Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: amacetti@gmail.com



Similar documents
RETE METROPOLITANA - UNDERGROUND NETWORK

Slab Track Austria. System ÖBB-PORR elastically supported slab

TELECONTROLLO MADE IN ITALY: A STEP FORWARD FOR A BETTER LIFE SUSTAINABLE SOLUTIONS FOR SMART COMMUNITIES

RHEDA MRT The ballastless track for underground and surface commuter transit

LVT System for. AlpTransit Gotthard AG

ig4rt Italian Group for Railway and Road Traffic Technology

ARCHITETTO ANDREA FERRARO

COWI s Role in the Copenhagen Metro Project

The rail engineering service provider. Consulting, planning, project management

Use of GPS systems with people count sensors for transport planning studies

URBAN INFRASTRUCTURE METRO

LOMBARDIA STAR CLASS MILAN, 2 nd -4 th OCTOBER 2009 ANNOUNCEMENT

Selection of a Railway Track System by Best Value Analysis

DESIGN STANDARDS STRAY CURRENT MANAGEMENT


Embedded Rail Slab Track


HOW to REACH LIUC. Arriving at Malpensa you will need to take the Malpensa Express train (from the arrivals hall take the escalator one floor down).

Shortlist of projects. References viaducts, bridges and infrastructures

LIGHT RAIL ON RING 3 NOVEMBER 19 TH Supplier Workshop. Islevbro station (Rødov

Company Profile.

Tunnelling & Underground. Specialists

Contents. Please check further information about how to reach University or your accommodation site on SPS web page. HAVE A NICE TRAVEL!

References on railways infrastructures

Ordinance on Railway Infrastructure. General provisions. Article 1

HOW TO REACH POLITECNICO DI MILANO DEPARTMENT OF MECHANICAL ENGINEERING

PRACTICAL INFORMATION GUIDE

1. Senior / Executive Project Engineer (Civil)

A new approach to rail asset management.

References on tube and transport analysis

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Sample project reference for escalator & moving walkway

Line 2 and Av. Faucett Av. Gambetta branch line concession of the Lima and Callao Basic Metro Network

KMG PROJE ENGINEERING CONSULTING INFORMATION TECHNOLOGIES LTD. CO.

HEAVY DUTY CROSSINGS TRANSIT CROSSINGS DRIP TRACK TANK CAR SPILL CONTAINMENT VEHICLE INSPECTION PITS CONVEYOR/UNLOADING PITS

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

AW : th FEB SS 2015 : nd SEPT 2014

Grandi Stazioni Retail. A unique investment opportunity in the Italian travel retail sector

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Hanson Building Products. precast basement solutions

LBD DISCONNECTING UNITS

ITREVISAN s.r.l Portogruaro (VE) - Via S. Giacomo, Tel / Fax info@trevisan-srl.it 1. THE ORIGINS ( )

THE CASE OF USING A VEHICLE-TRACK INTERACTION PARAMETERS AND IMPACT TEST TO MONITOR OF THE TRAMWAY

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

REGISTERED OFFICE AND HEADQUARTER Via Melchiorre Gioia, Milano Tel: r.a. Fax:

ASCE APM05 Special Sessions on PRT. Infrastructure Cost Comparisons for PRT and APM

Alignment design for Citybanan in Stockholm

company profile via Ma co n L e c c o - t e l f a x t h l c@tecn o h a b i t a t.

BUSINOVA A multi-hybrid bus for an energy efficient bus fleet and reduced air and noise pollution

Track and Track Drainage Renewals Programme

Maintenance and Management of JR East Civil Engineering Structures

Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.

EMPLOYMENT NOTICE No. :CMRL/HR/01/2012

GOVERNMENT COLLEGE UNIVERSITY FAISALABAD BACHELORS DEGREE PROGRAM IN CIVIL ENGINEERING TECHNOLOGY SCHEME OF STUDIES SEMESTER-1 Sr# Course Code Subject

THE ARRIVAL OF THE HIGH SPEED RAILWAY LINE IN REGGIO EMILIA:

DBA Group Srl Telecommunication & IT Infrastructures Power & Energy

Safe & Sound Bridge Terminology

UNIVERSITÀ DEGLI STUDI DI BERGAMO

Railway Development in Ethiopia

Università degli Studi di Verona WELCOME GUIDE ERASMUS. Staff Training Week

Company Presentation

STRUCTURAL HEALTH MONITORING AT ROME UNDERGROUND, ROMA, ITALY

RED RIVER DIVERSION FARGO MOORHEAD METRO FLOOD RISK MANAGEMENT PROJECT, FEASIBILITY STUDY, PHASE 4

Rail Contractors Liability Insurance

WORK SCOPE. Domains in which we work:

Virginia Approach Spans

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Bus Stop. schema:latitude. schema:longitude. geosparql:hasgeometry. geo:lat. geom:geometry. geo:long. dul:place, transit:station, naptan:station

3.1 Historical Considerations

PRO. English COMPLETE PRECAST PLANT

Guidelines for the Application of Asset Management in Railway Infrastructure Organisations

MILAN MALPENSA AIRPORT-BERGAMO

BNAM 2008 BERGEN BYBANE NOISE REDUCTION BY TRACK DESIGN. Reykjavik, august Arild Brekke, Brekke & Strand akustikk as, Norway

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

WELCOME TO UNIVERSITY OF BERGAMO

Civil Engineering Design

ÚBUDA IRODA BARÁZDA CENTER. Barázda Street th District, Budapest, Hungary. Topographical Lot Number: 3990/2

XXIII AINI Congress Italian Association of Neuroimmunology Milan (Italy) August 22 nd, 2013

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Altitude Profile. Altitude (m) 108. Distance (km)

Transcription:

Macetti Ing. Alessandro Via Marconi 12H 24050 Palosco (BG) Tel: 035-846843 E-mail: amacetti@gmail.com

INTRODUCTION Studio Macetti Macetti engineering firm provides engineering services in the field of metro, tram and railway superstructure systems. The range of activities provided covers technical designing, executive managing, operating on-site engineering. Our technicians ten-year experience and the continuous updating to the ever-changing market, enable our team to develop the best solutions both technically and financially. Studio Macetti can provide an effective support to Main Clients, Dealers and General Contractors which are in charge of designing and realizing a new metro, tram and railway superstructure, and furthermore we can provide support to new constructions, reopenings and restorations.

DESIGNING SUPPORT Studio Macetti provides engineering support to designing of railway, metro and tram superstructures, focusing on the choice of the typology of superstructure, basing on design, construction and maintenance constraints. Technological constraints Environmental constraints (noise vibration urban context) Budgetary and financial targets Maintenance Verification matrix Superstructure typology

DESIGN Studio Macetti self-manages Preliminary, Final and Construction Design of the superstructure of railways, tramways and metro systems, following the latest regulations, for new projects as well as for the renewal of former lines, providing also on-purpose maintenance plans. Track Horizontal alignment Detailed Horizontal alignment Elevation profile Detail typical sections Layout of track equipment Superstructure details Fastener details Rails Welding Glued insulation and mechanical joints Analysis of continuous welded rail Surface finishing Technical specifications Materials specifications Supply specifications Bill of quantities Calculation report and analysis Method of statement Special provisions Maintenance

CONSTRUCTION SUPPORT Studio Macetti provides support in terms of Technical Management to the building company for the realization of railway, tramway and metro superstructures. Our engineers expertise guarantees the company on obtaining satisfaction and maximization of the productivity required by the work program, promptly facing any issue that can arise during on-site works. Technical management Define technical specifications of the supply Assistance to materials purchasing Assistance to materials acceptance testing Management of Work program Resources quantification Work progress accounting Surveying activities Quality control (materials and laying) Construction design and As-built Technical supervision on site On site construction management Bari Collegamento Aeroporto Topografia in Base Assoluta Milano Metropolitana M5 Lilla Garibaldi fs - San Siro

CONSULTING Studio Macetti provides its Clients with consulting services concerning rail-metro-tram superstructures. Contracting Contract analysis and assessment Bill of quantities Works accounting Costs appraisal Price analysis Tender procedures Drawing of tender documents Financial analysis Project managing Project control managing and planning Precast products such as p.s.c. sleepers (mono-bi block), slabs, bridges Cost analysis for the implementation of production plants Production costs Raw materials analysis (availability and costs) Layout of plants Claim procedures

RAIL WORKS RECORD CLIENT PROJECT DESCRIPTION MILAN METRO Line 5: GARIBALDI FS SAN SIRO section Railway connection between Palese Bari airport and Bari city center Extension of city metrosystem from Hospital and Cecilia area Extension of MILAN METRO line 1 SESTO FS CINISELLO/MONZA section ACC Rome Hub Drawing and completion of Construction Design of the superstructure of Milan Metro Line 5 Garibaldi FS San Siro section. First automated metro line in Milan, double 7m-lenght track, 10 stations, Milano modificato and Milano Massivo track systems. Definition of topographic network and absolute cohordinates survey of superstructure. Railway line on traditional ballasted track, 8 km length double track, 2 stations. Design of superstructure system for C50/170/0,12 communication with 3.800mm middle axis, laid on floating massive superstructure with concrete sleepers embedded in concrete bed. Design and Technical assistance during construction of superstructure for the extension of MILAN METRO line 1 Sesto FS Cinisello Monza section, 4 km length, 2 stations, trackwork typology: «Milano Modificato» and «Milano Modificato Flottante». Superstructure Final Design for tendering.

