Road Asset Management
|
|
|
- Brianne Martin
- 10 years ago
- Views:
Transcription
1 Road Asset Management A Tolling Experience July 2011 Barry King Construction & Asset Engineer ConnectEast Group
2 Australia s largest road project
3 ConnectEast EastLink is owned and operated by ConnectEast. Under its Concession Deed with the State ConnectEast will operate EastLink as a toll road until At the conclusion of the Concession Period EastLink shall be handed back to the State.
4
5 EastLink Facts 39km electronic tollway between Mitcham and Frankston $2.5b construction cost Two three-lane 1.6 km tunnels 17 interchanges 88 bridges 310 km traffic lanes 35km shared user path 60 wetlands
6 Construction, Operation & Maintenance Design and Construction provided by Thiess John Holland. EastLink construction commenced early Opened to traffic 29 June Operation and Maintenance contracted to Transfield Services
7 Residual Asset Life at 2043 Handover Road pavements and tunnel secondary linings 20 years Pavement Surfaces 5 years All other assets at least 50% design life
8 Asset Management System Form acceptable to the State, and must be available for independent interrogation by the State through online, real time, access; Maintain a record of the current, historical and projected future condition of each Asset.. including detailed records of the repair or replacement of Asset Items or Asset Sub-Items to assist in establishing the Residual Design Life of the Asset Items and Asset Sub-Items; Maintain a record of the nature, extent, quantity, location, time and type of any maintenance works performed by, or programmed to be performed;
9 Asset Management System cont. include a method of reporting to the State..on the performance of any Asset by analysis of the specific condition and defect information recorded for individual Asset Items and Asset Sub-Items; and provide for the development and maintenance of pavement performance models for monitoring the performance of the pavements.
10 Asset Management System cont. must document the regular inspection of the Asset Items and Asset Sub-Items document any failure to meet performance standards and/or condition indicators must initiate an appropriate maintenance response. location referencing system must be based on a linear system
11 Maximo Maximo Enterprise Suite 6.2 Customisations: Linear functionality; Residual life; Activity management.
12 Concession Deed Asset Inventory Requirements? The Asset Inventory is to be structured in layers comprising Asset Elements, Asset Types, Asset Items and where appropriate, Asset Sub-Items.
13 Asset Elements Asset Elements are the broader categorisations of the Asset Types, such as pavement, bridges, signs, line-marking and ventilation systems.
14 Asset Types Asset Types are the distinct class of Asset, such as flexible pavements, concrete bridges, fans, pumps, switchboards, warning signs or barrier lines.
15 Asset Items Asset Items are single occurrences of any Asset, such as a pavement section, a bridge bearing, specific items of plant or equipment, a warning sign or a length of barrier line.
16 Asset Sub-items Asset Sub-Items are components of Asset Items which have a Design Life or maintenance requirements which vary from that established for the Asset Item, of which it forms a part such as light lamps, or fan bearings.
17 Assets
18 Civil Asset Classifications
19 Tolling Asset Classifications
20 Location Classifications
21 EastLink KPI s 40% of the EastLink Concession KPI s are related to Road Operation and Maintenance and are reported using Maximo data. KPI s include Incident management, Lane Availability, Cyclic Maintenance, Routine Pavement and Landscape Maintenance and Pavement Condition.
22 Incident Management KPI 16, 17, 18 Incidents in a Traffic Lane, an Emergency Stopping Lane and other locations. Response times, 10, 15 and 25 minutes.
23 Sample Reports
24 Scheduled Maintenance KPI KPI 19 Perform Planned Inspection & Maintenance at scheduled intervals < 6 months
25 Sample Report
26 Pavement Condition KPI Pavement Condition Maintain road pavement condition as measured by roughness, rutting, cracking, skid resistance, texture, deflection and curvature through correction of areas outside intervention levels within the periods provided in the Code of Maintenance Standards.
27 Skid Resistance Road Element Investigatory Mean SFC Level Action Approaches to signalised intersections 0.55 Within 1 week - Inspect site Within 3 months - Produce report and recommendations Within 6 months - Consider recommendations and complete work as necessary. Entry and Exit ramps Left lane of the freeway covering the merge area for a distance of at least 300m before the ramp entry and exit points. The asphalt surfacing within the Mitcham tunnels Within 1 week - Inspect site Within 3 months - Produce report and recommendations Within 6 months - Consider recommendations and complete work as necessary. Approaches to unsignalised intersections 0.45 Within 1 week - Inspect site and produce report. Within 6 months Produce report and recommendations Within 12 months - Consider recommendations and complete work as necessary. Freeway carriageways outside the exit and entry ramp merge areas 0.35 Within 4 weeks - Inspect site and produce report. Within 6 months Produce report Within 12 months - Consider recommendations and complete work as necessary.
