1 CRM Initial Implementation PROJECT DOCUMENTATION PROJECT INITIATION DOCUMENT PID Document Description Version Number 0.1 Release Date Author Sandy Spink Owner Spink Telecom Consultants Ltd Client Tunbridge Wells Borough Council Document Ref. TWBC PID Ver 0.1 Revision Date of this Revision: 11 th February 2005 History Summary of Changes: Changes Marked? : Approvals This document version requires the following approvals: Name Role Initialled/ Distribution This document version has been distributed to: Name Role Date Andy Cole IT Mgr 11 th February 2005 Page 1 of 11

2 Details Contents PURPOSE 3 BACKGROUND 3 OBJECTIVES 4 SCOPE 5 DELIVERABLES AND/OR DESIRED OUTCOMES 6 EXCLUSIONS 8 CONSTRAINTS 8 RISKS 8 GENERAL REQUIREMENTS 9 ASSUMPTIONS 9 ORGANISATIONAL STRUCTURE 10 PROJECT CONTROLS 11 Page 2 of 11

3 Purpose Background To define the project, to form the basis for its management and the assessment of overall success Following the 2004 CPA review and a subsequent report by Spink Telecom Consultants Ltd, Tunbridge Wells Borough Council have concluded that a gradual approach to implementing a customer relationship management (CRM) system is necessary. Rather than adopt the single contact centre approach favoured by some other local authorities, the decision has been taken to introduce the principals of CRM on a distributed basis across selected departments. CRM will enable the single customer view by creating workflow and case management, integrating with back office applications. It will also initiate the separation of customer services from administration and professional services. Primary phase ( Stage 1 ) departments/services have been identified as Planning, Benefits, Housing, Environmental Services (including Client Services). These will serve as a 12 licence pilot scheme designed to introduce the concept of CRM to TWBC officers. It has been recognised that a successful CRM implementation must take into account three main factors: i) People fears must be addressed in a positive light with explanations as to why the project is taking place and how service delivery will improve through its implementation ii) iii) Processes current working practise must be reviewed down to a granular level and assessed for gaps and dependencies. Technology the current telephony system and Wide Area Network will need some enhancements to meet the call distribution and networking requirements of a CRM solution. The CRM solution must integrate with existing back office applications. Page 3 of 11

4 Objectives To procure and implement a CRM solution distributed across the three/four phase one departments To upgrade telephony to meet the required distribution capabilities. To educate officers, through workshops and general information bulletins, as to the benefits of the project. To ensure CRM integrates with CAPS software products for true back office integration. This approach is classified as deep and narrow rather than broad and shallow, with the emphasis being on customer service staff providing a more detailed level of assistance through workflow and integration, than simply logging enquiries. To develop a knowledge base that will allow quick answers to routine enquiries and in future phases, link into the workflow system. To support the growth and development plan of the CRM system and facilitate services transferring to it, ultimately leading to a centralised customer service unit. To ensure the CRM tool selected is robust enough to meet the council s longer term aspirations to extend its use to a greater number of services, future centralisation and for use in different front and back offices. To use the initial implementation to learn on how best to use CRM and how it can be applied in other areas in order to achieve benefits. To use the experience to build cost and work models for future introduction of CRM To avoid the risks of a larger CRM project being difficult to control and manage To meet the requirements of the Governments IEG priority outcomes (especially 14, making it easy to do business with the council ), BVPI 157 and the requirements of the latest CPA review. Page 4 of 11

