Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

Size: px
Start display at page:

Download "Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)"

Transcription

1 1. ADDITION & ALTERATION TO THE MAIN WAREHOUSE 1.1 ELECTRICAL WORKS The Contractor shall provide into the AFT1 building with 2 x 1000Amp power supply to be terminated with a main isolator. The power shall be derived from the existing electrical switch board with the provision to supply and install 6 new feeding powers with specific location as per specified the attached layout. The breakdown is listed below: Six New Feeding Power:- Point 1 (Belt/Tray): Point 2 (Belt/Tray): Point 3 (ULD): Point 4 (S-Tilter 1): Point 5 (S-Tilter 2): Point 6 (EBS): 306KVA 183KVA 75KVA 8KVA 8KVA 45KVA The Contractor shall study and arrange the relocation the existing affected cablings including electrical, CCTV and other services with the other in-house contractors to terminate and relocate the cabling works. All the works should be co-ordinated carefully to minimize affecting current operation and tenants in the building. Any shut down of power supply should inform user 3 days before the actual work to be carried out. The Contractor shall engaged the Building LEW (Mr Aqil Abdullah Cheng ) for any shutdown services required at the MV Switchboards. 1.2 FIRE PROTECTION SYSTEM The Contractor shall propose the following to complete the Fire protections system so as to comply with latest Fire Safety Code requirement and submit to SCDF for approval The Smoke Shelter in the warehouse shall be make of non-combustible material and able to withstand a temperature of 600 degree Celsius for half an hour. The proposal shall also include the supply and construct suitable cladding, the main structure frame work to hold the smoke shelter with structural PE calculation for safety load and installed at the interfacing between AFT1 and AFT2 on the airside Proposed a suitable sizable Fire Command Centre (FCC) room within the office area, the system shall link back to the Main fire boards located at AFT2 ( a building adjacent to AFT1) and to comply with latest fire safety code requirement and submit to SCDF for approval. The proposal should come with a suitable PA system. PART 1-1

2 1.2.3 To supply and install 2 sets of (2 hour fire rated) roller shutters which shall meet and come with certificate of compliance and PSB fire rated label To seal up 2 of the openings at adjacent of AFT 1 facing TNT building with minimum 215mm thick of brick works completed with plastering and painting To provide a suitable natural smoke ventilation system at the open space on the air side either at the external wall or at the jack roof area to enable effective smoke venting in the case of fire. This shall include submission of PE calculation. 1.3 PROVISION OF RECESSED PIT FOR WEIGHTING SCALE Creating recessed pit with 3.6m by 3m by 200mm depth on existing warehouse floor to Structural PE s design and details including any excavation to the levels as indicated. This is to cater for installing 1 weighing scale in the warehouse. Contractor to liaise with direct SAS Supplier as below on specifications for the pit to accommodate the weighing scale. Weighing Scale Supplier CM Specialists Pte Ltd derrick_ng@cmspecialist.com.sg Tel: RAMP OFFICE IN THE WAREHOUSE The contractor shall propose space planning including providing suitable workstations, chairs, cabinets for 2 working staff in the rooms. A perspective view to be submitted for approval before commenced work. 1.5 REPAIRING OF WAREHOUSE ROLLER SHUTTER The contractor shall provide labours, tools and equipments to repair existing damaged/faulty roller shutter system at AFT1. PART 1-2

3 1.6 HVLV FANS The contractor should source for suitable type of HVLV fans and propose the correct type and nos. of such fans to be supply and install in the warehouse of AFT1. The installation should include all PE calculation, electrical works and other accessories. The installation should come with 36 months free maintenance of the fans quarterly to ensure it functionality to comply with manufacturer requirement and safety to operate. 2. DESIGN & BUILD FOR OPERATION OFFICE 2.1 SPACE PLANNING OF THE OFFICE General guide The contractor has to come out with the design for the interior design and layout for the office, produce perspective of the proposal and submit for approval. The proposed operation room shall be open concept with a segregation of Mail Admin Office and Mail Operation Control Office. The office area should also incorporated other rooms as specified in the contract. Contractor s proposal shall include all the provisions for M&E works, building works and Fire protection system Main Entrance To design a reception counter with backdrop (incorporated with corporate signage) and construct it. The backdrop should be facing the main door. The reception counter should come with access from left and right of the counter, complete with a single leaf door and card access system to enhance security. To supply and install 1 LED signage (E-Commerce), after ID designer derived the design concept of the signage Mail Operation Control Office, behind the counter To propose suitable work stations with back support chairs for the following 7 staffs working in the control room, namely: CC Controller 1 person PART 1-3

