1 COMPREHENSIVE PROJECT REPORT FOR PROPOSED EXPANSION OF RESIDENTIAL APARTMENT PROJECT GREEN FIELDS At Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore. Submitted By M/s Shriprop Homes Pvt. Ltd., M/s Gardencity Realty Pvt. Ltd., and M/s Gardencity Homes, Bangalore. Submitted to State Environment Impact Assessment Authority, Karnataka. ENVIRONMENTAL CONSULTANTS M/s. AQUA TECH ENVIRO ENGINEERS, # 3391, 6 th Main, 3 rd Cross, RPC Layout, Vijayanagara II Stage, Bangalore Tele Phone: Fax: PROJECT REPORT

2 INDEX SL NO DESCRIPTION PAGE NO. 1 APPLICATION IN FORM I APPLICATION IN FORM I A ANNEXURE TO APPLICATIONS A B C D E F G H I J K L M N 0 COMPREHENSIVE PROJECT REPORT WATER REQUIREMENT DETAILS FOR THE PROJECT SEWAGE GENERATION, UTILITY OF TREATED SEWAGE & DESIGN DETAILS OF SEWAGE TREATMENT PLANTS WATER BALANCE CHART WATER REQUIREMENT AND SEWAGE DISPOSAL DURING CONSTRUCTION PHASE SOLID WASTE GENERATION & MANAGEMENT DETAILS (CONSTRUCTION & OPERATION PHASE) ENVIRONMENTAL MONITORING AND MANAGEMENT PLAN (EMP) FOR CONSTRUCTION AND OCCUPANCY PHASES RAIN WATER MANAGEMENT SCHEME DISASTER MANAGEMENT PLAN FOR PRE-CONSTRUCTION PHASE EMP FOR CONTROL OF DUST AND NOISE DURING CONSTRUCTION PHASE. RISK ASSESSMENT & MANAGEMENT PLAN GEO TECHNICAL INVESTIGATION REPORT TRAFFIC SURVEY AND ITS MANAGEMENT SAVINGS IN ELECTRICAL POWER CONSUMPTION PROJECT RELATED DRAWINGS/PLANS PROJECT REPORT

3 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: 1 Name of the Project Green Fields 2 S. No. in the schedule Serial No. 8 (b) of schedule 3 Proposed capacity/area/ length/tonnage to be handles/command area/lease area/number of wells to be drilled 31 PROJECT REPORT Expansion of Residential Apartment Project with addition of flats (710 units) and built up area 88, sq m EC Obtained: a) Flats: 935 units. b) Built up area: 1,46,372 sq m. Scenario after expansion: a) Flats: 1645 units b) Built up area: 2,34, sq m Additional Cost: Rs. 167 Crores Reference: SEIAA 123 CON 2014 dated New / Expansion / Modernization Expansion Proposal 5 Existing capacity / Area etc., EC Obtained: a) Flats: 935 units. b) Built up area: 1,46,372 sq m. 6 Category of project i.e., `A` or `B` B (Category B1) 7 Does it attract the general condition? NO If yes, please specify. 8 Does it attract the specific condition? NO If yes, please specify. 9 Location Green Fields Plot/Survey/Khasra No. Survey No.s 73/1, 73/2, 74 (P) & 81 Village Bommenahalli Village, Bidarahalli Hobli. Thesil Bangalore East Taluk District Bangalore State Karnataka

4 10 Nearest railway station/airport along with distance in Kms. Krishnarajapuram Railway Station and Kempegowda International Airport at about 12 Kms and 25 Kms respectively. 11 Nearest Town, City, District Headquarters along with distance in Kms. 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (Complete postal addresses with telephone nos. to be given) Nearest town. City & District Bangalore. Bangalore Metropolitan Region Development Authority, (BMRDA) #1, Ali Askar Road, Bangalore Phone number: Name of the applicants M/s. Shrivision Towers Pvt. Ltd., (GPA holder for M/s Gardencity Realty Pvt. Ltd., who had obtained EC for the project). 14 Registered address M/s. Shrivision Towers Pvt. Ltd., No. 40/43, 4th Cross Road, 8th Main Road, RMV Extension, Sadashivanagar, Bangalore Address for correspondence: M/s. Shrivision Towers Pvt. Ltd., Name Designation (Owner/Partner/CEO) Address Mr. Ravindra Kumar Pandey GM - Finance As above Pin Code Bangalore E mail pandey@shriramproperties.com Telephone No Fax No Details of alternative Sites examined, Village District State if any. Location of these sites would 1. be shown on a topo sheet. No alternative sites are examined. 17 Interlined Projects NA 18 Whether separate application of NA interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason Proposed project is Expansion of Residential Apartment Project 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given 32 PROJECT REPORT

5 a) The Forest (Conservation) Act 1980? b) The wildlife (Protection) Act, 1972? c) The C R Z Notification, 1991? NO NO NO 22 Whether there is any Government Order/Policy relevant/relating to the site? 33 PROJECT REPORT None 23 Forest land involved (Hectares) None 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders/directions of the court, if any and its relevance with the proposed project. None Screening Category: The proposed project is under Item 8 B (Category B1) as per amended EIA notification September 14 th Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (ii) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sl. No. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes /No Details thereof (with approximate quantities/rates, wherever possible) with source of information data Yes The project is designed in concurrence with the Bangalore Metropolitan Region Development Authority (BMRDA) and therefore there will not be any permanent or temporary changes in land use, though the proposed project is likely to increase the intensity of land use. 1.2 Clearance of existing land, No The proposed project site was a vegetation and buildings? barren, vacant land. 1.3 Creation of new land uses? No Creation of new land uses from the proposed project is not expected as

6 the intended use of the plot is for the Residential Apartment. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical investigation report is enclosed as Annexure L. 1.5 Construction works? Yes The proposed project mainly involves construction activities. These activities are likely to have certain impact on the surrounding environment in respect of Air, Water, Land etc., The associated impact of construction activity on the above environmental attributes and the mitigation measures adopted in the project is appended as Annexure G. 1.6 Demolition works? No There is no demolition work involved in the proposed project site. 1.7 Temporary sites used for construction works or housing of construction workers? (Details of labour camps, Number of labours, Number of toilets, Bath rooms, Medical facilities for labours, safety measures for labours, Nursery for labours children) Yes About 700 construction workers will be engaged during peak construction activities. 100 Sheds and 70 Toilets with bathrooms are provided for construction workers. Sheds for construction workers are provided within the project site. Drinking water supply and adequate storage facility is provided for construction workers. The workers are provided with first aid facilities apart from personal protective gadgets. Periodic health assessment camps and administration of medicines as and when required will be provided. A small class room with a teacher (crèche) to educate the children of construction worker will be provided. 34 PROJECT REPORT

7 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations (Calculation for earth work estimation) Yes Both basement and above ground structures are proposed. The proposed project involves Construction of Residential Apartment. Activity, Area statement and Building Configuration details of the project is detailed in the Comprehensive project report appended as Annexure - A. The total quantity of excavated soil is about 90,000 cum. About 26,000 cum will be used for landscape development, 35,000 cum will be used for backfilling and 29,000 cum will be used for formation and hardscaping activities within the project site. 1.9 Underground works including mining No NA or tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing No NA processes? 1.14 Facilities for storage of goods or Yes Temporary sheds are constructed for materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 35 PROJECT REPORT Yes storage of construction materials. Liquid waste: The liquid waste from workers camps is treated in Package STP and reused for dust suppression / construction activities. Water requirement for the Construction phase is appended as Annexure - E. Sewage Treatment Plant (STP) of total capacity 1150 KLD (650 KLD KLD) will be constructed to treat the wastewater generated from the project during occupancy phase. Quantity of wastewater generation

8 and design details of STP is appended as Annexure C. Solid Waste: Construction Phase: The domestic wastes is segregated and collected at a common designated place and will be composted and used as manure. Solid waste like construction debris generated during construction phase of about 1000 cum will be used for preparation of sub grades for Roads, Pavements and Pathways Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 36 PROJECT REPORT Yes No No No No Occupancy Phase: Collection and segregation at the source of generation and Organic Waste will be treated in Organic Converter and the Inorganic Waste will be sent for recycling. The solid waste generation detail is appended as Annexure F. No long term housing plan for the operational worker is planned in the proposed project as the local population residing in the surrounding areas of the project site will find the employment opportunity for various maintenance needs of the project once it is occupied. NA NA NA NA

