City modeling and BIM in infrastructure planning

Size: px
Start display at page:

Download "City modeling and BIM in infrastructure planning"

Transcription

1 The City Rail Loop City modeling and BIM in infrastructure planning Tiina Perttula, Jukka Tarkkala

2 The City Rail Loop

3 Idea and goals of the City Rail Loop The majority of commuter trains to run in a tunnel under Helsinki city center. Gives more space to long distance trains. Stations: Töölö, Keskusta ja Hakaniemi Max speed 80 km/h 3 3

4 4 4

5 5 5

6 Longitudinal section schematic Töölö -17 m bsl Keskusta -45 m bsl Hakaniemi Pasila +22 m asl Hakaniemi - 29 m bsl 6 6

7 7 7

8 BIM: Before starting the project

9 Before starting planning phase Decision to do planning phase and construction design phase using modeling was made in 2012 Open workshops for consultants and contractors late 2012 Modeling strategy early 2013 Goals and the use on model Process Actors and roles Quality Communication Education 10 10

10 Before starting planning phase Collect data for initial data model, summer 2013 Project portal for data, October 2013 possibilities to open models via data bank ICT and BIM guidelines for the project was finished early

11 Goals and challenges of using BIM

12 Goals of using BIM Combining Models - Combining new Building- and Infrastructure models - Compiling new structures with existent structures Quantities & Mass calculation - Target: real time quantities Continuous City model and collaboration with interest groups - Authorities - Related projects - Underground City Plan Generating information package that suits for maintenance systems 13 13

13 Challenges of using BIM Peculiar Project: - Combining Infra- and Building structures - Open LandXML/IM3 format - Huge amount of initial data - Dozens of interest groups 14 14

14 Initial data Initial data is basic information of the existing environment or other documents that are needed before starting the project design Initial data can be for example in pfd, dgn, dwg, doc, tif, jpg formats Representing data in computer interpretable formats All the computer applications used in the project should be able to utilize initial data Everyone in the project should have access to initial database (project bank) 15 15

15 Initial data, approximate model of existing tunnels Scanned model of existing tunnels 16 16

16 BIM Process and Operators

17 Requirements for BIMprocess 1. Common rules 2. Initial data management 3. Information flow and problem solving 19 19

18 Requirements set for designers BIM Strategy - Goals - Usage Of BIM - Information Transfer rules Design guidelines - Design Process - Participants and operators ICT-guidelines - BIM processes and procedures - Problematic parts - Detail of modelling 20 20

19 BIM based processes There are no ready processes: - Updating this amount of initial data - Combining Infra and Building -models - Cost estimation 21 21

20 Problem solving methods Before starting Planning Authorities Client Design coordinator Cost calculation Client BIM group Designer BIM Group Design teams 22 22

21 Combination models 23 23

22 Combination models 24 24

23 Experiences

24 Planning the Helsinki City Rail Loop, Experiences during General Data about present state When you collect information, do it well Wrong information can be dangerous Distribute the information to owners, authorities, other planners Underground spaces and structures are laborious to model and inspect, do it as well as possible at once XY is not enough, Z and attributes are needed also (case: cables) Planning with BIM Plan the processes well, somebody always knows the best work flow and alternatives Determine the purpose of planning first, determine the actions only then Talk about the problems, somebody always knows the solution (or wait for a while) BIM: Don t wait, but act yourself and inform other people Do sketches, but accept the idea that they are not final design models Don t use too large elements 29 29

25 Planning the Helsinki City Rail Loop, Experiences during Examples Borehole accidents 1. A close call to structures of underground public transport, practically no damages 2. Borehole through the roof of an underground garage, minor damage 3. Borehole through the wall of a rock tunnel, minor damage It is important to Maintain and update data about underground structures Spread the information Be open with the mistakes and damages 30 30

