1 REPLACEMENT AIR CONDITIONING UNITS FOR BRITISH EMBASSY RESIDENCE FOREIGN & COMMENWEALTH OFFICE BE BAHRAIN TEL: MAY TENDER ISSUE: 002/2014

2 1. GENERAL REQUIREMENTS

3 1.01 LOCATION OF SITE The British Embassy Bahrain is situated at 21 Government Avenue, Manama 306, Kingdom of Bahrain DESCRIPTION OF THE WORKS The scope of these works covers the removal of the existing R22 split air conditioning units and associated pipe work, insulation, controls etc. at the British Embassy, and the installation and commissioning of new R407C split air conditioning units and ancillaries. The works shall include all associated electrical, condensate drainage/plumbing and building works in connection with the installation. The installations shall comply strictly with the air conditioning unit manufacturer s drawings and specifications and the requirements of this specification. The existing air conditioning units shall remain operational throughout the works until such time as their phased removal. The contractor shall take special care to ensure that the protection is provided to the site and to the existing buildings/services and to members of staff throughout the duration of the works INSTRUCTIONS TO TENDERS Tender This specification and the manufacturer s drawings indicate the requirements for the installation works. The successful Contractor shall allow for all materials and labour to complete the works unless indicated otherwise including all electrical, builder s and plumber s works and protection to the site. The Contractor shall allow for installing all items indicated in the documents including any described as free issue.

4 Format of Tender The tender conditions and format of shall be in accordance with the requirements laid out by the FCO. The documents returned with the Contractor s tender shall include, but not necessarily be limited to the following:- (a) Details of key personnel who will be involved with the project (b) Health & Safety plan (c) Indicative programme of works (d) Completed tender summary (the works are to be undertaken as a lump sum contract) (e) The contractor shall allow for all costs Tender to Inform Himself It will be deemed that the Tenderer has thoroughly acquainted himself with the nature of the works and the conditions under which the work will be executed. The Contractor can, if deemed necessary, make arrangements to visit the Embassy via the British Embassy Estates Manager PROGRAMME The programme shall be agreed with the Estates Manager at the British Embassy, Bahrain prior to works commencing, but it is expected that all the works will be completed by 1 August The Embassy Compound will remain operational throughout the programmed works. It may be necessary to amend the programme due to daily operational requirements of the Embassy and the contractor should make some allowances for this within the tender. Indicative Working Hours Sunday Thursday 07:30 14:30 Friday and Saturday Closed (weekend out-of-hours working subject to agreement of Post) 1.05 GENERAL REQUIREMENTS Site Supervision

5 The Contractor shall keep a competent, English speaking Site Foreman who shall be in charge of the works during all working hours, who will be the duly accredited representative of the Contractor empowered to take instructions from the Estates Manager or her representative and to execute it Electrical, Builder s & Plumbing Works Requirements The Contractor shall carry out all necessary Electrical, Builder s and Plumbing Works associated with the Contract Disruption of Existing Services Any temporary disruption or disconnection of existing services which will be necessary to carry out the works shall only be made at such times as is agreed with the Estates Manager and/or his representative. This shall not be unreasonably withheld in order to allow the works to proceed in an economical manner. The programme and sequence of the works will be agreed with the Estates Manager prior to the works commencing INSPECTION, TESTING AND COMMISSIONING The installation shall be snagged by the Contractor and inspected by the Estates Manager or his representative, before final acceptance. The Estates Manager shall be offered the installations for witness testing upon completion of the works. The Contractor shall only offer the systems to the Estates Manager for final witnessing once he has satisfied himself that the systems are ready. The split air conditioning installations shall be tested and commissioned in accordance with the manufacturer s recommendations and shall include all control and safety devices. Prior to commissioning the Contractor shall provide a certificate of installation and electrical test certificates of the system to the Estates Manager or their representative.

