Secure I Reliable I Flexible COPT DC Hornbaker Road, Manassas, Virginia

Size: px
Start display at page:

Download "Secure I Reliable I Flexible COPT DC-6. 9651 Hornbaker Road, Manassas, Virginia"

Transcription

1 Secure I Reliable I Flexible COPT DC Hornbaker Road, Manassas, Virginia

2 Specialized Space by a Specialized Team 2 C O P T D A T A C E N T E R S O L U T I O N S

3 Corporate Office Properties Trust (COPT) Publicly traded (NYSE: OFC) $4.5 Billion real estate investment trust (REIT) Owns and developed and/or operates 2 million SF of data centers including COPT DC-6 in Manassas, VA Award-winning facility and mission control operations Experience and expertise in providing U.S. Government (USG) specialized data centers Experience in SCIF and communications room fitout COPT DC-6 Immediate Availability of Space 39,000 usable square feet (USF) and 5 megawatts (MW) of critical power Additional 9 MW and 28,000 USF in 6 months Modular data container pads available Lower Cost of Operations CRAC-free design provides a 10% power savings of $144,000/MW/year Owned water sources provides savings of $26,400/MW/year Yearly Cost of Operations Savings at COPT DC-6 is $410,400/MW/year Tenant Tax Savings Equipment taxes are 70% lower at COPT DC-6, in Prince William County, than at centers in Ashburn, Loudoun County or Fairfax County Savings of $125,000 for every million dollars in equipment over a term of 10 years w w w. C O P T d a t a. c o m 3

4 COPT DC-6 Site Security POWERLOFT SITE SECURITY PLAN Anti-Terrorism/Force Protection (ATFP). Container Ready. Site Security Features 22 miles away from the data center concentration risk in Ashburn, VA ATFP compliant with controlled site perimeter greater than 150 from the building MEP separated from the IT on the data floors SCIF space designs ready for construction DOD and DCID compliant FISMA compliant Container Data Center Solutions Site plan complete Support double wide data containers Make use of existing chilled water supply, UPS and generators 4 C O P T D A T A C E N T E R S O L U T I O N S

5 Are Your Digital Assets Secure? w w w. C O P T d a t a. c o m 5

6 ASHBURN Dulles International Airport COPT DC-6 MANASSAS 95 The Manassas Advantage Manassas Data Center Site Benefits 22 miles from Ashburn regional concentration of data centers risk Outside major flight paths of Dulles International Airport 70% lower personal property tax rate in Prince William County compared to Loudoun County Lower overall cost of operations over Ashburn data centers Satisfies all data center location criteria Not grouped together on same power generation as Ashburn Connectivity and Latency Innovation Park in Manassas, Prince William County is fiber rich Multiple retail and wholesale carriers provide direct and secure connections to the Ashburn peering point and to major government locations in VA, MD and DC Latency differences between Manassas and Ashburn are non-existent Latency to regional NAPs is 5x faster than NYSE SLAs Dedicated dark fiber connections available to government locations Certification capabilities include FISMA, ITIL and SAS 70/SAE 18 6 C O P T D A T A C E N T E R S O L U T I O N S

7 Robust Fiber and Connectivity Infrastructure COPT DC-6 is supported by robust fiber connectivity from AboveNet, Level 3 Communications, FiberLight, Verizon, NOVEC and Comcast. Many providers are located nearby and service from these providers is easily obtained. The U.S. Government secure connectivity is in the nearby area and direct connectivity is feasible through approved requirements. COPT DC-6 s location includes direct connectivity from multiple carriers to major network access points located in Ashburn, Virginia. Fiber providers have access to the site from two distinct underground locations and fiber entering the facility is directed into two diverse communications Meet-Me-Rooms (MMR). Connectivity is distributed to two additional Meet-Me-Rooms, providing a total of four MMRs. This provides one MMR for every 25,000 square feet of raised floor area, providing multiple pathways and redundant connectivity to every space within the data center. VERIZON COMCAST FIBERLIGHT LOCKHEED MARTIN LEVEL3 MICRON NOVEC ABOVENET GEORGE MASON UNIVERSITY MILES COMCAST PROLOGIC LOGIS-TECH PROGENY VACANT FBI 234 MEDITECH ZESTRON ASSETT COPT DC-6 EXPANSION LAND EXPANSION LAND w w w. C O P T d a t a. c o m 7

