Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015
|
|
- Brendan Dennis
- 8 years ago
- Views:
Transcription
1 Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015
2 Presentation Outline Mechanical Overview Chillers and Pumps Pipework and Ancillaries In Row Cooling Units Mechanical Ventilation 1 April 2015 Dervan Engineering Consultants 2
3 Presentation Outline Electrical Overview MV Switchgear & Transformers Generators / EGIP Main LV Switchgear UPS Miscellaneous 1 April 2015 Dervan Engineering Consultants 3
4 Mechanical Overview 1 April 2015 Dervan Engineering Consultants 4
5 Chillers and Pumps Chillers 3 No. chillers (N+1) are each rated at 721 kw at 15/21ºC flow and return, 30% glycol and 30ºC ambient. - Climaveneta All three chillers run in part load to achieve the maximum level of free cooling. The chillers have free cooling coils and the estimated percentage operation on free versus compressor cooling is as follows: Compressor cooling T > 16 ºC 7% Compressor & free 7 ºC < T <16 ºC 53% Free cooling T < 7 ºC 40% The chillers have integral primary pumps with variable speed drives which will control the flow rate in the primary loop in accordance with the demand in the secondary loop. Secondary Pumps Two sets of duty standby secondary variable speed pumps are provided - Wilo Each pump set is located in its own pump room along with the associated pump headers, pressurization / auto fill unit. 1 April 2015 Dervan Engineering Consultants 5
6 Pipework and Ancillaries Primary Pipework The three chillers are connected to primary flow and return looped headers with isolation valves between each chiller connection to facilitate total isolation of any chiller and still allow the other two chillers to function normally. The primary and secondary circuits are connected by two separate paths to allow the system to continue to function in the event of a component or path failure. Primary Buffer Vessels The two primary by pass lines are each fitted with a 1000L buffer vessel. These provide a minimum level of water in the primary loop to reduce the frequency of chiller starts. 1 April 2015 Dervan Engineering Consultants 6
7 Pipework and Ancillaries Secondary Buffer Vessels A 1000L buffer vessel is located on each of the two flow paths to the data hall. These act as thermal store for chilled water retention in the event of the chiller plant shutting down during a mains failure period. Secondary Loop in the Data Hall The chilled water is distributed around the data hall in the form of a loop in the floor void below the cold aisle with tap offs for each row of IRC. Isolation valves are located around the entire loop such as no more than one IRC in any pod would be out of service if a section of pipe had to be isolated. 1 April 2015 Dervan Engineering Consultants 7
8 In-Row Coolers In- Row Coolers (IRCs) IRCs are supplied as part of the rack and pod system. Each IRC is complete with its own control system and motorized 3 port modulating valve. The IRC s in each Pod provide N+1 redundancy They are also complete with Modbus interface for communicating with the BEMS. Cooling is designed precisely to match the equipment loads. Capacity grows to meet demand Large volume in room acts as a cold air reservoir 1 April 2015 Dervan Engineering Consultants 8
9 In-Row Coolers IRCs were supplied as part of the rack and pod system (shown in blue below) 1 April 2015 Dervan Engineering Consultants 9
10 Mechanical Ventilation Transformer and LV switch rooms Extract Fans operated by a temperature sensor Data Hall UPS Room / post discharge fire suppression system Extract fans Battery room extract fans operated by a temperature sensor Data Hall area heat recovery ventilation unit 1 April 2015 Dervan Engineering Consultants 10
11 Electrical System Overview 2MVA+ supply 2 x 2MVA Transformers (2N) 2 x 2.5MVA Generators (2N) 2 x 2MVA Form 4 LV Switchboards (2N) 2 x 4 x 400kVA/360kW UPS (2N+1) Dual supplies to chillers and MCC s (2N) 1 April 2015 Dervan Engineering Consultants 11
12 Electrical Redundancy Design is based on 2 No. 2MVA transformers and 2 No. 2.5MVA generators Maximum IT load = 1000kW (2N+1) Target PUE = 1.3 Maximum Load for Data Hall = 1400kW Other loads in existing Exchange or Data Hall = 250kW Total Load = 1650kW 1 April 2015 Dervan Engineering Consultants 12
13 MV Switchgear & Transformers MV Switchgear 4 cubicle MV Switchboard ABB - Unigear Transformers 2 No. Oil filled, natural air cooled 2MVA High Efficiency AoAk - ABB Own room with louvered doors and mechanical extract ventilation New 630kVA Cast Resin Transformer to feed existing exchange - ABB 1 April 2015 Dervan Engineering Consultants 13