9 1.21 Impoundment, damming, culver No NA ting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No NA 1.23 Abstraction or transfers of water form ground or surface waters? Yes Water supply for the project is from Mandur Gram Panchayat Sources Changes in water bodies or the land No NA surface affecting drainage or runoff? 1.25 Transport of personnel or materials Yes Transport facilities are not proposed for construction, operation or as the workers will be provided with decommissioning? sheds to be located within the project site Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? No No Yes The impacts due to the movement of vehicle both during construction and occupancy phase is detailed in the Traffic Management studies appended as Annexure M. NA NA There will be Influx of population during the construction and occupancy phase as detailed under. Temporarily during construction phase (700 numbers) and permanent during occupancy phase (8225 numbers) are expected Introduction of alien species? No NA 1.30 Loss of native species or genetic No NA diversity? 1.31 Any other actions? No NA 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sl.No Information/checklist confirmation Yes/ No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) Yes The proposed project site is converted for residential purposes. The net site area is 7.88 Hectares. 37 PROJECT REPORT

10 2.2 Water (expected source & competing users) unit: KLD 2.3 Minerals (MT) No NA 2.4 Construction material stone, aggregates, sand / soil (expected source MT) Yes The water for the proposed project will be from Mandur Gram Panchayat Sources. Total water requirement is about 1224 KLD Yes Description Unit Quantity Cement Bags Steel MT Sand Cum Tiles sq m Stone Aggregate cum Granite/Marble sq m Aluminium sq m Wood sq m Forests and timber (source MT) Yes Procured through local timber depots. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Yes No Power Requirement: Construction phase: Temporary power from BESCOM to operate construction machinery and Lighting for workers shed is 250 kva One DG Set of 250 kva capacity is used to serve as back up power supply during power failure. Occupancy phase: Anticipated power requirement from BESCOM is 5000 kva EC is obtained for DG set of 1 X 1250 kva capacity DG set. Further one more additional DG set of 1 X 1250 kva capacity will be installed, which will serve as back up power supply during power failure. Fuel Requirement: Construction phase: Low Sulphur content Diesel consumption is 50 L/hr for each DG set of 1250 kva capacity Occupancy phase: Low Sulphur content Diesel of 250 L/hr for each DG set. NA 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. 38 PROJECT REPORT

11 Sl.No Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? Yes /No No No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data NA NA The implementation of the proposed project is beneficial both socially and economically to its local populace, as it creates both long term and short term employment opportunities. 3.4 Vulnerable groups of people who No NA could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No NA 4. Production of solid wastes during construction or operation or Decommissioning (MT/Month) Sl.No Information/Checklist confirmation 39 PROJECT REPORT Yes /No 4.1 Spoil, overburden or mine wastes No NA 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Details thereof (with approximate quantities/rates, wherever possible) with source of information data Yes The quantity of solid waste generation and its management during construction and occupancy phase is appended as Annexure F. Yes Spent oil from DG sets category 5.1. About 250 to 300 L/Annum of spent oil is generated which is sent to authorized spent oil reprocessor with manifest as per notification of

12 4.4 Other industrial process wastes No NA 4.5 Surplus product No NA 4.6 Sewage sludge or other sludge from effluent treatment No Hazardous Waste (Management and Handling Rules). The secondary dewatered STP sludge is 414 kgs/day and is taken from Plate and Frame Filter Press and used as manure. 4.7 Construction or demolition wastes Yes There is no demolition work involved in the proposed project and all efforts will be made to reduce construction waste by adopting modern construction practices such as proportioning and weigh batchers for concreting. 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials No Yes 4.10 Agricultural wastes No NA 4.11 Other solid wastes No NA Construction debris of about 1000 cum is generated which will be used as preparatory materials for road, pavement and sub grade formation within the project site. NA Measures adopted to control soil contamination. 1. Providing collection trays to collect oil dripping from construction machineries if any. 2. Prevention of spillage and leakage of oils if required. 3. Providing kerb stones, lined gutter and oil traps. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sl.No Information/Checklist confirmation 40 PROJECT REPORT Yes /No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

13 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes No There is no other source of emission from the project other than from stationary sources like DG sets to be installed during occupancy period. NA Yes Fugitive dust due to movements of vehicles carrying construction materials. Proposed measures for control of dust and noise during construction phase is appended as Annexure - J. Yes Fugitive dust during earthwork, concreting, construction material handling. Closed operations for mixing of construction materials will be followed. Yes Fugitive dust due to handling of construction materials. Emission of fugitive dust will be controlled by sprinkling of water and barricading will be provided all around the project site. Details of control of Dust and Noise during construction phase is appended as Annexure J. 5.6 Emissions from incineration of No NA waste 5.7 Emissions from burning of waste in No NA open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No NA 6. Generation of Noise and Vibration, and Emissions of Light and Heat: Sl. No. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, Yes/ No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data Operation of DG set during occupancy phase. 41 PROJECT REPORT

14 crushers Appropriate and adequate noise control measures will be adopted to control noise. DG Sets are set-up in room with acoustic enclosures. Further noise attenuation by way of planting peripheral trees as noise barriers. 6.2 From industrial or similar No NA processes 6.3 From construction or demolition No Noise generation due to construction activities will be negligible and barricades will be erected all round the site. Details of control of Noise during construction phase are appended as Annexure J. However there is certain increase in ambient noise level during construction activities which will be reduced by under taking periodic preventive maintenance of construction materials and restricting and reducing the speed of vehicle operated for the movements of construction materials. All appropriate measure as detailed for 6.1 above is applicable. 6.4 From blasting or piling No NA 6.5 From construction or operational traffic Yes Construction phase: Vehicles carrying construction materials Occupancy phase: Vehicular movement by the occupants. The details of mitigation measure planned to reduce the noise level is appended as Annexure - G. 6.6 From lighting or cooling systems No NA 6.7 From any other sources No NA 7.Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Sl. No. Information/Checklist confirmation Yes /No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 42 PROJECT REPORT

15 7.1 From handling, storage, use or spillage of hazardous materials Yes Appropriate management measures to prevent contamination of land, water are detailed in Annexure - G under water and land environment. 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Yes No 7.4 From any other sources No NA Disaster management plan for Pre construction phase is appended as Annexure I The total quantity of wastewater generated from the proposed project is about 1,103 KLD. The treated sewage from the project will be used for landscape development and toilet flushing. Water Balance Chart is appended as Annexure D. NA 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No NA 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Sl. No. Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes /No No Details thereof (with approximate quantities/rates, wherever possible) with source of information data NA 43 PROJECT REPORT

16 8.2 From any other causes No No major risk from the project is anticipated. Risk Assessment & Management Plan for the project is appended as Annexure K 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. Floods, earthquakes, landslides, cloudburst etc)? No NA 8. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Sl. No L 9.1 Information/Checklist confirmation Lead to development of supporting. Utilities ancillary development or development stimulated by the project which could have impact on the environment e.g.: Yes /No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Net Positive Impact in terms of overall development of the Area is expected from the project. Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc.) Yes Direct & Indirect Employment opportunities are also created due to development of this project. New business opportunities are expected to cater the daily needs of the residence of the project. housing development Yes Expansion of Residential apartment project with addition of flats (710 units) and built up area 88, sq m extractive industries No supply industries No other No 9.2 Lead to after-use of the site, which No NA 44 PROJECT REPORT

17 could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes No The project development is likely to set precedence to other likely developments in the surrounding area. NA (II) Environmental Sensitivity: Sl. No. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses other water bodies, coastal zone, biospheres, mountains, forests. 45 PROJECT REPORT Name/ Identity 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground No NA waters 5 State, National boundaries No NA 6 Routes or facilities used by the public No NA for access to recreation or other tourist, pilgrim areas 7 Defense installations No NA 8 Densely populated or built-up area No NA 9 Areas occupied by sensitive man-made No NA land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality No NA No Aerial distance (within 15 km.) Proposed project location boundary NA Yes Water bodies: Lagumenahalli lake (at about 70 m on North East Direction), Hosakote lake (at about 1.3 Km on East Direction) and Katamnallur lake (at about 1.75 Km on South Direction) No NA

18 or scarce resources(ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problem (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) No No NA NA 46 PROJECT REPORT

