BREWSTER BUFFALO - Production listing (reconstructed) Version 10 February 2007 By Jos Heyman, Australia

Size: px
Start display at page:

Download "BREWSTER BUFFALO - Production listing (reconstructed) Version 10 February 2007 By Jos Heyman, Australia"

Transcription

1 Introduction BREWSTER BUFFALO - Production listing (reconstructed) Version 10 February 2007 By Jos Heyman, Australia Whilst the history of each individual aircraft is reasonably well, matching aircraft to their construction number remains a problem. Archival listings of construction numbers are no longer available except for the Finnish aircraft, where construction numbers have been listed on a US Treasury Department document (Form 5, Firearms) dated 7 February In all other cases, the batches of construction numbers have been deduced from miscellaneous references. Gerard Casius in Air Enthusiast No. 8 (Oct 1978/Jan 1979), p. 80, as provided by Luc Wittemans on 14 January 2002, provides one version. An alternative version is provided by Jean- Louis Couston s book Le Brewster Buffalo. The Casius listing seems to be based on the assumption that the civilian registration that was used for factory test flights in the US, was based on the manufacturer's construction number, followed by the letter 'B' for Brewster. However, there are also test registrations which do not fit this pattern. Some test registrations have also been listed in Flightpath of February It has, however, not been possible to confirm the civilian registrations with surviving listings such as the listing on Aerofiles.com, let alone establish the link between the registration and the c/n. Casius suggested the following break-up of the construction numbers: 1 Protoype F2A 2/55 US Navy (F2A-1), with some diverted to Finland 56/103 Belgium, with some diverted to Finland and United Kingdom (RAF) 104/146 US Navy (F2A-2) 147/316 United Kingdom (RAF) 317/388 Neth East Indies 389 Brewster Buccaneer?/? Neth East Indies?/? US Navy (F2A-3) Couston s book does not disclose the source of that listing. However, the listing reveals several production batches within orders and also provides construction numbers for aircraft for which Casius had no construction number. Nevertheless, there remain discrepancies between Couston s listing and the confirmed Finnish construction numbers. In deciding whether to use the Casius or Couston listing (apart from the confirmed Finnish construction numbers), it was felt that the Couston listing provided a higher level of confidence event though it continues to pose problems. As such, Couston s listing has been chosen as a basis for the unconfirmed construction numbers. In compiling the listing, it is generally assumed that serials were issued in sequence within a batch but this may not always be the case as there have been instances where serials were issued in sequence of aircraft delivered or shipped. As such, where a match between a c/n and a serial has not been confirmed with a fair degree of certainty, the match has been labeled as 'probably'. Type designations The type designation x39 was used for export orders only and comprised the xth export order in a given year, ie There was never a 139, but export orders were 239 and 339. The additions B, D and E were not, as often thought, references to the ordering countries, but rather a follow on letter with 339A being a cancelled version and 339C being some of the Dutch aircraft. Later 'block

2 number' type suffixes were introduced, such as and US Navy aircraft never received type designations. (Source: Jim Maas on Warbirds forum, 1 March 2006) C/n - Description Completed without a construction number Delivered to US Navy as XF2A-1, serial BuA 0451; delivery date not Converted to XF2A-2 References 1 Completed with c/n 1 Delivered to US Navy as F2A-1 probably with serial BuA 1386; delivered on 6 October Operated by VS-201 Converted to F2A-2 on 9 January W/o 27 November 1940 at NAS Norfolk, VA 2 Completed with c/n 2 Delivered to US Navy as F2A-1 probably with serial BuA 1387; delivered on 6 October 1939 Operated by VF-3 as 3-F-1 Operated by VS-201 Converted to F2A-2 on 17 November W/o 20 February 1943 or 28 March 1943 at NAS Miami, FL 3 Completed with c/n 3, 16 Delivered to US Navy as F2A-1 probably with serial BuA 1388; delivered on 31 Jul Operated by VF-3 as 3-F-18, 45 Operated by VS-201, 45 Converted to F2A-2 on 17 November Converted to XF2A-4 on 4 August Wfu 28 June Completed with c/n 4 Delivered to US Navy as F2A-1 probably with serial BuA 1389; delivered on 28 6 November 1939 Operated by VF-3 as 3-F-17 Converted to F2A-2 on 5 November Wfu 31 October Completed with c/n 5 Delivered to US Navy as F2A-1 probably with serial BuA 1390; delivered on 28 November 1939 Operated by VF-3 as 3-F-16 W/o 23 September 1940 at Dana Point, CA 6, 45 6 Completed with c/n 6 Delivered to US Navy as F2A-1 probably with serial BuA 1391; delivered on 4 6 December 1939 Operated by VF-3 as 3-F-14, 45 Operated by VS-201, 45 Converted to F2A-2 on 17 November

3 Wfu 31 October Completed with c/n 7 Delivered to US Navy as F2A-1 probably with serial BuA 1392; delivered on 4 6 December 1939 Operated by VF-3 as 3-F-14, 45 Operated by VS-201, 45 Converted to F2A-2 on 5 November W/o 21 May 1943 at Jacksonville NAS, FL 8 Completed with c/n 8 Delivered to US Navy as F2A-1 probably with serial BuA 1393; delivered on 4 6 December 1939 Operated by VF-3 as 3-F-13, 45 Crashed 22 August 1940 but repaired 6 Converted to F2A-2 W/o 7 May 1943 at Jacksonville NAS, FL 6 9 Completed with c/n 9 Delivered to US Navy as F2A-1 probably with serial BuA 1394; delivered on 11 6 December 1939 Operated by VF-3 as 3-F-12, 45 Operated by VS-201, 45 Converted to F2A-2 on 5 November W/o 28 February 1942 and 4 March 1942 at Miami NAS, FL 10 Completed with c/n 10, 16, 45 Delivered to US Navy as F2A-1 probably with serial BuA 1395; delivered on 11 6 December 1939 Operated by VF-3 as 3-F-11, 45 Operated by VS-201, 45 Converted to F2A-2 on 17 November W/o 18 February 1942 at Davis, FL 11 Completed with c/n 11, 16, 45 Delivered to US Navy as F2A-1 probably with serial BuA 1396; delivered on 11 6 December 1939 Operated by VF-3 as 3-F-10, 45 Operated by VS-201, 45 Converted to F2A-2 on 5 November Completed with c/n 12 Intended for US Navy as F2A-1 probably with serial BuA 1397; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, Completed with c/n 13 Intended for US Navy as F2A-1 probably with serial BuA 1398; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, 41

4 14 Completed with c/n 14 Intended for US Navy as F2A-1 probably with serial BuA 1399; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, Completed with c/n 15 Intended for US Navy as F2A-1 probably with serial BuA 1400; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, Completed with c/n 16 Intended for US Navy as F2A-1 probably with serial BuA 1401; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, Completed with c/n 17 Intended for US Navy as F2A-1 probably with serial BuA 1402; not delivered The suggestion this aircraft was delivered to Finnish AF as type 239 is not supported by shipping documents, 4, 37, Completed with c/n 18 Test registration NX15694 is probably incorrect, 41, 42 Intended for US Navy as F2A-1 probably with serial BuA 1403; not delivered Delivered as type 239 to Finnish AF in New York on 17 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-387; first flight date not, 45 Operated by LeLv 26 Wfu 27 January Completed with c/n 19 Test registration probably NX15695, 37 Intended for US Navy as F2A-1 probably with serial BuA 1404; not delivered Delivered as type 239 to Finnish AF in New York on 12 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-353; first flight on 25 February 1940, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 17 October Completed with c/n 20 Intended for US Navy as F2A-1 probably with serial BuA 1405; not delivered Delivered as type 239 to Finnish AF in New York on 2 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-351; first flight on 14 February 1940, 45

5 W/o 17 June Completed with c/n 21 Intended for US Navy as F2A-1 probably with serial BuA 1406; not delivered Delivered as type 239 to Finnish AF in New York on 2 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-352; first flight on 21 February 1940, 45 Operated by LeLv 22 W/o 21 April Completed with c/n 22 Intended for US Navy as F2A-1 probably with serial BuA 1407; not delivered Delivered as type 239 to Finnish AF in New York on 2 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-355; first flight on 25 February 1940, 45 Operated by LeLv 22 W/o 24 October Completed with c/n 23 Intended for US Navy as F2A-1 probably with serial BuA 1408; not delivered Delivered as type 239 to Finnish AF in New York on 3 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-354; first flight on 29 February 1940, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 21 April Completed with c/n 24 Intended for US Navy as F2A-1 probably with serial BuA 1409; not delivered Delivered as type 239 to Finnish AF in New York on 4 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-356; first flight on 29 February 1940, 45 Operated by LeLv 22 W/o 31 August Completed with c/n 25 Intended for US Navy as F2A-1 probably with serial BuA 1410; not delivered Delivered as type 239 to Finnish AF in New York on 4 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-357; first flight on 2 March 1940, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 18 October 1944