26 Planning the Helsinki City Rail Loop, Experiences during Examples There s a lot of simulations 1. Air pressure, ventilation 2. Temperature 3. Smoke and fire propagation 4. Pedestrian 5. Emergency exit, evacuation 6. Rock mechanics 7. Ground water flow 8. Noise and vibration analysis 9. Electricity and train operation 10.(Later: lights, acoustics) State of art My understanding is that experts make their own models Architecture and engineer models support in identifying the cases and in further modeling 31 31

27 Planning the Helsinki City Rail Loop, Experiences during Examples 1. Work flows are working and they are revised when needed 2. IFC- and DWG-models are widely used 3. LandXML (Inframodel) format is used only in rail alignment 4. City of Helsinki use Microstation (dgn) successfully also with IFC and DWG 5. Don t use too large models or too large elements, because it is difficult to identify the hotspots (the right clashes) 6. Conversion of source data works fine usually but not in all cases 7. Communication within design groups as usual, collaboration server is not used 8. City of Helsinki has very strict policy with computer security, this causes delay but can be worked with 32 32

28 Contacts Finnish Transport Agency Project manager Jussi Lindberg PL HELSINKI tel City of Helsinki Project manager Jukka Tarkkala PL HELSINGIN KAUPUNKI tel Client BIM Group Project office: Mannerheimintie C, 2. floor 34 34

MY HOME IN A HOUSING BLOCK A GUIDE FOR RESIDENTS

MY HOME IN A HOUSING BLOCK A GUIDE FOR RESIDENTS MY HOME IN A HOUSING BLOCK A GUIDE FOR RESIDENTS -KESKUSTA One half of Finns live in housing blocks, which is a safe and comfortable way to live. Welcome a board! Buildings and the Finnish climate There

More information

InfraBIM Tiina Perttula 19.11.2013

InfraBIM Tiina Perttula 19.11.2013 InfraBIM Tiina Perttula 19.11.2013 The Finnish Transport Agency FTA Is a multidisciplinary expert organisation specialising in transport Responsible for the Finnish transport infrastructure and the overall

More information

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November 2013. Juha Hyvärinen, Senior Scientist

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November 2013. Juha Hyvärinen, Senior Scientist InfraFINBIM / buildingsmart Infra Seminar 19 November 2013 Inframodel 3 (4-5) Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 2 The Finnish Inframodel To improve information exchange

More information

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project Model based quality assurance process in a infra construction project Case Riippa-Eskola RU2 double rail project M. Jaakkola a and P. Toppi a a Destia Ltd, Development of Infra construction, Finland E-mail:

More information

How will the construction of the City Line affect you? English

How will the construction of the City Line affect you? English English How will the construction of the City Line affect you? How the City Line will affect people living, working or using public transport in Stockholm. The City Line will be noticed! The City Line

More information

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am

BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow

More information

Geometrisch Raakvlakkenbeheer op de Velsertunnel

Geometrisch Raakvlakkenbeheer op de Velsertunnel Geometrisch Raakvlakkenbeheer op de Velsertunnel 3 de Praktijkdag BIM Hasselt Johannes Anrijs - BESIX BESIX Group Biggest Belgian Contractor BESIX Group Why BIM? // BIM-department Why BIM? Increase EFFICIENCY

More information

BIM-based falling prevention planning

BIM-based falling prevention planning BIM-based falling prevention planning BIM Safety research project, Pilot 1 Kristiina Sulankivi & Markku Kiviniemi VTT Technical Research Centre of Finland 2 Guardrail components for Pilot 1 (modelling

More information

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED

More information

SOLUTIONS FROM VIANOVA SYSTEMS

SOLUTIONS FROM VIANOVA SYSTEMS NovapointDCM & QuadriDCM Sydhavna, Oslo - Statens vegvesen/vianova SOLUTIONS FROM VIANOVA SYSTEMS The transport infrastructure industry worldwide is restructuring to meet increasing demands for shorter

