42U/45U 28" Wide Rack Installation & Service Guide



Similar documents
Express5800/120Ed. Rack Mount Kit Installation Procedures PN:

HP UPS R1500 Generation 3

Rack Installation. Unpacking the System. Choosing a Setup Location. General Server Precautions. Barracuda Appliances

AU-110 racking guide NBXPN: 023

DCF Optimized Rack System

Rack Installation Instructions

Installing Your 960 or 980 Server into a Rackmount Cabinet

ATS Overhead Table Shelf System INSTRUCTION MANUAL

EXPLORE 4-Leg Teaming Table with Screen Share Assembly Instructions

Rack installation instructions

Rack Installation Instructions

PS6500 Storage Arrays Rack Mount Instructions

UPLIFT Height Adjustable Standing Desk (T-Frame) DIRECTIONS FOR ASSEMBLY AND USE - - ALSO - - Watch our assembly video

How To Fit A Dll 2420 And 4220 Rack Enclosure

Cabinets 101: Configuring A Network Or Server Cabinet

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

HP R12000 and R18000 DirectFlow UPS User Guide

Installation Instructions For Slider Casement Air Conditioners

Spec Sheet. Cisco R42610 Rack CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, REV A.6 DECEMBER 9,

5800 Temperature Sensor Cable Assembly

INSTRUCTIONS: LocknCharge Laptop Carts

Unpacking, Installation, and Customization

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Installation Instructions

6 inch A-Arm Lift Kit WARNING: / installation instructions. will fit CLUB CAR DS. included:

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

GPS AutoSteer System Installation Manual

UPDATEUPDATEUPDATE. Converting the tower chassis to a rack-mount chassis. A - M To mount outer member to rack

FPU SYSTEMS OPERATION MANUAL BOH OFFICE MODULE (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH FPU Field Pack/up Units CHAPTER 5

HP SATA/SAS hard drive and Solid State Drive installation

Anthro Tablet Charging Cabinets

Secure your IT equipment with confidence... secure with NetClosure

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

WARNING! DO NOT ATTEMPT TO INSTALL THIS KIT IN A POWERED CONVEYOR.

5-Slot Housing and FrameSaver 9000 Series Access Carrier AC Power Supply Installation Instructions

Refer installation of power supplies to qualified service personnel.

SNQ-60x0-320 Series Data Center Switch. Quick Installation Guide

Installation Instructions

EasyNote TJ Series. Disassembly Manual

Data Center Rack Systems Key to Business-Critical Continuity. A White Paper from the Experts in Business-Critical Continuity TM

About the BitStorm 6051 POTS Splitter

MGB Chrome Bumper Conversion

DCF Optimized Rack System Selection Guide

Vision Engravers and Routers PRE-Installation Guide Vision Engraving & Routing Systems

Dell E Series Monitor VESA Mounting Bracket Installation Instructions

Wall-Mounting your HP computer. User Guide

Dimensions (HxDxW) Total Cabinet Area 89.96x x 24 in/ 2,285 x 1, x mm 95.47x 48 x 32 in/ 2,425 x 1,219.2 x 812.

HP 16/18-Port Cable Management Kit Installation Guide

HP Pavilion All-in-One MS200 series PC. Upgrading and Servicing Guide. Printed in

Oceanscience Cable Chimp II Cableway ROV System User Guide and Warranty

Hard Disk Drive (HDD)

GEK-90214B. GE Lift Truck. User s Guide 144D2933G1 144D2912G1 144D2911G5

Installation Instructions

Small form factor bay converter and hard drive installation

ECM-D70T / ECM-D70T1.5

430 Power/Electronics Replacement

100 - SERIES NETWORK SWITCHES QUICK START GUIDE

Expanding a 40-Type Cabinet

Installation. Smart-UPS VT MGE Galaxy Maintenance Bypass Panel kva 400 V

INSTALLATION MANUAL ELECTRIC RANGE. Please read these instructions thoroughly before installing and operating the range.