6 26 Completed with c/n 26 Intended for US Navy as F2A-1 probably with serial BuA 1411; not delivered Delivered as type 239 to Finnish AF in New York on 13 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-358; first flight on 5 March 1940, 45 Operated by LeLv 22 W/o 24 January Completed with c/n 27 Intended for US Navy as F2A-1 probably with serial BuA 1412; not delivered Delivered as type 239 to Finnish AF in New York on 13 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-359; first flight on 8 March 1940, 45 Operated by LeLv 26 W/o 26 February Completed with c/n 28 Intended for US Navy as F2A-1 probably with serial BuA 1413; not delivered Delivered as type 239 to Finnish AF in New York on 13 January 1940, 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-360; first flight on 9 March 1940, 45 Operated by LeLv 22 W/o 14 October Completed with c/n 29 Intended for US Navy as F2A-1 probably with serial BuA 1414; not delivered Delivered as type 239 to Finnish AF in New York on 13 January 1940 Ref: 37 Shipped on SS Mormacktide, departing New York on 13 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-361; first flight date not, 45 Operated by LeLv 22 Operated by LeLv 26 Used to make templates for VL Humu development 3 Wfu 9 February Completed with c/n 30 Intended for US Navy as F2A-1 probably with serial BuA 1415; not delivered Delivered as type 239 to Finnish AF in New York on 18 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-362; first flight date not, 45 Operated by LeLv 22 W/o 9 March 1942

7 31 Completed with c/n 31 Intended for US Navy as F2A-1 probably with serial BuA 1416; not delivered Delivered as type 239 to Finnish AF in New York on 18 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-363; first flight date not, 45 Operated by LeLv 22 Operated by LeLv 26 Wfu 7 August Completed with c/n 32 Intended for US Navy as F2A-1 probably with serial BuA 1417; not delivered Delivered as type 239 to Finnish AF in New York on 19 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-364; first flight date not, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 29 July Completed with c/n 33 Intended for US Navy as F2A-1 probably with serial BuA 1418; not delivered Delivered as type 239 to Finnish AF in New York on 19 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-366; first flight date not, 45 Operated by LeLv 22 W/o 10 November Completed with c/n 34 Intended for US Navy as F2A-1 probably with serial BuA 1419; not delivered Delivered as type 239 to Finnish AF in New York on 19 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-365; first flight date not, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 10 June Completed with c/n 35 Intended for US Navy as F2A-1 probably with serial BuA 1420; not delivered Delivered as type 239 to Finnish AF in New York on 20 January 1940 Ref: 37 Shipped on SS Mormackstar, departing New York on 20 January 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-367; first flight date not, 45 Operated by LeLv 22 Operated by LeLv 26 W/o 17 October 1944

8 36 Completed with c/n 36 Intended for US Navy as F2A-1 probably with serial BuA 1421; not delivered Delivered as type 239 to Finnish AF in New York on 3 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-371; first flight date not, 45 Operated by LeLv 26 Used in development of VL Humu 3 W/o 22 February Completed with c/n 37 Intended for US Navy as F2A-1 probably with serial BuA 1422; not delivered Delivered as type 239 to Finnish AF in New York on 2 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-368; first flight date not, 45 Operated by LeLv 26 W/o 30 July Completed with c/n 38 Test registration probably NX25196, 37 Intended for US Navy as F2A-1 probably with serial BuA 1423; not delivered Delivered as type 239 to Finnish AF in New York on 17 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-381; first flight date not, 45 W/o 25 June Completed with c/n 39 Intended for US Navy as F2A-1 probably with serial BuA 1424; not delivered Delivered as type 239 to Finnish AF in New York on 3 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-372; first flight date not, 45 W/o 25 June Completed with c/n 40 Intended for US Navy as F2A-1 probably with serial BuA 1425; not delivered Delivered as type 239 to Finnish AF in New York on 5 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-369; first flight date not, 45 Operated by LeLv 22 W/o 28 June Completed with c/n 41 Intended for US Navy as F2A-1 probably with serial BuA 1426; not delivered

9 Delivered as type 239 to Finnish AF in New York on 2 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-370; first flight date not, 45 Operated by LeLv 26 W/o 18 November Completed with c/n 42 Intended for US Navy as F2A-1 probably with serial BuA 1427; not delivered Delivered as type 239 to Finnish AF in New York on 1 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-373; first flight date not, 45 Operated by LeLv 26 W/o 30 June Completed with c/n 43 Intended for US Navy as F2A-1 probably with serial BuA 1428; not delivered Delivered as type 239 to Finnish AF in New York on 1 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-394; first flight date not, 45 W/o 8 June Completed with c/n 44 Intended for US Navy as F2A-1 probably with serial BuA 1429; not delivered Delivered as type 239 to Finnish AF in New York on 3 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-375; first flight date not, 45 W/o 2 July Completed with c/n 45 Intended for US Navy as F2A-1 probably with serial BuA 1430; not delivered Delivered as type 239 to Finnish AF in New York on 1 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-374; first flight date not, 45 Operated by LeLv 26 W/o 12 June Completed with c/n 46 Intended for US Navy as F2A-1 probably with serial BuA 1431; not delivered Delivered as type 239 to Finnish AF in New York on 1 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-391; first flight date not, 45 W/o 28 January 1941

10 47 Completed with c/n 47 Intended for US Navy as F2A-1 probably with serial BuA 1432; not delivered Delivered as type 239 to Finnish AF in New York on 2 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-393; first flight date not, 45 Operated by LeLv 26 W/o 2 July Completed with c/n 48 Intended for US Navy as F2A-1 probably with serial BuA 1433; not delivered Delivered as type 239 to Finnish AF in New York on 2 February 1940 Ref: 37 Shipped on SS Southfolk, departing New York on 7 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-376; first flight date not, 45 W/o 30 October Completed with c/n 49 Intended for US Navy as F2A-1 probably with serial BuA 1434; not delivered Delivered as type 239 to Finnish AF in New York on 10 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-385; first flight date not, 45 W/o 3 December Completed with c/n 50 Intended for US Navy as F2A-1 probably with serial BuA 1435; not delivered Delivered as type 239 to Finnish AF in New York on 10 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-392; first flight date not, 45 Used in development of VL Humu 3 W/o 5 June Completed with c/n 51 Intended for US Navy as F2A-1 probably with serial BuA 1436; not delivered Delivered as type 239 to Finnish AF in New York on 13 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-389; first flight date not, 45 W/o 29 January Completed with c/n 52 Intended for US Navy as F2A-1 probably with serial BuA 1437; not delivered Delivered as type 239 to Finnish AF in New York on 13 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-390; first flight date not, 45

11 W/o 29 May Completed with c/n 53 Intended for US Navy as F2A-1 probably with serial BuA 1438; not delivered Delivered as type 239 to Finnish AF in New York on 13 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-384; first flight date not, 45 Operated by LeLv 26 W/o 20 November Completed with c/n 54 Intended for US Navy as F2A-1 probably with serial BuA 1439; not delivered Delivered as type 239 to Finnish AF in New York on 14 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-380; first flight date not, 45 W/o 2 May Completed with c/n 55 Intended for US Navy as F2A-1 probably with serial BuA?; not delivered Delivered as type 239 to Finnish AF in New York on 14 February 1940 Ref: 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-382; first flight date not, 45 Operated by LeLv 26 Wfu 14 September Completed with c/n 56, type 339B Test registration probably NX56B; flown with Belgian markings Delivery details not Captured by Germany Ref: 8 57 Completed with c/n 57, type 339B Test registration probably NX57B Delivered as type 239 to Finnish AF in New York on 14 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-386; first flight date not, 45 Operated by LeLv 26 W/o 15 October 1944 some reference sources have suggested:, 7 Shipped to France on French a/c carrier Bearn, leaving New York on 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8

12 Destroyed in Martinique Ref: 8 58 Completed with c/n 58, type 339B Test registration probably NX58B Delivered as type 239 to Finnish AF in New York on 14 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-388; first flight date not, 45 W/o 4 May 1943 some reference sources have suggested:, 7 Shipped to France on French a/c carrier Bearn, leaving New York on 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8 Destroyed in Martinique Ref: 8 59 Completed with c/n 59, type 339B Test registration probably NX59B Delivered as type 239 to Finnish AF in New York on 15 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-378; first flight date not, 45 W/o 18 August 1942 some reference sources have suggested:, 7 Shipped to France on French a/c carrier Bearn, leaving New York on 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8 Destroyed in Martinique Ref: 8 60 Completed with c/n 60, type 339B Test registration probably NX60B Delivered as type 239 to Finnish AF in New York on 15 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-377; first flight date not, 45 Wfu 14 September 1948 some reference sources have suggested:, 7 Shipped to France on French a/c carrier Bearn, leaving New York on 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8 Destroyed in Martinique Ref: 8 61 Completed with c/n 61, type 339B Test registration probably NX61B Test registration probably NX15694, 37 Delivered as type 239 to Finnish AF in New York on 16 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-383; first flight date not, 45