More information

CALL IN PROGRAMS, CATEGORIES, AND TERMS *

CALL IN PROGRAMS, CATEGORIES, AND TERMS * CALL IN PROGRAMS, CATEGORIES, AND TERMS * AUDIT DEPARTMENT 1. Internal Audit Services 2014 2018 AVIATION DEPARTMENT 2014 2018 1. Aeronautical, Environmental & Technical Services 2. Airport Capacity Planning

More information

Application Form Part A

Application Form Part A A1 Proposal TENtec nr. 2014-FI-TM-0142-M (26195427) MAP Call 2014 F01 Priority 1: (F01) Pre-identified projects on the Core Network corridors Railways Inland Waterways and Ports Roads Maritime Ports Priority

More information

Fire Risk in Metro Tunnels and Stations

Fire Risk in Metro Tunnels and Stations Fire Risk in Metro Tunnels and Stations Hyder Consulting Presented by: Dr. Leong Poon Ir. Richard Lau 2 Dec 2005 Metro Tunnels and Stations General Characteristics Limited to metropolitan area (hence the

More information

How To Develop A Landxml For A City Planning Project

How To Develop A Landxml For A City Planning Project buildingsmart and Infra FINBIM Nordic Workshop, Helsinki, 30.11.2011 Report Kalle Serén, Eurostep Oy 1.12.2011 buildingsmart / InfraFINBIM Nordic Workshop Participants from Nordic Countries + some other

More information

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL

More information

Built Environment Process Reengineering (PRE): Infra FINBIM

Built Environment Process Reengineering (PRE): Infra FINBIM RAKENNETTU YMPÄRISTÖ Tarvitaanko tätä palkkia? (PRE): Infra FINBIM buildingsmart and Infra FINBIM - Nordic Workshop in Helsinki November 30th 2011 30.11.2011 Built Built Environment Process Innovations

More information

A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects

A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects A Conceptual Methodology and Practical Guidelines for Managing Data and Documents on Hydroelectric Projects Alan Hodgkinson SoftXS GmbH Alpensrasse 14 CH-6300 Zug Switzerland Joseph J Kaelin Pöyry Infra

More information

Titelmasterformat durch Klicken bearbeiten

Titelmasterformat durch Klicken bearbeiten Titelmasterformat durch Klicken bearbeiten Stefan Trometer, CADFEM GmbH Exploring Urban Simulation Semantic 3D City Models 3D city model of Frankfurt Generated and hosted by virtualcitysystems CityGML

More information

Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.

Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors. R a i l V e h i c l e S y s t e m s P l a t f o r m S y s t e m s A p p l i c a t i o n s Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl

SAFETY AND ENVIRONMENTAL INFORMATION FOR EXTERNAL COMPANIES. Koehler Kehl 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after

More information

Three minutes about the City Line the commuter train tunnel that will make life easier and greener

Three minutes about the City Line the commuter train tunnel that will make life easier and greener Three minutes about the City Line the commuter train tunnel that will make life easier and greener English 1. GOOD FOR YOU Saving you time Delays and overcrowding on rail services are caused by the fact

More information

Helsinki, Finland. EPA Award 2011

Helsinki, Finland. EPA Award 2011 Stockmann Q-Park Helsinki, Finland EPA Award 2011 Category New projects City environment Stockmann Q-Park car park 2 has 600 spaces in three levels H serving shoppers, tourists, 6 leisure users, hotel

More information

What's New in Heavy Civil Construction Software. Chris Richardson HCC-6898

What's New in Heavy Civil Construction Software. Chris Richardson HCC-6898 What's New in Heavy Civil Construction Software Chris Richardson HCC-6898 Segment Initiatives Make it simple Easy to use Integrated with the Heavy Civil Construction portfolio Workflow improvements Provide

More information

Introduction: Scheduling of Energy Improvement Projects (Existing Buildings)

Introduction: Scheduling of Energy Improvement Projects (Existing Buildings) Introduction: Energy improvement projects are construction projects, and successful scheduling is part of any successful construction project. If you cannot stay on schedule, then the owner may be dissatisfied,