8 8 C O P T D A T A C E N T E R S O L U T I O N S

9 w w w. C O P T d a t a. c o m 9

10 COPT DC-6 I Space and Rack Plan WEST WING I Suites C O P T D A T A C E N T E R S O L U T I O N S

11 EAST WING I Suites w w w. C O P T d a t a. c o m 11

12 Design Benefits and Specifications Data Space and Rack Efficiencies 254 Racks within a 5,600 square foot bay CRAC-free Space - tenant installs 50% more racks within the premises Flexible Power W to over 300 W per usable square foot Systems Design Advantages Tier III+ Design Flexible Design - Rotary or Static UPS LEED-NC Gold rating and top energy efficiency Isolation from the power grid providing MEP protection Electrical generation is block redundant - no single point of failure Most advanced NOC and integrated management reporting systems Water and air side economizer reduces energy and operating costs 12 C O P T D A T A C E N T E R S O L U T I O N S

13 Innovative Design Segregates Mechanical/Electrical Infrastructures from the IT space Exhaust Louvers Above Exhaust Louvers Above Intake Louvers Below Intake Louvers Below Segregation of MEP from IT Scales easily Minimizes disruption Preserves raised floor rack space Hard security separation AHU vs. CRAC 160 ton AHU vs. 20 ton CRAC VFD Drives Unique return air plenum Supports 300 W/SF N+1MIN.) Chilled Water Loop Concurrently maintainable No water over raised floor Taps for In-Rack cooling w w w. C O P T d a t a. c o m 13

14 Design Benefits and Specifications Federal Compliance: COPT DC-6 meets stringent Federal security standards that include: a minimum 150 secured vehicle standoff, vehicle arrest barriers, K-12 fencing, guarded entrances, man traps, biometric access controls and multiple video surveillance zones. The facility hosts SAS 70 II and SSAE 16 certified installations and can support a FISMA (High) level of network certification. COPT DC-6 is one of the 10 sites selected to host the GSA Cloud. Operating Efficiency: COPT DC-6 uses 70% less essential power than traditional designs in the Northern Virginia market. Scalable High Density: The COPT DC-6 design allows users to increase critical power and cooling for higher rack densities with minimal disruption or loss of raised floor area, with either air or close coupled cooling. The building was designed to handle up to 300 watts per square foot using air, and densities well beyond that using water to the rack. The chilled water plant utilizes water-side economization while the building allows for air-side economization. Reliability: COPT DC-6 is designed to a N+1 minimum level of reliability and would be classified as a Tier III+ when measured against the Uptime Institute s reliability criteria. 2N UPS topography can be added to bring this system to Tier IV level of reliability. COPT DC-6 is managed by COPT staff and COPT is fully responsible for insuring that the facility and campus meet an exacting array of SLA metrics that track all operations 24/7, from the closed circuit cameras prowling the perimeter down to a single circuit monitoring device, all of which are monitored from a dedicated 24/7 Network Operation Center located within the facility. Green Design: COPT DC-6 is a LEED NC Gold facility. Our mechanical plant uses both air and water side economization. The roof ballast is comprised of reflective white stone. Automated illumination fixtures and surfaces throughout. Location: Innovation Park COPT DC-6 is in Prince William County s Innovation Park campus, a 1,000 acre master planned business park designated as a high technology incubator and managed by the Prince William County Economic Development Authority ( Distance from Washington, D.C. Innovation Park is located 30 miles west of Washington, D.C., within an easy 45 minute reverse commute from downtown Washington, D.C. The site is accessible via Route 234 either from I-95 to the south or I-66 to the north. The Manassas VRE rail station is 1.5 miles to the south and Dulles International Airport is 15 miles to the north. 14 C O P T D A T A C E N T E R S O L U T I O N S