14 Generators & EGIP 2 No. 2.5MVA diesel power gen sets in acoustic containers FG Wilson Each complete with bulk tank to provide a combined total of 48 hours at full load Generator sets are deemed to be the primary source of power with ESB a reserve but supplying the load for economic reasons New EGIP Grid Protection System 1 st in Ireland 1 April 2015 Dervan Engineering Consultants 14
15 Main LV Switchgear 2 No. 2MVA/3000 Amp switchboards connected via normally open bus coupler All breakers are withdrawable and therefore can be added as the load grows Main Board feeds: Chillers UPS Modules UPS and Air Conditioning in existing Exchange 1 April 2015 Dervan Engineering Consultants 15
16 UPS 2 x 4 x 400kVA UPS per site providing 1080kW (2N+1) - Riello UPS power is delivered to the racks via dedicated UPS switchboard with plug-in MCCB s and overhead busbar systems. 1 April 2015 Dervan Engineering Consultants 16
17 Miscellaneous BMS System Standard Controls KNX Lighting Control Standard Controls Fire Alarm System Siemens Fire Suppression System - Siemens 1 April 2015 Dervan Engineering Consultants 17
18 Thank You for Your Attention End of Presentation 1 April 2015 Dervan Engineering Consultants 18
EXAMPLE OF A DATA CENTRE BUILD
EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist
More informationData Centre Testing and Commissioning
Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to
More informationCyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
More informationOur data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
More informationDatacentre Capability March 2015
Callaghan Engineering Consul-ng Engineers Project Managers Datacentre Capability March 2015 Callaghan Engineering Multi-discipline engineering & project management company Established in 1990 Offices in
More informationNational Grid Your Partner in Energy Solutions
National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National
More information7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
More informationGREEN DATA CENTER DESIGN
Jeffrey Menig Global Facilities Facility Engineering The application of multiple available technologies resulting in improved energy optimization without significantly increasing capital investment. A
More informationBlade Server & Data Room Cooling Specialists
SURVEY I DESIGN I MANUFACTURE I INSTALL I COMMISSION I SERVICE SERVERCOOL An Eaton-Williams Group Brand Blade Server & Data Room Cooling Specialists Manufactured in the UK SERVERCOOL Cooling IT Cooling
More informationState of the Art Energy Efficient Data Centre Air Conditioning
- White Paper - State of the Art Energy Efficient Data Centre Air Conditioning - Dynamic Free Cooling - Release 2, April 2008 Contents ABSTRACT... 3 1. WHY DO I NEED AN ENERGY EFFICIENT COOLING SYSTEM...
More informationDesign Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
More informationIntroducing UNSW s R1 Data Centre
Introducing UNSW s R1 Data Centre R1-DC Our New High Density Data Centre Right here Right now - Welcome to our newest UNSW Data Centre R1-DC R1 Location on UNSW Randwick campus. Keeping it in the family
More informationCANNON T4 MODULAR DATA CENTRE HALLS
CANNON T4 MODULAR DATA CENTRE HALLS Halve up-front investment, use a Modular fit out approach Highly efficient, Low PUE, Scalable system with reduced Capex and Opex Turnkey solutions available complete,
More informationUniversity of St Andrews. Energy Efficient Data Centre Cooling
Energy Efficient Data Centre Cooling St. Andrews and Elsewhere Richard Lumb Consultant Engineer Future-Tech Energy Efficient Data Centre Cooling There is no one single best cooling solution for all Data
More informationCase Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia
Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program
More informationThe Pros and Cons of Modular Systems
The Pros and Cons of Modular Systems Kevin Brown, Vice President Global Data Center Offer Schneider Electric Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Desired characteristics of pre-fabricated
More informationStatement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary
Installation Service Statement of Work - 1 - Cooling Start-up Service Cooling Start-up Service Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details
More informationEuropean Code of Conduct for Data Centre. Presentation of the Awards 2016
European Code of Conduct for Data Centre Presentation of the Awards 2016 Paolo Bertoldi European Commission DG JRC Institute for Energy and Transport 1 The Code of Conduct for Data Centre Results European
More informationOur data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
More informationKU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...
More informationHVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
More informationFree Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
More informationData Center Uninterrupted efficiency, guaranteed reliability and continuous modularity. ABB solutions always work.
Data Center Uninterrupted efficiency, guaranteed reliability and continuous modularity. ABB solutions always work. Data security is first of all electrical Maximizing security while providing efficiency
More informationCapgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
More informationCOMMISSIONING OF HVAC SYSTEMS
FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS
More informationTitle: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria
Tier 3+ 1 Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria Abstract: Schoolcraft College is constructing a High Availability (HA) Data Center
More informationDirect Fresh Air Free Cooling of Data Centres
White Paper Introduction There have been many different cooling systems deployed in Data Centres in the past to maintain an acceptable environment for the equipment and for Data Centre operatives. The
More informationAIR-COOLED CHILLERS APPLIED SYSTEMS. www.daikin.eu EUWA*5-24KAZW - EUWY*5-24KAZW -
AIR-COOLED CHILLERS APPLIED SYSTEMS www.daikin.eu Cooling Only Heat pump EUWA*5-24KAZW - EUWY*5-24KAZW - Environmental Awareness Daikin and the Environment In recent years, motivated by a global awareness
More informationNEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
More informationDigital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect
Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is
More informationData Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
More informationDesign of electrical power system for a 1000MW nuclear power generating station
Design of electrical power system for a 1000MW nuclear power generating station K Raja, K Yesunadam Dept. of Electrical & Electronics Engineering, Lingaya s Institute of Management & Technology, Vijayawada,
More informationThe main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
More informationReference Guide: SmartDesign Approach: Common Data Center Challenges:
Smart Solutions Reference Guide Solutions For Business-Critical Continuity 1100kW Tier 3 With High Density Design Intelligent, Integrated Infrastructure for the Data Center Reference Guide: 1100kW Tier
More informationLiquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling
More informationEnergy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
More informationData Center Energy Profiler Questions Checklist
Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space
More informationLocation. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport
Welcome Zenium Istanbul One provides 12,000 square metres of high specification technical space across three purpose-built data centers. It is Turkey s first wholesale data center offering; the data halls
More informationAIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
More informationIBM Portable Modular Data Center Overview for Critical Facilities Round Table
Brian Canney Global Services Executive, IBM GTS Site and Facilities Services April 2011 IBM Portable Modular Data Center Overview for Critical Facilities Round Table 2009 IBM Corporation Key messages Containers
More informationOur data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
More informationBELLE VUE MANCHESTER DATA CENTRE
www.iracknet.com 0843 557 5712 bellevue@iracknet.com www.iracknet.com BELLE VUE MANCHESTER DATA CENTRE 02 BELLE VUE MANCHESTER HIGHLY ADVANCED DATA CENTRE PURPOSE BUILT TO DELIVER UNRIVALLED FLEXIBILITY
More informationData Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,
More informationANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.
POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,
More informationData Center Solutions - The Containerized Evolution
Data Center Solutions - The Containerized Evolution Power IT Cooling 7 th Green Connected World Tsikogias Thanassis Data Centers Solutions Architect, IT Business Athens 2015 1 We are the global specialist
More informationUnderstanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM)
Understanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM) Salim Janbeh Physical Infrastructure Consultant uae-sj@panduit.com PANDUIT You Can t Manage What You Don t Measure:
More informationEHDC. Cooling system for Data Center and server cabinets.