5 Scope The scope of this project is for a defined initial implementation that allows TWBC to introduce CRM in a controlled manner thus reducing the risk and work involved with a larger big bang approach. The project is planned to run in four phases as follows:- Phase 1 Business Process Review Phase 2 Procurement Phase 3 Implementation Phase 4 Consolidation & Review Phase 1 of the project will comprise 4 stages: i) Corporate awareness and change management (.weeks) ii) Process Mapping as is of Stage 1 departments (6-8 weeks) iii) ROI and business benefits assessments. iv) Process re-engineering to be (4-6 weeks) Phase 2 of the project will comprise 6 stages i) Specify and update telephony requirements (6-8 weeks) ii) Specify CRM requirements (4 weeks) iii) Prepare Procurement documentation (2 weeks) iv) Issue ITT (4 weeks) v) Evaluate Proposals (4 weeks) vi) Agree Contract/Plan (4 weeks) Phase 3 of the project will comprise 5 stages i) Supplier workshops for workflow evaluations (3 weeks) ii) Installation of software and hardware (3 weeks) iii) Training (2 weeks) iv) Integration with existing applications (4 weeks) v) Training (2 weeks) Phase 4 will be further specified at the end of phases1, 2 & 3. Some parts of Phases 1 and 2 may run concurrently (see GANT chart). The scope limits the CRM to four Stage 1 departments: Planning Benefits Housing Environmental Services ( including Client Services) and to interface with the Academy, ESRI and Uniform systems. Page 5 of 11

6 Deliverables and/or Desired Outcomes In order to provide its objectives, the project will deliver the following products leading through the procurement process to the installation of a CRM system. General This PID as a high level statement of objectives Establish a project mandate and define membership and terms of reference for the project board. Establish departmental champions, who may form part of the Level 4a procurement team (see Organisation Structure) A corporate communication plan on the CRM project, to be developed by the project manager in liaison with the project board A risk register for the project to be developed through the running of a risk workshop Phase 1 Business Process Review A record of current as is processes in Stage 1 departments presented as flow charts on Microsoft Visio or similar A management report and gap analysis Process costs for ROI evaluation Business benefits analysis- - Performance - Costs - Customer service - Accuracy To be process generation based on information gathered and detailed discussions with departmental teams. Phase 2 Procurement Specifications and upgrade to telephony systems and WAN Specifications and ITT for CRM GCAT mini tender An evaluation plan and team for evaluating the Gcat proposals The evaluation of proposals by the evaluation panel following the agreed method A recommendation from the evaluation panel to the Project board on the preferred solution Confirmation of contract terms with preferred supplier. Page 6 of 11

7 Phase 3 Implementation Installation of telephony updates Upon selection of the chosen CRM supplier an agreed plan for the implementation phase Installation and configuration of all required hardware and software Initial Implementation of CRM within the Stage 1 departments. Development of the scripts, templates, workflow, knowledge management and help facilities to for the services within the Stage 1 departments. Acceptance Training for staff in use of the CRM Interfaces from the CRM to/from CAPS & Academy applications. Phase 4 Consolidation The ability to demonstrate practical use and benefits of CRM within a real life TWBC example Upon completion of the implementation phase a review of the system and process leading to a plan for further phases Upon completion of the implementation and/or during the consolidation phase updated proposals for the future development of CRM at TWBC A costed justification for sustainability funding and the ongoing licence and support costs for the use of CRM Page 7 of 11

8 Exclusions The project excludes any additional interfaces between the CRM system and business applications other than those identified Sustainability funding for future year use of the CRM Changes to ground floor reception Migration to a central customer service unit Constraints The new system and associated consultancy must be provided within the budget set Conflicts in corporate priorities Availability of staff to support the project Constraints set by the market place for CRM and/or by the proposals that may emanate from the Gcat mini tender There may be constraints imposed by 3 rd party suppliers in respect to their own development or installation timetables. The CRM system must be supplied and installed by (date..) Implementation and testing must be complete by the end of (month).2005 Tolerances for each phase of the project will be established as part of the phase plan. Risks Project support from top to bottom. Without buy in from all levels, the project will be difficult to implement successfully. The communication plan must be effective to avoid non participation. Page 8 of 11