Installation Guide. Wyse D Class 4-GB RAM Upgrade Option Kit. Products: D90D7, D90DW. Issue: PN: L Rev. A

Vertical Display and Storage B SKOPE Gen2: Three Door Chiller

BODY-12, Door Handle - Removal, Installation, and Adjustment

OWNER S MANUAL Table Tennis Table Patent Pending

Dell P Series Monitor VESA Mounting Bracket Installation Instructions

INSTRUCTION BOOK FOR. Single Monitor Video Conference Cart

Liebert DCR Part of the SmartRow Offering. Installation Manual 3-6, Single/Redundant and 5-10 Racks Higher Capacity Cooling Units, 60Hz

DIRECTIONS FOR ASSEMBLING BASE & WALL CABINETS

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

SOHOline and SOHO Slimline The SOHOline and SOHO Slimline offer a modular, sturdy and compact design

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

Solstice/Sky Water Pump Replacement

Installation Instructions

Contractors Guide Central Inverter System Installation

Compaq Presario Desktop Products. Upgrading and Servicing Guide

Service Guide. Gateway M275

INSTRUCTION BOOK FOR. Dual Monitor Video Conferencing Cart

KEEP FOR FUTURE REFERENCE MRTALP VERTICAL LIFT BAR READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

TS93 EMR T/PT/TDE. Surface applied door closer

FUSION R400 RAID USB 3.0

Quick Setup Guide. Tandberg Data DPS1000 Series Model: DPS1100 and DPS1200, Release: 1.3

Static Clean International

To Purchase This Item, Visit BMI Gaming

Changing the SIM in a BANDIT Product s GSM Card

Rack Systems Solutions

Small Flat Panel Lift Arm FSA-1004 and KSA-1004

Assembly and Usage Instructions

HP Laser Jet 4200/4240/4250/4300/4350 Swing Plate

Roll-Up Door Maintenance Guide

TABLE OF CONTENTS CABINET SAFETY

Integral Kit Instructions

CETAC Z-Drive Assembly

SC 7000 and SC 9000XL Patient Monitors SC 9000XL Monitor 12in (30.5cm) Display Service Manual Supplement Two

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

MIRAGE. Set-Up Instructions.

LIEBERT VNSA Installation Sheet

Transcription:

42U/45U 28" Wide Rack Installation & Service Guide 96-00171-005 Rev B

Important Information Information in this document is subject to change without notice and does not represent a commitment on the part of DataDirect Networks, Inc. No part of this manual may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying and recording, for any purpose other than the purchaser s personal use without the written permission of DataDirect Networks, Inc. 2011 DataDirect Networks, Inc. All rights reserved. Document Number 96-00171-005 Rev B Jun 2011 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 2

Preface What is in this Guide This guide provides installation and maintenance information that is specific to the DataDirect Networks 42U/45U 28" wide racks. Who should use this Guide This guide should be used by service representative to install or repair the 42U/45U racks. Rack System Precautions Elevated Operating Ambient Temperature The rack design should take into consideration the maximum operating ambient temperature for the unit. If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient. Therefore, consideration should be given to installing the system in an environment compatible with the system s maximum rated ambient temperature. Reduced Air Flow Installation of the system in a rack should be such that the amount of air flow required for safe operation of the system is not compromised. Mechanical Loading Mounting of the system in the rack should be such that a hazardous condition does not occur due to uneven mechanical loading. The rack design should incorporate stabilizing features suitable to prevent the rack from tipping during installation. When loading a rack with the enclosures, fill the rack from the bottom up and empty from the top down. The rack design should incorporate stabilizing features suitable to prevent the rack from tipping or being pushed over in normal use. Circuit Overloading Consideration should be given to the connection of the system to the supply circuit and the effect that overloading of circuits might have on overcurrent protection and supply wiring. The rack should have a safe electrical distribution system. It must provide overcurrent protection for the unit and must not be overloaded by the total number of units installed in the rack. Consideration of the units nameplate rating should be used when addressing these concerns. Reliable Earthing Reliable earthing of rack-mounted systems should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuit (e.g. use of power distribution units). 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 3

Preface The electrical distribution system must provide a reliable earth for each unit and the rack. The design of the electrical distribution system must take into consideration the total earth leakage current from all the power supplies in all the units. The rack will require labeling with HIGH LEAKAGE CURRENT. Earth connection essential before connecting supply. Rack Relocation Observe the following precautions when you need to relocate your rack: Before you add or remove drawers, always lower the leveling feet and install the anti-tip plates, or have the rack bolted to the floor. Always install drawers at the bottom of the rack first. Always remove drawers from the top of the rack first. Always install the heaviest drawers on the bottom of the rack. Never push on the sides of the rack. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 4