More information

Geospatially Enabling the World: The Convergence of Geospatial and Architectural and Engineering Design

Geospatially Enabling the World: The Convergence of Geospatial and Architectural and Engineering Design Geospatially Enabling the World: The Convergence of Geospatial and Architectural and Engineering Design Geoff Zeiss Director of Technology Autodesk Map Middle East Dubai 2007 1 Overview Geospatial inflection

More information

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sanglog Kwak, Jongbae Wang, Yunok Cho Korea Railroad Research Institute, Uiwnag City, Kyonggi-do, Korea Abstract: After the subway

More information

Autodesk Revit Architecture. Design without compromise.

Autodesk Revit Architecture. Design without compromise. Autodesk Revit Architecture Design without compromise. Definitive Design From conception to construction documentation, design projects within an intuitive environment. Building information modeling and

More information

Fire Safety Risk Assessment Checklist for Residential Care Premises

Fire Safety Risk Assessment Checklist for Residential Care Premises Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or

More information

1 st RESOLUTE Workshop Florence 15.12.2015

1 st RESOLUTE Workshop Florence 15.12.2015 1 st RESOLUTE Workshop 15.12.2015 Dr. Alexandros Deloukas, Attiko Metro S.A. Evangelos Karagkounis, Metro Operations Expert Athens Metro System Overview System Description, Practices and Interdependencies

More information

Flammable and combustible liquids. Licence guide. Guide for operators

Flammable and combustible liquids. Licence guide. Guide for operators Guide for operators About this guide This guide is for businesses that provide flammable and combustible liquids. It provides advice on licensing and fit-out guidelines for businesses. Table of Contents

More information

Model based construction and Model based quality assurance process Contractor s experiences

Model based construction and Model based quality assurance process Contractor s experiences Model based construction and Model based quality assurance process Contractor s experiences Pasi Nurminen Destia Ltd is a Finnish infrastructure and construction service company. Building the Bigger Picture

More information

BIM and Lean Construction Can BIM remove waste from construction processes?

BIM and Lean Construction Can BIM remove waste from construction processes? Tekla European BIM Forum 2014 BIM and Lean Construction Can BIM remove waste from construction processes? Assoc. Professor Rafael Sacks What is Lean Construction? Waste in construction? Lean and BIM Synergies

More information

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Olilo's AEC Design Services. SrinSoft Inc, Partners of Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,

More information

Design without compromise. Autodesk Revit. Architecture 2010

Design without compromise. Autodesk Revit. Architecture 2010 Design without compromise. Autodesk Revit Architecture 2010 BIM Simply a Better Way of Working Deliver projects faster, more economically, and with enhanced potential for reduced environmental impact.

More information

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM J. Schabacker, M. Bettelini, Ch. Rudin HBI Haerter AG Thunstrasse 9, P.O. Box, 3000 Bern, Switzerland

More information

The Royal London Hospital Our BIM approach for the new building

The Royal London Hospital Our BIM approach for the new building The Royal London Hospital Our BIM approach for the new building Existing Hospital North Tower Central Tower Stepney Way South Tower New Pathology & Pharmacy Site Progress: February 2007 INTRODUCTION When

More information

The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts

The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts The Impact of the new Directive 2014/33/EU and Standard EN81-20 on New Lifts Malta Lift Association Workshop Ing Ray Spiteri DMS, MBA (Brunel), B.Sc.. Mech Eng (Hons), EUR Ing, MIMechE, MASHRAE, MIAEE,

More information

Student Academic Achievement Committee (SAAC) Standardized Report Form

Student Academic Achievement Committee (SAAC) Standardized Report Form Student Academic Achievement Committee (SAAC) Standardized Report Form INTRODUCTION Program/Discipline Title: Construction Technology General Construction Concentration Degree Time Period: Fall term through