15 Utilities: Water Water is provisioned from dual ground water wells, which are capable of sustaining the facility s mechanical plant requirements Electric during the hottest days of the Virginia summer. As a result, our operating expenses do not include a monthly fee for water. NOVEC committed to providing 50 MW power via a dedicated 34.5 KV connection. In addition to insulating COPT DC-6 from variations in power quality resulting from a shared distribution loop, NOVEC oversized the concrete conduits serving COPT DC-6 s site to accommodate another 50 MW of expansion capacity. Loudoun Transmission Network 500/230 kv Gainesville Sub 230/115 kv COPT DC-6 Ox Transmission Network 500/230 kv Bull Run Transmission Network 115/230 kv Vulcan Sub 115/34 kv Innovation Sub 115/34 kv Cannon Branch Sub 230/115 kv Power feed from multiple transmission sources Loudoun/Gainesville/Vulcan Substations New radial 34.5 kv circuit with 50 MW of capacity Dedicated feeds = higher quality power Optional redundant 34.5 kv circuit From the Ox/Cannon Branch Substations Summary Specifications RAISED FLOOR 100,000 square feet of raised floor area 16 bays each supported by MW 250 pound per square foot floor loads Ability to scale from 150 to 300 watts per square foot with no disruption or loss to secure raised floor zone POWER SYSTEM 5 x 2.25 MW Diesel Gensets (1.25 MW Critical) Configured in 6 MW block - 4 primary, 1 backup Rotary or Static UPS available No electrical paralleling No Emergency Power Off system 2 MW Diesel Generators provide N+2 power to mechanical plant Power topology with backbone designed to accommodate AC or DC power loads Modular design that provides ability to expand power in place with minimal disruption and lead time FUEL STORAGE Up to 500,000 gal. of ultra-low sulfur diesel fuel storage Fuel polishing system, w/ redundant fuel piping systems HVAC Up to 11,400 tons of refrigeration Up to 60 x 60,000 CFM air handlers High efficiency chilled water plant Air and water side economization 20 minutes of chilled water storage On site make-up water supply wells Concurrently maintainable chilled water piping loops N+2 redundant No water over raised floor FIRE SUPPRESSION Multi-zone pre-action dry pipe sprinkler system ivesda detection installed per HPCS requirements MONITORING SYSTEMS Four Siemens modules: EPMS, BMS, Security and Life/Fire/Safety w w w. C O P T d a t a. c o m 15

16 Time To Upgrade Your Digital Infrastructure? CONTACT US: Mark Gilbert Director, Business Development - COPT Data Center Solutions I mark.gilbert@copt.com Frank W. Ziegler Senior Vice President New Business & Development COPT Government Services I frank.ziegler@copt.com Charles J. Fiala, Jr. Senior Vice President - COPT Government Services I charles.fiala@copt.com w w w. C O P T d a t a. c o m James F. Coakley President & CEO - Hornbaker Group I jcoakley@hornbakergroup.com Robert Walters Principal - Avison Young I rob.walters@avisonyoung.com Corporate Office Properties Trust 6711 Columbia Gateway Drive, Suite 300, Columbia, Maryland I I I NYSE: OFC

Secure I Reliable I Flexible

Secure I Reliable I Flexible Secure I Reliable I Flexible COPT DC-6 Tour for CareFirst Agenda» Welcome and Introductions» COPT Data Center Practice and COPT DC-6 Overview» Tour of the data center facility» Qs & As COPT Overview Why

More information

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW

NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and

More information

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM OVERVIEW VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from

More information

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G 100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the

More information

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL II MARSH LANE CARROLLTON TX OVERVIEW VAZATA s Dallas Data Center II (Dal II) is located at 2440 Marsh Lane

More information

X-tier Data Facility. Prepared by X-tier SAE Corporation

X-tier Data Facility. Prepared by X-tier SAE Corporation X-tier Data Facility Company Profile X-tier Corporation X-tier is based in Leawood, Kansas. X-tier provides business agnostic, security hardened, custom and turnkey Cloudbased software systems, services,

More information

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0. Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M

More information

Experience Matters...

Experience Matters... Experience Matters... Travelport Data Center offers confidence and space to meet your demanding IT needs Transwestern presents the Travelport Data Center in Denver, Colorado totaling 267,000 SF with 121,600

More information

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.

LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet

More information

Data Center CH1. Elk Grove Village, IL

Data Center CH1. Elk Grove Village, IL Data Center CH1 Elk Grove Village, IL powerful/ efficient /reliable solutions > Data Center CH1 ABOUT DUPONT FABROS TECHOLOGY (DFT) DFT is a leading owner, developer, operator and manager of wholesale

More information

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM

DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL I MIDWAY ROAD CARROLLTON TX OVERVIEW 4025 Midway Road is a full service, enterprise-class data center colocation

More information

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to

More information

Digital Chicago. 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago

Digital Chicago. 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago Digital Chicago 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago The Digital Chicago portfolio consists of three state-of-the-art data center facilities: 600 South

More information

How To Build A Data Center For Ragingwire

How To Build A Data Center For Ragingwire TURN-KEY AND BUILD-TO-SUIT WHOLESALE DATA CENTER SOLUTIONS RAGINGWIRE CA3 SACRAMENTO, CA NOW LEASING LARGEST DATA CENTER IN CALIFORNIA WITH LOWEST COST POWER RagingWire s new CA3 data center facility brings

