KAHU RESIDENTIAL ROOFING RRKA DETAIL LIST



Similar documents
!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

When considering Roof drainage design the following should be taken into account:

How To Build A Gambrel Roof And A Gable End Roof

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

FLAT ROOF BOX SPAN CARPORTS

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

The WANZ Guide to Window Installation

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

CARPENTRY - HOUSING. This is the sloping length of a right-angled triangle.

There s a LYSAGHT walling solution to suit every Australian building. Walling Solutions 2PF300 PAGE 1

Ubiflex. Non-lead flashing system

EDW + FS, VS, VSE, GGL, GGU, GHL. EDW Deck Mounted Skylight and Roof Window Flashing Installation Instructions VAS

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

FLASHING GUIDE FOR ARCHITECTS AND DETAILING PROFESSIONALS FLASHING GUIDE

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Leaky Homes Financial Assistance Package (FAP) Repair plan example

VM ZINC : standing seam Guidelines for specification and installation

The WANZ Guide to Window Installation

Residential Roofing Guide

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Guide to Safe Building Practices

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Installation Manual for STANDING SEAM ROOFING

Flue Installation. High Efficiency Condensing Boilers

Cupa Natural Slate Roofing design and fixing guide

Instruction Manual 19/9/01. Flat Roof Carport

The formation of roof waterproofing details calls for

Epdm Flat Roofing Systems

VERTICAL LOCK Table of Contents

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

EXAMPLE BILL OF MATERIALS


Compliance Document for New Zealand Building Code Clause E2 External Moisture

PERIMETER FLASHING. Table of Contents

Installation Instructions

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

CI/SfB (Ff3) January Roofing design guide. Showing you the way. Redefining traditional products

Asphalt Shingle Application Requirements

Ridge. Hip. Abutment. Eaves. Roof slope. Vertical slating. Clay plain tiles. Valley. Ridge Roll. Verge. Bedded verge.

DETAIL MANUAL. for Standing Seam East 23rd Street Chattanooga, TN South Lee Hwy. Cleveland, TN 37311

Repairing storm damaged roofs

Titan Old World Spanish Tile

UBBINK SOLAR IN-ROOF SYSTEM

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

METAL ROOFING INSTALLATION GUIDE

Section Page Section Page

REDLAND DRY BONDING GUTTER. Installation Instructions for Redland Dry Bonding Gutter

Detached accessory structures that contain no conditioned floor area are exempt.

PANELIZED HOME INSTALLATION GUIDELINE

rationel WINDOWS WITH VISION

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals Magnolia Ave. Chino, CA 91710

Product Catalog. Extreme Roofing, Inc Rt. 982 Mammoth, PA

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

Lindab Seamline Application guide. Lindab Seamline TM. Lindab Standing Seam Roofing Application guide

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

BUILD A CARPORT. 2 - Planning the carport. 3 - Designing the carport

Including. Rubershield-Pro. Breather Membrane

Under Tile and Slate Undersheeting System

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Plans will call for one of two soffit/fascia details:

PHILLIPSmfg.com

Metal Building Systems Installation and Flashings & Details Guide. Table of Contents