More information

Built Environment Process Reengineering (PRE)

Built Environment Process Reengineering (PRE) RAKENNETTU YMPÄRISTÖ Tarvitaanko tätä palkkia? Built Environment Process Reengineering (PRE) RYM SUMMIT 2013 Kimmo Laatunen, Infra FINBIM Built Environment Process Innovations Reengineering 3.12.2013 Built

More information

RoadBIM Seminar 11.09.2013 Tallinn

RoadBIM Seminar 11.09.2013 Tallinn RoadBIM Seminar 11.09.2013 Tallinn Ongoing Finnish InfraBIM Activities and the Finnish Inframodel Juha Hyvärinen, Senior Scientist VTT Technical Research Centre of Finland 3 Background Building Information

More information

Design without compromise. Autodesk Revit. Architecture

Design without compromise. Autodesk Revit. Architecture Design without compromise. Autodesk Revit Architecture Definitive Design From conception to construction documentation, design projects within an intuitive environment. Building information modeling and

More information

YOU THINK YOU MIGHT WANT TO STUDY:

YOU THINK YOU MIGHT WANT TO STUDY: YOU THINK YOU MIGHT WANT TO STUDY: Building Services & Renewable Energy Civil Engineering Architectural Technology Quantity Surveying Fire Safety Engineering Sustainable Construction Management 104 CIVIL

More information

New Business Models in Construction

New Business Models in Construction New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director

More information

Domain A: Creating AV Solutions Task 3: Evaluate site environment (acoustics, lighting, seating, finishing, etc.)

Domain A: Creating AV Solutions Task 3: Evaluate site environment (acoustics, lighting, seating, finishing, etc.) CTS Examination: Job Task Analysis A detailed job task analysis is available on the CTS Exam Resource page of InfoComm s website. Visit www.infocomm.org/cts Task 1: Conduct site survey Conversions (metric

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

Drop the B in BIM. Clay Hickling, GHD. Class Description

Drop the B in BIM. Clay Hickling, GHD. Class Description Class Description Don t let the B in BIM, ie the Building, limit your ideas on how to deliver non building related projects. Information Modelling (IM) covers more then just buildings. Large infrastructure

More information

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company

Proposed Residential Complex At Holding No. - 98, B.T. Road, Kolkata - 700090 Developer Premier Mica Mining And Manufacturing Company RISK MANAGEMENT PLAN is an integral part of a modernized and sophisticated residential complex. No efforts will be spared in identifying the all possible risks and disasters, evaluating them, installing

More information

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum Flexible strategy ON MOST schemes, the architectural design of a building is influenced by fire engineering strategy. This could be in the form of visual, physical elements such as fire doors, fire curtains,

More information

Crime Prevention through Environmental Design (CPTED) - Checklist

Crime Prevention through Environmental Design (CPTED) - Checklist Crime Prevention through Environmental Design (CPTED) - Checklist * Where relevant, each item is to be shown on the architectural plans. A description of how the development complies, together with the

More information

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Florian Aalami CEO ADAPT Corporation florian@adaptsoft.com What is BIM? The ability to model

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

Planning Information. Passenger and Freight Elevators.

Planning Information. Passenger and Freight Elevators. A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should

More information

Establishment of Fire Control Management System in Building Information Modeling Environment

Establishment of Fire Control Management System in Building Information Modeling Environment Establishment of Fire Control Management System in Building Information Modeling Environment Yan-Chyuan Shiau 1, Chong-Teng Chang 2 Department of Construction Management, Chung Hua University, 707, Wu-Fu

More information

RHEDA MRT The ballastless track for underground and surface commuter transit

RHEDA MRT The ballastless track for underground and surface commuter transit RHEDA MRT The ballastless track for underground and surface commuter transit 2 3 Cities on the move Living and working today confront people with increasing demands for mobility. Planners and engineers

More information

Put us to the test. Construction testing and building investigations services from BRE. www.bre.co.uk