19 47 PROJECT REPORT APPENDIX II (See paragraph 6) FORM-1 A (Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring program) 1. LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority be submitted) Attach Maps of (i) (ii) site location (Google Image showing the project site location with surrounding details is enclosed) surrounding features of the proposed site (within 500 meters) (iii) The site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The existing land use does not get altered significantly as the project surroundings have Residential Apartments, Layouts and areas with rural settings. Surrounding Features: Google, Location map of the project site is enclosed as Annexure - O. Land Availability & Land use Pattern: The plot area of the project is 78, sq m. Land Use Pattern: The land around the project site indicates a mixed land use pattern; there are Residential Apartments, Layouts and areas with rural settings. Transportation: Project site is located at a distance of about 1.5 Kms from NH 4 (Bangalore Hosakote Road) on South direction. Agricultural Land: Areas around the project have few plantations, and agricultural lands are seen in the surrounding areas of the site. The site is surrounded by villages / areas like Bommenahalli,

20 Bendiganahalli, Lagumenahalli, Huskur, Katamnallur, Kodigehalli Raghuvanahalli etc., Forest: Bannerughatta National Park is at a distance of about 30 Km from site. 1.2 List out all the major project requirements in terms of the Water Bodies: Lagumenahalli lake (at about 70 m on North East Direction), Hosakote lake(at about 1.3 Km on East Direction) and Katamnallur lake (at about 1.75 Km on South Direction) 78, sq m (19.48 Acres) Total Plot Area Built up area, Water consumption, Power requirement, 2,34, sq m (After Expansion) 1,224 KLD (After Expansion) The power required for the proposed project will be supplied by BESCOM which is about 5000 kva. connectivity, community facilities, Project site is located at a distance of about 1.5 Kms from NH 4 (Bangalore Hosakote Road) on South direction. Parking needs etc., 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). Total parking provided: 1736 numbers. Parking details & drawing is appended as Annexure O. No ecological disturbance is anticipated. 48 PROJECT REPORT

21 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc., may be given). 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork involved in the construction activitycutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) 1.7 Give details regarding water supply, waste handling etc., during the construction period. 1.8 Will the low lying areas & wetlands get altered?(provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris & waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal) Geotechnical Investigation report of the project site is enclosed as Annexure L. No The survey/contour map of the project site is appended as Annexure O. The total quantity of excavated soil is about 90,000 cum. About 26,000 cum will be used for landscape development, 35,000 cum will be used for backfilling and 29,000 cum will be used for formation and hardscaping activities within the project site. Sewage generated from construction workers camp will be treated in Package STP. No Construction debris 1,000 cum will be used for road formation activities in the project site. The details of solid wastes generated by the construction workers is appended as Annexure F. 2. WATER ENVIRONMENT: 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish Domestic water requirement is 1,224 KLD which will be sourced from Mandur Gram Panchayat Sources. The details of source of water supply and basis of calculations is 49 PROJECT REPORT

22 a water balance statement. appended as Annexure - B. 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can be met from the recycling of treated wastewater? The water balance chart is appended as Annexure D. Details are applicable as above. The expected domestic water requirement is 1,224 KLD and will be augmented through Mandur Gram Panchayath Sources. The proposed project envisages the utility of treated sewage for recycling purposes by way of using it for flushing of toilets and gardening. (Give the details of quantities, sources and usage) The total quantity of treated sewage available in the project is 1,103 KLD Toilet Flushing (Recycled): 371 KLD 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) Water balance chart Furnished as Annexure D No The Raw sewage generated from the proposed activity will be treated to tertiary level and the residual organics in the treated wastewater will be practically nil, the treated sewage will be reused, therefore incremental pollution load is not anticipated. Details of wastewater quality and quantity and design details of STP (total capacity of 1,150 KLD) and flow chart is appended as Annexure 50 PROJECT REPORT

23 C. 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. 2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? Rain Water Harvesting Potential from apartment: 267 KLD Details furnished as Annexure H Adequate and optimal internal storm water drains are created to handle the internal runoff and convey it to external drains. The detailed drawing for internal storm water management is appended as Annexure O. 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) As the ground water potential is likely to increase due to ground water recharging. The groundwater recharging scheme is planned in the project. Storm water Management drawing is enclosed as Annexure O What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) Runoff contamination from the proposed project is reduced by providing lined gutter for carrying runoff from construction areas and Kerb Stones and bunds to prevent Runoff Contamination. Preventing the mixing of storm water runoff and sewage from labour camps. Use of leak proof containers for storage of oil to avoid contamination of runoff. 51 PROJECT REPORT

24 2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) 2.12 Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) The storm water is channalised through storm water drains to finally join ground water recharge pits and the excess Storm Water free from runoff Contamination will be let to External Drains. Sewage generated from the construction workers camp will be treated in Package STP What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal) 2.14 Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use. Sewage Treatment Plant is proposed for treatment of domestic sewage from the project and the quantity of wastewater, design details with unit capacity and technology adopted with disposal options is appended as Annexure C. Dual piping system is proposed to reduce the fresh water consumption. Dual piping system drawing is appended as Annexure O. 3. VEGETATION: 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with it s unique features, if any) 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features No The proposed project site has vegetation and will be cleared. An area of about 24,111 sq m is left for development of landscape. The Ground Coverage area is about 52 PROJECT REPORT

25 (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) 18, sq m The Paved area is 30,138 sq m The Land use pattern scheme of the proposed project is detailed in the Comprehensive Project report appended as Annexure A Drawing showing the details of Landscaping and other features is appended as Annexure O 4. FAUNA: 4.1 Is there likely to be any displacement of fauna- both terrestrial and aquatic or creation of barriers for their movement? Provide the details. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. 4.3 Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna No No No 5. AIR ENVIRONMENT: 5.1 Will the project increase atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. DG sets are the only air pollution source of the project. The DG sets will be provided with adequate stack height to disperse the emissions into the atmosphere. NA 53 PROJECT REPORT

26 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. Adequate parking facilities are proposed to be provided as per the local building by law. The parking plan showing the entry & exit to the project site with traffic management is enclosed as Annexure - O. Traffic management study is appended as Annexure M. Site plan with roads, pedestrian pathways and paved areas of the project is enclosed as Annexure O Details of noise mitigation measure proposed is appended as Annexure G The DG sets will be provided with acoustic enclosures to reduce the noise level < 55 db 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. NA The surrounding areas of the project Software Tech Parks, Industries, Residential Apartments, Commercial Establishments and surrounded by villages / areas like Bommenahalli, Bendiganahalli, Lagumenahalli, Katamnallur, Huskur, Kodigehalli Raghuvanahalli etc., The local byelaw of Bangalore Metropolitan Region Development Authority (BMRDA) is considered in designing the project. 54 PROJECT REPORT

27 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered. 6. AESTHETICS: No 7. SOCIO-ECONOMIC ASPECTS: 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. 7.2 Give details of the existing social infrastructure around the proposed project. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? Once the project is completed approximately about 8225 people are expected in the building. Surrounded by Residential layouts, apartments and areas with rural settings. NA 8. BUILDING MATERIALS: 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) The proposed project construction materials are selected to conform the building energy efficiency norms and as well as Energy Conservation Building Code Guidelines The following measures are taken to for conserving the energy 1. Solar powered street lighting for common areas. 2. LED bulbs, lights and fixtures for common areas 3. Proper sizing of cables with less voltage drop so that losses in cables can be minimized 4. Optimal pumping of water using water level controllers, switching on/off of street lights with photo cell /time switch. 55 PROJECT REPORT

28 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. 5. Procuring graded electrical appliances which helps in high energy conservations. 6. Timer control for external lighting 7. LED type street lighting fixtures instead of high power sodium vapor light fixture. Details appended as Annexure G The construction waste and debris (1000 cum) from the project will be used in road and pavement formation The solid Wastes generated are segregated at its point of generation, collected and stored at a common designated place and Organic solid waste will be treated in an organic converter and product will be used as manure for Landscape or used as fuel. The inorganic solid waste is proposed to be recycled. The details of quantity of solid waste generated is appended as Annexure F 9. ENERGY CONSERVATION: 9.1 Give details of the power requirements, source of supply, backup source etc. The power required for the project is about 5,000 kva and will supply from BESCOM. What is the energy consumption assumed per square foot of built-up area? Yes, Energy conservation methods are adopted. Non Conventional Sources of Energy with Solar Street Lighting and Solar Hot 56 PROJECT REPORT