6 2. SCOPE OF WORK

7 2.01 STANDARDS All equipment and installation works shall be carried out strictly in accordance with this specification, the air conditioning unit manufacturer s drawings and specifications and the Foreign & Commonwealth Office Electrical Standards HSP 9.64 (copy attached.) 2.02 GENERAL REQUIREMENTS All general provisions contained within this, or any other section of the Specification shall be fully applicable to each and every other section. All work carried out on the installation shall be carried out in a neat, efficient and workmanlike manner to provide for proper operation, maintenance and repair. The work shall be in accordance with the requirements of these Specifications and shall fulfil their true intent and meaning. No deviations from these Specifications and/or the manufacturer s drawings/specification shall be made without the Project manager s written approval. The Specification forms a composite document intended for the selection and installation of equipment having the general and specific characteristics, as detailed. The specifications indicate the equipment to be supplied and installed by the Contractor. Where the equipment or services are to be supplied or installed by others, it is noted accordingly. Unless otherwise specifically stated, the installation shall be left complete, tested and operating in all respects and fully integrated and coordinated with all other construction and installation works. The Contractor shall make any temporary connections and carry out other temporary works, as required for the installation of the works. Adequate precautions shall be made to ensure that the installation and site is safe at all times COORDINATION The contractor shall be solely responsible for the proper co-ordination of all phases of the work and timely delivery to the site of all equipment and materials for proper execution of the work.

8 It is the contract s sole responsibility to fully co-ordinate the work with all, or any other disciplines, and to ensure proper phasing of the work to ensure continuity of all works under this Contract. If it becomes necessary to remake any part of these works or that of any other discipline or trade as a result of poor or badly timed co-ordination, then all costs associated with remaking those works shall be borne by the Contractor. The Contractor shall take into consideration all statutory and local requirements issued by the local authorities, water, telephone and telecommunications etc. Along with any other requirements to be considered for the correct and legal operation of the air conditioning installation or equipment connected to the installation as part of this Contract GENERAL TECHINCAL REQUIREMENTS Electrical Supply The low voltage electrical system is a 3 phase, 4-wire 400/240 volts, 50Hz Earthing Requirements The air conditioning installation earthing arrangements shall in all respects comply with the following:- (a) FCO HSP 9.64 (b) Any other requirements stated within this Specification. The earthing conductor (the final conductor by which the connection to the selected means of earthing is made) is to be of copper construction and comply with the requirements of HSP All extraneous conductive parts are to be protected by supplementary bonding in accordance with HSP Minimum conductor size 4mm Green/Yellow Climate Conditions Except as stated below, all equipment shall be rated for the local ambient dry and wet bulb temperatures likely to be experienced. When equipment is installed in direct sunlight, it shall either be shielded from direct radiation or suitably rated for additional solar gains. Cables and hoses shall always be shielded from direct sunlight, if necessary, by the installation of ventilated covers or ducts. All equipment shall be rated for continuous services throughout its normal rated life, except for necessary routine maintenance Accessibility All work shall be so installed as to be accessible for operation, maintenance and repair.

9 Storage of Materials and Equipment All materials and equipment, fixed or unfixed, shall be protected against corrosion, deterioration and ingress of foreign matter. Wooden bearers shall keep all equipment clear of the floor or ground or other means and shall be protected against the weather. The contractor shall be responsible for arranging any off-site storage of the air conditioning units and ancillaries until installation is due. Deliver to site, safe unloading and positioning of the air conditioning units and ancillaries will be the responsibility of the Contractor and will be at a time to be agreed with the Estates Manager DETAILED SCOPE OF WORK The Contractor shall supply, install, test, commission and set to work the split air conditioning installation as detailed within the specification. The installation will consist of 10 no. new R407C split air condition units mounted in the Residence of the British Embassy in Manama. The existing redundant R22 split air conditioning units, refrigerant piping, insulation, condensate drains, controls etc. shall be removed prior to installation of the new units the exact location and type of the new units shall be determined on site and agreed with the Estate Manager before any work commences. When decommissioning the existing air conditioning units the contractor shall ensure that all R22 refrigerant removed is properly evacuated to avoid any emissions to atmosphere. All new interconnecting copper pipe work and associated copper materials must be of suitable quality for refrigerant R407C and shall be as per the manufacturer s recommendations. Copper pipe work shall be run in existing pipe ducts where possible and suitably fixed and supported along its entire length. Fixings and/or supports shall allow for pipe work expansion. To minimise the number of joints between the system components, coiled copper shall be used in preference to straight lengths of half-hard copper. All joints shall be brazed as flare joints are prone to leaking. The copper pipe work shall be capped at all times (with outside cover and caps), except when being worked upon. All pipe work shall be cut square with a propriety pipe cutter to give a clean cut, without copper fragmentation. Hacksaws must not be used. When brazing, all pipe work must be purged with low-pressure, oxygen free nitrogen, above atmospheric pressure to prevent moisture from the surrounding air entering the system. When all site works have been completed the pipe work shall be flushed with oxygen free, high-pressure nitrogen to ensure that any moisture and debris are removed. Pipe fittings shall be kept to a minimum and swept bends should be formed using a bending tool with the correct dies/mandrill/spring to prevent reeking or barrelling. A structured pressure test procedure shall be carried out as part of the general commissioning procedure and records kept. The formal test will be a multiple test and include the site pipe work, indoor/outdoor units etc. All capillary, solenoid and expansion valves shall be opened for these tests, to ensure all parts of the system are subjected to the test.