Put us to the test. Construction testing and building investigations services from BRE. www.bre.co.uk Put us to the test Construction testing and building investigations services from BRE www.bre.co.uk Backed by an extraordinary range of facilities BRE prides itself on being able to answer virtually any

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information

Safety and Environmental Information for External Companies Koehler Oberkirch

Safety and Environmental Information for External Companies Koehler Oberkirch and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,

More information

3Dcities INDIA. www.3dcindia.com. Architecture and Engineering Outsourcing Company since 1999

3Dcities INDIA. www.3dcindia.com. Architecture and Engineering Outsourcing Company since 1999 3Dcities INDIA Architecture and Engineering Outsourcing Company since 1999 www.3dcindia.com We are an India based organisation provides a range of products and services linked to our core discipline of

More information

General Comparison between 4D Software

General Comparison between 4D Software General Comparison between 4D Software (Navisworks, Synchro professional, Vico control, itwo and Navigator) Comparison between 4D Software 4D BIM is the next generation of project management, including

More information

Working Relationship with Local Law Enforcement Authorities. Department of Safety and Security Scope of Authority. How to Report On-Campus Crime

Working Relationship with Local Law Enforcement Authorities. Department of Safety and Security Scope of Authority. How to Report On-Campus Crime Working Relationship with Local Law Enforcement Authorities The working relationship with local police departments is limited to the reporting of crimes and information sharing. The working relationship

More information

Eni Green Data Center - Specification

Eni Green Data Center - Specification Eni Green Data Center - Specification Green IT Adopting the principles of sustainable development is one of the key missions in the field of information technology today. 2% of the world s CO2 emissions

More information

OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School

OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School Fulton Trotter Architects Overview The Faith Lutheran College Secondary School is located in the suburb of Plainland one hour West

More information

MARULENG LOCAL MUNICIPALITY

MARULENG LOCAL MUNICIPALITY MARULENG LOCAL MUNICIPALITY Data Centre Physical Access and Environmental Control Policy Draft: Data Centre Access Control and Environmental Policy Page 1 Version Control Version Date Author(s) Details

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS Economic and Social Council Distr. GENERAL E Informal document No. 14 20 September 2002 ENGLISH ONLY ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Ad hoc Meeting of the Multidisciplinary

More information

ŠkodaOctavia Supplement - for vehicles with LPG drive

ŠkodaOctavia Supplement - for vehicles with LPG drive SIMPLY CLEVER ŠkodaOctavia Supplement - for vehicles with LPG drive 01/2011 Supplement - for vehicles with LPG drive (natural gas) 1 Supplement - for vehicles with LPG drive (natural gas) This supplement

More information

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0

COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0 COBIM v 1.0 Common BIM Requirements 2012 Series 3 Architectural design Series 3 Author Gravicon Oy Tomi Henttinen Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based

More information

Using Technology to Maximize Fire System Flexibility and Protection

Using Technology to Maximize Fire System Flexibility and Protection Everyday Use and Extraordinary Protection Using Technology to Maximize Fire System Flexibility and Protection Donald Boynowski Copyright Siemens Industry, Inc. 2014 Donald Boynowski, CET President - National

More information

COWI s Role in the Copenhagen Metro Project

COWI s Role in the Copenhagen Metro Project COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in

More information

FIRE SAFETY MANUAL. Table of contents can be found on the left side of this document.