Installation Window Building In Details

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

Construction Guide. Pitched Roof Patio Pitched Roof Awning

Bungalow. Essential Elements. Prominent porch columns,

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

TRAINING OUTLINE FOR PART TIME BUILDERS

Gerard Installation Manual Shingle Profiles

Installing the Sno-free Standing Seam System for Metal Roofs

V-joint fascia soffit systems

Classic Products, Inc. ClickLock Standing Seam Installation Manual

INSTALLATION OF A BAY WINDOW

Best Barns USA Assembly Book

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

TECHNICAL MANUAL. airlite.com.au

AIA PRESENTATION. Standing Seam Metal Roofing Seminar SSRLU2B 1 LU/HSW Hour

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

Sliding and Folding Door Fittings Sliding Door Accessories

Construction details. Technical specifications

Rooflight INSTALLATION INSTRUCTIONS

SECTION STANDING SEAM METAL ROOF

STANDING SEAM SHEET METAL ROOFING

SECTION ROOFING TILE

and Siding Effective Date 12/08 1

FC:121 EXTERNAL CLADDING & EAVES LINING CSR CEMINTEL

UNIVERSAL MOUNTING SET (UMS) FOR ARTOLINK FSO EQUIPMENT

Part 7 Roofs. Chapter 7.2. Pitched roofs. Effective from 1 January 2012

METAL ROOFING SYSTEM ORDERING & INSTALLATION SELF HELP GUIDE. Fabral, Inc 1

March 14, Installation of Bay, Bow and Garden Windows

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

Shingle Installation Guide

Transcription:

KAHU DETAIL LIST 00 / 24 COVER SHEET 01 / 24 ROOF RIDGE 02 / 24 SAWTOOTH RIDGE 03 / 24 SAWTOOTH EAVE 04 / 24 ROOF VALLEY 05 / 24 ROOF - CHANGE PITCH 06 / 24 EAVE WITH METALLINE FASCIA 07 / 24 EAVE WITH INTERNAL GUTTER BRACKET 08 / 24 EAVE WITH SNOW STRAP 09 / 24 FLUSH EAVE WITH INTERNAL GUTTER BRACKET 10 / 24 FLUSH EAVE WITH ETERNAL GUTTER BRACKET 11 / 24 BARGE WITH PROFILED CLADDING 12 / 24 BARGE OVERHANG 13 / 24 PARAPET WITH TRANSVERSE APRON 14 / 24 TRANSVERSE APRON 15 / 24 PARALLEL APRON 16 / 24 MA. 85mm DIAMETER PIPE PENETRATION 17 / 24 OVER 85mm DIAMETER PIPE PENETRATION 18 / 24 3D RIDGE TO BARGE JUCTION 19 / 24 3D DUTCH GABLE 20 / 24 3D APRON 21 / 24 3D OVER 85mm DIAMETER PIPE PENETRATION 22 / 24 3D CHIMNEY PENETRATION 23 / 24 3D RIDGE/BARGE S 24 / 24 3D DUTCH GABLE S 0800 ROOFN (0800 766 369) www.metalcraftroofing.co.nz Architectural / Specification Enquiries Ph: 09 274 0408 Mobile: 027 603 1096 Email: Frances.charles@unitedindustries.co.nz

PRE-FINISHED RIDGE CAP STOPENDS TO ROOF CLADDING METALCRAFT KAHU ROOFING * KAHU MIN.ROOF PITCH = 4 15.00 PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER FLASHGUARD DRESSED OVER KAHU RIBS CATEGORY A CATEGORY B 1. NORMAL EPOSURE 2. ROOF PITCH >10 MIN. 130mm 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. BUILDING PAPER SHOWN DASHED SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 SITUATION 2 1. VERY HIGH WIND ONE SITUATION 3 1. ETRA HIGH WIND ONE MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. ROOF RIDGE 01 / 24

PRE-FINISHED SAWTOOTH RIDGE CAP 20 * KAHU MIN.ROOF PITCH = 4 15.00 15 5 GAP ALTERNATIVE OPTION BIRDS BEAK EDGE HEMMED EDGE PRE-FINISHED 8g WAFER- TEK SCREW BEDDED IN SILICONE TIMBER PACKER STOPENDS TO ROOF CLADDING FLASHGUARD DRESSED OVER KAHU RIBS PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER BUILDING PAPER SHOWN DASHED FASCIA BOARD CATEGORY A 1. NORMAL EPOSURE 2. ROOF PITCH >10 CATEGORY B 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 TIMBER PACKER WEATHERBOARDS ON CAVITY ROOF OR WALL FRAMING MIN. 130mm MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) (VERTICALLY DOWN FACE - PROFILED) SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) SITUATION 2 1. VERY HIGH WIND ONE (VERTICALLY DOWN FACE - SMOOTH) MIN. 100mm (VERTICALLY DOWN FACE - PROFILED) PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) SITUATION 3 1. ETRA HIGH WIND ONE MIN. 50mm MIN. 70mm MIN. 90mm PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. SAWTOOTH RIDGE 02 / 24

