50 St Mary Axe London EC3



Similar documents
Balderton Mayfair London W1 Tenants Guide

CONDUIT MAYFAIR READY FOR OCCUPATION SPRING 2014 GLINSMANWELLER.CO.UK A DEVELOPMENT BY LONDON PROPERTY PARTNERSHIP LTD

1 Stratford Place 2 Oxford Street 3 New Bond Street 4 Wigmore Street 5 Grosvenor Street

2 HAREWOOD PLACE MAYFAIR LONDON W1

75 Davies Street Mayfair

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

SPECIFICATION ARE YOU? 77 SHAFTESBURY SOHO FLOOR TO CEILING HEIGHTS GROUND FLOOR RECEPTION 3,200 MM FIRST FLOOR OFFICE 3,000 MM

ST JAMES S ACCOMMODATION STUNNING RECEPTION 3 ST JAMES S SQUARE UNIQUE FLOORPLATES SPECIFICATION THE SPACES CONTACTS

1 Bartholomew Lane London EC2 79,427 sq ft 7,381 sq m

PRE-LEASE SURVEY OF THE ENGINEERING SERVICES. XXXX London

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

ACCESS AUDIT OF WESTPORT HOUSE


Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

Building Control Guidance Note

CITYVIEW SUMMARY SPECIFICATION

Product description NCC Data Center

8,780 to 77,311 square feet

130,000 sq ft Delivered September 2011

Building Condition Assessment Report

Contents. Overview 3. Structure 23

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

A VIBRANT NEW BUSINESS DISTRICT FOR LONDON

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

Building Code Clarifications - 7. Fire Resistance

110 BISHOPSGATE, EC2

T E C H N I C A L PA C K

17,280 square feet Overview:

HOUSING STANDARDS POLICY TRANSITION STATEMENT IMPLEMENTATION: OCTOBER May 2015

Cyprus Freephone: Moscow St Petersburg Kiev Athens United Kingdom

faraday HOUSE CANNING TOWN STATION LIGHTHOUSE BUILDING

Garden Rooms & Traditional Summerhouses

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Oliver House City Road, EC1. Design & Access Statement Addendum Oliver House

Cheshunt Fabrications Ltd

MARQUETTE UNIVERSITY: McCabe Hall

- 5 - Table1. Maximum Compartment Volumes

How to report a repair

Chips New Islington Manchester

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

Concepts. Products. Service. 30 Crown Place, London EC2

2-6 AUSTIN FRIARS, LONDON EC2

Appendix G. Security management plan

SPECIFICATION GUIDE.

Saffron Square (Keats) Unit 6.05 apt 36

Certification: Building Plans Examiner. Exam ID: B3

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

STUNNING RIVERSIDE VIEWS

A NEW 21ST CENTURY LANDMARK FOR SOHO

A striking new office development of 225, Central for your people and your business. sq ft. 1/4 acre roof top garden. Light filled island site

When we first considered the construction of a unique residential project, we searched the city for the best possible location.

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

BUILDING PERMIT SPECIFICATIONS

Connect Transform Locate

A MODERN ARCHETYPE. The Adelphi has become an icon of modernist architecture. Today, that history takes another leap forward.

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON

THE VOID LETTABLE STANDARD

Integrated Solar Radiant Systems

Peninsula Place, Greenwich, London

30,485 SQ FT (2,832.2 SQ M) NEWLY REFURBISHED OFFICES AVAILABLE TO LET IN A PRIME CITY LOCATION

Decree of the Ministry of the Environment on fire safety of ventilation systems

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

Energy Efficiency in Buildings

Green House, Hungary

The specialist for mobile space solutions

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

MILTON HALL BCO AWARDS 2014 THE WORKSPACE CONSULTANTS LLP

Fire Safety Requirements for Child Care Centre

Hotel Accessibility Pack

PUBLIC RESTROOMS, DESIGN INTENT

The replacement or modification of existing windows shall comply with the following requirements:

GENERAL FIRE SAFETY TERMS & DEFINITIONS

REAL ESTATE DESCRIPTION

Holistic Approach in Delivering Government Buildings The Low Carbon Concept

Building Condition Assessment Report

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

ANNEX C - DESIGN BRIEF

BUILDING CONTROL GUIDANCE SHEET REPLACEMENT WINDOWS AND DOORS Last updated 16/11/2010

KIEWIT CM/GC Enabling/Utilities

LOCATION. By Taxi Taxis are readily available to and from 28 Hennessy Road. ACCESSIBILITY. Kowloon Tong

FIRE RATED GLAZING System Guide

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Confort 26. Sliding Systems. Sapa Building System