29 Water Generation. How have you tried to minimize energy consumption 9.2 What type of, and capacity of, power back-up to you plan to provide? 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Terrace floor plan showing the location of solar panels and tanks is appended as Annexure O. The project will be provide with 2 X 1250 kva (EC obtained for 1 DG set and additional DG set is proposed) capacity DG sets to serve as alternative source of power supply in case of break down of power from BESCOM. Occupancy phase: Low Sulphur content Diesel consumption of 250 L/hr for each DG set. Low emission and low solar heat gain Single glazed with aluminum frame are proposed to be used for windows etc., U = 5.7 W/m 2 0 C < 6.922W/m 2 0 C SHGC = 0.4 Passive solar architectural features are considered while designing the buildings in respect of orientation of building thermal insulation aspects for wall with fenestration & roof is considered as per ECBC 2007 Guidelines viz., Balconies, Projections, Recessed window etc., Yes Solar hot water facilities and Solar panels for Street lighting are proposed to be adopted. Terrace floor plan with solar panel, numbers, capacity details is appended as Annexure O. As per ECBC Guidelines the thermal transmittance (U) value = W/m 2-0 C for roofs 57 PROJECT REPORT

30 Roof? How much energy saving has been effected? 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans If you are using glass as wall material provides details and specifications including emissive and thermal characteristics. Yes, Passive solar architectural features are considered while designing the project in respect of orientation of building with natural light and ventilation The Low loss energy efficient transformers, LED s, Ballets, variable frequency drives for motors for low power consumption are proposed. Variable frequency drive is used for motor and pumps in order to reduce the energy consumption. None None For Roof: U 0.34 W/m 2-0 C < W/m 2-0 C For Walls: U-Value = 0.42 W/m 2 0 C < W /m 2 0 C For Vertical Fenestration: U-Value = 5.7 W /m 2 0 C < W/m 2 0 C and Max. SHGC : 0.40 The building is designed in compliance with fire and safety norms and the NOC is obtained from Fire Fighting Department. Static Fire water tank as per the regulations is proposed, wet risers and sprinklers provided as per the Fire Fighting Norms. Low E glasses are considered and as per the details furnished above. 58 PROJECT REPORT

31 9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. NA Solar hot water facilities and Solar Street lighting system are proposed. 10. Environment Management Plan: 10.1 The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Wet risers/down riser, fire alarm system, automatic sprinklers system, and portable fire extinguishers are proposed in case of fire accidents. Details of mitigation measures to minimize adverse environmental impacts during construction and operation phase of the project is appended in Environmental Monitoring plan is enclosed as Annexure G. I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the Project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: Place: Bangalore RAVINDRA KUMAR PANDEY, GM - Finance, M/s. SHRIVISION TOWERS PVT. LTD., 40/43, 4th Cross Road, 8th Main Road, RMV Extension, Sadashivanagar, Bangalore PROJECT REPORT

32 Annexure & Details to Application in Form 1 and Form 1A 60 PROJECT REPORT

33 ANNEXURE A COMPREHENSIVE PROJECT REPORT PROJECT AT GLANCE PROPOSED PROJECT Expansion of Residential Apartment Project with addition of flats (710 flats), built up area 88, sq m LOCATION TOTAL PLOT AREA EC Reference: Environmental Clearance obtained from SEIAA vide letter No. SEIAA 123 CON 2014 dated for apartment with 935 flats and built up area 1,46,372 sq m., Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore District. EC obtained: 78,812 sq m (19.69 Acres) TOTAL BUILT UP AREA EC obtained: 1,46, sq m TOTAL COST OF PROJECT (EXPANSION PROPOSAL) NO. OF FLOORS PROPOSED Proposed Addition: After Expansion: 88, sq m 2,34, sq m Expansion Cost: Rs. 167,00,00,000/- (Rupees One Hundred and Sixty Seven Crores Only) 1) EC Obtained: c) Activity: Residential Apartment. d) Flats: 935 units. e) Built up area: 1,46,372 sq m. f) Plot area: 78,812 sq m. g) Number of buildings: 1 Building (6 Towers) h) Configuration: 6 Tower viz., A to F comprising of 2 Basements, Ground and 19 Floors. 61 PROJECT REPORT

34 62 PROJECT REPORT 2) Proposed Addition: a) Activity: Residential Apartment. b) Flats: Addition of 710 flats c) Built up area: Addition of 88, sq m d) Number of buildings: Addition of 1 Building (3 Towers) e) Configuration: Proposed Building 2 consisting of 3 towers namely G, H and J comprising of 2 Basements, Ground and 19 Floors. 3) Scenario after expansion: c) Activity: Residential Apartment d) Flats: 1645 units e) Built up area: 2,34, sq m i) Plot area: 78,812 sq m. f) Number of Buildings: 2 Buildings (and 9 Blocks) g) Configuration: Building 1 comprises of Towers viz., A to F consisting of 2 Basements, Ground and 19 Floors and Building 2 comprises of Towers viz., G, H and J consisting of 2 Basements, Ground and 19 Floors. CAR PARKING DETAILS Existing building : 1001 cars Proposed building : 735 cars Total after expansion : 1736 cars WATER SUPPLY PROPOSED SANITATION SOLID WASTE MANAGEMENT AIR POLLUTION/ NOISE GENERATION SOURCE The water supply is from Mandur Gram Panchayat Sources EC is obtained for STP of 650 KLD capacity. Proposed Expansion: Additional STP of 500 KLD capacity will be established for proposed blocks. After Expansion: 1 X 650 KLD and 1 X 500 KLD. Collection and Segregation at source of generation and the Organic waste treated in Organic Converter and the Inorganic Waste will be sent for recycling. i) EC obtained: 1 X 1250 kva capacity DG set. ii) Proposed Expansion: Addition of 1 X 1250 kva capacity DG Set. iii) After expansion: 2 X 1250 kva capacity DG sets. with acoustics are proposed to be provided with adequate stack height.

35 BACKGROUND OF THE PROPOSED APARTMENT PROJECT: M/s Gardencity Realty Pvt. Ltd., # 845, 5 th Cross, 10 th Main, 2 nd Stage, Indiranagar, Bangalore had obtained Environmental Clearance (EC) for the Residential Apartment Project at Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore. Subsequently, M/s. Gardencity Realty Pvt. Ltd., have given General Power of Attorney (GPA) and Development Agreement (DA) to M/s. Shrivision Towers Pvt. Ltd., No. 40/43, 4 th Cross Road, 8 th Main Road, RMV Extension, Sadashivanagar, Bangalore Presently, M/s. Shrivision Towers Pvt. Ltd., intend to expand the Residential Apartment with addition of flats (710 units) and built up area 88, sq m. Environmental Clearance has been obtained for the project from State Level Environment Impact Assessment Authority (SEIAA), Karnataka vide Letter No. SEIAA 123 CON 2014 dated LAND USE PATTERN FOR THE PROJECT: Sl. Particulars EC Obtained After Expansion No. Area Percentage Area Percentage sq m Acres (%) sq m Acres (%) 1 Total Plot 78, , Area 2 Road 7, , Widening Area 3 Future Development Area 8, Presently, buildings are added in this area with few changes in other areas also 4 Net Plot Area 63, , Ground 9, , Coverage Area 6 Paved area 28, , Landscape area 25, , PROJECT REPORT

36 AREA STATEMENT FOR THE PROJECT: Sl. no Description 1 Lower Basement Floor 2 Upper Basement floor Built up area in sq m EC Obtaining (Building 1 Tower A to F) Proposed Expansion (Building 2 Tower namely G, H and J) Total 12, , , , , , Ground floor 9, , , First floor 10, , , Typical floor 1,02, , X 18 = 1,60, (Second to Nineteenth floor) 57, Terrace floor Total 1,46,372 (935 flats) 88, (710 flats) 2,34, (1645 flats) CAR PARKING STATEMENT: Sl. Description EC Obtained Proposed Addition After Expansion No. 1 Lower Basement 377 cars cars 2 Upper Basement 383 cars cars 3 Ground Floor 241 cars cars 4 Total parking spaces 1,001 cars 735 1,736 cars 64 PROJECT REPORT