13 Operated by LeLv 26 W/o 2 July 1944 some reference sources have suggested:, 7 62 Completed with c/n 62, type 339B Test registration probably NX62B Delivered as type 239 to Finnish AF in New York on 16 February 1940, 5, 37 Shipped on SS Mormacksea, departing New York on 19 February 1940 Assembled by Saab at Trollhattan, Sweden and given serial BW-379; first flight date not, 45 Operated by LeLv 26 W/o 18 October 1944 some reference sources have suggested:, 7 Shipped to France on French a/c carrier Bearn, leaving New York on 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8 Destroyed in Martinique Ref: 8 63 Completed with c/n 63, type 339B Test registration probably NX63B some reference sources have suggested: Shipped to France on French a/c carrier Bearn, leaving New York 16 Jun 1940 and diverted to Martinique Ref: 8 Intended for RAF with serial probably in AS410/430 range but not taken up Ref: 8 Destroyed in Martinique Ref: 8 64 Completed with c/n 64, type 339B Test registration probably NX64B Delivered to RAF assumed with serial AS410 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain 65 Completed with c/n 65, type 339B Test registration probably NX65B Delivered to RAF assumed with serial AS411 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain

14 66 Completed with c/n 66, type 339B Test registration probably NX66B Delivered to RAF assumed with serial AS412 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Operated by 760 Sq W/o 24 December 1941 at Yeovilton, Britain 67 Completed with c/n 67, type 339B Test registration probably NX67B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS413 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o 16 May 1941 at Dekheila, Egypt 68 Completed with c/n 68, type 339B Test registration probably NX68B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS414 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 69 Completed with c/n 69, type 339B Test registration probably NX69B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS415 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Wfu 70 Completed with c/n 70, type 339B Test registration probably NX70B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS416 in ranges AS410/430, AX811/820 and BB450; delivered 21 November 1940, 6, Completed with c/n 71, type 339B Test registration probably NX71B

15 Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS417 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 759 Sq Wfu 21 March 1942 ref: Completed with c/n 72, type 339B Test registration probably NX72B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS418 in ranges AS410/430, AX811/820 and BB450; delivered in August 1940, 6, Completed with c/n 73, type 339B Test registration probably NX73B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS419 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o 19 March 1941 at Maleme, Crete 74 Completed with c/n 74, type 339B Test registration probably NX74B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS420 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o at Maleme, Crete 75 Completed with c/n 75, type 339B Test registration probably NX75B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS421 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 759 Sq 76 Completed with c/n 76, type 339B Test registration probably NX76B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS422 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6

16 Operated by 804 Sq Operated by 759 Sq 77 Completed with c/n 77, type 339B Test registration probably NX77B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS423 in ranges AS410/430, AX811/820 and BB450; deliverey date not, 6 Operated by 759 Sq Operated by 804 Sq 78 Completed with c/n 78, type 339B Test registration probably NX78B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS424 in ranges AS410/430, AX811/820 and BB450; delivered November 1940, 6, Completed with c/n 79, type 339B Test registration probably NX79B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS425 in ranges AS410/430, AX811/820 and BB450; delivered November 1940, 6, Completed with c/n 80, type 339B Test registration probably NX80B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS426 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 711 Sq Wfu, to Instructional Airframe A38 81 Completed with c/n 81, type 339B Test registration probably NX81B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS427 in ranges AS410/430, AX811/820 and BB450; delivered November 1940, 6

17 82 Completed with c/n 82, type 339B Test registration probably NX82B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS428 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 83 Completed with c/n 83, type 339B Test registration probably NX83B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS429 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 84 Completed with c/n 84, type 339B Test registration probably NX84B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AS430 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 85 Completed with c/n 85, type 339B Test registration probably NX85B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX811 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 86 Completed with c/n 86, type 339B Test registration probably NX86B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX812 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq 87 Completed with c/n 87, type 339B

18 Test registration probably NX87B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX813 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o 17 Jun 1941 at Sidi Barrani, Egypt 88 Completed with c/n 88, type 339B Test registration probably NX88B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX814 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o Maleme, Crete 89 Completed with c/n 89, type 339B Test registration probably NX89B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX815 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o 24 October 1943 as Patandi, India 90 Completed with c/n 90, type 339B Test registration probably NX90B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX816 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 91 Completed with c/n 91, type 339B Test registration probably NX91B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX817 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq W/o 11 Jun 1941 at Dekheila, Egypt 92 Completed with c/n 92, type 339B Test registration probably NX92B Shipped by HMS Furious from Halifax, Canada

19 Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX818 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq 93 Completed with c/n 93, type 339B Test registration probably NX93B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX819 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 94 Completed with c/n 94, type 339B Test registration probably NX94B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial AX820 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 805 Sq Operated by 775 Sq 95 Completed with c/n 95, type 339B 96 Test registration probably NX95B Shipped by HMS Furious from Halifax, Canada Assembled at Burtonwood, Britain Delivered to RAF assumed with serial BB450 in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 Operated by 759 Sq Operated by 761 Sq Operated by 804 Sq Completed with c/n 96 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1397 (reassigned); delivered 6 on 4 October 1940 Operated by VMF-121 Wfu 29 April some reference sources have suggested: 96 Completed with c/n 96, type 339B Test registration probably NX96B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 97 Completed with c/n 97 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1398 (reassigned); delivered 6

20 on 12 September 1940 Operated by VF-3 as 3-F-8 Operated by VMF-221 Converted to F2A-2P 6 W/o 7 May 1943 at Jacksonville NAS, FL 6, 45 some reference sources have suggested: 97 Completed with c/n 97, type 339B Test registration probably NX97B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 98 Completed with c/n 98 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1399 (reassigned); delivered 6 on 11 September 1940 Operated by VF-3 as 3-F-7 Operated by VMF-211 Operated by VMF-212 Operated by VMF-222 Converted to F2A-2P 6 W/o 18 November some reference sources have suggested: 98 Completed with c/n 98, type 339B Test registration probably NX98B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, 6 99 Completed with c/n 99 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1400 (reassigned); delivered 6 on 11 September 1940 Operated by VF-3 as 3-F-6 Converted to F2A-2P 6 W/o 14 October 1942 at NAS Miami, FL 6 some reference sources have suggested: 99 Completed with c/n 99, type 339B Test registration probably NX99B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, Completed with c/n 100 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1401 (reassigned); delivered 6 on 11 September 1940 Operated by VF-3 as 3-F-5 Operated by VF-2 Wfu 18 November some reference sources have suggested: 100 Completed with c/n 100, type 339B Test registration probably NX100B

21 Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, Completed with c/n 101 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1402 (reassigned); delivered 6 on 11 September 1940 Operated by VF-3 as 3-F-4 Operated by VF-2 Operated by VMF-112 Converted to F2A-2P 6 Wfu 9 May some reference sources have suggested: 101 Completed with c/n 101, type 339B Test registration probably NX101B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, Completed with c/n 102 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1403 (reassigned); delivered 6 on 12 September 1940 Operated by VF-3 as 3-F-3 Operated by VF-2 Operated by VMF-111 W/o 2 March 1942 at Camp Kearny, CA 6 some reference sources have suggested: 102 Completed with c/n 102, type 339B Test registration probably NX102B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, Completed with c/n 103 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1404 (reassigned); delivered 6 on 4 October 1940 Operated by VF-3 as 3-F-2 Operated by VF-2 Operated by VMF-111 Operated by VMF-121 Operated by VMF-112 Wfu 31 January some reference sources have suggested: 103 Completed with c/n 103, type 339B Test registration probably NX103B Delivered to RAF assumed with serial in ranges AS410/430, AX811/820 and BB450; delivery date not, Completed with c/n 104 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1405 (reassigned); delivered on 4 October

22 2 Operated by VF-3 as 3-F-1 2 Operated by VMF-121 Wfu 29 April Completed with c/n 105 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1406 (reassigned); delivered 6 on 4 October 1940 Operated by VF-2 as 2-F-1 Wfu 30 June Completed with c/n 106 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1407 (reassigned); delivered 6 on 4 October 1940 Operated by VF-2 as 2-F-2 W/o 29 January Completed with c/n 107 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1408 (reassigned); delivered 6 on 4 October 1940 Operated by VF-2 as 2-F-3 Wfu 29 April Completed with c/n 108 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1409 (reassigned); delivered 6 on 4 October Operated by VF-2 as 2-F-4 3 Operated by VMF Operated by VMF-121 Wfu 9 May Completed with c/n 109 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1410 (reassigned); delivered 6 on 10 October 1940 Operated by VF-2 as 2-F-5 W/o 13 January 1943 at NAS Miami, FL Completed with c/n 110 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1411 (reassigned); delivered on 10 October 1940 Operated by VF-2 as 2-F-6 Operated by VMF-121 W/o 29 October 1942 at Davis Field, FL Completed with c/n 111 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1412 (reassigned); delivered on 10 October 1940 Operated by VF-2 as 2-F-7 Operated by VF-3 Operated by VMF-221 Operated by VMF-112 W/o 6 February 1943 near Miami, FL Completed with c/n 112 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1413 (reassigned); delivered on 10 October

