1 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 1.0 INTRODUCTION 1.1 GENERAL M/s. Alliance Villas Pvt Ltd. Projects proposes to construct its residential complex in Thaiyur-B Village, Thiruporur Taluk, and Kancheepuram District in the state of Tamil Nadu. Total land area available is sqm. The total built-up area is sqm. As per EIA notification, 2006, any new or modernization building and construction project with built-up area more than 20,000 sq m falls under activity 8 a and category B and thus requires to obtain environment clearance from concerned authority prior start of the construction. As SEIAA Tamil Nadu is not formed till date after completion of tenure of last SEIAA, we are herewith applying in MoEF for obtaining environment clearance for the project. 1.2 SITE DESCRITPION The project site is located 12 46'39.74"N latitude and 80 12'55.07"E longitude. The site is located in Thaiyur-B Village, Thiruporur Taluk, and Kancheepuram District. No ecosensitive zone is present within 2 km area of the project site. The environmental settings of the site are given below in Table 1. Table 1: Details of Environmental Settings S. No. Particulars Details 1. Latitude 12 46'39.74"N 2. Longitude 80 12'55.07"E 3. Total Plot Area sqm 5. Nearest Highway Rajiv Gandhi IT Express Way 6. Nearest Road Rajiv Gandhi IT Express Way 7. Nearest Railway Station Vandaloor Station (20 km, West) 8. Nearest Airport Chennai International airport (30 km, South West) 9. Nearest Harbour Chennai (35 km, NE) 10. Nearest Town Kelambakkam (1.0 km, North) 11. Nearest City Chennai (20.0 km, South) Page _ 43

2 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 1.3 PROJECT COMPONENTS The proposal involves construction of residential blocks with a total built up area of sqm. The area split up and space utilization details are given below, the project consists of five blocks, detailed area break up is given in below Table 2. Table 2: Land Use Break up Details Details Area in (Sqm) a) Total Land Area b) Total Ground Coverage Area of Buildings (38%) 20, c) Roads and Pavements Area (34.6%) 18, d) Surface or open Parking Area (if any) (1.63%) e) STP, Solid Waste Disposal and Other Utilities Area (0.71%) f) Greenbelt development Area (15%) g) OSR Area (10.03%) Total Built up Area and Details on Housing Units: Built up area is calculated as per the latest Circular of MoEF, Dated: 2" April Built-up area is defined as ''The built-up or covered area on all the floors put together including basement(s) and other service areas, which are proposed in the building / construction project" as per the latest Circular of MoEF, Dated: 2" April Detailed built-up area calculations are given in Table 3 & 4 below Table 3: Built-up Area Calculations Floors FSI Area (Sqm) Block 1 Built-up Area Non FSI Parking Area Area (Covered Built (Sqm) Up Area) Sqm Total (Sqm) Ground floor I floor II floor Total Block 2 Ground floor I floor II floor Total Page _ 44

3 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Floors FSI Area (Sqm) Block 3 Built-up Area Non FSI Area Parking Area (Sqm) (Covered Built Up Area) Sqm Total (Sqm) Ground floor I floor II floor Total Block 4 Ground floor I floor II floor Total Block 5 Ground floor I floor II floor Total Block 6 Ground floor I floor II floor Total Block 7 Ground floor I floor II floor Total Block 8 Ground floor I floor II floor - - Total Page _ 45

4 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Floors FSI Area (Sqm) Block 9 Built-up Area Non FSI Area Parking Area (Sqm) (Covered Built Up Area) Sqm Total (Sqm) Ground floor I floor II floor Total Block 10 Ground floor I floor II floor Total Block 11 Ground floor I floor II floor Total Block 12 Ground floor I floor II floor Total Block 13 Ground floor I floor II floor Total Block 14 Ground floor I floor II floor Total EWS Block-1 Stilt floor Parking & Non FSI Area I floor II floor IIIfloor IVfloor Total Page _ 46

5 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Floors Stilt floor FSI Area (Sqm) EWS Block-2 Built-up Area Non FSI Area Parking Area (Sqm) (Covered Built Up Area) Sqm Parking & Non FSI Area Total (Sqm) I floor II floor IIIfloor IVfloor Total Clubhouse Basement Floor Ground floor I floor II floor III floor Total Blocks Table 4: Summary of Built up Area FSI Area (Sqm) Non FSI Area (Sqm) Parking Area (Covered Built Up Area) Sqm Total (Sqm) Block Block Block Block Block Block Block Block Block Block Block Block Block Block EWS Block EWS Block Clubhouse Total Grand Total Page _ 47

6 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Table 6: Details on Block wise BHK Units S.No. Block Floors BHK Description No of Units 1 BHK 2 BHK 3 BHK 1 G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors G+2 Floors 8 8 EWS1 Stilt EWS2 Stilt Clubhouse G+3 Floors Total Number of Housing units Total Built up Area = 416 units = sqm. Page _ 48

7 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 1.4 VEHICLE PARKING FACILITIES Parking will be provided as per the building bye laws of DTCP. Details of parking required and to be provided is given below in Table 5. Table 5: Parking Provided Details 1) Total number of car& Two Wheeler parks in Stilt 2)Total number of car parks in Ground level (Surface parking) Total number of Car Parks required as DTCP norms No. of Car parks No of two wheeler parks Area allotted for parking in (SQM) Total number of Car Parks provided POWER REQUIREMENT The power requirement during operation is about 2250 KVA and it will be sourced from the nearby TNEB grid DG sets of capacity 1 nos of 250 KVA will be provided to cater essential load requirement during power failure. 1.5 BASELINE ENVIRONMENTAL STATUS Baseline studies are carried out to provide a detailed description of the existing ecosystem, landscape, infrastructure, cultural heritage and urban environment. A baseline study describes the initial state of the environment within the selected boundaries of the study area. The baseline data has been generated and secondary data collected from various Government and Semi-Government organizations. The details about the existing environmental values are projected based on the volume of the assessment accomplished during the period. The various environmental attributes were divided into primary and secondary studies. Primary attributes such as air environment, water, soil, noise & biological environment were being assessed by conducting field studies, on-site monitoring. The baseline studies started with site visits and survey in the study area for fixing the monitoring locations for the primary data generation. 1.6 ENVIRONMENTAL COMPONENTS The baseline environmental studies helped in assessing the existing environmental conditions of the study area and identifying the critical environmental attributes. This will facilitate the comparison of the resultant environmental conditions in the post study scenario with the prestudy conditions and will help in checking the environmental pollution. The baseline Page _ 49