10 Suggested pressures used for testing are: Stage 1 - Stage 2 - Stage 3 - Flush system 3 bar for 2-3 minutes (to indicate major leaks) 1 st pressure test 15 bar for 10 minutes (if 1% deviation check for leaks) 2 nd pressure test 28 bar for 24 hours (No deviation in pressure) After satisfactory completion of pressure testing, the system shall be put under vacuum. The pipe work shall be evacuated to -755mm Hg (or manufacturers recommended value) for 1-2 hours and the vacuum broken with oxygen free dry nitrogen, this process shall then be repeated and after a third evacuation refrigerant shall be used in place of nitrogen. Interconnecting pipe work lengths shall be kept to a minimum, however any additional refrigerant charge required shall be calculated in accordance with the manufacturers detailed instructions. All pipe work shall be insulated with preformed armaflex or equal and approved, class O fire rated and vapour sealed. Insulation thickness shall be 6mm for ¼ pipe size and 13mm for 3/8 and above. Condensate drainage shall be heavy duty PVC and joints shall be made with couplers and solvent cement. All condensate pipe work shall be installed with a minimum gradient of 1:100 and shall not terminate in foul drains. Access for pipe cleaning shall be installed at suitable positions to allow rod access event of blockage. Each new split air conditioning system shall be fed from existing electrical supplies, however the contractor shall ensure that the existing supply cables are adequately sized for the load and shall complete insulation resistance testing before installation new cables shall be installed should the test results not comply with FCO HSP Earth loop impedance testing shall be carried out on completion of each installation and protective device disconnection times shall be in accordance with FCO HSP Each split air conditioning installation shall be protected by a suitably rated Type C MCB at the main distribution board and shall have IP 65 rated, rotary lockable isolators at the external unit. Indoor units shall be fed via suitably rated double pole switches and all indoor/outdoor units shall be labelled for correct identification HEALTH & SAFETY PLAN The contractor shall provide method statements/plans detailing health and safety proposals for the following areas of work: Working at height; Working with refrigerants; Hot works; Personal Protective Equipment (PPE).

11 2.08 TESTING AND COMMISSIONING The air conditioning installations shall be tested in accordance with the manufacturer s recommendations and all supply circuits shall be tested in accordance with FCO HSP all test results shall be recorded on approved test sheets. The Estates Manager shall be offered the installation for witness testing upon completion of the works. The contractor shall only offer the systems to the Estates Manager for final witnessing once he has satisfied himself that the system/s are ready. Only an experienced commissioning engineer who has been trained on the specific system installed shall carry out the commissioning of the installation, ie, the manufacturer s commissioning engineer. Prior to commissioning the Contractor shall provide a certificate of installation and test certificates of the system to the Estates Manager or her representative. Once the Certificates have been witnessed, issue a typed Inspection, Completion Certificate.

12 3. TENDER SUMMARY

13 3.01 TENDER SUMMARY To provide materials and install split air conditioning units as per the specification, meeting the manufacturers installation requirements and FCO Electrical Standards HSP 9.64.

14 TENDER SUMMARY 1. Decommissioning and removal of existing R22 split air conditioning units at British Embassy 2. Installation of 2 new 1.5-ton wall mounted R407C split air conditioning units at British Embassy 3. Installation of 8 new 2-ton ceiling mounted R407C split air conditioning units at British Embassy 4. All associated builders/plumbing/electrical work 5. Testing, commissioning & handover of installations 6. Complete two years, 4-times, maintenance & servicing of all units Total BHD 6,940 SIGNED... POSITION... COMPANY NAME... DATE...