23 Operated by VF-2 as 2-F-8 Operated by VF-3 Operated by VMF-121 Wfu 30 November Completed with c/n 113 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1414 (reassigned); delivered 6 on 10 October 1940 Operated by VF-2 as 2-F-9 Wfu 30 November Completed with c/n 114 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1415 (reassigned); delivered 6 on 10 October 1940 Operated by VF-2 as 2-F-10 Converted to F2A-2P 6 W/o 10 July 1942 at NAS Jacksonville, FL 115 Completed with c/n 115 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1416 (reassigned); delivered on 18 October 1940 Operated by VF-2 as 2-F-11 Operated by VMF-211 W/o 2 September 1942 at Boca Raton, FL Completed with c/n 116 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1417 (reassigned); delivered 6 on 18 October 1940 Operated by VF-2 as 2-F-12 Operated by VF-3 Operated by VMF-1212 Operated by VMF-112 Converted to F2A-2P 6 Wfu 30 November Completed with c/n 117 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1418 (reassigned); delivered on 18 October 1940 Operated by VF-2 as 2-F-13 Operated by VF-3 Operated by VMF-221 Operated by VMF-111 W/o 15 March 1942 at NAS San Diego, CA Completed with c/n 118 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1419 (reassigned); delivered on 18 October 1940 Operated by VF-2 as 2-F-14 Operated by VMF-121 W/o 5 December 1942 at NAS Miami, FL Completed with c/n 119 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1420 (reassigned); delivered on 18 October

24 Operated by VF-2 as 2-F-15 Operated by VMO-251 Operated by VMD-2 Converted to F2A-2P 6 W/o 2 November 1942 at NAS Miami, FL 120 Completed with c/n 120 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1421 (reassigned); delivered 6 on 18 October 1940 Operated by VF-2 as 2-F-16 Operated by VF-3 Operated by VMF-112 Converted to F2A-2P 6 Wfu 30 November Completed with c/n 121 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1422 (reassigned); delivered 6 on 18 October 1940 Operated by VF-2 as 2-F-17 Operated by VMF-111 Operated by VMF-121 Converted to F2A-2P 6 Wfu 30 November Completed with c/n 122 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1423 (reassigned); delivered 6 on 23 October 1940 Operated by VF-2 as 2-F-18 Operated by VMF-221 Wfu 30 November Completed with c/n 123 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1424 (reassigned); delivered 6 on 23 October 1940 Operated by VF-3 as 3-F-9 Operated by VMF-121 Operated by VMF-112 Converted to F2A-2P 6 Wfu 30 November Completed with c/n 124 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1425 (reassigned); delivered on 26 October 1940 Operated by VF-3 as 3-F-10 W/o 19 November 1941 at Otay Mesa Field, CA 6, Completed with c/n 125 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1426 (reassigned); delivered 6 on 2 January 1941 Retained by Brewster for testing 6 To NAS Anacostia 6 To NACA Langley 6 W/o 31 October 1943

25 126 Completed with c/n 126 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1427 (reassigned); delivered on 28 October 1940 Operated by VF-3 as 3-F-11 Operated by VF-2 Operated by VMF-221 W/o 31 October 1941 at Point Loma, CA 6, Completed with c/n 127 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1428 (reassigned); delivered 6 on 24 October 1940 Operated by VF-3 as 3-F-12 Operated by VF-2 Operated by VMF-112 Converted to F2A-2P 6 W/o 7 September 1942 on USS Lexington 128 Completed with c/n 128 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1429 (reassigned); delivered 6 on 28 October 1940 Operated by VF-3 as 3-F-13 Operated by VMF-221 Operated by VMF-111 Operated by VMF-121 Wfu 31 January Completed with c/n 129 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1430 (reassigned); delivered 6 on 1 November 1940 Operated by VF-3 as 3-F-14 Operated by VMF-111 Operated by VMF-112 Converted to F2A-2P 6 W/o 21 October Completed with c/n 130 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1431 (reassigned); delivered 6 on 1 November 1940 Operated by VF-3 as 3-F-15 Operated by VF-2 Wfu 29 April Completed with c/n 131 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1432 (reassigned); delivered 6 on 1 November 1940 Operated by VF-3 as 3-F-16 Operated by VMF-121 Operated by VMF-112 Operated by VMO-251 Converted to F2A-2P 6 W/o before 30 November 1943 at Chula Vista, CA, Completed with c/n 132 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1433 (reassigned); delivered 6

26 on 6 November 1940 Operated by VF-3 as 3-F-17 Operated by VMF-221 Wfu 29 April Completed with c/n 133 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1434 (reassigned); delivered 6 on 5 November 1940 Operated by VF-3 as 3-F-18 Operated by VMD-2 W/o 7 May 1943 at NAS Jacksonville, FL Completed with c/n 134 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1435 (reassigned); delivered on 6 November 1940 Operated by VF-3 Operated by VF-2 W/o 4 December 1941 at Poway Canyon, CA 6, Completed with c/n 135 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1436 (reassigned); delivered on 19 November 1940 Operated by VF-3 Operated by VF-2 Operated by VMF-221 Operated by VMF-121 W/o 6 July 1942 at Helotes, TX Completed with c/n 136 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1437 (reassigned); delivered 6 on 19 November 1940 Operated by VF-3 Operated by VF-2 Operated by VMF-221 W/o 23 December Completed with c/n 137 Ref: 34 Delivered to US Navy as F2A-2 probably with serial BuA 1438 (reassigned); delivered 6 on 19 November 1940 Operated by VF-2 Wfu 30 November Completed with c/n 138, as type 339E Test registration probably NX147B Delivered to RAF probably with serial W8131; delivery date not Retained in Great Britain Ref: Completed with c/n 139, as type 339E Delivered to RAF probably with serial W8132; delivery date not Retained in Great Britain Became instructional airframe 3133M Ref: 3

27 140 Completed with c/n 140, as type 339E Delivered to RAF probably with serial W8133; delivery date not Retained in Great Britain Became instructional airframe 3134M 141 Completed with c/n 141, as type 339E Delivered to RAF probably with serial W8134; delivery date not Operated by 243 Sq as WP-M W/o 16 August 1941 at Kallang, Singapore 142 Completed with c/n 142, as type 339E Delivered to RAF probably with serial W8135; delivery date not Assembled at RAF Selatar Operated by 488 Sq (RNZAF) W/o 12 January 1942 at Seletar, Singapore 143 Completed with c/n 143, as type 339E Delivered to RAF probably with serial W8136; delivery date not Operated by 243 Sq Operated by 4 PRU W/o 7 February 1942 at Bandoeng, Netherlands East Indies 144 Completed with c/n 144, as type 339E Delivered to RAF probably with serial W8137; delivery date not Operated by 243 Sq as WP-C W/o 12 January 1942 at SIngapore 145 Completed with c/n 145, as type 339E Delivered to RAF probably with serial W8138; delivery date not Assembled at RAF Selatar Operated by 488 Sq (RNZAF) as NF-O Flown to Palembang, Neth East Indies on 7 February 1942 W/o 7 February 1942 at Palembang, Neth East Indies 146 Completed with c/n 146, as type 339E Delivered to RAF probably with serial W8139; delivery date not Operated by 243 Sq as WP-B W/o 13 January Completed with c/n 147, as type 339E Delivered to RAF probably with serial W8140; delivery date not Operated by 243 Sq Ref: 3, 45, 45, 45, 45, Completed with c/n 148, as type 339E Delivered to RAF probably with serial W8141; delivery date not Assembled at RAF Selatar

28 Operated by 488 Sq (RNZAF) W/o 18 Jan 1942 at Phillip Strait 149 Completed with c/n 149, as type 339E Delivered to RAF probably with serial W8142; delivery date not Operated by 243 Sq as WP-N Operated by 453 Sq (RAAF) on 26 January 1942, 45, Completed with c/n 150, as type 339E Delivered to RAF probably with serial W8143; delivery date not Assembled at RAF Selatar Operated by 243 Sq W/o 6 Feb Completed with c/n 151, as type 339E Delivered to RAF probably with serial W8144; delivery date not Assembled at RAF Selatar as RD-C W/o 19 September Completed with c/n 152, as type 339E Delivered to RAF probably with serial W8145; delivery date not Operated by 243 Sq W/o 18 January Completed with c/n 153, as type 339E Delivered to RAF probably with serial W8146; delivery date not Assembled at RAF Selatar as RD-D W/o 21 Jun Completed with c/n 154, as type 339E Delivered to RAF probably with serial W8147; delivery date not Operated by 243 Sq as WP-O W/o 21 January Completed with c/n 155, as type 339E Delivered to RAF probably with serial W8148; delivery date not Assembled at RAF Selatar Operated by 488 Sq (RNZAF) as NF-J W/o 13 January Completed with c/n 156, as type 339E Delivered to RAF probably with serial W8149; delivery date not Operated by 243 Sq W/o 8 April 1941 at Kallang, Singapore