8 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. environmental data for Ambient Air, Noise, Soil and Ground water is enclosed separately in Annexure. Project Components Occupancy load Total Water Requirement (lpd) Domestic water Requirement (lpd) Recycled water Requirement (lpd) Residential occupancy 2080 Visitors 208 Maintenance Staff WATER REQUIREMENT ( 135lpcd) (90 lpcd) (45 lpcd) 3, ( 15 lpcd) (5 lpcd) (10 lpcd) (45 lpcd) (15 lpcd) (30 lpcd) Total 284, , Water requirement for Gardening purposes based on the Gardening area Swimming pool top up sqm (@ 3.5 litres/sqm) Total water requirement , KLD 192, KLD 123, KLD The total water requirement during operation is 316 KLD. Source of water is local body. The wastewater generation from the project is estimated to be about 271 KLD, which will be treated in proposed sewage treatment plant and will be recycled for flushing, gardening and the remaining will be disposed through the local body. The estimation of water requirement and the water balance chart is shown in Table 7, 8 and 9. Table 7: Water Requirement and Water Balance - Occupancy Load Calculation S.No Project Components Total Apartments Occupancy load 1 2 Residential units Visitors & Maintenance staff - Residential 3 Club House 10% of Resident population 5% of residential population 208 Total Occupancy Page _ 50

9 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Water Requirement Summary: Total Water Requirement = 316KLD Table 8: Water Requirement Calculation Table 9: Summary of Total Water Balance Fresh water requirement for domestic purposes = 188 KLD Treated water requirement for Flushing purposes = 124 KLD Treated water requirement for Gardening purposes = 4 KLD Water balance during dry season Daily Fresh Water Requirement 188 KLD Domestic (NF) 188 KLD 150 KLD (80%) 274 KLD STP 300 KLD Flushing 124 KLD 124 KLD 124 KLD 260 KLD (95%) Gardening 4.0 KLD 4.0 KLD 133 KLD Disposal through Local body 129 KLD 1.8 SOLID WASTE GENERATION The solid waste from the proposed development will comprises of compostable wastes like domestic food waste, horticultural waste and recyclable waste like plastics, paper etc. As per the manual on municipal solid waste prescribed by Central Public Health and Environmental Engineering Organization (CPHEEO), the quantity of solid waste generated varies between kg / capita / day. Quantity of solid waste generated from the proposed residential building is given below in Table 10 Page _ 51

10 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Table 10: Quantity of solid waste generated from the proposed residential building S.No Project Components Occupancy load Per Capita generation Total solid Waste generation Kg/day Residential occupancy Visitors Maintenance Staff Club House Staffs STP Sludge 28 Total Waste Generation in Kg/day 1101 Source: Central Public Health and Environmental Engineering Organization (CPHEEO), Per capita waste generation for residential are 0.5 kg / capita / day for staff population it is 0.25 kg/capita/day and for visitors it is 0.15 kg/day. S.No 1 2 Description Compostable Waste (@60% of waste generated) Recyclable waste (@40% of waste generated Table 11: Waste Composition Quantity (Tons/day) STP Sludge 28 kg/day Mode of treatment / disposal Will be treated in organic waste convertor within the project site. Manure generated will be used for landscaping purpose within project site Waste will be sold to authorized recyclers Will be used as a Manure for greenbelt development Wastes generated from the households will be segregated into compostable waste, recyclable and inert waste in the source itself (by the occupants) in separate bins. Door to door waste collection system will be adopted. Compostable waste will be treated in organic waste convertor within the site. Manure generated will be used within the site for landscaping purpose. Recyclable fraction of waste will be sold to authorized vendors and inert waste will be send for land filling through authorized agency for waste collection in the area. Page _ 52

11 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Organic waste convertor of various makes like Excel, Nachiket Engineering, Earth Care equipments are available. These OWC reduce volume of waste fed by 80% and convert it into manure that can be used for landscaping purpose. This manure can be stored, packed, sold and used for landscaping. Apart from the municipal waste, E-waste comprising of rejected CFL, bulbs, laptops, TV sets, computers etc will be generated. This waste will be insignificant in initial stage. Room will be provided within project site for storing discarded electronics. These will be sold to authorized vendors on regular basis. 2.0 ENVIRONMENTAL IMPACT ASSESSEMNT 2.1 INTRODUCTION This chapter presents the assessment of various impacts due to the proposed construction project in the study area. Generally, the environmental impacts can be categorized as either primary or secondary. Primary impacts are those, which are attributed directly by the project and secondary impacts are those, which are indirectly induced and typically include the changed patterns of social and economic activities by the proposed project. The Proposed construction project would create impact on the environment in two distinct phases: Impacts during the construction phase Impacts during the operation phase The construction and operational phase of the proposed construction project comprises of various activities each of which will have impact on some or other environmental parameters. Various impacts during the construction or operational phase and the environmental parameters have been studied to estimate the impacts on environment. The identification and details on impact of the project activity on each of the above environmental attributes are discussed below. 2.2 IDENTIFICATION OF IMPACTS Construction of residential complex is for the benefit of general population, however, like any other projects, it also has impacts on existing Environmental settings and if not properly evaluated and controlled, it may lead to imbalances. These could be reversible, irreversible, temporary or permanent. The identification of impacts is important as it leads to the other elements such as quantification and evaluation of impacts. Although a number of non-projects related impacts have been identified while describing the existing (baseline) environmental status, it is necessary at this stage to identify the types of the potential impacts which might be caused by the proposed development. Many techniques are available for identification of impacts. In Page _ 53