Fire Resistant Systems

Minimum Housing and Health Standards

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

Plaisance 24. Sliding Systems. Sapa Building System

SPECIFIC GUIDANCE FOR A HOUSE IN MULTIPLE OCCUPATION (HMO) CONVERTED ENTIRELY INTO SELF CONTAINED FLATS

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

plumbing products guide

A Complete Solution CREATING WALLS THAT DEFINE SPACE

Transcription:

50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series of pre-fabricated natural Portland stone panels. Bronze anodised aluminium framed double glazed windows from ground to sixth floor, with full height curtain wall glazing, to the seventh floor. The glazing system is toughened externally and laminated internally, with a solar control film to moderate the external solar gain. External stainless steel Brise Soleil, 0.9m overhang provide additional solar shading to the seventh floor. In addition stainless steel balustrades provide protection to the external terraces on fourth, sixth and seventh floors. The flat roofs incorporate a high performance covering including insulation and vapour barrier, external terraces have stone paving slab finish. The main entrance comprises of single sliding stainless steel doors which are set back from the pavement and form a draught lobby, with a curved glazed canopy over and integrated lighting. Imposed loadings Basement Floor: Plant room areas/bicycle parking = 7.5kN/m2 General office area = 4kN/m2 + 1kN/m2 for Partition walls Ground Floor: General office areas = 4kN/m2 + 1kN/m2 for Partition walls with a 30m2 enhanced loaded area per floor of 7.5kN/m2 Corridor area = 5kN/m2 Utility area/ refuse chamber & Sub-station = 8.5kN/m2 First to Seventh Floor: General office areas = 4kN/m2 + 1kN/m2 for Partition walls with a 30m2 enhanced loaded area per floor of 7.5kN/m2 Terrace areas = 3kN/m2 Roof Level: Plant room = 7.5kN/m2 Terrace areas = 3kN/m2 2. Offices The office floors are designed with an occupancy level of one person per 10m2 of net lettable floor area and 1 person of 6m for fire provisions. Toilets are based on an average occupancy over the whole building of one person per 10m2 of net internal floor space and a nominal male: female ratio of 60:60. 3 unisex toilets and 1 disabled toilet with alternate shower/cleaner per floor, 1 unisex toilet on 7th floor, 1 toilet & shower in the basement and 1disabled toilet and disabled shower on the third floor. Showers are provided on 4 out of 7 floors of the building.

Office floor nominal dimensions Raised Floor 100mm overall/75mm clear Finished floor to ceiling height 2,650mm Slab to slab height 3,450mm Structural grid app 5x5m Planning grid app 7x7m 3. Finishes Offices The flooring consists of a fully accessible 100mm raised modular system with suspended tiles (600x600mm) on adjustable pedestals. All internal walls are skimmed painted plasterboard, integrating square edged painted MDF skirting boards. Principle doors are flush American white oak veneered incorporating glazed vision panels with brushed stainless steel ironmongery. The ceilings are suspended perforated metal planks - white, 600x1200mm spanning between chilled beams with integral lighting and services. Reception Honed book matched arabescato marble tile flooring, with skimmed and painted plasterboard partitions with a technical stone skirting and LED cove and down lighters. Automatic glass sliding doors with fixed opening door for out of hours access. The reception desk is made from Crown Cut European Walnut with an arabescato marble top with integrated lighting. Back painted glass wall panelling with applied tenant signage. Decorative textured panelling to lift surround. Staircases The principle stair has a galvanised metal finish with black recycled rubber treads. Walls are skimmed and painted incorporating recessed wall lights and brushed stainless steel handrails. The secondary stair is made of galvanised steel with, incorporating stainless steel handrails. Toilets Areas Glass wall tiles integrated with ceramic flooring and ceramic skirting. Skimmed plasterboard suspended ceilings, with recessed perimeter lighting. Toilets are wall hung with concealed cisterns, incorporating a dual flush system with satin stainless steel taps. Lifts Two 13 person 1000 kg lifts with 900mm wide centre opening doors. Lift interior to include stainless steel cladding with recessed ceiling lights. One lift will serve as a fire fighting lift. One lift is for fire fighting purposes.