PRE-FINISHED SAWTOOTH RIDGE CAP * KAHU MIN.ROOF PITCH = 4 15.00 STOPENDS TO ROOF CLADDING FLASHGUARD DRESSED OVER KAHU RIBS 20 PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER 15 5 GAP ALTERNATIVE OPTION BIRDS BEAK EDGE HEMMED EDGE CATEGORY A 1. NORMAL EPOSURE 2. ROOF PITCH >10 MIN. 130mm CATEGORY B 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 PRE-FINISHED 8g WAFER-TEK SCREW BEDDED IN SILICONE MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) (VERTICALLY DOWN FACE - PROFILED) (VERTICALLY DOWN FACE - SMOOTH) MIN. 100mm (VERTICALLY DOWN FACE - PROFILED) PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. TIMBER FASCIA SOFFIT LINING SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) MIN. 50mm SITUATION 2 1. VERY HIGH WIND ONE (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) MIN. 70mm SITUATION 3 1. ETRA HIGH WIND ONE MIN. 90mm PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. SAWTOOTH EAVE 03 / 24

A : OVERALL VALLEY GUTTER WIDTH * ROOF PITCH FOR VALLEYS AS PER E2. PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER B : CLEARANCE BETWEEN ROOFING C C MIN. 20mm MIN. 50mm VALLEY BOARD BUILDING PAPER CONTINUOUS UNDER GUTTER IF COPPER BASED TREATMENTS ARE USED. SHOWN DASHED SITUATION 1 SITUATION 2 PREFINISHED VALLEY GUTTER A MA. CATCHMENT 25m² MIN. ROOF PITCH 8 MIN. 250mm MA. CATCHMENT 16m² MIN. ROOF PITCH 12.5 160mm - 249mm B MIN. 50mm MIN. 40mm C MIN. 80mm MIN. 60mm PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND E2 FOR FURTHER INFORMATION. ROOF VALLEY 04 / 24

CATEGORY A 1. NORMAL EPOSURE 2. ROOF PITCH >10 CATEGORY B 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 METALCRAFT KAHU ROOFING MIN. 130mm PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. BUILDING PAPER CONTINUOUS OVER SHOWN DASHED SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) SITUATION 2 1. VERY HIGH WIND ONE (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) SITUATION 3 1. ETRA HIGH WIND ONE MIN. 250mm PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. STST OR GALV. FLAT HEAD NAIL FOR * KAHU MIN.ROOF PITCH = 4 MIN. 10mm CLEARANCE 45.00 PRE-FINISHED CHANGE OF ROOF PITCH BUILDING PAPER CONTINUOUS UNDER SHOWN DASHED 10.00 STOPENDS TO ROOF CLADDING PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER FLASHGUARD DRESSED OVER KAHU RIBS ROOF - CHANGE PITCH 05 / 24

EAVE REQUIRED WHEN - ROOF PITCH 10, OR - SOFFIT WIDTH 100mm, OR - WIND ONES = VERY HIGH OR ETRA HIGH OR - ENGINEER SPECIFIC DESIGN * KAHU MIN.ROOF PITCH = 4 15.00 MIN. 50mm MIN. 125 mm OR AS REQUIRED OVERLAP PRE-FINISHED EAVE TIMBER METALLINE QUAD GUTTER METALLINE QUAD GUTTER OVERSTRAP SPRING CLIP METALLINE FASCIA STST OR GALV. FLAT HEAD NAIL FOR PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER TIMBER SOFFIT LINING FASCIA BRACKET EAVE WITH METALLINE FASCIA 06 / 24

EAVE REQUIRED WHEN - ROOF PITCH 10, OR - SOFFIT WIDTH 100mm, OR - WIND ONES = VERY HIGH OR ETRA HIGH OR - ENGINEER SPECIFIC DESIGN * KAHU MIN.ROOF PITCH = 4 15.00 MIN. 50mm MIN. 125 mm OR AS REQUIRED OVERLAP PRE-FINISHED EAVE TIMBER METALLINE QUAD GUTTER STST OR GALV. FLAT HEAD NAIL OR METALLINE QUAD GUTTER INTERNAL BRACKET PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER PRE-FINISHED 8g WAFER-TEK SCREW TIMBER TIMBER FASCIA SOFFIT LINING EAVE WITH INTERNAL GUTTER BRACKET 07 / 24