More information

Subject: County of Los Angeles Data Center Space Requirement

Subject: County of Los Angeles Data Center Space Requirement Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,

More information

Data Centre Infrastructure

Data Centre Infrastructure Data Centre Infrastructure LONDON DATA CENTRE Our data centre is located within the heart of Europe s centre of global finance London s Square Mile. The centre offers a combined net capacity of 1,520 m²

More information

Chicago 1 (CHI-1) Data Center

Chicago 1 (CHI-1) Data Center 215 W. Ohio St. 5th Floor Chicago, IL 60564 Call Us Toll-Free 1 (866) 817-2811 Follow Us @SingleHop Like Us facebook.com/singlehop Chicago 1 (CHI-1) Data Center Enterprise-Class, Downtown Chicago Facility

More information

Data Center:Build-to-Suit

Data Center:Build-to-Suit Data Center:Build-to-Suit A fortified 100,000 SqFt mission critical build-to-suit constructed on a secured 5 acre parcel at Innovation Park Charlotte, NC On-Site 120MW Substation Sourced from Two Independent

More information

Wholesale Data Center Suites Available Now

Wholesale Data Center Suites Available Now Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available

More information

RAGINGWIRE. THE WORLD S MOST TECHNOLOGICALLY ADVANCED DATA CENTERS!

RAGINGWIRE. THE WORLD S MOST TECHNOLOGICALLY ADVANCED DATA CENTERS! RAGINGWIRE. THE WORLD S MOST TECHNOLOGICALLY ADVANCED DATA CENTERS! RagingWire designs, builds, and operates mission-critical, high density data centers. With nearly one million square feet of multi-tenant

More information

Santa Clara, CA 95054

Santa Clara, CA 95054 Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)

More information

san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence

san francisco//usa data center specifications tel: +61 2 9948 8888 fax: +61 2 9948 1111 internet + intellectual property + intelligence internet + intellectual property + intelligence We thank you for the opportunity to work with you regarding your colocation needs in San Francisco, USA. We can colocate standard rack-mountable servers

More information

LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY

LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY LEVEL 3 DATA CENTER SERVICES IN SAN FRANCISCO HOUSE POWER-INTENSIVE APPLICATIONS AND SUPPORT BUSINESS CONTINUITY THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT THE SCALE TO SUPPORT FLEXIBLE ENTERPRISE IT It

More information

ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION

ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION ISOMEDIA COLOCATION WWW.ISOMEDIA.COM/COLOCATION Your business needs a robust infrastructure that is secure, cost effective and reliable in order to remain competitive in today s market. ISOMEDIA s colocation

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Equinix Telecity Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se

More information

NY2 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET WWW.CORESITE.COM

NY2 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET WWW.CORESITE.COM CLOUD-ENABLED DATA CENTER 21 CRITICAL MEGAWATTS 280,000 SQUARE FEET WWW.CORESITE.COM NEW YORK CAMPUS The optimal location to propel your business SYMS WAY EMERSON LN EQ SECAUCUS HARTZ WAY SECAUCUS RD AMERICAN

More information

colocation. perfected. Overview

colocation. perfected. Overview colocation. perfected. Overview Welcome to COLO@ colocation perfected our network The expert team of COLO@ have the talent, tools, and facilities to power your operation all day, every day. Since 2008,

More information

OPERATOR - FACILITY ADDRESS - DATE

OPERATOR - FACILITY ADDRESS - DATE . Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.

More information

House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data

House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data Protection is Central. Twin Cities East Data Center House your data in a building constructed for only one express purpose protect the information inside. Twin Cities East Data Center is nothing less than

More information

Strategic Data Centre Site Profiles Data Centre Co-Location London North

Strategic Data Centre Site Profiles Data Centre Co-Location London North Strategic Data Centre Site Profiles Data Centre Co-Location London North Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 6 Contents 1. LONDON NORTH...3 1.1 LOCATION...3 1.2 TECHNICAL

More information

NEW JERSEY CENTER OF EXCELLENCE

NEW JERSEY CENTER OF EXCELLENCE Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves

More information

NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center

NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center NY-1 1.866.WEBAIR.1 WWW.NY1.WEBAIR.COM NY-1 LONG ISLAND S MOST SECURE, FULLY-REDUNDANT DATA CENTER ENTERPRISE COLOCATION, PRIVATE AND HYBRID CLOUD SOLUTIONS, AND MANAGED SERVICES. DATACENTER Enjoy the

More information

COMMODITIZING THE DATA CENTER MARKET

COMMODITIZING THE DATA CENTER MARKET COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.