37 COMPARITIVE SUMMARY OF THE PROPOSED EXPANSION PROJECT: Sl. Description PROJECT DETAILS No EC Obtained Project After Expansion Project M/s. Gardencity M/s. Shrivision Proponents Realty Pvt. Ltd., Towers Pvt. Ltd., 1 Project location, Survey No.s 73/1, 73/2A, 74 (P) & 81, Bommenahalli Village, Bidarahalli Hobli, Bangalore East Taluk, Bangalore. Remarks GPA and DA given for development No Change 2 Activity 935 Flats 1645 Flats Flats 3 Total Plot Area 78,812 sq m 78,812 sq m No change 4 Total Built up 1,46,372 sq m 2,34, sq m +88, sqm area 5 Total Number of blocks 1 Building (6 Towers viz., A to F) 2 Buildings ( 9 Towers A to J) 6 Building Configuration 7 Number of Occupants in the project 8 Water consumption 9 Wastewater discharge 10 Sewage Treatment Plant 11 Solid waste generated 2 B + G + 19 Floors Building 1: B + G + 19 Floors, Building 2: B + G + 18 Floors and Addition of 1 Building (3 Towers namely G, H and J) Addition of Building 2 4,675 persons 8,225 persons +3,550 persons 696 KLD 1,224 KLD KLD 627 KLD 1,103 KLD KLD 650 KLD 650 and 500 KLD KLD 1870 Kg/day 3290 Kg/day Kg/day 12 DG capacity 1 X 1,250 kva 2 X 1,250 kva + 1 X 1,250 kva 13 Total no. of 1,001 cars 1,736 cars cars Parking Proposed 65 PROJECT REPORT

38 AIR POLLUTION SOURCES & ITS MANAGEMENT: The anticipated power required for the project (about 5,000 kva) will be supplied from BESCOM. The primary sources of air pollution from the establishment are from the operation of diesel generator sets. The project will be provided with DG set of following capacity and is installed to serve as an alternative back up source of power supply in the event of breakdown of power supply BESCOM. The details of capacities & fuel consumption for the DG sets are given below. Air Pollution Sources for the Proposed Project: Sl. Stack Details Stack Attached to No Physical Details D.G Set 1 Capacity EC obtained: 1 X 1,250 kva Proposed addition: 1 X 1,250 kva Total after expansion: 2 X 1,250 kva 2 Fuel quantity 250 L/hr for each DG set 3 Fuel used Ultra Pure Low Sulphur Content Diesel 4 Stack height Chimneys (Above roof level) of 8m for each DG set. 5 Stack diameter 80 mm Emission Details 1 Sulphur dioxide g/s 2 Suspended Particulate g/s Matter (SPM) 3 Oxides of Nitrogen g/s NOISE GENERATION SOURCES: Major noise producing sources of the project is expected to be from DG set, Vehicular movements from and to the proposed project. The DG sets are provided with acoustic enclosures to control the noise levels in such a way that the noise levels are within the permissible limits specified for ambient noise levels. More over the DG set is operated only during the emergencies when there is power failure. 66 PROJECT REPORT

39 PROJECTED COST OF THE PROJECT: The total projected cost of the proposed expansion proposal Sl. Particulars Cost in Rupees No. 1. Construction rate of 1750/Sft of built up area Rs. 166,56,68,847/- (Additional built up area 88, sq m) TOTAL Rs. 166,56,68,847/- Or say Rs. 167,00,00,000/- Rupees One Hundred and Sixty Seven Crores Only 67 PROJECT REPORT

40 ANNEXURE: B SOURCE OF WATER FOR THE PROPOSED PROJECT: The most important aspect under the water supply scheme is the selection of source of Water, which should be reliable and potable. The source of water supply to the proposed project is through Mandur Gram Panchayath Sources. DETAILS OF WATER CONSUMPTION OF THE PROJECT: The apartment being a residential one, water demand is for domestic purpose, public uses and fire fighting purposes. It includes the quantity of water required in the houses for drinking, bathing, cooking, washing etc., The quantity of water required for domestic purposes depends on the habits, social status, climatic conditions and customs of the people. In India on an average the domestic water consumption under normal conditions is about 135 litres/capita/day as per National Building Code (NBC), the details of domestic consumption is as follows Sl. No. Utility Consumption in Litres per Capita per day 1 Drinking 5 2 Bathing 55 3 Cooking 5 4 Washing of clothes 20 5 Utensils washing 10 6 Washing of floor 10 7 Flushing of Toilets 30 Total 135 The anticipated water demand is worked out by taking into consideration that the project is fully developed and the residents have fully occupied their respective flats. 68 PROJECT REPORT

41 WATER CONSUMPTION DETAILS OF THE PROJECT: Sl. No. Description Number of Flats (a) Total number of occupants* Water requirement** (b X 135 = c) 10% extra for visitors (10% of c = Total water requirement (c + d = e) (a X 5 = b) d) 1 EC 935 4,675 6,31,125 L/day 63, KLD obtained or say 632 KLD L/day or say 64 KLD 2 Proposed 710 3,550 4,79,250 L/day 47, KLD Expansion or say 480 KLD L/day or say 48 KLD 3 Total ,225 1,112 KLD 112 KLD 1,224 KLD *Considering population as 5 persons per flat. **Considering water demand of 135 LPCD. WATER DISTRIBUTION SYSTEM: The proposed water supply scheme to cater to the public and domestic water requirement of the proposed project consists of sourcing potable water to a common collection facility known as the Raw Water Sump. The Raw Water Sump will be constructed in RCC. The water from the UG sump will be pumped to overhead tank. The OHTs will be staged on terrace depending on the contour of its distribution network. 69 PROJECT REPORT

42 ANNEXURE: C 1. SEWAGE GENERATION AND DISPOSAL SYSTEM: Wastes of different type such as spent water from bath rooms, water closets/pans, house and street washings, semi liquid waste of human excreta, dry refuse of house and street sweepings, broken furniture, crockery etc., are produced daily. If proper arrangement for collection treatment and disposal of all the wastes produced are not made, unsanitary conditions will develop and it will become impossible for the public to live. Therefore, it is most essential to collect, treat and dispose all the sanitary waste produced. Generally, it has been observed that about % of the water supplied comes out as sewage. Therefore, the total quantity of wastewater generated from the proposed Project is worked out as below. Sl. Description Water requirement Wastewater generated* Capacity of No. (a) (90% of a = b) STP 1 EC obtained 696 KLD or say 627 KLD 650 KLD 2 Proposed 528 KLD or say 476 KLD 500 KLD Expansion 3 Total 1,224 KLD 1,103 KLD 650 and 500 KLD (*Assuming 90 % of the water supplied comes out as wastewater) Domestic wastewater generated from the proposed project will be conveyed to Sewage Treatment Plant (STP) of capacity 650 and 500 KLD for treatment and disposal. EC has been obtained from SEIAA, Karnataka for STP of 650 KLD capacity. Further, in the Expansion proposal Additional STP of 500 KLD capacity will be established for proposed blocks. Further, after Expansion the project shall consist STPs of 1 X 650 KLD and 1 X 500 KLD capacity. 70 PROJECT REPORT

43 TREATED SEWAGE DISPOSAL: The quantity of treated sewage generated from the project is 1,103 KLD. The treated sewage will be disposed as under: a. Toilet Flushing: Total contribution population from the proposed project is 8225 Persons. Toilet flushing water requirement at the rate of 45 LPCD = 8,225 X 45 = 3,70,125 L/day or say 371 KLD b. Gardening: Treated water used for rate of 7 L/ sq m /day Area available for landscape development: 24,111 sq m Total water used for landscape development is 24,111 x 7 = 1,68,777 L/day Or say 169 KLD c. Excess quantity of 563 KLD will be used for: I. Car washing : 1736 X 35 = 60,760 L/day or say 61 KLD II. Road washing : 30,139 X 1 litre/sq m/day = 30,139 L/day or say 31 KLD III. Other construction projects/ watering avenue plantations = 471 KLD DESIGN DETAILS OF STP AND TREATMENT METHODOLOGY ADOPTED: In the project Two Sewage Treatment Plants (STP) of capacity 650 and 500 KLD are proposed to treat the wastewater generated from the project. The 650 KLS STP will be established as per the techicnial details submitted during obtaining EC for the project. Design details of 500 KLD STP is presented below: Treated water specifications as per KSPCB standards: Treated Sewage Standards: Treated Sewage ph : 6-9 Treated Sewage BOD 5 : <10 mg/l Turbidity (NTU) : <2 E. Coli : None Res. Cl2. Mg/l : >1 71 PROJECT REPORT