4 CC Manifest 1 person CC Finalizing 1 person CC Import 1 person CC Export 1 person CC Tracing 2 person (b) the Control Room- 6.4m x 3m (c) To propose and fabricate full height Cabinet c/w laminated finishes (d) Mail box: Material : Aluminium, Size: No of slots: Will be advised Mail General Admin, content behind the counter (b) (c) Briefing area To create a Briefing area Duty Manager Room To create a room for duty manager and should be fully furnishes for 2 persons to work Wet pantry and rest area To create a wet pantry/rest room furnished with tables and benches, 2 separate cabinets for halal & non-halal storage, space to house 2 nos. of oven and fridge Other requirement for Common Area, behind counter (b) (c) Conference room To create a conference Room 20 persons Cabinet s requirement at common area To propose, supply and install suitable Cabinets for storage of files, flight documents, stationaries, printing paper and etc. Store room To create and construct a small store room (d) Security Office To create a Security office for viewing PART 1-4

5 3 CARD ACCESS To propose (preferably using existing Staff card/ airport pass), card access system and supply and install at all the access points in the office. (b) The card access shall come with a warranty of 1 year after commission 4 AIR CONDITIONING REQUIREMENT The contractor to propose model, brand, capacity, type of refrigerant (must be ozone friendly) of air cooled cassette units for cooling the entire office and individual rooms created with The work shall include supply and install of the proposed air cooled system c/w all necessary fan coil units, condensing units air filters, piping, thermostat, insulation, drain pipe and accessories. Testing and commission must complete before handover to client. (The temperature should range from 18 to 30 deg C). All electrical works related to the air con system is deemed to include in the cost. PART 1-5

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

Standard Comms Rooms Specification

Standard Comms Rooms Specification Standard Comms Rooms Specification Room Configuration Electrical General Distribution Boards Small Power Lighting Containment Fire Detection General To be defined in the project brief but should meet requirements

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

www.denhamconstruction.co.uk

www.denhamconstruction.co.uk www.denhamconstruction.co.uk Denham Electrical & Building Services Ltd is a national company based in Essex. We offer a variety of services from design, installation, servicing and maintenance carried

More information

Energy Efficiency. Bars & RestauRants. www.energia.ie

Energy Efficiency. Bars & RestauRants. www.energia.ie Energy Efficiency Bars & RestauRants www.energia.ie 2 Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

DATACENTER COLOCATION. Flexible, Secure and Connected

DATACENTER COLOCATION. Flexible, Secure and Connected DATACENTER COLOCATION Flexible, Secure and Connected Flexible Solutions for Your Requirements Contents Your Goals 2 Compound and Buildings 4 Security 6 Infrastructure 8 Free Choice 10 Good Reasons 12 Our

More information

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency

More information

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation

Scope of works. Name Job# TBA -1. Project: Bathroom Renovation Scope of works Name Job# TBA -1 Address Date Suburb P. code Phone H BH 0 Mobile E-mail Project: Bathroom Renovation.01 Demolition Strip out and remove from site: All existing fixtures, fittings and cabinets

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential)

(02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au. STANDARD INCLUSIONS (Residential) (02) 6766 1477 266 Peel Street TAMWORTH www.singlebuilders.com.au STANDARD INCLUSIONS (Residential) INCLUSIONS PRE-CONSTRUCTION ~ SITE WORKS ~ FOUNDATIONS Plans: Preparation of building plans and specifications

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

WHEN IS A PERMIT REQUIRED?