EAVE REQUIRED WHEN - ROOF PITCH 10, OR - SOFFIT WIDTH 100mm, OR - WIND ONES = VERY HIGH OR ETRA HIGH OR - ENGINEER SPECIFIC DESIGN * KAHU MIN.ROOF PITCH = 4 15.00 MIN. 50mm MIN. 125 mm OR AS REQUIRED PRE-FINISHED POP RIVET BEDDED IN SILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW SNOW STRAP AS REQUIRED OVERLAP PRE-FINISHED EAVE METALLINE QUAD GUTTER TIMBER METALLINE QUAD GUTTER INTERNAL BRACKET STST OR GALV. FLAT HEAD NAIL FOR PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER PRE-FINISHED 8g WAFER-TEK SCREW TIMBER TIMBER FASCIA SOFFIT LINING EAVE WITH SNOW STRAP 08 / 24

EAVE REQUIRED WHEN - ROOF PITCH 10, OR - SOFFIT WIDTH 100mm, OR - WIND ONES = VERY HIGH OR ETRA HIGH OR - ENGINEER SPECIFIC DESIGN * KAHU MIN.ROOF PITCH = 4 15.00 MIN. 50mm MIN. 125 mm OR AS REQUIRED OVERLAP PRE-FINISHED EAVE TIMBER QUARTER ROUND GUTTER QUARTER ROUND GUTTER INTERNAL BRACKET PRE-FINISHED 8g WAFER-TEK SCREW STST OR GALV. FLAT HEAD NAIL FOR PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER TIMBER PACKER FASCIA BOARD TIMBER PACKER WEATHERBOARDS ON CAVITY FLUSH EAVE WITH INTERNAL GUTTER BRACKET 09 / 24

EAVE REQUIRED WHEN - ROOF PITCH 10, OR - SOFFIT WIDTH 100mm, OR - WIND ONES = VERY HIGH OR ETRA HIGH OR - ENGINEER SPECIFIC DESIGN * KAHU MIN.ROOF PITCH = 4 15.00 MIN. 50mm MIN. 125 mm OR AS REQUIRED OVERLAP PRE-FINISHED EAVE QUARTER ROUND GUTTER QUARTER ROUND GUTTER ETERNAL BRACKET PRE-FINISHED 8g WAFER-TEK SCREW TIMBER STST OR GALV. FLAT HEAD NAIL FOR PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER TIMBER PACKER FASCIA BOARD TIMBER PACKER WEATHERBOARDS ON CAVITY FLUSH EAVE WITH ETERNAL GUTTER BRACKET 10 / 24

20 PRE-FINISHED BARGE Y PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER 5mm GAP 15 5 GAP PRE-FINISHED 8g WAFER-TEK SCREW BEDDED IN SILICONE BUILDING PAPER SHOWN DASHED TIMBER PACKER ALTERNATIVE OPTION BIRDS BEAK EDGE HEMMED EDGE CATEGORY A CATEGORY B BARGE BOARD Y 1. NORMAL EPOSURE 2. ROOF PITCH >10 ONE RIB (TRAPEOIDAL & TRAY) 2 CORRUGATIONS (MC700) 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 ONE RIB, TWO RIBS (<20mm) (TRAPEOIDAL & TRAY) 3 CORRUGATIONS (MC700) TIMBER PACKER MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) (VERTICALLY DOWN FACE - PROFILED) (VERTICALLY DOWN FACE - SMOOTH) MIN. 100mm (VERTICALLY DOWN FACE - PROFILED) WEATHERBOARDS ON CAVITY BUILDING PAPER SHOWN DASHED PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. Y SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 AT LEAST TWO CRESTS MIN. 50mm SITUATION 2 1. VERY HIGH WIND ONE AT LEAST TWO CRESTS MIN. 70mm SITUATION 3 1. ETRA HIGH WIND ONE AT LEAST TWO CRESTS MIN. 90mm PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. BARGE WITH PROFILED CLADDING 11 / 24