9 General Requirements Establish clear workflow interfaces and pass through arrangements between activities carried out in Phase 1 departments using the CRM system and activities carried out elsewhere Establish a customer database that can be used to share data with other services and applications as required. Establish links with the council s approved address database (The Land and Property Gazetteer?) Establish the CRM in such a manner that it incorporates and builds a knowledge base, and has access to e-forms and published information from the Council s website to support the mediated service rather than duplicating such information within the CRM system itself. Inter-work with the office tools (e.g. Office, Exchange) used in the council and reside in a seamless manner on agents computers. Compatibility with the TWBC telephony API. Be developed to utilise the standards and guidance issued by the National CRM Project in respect of dealing with customers, with customer care programmes and with the standards and quality procedures applied throughout TWBC. Assumptions That there will be no further changes to the deadlines or priorities set by the government for its Implementing Electronic Government priorities. That the Town Hall reception area will have been refurbished to become a general reception area by the time the project is ready for implementation. That the CRM market place responds to the Gcat mini tender and we have a number of credible proposals to evaluate and make recommendations. That the budgeted 12 licences will be sufficient for the proposed pilot phase. Page 9 of 11

10 Organisational Structure Level 1: e-services Sub Group formal reports/approval Level 2: Project Board Level 3: Project Manager(s) Level 4a: Procurement & Evaluation Team Level 4b: Implementation Team Level 4c: Consolidation Team Level 1: Gave approval for the project and needs to receive progress reports and bids for any further funding Level 2: Management of the project, approval of project documents and controls Level 3: An internal project manager will be required to coordinate phases 1 & 2. If appointed, Spink Telecom Consultants Ltd will lead external resourcing and preparation of technical specifications will also take a project management role for the council for phase 3 if required. Upon completion of phase 3 decisions will be required on how to manage further roll-out of the CRM in phase 4. The project board will be the group that takes the decision on project management arrangements for implementation and beyond (Phases 3 and 4) Level 4a: Issuing the Gcat min tender will be led by Spink Telecom, if appointed, working with an reference group. The project board will appoint an evaluation team from nominations received to represent ICT, Customer Service and business services. Level 4b: To be agreed during the procurement phase, may have a joint team with the supplier or may have separate teams. Level 4c: To be determined during the implementation phase. Page 10 of 11

11 Project Controls The project will use the Prince 2 toolkit in a practical manner to ensure proper project discipline. The project board will approve/ratify documents either by (requiring a specific approval/not approved response) or by holding a meeting. The project board will meet at least once at the beginning of each new stage/end of each previous stage. The project manager will provide a short weekly briefing for the project executive and will update the project plan at regular intervals The project manager will issue highlight reports at the end of each stage and/or at least every 4 weeks and exception reports should any stage incur a delay/overspend/overrun beyond the agreed tolerances. Budget management and the placing of any orders will be undertaken by a council officer who has received the required training and who has appropriate authority under standing orders and schemes of delegation. Page 11 of 11

Programme Governance and Management Plan Version 2

Programme Governance and Management Plan Version 2 PROCESS FOR CHANGE - Detailed Design Programme Governance and Management Plan Version 2 1 INTRODUCTION In October 2008, the Council approved the selection of seven opportunity themes to take forward from

More information

ICT Service Desk Creation

ICT Service Desk Creation ICT Service Desk Creation Project Initiation Document Document: ICT Service desk Creation: PID Issue Date: 26 th November 2010 Version: 0.1 Draft Version Number: 1.0 Change Control Quality Assurance Document:

More information

Information Governance Strategy & Policy

Information Governance Strategy & Policy Information Governance Strategy & Policy March 2014 CONTENT Page 1 Introduction 1 2 Strategic Aims 1 3 Policy 2 4 Responsibilities 3 5 Information Governance Reporting Structure 4 6 Managing Information

More information

Digital Marketplace - G-Cloud

Digital Marketplace - G-Cloud Digital Marketplace - G-Cloud CRM Services Core offer 9 services in this area: 1. Dynamics CRM Upgrade Services Utilising this service, Core will undertake an evaluation of your current CRM platform. We

More information

Department of Finance and Deregulation 2011/004 Portfolio Panels for IT Services ATTACHMENT A

Department of Finance and Deregulation 2011/004 Portfolio Panels for IT Services ATTACHMENT A 2011/004 Portfolio Panels for IT Services Definition of IT Services The definition for IT Services supports the Portfolio Panel Policy and reflects the Victorian eservices model. Key Service Category Management