12 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. case of this project, the "Matrix Method" was adopted, which involves an understanding of the cause-condition-effect relationship between an activity and environmental parameters. It is very useful as gross screening tool for impact identification method. This method has been basically advantageous in recognizing the series of impacts that could follow from the proposed activities. The idea was to account for the project activity and identify the types of impacts that could initially occur. This process was repeated until all possible types of impacts were identified. With this method the potential impact of the proposed project has been identified. Table 12: Over view of potential impacts due to the proposed residential complex project Project activities Air quality Noise Level Ground Water Quality Ground Water Quantity Soil Stability/ Erosion Soil Quality Traffic Level Vegetation Socio Economic Site Clearance & Leveling Site excavation Foundation (Pile Foundation) Material Storage & Handling Generation and disposal of construction waste Movement of Vehicles Labour s Camp Occupancy Operation of DG Sets Sewage Generation & Discharge Rainwater Harvesting ST, -ve ST, -ve ST, -ve ST, -ve Construction Phase ST, -ve ST, - ST, - ve ve ST, -ve ST, -ve ST, -ve ST, -ve Operation Phase LT, -ve ST, - ve ST, - ve ST, -ve LT, - ve ST, - ve ST, +ve ST, +ve ST, +ve ST, -ve LT, +ve -ve -ve -ve LT, -ve LT, +ve LT, -ve LT, -ve LT, +ve Page _ 54

13 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Solid Generation Gardening Landscaping waste & LT, +ve LT, +ve LT, +ve LT, -ve LT, +ve LT, +ve LT, +ve Note: ST - Short Term Impact, LT - Long Term Impact, -ve - Negative Impact, +ve Positive Impact 2.3 IMPACT EVALUATION Impact evaluation assesses the expected changes in the environment due to the proposed project. It is the tool for identifying the magnitude of impact and forms basis for the development of Environmental Management Plan. Weightage for each impact is given below. Evaluation of impacts considering both positive and negative effects on air, noise, land, water and socioeconomic environment during the construction and operation phase of the project is given in Table 13 and 14 respectively. TABLE 13: EVALUATION OF CONSTRUCTION PHASE IMPACT Environment al Parameter Project Activities CONSTRUCTION PHASE AIR ENVIRON MENT Impact Type Significant Non Significant Direct Indirect Short Term Long Term Unavoidable Irreversible Mitigation Required Weight age Site Clearance & Leveling Negative -4 Site excavation Negative -4 Foundation (Shallow Negative 0 Foundation) Material Storage & Handling Negative -4 Generation and disposal of construction Negative -4 waste Vehicular Movement Negative -4 Labour s Camp No Impact - Public Health & Safety Economic Activity No Impact No Impact - - NOISE ENVIRON MENT Site Clearance & Negative 0 Leveling Site excavation Negative -4 Page _ 55

14 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Foundation (Shallow Foundation) Material Storage & Handling Generation and disposal of construction waste Vehicular Movement Labour s Camp Public Health & Safety Negative -4 Negative -1 No Impact Negative -1 No Impact No Impact Economic Activity No Impact - LAND ENVIRON MENT Site Clearance & Leveling Site excavation Foundation (Shallow Foundation) Material Storage & Handling Generation and disposal of construction waste Vehicular Movement Labour s Camp Public Health & Safety Economic Activity No Impact No Impact Negative -1 Negative -4 Negative -4 Negative -1 No Impact No Impact No Impact WATER ENVIRON MENT Site Clearance & Leveling Site excavation Foundation (Shallow Foundation) Material Storage & Handling Negative -2 No Impact No Impact Negative Page _ 56

15 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Generation and disposal of construction Negative -4 waste Vehicular Movement Negative 0 Labour s Camp Negative -4 Public Health & Safety Economic Activity No Impact No Impact - - SOCIO ECONOMI C ENVIRON MENT Site Clearance & Leveling Negative -2 Site excavation Negative -2 Foundation (Shallow Negative -2 Foundation) Material Storage & Handling Negative 0 Generation and disposal of construction Negative -2 waste Vehicular Movement Negative -2 Labour s Camp Negative -2 Public Health & Safety Positive 6 Economic Activity Positive 6 TABLE 14: EVALUATION OF OPERATION PHASE IMPACT Environme ntal Parameter OPERATION PHASE AIR ENVIRON MENT Project Activities Occupancy Operation of DG Sets Sewage Generation & Discharge Rainwater Harvesting Solid waste Generation Impact Type No Impact Significant Non Significant Direct Indirect Short Term Long Term Unavoidable Irreversible Mitigation Required Weigh tage Negative -8 Negative 0 No Impact Negative Page _ 57

16 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Gardening Landscaping & Positive 10 NOISE ENVIRON MENT Occupancy Operation of DG Sets Sewage Generation & Discharge Rainwater Harvesting Solid waste Generation Gardening & Landscaping No Impact Negative -8 No Impact No Impact No Impact Positive LAND ENVIRON MENT Occupancy Negative 0 Operation of DG Sets Negative 0 Sewage Generation & Negative -8 Discharge Rainwater Harvesting Positive 8 Solid waste Generation Negative -8 Gardening & Landscaping Positive 10 WATER ENVIRON MENT SOCIO ECONOMI C ENVIRON MENT Occupancy Negative -8 Operation of DG Sets Negative -6 Sewage Generation & Negative -8 Discharge Rainwater Harvesting Positive 10 Solid waste Generation Negative 0 Gardening & Landscaping Positive 10 Occupancy Positive 10 Operation of DG Sets Negative -6 Sewage Generation & Negative -6 Discharge Page _ 58