20 PRE-FINISHED 8g WAFER-TEK SCREW BEDDED IN SILICONE Y PRE-FINISHED BARGE 5mm GAP 15 5 GAP ALTERNATIVE OPTION BIRDS BEAK EDGE HEMMED EDGE FLY RAFTER CATEGORY A 1. NORMAL EPOSURE 2. ROOF PITCH >10 CATEGORY B 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 BARGE BOARD SOFFIT LINING Y ONE RIB (TRAPEOIDAL & TRAY) 2 CORRUGATIONS (MC700) MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) (VERTICALLY DOWN FACE - PROFILED) ONE RIB, TWO RIBS (<20mm) (TRAPEOIDAL & TRAY) 3 CORRUGATIONS (MC700) (VERTICALLY DOWN FACE - SMOOTH) MIN. 100mm (VERTICALLY DOWN FACE - PROFILED) PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. SITUATION 1 SITUATION 2 SITUATION 3 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 1. VERY HIGH WIND ONE 1. ETRA HIGH WIND ONE Y AT LEAST TWO CRESTS AT LEAST TWO CRESTS AT LEAST TWO CRESTS MIN. 50mm MIN. 70mm MIN. 90mm PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. BARGE OVERHANG 12 / 24

PRE-FINISHED PARAPET CAP TIMBER PACKER MIN. 5.00 BUILDING PAPER TO PROVIDE SEPARATION OF METAL CAPPING AND TIMBER SHOWN DASHED CONTINUOUS TIMBER PACKING G N CATEGORY A 1. NORMAL EPOSURE 2. ROOF PITCH >10 25mm MIN. 50mm + HEM OR 75mm (VERTICALLY UP FACE - SMOOTH) + HEM OR 100mm (VERTICALLY UP FACE - PROFILED) CATEGORY B 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 25mm + HEM OR 100mm (VERTICALLY UP FACE - SMOOTH) MIN. 100mm + HEM OR 125mm (VERTICALLY UP FACE - PROFILED) L MIN. 150mm MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH) (VERTICALLY DOWN FACE - PROFILED) (VERTICALLY DOWN FACE - SMOOTH) MIN. 100mm(VERTICALLY DOWN FACE - PROFILED) PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 SITUATION 2 1. VERY HIGH WIND ONE SITUATION 3 1. ETRA HIGH WIND ONE PRE-FINISHED 8g WAFER-TEK SCREW BEDDED IN SILICONE STST OR GALV. FLAT HEAD NAIL FOR PRE-FINISHED SELF DRILLING / TAPPING SCREW WITH RUBBER WASHER N G G N L * KAHU MIN.ROOF PITCH = 4 L MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) MIN. 50mm 15.00 (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) MIN. 70mm PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. MIN. 90mm PRE-FINISHED APRON BARGE BOARD TIMBER PACKER WEATHERBOARDS ON CAVITY BUILDING PAPER SHOWN DASHED TIMBER NOG FOR FIING APRON STOPENDS TO ROOF CLADDING TIMBER FLASHGUARD DRESSED OVER KAHU RIBS PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER WALL FRAMING PARAPET WITH TRANSVERSE APRON 13 / 24