44 TECHNOLOGY BRIEF OF TREATMENT PROPOSED: The Sequencing batch reactor (SBR) process is a sequential suspended growth (activated sludge) process in which all major steps occur in the same tank in sequential order (figure 1). There are two major classifications of SBRs: the intermittent flow (IF) or true batch reactor, which employees all the steps in figure 1, and the continuous flow (CF) system, which does not follow these steps. Both have been used successfully worldwide installations. SBRs can be designed and operated to enhance removal of nitrogen, phosphorus, and ammonia, in addition to removing TSS and BOD. The intermittent flow SBR accepts influent only at specified intervals and, in general, follows the five-step sequence. There are usually two IF units in parallel. Because this system is closed to influent flow during the treatment cycle, two units may be operated in parallel, with one unit open for intake while the other runs through the remainder of the cycles. In the continuous inflow SBR, influent flows continuously during all phases of the treatment cycle. To reduce short circuiting, a partition is normally added to the tank to separate the turbulent aeration zone from the quiescent area. 72 PROJECT REPORT

45 DESIGN DETAILS FOR 500 KLD CAPACITY STP: 1 BAR SCREEN: * Size of the unit : 1.0 m x 1.5 m x 1.0 m *Function : To separate coarse matter from the Raw Sewage 2. OIL AND GREASE SEPARATOR: * Flow rate : 500 m 3 /day = m 3 /hr * Detention time provided : 30 minutes * Volume of oil separation tank required : m 3 * Let the depth of the unit be : 1.2 m * Therefore area of oil Separator required : 8.68 m 2 * Let the width of the unit b : 1.0 m * Size of unit proposed : 2.95 m x 1.0 m x 1.2 m SWD * Function : To separate oil & grease from raw sewage 3. EQUALISATION TANK: OBJECTIVE: To equalize the flow and pollutant concentration. Generally, 6-8 hrs Hydraulic retention time is given for equalization tank. Provide one no. Equalization tank of 8 hrs hydraulic retention. Q max = 500 m 3 /day Average flow rate = m 3 /hr Tank volume required = x 8 = m 3 Size of the unit = 6.9 m x 6.9 m x 3.5 m SWD Average BOD of sewage at the inlet of the Pre-aeration tank. : 300 mg/lit. Total organic load with 20 % BOD reduction considered : 60 mg/lit. Quantity of BOD to be removed = ( 60 x 500 )/1000 = 30 kg/day 73 PROJECT REPORT

46 Total oxygen required assuming 2 Kg of O2/kg of BOD Removed Air required for pre aeration : m 3 /hr. : 30 x 2 = 60 Kg/day. 4. RAW SEWAGE PUMP: Volume of sewage : 500 m 3 / day ~ 62.5 m 3 /hr 5. SBR TANK: OBJECTIVE: To oxidize the organic content in the influent and to avoid any objectionable odor. As chemical not used in the process is biological in nature, the DO levels need to be high for maintaining the oxygen demand in the system. Flow (design) = 500 m 3 /day BOD = 300 mg/l SBR tank volume = Q x BOD F/M x MLSS = 500 x x 4000 SBR tank volume = 375 m 3 Provide 30% for sludge accumulation = m 3 Total SBR tank volume provided = = m 3 Assume SWD to be 3.5 m Therefore plan area required = 487.5/3.5 = m 2 Size of Aeration Tank Required: 11.8 m x 11.8 m x 3.5 m SWD with partition DIFFUSED AERATION SYSTEM: Flow = 500 cum/day Inlet BOD = 300 mg/l Organic load = BOD X Flow rate PROJECT REPORT

47 Total organic load in the system: (500 X 300)/ 1000 = 150 Kg/day Total oxygen required assuming that 2 Kg of O2/kg of BOD Removed = 2 X 150 = 300 Kg/day Assume alpha =0.6 and β= 0.7 Consider oxygen transfer at 0.35 m depth = 25% Density of Air = 1.2 Kg/m3 Percentage of Oxygen in Atmospheric air = 21% Air required = x 0.21 x 0.6 x 0.7 x 0.25 = m 3 /day = m 3 /hr. Calculation of diffuser required: Considering 12 m 3 /hour diffusion of air through the diffuser /m length Number of diffusers required = /12 = diffusers. Number of diffusers provided = 39 No s * Type of aeration : Membrane Fine pore diffused aeration System 6. SLUDGE TRANSFER PUMP: * Discharge rate : 2.0 m 3 15 m head. * Type of pump : Horizontal centrifugal with CI open impeller self-priming type Coupled to motor of required speed with B Class insulation and IP 55 protection hood. * Function : To transfer the sludge to Filter press 7. PLATE & FRAME FILTER PRESS: * Assumed Type of Sludge : Secondary Biological * Design Liquid Sludge Flow : 15,000 Lts/day * Concentration of Solids : 1% * Specific Gravity : 1.2 * Minimum Dry Solids allowable in the sludge solid cake: 25-30% 75 PROJECT REPORT

48 Sludge Cake Characteristics : * Cake Thickness : 32 mm * Wet Cake Density : 1280 Kg/m3 Operating Time *10 Hrs/Day : 6 Days /week Cycle Time * Feed : 20 Minutes * Compression : 15 Minutes * Cake Discharge : 25 Minutes * Total : 60 Minutes Daily Sludge Solid Generation * Rate : x 0.01 X 1.2 = 180 Kg/Day * Quantity of sludge solids load on filter press :180 x 7 (Seven days in a week operation) :1260 Kg/week * Assuming that the filter press is operated for 5 days/week. * Therefore Solid Load/day =1260/5 = 252 Kg/day * Assuming that sludge holding capacity as = 0.61 x 0.61 x x 1280 = Kg/m 2 * The size of Filter press required = 252/15.24 = m 2 * Let the size of each Plate be (0.61x 0.61 m) = 0.37 m2 * Therefore the number of such chambers required will be = 16.54/0.37 = 44.7 No.s Note: However provide 45 chambered filter press of size 0.61 m x 0.61 m with Collection tray, Filtrate line with Hydraulic/Power packed mechanism. 8. SCREW PUMP 2 No.s (1 W + 1 SB): * Flow rate =2-2.5 m 3 /hr * Type Single Screw Type with shaft mounted gear box * Working Pressure 4 to 6 kg/cm 2 76 PROJECT REPORT

49 9. SLUDGE HOLDING TANK: * Anticipated quantity of secondary sludge from the STP : liters per day = 15 m 3 /day * Capacity of aerobic digester required : 1000 liters * Size of aerobic digester required : 3.2 x 3.2 x 1.5 m SWD * Considering air required as 1.0 m 3 /hr per cum of volume * Air required for aerobic : 1.0 X volume of the tank digestion : 1 m 3 /Hr/cum volume x 15 m 3 /day = 15 m 3 /hr * Type of air diffusion : Membrane/HDPE air grid * Function : To supplement oxygen for aerobic digestion of secondary sludge. 10. PRE FILTRATION TANK /DECANT TANK: Average flow = m 3 /hr Provide 8 hr holding capacity Volume of the tank required= m 3 Providing SWD 3.0 m Final collection tank size is 7.5 m x 7.5 m x 3.0 m SWD 11. FILTER FEED PUMP 2 Nos. (1 W + 1 SB): Pumping Rate : 62.5 m 3 /Hr Type of pump : Horizontal centrifugal with CI open impeller self-priming type coupled to motor of required speed with B Class Insulation and IP 55 protection hood. Function : To pump the clarified water through Pressure Sand and Carbon Filters. 77 PROJECT REPORT