Table of Contents 1 Installing the Rack..................................................................... 6 1.1 Site Pre-Installation Inspection................................................. 6 1.2 Shipment and Handling Verification............................................ 7 1.3 Unpacking..................................................................... 8 1.4 Positioning the Rack.......................................................... 14 1.4.1 42U Rack Service Clearance....................................................... 14 1.4.2 45U Rack Service Clearance....................................................... 15 1.4.3 Cable Management............................................................... 16 1.5 Leveling the Rack............................................................. 17 1.6 Joining Multiple Racks........................................................ 18 1.7 Attaching Anti-Tip Plates...................................................... 20 1.8 Powering On the Rack......................................................... 20 2 Power Distribution Units........................................................... 21 2.1 Types of PDU................................................................. 21 2.1.1 Field Replaceable Units........................................................... 21 3 Servicing the Racks.................................................................. 22 3.1 Product Specifications........................................................ 22 3.2 Replacing the PDU............................................................ 23 3.3 Replacing the Doors.......................................................... 25 3.4 Replacing the Side Panels..................................................... 26 3.5 Relocating a Rack............................................................. 28 4 Breaking Down the Crate........................................................... 29 Index.......................................................................................... 31 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 5

Installing the Rack 1 Installing the Rack This chapter contains the procedures for installing the rack and preparing it for operation. 1.1 Site Pre-Installation Inspection! Warning Given the weight and size of the rack, it is possible that the rack may tip over while moving. The rack must be removed from the shipping crate using a minimum of 2 people. The rack may not be tipped more than 10 degrees, either from a level surface or rolling down an incline (ramp). Before a rack can be installed, a site inspection needs to be done and questions need to be answered to assure a successful installation. Questions to answer: 1. Where will the crate be dropped off? 2. Are there obstacles in the way at drop off point, such as steps and slope, complicating rack removal from crate? 3. Can the rack be wheeled to destination without obstacles such as low door hangs and low building components? 4. Is a sufficient power source installed and appropriate for customers desired configuration? 5. Are temperature, BTU cooling, and humidity of the room appropriate? 6. Are the floor tiles rated properly to hold the rack weight? If any of these questions are not fully addressed, precautionary measures might be needed at time of product deployment to create a successful installation. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 6

Installing the Rack 1.2 Shipment and Handling Verification 1. Verify that the information on the shipping label is correct (Figure 1). This should be the same as your sales order. Figure 1. Shipping Label Sales Order Number System Configuration 2. Visually inspect the crate for signs of external damage. If you detect any problems, please report it to Customer Service. 3. There are two tilt monitors attached to the left and front of the crate to indicate if the crate has been tipped over in transit (Figure 2). Verify that the arrow window on both monitors are clear. If not, report the problem to Customer Service. Figure 2. Tilt Monitors Tilt Monitor This Window Must be Clear 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 7

Installing the Rack 1.3 Unpacking CAUTION! When transporting the crate, insert forklift from the two sides of crate only (Figure 3). To prevent the pallet jack from breaking the crate base, only insert forklift 3/4 way in (Figure 4). Figure 3. Using Forklift on Crate Insert Forklift from Side of Crate Only Figure 4. Inserting Forklift Insert Forklift 3/4 Way In Only 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 8

Installing the Rack NOTE : Make sure you have enough space in front of the crate. The crate door will be used as a ramp for rolling out the rack. Tools Required: Cutter/scissors 3/4" Wrench 3/16" Allen wrench 1. Cut the center fastening strip as shown in Figure 5. Do NOT cut the other two strips. Figure 5. Opening the Shipping Crate DO NOT CUT Cut Center Strip Only 2. Engage the two ramp supports on front panel pull the pin out, turn the swivel leg up and release pin to lock (Figure 6). Figure 6. Engage Ramp Supports Engage Ramp Supports 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 9

Installing the Rack 3. Remove the 2 metal cleat locks near top of panel (Figure 7). Figure 7. Remove Metal Cleat Locks Remove Cleat Locks 4. Disengage the two link locks at top on both sides lift up the flap and turn counter-clockwise. Then flip open the top panel (Figure 8). Figure 8. Disengage Link Locks and Open Top Panel Flip Open Top Panel Disengage Lock 5. Lift and pull out the front panel (Figure 9). Lay the panel on the floor and align the holes in ramp top with bolts on base. Figure 9. Set Front Panel as Ramp Pull Out Front Panel Align Holes with Bolts 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 10