EHDC Cooling system for Data Center and server cabinets. EHDC PEN LP EHDC L is a High Density Cooling module for an pen Loop configuration. It is ideally installed with Enoc Systems cold corridor containment
More informationIn Row Cooling Options for High Density IT Applications
In Row Cooling Options for High Density IT Applications By Ramzi Y. Namek, PE, LEED AP, BD+C; Director of Engineering 1 Users wishing to deploy high density IT racks have several In Row Cooling solutions
More informationTechnical Systems. Helen Bedford
Technical Systems in Data Centres Helen Bedford Technical Systems in Data Centres Overview Cooling IT and Peripheral Equipment Security: Access and Control Building Management System (BMS) Data Centre
More informationUTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN
Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF
More informationData Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling
Data Center Rack Level Cooling Utilizing Water-Cooled, Passive Rear Door Heat Exchangers (RDHx) as a Cost Effective Alternative to CRAH Air Cooling Joshua Grimshaw Director of Engineering, Nova Corporation
More informationWe have the experience
We have the experience EST. 1977 Worldwide Generator, Electrical & Mechanical Installation Contractors 1 Aidan Strain has been in business since 1977, initially as commercial, industrial and domestic electrical
More informationPOLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747
POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609
More informationTHERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.
THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS. NOT ALL CODES ARE POSSIBLE ON ANY INDIVIDUAL UNIT. IF THE ALARM APPLIES
More informationCOMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
More informationDesigned for uptime. Defining data center availability via a tier classification system
Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center
More informationData Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. Equinix Telecity Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se
More informationEnergy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
More informationCURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers
CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building
More informationHow To Test A Theory Of Power Supply
A CASE STUDY ON: THE EFFECTS OF HIGHER OPERATING TEMPERATURES ON DATA CENTER EFFICIENCY Victor Garcia Director of Facilities Brocade October 24, 2012 Jeff Stein, PE Principal Taylor Engineering 2010 Brocade
More informationEuropean Code of Conduct for Data Centre. Presentation of the Awards 2014
European Code of Conduct for Data Centre Presentation of the Awards 2014 Paolo Bertoldi European Commission DG JRC Institute for Energy and Transport 1 The Code of Conduct for Data Centre Results European
More informationGuidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
More informationScalable. Affordable. Flexible. Fast.
Modular Data Center Solutions Scalable. Affordable. Flexible. Fast. Build the data center you need today with the flexibility to meet tomorrow s challenges The only constant in business is change. Fluctuations
More informationDrives and motors. A guide to using variable-speed drives and motors in data centres
Drives motors A guide to using variable-speed drives motors in data centres The power behind the data Private public businesses, from banks to supermarkets, to telecommunications companies internet providers
More information- White Paper - Data Centre Cooling. Best Practice
- White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH
More informationOptimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
More informationCANNON T4 MINI / MICRO DATA CENTRE SYSTEMS
CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS Air / Water / DX Cooled Cabinet Solutions Mini Data Centre All in One Solution: Where there is a requirement for standalone computing and communications, or highly
More informationDrives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)
Drives and motors A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC) The power behind the data Private and public businesses, from banks to
More informationORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -
Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e
More informationEnergy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.
Energy Efficient Data Centre at Imperial College M. Okan Kibaroglu IT Production Services Manager Imperial College London 3 March 2009 Contents Recognising the Wider Issue Role of IT / Actions at Imperial
More informationIT@Intel. Thermal Storage System Provides Emergency Data Center Cooling
White Paper Intel Information Technology Computer Manufacturing Thermal Management Thermal Storage System Provides Emergency Data Center Cooling Intel IT implemented a low-cost thermal storage system that
More informationDATACENTER COLOCATION. Flexible, Secure and Connected
DATACENTER COLOCATION Flexible, Secure and Connected Flexible Solutions for Your Requirements Contents Your Goals 2 Compound and Buildings 4 Security 6 Infrastructure 8 Free Choice 10 Good Reasons 12 Our
More informationAbout Injazat. Enterprise Cloud Services. Premier Data Center. IT Outsourcing. Learning and Development Services. Enterprise Application Services
About Injazat Injazat Data Systems is an industry-recognized market leader in the region for Information Technology Outsourcing, Cloud and Data Center Managed Services delivered from the region s 1st Tier
More informationDATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER
DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates
More informationData Center Planning. PUE Overview
Data Center Planning PUE Overview Steve Carter, Americas Managing Principal Charles Prawdzik Jr., Project Manager HP Critical Facility Services delivered by EYP Mission Critical Facilities, Inc. 2008 Hewlett-Packard
More informationSouth Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime
South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in August 2002,
More informationCGC s Hybrid System Loop Control
verview The CGC Group Hybrid Heat Pump System does NT operate with the same fluid loop temperatures as a conventional reversing Water Source Heat Pump system. The CGC system differs from a WSHP system
More informationCase Study: Guaranteed efficiency through standardised data centres
Case Study: Guaranteed efficiency through standardised data centres Rittal / SEC Event / October 2014 1 Case Study: Guaranteed efficiency through standardised data centres Smart Energy Community Event
More informationAEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
More informationData Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling
Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com
More informationAIA Provider: Colorado Green Building Guild Provider Number: 50111120. Speaker: Geoff Overland
AIA Provider: Colorado Green Building Guild Provider Number: 50111120 Office Efficiency: Get Plugged In AIA Course Number: EW10.15.14 Speaker: Geoff Overland Credit(s) earned on completion of this course
More informationConversion From Constant Flow System To Variable Flow
White Paper Conversion From Constant Flow System To Variable Flow By: Tony Egan 94.21-4/29/2010 www.armstrongintegrated.com S.A. Armstrong Limited 2010 S.A. Armstrong Limited 23 Bertrand Avenue Toronto,
More informationAT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:
More informationNORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
More informationDoc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC
TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while
More informationRe Engineering to a "Green" Data Center, with Measurable ROI
Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices
More informationData Centre Solutions energy efficient by design
Data Centre Solutions energy efficient by design Mobile & Modular Data Centre Solutions Agile, Scalable, High Performance Mobile and Modular DC solutions Flexible, scalable high performance mobile & modular
More informationGreen Computing: Datacentres
Green Computing: Datacentres Simin Nadjm-Tehrani Department of Computer and Information Science (IDA) Linköping University Sweden Many thanks to Jordi Cucurull For earlier versions of this course material
More informationData Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
More informationThe Different Types of Air Conditioning Equipment for IT Environments
The Different Types of Air Conditioning Equipment for IT Environments By Tony Evans White Paper #59 Executive Summary Cooling equipment for an IT environment can be implemented in 10 basic configurations.
More informationHow to Meet 24 by Forever Cooling Demands of your Data Center
W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the
More informationSystem integration oriented data center. planning. In terms of ATEN's eco Sensors DCIM solution
System integration oriented data center planning In terms of ATEN's eco Sensors DCIM solution 1. Introduction The reliability of an enterprise data center servicing either external or internal clients
More informationTHERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS
Eleventh International IBPSA Conference Glasgow, Scotland July 27-30, 2009 THERMAL ANALYSIS OF A DATA CENTRE COOLING SYSTEM UNDER FAULT CONDITIONS Michaël Kummert 1, William Dempster 1, and Ken McLean
More informationAnalysis of data centre cooling energy efficiency
Analysis of data centre cooling energy efficiency An analysis of the distribution of energy overheads in the data centre and the relationship between economiser hours and chiller efficiency Liam Newcombe
More informationLegacy Data Centres Upgrading the cooling capabilities What are the options?
Legacy Data Centres Upgrading the cooling capabilities What are the options? Presentation Structure What is a Legacy Data Centre? What is CRAC cooling? ASHRAE Standards Overview Available Cooling Systems
More informationStatement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features
More informationAdaptive Cooling in Data Centers. Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009
Adaptive Cooling in Data Centers Silicon Valley Leadership Group Energy Efficient Data Center Demonstration Project October, 2009 Maximizing Cooling Efficiency in a Concurrently Maintainable and Fault
More informationWater cooled chiller plant (cp/vs)
Data Center Water cooled chiller plant (cp/vs) Design Envelope File No: 9.573 Date: december 16, 2014 Supersedes: 9.573 Date: november 14, 2014 design envelope s performance improvements are among the
More informationLEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
More informationCRAC Precision climate control units for data centres
CRAC Precision climate control units for data centres 2 Rittal Computer Room Air Conditioner The whole is more than the sum of its parts The same is true of Rittal The System. With this in mind, we have
More information