50 12. PRESSURE SAND FILTER: OBJECTIVE: To filter the residual suspended solids from the clarified water. * Total Flow : 500 m 3 /day * Duration of Pumping considered : 8 Hr/day * Pumping rate : 62.5 m 3 /hr * Surface Loading considered : 12 m 2 /m 3 /hr * Area of filter required : 5.21 m 2 * Dia of the Filter : 2.28 m * Number of Sand Filters : 1 * Number of Carbon Filters : 1 * Height of the Shell : 1.5 m * Media for sand filter Pebbles, Grit, Stilt, Gravel Coarse & Fine sand * Function of Sand Filter For removal of suspended impurities 13. ACTIVATED CARBON FILTER: OBJECTIVE: To remove the odor and color from the clarified water. * Total Flow : 500 m 3 /day * Duration of Pumping considered : 8 Hr/day * Pumping rate : 62.5 m 3 /hr * Surface Loading considered : 12 m 2 /m 3 /hr * Area of filter required : 5.21 m 2 * Dia of the Filter : 2.28 m * Number of Sand Filters : 1 * Number of Carbon Filters : 1 * Height of the Shell : 1.5 m * Media for Carbon Filter Pebbles, Gravel and Activated Carbon * Function of Carbon Filter For removal of color and Odor 78 PROJECT REPORT

51 14. CHLORINE DOSER: Provide Milton Roy Asia LMI/ Prominent make metering pump of dosing capacity 4-6 LPH with 1000 Liters capacity dosing tank. 18. FINAL COLLECTION TANK: Average flow = m 3 /hr Provide 8 hr holding capacity Volume of the tank required= m 3 Providing SWD 3.0 m Final collection tank size is 7.5 m x 7.5 m x 3.0 m SWD 19. BLOWER CAPACITY: Blower capacity : Air for pre-aeration + SBR Tank + final Collection tank = = m 3 /hr or say 734 m 3 /hr. Note: The capacity of Common Twin Lobe Roots Air blower suitable to discharge about 740 m KSC 2 No.s (1 W + 1 SB). The common blower shall supply the air required for the Aeration Tank & final storage tank. Design details summary for 500 KLD STP Sl. no. Particulars Size 1 Bar Screen 1.0 m x 1.5 m x 1.0 m 2 Equalization cum neutralization Tank 6.9 m x 6.9 mx 3.5 m 3 SBR 11.8m x 11.8 m x 3.5 m 5 Mechanical filter press 0.61 m x 0.61 m 6 Pressure Sand and Carbon Filter - 1 each 2.28 m 79 PROJECT REPORT

52 FLOW CHART OF STP 80 PROJECT REPORT

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I. (See Paragraph-6) FORM 1 APPENDIX I (See Paragraph-6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the Project/s Dankari Granite Black Stone Quarry 2. Sl. in the schedule Sairat case no- 91/ 12-13 3. Proposed capacity

More information

APPENDIX I (See Paragraph -6) FORM I

APPENDIX I (See Paragraph -6) FORM I APPENDIX I (See Paragraph -6) FORM I (I) Basic Information: Sl.. Item Details 1 Name of the project/s Removal of sand from Sand bar SB-G2 2 S.. in the schedule G 3 Proposed capacity / area/length / tonnage

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: Rakesh Kumar, Partner M/s Maluka Bricks Industry Village Maluka, Sub-Tehsil Bhagta Bhaika, Tehsil & District Bathinda. (Punjab) (M): 0-98141-22141 1 ACTIVITY 2 1. Construction,

More information

RISK ASSESSMENT REPORT

RISK ASSESSMENT REPORT RISK ASSESSMENT REPORT Submitted by: M/s D.D. Bricks Co. Prop. : Harbhagwan Village: Mohan Ke Uttar Tehsil: Guru Harsahai District: Ferozepur, Punjab (M): 0-99993-38601 Construction, operation or decommissioning

More information

PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT

PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT PROJECT REPORT ON EXPANSION OF RESIDENTIAL APARTMENT PROJECT At, Survey Nos. 65/1, 65/2 and 65/3, Thubarahalli Village, Varthur Hobli, Bangalore East Taluk, Bangalore. Submitted By M/s. Vaswani Estates

More information

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN

Appendix I. Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN Appendix I Form 1 BASIC INFORMATION GRANITE MINING PROJECT VILLAGE KHARDA KI DHANI, TEHSIL ROHAT, DISTRICT PALI, RAJASTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 56/2000 PRODUCTION CAPACITY: 46,653 TPA PROJECT

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 &

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.Nos.: 332/1, 321/1 & Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.s.: 332/1, 321/1 & 321/3, THIRUPAIR Village, ULUNDURPET Taluk, VILUPPURAM District Tamil Nadu of THIRU.R. VIJAYAKUMAR. (Extent 0.83.50

More information

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI

Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.No: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI Form-1, Prefeasibility Report, Mining Plan for Rough Stone for S.F.: 421/4(Part), LEMBALAKUDI Village, THIRUMAYAM Taluk, PUDUKKOTTAI District Tamil Nadu of Thiru. S. APPAZ. (Extent 1.21.5Ha) FORM -1 (I)

More information

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information : 98795 50353 FORM - 1 I. Basic Information Name of project : Ajaysinh Bhupatsinh Suratia (Black Trap) Location/ Site alternatives under consideration : Block. O : Size of Project Lagu Survey. 17, Mahi River at Aklacha,

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 & Ammendments Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 & Ammendments To be submitted By NITEEN PARMAR S/O SHRI NARENDRA SINGH PARMAR

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Rojnaguda Stone Quarry In Kalahandi district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

Form-I for seeking clearance for project attracting CRZ notification

Form-I for seeking clearance for project attracting CRZ notification Form-I for seeking clearance for project attracting CRZ notification Basic information: Name of the Project: - Proposed Beach Resort by A. R. RESORTS INDIA PVT. LTD. Location or site alternatives under

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY MINING PROJECT (M.L. No. 107/02, ML Area: 1.0 ha) At Near Village-Banar Tehsil- Kotputli District - Jaipur (Raj.) PROJECT PROPONENT R/o Navratan Apartment, Plot No. 7A,

More information

APPENDIX I FORM I. Basic Information

APPENDIX I FORM I. Basic Information APPENDIX I (I) Basic Information FORM I S.. Item Details 1 Name of the project/s Enhancement of Phosphoric Acid Production from 700 MTPD to 1000 MTPD P2O5 and other auxiliary Facilities within the Existing

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project.

APPENDIX I FORM 1. 2. S. No. in the schedule 8(a) Building and Construction project. 1568651343757 01234567418199129126 76566544740738 313148746568 012204653107 81664 633840 91 APPENDIX I FORM 1 Basic Information Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

APPENDIX I. Revised FORM 1

APPENDIX I. Revised FORM 1 APPENDIX I Revised FORM 1 Basic Information Serial No. Item Details 1.1 Name of the project/s Proposed Residential Project by S. S. Properties at S. No.31/ & 32, Tal.- Mulshi, Dist. Pune 2. S. No. in the

More information

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details

1311/P, Khata No-570. Mariwada Malkangiri Malkangiri. APPENDIX I (See Paragraph-6) FORM 1. Basic Information. S. No. Item Details 1 APPENDIX I (See Paragraph-6) (I) Basic Information FORM 1 S.. Item Details 1. Name of the Project/s Mariwada Stone Quarry In Malkangiri district of Odisha 2. S. in the schedule 1 (a) 3. Proposed capacity

More information

FORM-1 A 1. LAND ENVIRONMENT

FORM-1 A 1. LAND ENVIRONMENT FORM-1A. FORM-1 A 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved

More information

APPENDIX I (See Paragraph 6) FORM 1

APPENDIX I (See Paragraph 6) FORM 1 vi(a) (i) Basic information APPENDIX I (See Paragraph 6) FORM 1 Serial Item Details number 1. Name of the project/s "JANA JEEVA ORCHID" 2. S.no. In schedule B Category item 8 3. Proposed capacity/area/length/tonnage

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE ABOUT THE PROJECT: Rampura Marble Mine (ML No.- 420/91) is proposed by M/s Continental Minerals Pvt. Ltd. The Mine Lease area consists of 3.0 ha, which is located at Khasra

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

FORM 1. Basic Information

FORM 1. Basic Information (I) Basic Information FORM 1 S. Item Details 1 Name of the Project /s Establishment of 1.5 M KCal/Hr (500 kg/hr) Hazardous Waste Incinerator (Upgradation) by M/s Ramky Enviro Engineers Limited. 2 S.. in

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area

BOMBAY XI FORM 1 FORM-1. Plot Area. FSI Area FORM 1 FORM 1 (I) Basic Information FORM-1 Item Details 1 Name of the Project Bombay XI 2 S.. in the Schedule 8(a) 3 Proposed capacity/area /length/tonnage to be handled/command area/lease area/ number

More information

APPENDEX I FORM 1. including Kharab Kharab Area ----- 3,540.96m 2. Net Plot Area 1,86, 759.82 m 2 1,38,943.43 m 2. Total Built up Area

APPENDEX I FORM 1. including Kharab Kharab Area ----- 3,540.96m 2. Net Plot Area 1,86, 759.82 m 2 1,38,943.43 m 2. Total Built up Area (I) Basic Information APPENDEX I FORM 1 Sl.No. Item Details 1. 1Name of the project/s Residential Development. 2. 2Sl. No. in the schedule 8 (b) Township and Area development Project. 3. 3Proposed capacity/area/length/

More information

List of Documents. List of Annexure

List of Documents. List of Annexure List of Documents S.No. Description Page No. 1 Form I Application 1 to 15 2 Standard Template and Checklist 16 to 24 3 Form IA for Building & Construction Projects 25 to 35 4 Environmental Management Plan

More information

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd.