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

Air Conditioning Equipment

Air Conditioning Equipment 1. PURPOSE OF THIS DOCUMENT This document has been written to assist DCC Premises Managers in obtaining quotations for the ongoing servicing and maintenance of where fitted to their premises. Specialist

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

[[ ;/LON/P&M/896/8/09 Date: 22-05-2013. Notice inviting quotation for Repairing heating system

[[ ;/LON/P&M/896/8/09 Date: 22-05-2013. Notice inviting quotation for Repairing heating system [[ ;/LON/P&M/896/8/09 Date: 22-05-2013 TENDER NOTICE Notice inviting quotation for Repairing heating system 1. High Commission of India invites bids from the prospective Heating/Boilers Companies with

More information

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation Qualification Guide BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation BPEC 600/5270/3 - Level 2 NVQ Diploma in Plumbing and Heating BPEC

More information

GENERAL INFORMATION FOR REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ).

GENERAL INFORMATION FOR REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ). GENERAL INFMATION F REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ). Name of sector Refrigeration & Air Conditioning Name of Module REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING

More information

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español

Split-type Air-Conditioner INSTALLATION MANUAL CONTENTS FOR INSTALLER MXZ-3A30NA MXZ-4A36NA ATTENTION. English. Français. Español Split-type Air-Conditioner MXZ-3A30NA MXZ-4A36NA INSTALLATION MANUAL Refer to the installation manual of each indoor unit for indoor unit installation. English Français Español ATTENTION This manual mentions

More information

10 tips for getting more reliability from your air-conditioning system [reliability]

10 tips for getting more reliability from your air-conditioning system [reliability] 10 tips for getting more reliability from your air-conditioning system [reliability] A guide for installers, specifiers, contractors and architects February 2010 10 tips for getting more reliability from

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2

STANDARD SPECIFICATION. for. Plumbing, Heating, Hot Water, Cold Water & Electrical work. Sussex Lodge London W2 & 16 Stanhope Terrace London W2 STANDARD for Plumbing, Heating, Hot Water, Cold Water & Electrical work undertaken by owners within the building known as Sussex Lodge London W2 & 16 Stanhope Terrace London W2 BPME Consulting Engineers

More information

Air Conditioner Water Heater Model ACWH18

Air Conditioner Water Heater Model ACWH18 Air Conditioner Water Heater Model ACWH18 Installation Guide IMPORTANT! READ THIS FIRST! Commissioning of this unit must be done by a licensed HVAC technician. Commissioning includes making the electrical

More information

Building Services Engineering Technician

Building Services Engineering Technician Building Services Engineering Technician A competent Building Services Engineering Technician is expected to be able to demonstrate the following skills and competences: Systems design in the building

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

ROOM AIR CONDITIONER INSTALLATION MANUAL

ROOM AIR CONDITIONER INSTALLATION MANUAL ROOM AIR CONDITIONER INSTALLATION MANUAL ( Split Type) Please read this installation manual completely before installing the product When the power cord is damaged, replacement work shall be performed

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING INDEX 1. Introduction 3 2. Objectives 3 3. Employment Opportunity 4 4. Course Structure 4 5. Entry Qualification 4 6. List

More information

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

What are the basic electrical safety issues and remedies in solar photovoltaic installations? What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic

More information

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales SPECIFICATION FOR LAUNDRY EQUIPMENT MAINTENANCE Maintenance Module 32 March 2011 issue This document has been compiled by the Engineering

More information

DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION

DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION May 2010 DEPARTMENT OF CODES AND BUILDING SAFETY FLOOD RECOVERY INFORMATION GUIDELINES FOR PERMITS ASSOCIATED WITH THE REPAIR OF FLOOD DAMAGED HOMES AND BUILDINGS The Department of Codes and Building Safety

More information

STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva

STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva STATEMENT OF WORK Upgrade of Electrical Service and Primary Electrical Panel 208 Ratu Sukuna Road, Suva INTRODUCTION: The United States Embassy in Suva, Fiji is seeking contractor proposals to upgrade

More information

Mechanical Services Standard Specification 5.0 - Compressed Air Systems. May 2010. For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Mechanical Services Standard Specification 5.0 - Compressed Air Systems. May 2010. For ROYAL HOLLOWAY UNIVERSITY OF LONDON Mechanical Services Standard Specification 5.0 - Compressed Air Systems May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd

More information

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DETAILS OF THE CLEINT Client and address ADDRESS OF THE INSTALLATION Installation

More information

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency

More information

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:

More information

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS Applied Energy Products Limited, Morley Way, Peterborough, PE2 9JJ, UK Telephone: +44 (0) 844 372 7761 / Fax: +44 (0) 84 372 7762 Website:

More information

Refrigeration Installation 101

Refrigeration Installation 101 Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly

More information

CENTRAL AIR CONDITIONER SPLIT SYSTEM

CENTRAL AIR CONDITIONER SPLIT SYSTEM CENTRAL AIR CONDITIONER SPLIT SYSTEM WITH ELECTRONIC CONTROL SERIES BS BS 30E BS 36 BS 43 INSTALLATION INSTRUCTIONS SUMMARY GENERAL...3 SELECTING THE LOCATION OF UNITS...5 RELATIVE LOCATION OF THE UNITS...5

More information

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system AURETU004 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system 2. Diagnose air conditioning and

More information

For installation guide see reverse of book

For installation guide see reverse of book USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance

More information

FAQs-Main switchboard design criteria

FAQs-Main switchboard design criteria FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard

More information

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery Part 3 Ancillary technologies Chapter CONTENTS SCOPE Clause Page DESIGN Design standards D1 1 Statutory requirements D2 1 System design D3 1 Building integration D4 2 Noise D5 2 Access and controls D6

More information

How To Design A Gas Dryer

How To Design A Gas Dryer Non Domestic Laundry Gas Appliance Installation Code of Practice Introduction This code of practice has been produced with the assistance of all Companies within the OPL sector of SLEAT because of the

More information

Method Statement. Risk Assessment

Method Statement. Risk Assessment Method Statement Risk Assessment Client: Location: Page 1 of 6 Health and Safety Method Statement and Risk Assessment Customer & Address: Site Address: Description of Works: Method Statement: Risk Assessment:

More information

Questions and Answers for Heating and A/C Contractors

Questions and Answers for Heating and A/C Contractors 1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded

More information

MAINTENANCE MANAGEMENT

MAINTENANCE MANAGEMENT www.thebowquarter.co.uk MAINTENANCE MANAGEMENT Scheduled routine maintenance each year is as follows. Projects classified as exceptional works such as external/internal decorations are excluded, as are

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Contents Page Ratings and Specifications..................... 2 Installation Requirements......................

More information

Troubleshooting Your Refrigerator

Troubleshooting Your Refrigerator Troubleshooting Your Refrigerator With conscientious care, a refrigerator will perform for years with little or no repairs. Refrigerators are categorized according to the way frost is removed from them.

More information

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS IMPORTANT: This booklet should be left with the user after installation and demonstration Thank you for choosing a quality Redring product

More information

Level 3 NVQ Certificate in Installing and Commissioning Air Conditioning and Heat Pump Systems (6187-03)

Level 3 NVQ Certificate in Installing and Commissioning Air Conditioning and Heat Pump Systems (6187-03) Level 3 NVQ Certificate in Installing and Commissioning Air Conditioning and Heat Pump Systems (6187-03) Candidate performance evidence logbook 600/0900/7 www.cityandguilds.com February 2012 Version 1.0

More information

Energy Efficiency. Bars & RestauRants. www.energia.ie

Energy Efficiency. Bars & RestauRants. www.energia.ie Energy Efficiency Bars & RestauRants www.energia.ie 2 Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could

More information

1932 Lexington Houston, Texas 77098-4220 (713) 524-4877. Recommendations for installation of cooling systems

1932 Lexington Houston, Texas 77098-4220 (713) 524-4877. Recommendations for installation of cooling systems 1932 Lexington Houston, Texas 77098-4220 (713) 524-4877 The purpose for this information is to provide a better understanding of the HVAC equipment, components, designs, and installations, of HVAC system

More information

Technical Solution Sheet 7.08 7: Mechanical Services (Including duct heating)

Technical Solution Sheet 7.08 7: Mechanical Services (Including duct heating) 7: Mechanical Services (Including duct heating) Split System Air Conditioning AIM The aim of this technical solution is to inform practitioners on the requirements for the safe discharge of condensate

More information

SPLIT -TYPE ROOM AIR CONDITIONER

SPLIT -TYPE ROOM AIR CONDITIONER Before using your air conditioner, please read this manual carefully and keep it for future reference SPLIT -TYPE ROOM AIR CONDITIONER Please read this installation manual completely before installing

More information

Terms of Reference Air Handling Unit (HVAC System) Cleaning

Terms of Reference Air Handling Unit (HVAC System) Cleaning Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning

More information

What to Expect From the Examination. How to Study the Plumbing Codes

What to Expect From the Examination. How to Study the Plumbing Codes Texas State Board of Plumbing Examiners Plumbing Inspector Examination Review Course The following Examination Review Course is designed to assist an applicant in preparing for the Plumbing Inspector examination.