WHEN IS A PERMIT REQUIRED? WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,

More information

SECTION 23 81 43 HEAT PUMPS

SECTION 23 81 43 HEAT PUMPS SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

QUICK BUILD DEMOUNTABLE CONTAINERS & WAREHOUSES. Construct the Quick-Build Container in under 5 minutes!

QUICK BUILD DEMOUNTABLE CONTAINERS & WAREHOUSES. Construct the Quick-Build Container in under 5 minutes! DEMOUNTABLE CONTAINERS & WAREHOUSES Construct the Quick-Build Container in under 5 minutes! Quick-Build Warehouse, assembly in just a few hours... Quick & Easy! Available to order NOW! build in 15 mins!

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

Project Close Out Summary

Project Close Out Summary Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Vertical Display and Storage B1350-2. SKOPE Gen2: Three Door Chiller

Vertical Display and Storage B1350-2. SKOPE Gen2: Three Door Chiller Vertical Display and Storage User Manual MAN1227 Rev. 3.0 March 2008 edition CONTACT ADDRESSES Designed and Manufactured by New Zealand SKOPE INDUSTRIES LIMITED PO Box 1091, Christchurch New Zealand Freephone:

More information

Facility Support Services

Facility Support Services Facility Support Services The Precision Group has a breadth of experience delivering innovative, first class facility support service solutions to clients across the public and private sectors. Our expert

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape

ModuSec. Secure and efficient IT room solutions. Turnkey Modular Construction Fast clean build to any size or shape ModuSec Secure and efficient IT room solutions Turnkey Modular Construction Fast clean build to any size or shape Room in room Standalone external build Transportable Modusec SR Options Modusec SR Options

More information

www.inspection-for-industry.com

www.inspection-for-industry.com Quality Control Form (TEST RUNNING RECORD FOR AIR HANDLING UNIT) SUB POWER SUPPLY: MAIN POWER V, Hz, CONTROL V, Blower 1 kw, Blower 2 kw, Compressor: (1) kw (2) kw (3) kw (4) kw Heating Element: kw 1.

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT REQUEST FOR PROPOSALS RFP#03 4004p HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT ISSUE DATE: MAY 31, 2013 ISSUING DEPARTMENT: MACON COUNTY

More information

MANUFACTURER WARRANTY LIST

MANUFACTURER WARRANTY LIST MANUFACTURER WARRANTY LIST Before contacting a manufacturer, please consult the following list to ensure the item(s) in question correspond(s) with the appropriate manufacturer(s). Once you have determined

More information

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Knock Down Rebuild. Building Process Building process - knock down rebuild 1 Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

ITEM DESCRIPTION SPECIFICATION TENDER OFFER

ITEM DESCRIPTION SPECIFICATION TENDER OFFER TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum

More information

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS 1.0 GENERAL INFORMATION Structural Interior Design includes all building related elements and components generally part of the building itself,

More information

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) MAINTENANCE TYPE: STATUTORY 1.0 SCOPE OF SERVICES The Contractor shall provide maintenance Services for

More information

Freezer Floor Heaving and Solution

Freezer Floor Heaving and Solution Freezer Floor Heaving and Solution Prepared By H. Charles Woolley and John Fountain For International Association for Cold Storage Contractors November 2-5, 2011 Introduction Mr. Charles Woolley -Vice

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

Confort 26. Sliding Systems. Sapa Building System

Confort 26. Sliding Systems. Sapa Building System Confort 26 Sliding Systems Sapa Building System Confort 26 is Sapa s thermally insulated sliding system for windows and doors. Available as two- and three-rail solution. Among its features, there are

More information

city of edmonds development information

city of edmonds development information #B17 city of edmonds development information Commercial Kitchen Hood & Hood Fire Suppression System Permit Submittal Requirements PERMIT REQUIRED: CODES: FEES: A Commercial Kitchen Hood Mechanical Permit

More information

Element Z General Design Requirements Owner Standards and other Requirements

Element Z General Design Requirements Owner Standards and other Requirements Element Z General Design Furniture and Accessories PART 1 - REQUIREMENTS FOR WORKING WITH MD ANDERSON PLANNER DESIGNER 1.01 OVERVIEW A. The MD Anderson Planner/Designer shall participate in the space,