Installing the Rack 6. Remove the ramp extension panel from left side of crate (Figure 10). Place the extension at end of ramp, making sure the two velcro fasteners are secured. Figure 10. Set Up Ramp Extension Fasten Velcro Ramp Extension Panel 7. Remove the 2 metal cleat locks from rear panel (Figure 11). Remove and set panel aside. Figure 11. Remove Metal Cleat Locks Remove Metal Cleat Locks 8. Verify that the 4 leveling feet at the bottom corners of rack are raised to the maximum height so they will not scratch the floor when the rack is moved (Figure 12). Use the wrench to adjust if necessary. Figure 12. Leveling Foot Position Leveling Foot 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 11

Installing the Rack 9. Remove the 2 foam pads at front (Figure 13). Figure 13. Remove Foam Pads Foam Pad 10. With the help of your partner, push the rack out from the rear side while the other person steer the rack down the ramp from front (Figure 14). 11. Once the rack is rolled onto the floor, remove the plastic cover. Then reassemble the crate. Figure 14. Pushing Out the Rack Push Out from Rear Steer Down from Front 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 12

Installing the Rack 12. Remove the stiffener panels that are attached to the rack for shipment (Figure 15). Figure 15. Remove Stiffener Panels Remove Panels 13. Verify that the locks on the side panels are engaged (Figure 16). CAUTION! The side panels can potentially be a hazard when they become unlatched. It is highly recommended that you lock the side panels if they are installed. Figure 16. Locks on Side Panels Panel Lock 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 13

Installing the Rack 1.4 Positioning the Rack 1.4.1 42U Rack Service Clearance For 42U racks populated with 16-bay enclosures, the recommended service clearances are given in Table 1 (Figure 17). Table 1. 42U Rack Service Clearance Location Front Rear Side Height Above top of rack Clearance 48" (1219.2 mm) when using 16-bay enclosures a 36" (914.4 mm) None 84" (2133.6 mm) 36" (914.4 mm) b a. Extra clearance is needed to faciliate the movement of mechanical lift when replacing the top enclosures. Please refer to your mechanical lift specifications for ground clearance information. b. Use of hard hat is recommended when servicing the top enclosures in low-ceiling environments. NOTE : The service clearance is only one of the factors used to determine floor layout. Cooling is another major factor that must be considered for your specific site/facility. Figure 17. 42U Rack Service Clearance 36" (914.4 mm) 36" (914.4 mm) 48" (1219.2 mm) 84" (2133.6 mm) Front of Rack 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 14

Installing the Rack 1.4.2 45U Rack Service Clearance For 45U racks populated with 48-bay or 60-bay enclosures, the recommended service clearances are given in Table 2 (Figure 18). Table 2. 45U Rack Service Clearance Location Clearance Front Rear Side Height Above top of rack 54" (1371.6 mm) when using 48-bay or 60-bay enclosures a 36" (914.4 mm) None 89" (2260.6 mm) 36" (914.4 mm) b a. Extra clearance is needed to faciliate the movement of mechanical lift when replacing the top enclosures. Please refer to your mechanical lift specifications for ground clearance information. b. Use of hard hat is recommended when servicing the top enclosures in low-ceiling environments. NOTE : The service clearance is only one of the factors used to determine floor layout. Cooling is another major factor that must be considered for your specific site/facility. Figure 18. 45U Rack Service Clearance 36" (914.4 mm) 36" (914.4 mm) 54" (1371.6 mm) 89" (2260.6 mm) Front of Rack 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 15

Installing the Rack 1.4.3 Cable Management There are cut-out holes, approximately 3.0" (76.2 mm) in diameter, on the top panel for passing cables into the rack from above (Figure 19). Figure 19. Top View of Rack Cable Cut-Out Hole Approx. 3.0" (76.2 mm) Diameter If you plan to pass the cables into the rack from underneath the floor, the recommended cut-out is 6" 6" in the rear of the tile on which the rack is positioned. Figure 20 illustrates the location for the cut-out. Figure 21 shows the location of the castors at the bottom of rack. Figure 20. Location of Cable Cut-Out in Floor 9" Rear of Rack 24" x 24" Tile 6" x 6" Cut-Out at Rear Center of Tile 9" Figure 21. Location of Castors (Viewed from Top of Rack) Castor 1.44" (36.58mm) Front of Rack 18" (457.20mm) 12" (304.80mm) 2.44" (61.98mm) 2.37" (60.20mm) 3.37" (85.60mm) 2.44" (61.98mm) 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 16