Core Ceramic tile flooring with painted skimmed plasterboard partitions to incorporate 125mm ceramic skirtings, to match the floor. Secret fix panels are used to conceal service risers. Doors are flush American white oak veneered with glazed vision panels, incorporating brushed stainless steel ironmongery. 4. Sub-Station Provides storage space for refuse bins and rooms for incoming services, natural ventilation to the street is achieved through louvers and louvered doors. 5.Waste Management Refuse chamber is provided at ground level in Bevis Marks with 2 x 1100 litre Euro Bins. 6. M&E Services Design Occupancy Open Plan Offices 1 person per 10m2 8. Mechanical Services Schedule of Design Criteria Outside Temperatures Winter Design -4 C saturated Summer Design 29 C db/20 C wb Notes: 1) Winter design criteria is used for the sizing of heat emitters / heating plant. 2) Summer design criteria is used for the sizing of cooling coils / cooling plant. 3) Heat rejection plant will be capable of operating up to ambient temperatures of 35 C without failure but with reduced cooling capacity. Average Internal Design Dry Resultant Temperatures: Summer Winter Comment General Office Areas 23.0 C 22.0 C See notes below Basement Plant Room 10 C Heated only Stairs - 18 C Heated only Toilets - 18 C See notes below Notes: 1) All internal dry resultant temperatures will be subject to the following range: Summer + 1.5 C Winter + 2.0 C 2) Circulation stairs are provided with minimum background heating only. 3) Toilets are not directly conditioned. Extract make-up air will be from the adjacent office space ceiling void which will also provide the method of heating (i.e. via the

transfer of warm office air into the toilets) 4) Winter dry resultant conditions are approximate assuming design occupancy and equipment load. Design Air temperature is 21 C+/-1.5 C control tolerance for offices. Population Densities: General Office: 1 person per 10m2 net lettable. Internal Cooling Load Densities: (Watts/m2 net lettable) Lighting Small Power General Office 12 25 Outside Air Provision: 12 l/s/person for net lettable office area based upon occupancy densities defined Above Air Change Rates: Toilets: 10 extract with air supply by transfer from offices. Filtration: Office Areas: To European Standards: Pre-filter to G3 (minimum). Final filter to F7 (minimum) Internal Noise Level: (Average under normal operating conditions due to mechanical plant) General Office (open plan) NR38 Toilets NR40 External Noise Level: The plant at roof level will be selected in accordance with the Local Authorities Requirements Rainwater Intensity: 150mm/hour to BS12056 Part 3. Water Storage 10 Litres per day / person based on one person per 10m2 for the offices. 9. Electrical Services The following schedule identifies the W/m2 allowances used to determine the electrical loads. Lighting 12W/m2 Small Power 25W/m2 Mechanical Plant 75W/m2

Low Voltage Distribution Supply from EDF substation is located at ground floor level providing low voltage supplies to the building at 400 volts. Metering The electrical services distribution allows for multiple or floor-to-floor tenancy splits with space for separate check metering for tenants services if required. Low Voltage Rising main bus-bars serve tenants lighting and small power distribution boards. Lighting Illumination levels will be as follows; Offices 300 500 lux at desk level. Target level illuminance 400-500 lux with 50% average illuminance on all solid walls. Stairs 100 150 lux floor level. Toilets 200 150 lux floor level Plantrooms 200 lux floor level Switchrooms 200 lux floor level Reception 300 lux Office Office accommodate incorporates high efficiency low brightness louvred luminaires accommodated in an integrated services tile utilizing T5 lamps to give standard service illumination of average 400 lux to meet CIBSR LG7 standard for VDT office usage. The lighting installation shall not exceed 1500 cd/m². Emergency Lighting This is incorporated using the main office luminaires to meet BS5266 recommendations and the requirements for means of escape. Lifts Two x 13 person (1000kg) lifts serving all levels within the central core 30 second wait interval. The speed of the lifts is 1.6m/s. Fire Protection The fire alarm system is to BS5839 and L2 standard, single stage evacuation. The protected lobby will be pressurized. An addressable fire detection and alarm system will be installed throughout the office areas. Security A CCTV system is installed to monitor all external entrance and exit doors. An intruder alarm is fitted to every external door at Ground Level. Conduits are provided to every door leading to the office space for future tenants to install an access control system. A door entry system is provided at ground floor level entrance with direct connection to all tenants floors. Currently the door entry panels are located within the tenant s electrical risers with 20m of additional coiled cable for future location.

Telecommunications An incoming telecommunications room is located at Ground Level. Routes for cabling Additional routes for IT cabling have been established from street level to central electrical riser. Empty cable trays have been allowed for future tenant voice/data requirements. Lightning Protection The lightning protection installation comprises a system in accordance with British Standards BS6651:1992. 10. Plant Space Allowance Plant space is available at roof level for tenant designated plant subject to planning. 11. Cycle Storage A cycle storage room is located in the basement with access from Bevis Marks through the secondary stair. A shower room is provided at this level. 12. BREEAM Rating Very Good