More information

JAWAHARLAL NEHRU UNIVERSITY

JAWAHARLAL NEHRU UNIVERSITY School of Biotechnology JAWAHARLAL NEHRU UNIVERSITY New Delhi 110 067 Tender No. JNU/SBT/DBT-BUILDER/Data Centre/2015-16 Sealed Quotation for the establishment of a Data Centre for High-End Computational

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department

HVAC 95% + Energy Efficient Furnace KC Heating and Air. Derald Smith Plumbing. Mountain Vista Homes Customer Care Department MANUFACTURER WARRANTY LIST Before contacting a manufacturer, please consult the following list to ensure the item(s) in question correspond(s) with the appropriate manufacturer(s). Once you have determined

More information

Orlando Home Inspection Services

Orlando Home Inspection Services PLEASE NOTE: Orlando Home Inspection Services Serving Central Florida since 1999 P O Box 915451, Longwood, Florida, 32791-5451 Phone: (321) 228-2493 Fax: (407) 374-8505 Web: http://www.orlando-home-inspections.com

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE

REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE FOREIGN & COMMENWEALTH OFFICE BE BAHRAIN TEL: MAY 2014 EMAIL: TENDER ISSUE: 002/2014 1. GENERAL REQUIREMENTS 1.01 LOCATION OF SITE The British

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Aurora Mall. Aurora (Denver), Colorado

Aurora Mall. Aurora (Denver), Colorado is the largest superregional mall in the city of Aurora, and it s only getting bigger and better. The mall is currently undergoing a significant interior and exterior renovation, scheduled for completion

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Fire Safety Requirements for Child Care Centre

Fire Safety Requirements for Child Care Centre Fire Safety Requirements for Child Care Centre A. Restrictions on Location Child care centre shall not be located : - (a) (b) in any premises designed for residential use; in any industrial building, warehouses,

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

South Carolina Home Inspector Standards of Practice

South Carolina Home Inspector Standards of Practice South Carolina Home Inspector Standards of Practice The following Standards provide guidelines for the Residential Home Inspector and outline what the Residential Home Inspector should observe, identify,

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

LogisticsCentre IV Distribution Center

LogisticsCentre IV Distribution Center KCI Intermodal BusinessCentre LogisticsCentre IV LogisticsCentre IV Distribution Center Modern Warehouse/Distribution Space Ranging From 108,000± SF to 432,000± SF 10221 NW Transcon Drive 112th Street

More information

SWIMMING POOL HEAT PUMP

SWIMMING POOL HEAT PUMP SWIMMING POOL HEAT PUMP Installation & User Manual Model HP40B HP50B HP65B Hayward Pool Products Canada, Inc. T: 1-888-238-7665 www.haywardpool.ca CONTENT I. Application 4 II. Features 4 III. Technical

More information

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall

TOWN of NEW BOSTON. Bid Package. Refurbishment and Upgrade of Basement of the New Boston Town Hall TOWN of NEW BOSTON Bid Package Refurbishment and Upgrade of Basement of the New Boston Town Hall Your bid Envelope must be marked with Basement Upgrade at Town Hall and the due date and time. If you send

More information

Company DUOL. Dušan Olaj CEO

Company DUOL. Dušan Olaj CEO Company DUOL Company DUOL has been active on the market since 1992 and throughout this period Duol has successfully attained the position of one of the most significant suppliers of fabric structures.