Installing the Rack 1.5 Leveling the Rack NOTE : If you are joining multiple racks, skip this section and proceed to Section 1.6. Tools Required: 3/4" Wrench Level Once the rack is placed at the desired location, it must be properly leveled. There are four leveling feet at the corners of the rack, next to the wheels. 1. Rotate each leveling foot by hand with a quick spinning wheel motion to lower the foot (Figure 22). Note: A slow rotation or pulling down of the foot does not engage the thread. Figure 22. Leveling Foot on Rack 2. Keep turning the leveling foot down by hand until it touches the floor (Figure 23). Then use the wrench to adjust and tighten the leveling nut until the wheel next to the leveling foot is completely off the floor. Figure 23. Leveling the Rack 3. Repeat Steps 1 and 2 above for the other 3 leveling feet. 4. Checking with a level, adjust the leveling nuts as needed until the rack is level. NOTE : All caster wheels must be completely off the floor so only the leveling feet are supporting the rack. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 17

Installing the Rack 1.6 Joining Multiple Racks Follow these steps to join two or more racks together side-by-side. Parts List: 11-00154-016 Bolt, 1/4-20 1.0", HEX, PSZ, RoHS [Qty 4] 13-R0039-001 Washer, ID.315, OD.74, THK.06, PSZ, RoHS [Qty 8] 12-R0019-001 Nut, Wing, 1/4-20, HEX, PSZ, RoHS [Qty 4] Tools Required: 7/16" socket wrench or 7/16" open-end wrench #2 Phillips screwdriver Step-ladder Procedure: 1. Remove the two inside (sides to be joined) side panels from racks disengage the locks, then release the latches and pull the panel out and up (Figure 24). Store the side panels for future use if desired. 2. On both racks, push out the 8 hole covers in each corner of the exterior frame (Figure 24). Figure 24. Removing the Side Panels and Hole Covers Pop Out Cover Remove Panels 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 18

Installing the Rack 3. Using the screwdriver, remove the filler panel on bottom of rack (Figure 25). Figure 25. Remove Filler Panel Filler Panel Removed 4. Align the racks side by side with frames touching. 5. Stand on the step-ladder. Remove all four screws from each top screen (Figure 26). Then slide the screens back for easier access to holes at top front. Figure 26. Slide Back Top Screen Slide Screen Back Remove Screws at 4 Corners of Screen 6. Insert one washer on each bolt. 7. Insert each bolt with washer through both racks, from the inside of one rack out and into the adjacent rack. 8. Then secure each bolt with one washer and wing nut. Tighten until snug using the 7/16" wrench. 9. Replace the top screens and screws. 10. Replace the filler panels at bottom of racks. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 19

Installing the Rack 1.7 Attaching Anti-Tip Plates CAUTION! Anti-tip plates must be firmly attached to the bottom of the rack to prevent the rack from tipping over when the drawers are pulled out of the rack. Tools Required: 7/16" wrench Each kit includes 3 anti-tip plates and 6 bolts. The three plates are to be attached to the bottom sides and front of the rack. For joined-rack configuration, plates will be attached to the sides of the two end units and front of each rack. 1. Place the short anti-tip plate at bottom front of rack, aligning the holes (Figure 27). Using the 7/16" wrench, attach 2 bolts to fasten plate to rack. Figure 27. Attaching Anti-Tip Plates to Bottom of Rack Attach Bolt Here Attach Bolt Here 2. Similarly, attach the two long plates to the bottom sides of rack. For joined-rack configuration, attach the long plates to the sides of the two end units. 1.8 Powering On the Rack 1. Make sure you have performed all the grounding checks. 2. Verify that your ac power source is ready. 3. Plug in all the enclosure power cords to the PDUs. 4. Connect the power cord of each PDU to your ac power outlets. 5. Turn on all switches on each PDU and verify that the 2 power LEDs on each PDU are on. 6. Follow the power on procedures for your enclosures. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 20