CATEGORY A CATEGORY B WEATHERBOARDS ON CAVITY 1. NORMAL EPOSURE 2. ROOF PITCH >10 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 BUILDING PAPER OVER SHOWN DASHED G N 25mm MIN. 50mm + HEM OR 75mm (VERTICALLY UP FACE - SMOOTH) + HEM OR 100mm (VERTICALLY UP FACE - PROFILED) 25mm + HEM OR 100mm (VERTICALLY UP FACE - SMOOTH) MIN. 100mm + HEM OR 125mm (VERTICALLY UP FACE - PROFILED) L MIN. 150mm PVC CAVITY CLOSER STST OR GALV. FLAT HEAD NAIL FOR PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. G N SITUATION 1 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 SITUATION 2 1. VERY HIGH WIND ONE SITUATION 3 1. ETRA HIGH WIND ONE CANT STRIP PACKER PRE-FINISHED APRON NOG FOR FIING APRON L G N L MIN. 130mm (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) * KAHU MIN.ROOF PITCH = 4 15.00 (ECLUDDING ANY SOFT EDGE OR TURN-DOWN TO ROOFING) PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. STOPENDS TO ROOF CLADDING PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER FLASHGUARD DRESSED OVER KAHU RIBS WALL FRAMING TRANSVERSE APRON 14 / 24

CATEGORY A CATEGORY B WEATHERBOARDS ON CAVITY 1. NORMAL EPOSURE 2. ROOF PITCH >10 1. EPOSED (HIGHER RISK) & WIND LOAD ECEEDS 1.5 kpa. 2. ROOF PITCH <10 BUILDING PAPER OVER SHOWN DASHED G N 25mm MIN. 50mm + HEM OR 75mm (VERTICALLY UP FACE - SMOOTH) + HEM OR 100mm (VERTICALLY UP FACE - PROFILED) 25mm + HEM OR 100mm (VERTICALLY UP FACE - SMOOTH) MIN. 100mm + HEM OR 125mm (VERTICALLY UP FACE - PROFILED) M ONE RIB (TRAPEOIDAL & TRAY) 2 CORRUGATIONS (MC700) TWO RIBS (<20mm) (TRAPEOIDAL & TRAY) 3 CORRUGATIONS (MC700) PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON COVER WIDTHS. SITUATION 1 SITUATION 2 SITUATION 3 PVC CAVITY CLOSER 1. LOW, MEDIUM, HIGH WIND ONES 2. ROOF PITCH 10 1. VERY HIGH WIND ONE 1. ETRA HIGH WIND ONE STST OR GALV. FLAT HEAD NAIL FOR FIING G N M AT LEAST TWO CRESTS AT LEAST TWO CRESTS AT LEAST TWO CRESTS PRE-FINISHED APRON CANT STRIP PACKER M G N PLEASE REFER TO E2 FOR FURTHER INFORMATION ON COVER WIDTHS. NOG FOR FIING APRON BUILDING PAPER SHOWN DASHED 5 mm GAP PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER WALL FRAMING PARALLEL APRON 15 / 24

THIS DETAIL IS APPLIED ONLY WHEN - ROOF PITCH MIN.10 and MA. 45 - PIPE DIAMETER MA. 85mm * MIN. 10 FOR PIPE PENETRATION 15.00 EPDM FLEIBLE CONE SLEEVE PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER TIMBER PIPE (PIPE DIAMETER MI. 85mm) MALLEABLE FLANGE, SCREW OR RIVET FIED, AND SEALED TO ROOFING PROFILE. FIT NEOPRENE WASHERS TO ALL SCREW FIINGS. FITTED ON 45 ANGLE IN PLAN. REFER TO MRM CODE OF PRACTICE VERSION 2 2/2012. EPDM FLEIBLE CONE SLEEVE MALLEABLE FLANGE, SCREW OR RIVET FIED, AND SEALED TO ROOFING PROFILE. FIT NEOPRENE WASHERS TO ALL SCREW FIINGS. FITTED ON 45 ANGLE IN PLAN. REFER TO MRM CODE OF PRACTICE VERSION 2 2/2012. TIMBER MA. 85mm DIAMETER PIPE PENETRATION Scale 1 : 5 16 / 24