More information

Single Stage Light Business Case Template

Single Stage Light Business Case Template Better Business Cases Single Stage Light Business Case Template Prepared by: Prepared for: Date: Version: Status: Better Business Cases Single Stage Light Business Case Template Document Control Document

More information

CenSus ICT Strategy (2012 2015)

CenSus ICT Strategy (2012 2015) CenSus ICT Strategy (2012 2015) Date: September 2012 Version: 5.0 Version Control Amendment History including Author: Version Date Author / Amendment History 1.0 Draft 30 th August 2012 Graham Crossingham

More information

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000 Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE

More information

Length of Contract: 2 months (with an option to extend for a further 5 months).

Length of Contract: 2 months (with an option to extend for a further 5 months). 1. Introduction The Joint Workplace Solution (JWS) team will shortly complete the migration of some 2000 users from SharePoint 2007 to 20 and alongside this a programme of developing a series of line-of-business

More information

Decision Request Form INDIVIDUAL CABINET MEMBER

Decision Request Form INDIVIDUAL CABINET MEMBER Cabinet Office Location: 3E/05 Ext: 0472 DDI : 01895 250472 My Ref: SEC To: COUNCILLOR RAYMOND PUDDIFOOT LEADER OF THE COUNCIL COUNCILLOR JONATHAN BIANCO CABINET MEMBER FOR FINANCE AND BUSINESS SERVICES

More information

JOB SPECIFICATION. Service Support Manager ORGANISATION CHART: JOB PURPOSE:

JOB SPECIFICATION. Service Support Manager ORGANISATION CHART: JOB PURPOSE: JOB SPECIFICATION JOB TITLE: GRADE: Service Support Manager SMP ORGANISATION CHART: JOB PURPOSE: Management responsibility for the Service Support within the Trust delivering an efficient and cost effective

More information

Procurement Policy. Finance Policy

Procurement Policy. Finance Policy 1 Purpose Victoria University of Wellington (the University ) and its subsidiaries are large scale procurers of goods and services. To ensure continued accountability and robust governance, it is critical

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: [email protected] Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: [email protected]

More information

APPENDIX A (CFO/263/09) Merseyside Fire & Rescue Service ICT Outsourcing Procurement Support. Final Report

APPENDIX A (CFO/263/09) Merseyside Fire & Rescue Service ICT Outsourcing Procurement Support. Final Report Merseyside Fire & Rescue Service ICT Outsourcing Procurement Support Final Report Version 1.1 Oct 2009 Contents 1. Executive Summary...3 2. Context and Background...3 3. Deliverables and Value Added...

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Wirral Council: Job Role Descriptor HR USE ONLY

Wirral Council: Job Role Descriptor HR USE ONLY Wirral Council: Job Role Descriptor Job Role: Service: Reports to: No. of Subordinates: Job Role Ref: Job Family: Grade: Senior ICT Technician ICT Services Team Leader/Group Leader 0 HR USE ONLY CSUP Corporate

More information

www.parkmark.co.uk Website development Invitation to Tender

www.parkmark.co.uk Website development Invitation to Tender www.parkmark.co.uk Website development Invitation to Tender Copyright 2012 - British Parking Association. All rights reserved. This document is supplied purely for the purpose of assisting suppliers to

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

Information Services Strategy 2011-2013

Information Services Strategy 2011-2013 Information Services Strategy Issue 1 1 Introduction The States of Jersey public sector is facing significant pressure for efficiencies and savings. This has created the context to take a fresh look at

More information

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Recommendations That the Executive note CRM procurement will be put out to tender in 2010/11 and note the proposed phasing

More information

Portfolio: Transformation, Modernisation and Regulation

Portfolio: Transformation, Modernisation and Regulation Portfolio: Transformation, Modernisation and Regulation Procurement Committee 19 October 2006 Procurement of E-mail, Calendar and Archiving System Report by: Ward Implications: Head of City Service and