28
29
30 Skid Resistance Report Asset Descriptio n Asset Location Asset Eastlink Classificati Start on Chainage Eastlink End Chainage Seg Av Length (m) Mean Skid Mean Skid Minimum Resistance Resistance Skid 100m 100m Segment, Segment, LWP RWP Resistance 100m Segment, LWP Minimum Short Skid Term Resistance Action 100m Required Segment, RWP Short Term Action Required By (date) Long Term Action Required Long Term Action Required By (date) Pavement- Inbound Traffic Lane, Traffic Lane Main 3: Springvale Carriageway Road I/C DEEPSTRG O LWP: Inspect within 4 weeks. Produce report within 6 months, include review of accident data. 20/06/2011 3:58:42 PM LWP: Within 12 months - Consider report and complete actions as necessary. 22/12/2011 3:58:42 PM Pavement- Inbound Traffic Lane, Traffic Lane Main 3: Springvale Carriageway Road I/C DEEPSTRG O LWP: Inspect within 4 weeks. Produce report within 6 months, include review of accident data. 20/06/2011 3:58:42 PM LWP: Within 12 months - Consider report and complete actions as necessary. 22/12/2011 3:58:42 PM
31 Asset Condition - Meters Pavement condition 23 parameters, recorded using 23 meters as previously described for skid resistance. Structures condition recorded by rating each component (sub-assets) 1 to 4 (%). Ratings determined through Level 2 Bridge Inspection process. An overall rating is applied to the parent asset good, fair, poor.
32 General Approach using to Meters Condition recorded via measured values and/or assessed through an objective inspection process.
33 Lessons Learnt 1 Scope and functionality What output information is required? How much effort is the organisation prepared to expend capturing maintenance and/or condition data? Develop an Asset Management Strategy
34 Lessons Learnt 2 Modelling Assets What asset/sub-assets are required to capture and track maintenance, condition, asset life or other specified parameters? Locations Preference for areas or spaces that can be visualised (physical locations).
35 Lessons Learnt 3 Capturing Maintenance and Condition Data at the coal face. Organisational culture Contracted maintenance commercial arrangements Industrial relations
36 Questions?
37 Follow Up Questions? M E [email protected]
Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL
-- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis
Validity of Skid Resistance Data Collected Under Western Australian Conditions
Validity of Skid Resistance Data Collected Under Western Australian Conditions Soet W.J. and Barnsley R. Main Roads Western Australia ABSTRACT Main Roads Western Australia manages an extensive arterial
Asset Management Policy for Major PFI Projects
Asset Management Policy for Major PFI Projects Agenda Asset Management Drivers Typical AM positioning in Motorway PFI Asset management Strategy Works Planning and Scheduling Innovation & Risk Mitigation
How To Manage A Road In Australia
ASFINAG Asset Management System (EMS) Gerhard Eberl (ASFINAG) Alfred Weninger-Vycudil (PMS-Consult GmbH) September 2010 Introduction 2 Austria at a glance Capital Vienna Total Area: 83,872 (115 th ) 32,383
Road Asset Management Research Program In Finland
Langfassung / long version Road Asset Management Research Program In Finland Abstract Mr. Vesa Männistö, M.Sc. (Statistics) Inframan Ltd Länsituulentie 10, 02100 Espoo, Finland Tel +358-9-8567 7715, fax
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT
AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract
STATE HIGHWAY ASSET MANAGEMENT MANUAL
STATE HIGHWAY ASSET MANAGEMENT MANUAL Manual Number: SM020 Effective From: October 1996 Re-issued: August 2000 Transit New Zealand PO Box 5084 WELLINGTON Telephone (04) 499 6600 Facsimile (04) 499 6666
Status of Asset Management in the Roads Sector. L Kannemeyer
Status of Asset Management in the Roads Sector L Kannemeyer Why Asset Management? Road Condition 100 80 60 40 20 Good Fair Poor B A Very Poor (Typically Designed for Traffic Expected over 20-30 Years)
LRMS LRMS SOFTWARE APPLICATION
PART PART : LRMS LRMS SOFTWARE APPLCATON Manual No. SM051-1 6 LRMS SOFTWARE Overview The LRMS Software Applications is the set of computer systems that are required to use and manage Transit New Zealand