29 157 Completed with c/n 157, as type 339E Delivered to RAF probably with serial W8150; delivery date not Assembled at RAF Selatar as RD-E Operated by 488 Sq (RNZAF) as NF-I W/o 12 January 1942 at Sembawang, Singapore 158 Completed with c/n 158, as type 339E Delivered to RAF probably with serial W8151; delivery date not Operated by 453 Sq (RAAF) as TD-C from 26 August 1941 W/o 9 December 1941 at Sembawang, Singapore 159 Completed with c/n 159, as type 339E Delivered to RAF probably with serial W8152; delivery date not Operated by 453 Sq (RAAF) as TD-F from 26 August 1941 W/o 13 December 1941 at Butterworth, Malaya 160 Completed with c/n 160, as type 339E Delivered to RAF probably with serial W8153; delivery date not Assembled at RAF Selatar Operated by 488 Sq Transferred to Neth East Indies AF with serial W8153 in February 1942 Captured by Japan at Andir, Neth East Indies, in February 1942, 45, 45 2, , Completed with c/n 161, as type 339E Delivered to RAF probably with serial W8154; delivery date not Operated by 243 Sq W/o 14 November 1941 at Kallang, Singapore 162 Completed with c/n 162, as type 339E Delivered to RAF probably with serial W8155; delivery date not Operated by 243 Sq W/o 27 January Completed with c/n 163, as type 339E Delivered to RAF probably with serial W8156; delivery date not Assembled at RAF Selatar Operated by 453 Sq (RAAF) W/o 27 January Completed with c/n 164, as type 339E Delivered to RAF probably with serial W8157; delivery date not Operated by 453 Sq (RAAF) from 26 August 1941 W/o 5 February , 43

Agilent Infoline Web Services. Quick Reference Guide. Scan and use your phone to go to Infoline at www.agilent.com/find/service

Agilent Infoline Web Services. Quick Reference Guide. Scan and use your phone to go to Infoline at www.agilent.com/find/service Agilent Infoline Web Services Quick Reference Guide Scan and use your phone to go to Infoline at www.agilent.com/find/service One location for all information This quick reference guide reviews the powerful

More information

Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22

Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22 Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22 Note: A summary of the rates and the relevant provisions relating

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information July 1 - December 31, 2014 apple Apple takes our commitment to protecting your data very seriously and we work incredibly hard to deliver the most secure hardware, software

More information

Japan Export Air. International Air Freight Fuel Surcharge. All Destinations

Japan Export Air. International Air Freight Fuel Surcharge. All Destinations Japan Export Air July 28, 2016 International Air Freight Fuel Surcharge Carrier 3K Jet Star Asia Airways 66 1-Jan-15 Taiwan, Philippines 48 1-Jan-15 5C C.A.L. Cargo 130 1-Oct-12 China, Hong Kong, Korea,

More information

Foreign Taxes Paid and Foreign Source Income INTECH Global Income Managed Volatility Fund

Foreign Taxes Paid and Foreign Source Income INTECH Global Income Managed Volatility Fund Income INTECH Global Income Managed Volatility Fund Australia 0.0066 0.0375 Austria 0.0045 0.0014 Belgium 0.0461 0.0138 Bermuda 0.0000 0.0059 Canada 0.0919 0.0275 Cayman Islands 0.0000 0.0044 China 0.0000

More information

Supported Payment Methods

Supported Payment Methods Supported Payment Methods Global In the global payments market, credit cards are the most popular payment method. However, BlueSnap expands the payment selection by including not only the major credit

More information

Supported Payment Methods

Supported Payment Methods Sell Globally in a Snap Supported Payment Methods Global In the global payments market, credit cards are the most popular payment method. However, BlueSnap expands the payment selection by including not

More information

PCI Express 1.0 (2.5 GT/s) Protocol Test

PCI Express 1.0 (2.5 GT/s) Protocol Test PCI Express 1.0 (2.5 GT/s) Protocol Test Configuration and Pricing Guide Gen1 today, ready for Gen2 in the future As PCI Express Gen2 becomes more mature in the market, you must decide whether to continue

More information

Turkish Arab Economic Forum June 29, 2012. Mehmet Şimşek. Minister of Finance

Turkish Arab Economic Forum June 29, 2012. Mehmet Şimşek. Minister of Finance Turkish Arab Economic Forum June 29, 2012 Mehmet Şimşek Minister of Finance 1 Outline Turkey: Short Term Outlook Managing a Soft Landing Fallout from the Euro Crisis Turkey & MENA REBALANCING Growing ON

More information

2010 AIRLINE HULL & LIABILITY INSURANCE MARKET REVIEW MARCH 2011

2010 AIRLINE HULL & LIABILITY INSURANCE MARKET REVIEW MARCH 2011 2010 AIRLINE HULL & LIABILITY INSURANCE MARKET REVIEW MARCH 2011 Algeria - Brazil - Colombia - Dubai - Germany - India - Japan - Korea - Malaysia - Mexico - Romania - Singapore - Sweden - Switzerland -

More information

How does a venture capitalist appraise investment opportunities?

How does a venture capitalist appraise investment opportunities? 1 How does a venture capitalist appraise investment opportunities? Michael Queen - Finance Director, 3i Group plc A presentation to: 23 Pensions Convention 2 June 23 A How presentation does a venture to:

More information

Rethink Convention. CUSTOMER SUPPORT

Rethink Convention. CUSTOMER SUPPORT Rethink Convention. CUSTOMER SUPPORT A STUBBORN RESISTANCE TO THE STATUS QUO. IT DEFINES OUR AIRCRAFT. AND OUR SERVICE AS WELL. It s in our DNA: the notion that good is never good enough. That impossible

More information

Microsoft Voucher Ordering Processes

Microsoft Voucher Ordering Processes Microsoft Voucher Ordering Processes *For purposes of this document, the term Member applies to all Microsoft Members, Academic, ITA and Learning partners. Pearson VUE Voucher Store The Pearson VUE Voucher

More information

AN1819 APPLICATION NOTE Bad Block Management in Single Level Cell NAND Flash Memories

AN1819 APPLICATION NOTE Bad Block Management in Single Level Cell NAND Flash Memories APPLICATION NOTE Bad Block Management in Single Level Cell NAND Flash Memories This Application Note explains how to recognize factory generated Bad Blocks, and to manage Bad Blocks that develop during

More information

IOOF QuantPlus. International Equities Portfolio NZD. Quarterly update

IOOF QuantPlus. International Equities Portfolio NZD. Quarterly update IOOF QuantPlus NZD Quarterly update For the period ended 31 March 2016 Contents Overview 2 Portfolio at glance 3 Performance 4 Asset allocation 6 Overview At IOOF, we have been helping Australians secure

More information

EURid s. Quarterly update 2015 Q3 PROGRESS REPORT

EURid s. Quarterly update 2015 Q3 PROGRESS REPORT EURid s Quarterly update 2015 PROGRESS REPORT Table of contents At a glance... 3 Highlights... 4 EURid.eu... 5 The.eu domain... 6 The registrants... 9 The registrars...12 AT A GLANCE EURid s Progress report

More information

PRELIMINARY ACCOUNTS FOR 2010

PRELIMINARY ACCOUNTS FOR 2010 INTERIM REPORT FOR Q4 2010 AND INTERIM REPORT FOR Q4 2010 AND PRELIMINARY ACCOUNTS FOR 2010 HIGHLIGHTS Profit for Hurtigruten in 2010 Pre-tax profit of NOK 22 million (loss of NOK 28 million in 2009) EBITDA

More information

Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract

Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract Agilent Mobile WiMAX R&D Test Set Solutions: Software and Technical Support Contract Product Overview Maximize the potential of the E6651A Mobile WiMAX test set and related software with the latest software

More information

Comparative tables. CPSS Red Book statistical update 427

Comparative tables. CPSS Red Book statistical update 427 CPSS Red Book statistical update 427 January 2013 Table 1 Basic statistical data GDP (USD billions) 1 Population (millions, yearly average) Australia 952 1,050 999 1,246 1,500 21.1 21.4 21.8 22.1 22.4

More information

Agilent N5970A Interactive Functional Test Software: Installation and Getting Started