More information

PARKWELL. An Introduction to. Parkwell Management Consultants

PARKWELL. An Introduction to. Parkwell Management Consultants PARKWELL An Introduction to Parkwell Management Consultants Table of Contents Page 1. Introduction 2 2. Background to Parkwell 3 3. Parkwell s methods 4 4. Case studies 12 1 1. Introduction Parkwell Management

More information

The Scottish Wide Area Network Programme

The Scottish Wide Area Network Programme The Scottish Wide Area Network Release: Issued Version: 1.0 Date: 16/03/2015 Author: Andy Williamson Manager Owner: Anne Moises SRO Client: Board Version: Issued 1.0 Page 1 of 8 16/04/2015 Document Location

More information

South Norfolk Council Project Management Handbook

South Norfolk Council Project Management Handbook South Norfolk Council Project Management Handbook Version 1.0 With special thanks and acknowledgement to the Manchester City Council in particular Kevin Fletcher, Bob Rutt, Julie Sprigg, Alan Holding &

More information

Chapter 6 Implementation Planning

Chapter 6 Implementation Planning Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work

More information

Agenda Item No.6 (j) DERBYSHIRE COUNTY COUNCIL CABINET. Report of the Director of Transformation

Agenda Item No.6 (j) DERBYSHIRE COUNTY COUNCIL CABINET. Report of the Director of Transformation DERBYSHIRE COUNTY COUNCIL CABINET 26 th September 2012 Report of the Director of Transformation Agenda Item No.6 (j) INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) STRATEGY Purpose of Report To seek Cabinet

More information

PLANNING AND DEVELOPMENT DEPARTMENT OUTLINE FUNCTIONAL SPECIFICATION FOR A BUSINESS OBJECTS DASHBOARD TOOL MAY 2011

PLANNING AND DEVELOPMENT DEPARTMENT OUTLINE FUNCTIONAL SPECIFICATION FOR A BUSINESS OBJECTS DASHBOARD TOOL MAY 2011 PLANNING AND DEVELOPMENT DEPARTMENT OUTLINE FUNCTIONAL SPECIFICATION FOR A BUSINESS OBJECTS DASHBOARD TOOL MAY 2011 TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 BACKGROUND... 3 1.2 PURPOSE... 4 1.3 RESPONSE

More information

EDRMS Procurement and Pre- Implementation

EDRMS Procurement and Pre- Implementation GPO Box 2343 Adelaide SA 5001 Tel (08) 8204 8773 Fax (08) 8204 8777 DX:467 [email protected] www.archives.sa. gov.au EDRMS Procurement and Pre- Implementation August 2009 Version 3.1 Table

More information

Information Governance Framework

Information Governance Framework Information Governance Framework March 2014 CONTENT Page 1 Introduction 1 2 Strategic Aim 2 3 Purpose, Values and Principles 2 4 Scope 3 5 Roles and Responsibilities 3 6 Review 5 Appendix 1 - Information

More information

SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR

SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR SOMERSET COUNTY COUNCIL KEY DECISION TAKEN BY THE COMMERCIAL AND BUSINESS SERVICES DIRECTOR Report title: Procurement of a preferred Software Licence Reseller and support services Officer(s): Richard Williams,

More information

POSITION INFORMATION DOCUMENT

POSITION INFORMATION DOCUMENT POSITION INFORMATION DOCUMENT Position Title: Senior Manager, ICT Contracts Classification Code: ASO8 Division: ICT Services Directorate: ICT Contracts & Performance Management Type of Appointment: Branch:

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which

More information

Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs

Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs 1. Introduction Background The National e-procurement Project (NePP) and Centre for Procurement Performance (CPP) are working to support and enable schools to meet their e- Government targets and to gain

More information

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services

Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Migrating to the Cloud Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Organisations are looking for new ways to deliver IT services and demanding that ICT

More information

Customer Service Software System Business Case Lead Officer:

Customer Service Software System Business Case Lead Officer: Agenda item: 17 Committee: CABINET Date of meeting: 21 November 2012 Subject: Customer Service Software System Business Case Lead Officer: Head of ICT Portfolio Holder: Resources - Councillor T Oliver

