More information

Pace s plant had minimal problems producing warm-mix asphalt for the paving project.

Pace s plant had minimal problems producing warm-mix asphalt for the paving project. Pace s plant had minimal problems producing warm-mix asphalt for the paving project. 22 Hot Mix Asphalt Technology SEPTEMBER/OCTOBER 2006 By Chuck MacDonald Tractor-trailer trucks crawled along an open

More information

Road Asset Management

Road Asset Management Road Asset Management Raja Shekharan, Ph.D., P.E. Virginia Department of Transportation National Workshop on Modern Trends in Pavement Engineering IISc, Bangalore July 15, 2011 Transportation Asset Management

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012

CITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012 CITY OF GREATER SUDBURY Financial Planning for Municipal Roads, Structures and Related Infrastructure Final Report July 10, 2012 Financial Planning for Roads Table of Contents I. Financial Planning for

More information

Preparing for the Fornebu Metro Line. Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016

Preparing for the Fornebu Metro Line. Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016 Preparing for the Fornebu Metro Line Ingeborg Krigsvoll, Sporveien Oslo AS June 7, 2016 Sporveien Norway s largest supplier of public transportation Unibuss AS Buss Revenue: 1 468 million Employees. 1

More information

ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION

ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION ASSET MANAGEMENT (A.M.) COUNTY COUNCIL PRESENTATION SEPTEMBER 2015 How A.M. impacts the County of Dufferin Slide taken from AMO Aug. 2015 Conference presentation by Bill Hughes, Region of York Tuesday

More information

Portland Cement Concrete Pavement Best Practices Summary Report

Portland Cement Concrete Pavement Best Practices Summary Report Portland Cement Concrete Pavement Best Practices Summary Report WA-RD 744.1 Stephen T. Muench August 2010 Office of Research & Library Services WSDOT Research Report Research Report Agreement T2695, Task

More information

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective - Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing

More information

Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester

Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester Minimizing Reflective Cracking With Applications of the Rolling Dynamic Deflectometer and Overlay Tester Dar-Hao Chen, 1 Moon Won, 2 Tom Scullion, 3 and John Bilyeu 4 ABSTRACT Since reflective cracking

More information

Climate Projections for Transportation Infrastructure Planning, Operations & Maintenance, and Design

Climate Projections for Transportation Infrastructure Planning, Operations & Maintenance, and Design Climate Projections for Transportation Infrastructure Planning, Operations & Maintenance, and Design KATHARINE HAYHOE, ANNE STONER, JO DANIEL, JENNIFER JACOBS and PAUL KIRSHEN THE INFRASTRUCTURE CLIMATE

More information

H: Road Asset Management Plan February 2015

H: Road Asset Management Plan February 2015 H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making

Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making Jay Cunningham, MSc.Eng., P.Eng. New Brunswick Department of Transportation John MacNaughton, BSc.

More information

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E.

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. Louisiana Case Study: Implementation of CRM Binder in PG specification. AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. My Story Background Approach Phase I Evaluation:

More information

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

Roof Insulation Building. Energy. Environment friendly e-library

Roof Insulation Building. Energy. Environment friendly e-library Roof Insulation Building Codes & Energy Efficiency Environment friendly e-library Building Code Driver Buildings consumer almost 50% of all energy. Experts believe that a 30% increase in building efficiency

More information

Construction Specifications for Keyhole Pavement Coring and Reinstatement

Construction Specifications for Keyhole Pavement Coring and Reinstatement F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October

More information

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA 2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Quick wins for energy savings in buildings

Quick wins for energy savings in buildings Quick wins for energy savings in buildings Choosing low energy air filters for both optimized energy performance and indoor air quality Executive Summary HVAC systems heat, cool and clean the air within

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance

Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Rongzong Wu, David Jones, Hui Li and John Harvey University of California Pavement Research Center Prepared

More information

INDEX. Chapter8. air master. Perforated Ceiling Diffusers

INDEX. Chapter8. air master. Perforated Ceiling Diffusers Chapter8 INDEX A. Perforated ceiling diffuser 1. Perforated ceiling diffuser with plenum box..: APCD+P...8.1. Perforated ceiling diffuser with damper....: APCD...8. Standard sizes...8. Fixing details...8.

More information