FORM 1. Project Proponent: M/s Casa Grande Private Limited. EQMS India Pvt. Ltd. June 2015 FORM 1 FORM 1 Residential Development At S.No: 163/1, 163/2,164/2, Thalambur village, Thiruporur Taluk, Kanchipuram District. Project Proponent: M/s Casa Grande Private Limited Prepared By: EQMS

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

M/s Gokul Stone Industries

M/s Gokul Stone Industries Minor Mineral Black Trap Mine (Existing Project) Village : Rethvaniya, Ta : Chikhli, Dist : Navsari (Gujarat) Production Capacity : 2,50,000 TPA Area : 01-50-00 Ha. Proposal For Environmental Clearance

More information

Project Details-Minor Minerals (Other Than Sand)

Project Details-Minor Minerals (Other Than Sand) Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey

More information

FORM I & FORM IA. PROJECT BY M/s. TWIN DEVELOPERS MUMBAI, MAHARASHTRA. PREPARED BY M/s. FINE ENVIROTECH ENGINEERS MUMBAI, MAHARASHTRA

FORM I & FORM IA. PROJECT BY M/s. TWIN DEVELOPERS MUMBAI, MAHARASHTRA. PREPARED BY M/s. FINE ENVIROTECH ENGINEERS MUMBAI, MAHARASHTRA FORM I & FORM IA ENVIRONMENTAL CLEARANCE FOR PROPOSED DEVELOPEMENT ON PLOT BEARING SURVEY NO. 198 (PART), C.T.S. NO.1 (PT) OF VILLAGE KURLA, C.S.T ROAD, KURLA, MUMBAI, MAHARASHTRA PROJECT BY M/s. TWIN

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.)

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP. 84 - LAWS OF SARAWAK, 1958 Ed.) THE NATURAL RESOURCES AND ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER, 1994 (Made under section 11A(1)) (Incorporating

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN 1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue

More information

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day A PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR KESHAVBHAI RATANJIBHAI PATEL 150 MT/day VILL.:VIRPOR, TAL.: VALOD, DIST.: TAPI INDEX LIST OF CONTENTS CHAPTER DESCRIPTION

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:

More information

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given) (1) Basic Information APPENDIX 1 (See paragraph - 6) Serial Item Details Number 1. Name of the Project/s Stone Quarry of Mr. Yogesh Dundappa Chavan, Halkarni, Tal-Gadhinglaj, Dist- Kolhapur 2. Sr.. in

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1 [Type the company name] ENVIRONMENT MANAGEMENT PLAN LIMESTONE (BUILDING) 1.0. INTRODUCTION: The proposed M/s. Building Lime Stone Mine of Shree Jitubhai Parbatbhai Chudashma

More information

16. Storm water drainage

16. Storm water drainage 16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

PROPOSED RESIDENTIAL CUM COMMERCIAL BUILDING BLOCK NO. 24, NO. 670/16-A, N-28/16-A, CHAMUNDI VIHAR LAYOUT ROAD, NAZARABAD MOHALLA, MYSURU.

PROPOSED RESIDENTIAL CUM COMMERCIAL BUILDING BLOCK NO. 24, NO. 670/16-A, N-28/16-A, CHAMUNDI VIHAR LAYOUT ROAD, NAZARABAD MOHALLA, MYSURU. FORM 1, FORM 1A, CONCEPTUAL PLAN AND ENVIRONMENTAL MANAGEMENT PLAN FOR PROPOSED RESIDENTIAL CUM COMMERCIAL BUILDING AT BLOCK NO. 24, NO. 670/16-A, N-28/16-A, CHAMUNDI VIHAR LAYOUT ROAD, NAZARABAD MOHALLA,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN Page 33 ENVIRONMENT MANAGEMENT PLAN BLACK TRAP 1.0. INTRODUCTION: The proposed M/s. Black Trap Mine of Govindbhai Karshanbhai Ram area at near Vill.Chuldi, Tal.Malia-Hatina,

More information

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) A PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT) OF PADMABEN JAYANTIBHAI OAD RESI. AT: VILL: GHALA, TAL: KAMREJ, DIST: SURAT INDEX LIST OF CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN LIMESTONE 1. INTRODUCTION: The proposed Bagdhara Limestone area, near Village- Bagdhara, Taluka- Jamjodhpur and District-Jamnagar, Gujarat has been granted to Dipakkumar Anantray

More information

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY Introduction and Assumptions 1. The existing section 27 Mineral Extraction of the Zoning Ordinance would remain and continue

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Form-1 A ( Construction) Checklist

Form-1 A ( Construction) Checklist FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES

AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES AP ENVIRONMENTAL SCIENCE 2012 SCORING GUIDELINES Question 2 The Fremont School District uses oil to heat school buildings. Go Green! is a new project the district will implement. The superintendent has

More information

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County,

More information

Project Details- Minor Minerals (Other Than Sand)

Project Details- Minor Minerals (Other Than Sand) Project - Minor Minerals (Other Than Sand) Sr. ABOUT THE PROPOSAL 1. Name of Lease Holder M/s. KARMANBHAI JODHABHAI RABARI (Partner) 2. Location address Mr. Karmanbhai Jodhabhai Rabari Survey No- 194 Paikee,

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Permitting of Development and Infrastructure Projects in Abu Dhabi

Permitting of Development and Infrastructure Projects in Abu Dhabi Table of Contents 1.0 Purpose... 4 1.1 What Is a Objection Certificate for Development and Infrastructure Projects?... 4 1.2 Why Is an NOC Required?... 4 2.0 Scope... 4 2.1 What Development and Infrastructure

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES ADDITIONAL STUDIES 7.0 DISASTER MANAGEMENT PLAN It is presumed that the proposed mining process would be designed and engineered with all possible safety measures and standard code of practices. In spite

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

Rural dwellings including bed and breakfast accommodation

Rural dwellings including bed and breakfast accommodation MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:

Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros: P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

FLOOD DAMAGE PREVENTION ORDINANCE

FLOOD DAMAGE PREVENTION ORDINANCE FLOOD DAMAGE PREVENTION ORDINANCE SECTION 1.0 STATUTORY AUTHORIZATION, FINDINGS FO FACT, PURPOSE, AND OBJECTIVES 1.1 STATUTORY AUTHORIZATION The Legislature of the State of Washington has in RCW delegated

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University.

Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Page 1 of 5 INTRODUCTION Queen Lane Addition, Philadelphia, Pennsylvania is a building of approximately 25,000 ft². The client is Drexel University. Queen Lane Addition is described as follows: Medical

More information

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles.

(1) Discuss the determination of the need for public visitation. Visitor center density within 100 miles. Chapter 4 Specifications Designs 3. Visitors Centers 3. Visitors Centers. The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing

More information

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

Each icon on this map represents the physical location of a station.

Each icon on this map represents the physical location of a station. ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery Key things to Know About Environment as a Cross Cutting Issue In Early Recovery This brief note provides an overview of key things to know about environment for early recovery actors, including Early Recovery

More information

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

Extent : 2.12.5Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM SEIAA. FOR Uthupatti ROUGH STONE QUARRY Extent 2.12.5Ha S.F.. 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village Uthupatti Taluk Kulithalai District Karur State

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

More information

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the following: 1 Executive summary of the project giving a

More information