More information

Epsom and Ewell CRM Tender Questions and Answers

Epsom and Ewell CRM Tender Questions and Answers Epsom and Ewell CRM Tender Questions and Answers Qu Question Answer 1 What Microsoft licence agreement does the Council currently have e.g. Enterprise or Select? The Council has an Enterprise Agreement

More information

Client Communication Portal Project

Client Communication Portal Project Client Communication Portal Project In 2014 Sunnyfield was awarded a grant by the Organisation Transition Fund to develop a Client Communication Portal. The aim of the project was to enhance person centred

More information

Project Initiation Document

Project Initiation Document Project Sponsor: Richard Ellis Version: 1.0 Date: 2 nd July 2009 Document Control Project Sponsor Richard Ellis Project Initiation Document Project Call Recording and Workforce Management Document PID

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

COMHAIRLE NAN EILEAN SIAR S CUSTOMER SERVICE STRATEGY

COMHAIRLE NAN EILEAN SIAR S CUSTOMER SERVICE STRATEGY S September 2008 CONTENTS INTRODUCTION...3 CUSTOMER RELATIONSHIP MANAGEMENT (CRM)...7 ACCESS CHANNELS...9 CUSTOMER CARE STANDARDS...13 PERFORMANCE & CONTINUOUS IMPROVEMENT...15 2 INTRODUCTION Background

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

sdsys THAGORAS SCISYS UK LTD The National Archives Customer Relationship Management System and Integrated Email Marketing Solution RESPONSE TO TENDER

sdsys THAGORAS SCISYS UK LTD The National Archives Customer Relationship Management System and Integrated Email Marketing Solution RESPONSE TO TENDER sdsys THAGORAS SCISYS UK LTD The National Archives Customer Relationship Management System and Integrated Email Marketing Solution RESPONSE TO TENDER The National Archives Redacted under! IFOI exemption

More information

Service Desk Institute 10 Steps To Successful ITSM Tool Selection

Service Desk Institute 10 Steps To Successful ITSM Tool Selection Service Desk Institute 10 Steps To Successful ITSM Tool Selection Introduction The one decision that really makes a difference for both consumers of IT and our service desk analysts is the one to replace

More information

The Danwood Group Professional Services Offering DANWOOD

The Danwood Group Professional Services Offering DANWOOD The Danwood Group Professional Services Offering DANWOOD Our Professional Services Our Professional Services department can provide you with a variety of services from Audit and Assessment to Technical

More information

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER ARGYLL AND BUTE COUNCIL STRATEGIC POLICY COMMITTEE CHIEF EXECUTIVE 20 JULY 2006 HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER 1 SUMMARY This report updates the

More information

Technical Project Manager JOB DESCRIPTION

Technical Project Manager JOB DESCRIPTION JOB TITLE: BUSINESS UNIT: REPORTS TO: Technical Project Manager ICT Manager, ICT EA GRADE: Non-EA Position DATE APPROVED: 17/12/2015 JOB SPECIFICATION SUMMARY OF THE BROAD PURPOSE OF THE JOB The Technical

More information

Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION

Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION Easthampstead House, Town Square, Bracknell, Berkshire RG12 1AQ Tel: (01344) 352000 Invitation to Quote (ITQ) for STREET WORKS IT SOLUTION xxx COMPLETED BY ORGANISATION [Supplier to complete] NAME DATE

More information

OIL & GAS SUPPORTING THE PROJECT & ASSET LIFECYCLE

OIL & GAS SUPPORTING THE PROJECT & ASSET LIFECYCLE OIL & GAS SUPPORTING THE PROJECT & ASSET LIFECYCLE KENNY INGRAM INDUSTRY DIRECTOR [email protected] AGENDA Who are IFS Typical Systems Landscape IFS Solution Benefits of IFS Solution SUPPLY CHAIN

More information

BRENT COUNCIL IT STRATEGY 2010-13

BRENT COUNCIL IT STRATEGY 2010-13 BRENT COUNCIL IT STRATEGY 2010-13 Contents 1 Introduction... 2 2 Empowering our customers... 3 2.1 Client Index... 3 2.2 Customer contact... 3 3 Tools for the Job... 4 3.1 Printing and scanning... 4 3.2