Performance-Based Road Management and Maintenance Contracts Worldwide Experiences
International Seminar on Road Financing and Investment Arusha, Tanzania, April 16 20, 2007 Performance-Based Road Management and Maintenance Contracts Worldwide Experiences by Dr. Gunter Zietlow 1 e-mail:
Road Asset Management
Road Asset Management Raja Shekharan, Ph.D., P.E. Virginia Department of Transportation National Workshop on Modern Trends in Pavement Engineering IISc, Bangalore July 15, 2011 Transportation Asset Management
Delineation. Section 4 Longitudinal markings
Delineation Section 4 Longitudinal markings The delineation guidelines have been developed to assist in designing and maintaining a quality delineation system. The guidelines are to comprise 19 sections
Louw Kannemeyer. Asset Management
Louw Kannemeyer Asset Management South African Road Network Authority Paved Gravel Total SANRAL 18,247 0 18,247 Provinces - 9 46,099 136,640 182,739 Metros - 8 51,682 14,461 66,143 Municipalities 37,691
Highway Network Management Services State of Qatar Ken Harland, Business Director, Amey Consulting
Cover with focus picture 1 Cover with focus picture 2 Cover with focus picture 3 Highway Network Management Services State of Qatar Ken Harland, Business Director, Amey Consulting Introduction Highway
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
ROAD MAINTENANCE CONTESTABILITY REFORM PROGRAM INDUSTRY BRIEFING
ROAD MAINTENANCE CONTESTABILITY REFORM PROGRAM INDUSTRY BRIEFING WELCOME Jim Peachman Reform Program Manager, RMS 1. BACKGROUND AND CONTEXT PETER DUNCAN CHIEF EXECUTIVE, RMS OUR VISION FOR RMS To be the
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS. Paul W. Wilke, P.E. Applied Research Associates, Inc.
USE OF A DIGITAL SURVEY VEHICLE FOR PAVEMENT CONDITION SURVEYS AT AIRPORTS Paul W. Wilke, P.E. Applied Research Associates, Inc. August 11, 2014 Words: 3,280 Figures: 3 Tables: 0 Photographs: 3 ABSTRACT
www.nams.au.com National Asset Management Strategy Australia
DEVELOPMENT OF A ROAD ASSET REGISTER USING DIGITAL VIDEO TECHNOLOGY DUNGOG SHIRE COUNCIL Matt Ryeland, mailto:[email protected] Senior Technical Officer, Management Services. Cardno Terry Wilson,
Scrim And Texture Data Collection Contract Management S Chamberlain
Scrim And Texture Data Collection Contract Management S Chamberlain Introduction Transit New Zealand (Transit) has been successfully managing SCRIM and texture data collection through external suppliers
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands
Monitoring of primary road network Walter Gerritsen, Jacob Groenendijk, Christ van Gurp KOAC NPC pavement research & consultancy, The Netherlands The Netherlands Mainport to EU 41.526 km² area 17 million
Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL
Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder
Asset Lifecycle Plans. December 2010
Asset Lifecycle Plans December 2010 Lifecycle Plan Summary December 2010 P a g e 2 A s s e t L i f e cy c l e P l a n Contents: 1 Introduction to Lifecycle Planning...4 1.1 Primary Purpose of Lifecycle
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
Pavement Engineering & Asset Management. Meeting the requirements of our existing & future diverse road networks
Pavement Engineering & Asset Management Meeting the requirements of our existing & future diverse road networks 3 Introduction Pavement Engineering Services Jean Lefebvre (UK) are able to provide analysis
Date: 10/10/2014 Initiated by: AAS-100
U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Airport Pavement Management Program (PMP) Date: 10/10/2014 Initiated by: AAS-100 AC No: 150/5380-7B Change:
Bridge asset management Project. Project for Bridge asset Management Support Service to ERA districts ( BMSS )
Bridge asset management Project Project for Bridge asset Management Support Service to ERA districts ( BMSS ) 1 BACK GROUND INFORMATION Implementation of the Bridge Management System ( BMS ) is a new practice
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS
Before applying for a Road Opening Licence, please read and understand the following information.