2 Power Distribution Units This chapter provides information on the power distribution unit (PDU) used with the racks. 2.1 Types of PDU Power is distributed to the disk enclosures and controllers in the rack by the PDUs. The PDUs must be installed in pairs. There are 8 PDUs installed in the 45U rack and 4 PDUs installed in the 42U rack. Two types of PDU are supported: IEC 309 plug type has 8 IEC 320-C13, 200-240V receptacles and 2 power switches (Figure 28) Figure 28. IEC 309 PDU 30A, 250V Plug 20A Circuit Breaker with Rocket Switch NEMA L6-30P plug type has 8 IEC 320-C13, 200-240V receptacles and 2 power switches (Figure 29) Figure 29. NEMA L6-30P PDU 30A, 250V Plug 20A Circuit Breaker with Rocket Switch 2.1.1 Field Replaceable Units These PDU are field replaceable. The part numbers are: PDU-30A-USA-R PDU-30A-EUR-R 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 21

3 Servicing the Racks This chapter provides information on product specifications and how to replace the PDUs and doors on the racks. 3.1 Product Specifications 42U Wide Rack Specifications Height: 84" (2133.6 mm) Depth: With front and rear doors installed Less front and rear doors 44" (1117.6 mm) 42" (1066.8 mm) Width: With side panels installed 28" (711.2 mm) Weight: Empty rack 380 lbs (172.73 kg) Max. weight with ten 16-bay enclosures and controller couplet 1216 lbs (552.73kg) Max. weight with ten 16-bay enclosures only Max. weight with five 48-bay enclosures and controller couplet Max. weight with five 48-bay enclosures only 1108 lbs (503.64 kg) 1305 lbs (593.18 kg) 1197 lbs (544.09 kg) 45U Wide Rack Specifications Height: 89" (2260.6 mm) Depth: With front and rear doors installed Less front and rear doors 44" (1117.6 mm) 42" (1066.8 mm) Width: With side panels installed 28" (711.2 mm) Weight: Empty rack 610 lbs (277.27 kg) Max. weight with ten 48-bay enclosures and controller couplet 2418 lbs (1099.09 kg) Max. weight with ten 48-bay enclosures only Max. weight with ten 60-bay enclosures and controller couplet Max. weight with ten 60-bay enclosures only 2310 lbs (1050.0 kg) 3090 lbs (1403.67 kg) 3010 lbs (1367.27 kg) 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 22

Servicing the Racks 3.2 Replacing the PDU Tools Required: 7/16" wrench 3/8" wrench #2 Phillips screwdriver There are 4 PDUs installed in the 42U rack, two on each side attached to a mounting rail. There are 8 PDUs installed in the 45U rack, four on each side attached to two mounting rails. A PDU can be replaced in the field if it is found to be defective. Follow these steps to replace a PDU: 1. For 45U rack, pull all the enclosures out about 8" at the front. 2. Turn off all power switches on the defective PDU and unplug it from the ac power source. 3. Determine which power supply modules must be turned off to service the defective PDU. Then turn off those modules and unplug their power cords from the defective PDU. 4. Using the 7/16" wrench, remove the top, middle, and bottom bolts from the PDU mounting rail (Figure 30). Be careful to support the mounting rail after you have removed the bolts. Figure 30. Remove Bolts from PDU Mounting Rail Remove Top, Middle, and Bottom Bolts 45U 42U 5. Flip over the mounting rail. Using the 3/8" wrench and #2 Phillips screwdriver, remove the 2 screws and nuts to detach the defective PDU from mounting rail (Figure 31). Figure 31. Remove Screws and Nuts from PDU Remove Top and Bottom Screws 6. Attach the replacement PDU to the mounting rail using the 2 screws and nuts. 7. Attach the mounting rail to rack using the 3 bolts. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 23

Servicing the Racks 8. Connect the power supply modules power cords to the replacement PDU. 9. Connect the replacement PDU to your ac power outlet. 10. Turn on all switches on the PDU and verify that the 2 power LEDs are on. 11. Turn on the power supply modules. 12. For 45U rack, push in all the enclosures. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 24

Servicing the Racks 3.3 Replacing the Doors To remove a door: 1. Make sure the lock is disengaged. Press the lock button to release the door handle (Figure 32). Turn handle to open door. Figure 32. Door Handle Door Handle 2. Lift up to take the door off from the hinges (Figure 33). Figure 33. Door Hinge Lift Up Door to Disengage To install a door: Hold the door close to rack, aligning the top and bottom hinges (Figure 34). Then place the hinges on door over hinge pins. Make sure both hinges are completely engaged. Figure 34. Front Door Top Hinge Align Hinges 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 25

Servicing the Racks 3.4 Replacing the Side Panels To remove a side panel: 1. Make sure the lock is disengaged. 2. Press to release the two latches simultaneously (Figure 35). 3. Then pull the panel out and up. Figure 35. Removing a Side Panel Latch Lock Latch 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 26