17 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Rainwater Harvesting Solid waste Generation Gardening & Landscaping Positive 8 Negative -6 Positive IMPACT ON AIR ENVIRONMENT Construction Phase Impacts of construction activities on air quality are cause for concern mainly in the dry months due to dust particles. The main sources of emission during the construction period are the movement of equipment at site and dust emitted during the leveling, grading, earthworks, and other construction related activities. The dust emitted during the above mentioned activities depend upon the type of soil being excavated. However, the impact will be for short duration and confined locally to the construction site. The composition of dust in this kind of operation is, however, mostly inorganic and non-toxic in nature. The impact of such activities would be temporary and restricted to the construction phase. The impact will be confined within the project boundary and is expected to be negligible outside the plant boundaries. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site are some of the measures that would greatly reduce the impacts during the construction phase. Thus, it is inferred that no significant impacts are expected on the overall ambient air quality due to the proposed construction activities. Transportation and Storage of Construction Materials Transportation of heavy machinery and building materials implies heavy traffic on the roads leading to the site with possible negative impacts to the surrounding area (dust, spillage, emissions and noise). Transportation of construction materials as well as improper storage of building materials, especially gravel, sand and cement in the construction site will lead to inadvertent dispersal of materials during heavy rain or high wind during dry periods. Measures will be adopted for proper handling of construction materials to reduce the negative impact Operation Phase Ambient air quality at the proposed project site and its surroundings is monitored and values of the pollutants RPM, PM2.5, NOx and SO2 are within the limits of NAAQS, 2009 prescribed by the central pollution control board. There is no major pollutant envisaged from the proposed development. It is likely that the air quality may be affected slightly due to the emissions from the vehicular movement. The emission from DG sets will be very negligible since it will be used only during power cut in Page _ 59

18 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. the necessary area. However in the case of DG sets the stack will be properly designed to meet the stipulations of CPCB. These emissions will be insignificant and the environmental pollutant levels will be maintained within the prescribed limits. Hence there shall not be any adverse impact on the air environment around the proposed Residential Complex. 2.5 IMPACT ON AMBIENT NOISE Construction Phase During the construction noise levels will increase due to use of machinery and heavy vehicles in the project area. In terms of noise emission; demolition, excavation and construction work can be divided into two phases, namely (1) Demolition and Earthworks and (2) building works. Loading and unloading of construction materials, fabrication, handling of equipment and material, operation of power shovels etc. will be the major source of noise during the construction phase. Various construction activities will cause short-term noise impact in the immediate vicinity of the project site. The areas affected are those close to the site and hence the impacts are localized. At the peak of the construction, marginal increase in noise levels is expected to occur. The peak noise levels from continuous construction activity may be as high as db (A). The noise control measures during construction phase shall restrict the noise levels to lower levels. Hence the overall impact on the ambient noise levels will not be significant Operation Phase There will not be any major impact from noise. This is because no equipment or other infrastructure facility in the project generates noise more than db (A). However, the only noise generation source is the DG set. The promoters have decided to adopt adequate steps to maintain the noise levels within the prescribed limits. For the same all the DG facility will be equipped with acoustic enclosure. Apart from this honking will be prohibited at the site and speed limits will be restricted within the site. This will significantly help in controlling noise levels at the site. Further the green belt provided within the site will act as noise barrier between inside and outside environment. This will act as buffer and protects the site from high noise levels outside the site. Traffic Noise Traffic will increase during both construction and operation phase of the project. Vehicles associated with construction would generate intermittent noise throughout the vicinity of the proposed action. In the operation phase, vehicular parking is being provided in the basement, ground floor and first floor of the building where noise levels are expected to increase substantially during the peak hours due to starting, idling and roaring of vehicles. Page _ 60

19 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 2.6 IMPACT ON LAND ENVIRONMENT No blasting will be done during construction phase of the project. The rehabilitation and resettlement issues are not involved in the project. Furthermore the existing environmental conditions of the project site reveal that the land is not contaminated or polluted. Top soil will be excavated upto 15 cm from the project site. It will be stored in covered area during construction phase and will be used for landscaping in operation phase within project site. The upper/top level of soil will be affected during construction phase but this will be limited to a portion of the project area. Also the impact due to exploitation of ground water is insignificant in the site due to the sourcing of water from other sources during the operation phases. Hence there will not be any adverse impact on the surrounding land use during the construction period as well as during the operation phase. 2.7 IMPACT ON WATER RESOURCES Construction Phase The required water quantity for construction will be utilized from the available resource in the project area. Impact on water quality during construction phase may be due to non-point discharges of sewage generated from the construction work force, stationed at the site. Construction activities for the proposed development can have minor impact on hydrology and ground water quality of the area if the construction waste leaches into ground. Potential sources of impacts on the hydrology and ground water quality during the construction phase would be soil runoff, improper disposal of construction debris, spillage of oil and grease from the vehicles and wastewater stream generated from on site activities such as vehicles washing, workshop etc. Precautions and preventive measure will be taken at the site during construction to avoid any ground and surface water contamination hence the overall impact on water environment during construction phase due to proposed project is likely to be insignificant Operation Phase The total quantity of wastewater generation is likely to be 274m 3 /day. No impact from wastewater, this is because the sewage generated will be treated and recycled within the project components for flushing and gardening. Therefore, surface and subsurface contamination due to treated wastewater will not be envisaged. Page _ 61

