Built Environment Process Reengineering (PRE)



Similar documents
Built Environment Process Reengineering (PRE): Infra FINBIM

InfraBIM Tiina Perttula

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November Juha Hyvärinen, Senior Scientist

RoadBIM Seminar Tallinn

New Business Models in Construction

buildingsmart and Infra FINBIM

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

About the Publication

Common InfraBIM requirements YIV2015

Development of the BIM based process for Dredging Works

City modeling and BIM in infrastructure planning

How To Build A Data Centre In Korea

Witty City Smart city programme 5/2013 Virpi Mikkonen

Foreword. Version Parties to the COBIM project

NELI-Programme. Kymenlaakso Logistics Development Programme Raija Salo, March 2009

BuildingSMART International Infrastructure Room Work Plan 2015 Summary

Schiphol- Amsterdam-Almere. The use of Open BIM and GIS. Henk Schaap Consultant RWS BIM program

SOLUTIONS FROM VIANOVA SYSTEMS

BIM based Schedule Control for Precast Concrete Supply Chain

Case Study: RAKLI Procurement Clinic

Human Resource Information System Contributes to the Management of Competence and Knowledge

Turku University of Applied Sciences Ltd furniture and equipment for the student laboratories of the degree programme in dental technology

Automated road transport in Finland

Contents. Expertise in access control. SaaS Software as a Service, a comprehensive solution. Megaflex Officeflow

BIM-based falling prevention planning

Cleantech. Lahti Finland. Gateway to Russia

Project Rijksweg 15, Maasvlakte-Vaanplein

QUALITY ASSURANCE IN ROAD OPERATIONS AND MAINTENANCE THE CONSULTANT S POINT OF VIEW WINTER MAINTENANCE

Case Marja-Vantaa: Introduction of a new housing area

Mobile tickets A roadmap scenario of account based ticketing in Finland

Identity Provisions for Cloud Services: Applying OASIS SOA Reference Model

Construction automation and productivity - Industry perspective

17th Eemeli Workshop. Wednesday 13th August 2014 VTT, Micronova, Tietotie 3, Espoo. Juhani Luotola, Orion Diagnostica Oy

Effective transport connections for a thriving Finland

Witty City. A Tekes Smart City Programme /2014. Program manager Virpi Mikkonen. Smart procurement program Program manager Sampsa Nissinen

Modernisation of degrees and qualifications potential for education development. Ċase Beihua Nursing Education development project.

GIS Solutions for FTTx Design. David Nelson, GISP

Road Asset Management Research Program In Finland

Case Studies. National Identity Management Commission (NIMC), Nigeria eid Consulting for national ID system

Regional innovation hubs and their role to international cooperation

use of OpenBIM Hospitals in Denmark Norway and Espoo Hospital in Finland DENMARK - FINLAND - NORGE

ABSOILS - SUSTAINABLE METHODS AND PROCESSES TO CONVERT ABANDONED LOW-QUALITY SOILS INTO CONSTRUCTION MATERIALS

Mastering Security in Agile/Scrum, Case Study

EHR STRATEGY FINLAND. Kari Harno Helsinki University Central Hospital

Inception Report. for. Cadastre & Registration FLOSS Project

ESPRIT ProCure. ICT at Work for the LSE ProCurement Chain:

ARACHNE PROJECT. Risk scoring tool. 16 Mai 2013 Jörg Schreckenberg / Auditor DG Regio Luc Molemans / Project Manager Arachne DG EMPL

2015 = 8 + 6/7! STRATEGY 2015 IMTECH ICT

Invoice Only PROFILE DESCRIPTION

International Classification of Business Functions

WATERWAYS in Finland

E-Invoice just a common message?

Bridging Innovation and Business

Public Private Partnership (PPP) Review

Department of Veteran Affairs. Fred Catoe Office of Cyber and Information Security AAIP Project Manager March 2004

SUPPLY CONTRACT NOTICE. Software Solution and ICT equipment for the State Aid System of BiH. Bosnia and Herzegovina

The Helsinki-Tallinn rail tunnel SHORT CUT TO CENTRAL EUROPE. Summary of the preliminary project plan

Development of Open BIM based Design Environment for Improving Design Productivity

MOBILE & WIRELESS SOLUTIONS IN CONSTRUCTION:

GENERAL AGREEMENT ON TARIFFS AND TRADE. GPR/Spec/69 14 August Procurement, which was circulated informally on 6 March 1992.

CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID. Document Description. Version Number 0.1 Release Date Author

TVO and Nuclear Waste Management at Olkiluoto. Corporate Adviser

Building Information Modelling and collaborative construction

FOREST PLANNING SOFTWARE DEVELOPMENT IN NORWAY

Certificate in Building Information Modelling (BIM) - Project Management

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

Experience of Aalto University with e-learning tools and ideas about implementing MUMIE

Industry Foundation Classes (IFC)

Tekla Structures More than a detailing tool. Precast concrete

BIM: Transitioning the Industry through Education. Adam Matthews Education Lead UK Government BIM Task Group

Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission

Authors and background System overview Case: The Kamppi Center Future research

Transcription:

RAKENNETTU YMPÄRISTÖ Tarvitaanko tätä palkkia? Built Environment Process Reengineering (PRE) RYM SUMMIT 2013 Kimmo Laatunen, Infra FINBIM Built Environment Process Innovations Reengineering 3.12.2013