More information

19 Site Location, Design and Attributes. Site Location, Design and Attributes

19 Site Location, Design and Attributes. Site Location, Design and Attributes 1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile

More information

Data Centre Barrie, Ontario

Data Centre Barrie, Ontario COGECO DATA SERVICES DATA CENTRE Data Centre Barrie, Ontario Cogeco Data Services offers flexible, secure, connected and fully managed ICT solutions at its Flagship Data Centre in Barrie, Ontario Data

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina S P E C I F I C A T I O N S Contact Doug Hollidge for more information

More information

Seattle London http://www.totalserversolutions.com sales@totalserversolutions.com 1-855-227-1939

Seattle London http://www.totalserversolutions.com sales@totalserversolutions.com 1-855-227-1939 At a Glance In business since 2005 Enterprise level network SSAE-16 Compliant Based in Atlanta, Georgia, United States Operates facilities in the following locations: Atlanta, GA, USA (two facilities)

More information

PEARL STREET @ MANHATTAN, NY

PEARL STREET @ MANHATTAN, NY FEATURES :: Power 40 MWs of high tension service :: Inter-connectivity 3 milliseconds to New York City s major exchanges :: Security New York Police Department is immediately adjacent; secured vehicular

More information

LEED-certified COPT DC-6 Data Center s green design includes innovative backup power solutions from MTU Onsite Energy

LEED-certified COPT DC-6 Data Center s green design includes innovative backup power solutions from MTU Onsite Energy Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: gary.mason@tognum.com Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210

More information

Data Center Infrastructure & Managed Services Outline

Data Center Infrastructure & Managed Services Outline Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists

More information

A Sustainable, Master-Planned Data Center Park.

A Sustainable, Master-Planned Data Center Park. Vineyard Data Center Park A Sustainable, Master-Planned Data Center Park. THE RUNDOWN Square feet : Up to 800,000 Critical Power: Up to 100 MW Power Cost: 4.4 cents/kwh (all in) PUE: 1.21 Availability:

More information

T5 CHARLOTTE REGION WEST DATA CENTER PARK

T5 CHARLOTTE REGION WEST DATA CENTER PARK Additional!Sites Up to 120+ MW available to site from Duke Energy Low cost reliable power - 3.9-4.6 /kilowatt hour Dual Circuit 100 KV Grid Connector Low natural disaster risk Multiple l fiber carriers

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

colocation. perfected.

colocation. perfected. colocation. perfected. colocation perfected The expert team of COLO@ have the talent, tools, and facilities to power your operation all day, every day. Since 2008, COLO@ has been providing the critical

More information

QTS Realty Trust shows progress on Dallas facility

QTS Realty Trust shows progress on Dallas facility QTS Realty Trust shows progress on Dallas facility Analyst: Glenn Ford Rick Kurtzbein 9 Jan, 2014 We recently visited the Quality Technology Services (QTS) Dallas Data Center, a new development site in

More information

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions

Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions Data Centers: Outsource or Own? Presented by: Rachel Dines, Forrester Research, Inc. Christopher Nicolini, Windstream Hosted Solutions Nov. 17, 2011 Introduction Today s Presenters: Rachel Dines, Research

More information

Salt Lake City Seattle Amsterdam London Toronto Developer http://www.totalserversolutions.com sales@totalserversolutions.

Salt Lake City Seattle Amsterdam London Toronto Developer http://www.totalserversolutions.com sales@totalserversolutions. At a Glance In business since 2005 Enterprise level network SSAE-16 Compliant Based in Atlanta, Georgia, United States Operates facilities in the following locations: Atlanta, GA, USA (two facilities)

More information

GREENSBORO DRIVE @ TYSONS CORNER, VA

GREENSBORO DRIVE @ TYSONS CORNER, VA FEATURES :: RIGHT IN THE HEART OF CORNER: EASY ACCESS FROM I-495 & 267 :: DUAL AUTHENTICATION SECURED ACCESS, 24x7x365 MANNED FACILITY :: FULLY AUTONOMOUS; RIGHT BY THE LOADING DOCK :: MULTIPLE REDUNDANT

More information

Data Center Commissioning: What you need to know

Data Center Commissioning: What you need to know Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,

More information

SolveXia Business Continuity Planning

SolveXia Business Continuity Planning Business continuity planning is the term we use to describe all the steps we take at SolveXia to ensure that our service is up and running when you need it. As a 'Software as a Service' provider, our aim