20 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 2.8 IMPACTS DUE TO WASTE DISPOSAL Stacking and Disposal of Construction Materials Stacking of construction materials will be confined to the project site only and also temporary sheds will be provided to store the materials, hence no impacts on surrounding area will be envisaged. Solid wastes generated due to proposed project during construction phase include sand, gravel, stone, bricks, plastic, paper, wood, metal and glass. Recyclables will be sent to authorize recyclers. Hence there is no significant impact due to waste disposal during the construction phase Operation Phase The solid waste generated from the project will be collected daily and moved to a common temporary storage facility by the staff dedicated for waste collection. The collected Solid waste will be disposed through Organic waste converter. 2.9 IMPACTS ON ECOLOGICAL RESOURCES Construction Phase The impact of construction activities will be primarily confined to the project site. The project site is a vacant land and devoid of any vegetation. Thus the site development work will not lead to any significant loss of any important plant species. Deposition of fugitive dust on leaves of nearby vegetation may lead to temporary reduction of photosynthesis. Such impacts will, however, be confined mostly to the initial period of construction phase. Hence the proposed development will not lead to habitat destruction, fragmentation or vegetation damage Operation Phase No wastewater will be discharge into the surface water stream. Hence, there will not be any impact on the aquatic ecology. Also the proposed project is to be located in an earmarked residential zone, which does not have any natural park or sanctuary or forest area in the immediate vicinity. The flora and fauna pattern in the area will not be disturbed due to the project. Hence the overall impact on ecological resources due to proposed project is likely to be insignificant. Moreover the entire project area would be landscaped with variety of plants. Page _ 62

21 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd IMPACT ON TRAFFIC LEVELS Construction Phase The movement of construction equipments will be mostly within the site during the project. Vehicles bringing in raw materials like sand, cement and aggregate materials will be moving into the site from outside, which will be strictly controlled and monitored as per the traffic rules, to avoid any sort of disturbance to the traffic and safety of the surrounding areas. Hence the impact due to the vehicular movement during the construction phase would be minor or insignificant Operation Phase Based on the vehicular density observed during the traffic survey conducted on the main roads around the proposed site, the existing infrastructure is capable of taking up additional traffic loads. Also the project is to be executed phase wise; the increase in traffic will be easily handled by the existing as well as the future improvements in the transportation infrastructure. Hence there will not be any impact on the traffic pattern and density IMPACTS ON SOCIO ECONOMIC ENVIRONMENT The required land for the development is owned by M/s.Alliance Villas Pvt Ltd.The proposed residential complex will be open to members of all communities and castes. The above measure will encourage mixing of different caste people for their respective festivals and occasions. This will improve the social welfare and brotherhood among the various communities and castes. Also the state of the art facilities proposed in the development is planned to cater the needs of the occupants which would be able to provide healthy working atmosphere. Hence it is obvious to assume that the activities of the proposed development will produce some positive impacts in the socio-economic status of the area Public Health and Safety As the project is only a construction of residential complex and all the construction activities are confined to the project site, no health related impact would be envisaged within the project area. The people engaged in the construction activities will be directly exposed to dust generation, which is likely to cause health related impact. Appropriate mitigation measures like spraying of water will be adopted to minimize dust emission in the construction site. Laborers will be provided with suitable Personal Protective Equipment (PPE) as required under the health and safety norms. Regular health checkups will be organized. Page _ 63

22 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd Positive Impact The project will facilitate maximum participation of the local work force for construction process; this will benefit the local economy, improvement in economic activity and enhancement in earning opportunities for the local population. The operation of the project and other allied facilities will improve the employment opportunities. The project will provide direct and indirect employment. About persons will be employed during the operation stage for the purpose of day-to-day maintenance works. The employment will have positive impact on the local economy thereby increasing the quality of life. The proposed rainwater recharge facility will augment the ground water level in the project area. The proposed project will also improve the aesthetics of the area due to the development of modern buildings. 3.0 ENVIRONMENTAL MANAGEMENT PLAN 3.1 GENERAL Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impacts of the project and for ensuring to maintain the environmental quality. The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken to eliminate the adverse environmental impacts or reduce them to acceptable levels. 3.2 AIR POLLUTION CONTROL AND MANAGEMENT Construction Phase The impacts will be due to the air emissions like Particulate matter (PM10 & PM2.5, CO2, NOx and SO2 due to material handling, vehicular movements and other site activities. The particulate matters will be reduced by frequent sprinkling water on the road surfaces and on other areas where dust is arising due to material handling. All the equipments and vehicles used in the construction and transportation of materials will be maintained properly and only low sulphur diesel will be used as fuel for DG sets and construction equipment and vehicles. The emissions from the DG sets will be let out only through the stacks with adequate heights as per CPCB norms. This will avoid the deposition of the particulate matters and other pollutants by facilitating the through dispersion of pollutants into the atmosphere. The stacking of all the construction materials will be confined only within the proposed site. Vehicles carrying the raw material and debris will be covered to minimize dust emissions while travelling. Adequate parking space will be provided for construction vehicle and machinery to prevent idling and thus will help in minimizing the emissions. Wheel wash facility will be provided at the exit point of the site. Page _ 64

23 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd Operation Phase Air emissions are observed during the operation phase of the project. The air emissions will be reduced by ensuring smoother flow of traffic within the premises by better traffic management plans. It is proposed to have trees all through the boundaries of the site and along the either side of the internal roads. This will reduce the particulate matters from being transported to the nearby areas. The air emissions from the Diesel Generators will be controlled by using low sulphur content high speed diesels, periodic maintenance of DG sets as per the defined schedule of manufacturer and by providing adequate stack heights as prescribed by CPCB. The stack height for the DG sets are calculated based on the CPCB guidelines as shown below; The proposed project to have 1 nos of 250 KVA Air Pollution Control (APC) Measures The main source of air emissions from the proposed residential development is the Generator Sets the above proposed generator sets will be used only during TNEB power failure. To control the air emissions from these D.G sets, adequate stack height is provided to release the exhaust flue gases into the atmosphere at a height at which efficient dispersion takes place. Since the DG sets are operated only during power failure, the emission is not continuous and hence the impact due to these emissions is insignificant. The stack height for the DG sets are calculated based on the CPCB guidelines as shown below; Stack Height Design Calculation for 250 KVA Generator Set H = h + (0.2) (kva) 0.5 = (250) 0.5 = = Where, H = Total height of stack in meters from ground level h = height of the building in meters The stack height required as per CPCB norms is 37 m. The same will be provided Page _ 65