Agilent N5970A Interactive Functional Test Software: Installation and Getting Started Agilent N5970A Interactive Functional Test Software: Installation and Getting Started Application Note The N5970A Interactive Functional Test Software along with the 8960 Series 10 (E5515C) wireless communications

More information

Price list 2012 ver.1 Valid from 1 st January 2012

Price list 2012 ver.1 Valid from 1 st January 2012 Price list 2012 ver.1 Valid from 1 st January 2012 US$ Contents Page 1 C-MAP Professional / C-MAP Professional+ 3 2 ENC (Official Electronic Navigational Charts) 4 3 Jeppesen PRIMAR ECDIS Service 5 4 C-MAP

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information January 1 - June 30, 2015 Apple takes our commitment to protecting your data very seriously and we work incredibly hard to deliver the most secure hardware, software and

More information

Thermo Scientific ClinQuan MD Software For In Vitro Diagnostic Use. Confidence in Results With Data Integrity

Thermo Scientific ClinQuan MD Software For In Vitro Diagnostic Use. Confidence in Results With Data Integrity Thermo Scientific ClinQuan MD Software For In Vitro Diagnostic Use Confidence in Results With Data Integrity 2 Make the World Healthier With the LC-MS Tests You Run Confidence in Test Results With Data

More information

Agilent Television Power Consumption Testing. Application Note

Agilent Television Power Consumption Testing. Application Note Agilent Television Power Consumption Testing Application Note Introduction Today, there are many types of televisions (TVs) on the market: the cathode ray tube (CRT) TV, liquid crystal display (LCD) TV,

More information

Customer Support. Superior Service Solutions for Your Laser and Laser Accessories. Superior Reliability & Performance

Customer Support. Superior Service Solutions for Your Laser and Laser Accessories. Superior Reliability & Performance Customer Support Superior Service Solutions for Your Laser and Laser Accessories Superior Reliability & Performance Optimizing Service Support for our Customers. Increased up-time Focus on core business

More information

VAT Guidelines for Tooling. Volvo Group VAT guidelines for Vendor Tooling

VAT Guidelines for Tooling. Volvo Group VAT guidelines for Vendor Tooling VAT Guidelines for Tooling VAT guidelines for Vendor Tooling VAT Guidelines for Tooling Scope: The VAT Guidelines for Tooling s applicable for all Tooling suppliers when billing Companies. Objective: is

More information

Market Highlights Miami

Market Highlights Miami Market Highlights Miami Highest Number of Sales In Miami s 93 Year History 2011 2012 2013 Could be another! April News Headlines: Miami Condo Sales Spiked 18.7% with Luxury Properties Leading the Pack

More information

Axioma Risk Monitor Global Developed Markets 29 June 2016

Axioma Risk Monitor Global Developed Markets 29 June 2016 Axioma Risk Monitor Global Developed Markets 29 June 2016 1. Global volatility hotspots 2. Global correlation hotspots www.axioma.com Greater than 1% rise over last week Greater than 1% fall over last

More information

Working Holiday Maker visa programme report

Working Holiday Maker visa programme report Working Holiday Maker visa programme report 30 June 2015 This page is left blank intentionally. Table of Contents About this report 1 Enquiries 1 Definition of terms 2 Background to the Working Holiday

More information

Agilent U2000 Series USB Power Sensors

Agilent U2000 Series USB Power Sensors Agilent U2000 Series USB Power Sensors Configuration Guide U2000 Series USB Power Sensors U2000A (10 MHz to 18 GHz) U2001A (10 MHz to 6 GHz) U2002A (50 MHz to 24 GHz) U2004A (9 khz to 6 GHz) U2000H (10

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information July 1 - December 31, 2015 Apple takes our commitment to protecting your data very seriously and we work incredibly hard to deliver the most secure hardware, software and

More information

Renewing Finland through skills. Forum Criteriorum Helsinki 29 September 2015 State Secretary Olli-Pekka Heinonen

Renewing Finland through skills. Forum Criteriorum Helsinki 29 September 2015 State Secretary Olli-Pekka Heinonen Renewing Finland through skills Forum Criteriorum Helsinki 29 September 2015 State Secretary Olli-Pekka Heinonen Our greatest strength: human resources Global Innovation Index 2015 Human capital and research

More information

Long-Term Underperformance of New Issues: Is Earnings Management the Villain?

Long-Term Underperformance of New Issues: Is Earnings Management the Villain? Long-Term Underperformance of New Issues: Is Earnings Management the Villain? S. Ghon Rhee K. J. Luke Distinguished Professor Of International Finance and Banking University of Hawai i FIMA Research Center,

More information

FedEx Electronic Trade Documents User Guide for FedEx Ship Manager TM Software

FedEx Electronic Trade Documents User Guide for FedEx Ship Manager TM Software FedEx Electronic Trade Documents User Guide for FedEx Ship Manager TM Software Overview Welcome to FedEx Electronic Trade Documents. FedEx Ship Manager Software includes this new solution to help streamline

More information

RFC and RAF SERVICE NUMBERS

RFC and RAF SERVICE NUMBERS RFC and RAF SERVICE NUMBERS The service numbers of RFC and RAF personnel indicate the date and manner of joining the service. The RFC numbering system began at 1 in 1912, the initial allocations being

More information

DRAFT - Duke Alumni Association - DRAFT Support for and Expectation of Regional Alumni Groups

DRAFT - Duke Alumni Association - DRAFT Support for and Expectation of Regional Alumni Groups DRAFT - Duke Alumni Association - DRAFT Support for and Expectation of Regional Alumni Groups Group A Co- Chairs and executive Hold at least four board meetings per Hold at least one open board meeting

More information

4 edition. LUxURY TRAVEL TRENDS. march 2014

4 edition. LUxURY TRAVEL TRENDS. march 2014 march 2014 WHO WE ARE p 3 THE STUDY p 4 MARKET p 6 LERS PROFILE CONCLUSION p16 p24 The Pangaea Network Who we are Pangaea Network is an international organization of independent agencies offering consultancy,

More information

Agilent 87421A/87422A Power Supply

Agilent 87421A/87422A Power Supply Agilent 87421A/87422A Power Supply Technical Overview Designed specifically for Agilent Technologies microwave system amplifiers Bias cable permits remote placement Compact size for easy system integration

More information

2014 UXPA Salary Survey. November 2014

2014 UXPA Salary Survey. November 2014 2014 UXPA Salary Survey November 2014 Summary 1355 Total Responses from 58 Countries Salary Data converted to US Dollars Median Salary decreased 2% (in constant US Dollars) to $92,500 Median US Salary

More information

Agenda. Company Platform Customers Partners Competitive Analysis

Agenda. Company Platform Customers Partners Competitive Analysis KidoZen Overview Agenda Company Platform Customers Partners Competitive Analysis Our Vision Power the backend of the post- web enterprise Key Challenges of the Mobile Enterprise Enterprise systems integration

More information

The Effect of Culture on Human Factors

The Effect of Culture on Human Factors The Effect of Culture on Human Factors Lex Rock Heemstra Human Factors Specialist Flight Training Discussion Definitions of Culture Hofstede s National Culture Traits FMAQ - Helmreich/Merrit Pilot study

More information

Table 1: TSQM Version 1.4 Available Translations

Table 1: TSQM Version 1.4 Available Translations Quintiles, Inc. 1 Tables 1, 2, & 3 below list the existing and available translations for the TSQM v1.4, TSQM vii, TSQM v9. If Quintiles does not have a translation that your Company needs, the Company

More information

ANNEX TABLES Table 1. Revenue by ICT Type Revenue * Share to Total Revenues Growth Rate ICT Type 2004 2005 2004 2005 (in percent)

ANNEX TABLES Table 1. Revenue by ICT Type Revenue * Share to Total Revenues Growth Rate ICT Type 2004 2005 2004 2005 (in percent) ANNEX TABLES Table 1. Revenue by Revenue * Share to Revenues 2004 2005 2004 2005 Contact Centers 32,904.1 54,295.1 44.4 49.4 65.0 Medical Transcription 236.7 466.2 0.3 0.4 97.0 Animation 694.2 939.1 0.9

More information

U.S. Trading Companies, 2012

U.S. Trading Companies, 2012 U.S. Trading Companies, 2012 Natalie Soroka Trade and Economic Analysis Industry and Analysis Department of Commerce International Trade Administration November 2014 U.S. Trading Companies: 2012 Highlights

More information

Update on the Latest Developments of the Madrid System Madrid Working Group Roundtable

Update on the Latest Developments of the Madrid System Madrid Working Group Roundtable Update on the Latest Developments of the Madrid System Madrid Working Group Roundtable Asta Valdimarsdottir Director Operations Division Madrid Registry Geneva Ocotber 23, 2014 Main points 2013 2014 Figures

More information

Working Holiday Maker visa programme report. 31 December 2014

Working Holiday Maker visa programme report. 31 December 2014 Working Holiday Maker visa programme report 31 December 2014 Contents Page About this report 1 Enquiries 1 Definition of terms 2 Background to the Working Holiday Maker programme 3 Recent developments