More information

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA

More information

Available Princeton Area Data Center / Disaster Recovery Lab / R&D

Available Princeton Area Data Center / Disaster Recovery Lab / R&D Available Princeton Area Data Center / Disaster Recovery Lab / R&D As exclusive listing agent, The Schultz Organization is pleased to offer space available at 109 Morgan Lane. is part of the Enterprise

More information

VOLICO. Colocation Checklist. Key Data Center Evaluation Criteria

VOLICO. Colocation Checklist. Key Data Center Evaluation Criteria VOLICO Enterprise Hosting Solutions Colocation Checklist Key Data Center Evaluation Criteria Not all data centers are created equal. You need to know what to look for. Are they equipped with up-to-date

More information

Data Centers in Hong Kong Powering business success

Data Centers in Hong Kong Powering business success Data Center Data Centers in Hong Kong Powering business success NTT Com Asia DATA CENTERS IN HONG KONG INDUSTRY-LEADING DATA CENTER SERVICES WITH GLOBAL FOOTPRINTS. NTT Communications offers data center

More information

colocation. perfected.

colocation. perfected. colocation. perfected. colocation perfected The expert team of COLO@ have the talent, tools, and facilities to power your operation all day, every day. Since 2008, COLO@ has been providing the critical

More information

215 W. Ohio St. 5th Floor Chicago, IL 60564. Enterprise-Class Security, Performance and Redundancy

215 W. Ohio St. 5th Floor Chicago, IL 60564. Enterprise-Class Security, Performance and Redundancy 215 W. Ohio St. 5th Floor Chicago, IL 60564 Call Us Toll-Free 1 (866) 817-2811 Follow Us @SingleHop Like Us facebook.com/singlehop Phoenix #1 (PHX-1) Enterprise-Class Security, Performance and Redundancy

More information

Strategic Data Centre Site Profiles. Data Centre Co-Location London East

Strategic Data Centre Site Profiles. Data Centre Co-Location London East Strategic Data Centre Site Profiles Data Centre Co-Location London East Document details Version: 1 Last Updated: 12/07/2013 Version 1.0 Page 1 of 5 Contents 1. LONDON EAST...3 1.1 LOCATION...3 1.2 TECHNICAL

More information

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport Welcome Zenium Istanbul One provides 12,000 square metres of high specification technical space across three purpose-built data centers. It is Turkey s first wholesale data center offering; the data halls

More information

CHICAGO S PREMIERE DATA CENTER

CHICAGO S PREMIERE DATA CENTER CHICAGO S PREMIERE DATA CENTER White City collocation was founded in June, 2010 by a highly experienced industry executive in conjunction with several investment companies. The strategy of White City is

More information

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:

More information

Colocation Scenario @ MIX

Colocation Scenario @ MIX Colocation Scenario @ MIX INTRODUCTION This white paper describes the colocation scene for ISPs interested to connect to MIX. The intended audience is network operator peering coordinators that have been

More information

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in August 2002,

More information

Data Center Checklist

Data Center Checklist Data Center Checklist The use of colocation and services has continued to increase, rapidly becoming the solution of choice for organizations requiring an efficient, secure, cost-effective way to manage

More information

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management. AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled

More information

Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined.

Contents Error! Bookmark not defined. Error! Bookmark not defined. Error! Bookmark not defined. We Do It Better. Contents Introduction...3 Service and Support...3 Data Center Details...4 Security...4 Location...4 Power...4 Humidification...5 AC...5 Cooling...6 Datacenter Features...6 SAS 70...6 PCI

More information

Introduction of China Telecom Data Center. Your Connection to Asia Starts Here

Introduction of China Telecom Data Center. Your Connection to Asia Starts Here Introduction of China Telecom Data Center Largest IDC Service Provider in China More than 300 DCs around the world 10 Tier-4; 198 Tier-3 Total IDC area is over 20 Million square meters One-stop service

More information

Presentations, One Summer Street UPS/ Generator Power and Boston Data Center Facility Overview. GridSolar, LLC

Presentations, One Summer Street UPS/ Generator Power and Boston Data Center Facility Overview. GridSolar, LLC ATTACHMENT 4 Markley Group Powerpoint Presentations, One Summer Street UPS/ Generator Power and Boston Data Center Facility Overview. GridSolar, LLC State of Maine Public Utilities Commission Docket No.