24 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 3.3 NOISE CONTROL AND MANAGEMENT Construction Phase The noise generated from the construction equipments will be reduced through proper maintenance of all the equipments which are involved in construction activities, confining the construction activities only during the day time and providing barricades all around the project area. The adverse impacts of noise especially on workers will be reduced by providing ear muffs to the workers in high noise zones. Noise control systems such as equipment foundation pads, dampeners, silencers and acoustic enclosures will be used for individual units as per the requirement to minimize the noise & vibration Operation Phase The increase in the ambient noise levels due to the vehicle transportation will be controlled by the development of the green cover all along the internal roads and by implementing better traffic management plans inside the site premises. The better traffic management plans will significantly reduce the noise generated due to the congestion caused by the movement of vehicles. The generator noise is controlled by providing acoustic enclosures. Proper air ventilation system is designed to allow the maximum aspiration and cooling airflow required so that the engines do not overheat. Axial flow fan of required size & numbers provided for proper air ventilation. Acoustic louvers, splitter & insulated ducts are provided to suppress the noise where required. 3.4 SOLID WASTE MANAGEMENT Construction Phase Separate raw material handling yard will be demarcated. This will prevent the contamination of the soil due to the spillage of the construction materials. Cement will be separately stored under cover in bales. The raw material handling yard will be located within the project site and separated by enclosures/barricades. This will keep the working area clean and reduce the soil contamination Operation Phase During the operation phase the used oil from the DG sets will be collected in separate drums and handed over to the authorized recyclers by TNPCB. Hazardous Waste: During the operation phase the used oil, DG filters, oil mixed cotton waste and oil containers from the DG sets will be collected in separate place. Page _ 66

25 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Generation and disposal of Hazardous waste Quantity per annum is given in Table 15 Table 15: Hazardous Waste Generation and Disposal S.No Waste category Description of waste DG Filters & filter material Used oil Quantity in Tonnes/per annum Activity/Activities for which authorization is required Collection & Storage MS drums within 0.6 the premises 0.5 MS drums within the premises Transport & Disposal Disposal through TSDF facility Gummudipoondi Disposed to authorized re -processors Non- Hazardous Waste: It is estimated that the municipal solid wastes will be generated in the following passion: Compostable wastes : Tons/day Recyclable wastes : Tons/day Sludge from STP : 28 Kg/day Wastes generated from the households will be segregated into compostable waste, recyclable and inert waste in the source itself (by the occupants) in separate bins. Door to door waste collection system will be adopted. Compostable waste will be treated in organic waste convertor within the site. Manure generated will be used within the site for landscaping purpose. Recyclable fraction of waste will be sold to authorized vendors and inert waste will be send for land filling through authorized agency for waste collection in the area. Horticulture wastes leaves, grass and vegetative residues shall be collected at the secured location such that it will not hinder daily activity schedule or washed away by the surface run-off causing choking of drains, etc. and will be separately treated and disposed off along with biodegradable waste.stp sludge will be stabilized, and dewatered for separation of solids, which will be used as manure in horticulture. Solid waste Source Separation Non Biodegradable Waste Collection point Sent to authorized recyclers Biodegradable Waste Collection point Organic Waste Converter Page _ 67

26 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. 3.5 WATER AND WASTEWATER MANAGEMENT Construction Phase The wastewater generated by the construction workers will be treated and disposed through septic tank with soak pit arrangement. All the water storage tanks/containers will be maintained without any leaks. Necessary precaution and preventive measures will be taken at the site during construction to avoid any groundwater and surface water contamination Operation Phase It is proposed to use the recycled water for the part of the daily water demand in the premises. The total water requirement during operation is 316KLD. The wastewater generation from the project is estimated to be about 274 KLD, which will be treated in proposed sewage treatment plant of 300 KLD STP. The technology adopted will be extended aeration system followed by disinfection. Treated sewage of 260 KLD will be reused for flushing, gardening and the excess will be disposed through local Municipality. 3.6 STORM WATER MANAGEMENT Construction Phase The surface runoff during the construction period will be directed into the drains separately provided for this purpose Operation Phase The highest recorded monthly rainfall in that area and surroundings of Chennai mm during November, 2008 considering the previous 5 years day peak rainfall (Refer Table below from IMD). Chennai receives considerable rainfall thus storm water management system has been proposed considering the peak hourly rainfall of 62 mm (Rakhecha & Pisharoty) Table 16: Five Yearly Rainfall Year Rainfall (mm) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Rain water from internal roads etc will be discharged through storm water drain sloping towards rain water collection sumps. The Rainwater down comer pipes from terrace level directly connected to rainwater inspection chambers interlinked and discharged to filtration Page _ 68