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information Requests January - June, Apple takes our commitment to protecting your data very seriously and we work incredibly hard to deliver the most secure hardware, software and

More information

Agilent FieldFox Remote Viewer

Agilent FieldFox Remote Viewer Agilent FieldFox Remote Viewer Application Brief Agilent Remote Viewer setup instructions The FieldFox remove viewer is a FREE ios application which allows you to view an Agilent FieldFox analyzer from

More information

Agilent Automotive Power Window Regulator Testing. Application Note

Agilent Automotive Power Window Regulator Testing. Application Note Agilent Automotive Power Window Regulator Testing Application Note Abstract Automotive power window regulator tests require the use of accurate data acquisition devices, as they cover a wide range of parameters

More information

Agilent U2000 Series USB Power Sensors

Agilent U2000 Series USB Power Sensors Agilent U2000 Series USB Power Sensors Single/Multi-Channel Power Measurement Simple Setup Affordable Demo Guide Table of Contents Introduction 2 The Agilent N1918A Power 3 Analysis Manager Demonstration

More information

Trends in Digitally-Enabled Trade in Services. by Maria Borga and Jennifer Koncz-Bruner

Trends in Digitally-Enabled Trade in Services. by Maria Borga and Jennifer Koncz-Bruner Trends in Digitally-Enabled Trade in Services by Maria Borga and Jennifer Koncz-Bruner Digitally-enabled are those for which digital information and communications technologies (ICT) play an important

More information

Sensitive handling of your sensitive shipments

Sensitive handling of your sensitive shipments Sensitive handling of your sensitive shipments 2013 Hellmann Perishable Logistics primusgf S HPL Mission & Vision Statement Insuring expertise and quality for transport and handling of perishables HPL

More information

F-35 Lightning II Program Status and Fast Facts 4Q 2015

F-35 Lightning II Program Status and Fast Facts 4Q 2015 F-35 Lightning II Program Status and Fast Facts 4Q 2015 Highlights of the Last Three Months Hill AFB celebrates its first operational F-35As with an Arrival Ceremony. (Oct. 14) The F-35C completes the

More information

Virtual Office. flexible solutions for your business needs

Virtual Office. flexible solutions for your business needs Virtual Office flexible solutions for your business needs Globalization is the key to successful business. Wherever you are located around the globe, your business can function without the need to pay

More information

2012 Regional Overview

2012 Regional Overview 2012 Regional Overview Hampton Roads, Virginia Aerospace & Aviation International Business Advice Composed of experts within the Hampton Roads business community, the International Advisory Council provides

More information

Working Holiday Maker visa program report 30 June 2011

Working Holiday Maker visa program report 30 June 2011 30/06/07 Working Holiday Maker visa program report 30 June 2011 Contents Page About this report 1 Enquiries 1 Definition of terms 2 Background to the Working Holiday Maker program 3 Recent developments

More information

BREVETTI PATENTS BEVERAGE AND CLOSURES

BREVETTI PATENTS BEVERAGE AND CLOSURES EP1293317 1396852 Portugal EP1773562 EP2307183 EP1265736 EP1140454 JP4426726 CN102015147 EP1293317 4079KOLNP2010 001856154-0001/0003 EP2035306 243769 South Africa 200700470 1370872 2530KOLNP2010 EP1585623

More information

World Consumer Income and Expenditure Patterns

World Consumer Income and Expenditure Patterns World Consumer Income and Expenditure Patterns 2014 14th edi tion Euromonitor International Ltd. 60-61 Britton Street, EC1M 5UX TableTypeID: 30010; ITtableID: 22914 Income Algeria Income Algeria Income

More information

2015 Annual Report. How many phones have been added to GARI?

2015 Annual Report. How many phones have been added to GARI? Annual Report 2015 The Global Accessibility Reporting Initiative in 2015 BACKGROUND Since the Global Accessibility Reporting Initiative (GARI) was established in 2008 by the Mobile Manufacturers Forum

More information

THE ETHICS HELPLINE Worldwide Dialing Instructions April 2012

THE ETHICS HELPLINE Worldwide Dialing Instructions April 2012 COUNTRY DIALING INSTRUCTIONS US, Canada and Virgin Islands The Ethics Helpline is always available, 24/7/365 888 478 6858 (Dialing instructions for other jurisdictions follow) Coming soon internet reporting

More information

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50.

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50. Overall Results Climate Change Performance Index 2012 Table 1 Rank Country Score** Partial Score Tendency Trend Level Policy 1* Rank Country Score** Partial Score Tendency Trend Level Policy 21 - Egypt***

More information

Decree on Utility Model Rights

Decree on Utility Model Rights 1 NB: Unofficial translation FINLAND Decree on Utility Model Rights (1419/1991; amendments up to 119/1996 included) Utility Model Applications and Record of Applications Section 1 A utility model application

More information

The Next Generation in Automated Oscilloscope Test

The Next Generation in Automated Oscilloscope Test The Next Generation in Automated Oscilloscope Test Spanning 100 MHz to 13 GHz, and varying in height from 1U to 8U, Agilent s family of LXI compliant oscilloscopes can accommodate virtually any automated

More information

Deutsche Global Infrastructure Fund (TOLLX)

Deutsche Global Infrastructure Fund (TOLLX) Global Infrastructure Fund (TOLLX) A step beyond MLPs Important risk information Any fund that concentrates in a particular segment of the market will generally be more volatile than a fund that invests

More information

Eindhoven Airport Catchment MIDT Analysis and business cases

Eindhoven Airport Catchment MIDT Analysis and business cases May 28 Eindhoven Airport Eindhoven Airport Catchment MIDT Analysis and business cases 1 Introduction The following analysis is based upon MIDT data for bookings made within the immediate catchment area

More information

PCI Express Probes for Agilent E2960B PCI Express Analysis Systems

PCI Express Probes for Agilent E2960B PCI Express Analysis Systems PCI Express for Agilent E2960B PCI Express Analysis Systems Version: 1.2 Superior Signal Probing options to address diverse designs and form factors As an industry leader in the innovation of non-intrusive,

More information

Comprehensive Course Schedule

Comprehensive Course Schedule Comprehensive Course Schedule The following designation and certificate courses are sponsored by BOMI International and BOMA Local Associations. Note that all BOMI International courses are also available

More information

CONSIDERATIONS WHEN CONSTRUCTING A FOREIGN PORTFOLIO: AN ANALYSIS OF ADRs VS ORDINARIES

CONSIDERATIONS WHEN CONSTRUCTING A FOREIGN PORTFOLIO: AN ANALYSIS OF ADRs VS ORDINARIES THE APERIO DIFFERENCE. Authors Michael Branch, CFA Ran Leshem CONSIDERATIONS WHEN CONSTRUCTING A FOREIGN PORTFOLIO: AN ANALYSIS OF ADRs VS ORDINARIES U.S. investors can capture international equity exposure

More information

Thermo Scientific Compound Discoverer Software. A New Generation. of integrated solutions for small molecule structure ID

Thermo Scientific Compound Discoverer Software. A New Generation. of integrated solutions for small molecule structure ID Thermo Scientific Compound Discoverer Software A New Generation of integrated solutions for small molecule structure ID Transforming Small Molecule Research Solutions for Small Molecule Structural ID Thermo

More information

Report on Government Information Requests

Report on Government Information Requests Report on Government Information Requests November, We believe that our customers have a right to understand how their personal information is handled, and we consider it our responsibility to provide

More information

Agilent 4339B/4349B High Resistance Meters

Agilent 4339B/4349B High Resistance Meters Agilent 4339B/4349B High Resistance Meters Technical Overview Within Budget Without Compromise Introducing the Agilent Technologies 4339B and 4349B High Resistance Meters Used for Making Ultra- High Resistance

More information

October 2013 - Bottled Water Exports and Imports continue to grow!

October 2013 - Bottled Water Exports and Imports continue to grow! October 13 - Bottled Water Exports and Imports continue to grow! Annualised exports for the year to October 13 continue an upwards climb following their break through NZD1m last month. Leading markets

More information

Subj: APPLICATION PROCEDURES FOR FISCAL YEAR 2016 NAVY MEDICINE ACTIVE COMPONENT CAREER MILESTONE POSITIONS

Subj: APPLICATION PROCEDURES FOR FISCAL YEAR 2016 NAVY MEDICINE ACTIVE COMPONENT CAREER MILESTONE POSITIONS DEPARTMENT OF THE NAVY BUREAU OF MEDICINE AND SURGERY 7700 ARLINGTON BOULEVARD FALLS CHURCH, VA 22042 Canc: Jun 2016 IN REPLY REFER TO BUMEDNOTE 1410 BUMED-M09 BUMED NOTICE 1410 From: Chief, Bureau of

More information

What is the difference between an equivalent time sampling oscilloscope and a real-time oscilloscope?