More information

Colocation Buyer s Guide and Checklist. A 5-10-15 Playbook for Technology Managers

Colocation Buyer s Guide and Checklist. A 5-10-15 Playbook for Technology Managers Colocation Buyer s Guide and Checklist A 5-10-15 Playbook for Technology Managers Deciding how to manage IT infrastructure is not easy. This document will help determine if colocation makes sense for your

More information

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services

About Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier

More information

Colocation. Scalable Solutions for a Shared IT Infrastructure. Enterprise. Colocation

Colocation. Scalable Solutions for a Shared IT Infrastructure. Enterprise. Colocation Scalable Solutions for a Shared IT Infrastructure Global and domestic competition, rising real estate and power costs, and shrinking IT budgets are causing today s businesses to seek alternatives to building

More information

Raised Floor Data Centers Prepared for the Future

Raised Floor Data Centers Prepared for the Future Raised Floor Data Centers Prepared for the Future Raised Floors Protect My Investment by Providing a Foundation for Current and Future Technologies. Creating the Future Proof Data Center Environment The

More information

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee FDA Building One R. Andy Pahwa Faculty Advisor: Jim Freihaut/Dustin Eplee Project Background Building One Project Background Originally the headquarters of the Naval Surface Warfare Center Project Background

More information

Assessment of Existing Data Centers for Critical Facilities Round Table Group

Assessment of Existing Data Centers for Critical Facilities Round Table Group Assessment of Existing Data Centers for Critical Facilities Round Table Group Chuck Shalley, P.E. Consulting Electrical Engineers BACKGROUND INFORMATION ASSIGNMENT Data Center Criteria Type Raised Floor

More information

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Data Centre Basiglio, Milan Flexible, advanced and efficient by design. Data Centre Basiglio, Milan Flexible, advanced and efficient by design. TelecityGroup Via Francesco Sforza 13 Milano 3 City 20080 Basiglio MI Italy Tel: +39 02 36679500 it.info@telecity.com www.telecitygroup.it

More information

Data Centre Powergate, London Flexible, advanced and efficient by design.

Data Centre Powergate, London Flexible, advanced and efficient by design. Data Centre Powergate, London Flexible, advanced and efficient by design. TelecityGroup Unit 2 Powergate Business Park Volt Avenue London NW10 6PW United Kingdom Tel: +44 (0)20 7001 0101 info@telecity.com

More information

March/April 2010 2010. Tour the. PhoenixNAP. See Inside. www.missioncriticalmagazine.com

March/April 2010 2010. Tour the. PhoenixNAP. See Inside. www.missioncriticalmagazine.com March/April 2010 2010 PhoenixNAP Tour the See Inside www.missioncriticalmagazine.com Meeting a need for space and services while remaining energy efficient and reliable BY IAN MCCLARTY Much has been made

More information

How To Visit An Internet Data Center

How To Visit An Internet Data Center AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina

More information

Attracting Data Centers to Your Market

Attracting Data Centers to Your Market Attracting Data Centers to Your Market A Presentation for: Presented by: Wendy McArthur, CB Richard Ellis OVERVIEW Introduction Qualify Requirement Site Selection Cost Marketing CB Richard Ellis Page 2

More information

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15

More information

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center

More information

1301 Fannin. Houston Data Center & Office Facility

1301 Fannin. Houston Data Center & Office Facility 1301 Fannin & Office Facility 1301 FANNIN Building Features Building Location Building Typical Floor plans Systems Infrastructure Amenities BUILDING FEATURES YEAR BUILT/RENOVATED: 1984/2009 TOTAL LEASE

More information

Data Centers in Hong Kong Powering business success

Data Centers in Hong Kong Powering business success Data Center Data Centers in Hong Kong Powering business success NTT Com Asia DATA CENTERS IN HONG KONG INDUSTRY-LEADING DATA CENTER SERVICES WITH GLOBAL FOOTPRINTS. NTT Communications offers data center

More information

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security. www.in-tuition.net

Our Hosting Infrastructure. An introduction to our Platform, Data Centres and Data Security. www.in-tuition.net Our Hosting Infrastructure An introduction to our Platform, Data Centres and Data Security www.in-tuition.net UK Infrastructure Infrastructure Overview Intuition Networks has provided managed Internet

More information

SLA. Co-Managed. Do-It-Yourself

SLA. Co-Managed. Do-It-Yourself SLA Do-It-Yourself Co-Managed Co-Managed Fully Managed Operational Application Support DB Support Storage Planning Capacity planning Change Management Release Management Pro Services Systems Monitoring