Sept 2012 Before applying for a Road Opening Licence, please read and understand the following information. What is a Road Opening Licence? A Road Opening Licence (ROL) is a licence that allows the holder
Pavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive
How To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders
2015 Fall Asphalt Conference VDOT 2016 Traffic Engineering Specification Revisions and Work Zone Reminders Harry A. Campbell, P. E., Central Office, Traffic Engineering Division - October 6, 2015 2016
Email: [email protected] Phone: + 64.9.87.7703 Fax: +64.9.87.7704. ROMDAS Manufactured by Data Collection Ltd. New Zealand
For further information on the ROMDAS road measurement system please visit www.romdas.com Email: [email protected] Phone: + 64.9.87.7703 Fax: +64.9.87.7704 ROMDAS Manufactured by Data Collection Ltd. New
Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack
Asset Management for MAP-21 Gary Lasham, P.E. Jonathan Pollack Replaced Intermodal Surface Transportation Efficiency Act (ISTEA) MAP-21 is transforming the policy and programmatic framework for investments
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
Maintenance Management and Asset Management
Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
South African Pavement Design Method (SAPDM) Revision Status Report. 26 th RPF Meeting 6 November 2013 L Kannemeyer
South African Pavement Design Method (SAPDM) Revision Status Report 26 th RPF Meeting 6 November 2013 L Kannemeyer Slide 2 Aka GODZILLA SAPDM Revision - Historical Overview Process initiated at RPF -May
Role of the Environmental Management Representative (EMR)
Legacy Way Project Role of the Environmental Management Representative (EMR) What is Legacy Way The project consists of the following key elements: Two 4.2 km road tunnels connecting the Western Freeway
ROADING ASSET MANAGEMENT PLAN
ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
Traffic Management During Construction
Traffic Management During Construction The construction of Dublin Port Tunnel couldn t begin until a traffic management plan had been developed and agreed to facilitate construction of the Tunnel and to
Maliakos Kleidi Project Construction & Challenges faced. Presentation to ELAC 2014
Maliakos Kleidi Project Construction & Challenges faced Presentation to ELAC 2014 Dimosthenis Papakrivopoulos, Civil Engineer, Deputy Project Director of MKCJV 09.05.2014 Index Introduction The Project
700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
Pavement Asset Management Guidance Section 3: Inventory and Data Management
Pavement Asset Management Guidance Section 3: Inventory and Data Management December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 3: Inventory and Data
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
H: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE (RMO) John McCarthy Senior Advisor Department of Transport, Tourism and Sport
MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE (RMO) John McCarthy Senior Advisor Department of Transport, Tourism and Sport MANAGING THE ROADS AND THE ROLE OF THE ROAD MANAGEMENT OFFICE
APPENDIX A: ASSET INFORMATION STRATEGY
APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings
Asset Management for Small, Rural or Remote Communities: BC & SK NAMS: The Canadian Pilot
institute of public works engineering australia Asset Management for Small, Rural or Remote Communities: BC & SK NAMS: The Canadian Pilot Chris Champion, CEO [email protected] LGAMWG BC, CANADA Asset
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY
INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY Allison Daniello Ben Powell Nicholas Schaeffer Aaliyah McClinton Yusuf Mehta Rowan University United States Kimberly
Thoughts on Warm Mix Asphalt production (..among other things!)
Thoughts on Warm Mix Asphalt production (..among other things!) Even K. Sund Senior Principal Engineer Roads and Traffic Department, Road Directorate Contents of presentation Brief status for road maintenance
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control
2016-2021 Highway Asset Management Strategy
2016-2021 Highway Asset Management Strategy Barnsley MBC 2016-2021 v0.1 0 BARNSLEY COUNCIL ASSET MANAGEMENT IMPLEMENTATION STRATEGY Contents 1.0 Introduction 2 Page 2.0 Legislative Requirements 2 3.0 Planning
How To Manage Transportation Asset Management
1 TRANSPORTATION ASSET MANAGEMENT THE NEW BUSINESS MODEL FOR TRANSPORTATION AGENCIES Presented at the AASHTO Subcommittee on Transportation Finance Policy Business Meeting Irvine, California June 26, 2012
TAMS 2.1 User s Manual. Utah LTAP Center. Contact: Utah LTAP 4111 Old Main Hill Logan, UT. 84322-4111 800-822-8878 www.utahltap.