More information

Fire Resistant Systems

Fire Resistant Systems Fire Resistant Systems A R C H I T E C T U R A L A L U M I N I U M G L A Z I N G S Y S T E M S Fire Resistant Systems Introduction Kawneer are pleased to introduce two new comprehensive Fire Resistant

More information

RFQ # PR5006805 Replace Kitchen Equipment in the CGR

RFQ # PR5006805 Replace Kitchen Equipment in the CGR RFQ # PR5006805 Replace Kitchen Equipment in the CGR GENERAL The Consulate General of the United States of America has a requirement to furnish and install new kitchen equipment at the Consul General s

More information

Tips on Saving Energy in Your Business

Tips on Saving Energy in Your Business Fact Sheet #3 Tips on Saving Energy in Your Business In this fact sheet you will discover: Quick and easy changes to save energy. Cost effective ways to reduce your heating, cooling, lighting and office

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Liebert Hiross HPW The High Performance Wallmount Cooling Solutions for Telecom Mobile Remote Access Nodes

Liebert Hiross HPW The High Performance Wallmount Cooling Solutions for Telecom Mobile Remote Access Nodes Precision Cooling for Business-Critical Continuity Liebert Hiross HPW The High Performance Wallmount Cooling Solutions for Telecom Mobile Remote Access Nodes We re Emerson Network Power, backed by Emerson,

More information

Tredegar Business Park Tredegar NP22 3EL

Tredegar Business Park Tredegar NP22 3EL Tredegar Business Park Tredegar NP22 3EL Investment Considerations Wales British Gas installation, service and maintenance training facility. Let to GB Gas Holdings Limited (D&B 5A1). A modern BREEAM Excellent

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

Interior Design IV Gary Leivers AIA, RIBA, LEED AP

Interior Design IV Gary Leivers AIA, RIBA, LEED AP Interior Design IV Fall 2013 T-Th 7:00-9:40 Gary Leivers AIA, RIBA, LEED AP gpleivers@hedev.com 619 929 2854 COURSE OUTLINE Building on previously studied design concepts, you will apply your knowledge

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

Protection of unoccupied or void properties

Protection of unoccupied or void properties Real Estate Issue one Protection of unoccupied or void properties Introduction The current economic downturn has lead to a greatly increased number of vacant properties. In some countries rates of unoccupancy

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table

More information

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE Turnkey Projects, Conversions, Restorations & Property Management Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE Reg. Office: Karlu Galea Street, Victoria, Gozo Malta. T. 2155 6600 M. 9943 4391

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

The District Energy Manager and Classroom Heating

The District Energy Manager and Classroom Heating Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 These guidelines supersede all previous instructions. It is crucial that these energy guidelines be observed in the operation

More information

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

Please note that exhibitor move out will not be permitted prior to 8:05 p.m and must be complete by 9:30pm.

Please note that exhibitor move out will not be permitted prior to 8:05 p.m and must be complete by 9:30pm. Logistics and Information The Manitoba Design Exchange 2011 will be held Thursday October 6, 2010 Victoria Inn Hotel and Convention Center Wellington Ballroom 1808 Wellington Avenue Winnipeg Manitoba The

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

Prelease Schedule of Condition and Want of Repairs at Milton Keynes for May

Prelease Schedule of Condition and Want of Repairs at Milton Keynes for May Prelease Schedule of Condition and Want of Repairs at Milton Keynes for May Instruction To carry out Inspection of the Industrial Unit, to identify areas of repair to the Unit at commencement of the Lease.

More information

Squash Court Design general points

Squash Court Design general points Squash Court Design general points Contents: Contents:... 1 1. Squash Court Dimensions... 2 2. CourtTech Walls... 3 3. Dimensional requirements for courts with CourtTech Walls... 3 4. Loading of CT System

More information

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS

PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS PRE-ASSEMBLED INSTALLATION INSTRUCTIONS FOR PACB SERIES COAL FIRED OVENS OVENS MANUFACTURED BY: EARTHSTONE OVENS-6717 SAN FERNANDO RD GLENDALE CA 91201 TELEPHONE: 800-840-4915 818-553-1134 FAX: 818-553-1133

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

BROWACOM PRODUCTS. Our web-pages can be found from: http://www.browacom.fi

BROWACOM PRODUCTS. Our web-pages can be found from: http://www.browacom.fi BROWACOM PRODUCTS manufactures and sells telecom solutions for professional users. Products include CityCabinet-product family, as a service Browacom offers subcontracting services in electromechanical

More information

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW JULY 2012 NEW PRODUCTION AND COMMERCIAL FACILITIES FOR RENT The production

More information

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information

More information