RAIL WORKS RECORD CLIENT PROJECT DESCRIPTION Railway connection MILAN PASSANTE superstructure 2nd Lot Bologna-Verona railway line Crevalcore-Nogara section Completion of the new Affori Railway Station Railway connection from Bari airport and Bari City center, combined with Bar Milan Passante railway connection removal of turnouts and setting of a suitable fitting new track. The track (5.000 m) runs entirely in tunnel and was designed and realized with a superstructure with concrete sleepers embedded in a concrete cast for the reduction of noise and vibration to the surrounding buildings. Use of different typologies of turnouts and communications in line with related kind of superstructure. Track on traditional ballasted superstructure. The track (110 km) runs entirely on embankment. Design and realisation of noise barriers made of concrete and clay, extended for 13.000 sqm. Design and construction of Affori Railway station - Ferrovienord Milano, included civil works, plants and traditional ballasted superstructure (1500 m). The superstructure has been designed and realized on traditional ballasted system. The track (30.8 km) runs on cut, tunnel and embankment. In order to reduce vibration, in special areas has been laid under-ballast antivibrational mat. Design and realisation of removal works of two turnouts in order to renew the proper track at Dateo Station Milano Passante. Railway line Verona Brennero Galleria SCILIAR Design and realisation of removal works of two turnouts in order to renew the proper track into SCILIAR Brennero tunnel

METRO WORKS RECORD CLIENT PROJECT CARACHTERISTICS Milan Metro Line 2 Famagosta-Assago section Milan Metro Line 2 Famagosta- Abbiategrasso Line Linea 3 Metropolitana di Milano Tratta Zara - Maciachini nea 3 Metropolitana di lano Tratta Maciachini- Comasina Genoa Metro - De Ferrari and Brignole stations tana Università h (ARABIA AUDITA) s Noura Bint aman University Superstructure on ballasted milano modificato system. Track (10 km) runs partially in tunnels and partially on city ground surface. Realisation of superstructure with Milano Massivo e Milano Modificato systems. The track (3,5 km) runs entirely in tunnel with many turnouts and communication, including a hub with 4 turnouts and a junction. Milano Massivo superstructure has been realised to dampem noise and vibration at most. It is the first section of underground realized with this system. The track (2,5 km) runs entirely in tunnel. Milano Massivo superstructure has been realised in order to dampen noise and vibration and to reduce maintenance at most. The track (7,4 km) runs entirely in tunnel. In order to solve some problems related to the vehicle envelope, the height of the system has been reduced The track (2,7 km) runs in tunnel and has been realised with metro superstructure typology on precast concrete slabs laid on elastomeric mat for dampening noise and vibrations. Technical and production support to the construction of innovative ballastless superstructure. On site activities: Realisation of Design for the main contractor, Training of technical and production workers from main contractor, Material orders specifications and quality control procedures, Supply of technical and production managers and skilled workers, Surveying activities management, Work program and materials supply management. The track (27,6 km) runs on viaduct, except depot.

TRAM WORKS RECORD CLIENT PROJECT DESCRIPTION MILAN North-South Metro-tramway Metro-tramway Milano Cinisello Balsamoo Tramway Bergamo Albino Metro-tramway Testi Bicocca Precotto nodo ca granda Ospedale maggiore Superstructure using nabla fasteners, on cast-in-situ p.s.c. slab. The track (4,0 km) runs on city surface ground. In some specific areas special solutions has been carried out for noise and vibration dampening. Superstructure using nabla fasteners, on cast-in-situ p.s.c. slab and p.s.c. sleepers. The track (8,7 km) runs on city surface ground. Superstructure (24 km) laid mostly on ballast, in some section a special mat has been laid to dampen noise and vibration. A track in depot is included also. At crossings with carriageways, an innovative and totally precast system has been designed and realised on purpose. The depot has also been designed and realised for stabling and maintenance of vehicles. Superstructure using nabla fasteners, on cast-in-situ p.s.c. slab and p.s.c. sleepers. The track (2,2 km) runs entirely on city surface ground.

PICTURE REPORT Princess Noura Bint Abdulrahaman University RIYADH - FREYSSINET Linea Metropolitana Milano: Famagosta Abbiategrasso METROPOLITANA MILANESE

PICTURE REPORT Nuova Stazione di Affori FERROVIE NORD Passante di Milano METROPOLITANA MILANESE 9

PICTURE REPORT Metrotranvia delle Valli Linea -TEB Metrotranvia delle Valli Deposito -TEB