27 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. bed to store Rain water of min. An overflow pumping main pipe will be laid as lead pipe from rainwater harvesting trench up to the road for draining the excess water during rainy seasons. UPVC pipes of 6 kgf/sq.cm and specials of approved make are considered. DESIGN PARAMETERS: Total Plot Area Considered Total roads and pavement area Total Greenbelt Area Total Roof Area Peak Rainfall intensity Sqm Sqm Sqm Sqm 62 mm/hr Co efficient of runoff considered for roof area : Co efficient of runoff considered for road/paved area : Co efficient of runoff considered for landscape area : Description Area in Sqm coefficient runoff Rainfall intensity in m Total Rainwater Runoff Cum/hr Road area Greenbelt area Roof area 20, Total Run-off (Road and Greenbelt area) Taking Retention of 15 min, run-off load is Size of RWH Pit (diameter- 3 m, depth 4 m) No. of Pits Required 10 No. of pits Provided 15Nos. Note: Runoff generated from (STP, Solid Waste Disposal and Other Utilities) Area will not be directed into storm water drains to prevent contamination of storm water. The runoff from rooftop will be collected in the rain water collection sump of 890 cum (3 nos of 290 cum) capacity. During abnormal rains, the excess runoff after storage and recharge will be disposed off through the storm water drains. Page _ 69

28 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. Details of recharge pit arrived based on soil conditions is briefed below Recharge through Pits Recharge pits are normally excavated as any shape, which are sufficiently deep to penetrate the low-permeability layers overlying the permeable layer. They are similar to recharge basins in principle, with the only difference being that they are deeper and have restricted bottom area. In many such structures, the infiltration occurs vertically through the permeable layer is much higher than the low permeable layer occurring in the top. G.L G.L 800 mm 800 mm 800 mm 800 mm 800mm Riverside Pebble (1 3") Course Soil Activated Charcoal Course Sand Pebble (1 3 ) CROSS SECTION OF RECHARGE PIT PCC 1:4:8 The developer has proposed to construct 10 numbers of pits in the premises. A portion of rain water falling over the road and paved area and the open area will be used for recharging the ground water. The dimension of pits is 3 m dia and, 4 meter depth, more rain water recharge to ground water. The pits will be filled with pebbles for 0.8meter depth at bottom, coarse sand the top, then followed by Activated charcoal, Course soil, Riverside pebble sand layer of the recharge pits will be periodically cleaned to ensure the proper recharge. RECHARGE TRENCHES Recharge trenches are normally excavated as linear pits, which are sufficiently deep to penetrate the low-permeability layers overlying the permeable layer. They are similar to recharge basins in principle, with the only difference being that they are deeper and have Page _ 70

29 Conceptual Plan for Residential Construction Project M/s. Alliance Villas Pvt Ltd. restricted bottom area. In many such structures, the infiltration occurs vertically through the permeable layer is much higher than the low permeable layer occurring in the top. Recharge Trench will be constructed in the premises of the company across the slopes. Details of Recharge Trenches: Trench maintained all along the boundary, the depth of the trenches will be around 1.50 m. It is planned to remove the entire impervious layer to facilitate rain water recharge. The width of the proposed trenches is 1.0 m. Pebbles of different size will be provided in an ascending order in the tank and a layer of sand will be provided on top of the filter media. The rain water flowing through the open land, paved area and green belt area will be used for recharging to ground water through the above said trenches. 3.7 LANDSCAPE AND ECOLOGICAL MANAGEMENT Construction Phase It is proposed to plant plantation on landscape area and all through the boundaries of the site and along the either side of the internal roads. This will have positive impact over the fauna of the locality Operation Phase It is proposed to have a landscape area of around Sqm (15% of plot area). It is also proposed to plant only the native species of plantations. In addition to augmenting present vegetation, it will also check soil erosion, make the ecosystem more diversified and functionally more stable, make the climate more conducive and restore balance. The following species are proposed for the plantations in the site. Adequate numbers of these species will be planted in the Landscape and along the boundaries of the site and along the either sides of the internal roads. Table 18:Proposed Plantation Within project Site Scientific Name Common Name Important Features Trees Proposed for border side plantation Albizia lebbeck Vakai Shady tree, yellowish green fragrant flowers Azadiracta indica Neem Large tree, good for roadside plantation Ailanthus excelsa Agal Large tree, good for roadside plantation Ficus retusa Indian Laurel Shady tree, good for roadside plantation Alstonia scholaris Elilaipalai Shady Tree, white fragrant flowers Pongamia pinnata Pungam Shady tree. Saraca asoka Sita Ashok Shady tree, yellowish green fragrant flowers Anthocephallus cadamba Vellai Kadambu Shady, large tree, ball shaped flowers. Page _ 71

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP

Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Project Location: S.No. 8/3/2, 8/3/3, Mundhwa, Tal- Haveli, Dist- Pune. Project Details: 1 Plot Area 14200 sqm

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.

Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd. Environment Management Plan of At Khasra No. 605 PTC Road, Village & Tehsil Narender Nagar, District Tehri Garhwal (Uttarakhand) Brief Features of the Project: Name of the Project Hotel & Resort Project

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Form-I for seeking clearance for project attracting CRZ notification

Form-I for seeking clearance for project attracting CRZ notification Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd.

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd. June 2015 FORM 1 FORM 1 Residential Development At S.No: 163/1, 163/2,164/2, Thalambur village, Thiruporur Taluk, Kanchipuram District. Project Proponent: M/s Casa Grande Private Limited Prepared By: EQMS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

FORM-1 A 1. LAND ENVIRONMENT

FORM-1 A 1. LAND ENVIRONMENT FORM-1A. FORM-1 A 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN

EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN Pact Real Estate Pvt. Ltd proposes at Construction project at Pirangut. Proposed project of Construction project is coming up in Pirangut, Tal. Mulshi. This area

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

Phosphorus. Phosphorus Lake Whatcom Cooperative Management. www.ecy.wa.gov/programs/wq/nonpoint/phosphorus/phosphorusban.html

Phosphorus. Phosphorus Lake Whatcom Cooperative Management. www.ecy.wa.gov/programs/wq/nonpoint/phosphorus/phosphorusban.html Phosphorus Phosphorus Brochure Lake Whatcom Cooperative Management Reducing Phosphorus Website Washington State Department of Ecology www.ecy.wa.gov/programs/wq/nonpoint/phosphorus/phosphorusban.html Nutrients

More information

CONCEPTUAL PLAN. For project namely: The ParkSyde

CONCEPTUAL PLAN. For project namely: The ParkSyde CONCEPTUAL PLAN For project namely: The ParkSyde by Khasara No. : 319/ 1 to 2, 320/ 8, 320/ 12-13, 321/8, 321/12-13, 343, 344/2, 345/1, 358/1-3, 359/1-3, Village : Kachna Tehsil : Raipur District : Raipur

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd.