More information

BASIC PLUMBING. 2 - Preparation. The simple skills required for basic plumbing are explained in this project.

BASIC PLUMBING. 2 - Preparation. The simple skills required for basic plumbing are explained in this project. BASIC PLUMBING The simple skills required for basic plumbing are explained in this project. It helps to have some metalworking experience. Take care when working with a blowtorch in loft spaces. Be aware

More information

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements

ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements ELECTRIC HEATER COMPANY Operating and Maintenance Manual For Immersion Heating Elements HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203) 378-2659 FAX: (203) 378-3593 INTERNET:

More information

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling February 2001 contents General Information 3 Inspection 4 New Drain and Vent Installations

More information

Fire Protection Notice No. 9 ELECTRICAL SAFETY

Fire Protection Notice No. 9 ELECTRICAL SAFETY Fire Protection Notice No. 9 ELECTRICAL SAFETY Because electricity is one of the most controllable forms of energy it can also be one of the safest. But, as industry and commerce draw ever more heavily

More information

Ductless Split Air Conditioner

Ductless Split Air Conditioner Ductless Split Air Conditioner Installation Manual Indoor HSU09VHG(DB)-W HSU12VHG(DB)-W HSU18VHH(DB)-W HSU24VHG(DB)-W Outdoor HSU09VHG(DB)-G HSU12VHG(DB)-G HSU18VHH(DB)-G HSU24VHG(DB)-G Table of Contents

More information

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) MAINTENANCE TYPE: STATUTORY 1.0 SCOPE OF SERVICES The Contractor shall provide maintenance Services for

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

Bituminous Sheet Flat Roofs: Their repair and maintenance

Bituminous Sheet Flat Roofs: Their repair and maintenance Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured. SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation

More information

forair optimal air environments ResidentialPresentation

forair optimal air environments ResidentialPresentation forair optimal air environments ResidentialPresentation Quick Fact Countless neighborhood residents never recognize their home air conditioning system works roughly 3,000+ hours each year. In order to

More information

building engineering services association specification for: Domestic Heating www.thebesa.com

building engineering services association specification for: Domestic Heating www.thebesa.com building engineering services association specification for: Domestic central Heating installation www.thebesa.com building engineering services association acknowledgments Guide to good practice: Domestic

More information

SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS

SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS 2 This water heater must be installed (water and electrical installation), commissioned and serviced

More information

Contents. All Rights Reserved

Contents. All Rights Reserved Electricity Specification 400C8 Issue 6 October 2015 LV Service Cables Contents 1 Scope 2 Definitions 3 General Requirements for Approvals and Assurance 4 Conditions of Installation 5 Conditions of Operation

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Guidance notes for the installation of electrical supply in mobile trailers for breast screening

Guidance notes for the installation of electrical supply in mobile trailers for breast screening NHS Breast Cancer Screening Programme Cancer Screening Programmes Guidance notes for the installation of electrical supply in mobile trailers for breast screening B Mansfield, CP Lawinski NHSBSP PUBLICATION

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

DESIGN STANDARDS SECTION 23 60 00

DESIGN STANDARDS SECTION 23 60 00 PART 1 - GENERAL 1.01 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.02 General requirements: A.