THIS DETAIL IS APPLIED ONLY WHEN - ROOF PITCH MIN.10 - PIPE DIAMETER OVER 85mm AND MA. 500mm - PIPE TO BE POSITIONED AS CLOSE TO ROOF RIDGE AS POSSIBLE L PRE-FINISHED ROOF RIDGE CAP * MIN. 10 FOR PIPE PENETRATION 15.00 EPDM FLEIBLE CONE SLEEVE PRE-FINISHED SELF DRILLING/TAPPING SCREW WITH RUBBER WASHER PRE-FINISHED SOAKER UNDER PRE-FINISHED ROOF RIDGE CAP MALLEABLE FLANGE, SCREW OR RIVET FIED, AND SEALED TO ROOFING PROFILE. FIT NEOPRENE WASHERS TO ALL SCREW FIINGS. FITTED ON 45 ANGLE IN PLAN. REFER TO MRM CODE OF PRACTICE VERSION 2 2/2012. M PIPE (PIPE DIAMETER OVER 85mm AND MA. 500mm) EPDM FLEIBLE CONE SLEEVE PRE-FINISHED SOAKER WITH PRE-FINISHED POP RIVET BEDDED IN SILICONE OR PRE- FINISHED 8g WAFER-TEK SCREW 5mm GAP 5mm GAP NOGS BETWEEN S FOR PENETRATION L M REFER TO SHEET NO. 14/24 TRANSVERSE APRON REFER TO SHEET NO. 16/24 PARALLEL APRON REFER TO SHEET NO. 01/24 ROOF RIDGE OVER 85mm DIAMETER PIPE PENETRATION Scale 1 : 5 17 / 24

* PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. PRE-FINISHED RIDGE CAP PRE-FINISHED BARGE FASCIA BOARD WALL FRAMING WALL CLADDING ON CAVITY 3D RIDGE TO BARGE JUCTION Scale 18 / 24

PRE-FINISHED RIDGE PRE-FINISHED BARGE PRE-FINISHED HIP PRE-FINISHED APRON TURN DOWN INTO GUTTER. REFER TO EAVE DETAILS FOR MINIMUM ROOF OVERHANG GUTTER FASCIA BOARD WALL CLADDING ON CAVITY * PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. Scale 3D DUTCH GABLE 19 / 24

WALL CLADDING ON CAVITY PRE-FINISHED APRON DIVERTER PRE-FINISHED APRON WITH HEMMED EDGE. TURN DOWN INTO GUTTER REFER TO EAVE DETAILS FOR MINIMUM ROOF OVERHANG GUTTER * PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. FASCIA BOARD WALL CLADDING ON CAVITY Scale 3D APRON 20 / 24

* PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. PRE-FINISHED ROOF RIDGE PRE-FINISHED SOAKER LINE UNDER PRE- FINISHED ROOF RIDGE PRE-FINISHED ROOF BARGE PIPE (DIAMETER OVER 85mm) EPDM FLEIBLE CONE SLEEVE MALLEABLE FLANGE, SCREW OR RIVET FIED, AND SEALED TO ROOFING PROFILE. FIT NEOPRENE WASHERS TO ALL SCREW FIINGS. FITTED ON 45 ANGLE IN PLAN. REFER TO MRM CODE OF PRACTICE VERSION 2 2/2012. PRE-FINISHED SOAKER 3D OVER 85mm DIAMETER PIPE PENETRATION Scale 21 / 24

DIVERTER ON UPPER SIDE OF CHIMNEY MIN. 110mm UPSTAND WALL CLADDING ON CAVITY MIN. 110mm UPSTAND PRE-FINISHED 1.6mm ALUMINIUM WELDED SOAKER PRE-FINISHED SOAKER PREFINISHED VALLEY GUTTER VALLEY BOARD PRE-FINISHED APRON METALCRAFT KAHU ROOFING TURN DOWN INTO GUTTER * PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. 3D CHIMNEY PENETRATION Scale 22 / 24

OPTION 1 OPTION 2 RIDGE CAP RIDGE CAP ADDITIONAL SADDLE ADDITIONAL SADDLE BARGE BARGE * PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. 3D RIDGE/BARGE S Scale 23 / 24

(4) PRE-FINISHED BARGE (3) PRE-FINISHED 3D SADDLE (2) PRE-FINISHED APRON * PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 AND RAN HOW TO ON-SITE GUIDE METAL ROOF S FOR FURTHER INFORMATION ON COVER WIDTHS. (1) PRE-FINISHED HIP 3D DUTCH GABLE S Scale 24 / 24