Servicing the Racks To install a side panel: 1. Hold the panel at an angle and slide it onto the bottom edge of opening (Figure 36). Make sure the lip of the panel is fully inserted. 2. Push the panel towards the rack until the two latches are engaged. CAUTION! The side panels can potentially be a hazard when they become unlatched. It is highly recommended that you lock the side panels if they are installed. Figure 36. Installing a Side Panel Bottom of Panel Must Latch on Edge of Opening Lip 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 27

Servicing the Racks 3.5 Relocating a Rack CAUTION! Removing components from the upper positions in the rack cabinet improves rack stability during relocation. If needed, reduce the weight of the rack cabinet by removing equipment starting at the top of the rack cabinet. After the rack has been relocated, restore the rack cabinet to its original configuration. Follow these steps whenever you relocate a populated rack cabinet within a room or building. 1. Turn off all power to the rack and the system that is installed. 2. Disconnect all PDU power cords from the wall outlets and secure the power cords inside the rack. 3. Make sure that all anti-tip plates are installed. 4. Ensure that the heaviest devices are installed in the bottom of the rack cabinet. 5. Ensure that there are no empty U-levels between devices installed in the rack cabinet below the 25U level. 6. Remove all anti-tip plates. 7. If the rack cabinet you are relocating is part of a suite of rack cabinets, detach the rack cabinet from the suite. 8. Ensure that all devices, shelves, drawers, doors, and cables are secure. 9. Ensure that the four leveling feet are raised to their highest position. 10. Inspect the route that you plan to take when moving the rack to eliminate potential hazards: - Note: Do not use a ramp inclined at more than 10 degrees. - Verify that the route that you choose can support the weight of the loaded rack cabinet. Refer to Section 3.1 on page 22 for the weight of a loaded rack cabinet. - Verify that all door openings are bigger than the rack. Refer to Section 3.1 on page 22 for the dimensions of rack cabinet. 11. With the help of your partner, carefully roll the rack to the new location. If a long distance relocation is required, restore the rack cabinet to the configuration as you received it. Pack the rack cabinet in the original packaging material, or equivalent. Once the rack cabinet is in the new location, do the following: 1. Lower the four leveling feet. 2. Level the rack. 3. Attach the anti-tip plates to the rack cabinet. 4. If previously removed, replace all the drawers and devices to their original rack location. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 28

4 Breaking Down the Crate This chapter provides information on how to break down the crate for disposal. 1. Disengage the two link locks at the top of crate (Figure 37). Figure 37. Disengage the Two Link Locks Disengage Locks 2. Remove the front and rear panels. 3. Carefully cut the fastening strips at 4 places on both sides as shown in Figure 38 (total 8 cuts). Figure 38. Cut the Fastening Strips 4. Lift and remove the top panel. CAUTION! Side panels will fall freely. 5. Lift and pull the remaining panels off the pallet base. 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 29

Breaking Down the Crate 6. Dispose of loose pieces top panel, front panel, rear panel, two side panels, base, ramp extension, and two foam inserts (Figure 39). Figure 39. Crate Panels Rear Panel Top Panel Side Panel Side Panel Front Panel Base Foam Insert Ramp Extension 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 30

Index A anti-tip plate, attach 20 B break down, crate 29 C cable, passing into rack 16 clearance, service 42U 14 45U 15 crate, breakdown 29 D disposal, crate 29 door, replace 25 I installation 6 site inspection 6 J join rack 18 L level rack 17 P panel, replace 26 PDU part numbers 21 replace 23 types of 21 power on rack 20 product specifications 42U 22 45U 22 R rack joining 18 power on 20 relocate 28 relocate a rack 28 S service clearance 42U 14 45U 15 specifications, product 42U 22 45U 22 T tilt monitor 7 U unpack rack 8 96-00171-005 Rev B DataDirect Networks 42U/45U 28" Wide Rack Installation & Service Guide 31

9351 Deering Avenue, Chatsworth, CA 91311 www.ddn.com, 1.800.TERABYTE 2011 DataDirect Networks, Inc. All rights reserved. DataDirect Network, the DataDirect Networks logo, Silicon Storage Architecture, S2A, xstreamscaler, and D-MAID are trademarks of DataDirect Networks. All other trademarks are the property of their respective owners.