FIRE SAFETY MANUAL. Table of contents can be found on the left side of this document. FIRE SAFETY MANUAL Table of contents can be found on the left side of this document. 1. INTRODUCTION The University of Regina strives to preserve life and property by recognizing that a prompt, efficient

More information

nr 28 nr 68 nr 4 nr 1

nr 28 nr 68 nr 4 nr 1 SEEB INTERNATIONAL BILL OF QUANTITIES AIRPORT ELECTRICAL WORKS NEW TERMINAL PIER ITEM ITEM DESCRIPTION UNIT QUANTITY BILL PART SECTION No. VOLUME 3 4 UNIT RATE (R.O.) (in words) (in figures) SECTION R:

More information

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Safety and Health Office WORKPLACE SAFETY CHECKLIST Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting

More information

EMERGENCY EVACUATION PLAN FOR LIFE AND FIRE SAFETY

EMERGENCY EVACUATION PLAN FOR LIFE AND FIRE SAFETY EMERGENCY EVACUATION PLAN FOR LIFE AND FIRE SAFETY By: Ashok Menon, A.D.F.E. (NFSC),G.I.Fire E (U.K.) & (I), A.M.Fire E(I) Director Directorate of Fire and Emergency Services, Government of Goa. The role

More information

The Integrated Design Process

The Integrated Design Process The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000

More information

Your responsibilities if you have an automatic fire alarm. A handy guide for owners and responsible persons

Your responsibilities if you have an automatic fire alarm. A handy guide for owners and responsible persons Your responsibilities if you have an automatic fire alarm A handy guide for owners and responsible persons Kent Fire and Rescue Service Contents Your responsibilities if you have an automatic fire alarm

More information

Product Overview. For a more detailed overview of the SafeTime system please view our video via our website: www.safe-time.co.uk

Product Overview. For a more detailed overview of the SafeTime system please view our video via our website: www.safe-time.co.uk Presentation for Product Overview The SafeTime inspection device has been designed with collaboration in mind, ensuring that everyone has access to the latest inspection information. This critical information

More information

Approved by the Representative Council on 27 Aug 2014

Approved by the Representative Council on 27 Aug 2014 approved by the Representative Council on 27 Aug 2014 Main objectives of HYY's housing policy: The main focus of the Finnish national student housing policy should be on the improving of the housing situation

More information

REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL CONTROL POLICY

REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL CONTROL POLICY LI_M_POPO PROVINCIAL GOVERNMENT :;:ED.JBl-C ()F SO"';-H AFR;IC. ':.,. DEPARTMENT OF CO-OPERATIVE GOVERNANCE, HUMAN SETTLEMENTS & TRADITIONAL AFFAIRS REVIEWED ICT DATA CENTRE PHYSICAL ACCESS AND ENVIROMENTAL

More information

ISO IEC 27002 2005 (17799 2005) INFORMATION SECURITY AUDIT TOOL

ISO IEC 27002 2005 (17799 2005) INFORMATION SECURITY AUDIT TOOL 9.1 USE SECURITY AREAS TO PROTECT FACILITIES 1 GOAL Do you use physical methods to prevent unauthorized access to your organization s information and premises? 2 GOAL Do you use physical methods to prevent

More information

Case Study. Cool and green: Citigroup s Frankfurt Data Center

Case Study. Cool and green: Citigroup s Frankfurt Data Center Zug, April 16, 2015 Cool and green: Citigroup s Frankfurt Data Center In Frankfurt, Siemens helps optimize Citigroup s data center. When it comes to building automation, security technology and power supply,

More information

A BIM Case Study: SELCEN Mimarlik

A BIM Case Study: SELCEN Mimarlik A BIM Case Study: SELCEN Mimarlik Final Submission 19 January 2012 Yekta Ipek 523101013 MBL607E::Building Information Models Instructor: Salih Ofluoglu Istanbul 2012 Building Information Models Final Submission

More information

Common InfraBIM requirements YIV2015

Common InfraBIM requirements YIV2015 Common InfraBIM requirements YIV2015 Vol 1.0 MANAGING MODEL BASED PROJECT Quality control Interaction and collaboration Supervision and coordination Infra modeling Coordination of disciplines Gathering

More information

Instructions for Public Transportation and Parking near Arena Center Venues

Instructions for Public Transportation and Parking near Arena Center Venues Instructions for Public Transportation and near Arena Center Venues Here are simple instructions for parking near the Arena Center venues and also instructions how to use public transportation near the