More information

Finding and Fixing Leaks

Finding and Fixing Leaks Finding and Fixing Leaks Where did all that water go? Could we have splashed all that water out of the tub? These are all common thoughts that can run through your mind when you open up the hot tub cover

More information

www.the Floor Heating Warehouse.co.uk

www.the Floor Heating Warehouse.co.uk www.the Floor Heating Warehouse.co.uk Underfloor Heating Installation Guide (Grundfoss Pump System) General Overview: Our water based underfloor heating system can be installed by your own plumber or heating

More information

ASBESTOS IN THE HOME

ASBESTOS IN THE HOME J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

Maintaining Fire Protection Systems

Maintaining Fire Protection Systems Maintaining Fire Protection Systems Fire continues to be a major threat to your business and your personal safety. Each year several thousand people are injured or killed by fires and billions of dollars

More information

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS

A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS A TO Z HOME INSPECTIONS PROFESSIONAL HOME INSPECTION SERVICES FOR HOME BUYERS AND SELLERS Insurance Inspection Report 1234 Main Street Tallahassee, Florida Report Prepared For: Charles Smith Report Prepared

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by

More information

Builder Specifications for Solar Ready Homes

Builder Specifications for Solar Ready Homes Builder Specifications for Solar Ready Homes This document specifies the essential elements required to make a new home ready for the future installation of roof-mounted solar domestic hot water and photovoltaic

More information

MEM18084A Commission and decommission split air conditioning systems

MEM18084A Commission and decommission split air conditioning systems MEM18084A Commission and decommission split air conditioning systems Release: 1 MEM18084A Commission and decommission split air conditioning systems Modification History Not Applicable Unit Descriptor

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a

More information

Elements Elements describe the essential outcomes.

Elements Elements describe the essential outcomes. AURETU005 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. Retrofit and modify air conditioning and HVAC systems This unit describes the performance outcomes

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS 2009 Tecumseh Products Company. All rights reserved. Page 1 of 8 Refrigerant R22 is widely used for residential and commercial air conditioning, as

More information

Test Code: 8297 / Version 1

Test Code: 8297 / Version 1 Blueprint HVAC Maintenance Technology PA Test Code: 8297 / Version 1 Copyright 2014. All Rights Reserved. General Assessment Information HVAC Maintenance Technology PA Blueprint Contents General Assessment

More information

Service Level Agreement/Specification

Service Level Agreement/Specification Service Level Agreement/Specification For Maintenance and Associated Risk Management Services at New College Campus and Associated properties May 2007 INDEX 1. SCOPE 2. MAINTENANCE SERVICE LEVELS a. Staffing

More information

Meaco 30L and Meaco 40L dehumidifier instruction manual

Meaco 30L and Meaco 40L dehumidifier instruction manual Meaco 30L and Meaco 40L dehumidifier instruction manual Please read this instruction manual before using the dehumidifier and keep safe for future reference SAFETY INSTRUCTIONS PLEASE READ ALL INSTRUCTIONS

More information

Portable Air Conditioner

Portable Air Conditioner Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE

More information

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book USERS GUIDE LOGIC Combi 24, 30, 35 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance

More information

Example Specialist Other contact

Example Specialist Other contact Callout Examples CO 001 CO 002 CO 003 CO 004 CO 005 CO 006 CO 007 CO 008 CO 009 CO 010 CO 011 CO 012 CO 013 CO 014 CO 015 CO 016 CO 017 CO 018 CO 019 CO 020 CO 021 CO 022 CO 023 CO 024 CO 025 Example Specialist

More information

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS SECTION 1001 GENERAL 1001.1 Scope. This chapter shall govern the installation, alteration and repair of boilers, water heaters and pressure vessels.

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

Instruction Manual. Ultrasonic Cleaning Tank. Advanced Ceramics Technology (M) Sdn. Bhd A Crest Group Inc. Company

Instruction Manual. Ultrasonic Cleaning Tank. Advanced Ceramics Technology (M) Sdn. Bhd A Crest Group Inc. Company Instruction Manual Ultrasonic Cleaning Tank Advanced Ceramics Technology (M) Sdn. Bhd A Crest Group Inc. Company No 1536, Jalan Perusahaan, Kawasan Perusahaan Bukit Tengah, 13600 Perai, Penang, Malaysia.

More information

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad PLEASE MARK TICK ON LEFT BOX WHICH EQUIPMENT YOU HAVE QUOTED PROPOSAL BASED ON CHINESE EQUIPMENT

More information

Addendum to Florida Academy Catalog for: HVAC Fundamentals HVAC Advanced Fundamentals

Addendum to Florida Academy Catalog for: HVAC Fundamentals HVAC Advanced Fundamentals Addendum to Florida Academy Catalog for: HVAC Fundamentals HVAC Advanced Fundamentals HVAC PROGRAMS The school s Heating, Ventilation, and Air Conditioning Programs provide training for entry level employment

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information