More information

Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota

Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota A Premier Mission Critical Development and Leasing Opportunity The Connexion A carrier-neutral data center

More information

COLOCATION PROVIDERS:

COLOCATION PROVIDERS: COLOCATION PROVIDERS: INTRO The benefits of colocation are well documented, and making the business case for going that route is often quite easy for many organizations. Once the decision has been made

More information

Critical Environments. Innovative Solutions for a Changing World

Critical Environments. Innovative Solutions for a Changing World Critical Environments Innovative Solutions for a Changing World Diverse Talent Singular Vision As members of the ARCADIS family, RTKL and Callison together represent a globally renowned presence in design

More information

MINNEAPOLIS MARKET STREAM PRIVATE DATA CENTER CHASKA, MINNESOTA. 2001 Ross Avenue, Suite 2800 Dallas, Texas 75201

MINNEAPOLIS MARKET STREAM PRIVATE DATA CENTER CHASKA, MINNESOTA. 2001 Ross Avenue, Suite 2800 Dallas, Texas 75201 STREAM PRIVATE DATA CENTER MINNEAPOLIS MARKET CHASKA, MINNESOTA 2001 Ross Avenue, Suite 2800 Dallas, Texas 75201 www.streamdatacenters.com 866.301.0901 2 SECURE INDEPENDENT EFFICIENT SECURE Secured perimeter

More information

CyrusOne Global Data Center Solutions

CyrusOne Global Data Center Solutions CyrusOne Global Data Center Solutions 1649 W Frankford Road, Carrollton, TX 75007 + Leader in Global Data Center Colocation Built for tomorrow. Ready today. CyrusOne has quickly emerged as a global leader

More information

Sovereign. The made to measure data centre

Sovereign. The made to measure data centre Sovereign D ATA C O N N E C T The made to measure data centre Prime Location Within touching distance of everything that s important. 2 Your Customer-Centric Data Centre For the vast majority of organisations

More information

Building a data center. C R Srinivasan Tata Communications

Building a data center. C R Srinivasan Tata Communications Building a data center C R Srinivasan Tata Communications Introduction Data Center as defined by TIA 942 A building or a portion of a building whose primary function is to house a computer room and its

More information

N O W A V A I L A B L E

N O W A V A I L A B L E N O W A V A I L A B L E 5 0, 0 0 0 S F P O W E R E D S H E L L D A T A C E N T E R I I Data Center Park Catawba County, North Carolina Contact Doug Hollidge for more information Email: doug@five9sdigital.com

More information

Subject: ITN for Redundant High Speed Communications (Part II) Off Campus Equipment Location. Proposed Board Action

Subject: ITN for Redundant High Speed Communications (Part II) Off Campus Equipment Location. Proposed Board Action AGENDA ITEM: VIII D (ii) Florida Polytechnic University Board of Trustees August 26, 2013 Subject: ITN for Redundant High Speed Communications (Part II) Off Campus Equipment Location Proposed Board Action

More information

Rely on a Trusted Resource

Rely on a Trusted Resource Colocation Rely on a Trusted Resource» Highly secure environment to deploy your computing, network, storage and IT infrastructure» Helps reduce capital and operational expenses required to run mission-critical

More information

Developer http://www.totalserversolutions.com sales@totalserversolutions.com 1-855-227-1939

Developer http://www.totalserversolutions.com sales@totalserversolutions.com 1-855-227-1939 At a Glance In business since 2005 Enterprise level network SSAE-16 Compliant Based in Atlanta, Georgia, United States Operates facilities in the following locations: Atlanta, GA, USA (two facilities)

More information

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management Zen DC1 Our Services: Colocation Cloud Solutions Managed Hosting Dedicated Servers Zen DC1 - Key Facts Size: 10,000 sq ft Capacity: 150 rack capacity Ownership: 100% independently owned, operated and managed

More information

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.

More information

BELLE VUE MANCHESTER DATA CENTRE

BELLE VUE MANCHESTER DATA CENTRE www.iracknet.com 0843 557 5712 bellevue@iracknet.com www.iracknet.com BELLE VUE MANCHESTER DATA CENTRE 02 BELLE VUE MANCHESTER HIGHLY ADVANCED DATA CENTRE PURPOSE BUILT TO DELIVER UNRIVALLED FLEXIBILITY

More information

Building a Tier 4 Data Center on a Tier 1 Budget

Building a Tier 4 Data Center on a Tier 1 Budget Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942

More information