More information

Organisational Improvement Programme Management Highlight Report. Highlight Report Overall RAG Status AMBER. Management Summary

Organisational Improvement Programme Management Highlight Report. Highlight Report Overall RAG Status AMBER. Management Summary Appendix 1 Organisational Improvement Programme Management Highlight Report Highlight Report Overall RAG Status To I&E sub-committee Project / Programme Name Organisational Improvement Programme Reporting

More information

Marval Software Limited. G Cloud iii Framework Service Definition

Marval Software Limited. G Cloud iii Framework Service Definition 1 Marval Software Limited G Cloud iii Framework Service Definition Page 1 of 9 2 Contents An overview of the Marval Service Management (MSM) Software Solution... 3 Information assurance Impact Level (IL)

More information

Enquiry 2014 15 Ref 034

Enquiry 2014 15 Ref 034 2014 12 03 Request for Quotation: Design, Printing and Supply of the Buffelsdraai Information Booklet and Brochure for the Environmental Planning and Climate Protection Department 1. Background Enquiry

More information

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change For Decision Member Champion(s): Cllr A Alford, Corporate - Director:

More information

KPMG Advisory. Microsoft Dynamics CRM. Advisory, Design & Delivery Services. A KPMG Service for G-Cloud V. April 2014

KPMG Advisory. Microsoft Dynamics CRM. Advisory, Design & Delivery Services. A KPMG Service for G-Cloud V. April 2014 KPMG Advisory Microsoft Dynamics CRM Advisory, Design & Delivery Services A KPMG Service for G-Cloud V April 2014 Table of Contents Service Definition Summary (What s the challenge?)... 3 Service Definition

More information

About ERP Software Whitepaper

About ERP Software Whitepaper About ERP Software Whitepaper Many people have heard the term ERP used in a conversation but don t fully understand what it means. This whitepaper will provide information about the processes and advantages

More information

OGC. OGC Gateway Review 4 Readiness for service. FINAL REPORT Programme Title: New National Network (N3) OGC Gateway Number: 339

OGC. OGC Gateway Review 4 Readiness for service. FINAL REPORT Programme Title: New National Network (N3) OGC Gateway Number: 339 OGC Gateway Review 4 Readiness for service Version number: Final Report Date of issue to SRO: 25/8/2005 Department: DoH Agency or NDPB: CfH OGC Gateway Review dates 22/8/2005 to 25/8/2005 OGC Gateway Review

More information

Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview

Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1 Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program

More information

University of Strathclyde: Information Services Directorate Operational Plan for 2014/15

University of Strathclyde: Information Services Directorate Operational Plan for 2014/15 University of Strathclyde: Information Services Directorate Operational Plan for 2014/15 Enabling the future: transforming our information systems and technology 2014/15 2014/2015 CONTENTS 1 DRIVERS, STRATEGIC

More information

Prince 2 Health Check

Prince 2 Health Check Prince 2 Health Check Start-up Was there a Project Mandate? Was the Project Board designed/appointed before initiation was authorised? Was a Project Brief produced? Is the Project Brief to PRINCE standards?

More information

the Cloud with SharePoint & Office 365 www.gig-werks.com

the Cloud with SharePoint & Office 365 www.gig-werks.com Enterprise Workflow & Process Automation in the Cloud with SharePoint & Office 365 Today s Presentation: Introduction About Gig Werks Advantages of Office 365 SharePoint & Workflow Overview About Nintex

More information

Senior Project Manager (Web Content Management)

Senior Project Manager (Web Content Management) Senior Project Manager (Web Content Management) IT Services Portfolio & Project Management Office Salary Grade 8-40,046 to 45,053 per annum Fixed term contract for 2 years (** see below for contract information)

More information

ICT Category Sub Category Description Architecture and Design

ICT Category Sub Category Description Architecture and Design A A01 Architecture and Design Architecture and Design Enterprise & Business Architecture A02 Architecture and Design Information Architecture A03 Architecture and Design Solution Architecture B Benchmarking

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information