What is the difference between an equivalent time sampling oscilloscope and a real-time oscilloscope? What is the difference between an equivalent time sampling oscilloscope and a real-time oscilloscope? Application Note In the past, deciding between an equivalent time sampling oscilloscope and a real

More information

Take Control of Your Trade Compliance

Take Control of Your Trade Compliance MARCH 2013 Atlanta, GA Buffalo, NY Charlotte, NC Houston, TX Newark, NJ Orlando, FL APRIL 2013 Albuquerque, NM Boston, MA Louisville, KY Minneapolis, MN Pittsburgh, PA MAY 2013 Cleveland, OH Detroit, MI

More information

Singapore Airlines Group Analyst/Media Briefing FY2012-13 13 RESULTS 17 MAY 2013 THE PARENT AIRLINE FY2012/13 RESULTS

Singapore Airlines Group Analyst/Media Briefing FY2012-13 13 RESULTS 17 MAY 2013 THE PARENT AIRLINE FY2012/13 RESULTS Singapore Airlines Group Analyst/Media Briefing FY2012-13 13 RESULTS 17 MAY 2013 THE PARENT AIRLINE FY2012/13 RESULTS THE PARENT AIRLINE COMPANY RESULTS FY2012/13 4Q/12 $million Better/ (Worse) $million

More information

European SME Export Report - FRANCE Export / import trends and behaviours of SMEs in France

European SME Export Report - FRANCE Export / import trends and behaviours of SMEs in France SOUS EMBARGO JUSQU AU 8 JUILLET A 8H00 European SME Export Report - FRANCE Export / import trends and behaviours of SMEs in France July 2015 European SME Export Report Small and medium-sized enterprises

More information

Network And Internet Management Services Telecoms Pricing

Network And Internet Management Services Telecoms Pricing PSTN Lines (Analogue Lines) PSTN lines are available in business or residential options as new provides, transfers and reactivations. PSTN Multi-lines are also available. Costs stated below are per auxiliary

More information

Foreign Obligations Notification Process

Foreign Obligations Notification Process Foreign Obligations Notification Process Santiago Aguilar Nuclear Regulatory Commission 1 Agreements for Peaceful Nuclear Cooperation Current agreements with the IAEA, 21 countries, and Taiwan. The agreements

More information

The Growing Importance of Fixed Income Analytics

The Growing Importance of Fixed Income Analytics Trusted by the Market. Driven by You. www.yieldbook.com The Growing Importance of Fixed Income Analytics Susan Y. Lin Managing Director Regional Head, Asia Pacific The Yield Book and Citi Fixed Income

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

With data up to: May 2016. Monthly Electricity Statistics

With data up to: May 2016. Monthly Electricity Statistics With data up to: 216 Monthly Electricity Statistics Date of publication: 12 ust 216 Monthly Electricity Statistics TABLE OF CONTENTS Page # HIGHLIGHTS i ORGANISATIONAL AND REGIONAL TABLES OECD Total 1

More information

CNE Progress Chart (CNE Certification Requirements and Test Numbers) (updated 18 October 2000)

CNE Progress Chart (CNE Certification Requirements and Test Numbers) (updated 18 October 2000) Novell Education CNE Progress Chart (CNE Certification Requirements and Test Numbers) (updated 18 October 2000) Prerequisite for all certifications In order to receive a Novell certification the candidate

More information

International Mobile Phone Top Up For Consumers & Merchants

International Mobile Phone Top Up For Consumers & Merchants International Mobile Phone Top Up For Consumers & Merchants March 2015 What is CY.SEND? CY.SEND is an international prepaid mobile phone top up provider located in Switzerland for consumers and merchants.

More information

FY 2015 Schedule at a Glance

FY 2015 Schedule at a Glance Coaching and Mentoring for Excellence Oct 21 23, 2014 $2,950 Residential Coaching and Mentoring for Excellence Apr 7 9, 2015 $2,400 Non-residential Coaching and Mentoring for Excellence May 27 29, 2015

More information

International Call Services

International Call Services International Call Services Affordable rates for business calls. Wherever you are in the world. We ve got plenty to say when it comes to staying in touch when you re overseas. We have agreements with 443

More information

A/S Nielsen & Winther

A/S Nielsen & Winther A/S Nielsen & Winther The fourth Danish company to venture into aircraft construction was a civilian company A/S Nielsen & Winther a large machine building factory situated in Copenhagen also on the island

More information

INTERNATIONAL SECURITIES TRADING NOW YOU CAN INVEST ACROSS THE WORLD

INTERNATIONAL SECURITIES TRADING NOW YOU CAN INVEST ACROSS THE WORLD INTERNATIONAL SECURITIES TRADING NOW YOU CAN INVEST ACROSS THE WORLD YOU ARE WHAT YOU DO INTERNATIONAL SECURITIES TRADING III CONTENTS CONTENTS Welcome Welcome 1 2 Trade international securities with

More information

BT Premium Event Call and Web Rate Card

BT Premium Event Call and Web Rate Card BT Managed Event and BT Self-Managed Event (also referred to as Express, Plus and Premium) Conference Bridge and Call for Booked Audio Conferencing Services will comprise the following for each phone-conference:

More information

Agilent Technologies. Troubleshooting Three-Phase AC Motors with U1210 Series Handheld Clamp Meters. Application Note

Agilent Technologies. Troubleshooting Three-Phase AC Motors with U1210 Series Handheld Clamp Meters. Application Note Agilent Technologies Troubleshooting Three-Phase AC Motors with U1210 Series Handheld Clamp Meters Application Note INTRODUCTION In today s world, the three-phase AC induction motors are widely used in

More information

APPENDIX C HONG KONG S CURRENT HEALTHCARE FINANCING ARRANGEMENTS. Public and Private Healthcare Expenditures

APPENDIX C HONG KONG S CURRENT HEALTHCARE FINANCING ARRANGEMENTS. Public and Private Healthcare Expenditures APPENDIX C HONG KONG S CURRENT HEALTHCARE FINANCING ARRANGEMENTS and Healthcare Expenditures C.1 Apart from the dedication of our healthcare professionals, the current healthcare system is also the cumulative

More information

Working Holiday Maker visa programme report

Working Holiday Maker visa programme report 0 Working Holiday Maker visa programme report 31 December 2015 This page is left intentiolly blank. Table of Contents Page About this report 1 Enquiries 1 Definition of terms 2 Background to the Working

More information

TRAVELING TOGETHER. YOUR COMPANION, HALF OFF. Book a voyage by June 30, 2015, and receive 50% off the cruise fare of the second guest.

TRAVELING TOGETHER. YOUR COMPANION, HALF OFF. Book a voyage by June 30, 2015, and receive 50% off the cruise fare of the second guest. The offer for those who love TRAVELING TOGETHER. QUALIFYING 2015 AZAMARA JOURNEY VOYAGES 21-OCT 11 ACROPOLIS TO ROME, FLORENCE & MONACO PIRAEUS (ATHENS), GREECE MONTE-CARLO, MONACO 1-NOV 9 SOUTH OF FRANCE,

More information

FAQs for Two-factor Authentication

FAQs for Two-factor Authentication FAQs for Two-factor Authentication Two-factor Authentication 1. What is two-factor authentication? Two-factor authentication is an authentication scheme that increases online security by relying on a combination

More information

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace DSV Air & Sea, Inc. Aerospace Sector DSV Air & Sea, Inc. Aerospace Introduction to DSV DSV is a global supplier of transport and logistics services. We have offices in more than 70 countries and an international

More information

QIAsymphony RGQ Protocol Sheet

QIAsymphony RGQ Protocol Sheet QIAsymphony RGQ Protocol Sheet Settings to run the artus CT/NG QS-RGQ Kit (Rotor-Gene Q software.) Check availability of new electronic labeling revisions at www.qiagen.com/products/artusctngqsrgqkitce.aspx

More information

EXPORT AIRWORTHINESS APPROVALS

EXPORT AIRWORTHINESS APPROVALS Advisory Circular AC 21.17(0) APRIL 1999 EXPORT AIRWORTHINESS APPROVALS CONTENTS 1. References 1 2. Purpose 1 3. Status of this AC 1 4. Classification of products 2 5. General 2 6. Who may apply? 4 7.

More information

Integrating CaliberRM with Software Configuration Management Tools

Integrating CaliberRM with Software Configuration Management Tools Integrating CaliberRM with Software Configuration Management Tools A Borland White Paper By Jenny Rogers, CaliberRM Technical Writer January 2002 Contents Introduction... 3 Enabling SCM for a Project...

More information

Trends in International Education

Trends in International Education Trends in International Education 1 Presentation Objectives 1. International landscape the competitive environment for recruitment of international students 2. Key statistics 3. Key trends 4. Observations/Conclusions

More information