More information

Decree of the Ministry of the Environment. on fire safety of garages

Decree of the Ministry of the Environment. on fire safety of garages E4 THE NATIONAL BUILDING CODE OF FINLAND Fire safety of garages Guidelines 2005 Decree of the Ministry of the Environment on fire safety of garages Adopted in Helsinki, 22 March 2005 Pursuant to the Decision

More information

Integrated Solar Radiant Systems

Integrated Solar Radiant Systems Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant

More information

State of the road tunnel safety technology in Japan

State of the road tunnel safety technology in Japan State of the road tunnel safety technology in Japan H. Mashimo Public Works Research Institute, Independent Administrative Institution, Tsukuba, Japan ABSTRACT: As more and more tunnels have been constructed

More information

Maximum uptime and optimum fire safety for your data center

Maximum uptime and optimum fire safety for your data center Maximum uptime and optimum fire safety for your data center Integrated and tailored fire safety solutions from one partner Answers for infrastructure. Complete solutions for a safe data center with a single

More information

Maximum uptime and optimum fire safety for your data center

Maximum uptime and optimum fire safety for your data center Maximum uptime and optimum fire safety for your data center Integrated and tailored fire safety solutions from one partner Answers for infrastructure. Complete solutions for a safe data center with a single

More information

Federal Construction Capabilities Statement

Federal Construction Capabilities Statement SAN Business Consultants, a woman-owned small disadvantaged business certified 8(a), is a distinguished General Contractor for the US Government. SAN provides general contracting, renovation and construction,

More information

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by

More information

A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING

A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING A HYBRID GROUND DATA MODEL TO SUPPORT INTERACTION IN MECHANIZED TUNNELING F. HEGEMANN P. MANICKAM K. LEHNER M. KÖNIG D. HARTMANN Department of Civil and Environmental Engineering, Ruhr-University of Bochum,44780

More information

EVACUATION Fire / Explosion / Smell of Smoke / Gas Odor / Fire Alarm / Bomb Threat

EVACUATION Fire / Explosion / Smell of Smoke / Gas Odor / Fire Alarm / Bomb Threat Emergency Procedures Quick Reference Guide Faculty Edition EVACUATION Fire / Explosion / Smell of Smoke / Gas Odor / Fire Alarm / Bomb Threat LOCKDOWN Intruder / Weapon / Hostage /Active Shooter / Hostile

More information

Smart City Australia

Smart City Australia Smart City Australia Slaven Marusic Department of Electrical and Electronic Engineering The University of Melbourne, Australia ARC Research Network on Intelligent Sensors, Sensor Networks and Information

More information

Certified Instructors & Curriculum

Certified Instructors & Curriculum Our Promise. TPM is dedicated to provide the most extensive and high-quality training programs to help you maximize your investment. Although the investment in time and money may seem substantial, it will

More information

Authors and background System overview Case: The Kamppi Center Future research

Authors and background System overview Case: The Kamppi Center Future research Authors and background System overview Case: The Kamppi Center Future research Research background: Use of Line-of-Balance began in Finland in 1980s (HUT) Wide adoption in Finland by 1985 Now used by almost

More information

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency; Fire Action Plan FIRE ACTION PLAN SEStran aims to provide and maintain safe & healthy working conditions, equipment and systems of work for all our employees, and to provide such information, training

More information

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty

More information

CABLE TRENCH INSTALLATION GUIDE

CABLE TRENCH INSTALLATION GUIDE 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard

More information

Tekla Structures More than a detailing tool. Precast concrete

Tekla Structures More than a detailing tool. Precast concrete Tekla Structures More than a detailing tool Precast concrete Much more Than a detailing tool a Tekla Structures is much more than design and detailing software: it is the most accurate and comprehensive

More information

Information Sheet. What is a Workplace Transport Risk Assessment?

Information Sheet. What is a Workplace Transport Risk Assessment? Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,

More information