1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd. ENVIRONMENTAL MANAGEMENT PLAN: 1. INTRODUCTION: Proposed Residential and Commercial development at S. No. 22/2, Pune by Goel Ganga Developers (India) Pvt Ltd. Proposed Buildings: The proposed development

More information

BASEMENT FLOODING. Prevention Guide for. Homeowners

BASEMENT FLOODING. Prevention Guide for. Homeowners BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result

More information

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.

SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank. SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn:-36000 TPa EnVirOnMEnT ManaGEMEnT PLan FOr M/S. LiME STOnE MinE OF dhirajlal PanChhanBhai VaChhani area (SUrVEY no.49 PaiKi, ViLL.Unadari, TaL.Una, dis.junagadh) PrOPOSEd PrOdUCTiOn:-36000 TPa PrOJECT COST: - 15

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Sildhara Flage Stone Quarry Area-.1.50,Hectare Kh No-87 At Village- Sildhara, Tehsil Panna, Distt.Panna MR.BRIJMOHAN SINGH S/O SHRI JAI RAM SINGH RESI-VILLAGE

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

CONCEPTUAL PLAN / ENVIRONMENTAL MANAGEMENT PLAN (PROPOSED COMMERCIAL BUILDING CONSTRUCTION PROJECT) Index

CONCEPTUAL PLAN / ENVIRONMENTAL MANAGEMENT PLAN (PROPOSED COMMERCIAL BUILDING CONSTRUCTION PROJECT) Index CONCEPTUAL PLAN / ENVIRONMENTAL MANAGEMENT PLAN (PROPOSED COMMERCIAL BUILDING CONSTRUCTION PROJECT) Index Description Section 1 Introduction 2 Project Site Description 3 Project Components 4 Water Requirement

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN 6. REHABILITATION AND RESETTLEMENT (R & R) PLAN Since the project is private land, there is no reserves forest or protected forest land within the applied area. There is no human settlements within the

More information

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

CHANDAM7AIL,P SAND DEPOSIT

CHANDAM7AIL,P SAND DEPOSIT 1 RVER SAND QUARRY 11 ENVRONMENT MANEGMENT PLAN OF CHANDAM7AL,P SAND DEPOST VLLAGE- GHAWDAWAL, TEHSHL- LAltEAR DSTRCT- BMTUD, STATE- MADHYA PRADESH (MASRL4 NO- 1, 10, 15, AREA- 5.975 Hectare APPLCANT Sub

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Type of Sewer Systems. Solomon Seyoum

Type of Sewer Systems. Solomon Seyoum Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Sri Krishna Phramaceuticals Ltd., (SKPL) Solapur has been incorporated with a main objective to manufacture Bulk Drug and Intermediates

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project. 1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Agariya Crusher stone Quarry Area-4.00,Hectare Kh No-141/3/1,141/4,141/5 At Village- Agariya, Tehsil: Gouharganj Distt. Raisen SHRI. ASHOK SHARMA S/O SHRI GANGAPRASAD

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia

Georgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia Georgia Department of Public Health Georgia Onsite Sewage Management Systems Background and Use of Onsite Wastewater Treatment Systems in Georgia Background On-site sewage management systems are designed

More information

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester.

Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications. klargester. Pollution Control NEW! NEW! Stormwater Attenuation Systems Sustainable Urban Drainage Solutions for Domestic & Commercial Applications klargester.com Stormwater Attenuation Systems Sustainable Urban Drainage

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,

More information

septic systems What is a Septic System? How does a Septic System Work?

septic systems What is a Septic System? How does a Septic System Work? septic systems What is a Septic System? A septic system is a private sewage treatment system. They are common in rural areas where there are no municipal sewage pipes for homes, farms, businesses or other

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Low Impact Development

Low Impact Development Low Impact Development for Linear Transportation Projects Disclaimer This project was developed through an Assistance Agreement under the U.S. EPA Office of Water 104 b(3) Program. It is intended for use

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI OF ABDUL MUNAF ABDUL KADAR SHAIKH (50 MT/DAY) (0-28-50 Hectors)

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

List of Documents. List of Annexure

List of Documents. List of Annexure List of Documents S.No. Description Page No. 1 Form I Application 1 to 15 2 Standard Template and Checklist 16 to 24 3 Form IA for Building & Construction Projects 25 to 35 4 Environmental Management Plan

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY

More information

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS

COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS At Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. ABDUL MUNAF MOHAMMEDMIYA MALEK Mr.Abdul Munaf Mohammedmiya malek (Proprietor) 2. Location address OPP Block

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management

Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management Steps taken by Delhi Government in arresting environmental degradation on all the fronts: Air, Water, Noise and Waste Management A. AIR POLLUTION: Air Pollution sources are Transportation, Industries and

More information

Solid Waste Treatment Facility Solid Waste Permit Application

Solid Waste Treatment Facility Solid Waste Permit Application Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Chapter 5.0. Stormwater Credits for Innovative Site Planning Chapter 5.0 Stormwater Credits for Innovative Site Planning Chapter 5. Stormwater Credits...Introduction 5.0 Stormwater Credits In Maryland, there are many programs at both the State and local level that

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan FOR BOULDER, GRAVEL AND SAND MINOR MINERAL Mine lease area: 13.20 Ha Village Mandlai Tehsil Raipur Rani, District- Panchkula and State - Haryana Category of Project: B2 Lease

More information