TAMS 2.1 User s Manual Utah LTAP Center Contact: Utah LTAP 4111 Old Main Hill Logan, UT. 84322-4111 800-822-8878 www.utahltap.org Table of Contents Introduction 1 Initializing the program... 1 Data Needed
HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
SECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
ROADS AND MARITIME SERVICES QA SPECIFICATION G10 TRAFFIC MANAGEMENT REVISION REGISTER
ROADS AND MARITIME SERVICES (RMS) QA SPECIFICATION TRAFFIC MANAGEMENT NOTICE This document is a Roads and Maritime Services QA Specification. It has been developed for use with roadworks and bridgeworks
The Pavement Management System
SMEC ASSET MANAGEMENT SYSTEMS The Pavement Management System Product Overview Date: 01-Nov-2010 PREPARATION, REVIEW AND AUTHORISATION Revision # Date Prepared by Reviewed by Approved for Issue by 1.0 ISSUE
Pavement Management Program
Pavement Management Program ALACPA Short Course on Pavements Maintenance Course Objective Pavement Management Program Benefits of a Pavement Management System Components of a Pavement Management System
LEVERAGING THE ROMAN II ASSET MANAGEMENT SYSTEM
LEVERAGING THE ROMAN II ASSET MANAGEMENT SYSTEM Damien Douglas BE(Civil) MIEAust Opus International Consultants LEVERAGING THE ROMAN II ASSET MANAGEMENT SYSTEM LEVERAGING THE ROMAN II ASSET MANAGEMENT
ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT
I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
High-Speed Nondestructive Testing and Intelligent Construction Systems
High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
CURRENT PRACTICE SHEET
CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans
Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001
Project Traffic Management Plan for Design & Construction of the Port Botany Expansion Project of Sydney Ports Corporation Document No: PLAN-TM-001 PLAN-TM-001 [5W] Traffic Management Plan.doc Page 1 of29
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
FLH Asset Management
FLH Asset Management What is Asset Management? Asset Management is not a specific product or service, but rather a way of doing business It provides a solid foundation from which to monitor the transportation
ROAD MANAGEMENT SYSTEMS - THE DEVELOPMENT OF THE ROAD MENTOR SYSTEM IN TANZANIA.
ROAD MANAGEMENT SYSTEMS - THE DEVELOPMENT OF THE ROAD MENTOR SYSTEM IN TANZANIA. AUTHORS: Mr J Katala (TANROADS), and Mr T Toole (TRL) ABSTRACT Tanzania is currently in the process of completing the re-organisation
DEVELOPMENT OF INTEGRATED HIGHWAY MANAGEMENT SYSTEM IN KOREA
DEVELOPMENT OF INTEGRATED HIGHWAY MANAGEMENT SYSTEM IN KOREA Chunjoo YOON Researcher Highway Research Department Korea Institute of Construction Technology 2311, Daehwa-Dong, Ilsan-Gu, Goyang-Si, Gyeonggi-Do,
The Development of Practical Asset Management System for an Urban Expressway Network
The Development of Practical Asset Management System for an Urban Expressway Network Motohiko Nishibayashi, Hanshin Expressway Company Limited 1. Introduction Hanshin Expressway is an urban expressway
CONGESTION AND INCIDENT MANGEMENT APPLICATIONS FOR DISTRIBUTED ACOUSTIC SENSING TECHNOLOGY NZTA CASE STUDY
CONGESTION AND INCIDENT MANGEMENT APPLICATIONS FOR DISTRIBUTED ACOUSTIC SENSING TECHNOLOGY NZTA CASE STUDY Authors Russell Pinchen, Senior ITS Engineer, New Zealand Transport Agency, 1 Queen Street, Auckland
Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making
Managing the Risk of Aging Pavement Infrastructure in New Brunswick Through Innovative Decision Making Jay Cunningham, MSc.Eng., P.Eng. New Brunswick Department of Transportation John MacNaughton, BSc.
SLIPS, TRIPS AND FALLS POLICY
SLIPS, TRIPS AND FALLS POLICY First Issued Issue Version Purpose of issue/description of change Planned Review Date 2 Root cause analysis (RCA), RIDDOR August 2012 and inspection of communal areas referenced
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
Pavement Design. Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION. 1005 Terminal Way, Suite 125 Reno, Nevada 89502
Pavement Design Guest Lecturer Dr. Sirous Alavi, P.E. SIERRA TRANSPORTATION ENGINEERS,, INC. I 1005 Terminal Way, Suite 125 Reno, Nevada 89502 Topics Introduction Design Factors Pavement Types Fundamentals
GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Feeder Roads
GIS a Tool for Transportation Infrastructure Planning in Ghana A Case Study to the Department of Stephen Yao FIATORNU, Ghana Key words: SUMMARY With the development of GIS technology, network transportation
Appendix 14 Traffic Management Plan
Appendix 14 Traffic Management Plan Toms Gully Underground Project Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
Pavement Management System Overview
TABLE OF CONTENTS The Home Screen... 3 The Gutter... 4 Icons... 4 Quick Links... 5 Miscellaneous... 6 PMS Menus... 7 Setup Menu... 7 Construction Setup... 7 1. Material Codes... 8 2. Standard Sections...
ASSET MANAGEMENT OF ROADS Bob Lloyd ARRB Transport Research Ltd
26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 ABSTRACT ASSET MANAGEMENT OF ROADS ARRB Transport Research Ltd The World Bank s initial approach to road project / network
How To Manage Big Data For The Ohio Department Of Transportation
Big Data & Asset Management Ohio Planning Conference 2014 John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Big Data: Asset Management Andrew Williams, Administrator Office