Built Environment PRE and Infra FINBIM Kimmo Laatunen Aim of PRE is to promote BIM in Building and Infra Construction areas PRE Program period 1.11.2010 30.4.2014 PRE total budget is 21 M, 37 industrial and 6 research partners Infra FINBIM is one of the six PRE work packages Infra FINBIM budget is about 6 M, consortium partners 18 3.12.2013 Page 2

Infra FINBIM visio Year 2014 large owners of infra structures are ordering just model-based services, which are used in all stages of project, beginning from order of design and ending to maintenance stage. Signature: Infra FINBIM consortium year 2010 3.12.2013 Page 4

How to Achieve the Goals? Infra FINBIM output will be guidance and requirements for product modeling. InfraBIM-project will publish guidelines and requirements. Before publishing all guidelines and reguirements will be tested by real case pilots. Research partners will collect and collate the pilots experiencies. 3.12.2013 Page 5

Business Processes Guidelines, skill requirements Information needs Efficiency Information, knowledege Actors (human) Technologies (ICT / BIM) 3.12.2013 Page 6

Business Processes Guidelines, skill requirements Information needs Efficiency Information, knowledege Actors (human) Technologies (ICT / BIM) 3.12.2013 Page 7

Business Processes Guidelines, skill requirements Information needs Efficiency Information, knowledege Actors (human) Technologies (ICT / BIM) 3.12.2013 Page 8

InfraBIM information Kimmo Laatunen Format Inframodel3-format Classification and coding systems InfraBIM-classification The language Format Modelling guidelines and requiremets InfraBIM-requirements How to model, accuracy Classification Requirements 3.12.2013 Picture: Juha Liukas

Inframodel is an open method for transfer of infrastructure informations / models Kimmo Laatunen A subset of international LandXML-standard Extensions as Feature-elements Adapted to Finnish practices In the InfraFINBIM-project has been published Inframodel3-definition, based on the LandXML1.2-version Large owners of infra structures will require in all design orders inframodel3-format 1.5.2014! 3.12.2013

Web-documentation Kimmo Laatunen http://cic.vtt.fi/projects/inframodel... 3.12.2013

www.infrabim.fi 3.12.2013 Page 12

Guidelines development in the future Guidelines will be used by Infraowners daily published Building Information Ltd (RTS) maintained as efford of buildingsmart Finland development further as common efforts InfraFINBIM työpaketin jäsenille ja aktiiveille, tehkää varaus inframallinnusasioille keskiviikkoon 15.1.2014 buildingsmart Finland Infra toimialaryhmän perustamiskokous ja InfraFINBIM Mallinnusvaatimukset työpaja 1/2014 pidetään keskiviikkona 15.1.2014 Rakennustiedossa, os. Malminkatu 16 A, 00100 Helsinki, 8. krs. 3.12.2013 Page 13

MANY REAL PILOTS ID Name Description Type 1 Vt7 Hamina Inframodel Fundamental improvement, main road, design and construction phase Road Fundamental improvement, street, design and construction phase, built-up 02a Vanha Kirkkotie Street COLLECTED TO DATA environment BANK Fundamental improvement, street, design and construction phase, un-built 02b Bassenkylä Street area 02c 02d Storhemtintie Tammitie Fundamental improvement, street, design and construction phase, un-built area Fundamental improvement, street, design and construction phase, built-up environment Street Street Kimmo Laatunen 3 Maintenance-BIM Maintenance, initial data (new technology), entire process of the maintenance Road 5 VT8 Sepänkylän ohitustie New highway design and construction phase Road 6 DredgingBIM Information model and automation in dredging Waterway 9 VT 14 Laitaatsalmi Fundamental improvement, main road, design and construction phase Road, Railroad, Waterway 10 Laitaatsalmen lähtötietomalli Bridge/street/track/water, information model, entire process Road, Railroad, Waterway 14 Jorvaksen ratapihan lähtötietomallin mittaus Track, initial data, technology Railroad 15 Jorvaksen ratasuunnitelman hankinta Track, procurement process, formatting tender documents Railroad 17 Vt 25 Meltola-Mustio Fundamental improvement, main road, design and construction phase Road, Bridge 18 Nybro Bridge, information model, entire process Bridge 19 Varjakanpuisto Bridge, information model, entire process Bridge 20 Melatie Bridge, information model, entire process Bridge 21 Töölönlahti Bridge, information model, entire process, tunnel Bridge 22 Junatie Bridge, information model, entire process Bridge 23 Hyväntoivonpuisto Bridge, information model, entire process Bridge 24 Nissolan ratasuunnitelma Fundamental improvements, track, design, virtual model, customer feedback Railroad, Street 25 Lumitöiden estekartoitus Maintenance, track, snow works, geographic information Railroad 26 Mallipohjainen radanrakentamisen automaatio track, macine guidance, quality control Railroad 28 Karhumäen ylikulkusilta Bridge, information model, construction planning Bridge 29 Kehä III ja Lentoasemantien tukimuurit retaining wall, information model, construction planning Retaining wall 3.12.2013 Page 14

Interface of design and construction is the main focus points in piloting 28 29 26 25 3.12.2013 Page 15

Infra owners have the knowhow! Kimmo Laatunen 3.12.2013 Page 16

Realtime Production Control Under Piloting 3.12.2013 Page 17

THANK YOU! Kimmo Laatunen 040 866 5537 kimmo.laatunen@vr.fi Picture: Rauno Heikkilä 3.12.2013 Page 18